Loading...
HomeMy WebLinkAboutPACKET Transportation Advisory Board 2021-7-21 Transportation Advisory Board Agenda Current Members: Belle Morris (03/31/23) July 21, 2021 Lawrence Gamble (03/31/23) Gordon Slack (03/31/24) 12:00 PM – 2:00 PM Vacant (03/31/24) Tom Street (03/31/22) Ann Finley (03/31/23) Linda Hanick (03/31/22) VIRTUAL – Zoom Scott Moulton (03/31/22) Vacant (03/31/24) The Transportation Advisory Board will participate in the meeting remotely due to the Declaration of Emergency signed by Town Administrator Machalek on March 19, 2020 related to COVID-19 and provided for with the adoption of Ordinance 04-20 on March 18, 2020 Options for the Public to Participate Remotely and Provide Public Input: 1. By Electronic Mail: Members of the public may provide public comment or comment on a specific agenda item by sending an email to publicworks@estes.org. The email must be received by 5:00 p.m., Tuesday, July 20, 2021. All emails will be provided to the Transportation Advisory Board and incorporated into the minutes. 2. By Telephone Message: Members of the public may provide public comment or comment on a specific agenda item by calling (970) 577-3587. The calls must be received by 5:00 p.m., Tuesday, July 20, 2021. All call-in information will be provided to the Transportation Advisory Board and incorporated into the minutes. 3. No public attendance at this meeting. PUBLIC PARTICIPATION DURING MEETING Options for participation in the meeting will be available by call-in telephone option or online via Zoom Webinar which will be moderated by the Transportation Advisory Board Chairperson. CALL-IN (TELEPHONE OPTION): Dial public participation phone number, Toll Free 833-548-0276 Enter the Meeting ID for the July 21, 2021 meeting 913 1736 3744 followed by the pound sign (#). The meeting will be available beginning at 11:50 a.m. the day of the meeting. Please call into the meeting prior to 12:00 p.m., if possible. Request to Speak: For public comment, the Chairperson will ask attendees to indicate if they would like to speak – phone participants will need to press *9 to “raise hand”. The Chairperson will be moderating the Zoom session to ensure all participants have an opportunity to address the Transportation Advisory Board. Once you are announced by phone please state your name and address for the record. PUBLIC PARTICIPATION (ONLINE): Individuals who wish to address the Board via virtual public participation can do so through Zoom Webinar at https//zoom.us/w/91317363744 – Zoom Webinar ID: 913 1736 3744. Individuals participating in the Zoom session should also watch the meeting through that site, and not via the website, due to the streaming delay and possible audio interference. Start Time: The Zoom Webinar will be available beginning at 11:50 a.m. on the day of the meeting. Participants wanting to ensure their equipment setup is working should join prior to the start of the meeting at 12:00 p.m. Request to Speak: For public comments, the Chairperson will ask attendees to click the “Raise Hand” button to indicate you would like to speak at that time. The Chairperson will moderate the Zoom session to ensure all participants have an opportunity to address the Transportation Advisory Board. • You will experience a short delay prior to re-connecting with the ability to speak. • State your name and address for the record. In order to participate, you must: • Have an internet-enabled smartphone, laptop or computer. o Using earphones with a microphone will greatly improve your audio experience. • Join the Zoom Webinar. o The link can be found above. • Click “Participate Virtually in the Transportation Advisory Board Meeting”. • DO NOT watch/stream the meeting via the website at the same time due to delays and possible feedback issues. Documents to Share: If individuals wish to present a document to the Transportation Advisory Board, material must be emailed by Tuesday July 20, 2021 by 12:00 p.m. to the Public Works Office at publicworks@estes.org. AGENDA NEXT PAGE AGENDA Transportation Advisory Board Wednesday, July 21, 2021 12:00 p.m. 12:00 – 12:05 Public Comment Chair Belle Morris 12:05 – 12:10 Approval of June Minutes Chair Belle Morris 12:10 – 12:55 Downtown Estes Loop 95% Plans Public Works Director Greg Muhonen 12:55 – 1:15 Graves Ave. 30% Design Documents Pavement Mgr. Ryan Barr Engineering Mgr. David Hook 1:15 – 1:30 Bylaw Template & Policy 102 Discussion Chair Belle Morris 1:30 – 1:40 Parking & Transit Updates Parking & Transit Mgr. Vanessa Solesbee The Car Park GM, Matt Eisenberg 1:40 – 1:50 Engineering Updates Engineering Mgr. David Hook 1:50 – 2:00 Project /Administration Updates Public Works Director Greg Muhonen Adjourn Carlie Bangs, Town Board Trustee Liaison Greg Muhonen, Estes Park Public Works Staff Liaison Town of Estes Park, Larimer County, Colorado, June 16, 2021 Minutes of a Regular meeting of the Transportation Advisory Board of the Town of Estes Park, Larimer County, Colorado. Meeting held virtually on the 16th day of June 2021. Committee: Belle Morris, Tom Street, Ann Finley, Larry Gamble, Linda Hanick, Scott Moulton, Gordon Slack Attending: Belle Morris, Tom Street, Ann Finley, Larry Gamble, Linda Hanick, Scott Moulton, Gordon Slack, Public Works Director Greg Muhonen, Engineering Mgr. David Hook, Parking & Transit Mgr. Vanessa Solesbee, The Car Park Matt Eisenberg, Rocky Mountain National Park John Hannon, Pedi-Cab Business Owner Ryan Hale, Town Board Trustee Carlie Bangs Absent: Chair Morris called the meeting to order at 12:05 p.m. PUBLIC COMMENT No electronic submissions of public comment were received prior to the deadline and no public was in attendance. APPROVAL OF MINUTES A motion was made and seconded (Slack/Gamble) to approve the May meeting minutes with edits and all were in favor. PEDI-CAB IN ESTES PARK (Ryan Hale, Pedicab Business Owner) Chair Morris introduced Ryan Hale, owner of the local pedicab business. Hale’s participation and discussion today is intended to introduce members to another transportation mode as part of a multimodal discussion and share its successes and challenges. Hale shared that he owns Hale Pedicab. He stated that when he previously worked as a Community Service Officer (CSO), he saw someone walking from the parking structure to Performance Park at the opposite end of downtown. He concluded that short- distance transportation services would be helpful to many individuals. The pedicab business runs on zero emissions, using only leg power and serves the Estes Park downtown area. Additionally, pedicabs are made in Broomfield, Colorado. The original individuals operating Hale’s Pedicab now both have employment that is not conducive to continuing the performance of short-distance travel services. The pedicab, when operating is now provided as a public service, with rides being free and tips being welcomed. Hale invested $6K in the pedicabs. While it is now more of a hobby, Hale would love to see 2 dozen pedicabs downtown. He was able to earn back his investment in the first year of pedicab service. Member Hanick asked if people have the ability to call and request a ride. Hales stated that those seeking a ride can contact 970-215-4030 to make their request. At this time there is no existing website or Facebook page, however business cards are available and much of his service is generated based on word-of-mouth. Member Gamble extended his appreciation for Hale’s time in presenting to the TAB. He then asked Hale what demand he feels is accurate and how many pedicabs would be required to meet the demand. How many to meet the demand. Ryan - May – Oct service. Explained the business thoughts behind the plan, but hard to determine business potential. Member Slack recommended Hale attend the upcoming Bike To Work day to visit with other participants. Transportation Advisory Board – June 16, 2021 – Page 2 BYLAW TEMPLATE & POLICY 102 DISCUSSION (Director Greg Muhonen) The TAB has been working on bylaw updates for well over a year and have spearheaded much change. Muhonen shared that the recommended changes by TAB carried through to other advisory boards. The Code of Conduct and Job Description triggered broader discussion. Eventually the discussion resulted in a new template, with the Code of Conduct and Job Description being added to Policy 102 which is applicable to all Town advisory boards. Relating to process, the bylaws currently identify that if any revisions are made, 20 days must be allowed for review and comment. Muhonen asked the TAB to review the information, to be sent after the meeting, and be ready to discuss and vote at July meeting. Muhonen reminded the TAB that staff have limited discretion on changing the bylaws. COMPLETE STREETS POLICY DISCUSSION (Chair Belle Morris) Referencing last month’s discussion, a street hierarchy needs determined. Morris requested Director Muhonen guide the discussion. Muhonen stated the thought process behind the suggestion for added discussion spun from a couple things. The first being the Safe Routes to School Task Force evaluated the pedestrian facilities within one mile of the school, and had many findings. Although it is not reasonable to add sidewalks to every street in Town, the policy doesn’t clarify. It needs determined the types of transportation modes on defined types of streets. The determination basically comes down to the average daily traffic in a given location. There are a variety of modes that the policy does not address, making the policy not accommodating, but restrictive. Morris agrees that based on the Task Force’s street survey, the improvements and desired upgrades would be very expensive and time consuming. The Task force identified a type of ranking and hierarchy during the walking audits which may be a good starting point. Member Gamble agreed and stated that the definition of a street, within the policy, is a bit broad and concurred with Muhonen that a hierarchy should be well-defined. Member Slack has understood that the current policy is working well, although only used a couple times. Muhonen stated the importance of defining this is due to the communications and comments that have been made indicating the policy is not being satisfied. TAB can attack this proactively and provide suggestions to staff or when staff is ready to implement new street standards, get involved at that time, either perform proactively or reactively. Slack further stated that Graves Avenue is a high-traffic street both for pedestrians and vehicles and suggested leaving it to Public Works to make the decisions on how to implement the projects. Morris stated that, for the Graves Avenue Improvements, the presentation only provided 3 options and the fact that there were no bike lanes was startling. The modifications to the designs were still not acceptable. Manager Hook offered his thoughts, stating that there had not been many applications of the policy. Although the policy was not created perfectly, these early applications have brought improvement opportunities to light and has initiated conversation. Work on the Complete Streets Policy will continue without great urgency. Morris agrees this is not a TAB top priority and recommended reviewing the policy again in December. Gamble stated that, based on feedback from Greg and knowing that the Complete Streets checklist has been used, there aren’t many modifications needed. PARKING & TRANSIT UPDATES (Parking & Transit Mgr. Vanessa Solesbee, The Car Park Mgr. Matt Eisenberg) Parking: Eisenberg shared information about the paid parking program launch, improvements, and successes. Key Performance Indicator (KPI) Dashboard is now available on the Town’s website. Transportation Advisory Board – June 16, 2021 – Page 3 Identified areas for improvement: The signs are too high, are hard to read, and it is difficult to scan the QR codes. Feedback has also been received stating that the signs are confusing. Compliance: The Car Park has not seen the level of compliance expected. There are 25-40% of vehicles that are not paying or are not displaying the proper permit. Although improved signage may help, there is also a need for increased enforcement. Estes Parking App: Individuals that own the newer iOS Apple phones are having difficulty with the app. The Car Park is working with their vendor to correct the issues. Public Outreach – The Car Park and Town parking staff continue to communicate with individuals around town. Eisenberg has been walking into businesses to ask how everything is going. Additional steps are forthcoming. Eisenberg then listed the successes with this year’s program: • Since May 28 the free lots are up 48% in occupancy • When viewing the peripheral lots it is showing occupancy in the parking structure is up nearly 50% • The average revenue is at $5,614 per day which is good, but an increase is expected beginning in July • Mobile Payment Adoption is at 49%. Eisenberg shared that when working in Boise, Idaho the adoption was only at 20-30%. Solesbee stated that the Parking & Transit Division is also tracking all comments received from residents and visitors and qualitative perspectives to share with the Town Board. Member Slack stated that he has witnessed, when driving through the lots, that there are actually open parking spaces, specifically in the Town Hall lot which hasn’t been seen in the past. This is a good sign and has achieved the desired result. Solesbee stated she’s received this feedback as well. Member Hanick also feels the program is a success. She added that the only real problem is the Public Relations part of it, identifying that the signage definitely needs work. She reminded the TAB that the average reading is at a 4th grade level. Hanick also stated that the signs do not contain enough information, adding that they need hours of required pay and the charge. Managers Solesbee and Eisenberg are working toward solutions for signage improvement. Vice Chair Street has seen individuals lined up at the payment kiosks, adding some people don’t know they can use their phone to pay until they get to the kiosk. Street is still hoping the congestion lessens as was anticipating being one of the points of paid parking. Eisenberg suggested that once the wayfinding signage is installed, it may help this situation. Muhonen will be working to establish traffic counts and has hired a traffic counting company to perform these measures. Once completed, Muhonen will perform a comparative analysis of past years. Transit: Solesbee shared that on July 3 there will be a ribbon-cutting for new trolley and the launch of Bustang services. Solesbee invited all to attend. Public Works would like to pursue FTA funding 5311 operating dollars. The Town is eligible and the Town’s Grant Specialist Christy Crosser will help complete and submit the grant application. The additional funding totals $360K with no required match. ENGINEERING UPDATES (Engineering Mgr. David Hook) Manager Hook provided project updates since the last meeting. Parking Wayfinding: Phase 1 destination signage installation is complete. The Phase 2 directional signage is scheduled to begin with installation next week. This phase includes the street name Transportation Advisory Board – June 16, 2021 – Page 4 signs being installed that are located on mast arms, with the color and formatting of the other recently installed signage. Graves Avenue Improvements: A Virtual Open House was held since the May TAB meeting with 2 weeks allotted to provide input. There were also 2 different in-person open houses resulting in excellent turnout. The North side improvements received the highest ranks and the design concept is moving forward. The options presented have been merged resulting in the following plan: Extend the existing 5’ sidewalk on the North side; slim down travel lanes; maintain parking on both the North and South side. Install 10’ trail on the South side. This work will be done using a phased approach as the budget for this project has been far exceeded with the suggested changes. The next opportunity for a Safe Routes to School (SRTS) grant would provide for improvement not captured in the initial phase, as well as provide for trail improvements along Community Drive for trail connectivity. PROJECT / ADMINISTRATION UPDATES (Public Works Director Greg Muhonen) Muhonen shared that advisory boards have been released to meet in-person after the first Town Board meeting is held in-person, potentially occurring in July but may not be until August. There is a funding shortfall for the Community Dr./US 36 Roundabout. There is however a Federal Invest in America grant opportunity for $850K. Additionally there is an opportunity for a Revitalizing Main Street Large Project Grant with a cap of $2M per agency. An application has been made for $1.7M to aid in the funding of this project. Muhonen provided the TAB with an update on the 2022 Strategic Plan and 2022 Budget. A special study session was held on Monday to go through the proposed 1-year objectives. Once the information is received by Public Works, the information will be distributed to the TAB, allowing an opportunity to provide feedback to the Town Board prior to the July deadline. OTHER BUSINESS (Chair, Belle Morris) There being no further business, Chair Morris adjourned the meeting at 2:13 p.m. Megan Van Hoozer, Recording Secretary 2’ CURB & GUTTER 6’ PARKING LANE 10’ SIDEWALK 5’ SIDEWALK 2’ CURB & GUTTER 10’ TRAVEL LANE 9’ TRAVEL LANE NOT TO SCALE GRAVES AVENUE SAFE ROUTES TO SCHOOL MOUNTABLE CURB PROJECT CONTROL BASIS OF BEARING: CONSIDERING THE NORTH LINE OF LOT 21 OF REPLAT OF LOTS 11 THROUGH 16 OF EAST MULBERRY SUBDIVISION, COUNTY OF LARIMER, STATE OF COLORADO TO BEAR S60° 53' 22”E BETWEEN THE NORTHWEST CORNER, BEING MARKED BY A NO.4 REBAR WITH YELLOW PLASTIC CAP STAMPED LS 38318, AND THE NORTHEAST CORNER, BEING MARKED BY A NO.4 REBAR WITH YELLOW PLASTIC CAP STAMPED LS 38318, BASED UPON G.P.S. OBSERVATIONS AND THE CITY OF FORT COLLINS GROUNDMASTER COORDINATE SYSTEM, WITH ALL BEARINGS CONTAINED HEREIN RELATIVE THERETO. PROJECT DATUM: NAVD88 ELEVATION: 4942.21 FT BENCHMARK R-402 VERT ORDER - FIRST CLASS II MARKER:DB=BENCHMARK DISK SETTING: 41=SET IN A LARGE STRUCTURE WITH FOUNDATIONS ON BEDROCK STAMPING: R 402 1984 STABILITY: A=MOST RELIABLE AND EXPECTED TO HOLD STABILITY: POSITION/ELEVATION WELL HISTORY - 1984 MONUMENTED NGS STATION DESCRIPTION DESCRIBED BY NATIONAL GEODETIC SURVEY 1984 IN FORT COLLINS, AT THE JUNCTION OF 9TH STREET AND LINCOLN AVENUE, IN THE EAST EDGE OF THE CONCRETE FOOTING FOR HIGHLINE TOWER NUMBER 29, 47.8 METERS (156.8 FT) NORTH OF THE CENTERLINE OF THE AVENUE, 22.3 METERS (73.2 FT) WEST OF THE CENTERLINE OF THE STREET, AND 0.2 METERS (0.7 FT) WEST OF THE EAST EDGE OF THE FOOTING. NOTE - THE FOOTING IS 96-INCHES IN DIAMETER, 26-1/2 FEET DEEP AND SET INTO 9 FEET OF BEDROCK PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 -2.84'LARIMER COUNTY DRAWING REVIEW REVIEWED BY: LARIMER COUNTY ENGINEERING DATE THE LARIMER COUNTY REVIEW CONSTITUTES COMPLIANCE WITH THESE STANDARDS. REVIEW BY THE COUNTY DOES NOT CONSTITUTE APPROVAL OF THE PLAN DESIGN. THIS REVIEW DOES NOT CONSTITUTE REVIEW/APPROVAL OF ANY PRIVATE ON-SITE IMPROVEMENTS WHICH MAY BE SHOWN. THESE PLANS ARE INTENDED TO BE FOR COUNTY REVIEW OF PUBLIC IMPROVEMENTS ADJACENT TO THE PROPERTY. CONSTRUCTION OF ON-SITE PRIVATE IMPROVEMENTS CANNOT COMMENCE UNTIL ALL REQUIRED TRAFFIC WORSHEET OR STUDY(S), FINAL DEVELOPMENT PLAN(S), SPECIAL REVIEW(S), AND BUILDING PERMIT(S) ARE COMPLETE, APPROVED AND ON FILE WITH LARIMER COUNTY. LARIMER COUNTY INDEMNIFICATION STATEMENT THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF DOES HEREBY AFFIRM RESPONSIBILITY TO THE COUNTY, AS A BENEFICIARY OF SAID ENGINEER'S WORK, FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESE PLANS BY THE LARIMER COUNTY ENGINEERING DEPARTMENT SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE PLANS OF ANY SUCH RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY LARIMER COUNTY, AND ITS OFFICERS AND EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN THE PLANS. PROFESSIONAL ENGINEER CERTIFICATION THESE CONSTRUCTION PLANS FOR ALLEN SERVICES PLUMBING & HEATING WERE PREPARED BY ME (OR UNDER MY DIRECT SUPERVISION) IN ACCORDANCE WITH THE REQUIREMENTS OF THE ROAD STANDARDS AND THE STORMWATER DESIGN STANDARDS FOR LARIMER COUNTY." ENGINEER'S NAME: JOHN E. TUFTE, PE COMPANY: SANDERSON STEWART MONTH, DAY, YEAR VICINITY MAP PREPARED FOR: TOWN OF ESTES PARK - PUBLIC WORKS DEPARTMENT ESTES PARK, CO. 80517 P.O. BOX 1200 ESTES PARK, COLORADO SIDEWALK IMPROVEMENTS GRAVES AVENUE SAFE ROUTES TO SCHOOL PHASE 1 SITE PROJECT NO: NORTH 425 West Mulberry Street, Ste 201 Fort Collins, Colorado 80521 970.797.2504 sandersonstewart.com NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. CDOT 23027 30% REVIEW - NOT FOR CONSTRUCTION CO M M U N I T Y D R . S T . V R A I N A V E . BRODIE AVE. GRAVES AVE. SHEET TITLE C1.1 COVER SHEET C1.2 LEGENDS AND ABBREVIATIONS C2.1 GRAVES AVENUE EXISTING CONDITIONS AND DEMOLITION PLAN C2.2 BRODIE AVENUE EXISTING CONDITIONS AND DEMOLITION PLAN C3.1 GRAVES AVENUE SITE PLAN C3.2 BRODIE AVENUE SITE PLAN C4.1 GRADING PLAN C5.1 PLAN & PROFILE-GRAVES AVENUE NORTH SIDEWALK C5.2 PLAN & PROFILE-BRODIE AVENUE SIDEWALK C6.1 DETAILS C6.2 DETAILS C6.3 DETAILS C7.1 CROSS SECTIONS-GRAVES AVENUE NORTH SIDEWALK SITE CONTACTS OWNER TOWN OF ESTES PARK, PUBLIC WORKS DEPARTMENT, ATTN: RYAN BARR, 970-577-3575 CIVIL ENGINEER/SURVEYOR/ SANDERSON STEWART LANDSCAPE ARCHITECT 425 WEST MULBERRY STREET, STE. 201 FORT COLLINS, CO 80521 970-893-1688 WATER TOWN OF ESTES PARK WATER DIVISION, CHRIS ESHELMAN, 970-577-3630 SANITARY SEWER ESTES PARK SANITATION DISTRICT, JIM DUELL, 970-586-2866 UPPER THOMPSON SANITATION DISTRICT, MATT ALLEN, 970-586-4544 ELECTRIC TOWN OF ESTES PARK POWER & COMMUNICATIONS DIVISION, TYLER BOLES, 970-577-3607 FIBER TRAILBLAZER BROADBAND, JOE LOCKHART, 970-577-3613 TELECOM CENTURYLINK, JUSTIN WALLACE, 970-381-8449 TDS, JASON PATRICK, 970-539-0592 GAS XCEL ENERGY, JODY HUTCHINSON, 970-225-7834 P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ C O V E R . d w g , C O V E R , 7 / 1 3 / 2 0 2 1 9 : 5 8 : 0 6 A M , V G e n t r y , 1 : 1 30 % R E V I E W - N O T F O R C O N S T R U C T I O N FI L E : PR O J E C T N O : CA D : QU A L I T Y A S S U R A N C E : DR A W I N G H I S T O R Y DA T E D E S C R I P T I O N PH A S E 1 LE G E N D S A N D A B B R E V I A T I O N S GR A V E S A V E N U E S A F E R O U T E S T O S C H O O L SI D E W A L K I M P R O V E M E N T S ES T E S P A R K , C O L O R A D O C1.2 KP C 20 2 3 1 _ C O V E R . D W G VJ G 07 / 0 5 / 2 0 2 1 30 % D E S I G N P L A N S E T ------ ------ - - CD O T 2 3 0 2 7 EW = FINISHED GRADE AT EDGE OF WALK TC = FINISHED GRADE AT TOP BACK OF CURB BC = FINISHED GRADE AT BUILDING CORNER TW = FINISHED GRADE AT TOP OF WALL AC = FINISHED GRADE AT ASPHALT EA = FINISHED GRADE AT EDGE OF ASPHALT EC = FINISHED GRADE AT EDGE OF CONCRETE SDI = STORM DRAIN INLET SDMH = STORM DRAIN MANHOLE FL = FINISHED GRADE AT FLOWLINE FG = FINISHED GRADE EX = APPROXIMATE EXISTING ELEVATION POC = POINT ON CURVE WTR = WATER PI = POINT OF INTERSECTION PRC = POINT OF REVERSE CURVE RT = RIGHT LT = LEFT SS = SANITARY SEWER PT = POINT OF TANGENCY SD = STORM DRAIN GV = GATE VALVE BFV = BUTTERFLY VALVE RED = REDUCER LF = LINEAL FOOT FT = FEET SSMH = SANITARY SEWER MANHOLE BVC = BEGIN VERTICAL CURVE CS = CURB STOP EVC = END VERTICAL CURVE PVI = POINT OF VERTICAL INTERSECTION ABBREVIATIONS SYMBOLS KEYNOTE CALL OUT (SEE KEYNOTE LEGEND) SRVC = SERVICE (TYP.) = TYPICAL PC = POINT OF CURVATURE NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. GR = EXISTING GRADE AT GROUND BRK = GRADE BREAK HP = HIGH POINT CURB CUT ELECTRIC BOX SANITARY MANHOLE MAILBOX VALVE BOX HANDICAP RAMP FENCE GATE FOUND MONUMENT AS DESCRIBED ELECTRIC TRANSFORMER WATER MANHOLE GAS MARKER POWER POLE WOOD POST T-POST STEEL POST TELEPHONE PEDESTAL WATER SHUTOFF VALVE SIGN DECIDUOUS TREE CONIFEROUS TREE WATER VALVE ELECTRIC VAULT FIBER OPTIC VAULT CONTROL POINT LANDSCAPE ROCK FIRE HYDRANT GUY WIRE LINETYPES STORM DRAIN CONTOUR CURB AND GUTTER EDGE OF ASPHALT EDGE OF GRAVEL PROPOSED DEMO AREA PROPOSED ASPHALT PROPOSED CONCRETE PROPOSED GRAVEL EDGE OF ASPHALT OVERHEAD ELECTRIC LINE ELECTRIC LOCATE FENCE CHAIN LINK FENCE FIBER OPTIC LOCATE FLOW LINE GAS LOCATE EDGE OF GRAVEL PIPE SANITARY LINE WATER LOCATE EASEMENT LINE MAJOR CONTOUR MINOR CONTOUR RIGHT OF WAY LINE EXISTING P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ C O V E R . d w g , L E G E N D S , 7 / 1 3 / 2 0 2 1 9 : 5 8 : 0 9 A M , V G e n t r y , 1 : 1 30 % R E V I E W - N O T F O R C O N S T R U C T I O N NORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. FI L E : PR O J E C T N O : CA D : QU A L I T Y A S S U R A N C E : DR A W I N G H I S T O R Y DA T E D E S C R I P T I O N PH A S E 1 GR A V E S A V E N U E E X I S T I N G C O N D I T I O N S A N D D E M O L I T I O N P L A N GR A V E S A V E N U E S A F E R O U T E S T O S C H O O L SI D E W A L K I M P R O V E M E N T S ES T E S P A R K , C O L O R A D O C2.1 KP C 20 2 3 1 _ E X I S T I N G _ P R O D . D W G VJ G 07 / 0 5 / 2 0 2 1 30 % D E S I G N P L A N S E T ------ ------ - - CD O T 2 3 0 2 7 0 30 SCALE: 1" = 30' 601530 NORTH SIDE GRAVES AVENUE SIDEWALK EXTENSION NORTH SIDE GRAVES AVENUE SIDEWALK EXTENSION HORIZONTAL DATUM: MODIFIED NAD83/2011 COLORADO STATE PLANE COORDINATE SYSTEM NORTH ZONE SCALE FACTOR 1.000401381 (0.99959878) VERTICAL DATUM: NGS VERTICAL BENCHMARK COLLINSON ELEVATION = 7497.80 (NAVD88 VERTICAL DATUM) NOTES: 1.UNDERGROUND UTILITY LOCATES PROVIDED BY KINETIC ENERGY SERVICES, LLC 2.THIS IS NOT A LAND SURVEY PLAT OR IMPROVEMENT SURVEY PLAT. ALL LOT LINES, RIGHTS OF WAY AND EASEMENT LINES ARE TO BE CONSIDERED APPROXIMATE. 3.ALL CONTROL SHOWN SHALL BE VERIFIED BY THE CONTRACTOR BEFORE ANY CONSTRUCTION OR OTHER IMPROVEMENTS. DEMOLITION QUANTITIES: 1.STRIPING A.1084 LF DOUBLE YELLOW CENTERLINE STRIPING B.1795 LF WHITE SHOULDER STRIPING C.70 LF WHITE TURN LANE STRIPING D.35 LF WHITE STOP BAR E.2 EA LANE DIRECTION MARKERS 2.CONCRETE - 138 SF 3.ASPHALT - 374 SY 4.ASPHALT SAWCUT - 600 LF P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ E X I S T I N G _ P R O D . d w g , C 2 . 1 G R A V E S E X I S T I N G , 7 / 1 3 / 2 0 2 1 9 : 5 8 : 2 8 A M , V G e n t r y , 1 : 1 30 % R E V I E W - N O T F O R C O N S T R U C T I O N NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. FI L E : PR O J E C T N O : CA D : QU A L I T Y A S S U R A N C E : DR A W I N G H I S T O R Y DA T E D E S C R I P T I O N PH A S E 1 BR O D I E A V E N U E E X I S T I N G C O N D I T I O N S A N D D E M O L I T I O N P L A N GR A V E S A V E N U E S A F E R O U T E S T O S C H O O L SI D E W A L K I M P R O V E M E N T S ES T E S P A R K , C O L O R A D O C2.2 KP C 20 2 3 1 _ E X I S T I N G _ P R O D . D W G VJ G 07 / 0 5 / 2 0 2 1 30 % D E S I G N P L A N S E T ------ ------ - - CD O T 2 3 0 2 7 0 30 SCALE: 1" = 30' 601530 BRODIE AVENUE SIDEWALK EXTENSION NORTH HORIZONTAL DATUM: MODIFIED NAD83/2011 COLORADO STATE PLANE COORDINATE SYSTEM NORTH ZONE SCALE FACTOR 1.000401381 (0.99959878) VERTICAL DATUM: NGS VERTICAL BENCHMARK COLLINSON ELEVATION = 7497.80 (NAVD88 VERTICAL DATUM) NOTES: 1.UNDERGROUND UTILITY LOCATES PROVIDED BY KINETIC ENERGY SERVICES, LLC 2.THIS IS NOT A LAND SURVEY PLAT OR IMPROVEMENT SURVEY PLAT. ALL LOT LINES, RIGHTS OF WAY AND EASEMENT LINES ARE TO BE CONSIDERED APPROXIMATE. 3.ALL CONTROL SHOWN SHALL BE VERIFIED BY THE CONTRACTOR BEFORE ANY CONSTRUCTION OR OTHER IMPROVEMENTS. DEMOLITION QUANTITIES: 1.CONCRETE - 564 SF 2.ASPHALT - 28 SY 3.ASPHALT SAWCUT - 138 LF P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ E X I S T I N G _ P R O D . d w g , C 2 . 2 B R O D I E E X I S T I N G , 7 / 1 3 / 2 0 2 1 9 : 5 8 : 3 4 A M , V G e n t r y , 1 : 1 NORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. FI L E : PR O J E C T N O : CA D : QU A L I T Y A S S U R A N C E : DR A W I N G H I S T O R Y DA T E D E S C R I P T I O N PH A S E 1 GR A V E S A V E N U E S I T E P L A N GR A V E S A V E N U E S A F E R O U T E S T O S C H O O L SI D E W A L K I M P R O V E M E N T S ES T E S P A R K , C O L O R A D O C3.1 KP C 20 2 3 1 _ S I T E _ P R O D . D W G VJ G 07 / 0 5 / 2 0 2 1 30 % D E S I G N P L A N S E T ------ ------ - - CD O T 2 3 0 2 7 0 30 SCALE: 1" = 30' 601530 NORTH SIDE GRAVES AVENUE SIDEWALK EXTENSION NORTH SIDE GRAVES AVENUE SIDEWALK EXTENSION 30 % R E V I E W - N O T F O R C O N S T R U C T I O N SITE PLAN NOTES ESTES PARK INFLOW CURB AND GUTTER LOVELAND ROLL-OVER CURB AND GUTTER DOUBLE SOLID 4" YELLOW LANE LINE WITH 4" SPACING SINGLE SOLID 4" WHITE LANE LINE SINGLE SOLID 8" WHITE LANE LINE SINGLE SOLID 24" STOP BAR LINE RELOCATED MAILBOXES SINGLE 4" WHITE EXTENSION LINE 12" WIDE RETAINING WALL WITH RAILING. P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ S I T E _ P R O D . d w g , C 3 . 1 G R A V E S S I T E P L A N , 7 / 1 3 / 2 0 2 1 9 : 5 8 : 5 8 A M , V G e n t r y , 1 : 1 30 % R E V I E W - N O T F O R C O N S T R U C T I O N NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. FI L E : PR O J E C T N O : CA D : QU A L I T Y A S S U R A N C E : DR A W I N G H I S T O R Y DA T E D E S C R I P T I O N PH A S E 1 BR O D I E A V E N U E S I T E P L A N GR A V E S A V E N U E S A F E R O U T E S T O S C H O O L SI D E W A L K I M P R O V E M E N T S ES T E S P A R K , C O L O R A D O C3.2 KP C 20 2 3 1 _ S I T E _ P R O D . D W G VJ G 07 / 0 5 / 2 0 2 1 30 % D E S I G N P L A N S E T ------ ------ - - CD O T 2 3 0 2 7 0 30 SCALE: 1" = 30' 601530 BRODIE AVENUE SIDEWALK EXTENSION NORTH P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ S I T E _ P R O D . d w g , C 3 . 2 B R O D I E S I T E P L A N , 7 / 1 3 / 2 0 2 1 9 : 5 8 : 5 9 A M , V G e n t r y , 1 : 1 NORTH NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. FI L E : PR O J E C T N O : CA D : QU A L I T Y A S S U R A N C E : DR A W I N G H I S T O R Y DA T E D E S C R I P T I O N PH A S E 1 GR A D I N G P L A N GR A V E S A V E N U E S A F E R O U T E S T O S C H O O L SI D E W A L K I M P R O V E M E N T S ES T E S P A R K , C O L O R A D O C4.1 KP C 20 2 3 1 _ O V E R A L L _ G R A D I N G P L A N . D W G VJ G 07 / 0 5 / 2 0 2 1 30 % D E S I G N P L A N S E T ------ ------ - - CD O T 2 3 0 2 7 0 20 SCALE: 1" = 20' 401020 BRODIE AVENUE SIDEWALK EXTENSION NORTH SIDE GRAVES AVENUE SIDEWALK EXTENSION 30 % R E V I E W - N O T F O R C O N S T R U C T I O N NORTH P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ O V E R A L L _ G R A D I N G P L A N . d w g , C 4 . 1 G R A D I N G P L A N , 7 / 1 3 / 2 0 2 1 9 : 5 9 : 2 8 A M , V G e n t r y , 1 : 1 FI L E : PR O J E C T N O : CA D : QU A L I T Y A S S U R A N C E : DR A W I N G H I S T O R Y DA T E D E S C R I P T I O N PH A S E 1 PL A N & P R O F I L E - G R A V E S A V E N U E N O R T H S I D E W A L K GR A V E S A V E N U E S A F E R O U T E S T O S C H O O L SI D E W A L K I M P R O V E M E N T S ES T E S P A R K , C O L O R A D O C5.1 KP C 20 2 3 1 _ P N P _ P R O D _ P H 1 . D W G VJ G 07 / 0 5 / 2 0 2 1 30 % D E S I G N P L A N S E T ------ ------ - - CD O T 2 3 0 2 7 NORTH VERTICAL SCALE: 1"=5' 30 15 0 HORIZONTAL SCALE:1" = 30' 30 60 PLAN & PROFILE-GRAVES AVENUE NORTH SIDEWALK 30 % R E V I E W - N O T F O R CO N S T R U C T I O N P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ P N P _ P R O D _ P H 1 . d w g , C 5 . 1 G R A V E S A V E N U E N O R T H S I D E W A L K I M P R O V E M E N T S , 7 / 1 3 / 2 0 2 1 9 : 5 9 : 5 9 A M , V G e n t r y , 1 : 1 FI L E : PR O J E C T N O : CA D : QU A L I T Y A S S U R A N C E : DR A W I N G H I S T O R Y DA T E D E S C R I P T I O N PH A S E 1 PL A N & P R O F I L E - B R O D I E A V E N U E S I D E W A L K GR A V E S A V E N U E S A F E R O U T E S T O S C H O O L SI D E W A L K I M P R O V E M E N T S ES T E S P A R K , C O L O R A D O C5.2 KP C 20 2 3 1 _ P N P _ P R O D _ P H 1 . D W G VJ G 07 / 0 5 / 2 0 2 1 30 % D E S I G N P L A N S E T ------ ------ - - CD O T 2 3 0 2 7 NORTH VERTICAL SCALE: 1"=5' 30 15 0 HORIZONTAL SCALE:1" = 30' 30 60 PLAN & PROFILE-BRODIE AVENUE SIDEWALK 30 % R E V I E W - N O T F O R CO N S T R U C T I O N P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ P N P _ P R O D _ P H 1 . d w g , C 5 . 2 P L A N & P R O F I L E - B R O D I E A V E N U E S I D E W A L K , 7 / 1 3 / 2 0 2 1 1 0 : 0 0 : 0 4 A M , V G e n t r y , 1 : 1 30 % R E V I E W - N O T F O R C O N S T R U C T I O N FI L E : PR O J E C T N O : CA D : QU A L I T Y A S S U R A N C E : DR A W I N G H I S T O R Y DA T E D E S C R I P T I O N PH A S E 1 DE T A I L S GR A V E S A V E N U E S A F E R O U T E S T O S C H O O L SI D E W A L K I M P R O V E M E N T S ES T E S P A R K , C O L O R A D O C6.1 KP C 20 2 3 1 _ D E T A I L S . D W G VJ G 07 / 0 5 / 2 0 2 1 30 % D E S I G N P L A N S E T ------ ------ - - CD O T 2 3 0 2 7 ESTES PARK INFLOW CURB AND GUTTER TYPICAL SIDEWALK WITH VERSA-LOK RETAINING WALL SECTION TYIPICAL SIDEWALK SECTION P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ D E T A I L S . d w g , C 6 . 1 D E T A I L S , 7 / 1 3 / 2 0 2 1 1 0 : 0 0 : 2 0 A M , V G e n t r y , 1 : 1 30 % R E V I E W - N O T F O R C O N S T R U C T I O N FI L E : PR O J E C T N O : CA D : QU A L I T Y A S S U R A N C E : DR A W I N G H I S T O R Y DA T E D E S C R I P T I O N PH A S E 1 DE T A I L S GR A V E S A V E N U E S A F E R O U T E S T O S C H O O L SI D E W A L K I M P R O V E M E N T S ES T E S P A R K , C O L O R A D O C6.2 KP C 20 2 3 1 _ D E T A I L S . D W G VJ G 07 / 0 5 / 2 0 2 1 30 % D E S I G N P L A N S E T ------ ------ - - CD O T 2 3 0 2 7 P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ D E T A I L S . d w g , D E T A I L S - 2 , 7 / 1 3 / 2 0 2 1 1 0 : 0 0 : 2 6 A M , V G e n t r y , 1 : 1 30 % R E V I E W - N O T F O R C O N S T R U C T I O N FI L E : PR O J E C T N O : CA D : QU A L I T Y A S S U R A N C E : DR A W I N G H I S T O R Y DA T E D E S C R I P T I O N PH A S E 1 DE T A I L S GR A V E S A V E N U E S A F E R O U T E S T O S C H O O L SI D E W A L K I M P R O V E M E N T S ES T E S P A R K , C O L O R A D O C6.3 KP C 20 2 3 1 _ D E T A I L S . D W G VJ G 07 / 0 5 / 2 0 2 1 30 % D E S I G N P L A N S E T ------ ------ - - CD O T 2 3 0 2 7 P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ D E T A I L S . d w g , D E T A I L S - 3 , 7 / 1 3 / 2 0 2 1 1 0 : 0 0 : 3 6 A M , V G e n t r y , 1 : 1 30 % R E V I E W - N O T F O R CO N S T R U C T I O N FI L E : PR O J E C T N O : CA D : QU A L I T Y A S S U R A N C E : DR A W I N G H I S T O R Y DA T E D E S C R I P T I O N PH A S E 1 CR O S S S E C T I O N S - G R A V E S A V E N U E N O R T H S I D E W A L K GR A V E S A V E N U E S A F E R O U T E S T O S C H O O L SI D E W A L K I M P R O V E M E N T S ES T E S P A R K , C O L O R A D O C7.1 KP C 20 2 3 1 _ X S E C T _ P R O D . D W G VJ G 07 / 0 5 / 2 0 2 1 30 % D E S I G N P L A N S E T ------ ------ - - CD O T 2 3 0 2 7 VERTICAL SCALE: 1"=10' 10 5 0 HORIZONTAL SCALE:1" = 10' 10 20 P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ X S E C T _ P R O D . d w g , C 7 . 1 G R A V E S A V E N U E N O R T H S I D E W A L K X S E C T I O N S , 7 / 1 3 / 2 0 2 1 1 0 : 0 1 : 0 0 A M , V G e n t r y , 1 : 1 PROJECT CONTROL BASIS OF BEARING: CONSIDERING THE NORTH LINE OF LOT 21 OF REPLAT OF LOTS 11 THROUGH 16 OF EAST MULBERRY SUBDIVISION, COUNTY OF LARIMER, STATE OF COLORADO TO BEAR S60° 53' 22”E BETWEEN THE NORTHWEST CORNER, BEING MARKED BY A NO.4 REBAR WITH YELLOW PLASTIC CAP STAMPED LS 38318, AND THE NORTHEAST CORNER, BEING MARKED BY A NO.4 REBAR WITH YELLOW PLASTIC CAP STAMPED LS 38318, BASED UPON G.P.S. OBSERVATIONS AND THE CITY OF FORT COLLINS GROUNDMASTER COORDINATE SYSTEM, WITH ALL BEARINGS CONTAINED HEREIN RELATIVE THERETO. PROJECT DATUM: NAVD88 ELEVATION: 4942.21 FT BENCHMARK R-402 VERT ORDER - FIRST CLASS II MARKER:DB=BENCHMARK DISK SETTING: 41=SET IN A LARGE STRUCTURE WITH FOUNDATIONS ON BEDROCK STAMPING: R 402 1984 STABILITY: A=MOST RELIABLE AND EXPECTED TO HOLD STABILITY: POSITION/ELEVATION WELL HISTORY - 1984 MONUMENTED NGS STATION DESCRIPTION DESCRIBED BY NATIONAL GEODETIC SURVEY 1984 IN FORT COLLINS, AT THE JUNCTION OF 9TH STREET AND LINCOLN AVENUE, IN THE EAST EDGE OF THE CONCRETE FOOTING FOR HIGHLINE TOWER NUMBER 29, 47.8 METERS (156.8 FT) NORTH OF THE CENTERLINE OF THE AVENUE, 22.3 METERS (73.2 FT) WEST OF THE CENTERLINE OF THE STREET, AND 0.2 METERS (0.7 FT) WEST OF THE EAST EDGE OF THE FOOTING. NOTE - THE FOOTING IS 96-INCHES IN DIAMETER, 26-1/2 FEET DEEP AND SET INTO 9 FEET OF BEDROCK PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 -2.84'LARIMER COUNTY DRAWING REVIEW REVIEWED BY: LARIMER COUNTY ENGINEERING DATE THE LARIMER COUNTY REVIEW CONSTITUTES COMPLIANCE WITH THESE STANDARDS. REVIEW BY THE COUNTY DOES NOT CONSTITUTE APPROVAL OF THE PLAN DESIGN. THIS REVIEW DOES NOT CONSTITUTE REVIEW/APPROVAL OF ANY PRIVATE ON-SITE IMPROVEMENTS WHICH MAY BE SHOWN. THESE PLANS ARE INTENDED TO BE FOR COUNTY REVIEW OF PUBLIC IMPROVEMENTS ADJACENT TO THE PROPERTY. CONSTRUCTION OF ON-SITE PRIVATE IMPROVEMENTS CANNOT COMMENCE UNTIL ALL REQUIRED TRAFFIC WORSHEET OR STUDY(S), FINAL DEVELOPMENT PLAN(S), SPECIAL REVIEW(S), AND BUILDING PERMIT(S) ARE COMPLETE, APPROVED AND ON FILE WITH LARIMER COUNTY. LARIMER COUNTY INDEMNIFICATION STATEMENT THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF DOES HEREBY AFFIRM RESPONSIBILITY TO THE COUNTY, AS A BENEFICIARY OF SAID ENGINEER'S WORK, FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESE PLANS BY THE LARIMER COUNTY ENGINEERING DEPARTMENT SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE PLANS OF ANY SUCH RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY LARIMER COUNTY, AND ITS OFFICERS AND EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN THE PLANS. PROFESSIONAL ENGINEER CERTIFICATION THESE CONSTRUCTION PLANS FOR ALLEN SERVICES PLUMBING & HEATING WERE PREPARED BY ME (OR UNDER MY DIRECT SUPERVISION) IN ACCORDANCE WITH THE REQUIREMENTS OF THE ROAD STANDARDS AND THE STORMWATER DESIGN STANDARDS FOR LARIMER COUNTY." ENGINEER'S NAME: JOHN E. TUFTE, PE COMPANY: SANDERSON STEWART MONTH, DAY, YEAR VICINITY MAP PREPARED FOR: TOWN OF ESTES PARK - PUBLIC WORKS DEPARTMENT ESTES PARK, CO. 80517 P.O. BOX 1200 ESTES PARK, COLORADO SIDEWALK IMPROVEMENTS GRAVES AVENUE SAFE ROUTES TO SCHOOL PHASE 2 PROJECT NO: NORTH 425 West Mulberry Street, Ste 201 Fort Collins, Colorado 80521 970.797.2504 sandersonstewart.com NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. CDOT 23027 30% REVIEW - NOT FOR CONSTRUCTION SHEET TITLE C1.1 COVER C1.2 LEGENDS & ABBREVIATIONS C2.1 EXISTING CONDITIONS AND DEMOLITION PLAN C3.1 OVERALL SITE PLAN C4.1 GRADING PLAN C5.1 PLAN & PROFILE-GRAVES AVENUE SOUTH SIDEWALK-STA 10+00-16+00 C5.2 PLAN & PROFILE-GRAVES AVENUE SOUTH SIDEWALK-STA 16+00-21+50 C6.1 DETAILS C6.2 DETAILS C6.3 DETAILS C7.1 CROSS SECTIONS-GRAVES AVENUE SOUTH SIDEWALK SITE CO M M U N I T Y D R . S T . V R A I N A V E . BRODIE AVE. GRAVES AVE. CONTACTS OWNER TOWN OF ESTES PARK, PUBLIC WORKS DEPARTMENT, ATTN: RYAN BARR, 970-577-3575 CIVIL ENGINEER/SURVEYOR/ SANDERSON STEWART LANDSCAPE ARCHITECT 425 WEST MULBERRY STREET, STE. 201 FORT COLLINS, CO 80521 970-893-1688 WATER TOWN OF ESTES PARK WATER DIVISION, CHRIS ESHELMAN, 970-577-3630 SANITARY SEWER ESTES PARK SANITATION DISTRICT, JIM DUELL, 970-586-2866 UPPER THOMPSON SANITATION DISTRICT, MATT ALLEN, 970-586-4544 ELECTRIC TOWN OF ESTES PARK POWER & COMMUNICATIONS DIVISION, TYLER BOLES, 970-577-3607 FIBER TRAILBLAZER BROADBAND, JOE LOCKHART, 970-577-3613 TELECOM CENTURYLINK, JUSTIN WALLACE, 970-381-8449 TDS, JASON PATRICK, 970-539-0592 GAS XCEL ENERGY, JODY HUTCHINSON, 970-225-7834 P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ C O V E R _ P H 2 . d w g , C O V E R , 7 / 6 / 2 0 2 1 1 0 : 5 9 : 3 3 A M , V G e n t r y , 1 : 1 30 % R E V I E W - N O T F O R C O N S T R U C T I O N FI L E : PR O J E C T N O : CA D : QU A L I T Y A S S U R A N C E : DR A W I N G H I S T O R Y DA T E D E S C R I P T I O N PH A S E 2 LE G E N D S & A B B R E V I A T I O N S GR A V E S A V E N U E S A F E R O U T E S T O S C H O O L SI D E W A L K I M P R O V E M E N T S ES T E S P A R K , C O L O R A D O C1.2 KP C 20 2 3 1 _ C O V E R _ P H 2 . D W G VJ G 07 / 0 5 / 2 0 2 1 30 % D E S I G N P L A N S E T ------ ------ - - CD O T 2 3 0 2 7 EW = FINISHED GRADE AT EDGE OF WALK TC = FINISHED GRADE AT TOP BACK OF CURB BC = FINISHED GRADE AT BUILDING CORNER TW = FINISHED GRADE AT TOP OF WALL AC = FINISHED GRADE AT ASPHALT EA = FINISHED GRADE AT EDGE OF ASPHALT EC = FINISHED GRADE AT EDGE OF CONCRETE SDI = STORM DRAIN INLET SDMH = STORM DRAIN MANHOLE FL = FINISHED GRADE AT FLOWLINE FG = FINISHED GRADE EX = APPROXIMATE EXISTING ELEVATION POC = POINT ON CURVE WTR = WATER PI = POINT OF INTERSECTION PRC = POINT OF REVERSE CURVE RT = RIGHT LT = LEFT SS = SANITARY SEWER PT = POINT OF TANGENCY SD = STORM DRAIN GV = GATE VALVE BFV = BUTTERFLY VALVE RED = REDUCER LF = LINEAL FOOT FT = FEET SSMH = SANITARY SEWER MANHOLE BVC = BEGIN VERTICAL CURVE CS = CURB STOP EVC = END VERTICAL CURVE PVI = POINT OF VERTICAL INTERSECTION ABBREVIATIONS KEYNOTE CALL OUT (SEE KEYNOTE LEGEND) SRVC = SERVICE (TYP.) = TYPICAL PC = POINT OF CURVATURE NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. GR = EXISTING GRADE AT GROUND BRK = GRADE BREAK HP = HIGH POINT LINETYPES SYMBOLS STORM DRAIN CONTOUR CURB AND GUTTER EDGE OF ASPHALT EDGE OF GRAVEL PROPOSED DEMO AREA PROPOSED ASPHALT PROPOSED CONCRETE PROPOSED GRAVEL CURB CUT ELECTRIC BOX SANITARY MANHOLE MAILBOX VALVE BOX HANDICAP RAMP FENCE GATE FOUND MONUMENT AS DESCRIBED ELECTRIC TRANSFORMER WATER MANHOLE GAS MARKER POWER POLE WOOD POST T-POST STEEL POST TELEPHONE PEDESTAL WATER SHUTOFF VALVE SIGN DECIDUOUS TREE CONIFEROUS TREE WATER VALVE ELECTRIC VAULT FIBER OPTIC VAULT CONTROL POINT LANDSCAPE ROCK FIRE HYDRANT GUY WIRE EDGE OF ASPHALT OVERHEAD ELECTRIC LINE ELECTRIC LOCATE FENCE CHAIN LINK FENCE FIBER OPTIC LOCATE FLOW LINE GAS LOCATE EDGE OF GRAVEL PIPE SANITARY LINE WATER LOCATE EASEMENT LINE MAJOR CONTOUR MINOR CONTOUR RIGHT OF WAY LINE EXISTING P: \ 2 0 2 3 1 _ E s t e s _ G r a v e s _ A v e _ S R T S \ C A D D _ C 3 D \ P R O D U C T I O N _ D W G \ 2 0 2 3 1 _ C O V E R _ P H 2 . d w g , L E G E N D S , 7 / 6 / 2 0 2 1 1 0 : 5 9 : 3 8 A M , V G e n t r y , 1 : 1