HomeMy WebLinkAboutPACKET Town Board Study Session 2012-09-11* Revised
NOTE: The Town Board reserves the right to consider other appropriate items not available at the time the
agenda was prepared.
STUDY SESSION
TOWN BOARD
Tuesday,September 11, 2012
4:30 p.m.
Rooms 202/203
170 MacGregor Ave.
AGENDA
4:30 p.m.Streaming Audio & Video of Meetings
Community Reinvestment Fund Update
Stall Barn/ MPEC Bidding D irection
Review 2013 Board Objectives
6:30 p.m.Meeting Adjourn –Prepare for Board Meeting.
Finance Memo
To: Honorable Mayor Pinkham
Board of Trustees
Town Administrator Lancaster
From: Steve McFarland, Finance Officer
Date: September 11th, 2012
RE: Community Reinvestment Fund update
Background:
The Community Reinvestment Fund (CRF) has become the Town’s Capital project
account. As the amount and scope of projects has increased dramatically in recent
years, the CRF Budget has become more difficult to decipher. Staff hopes this narrative
will help explain the detail provided in the CRF detailed report. Projects are identified
below and individually discussed. Staff hopes that this identification and update
process will better inform Town Board of what will be presented in the Budget Study
Sessions in October. Staff seeks comments and guidance on the items contained in
this memorandum.
Grant-related projects
There are four grant-related projects. The financial progress and net cost to the Town
of each grant is identified in the last section of the attached document.
• The Transportation Hub, Transportation Enhancement (Moraine Avenue), and NEPA
Study Grants were identified and approved in the 2011 Budget. These 3 projects are in
various stages of completion.
• The 4th grant project, the Parking Structure, is a 2012-13 Budget item. There is currently
$3,378,500 in obtained funding, which means that if the project comes in at its original
$4,500,000, the Town will have to provide $1,121,500 in funding (original estimate was
$900,000).
Status of Original 2012 Budget projects
• The stall barn project was approved in the 2012 Budget at $600,000, and is currently
projected at $2,600,000 in the 2013 Budget. Funding has not been identified.
• The Police Department remodel was approved in the 2012 Budget at $40,000, and has
been revised to $140,000. Funding for the additional $100,000 is in the form of a
$100,000 transfer from the General Fund as seen in the “revenues/inflows” section.
• The CVB –Visitors Center upgrade scope and cost ($50,000) has remained unchanged
from the original 2012 Budget.
• The $50,000 Barn W re-roofing project ($50,000) was cancelled.
Status of 2012 projects created since the original 2012 Budget
• The Stall Barns Master Plan was undertaken to “nail down” specifics for the $2,600,000
Stall Barn project. The cost estimate of the plan is $155,000 (June 12th Town Board
mtg).
• The Weist retaining wall, originally estimated at $65,000, was updated to $69,500 in the
January 24th Town Board meeting.
• The Museum Master Plan has been estimated at $25,000. The RFP has been issued.
• The MPEC Pro-forma, originally estimated as $40,000, has been revised to $60,000 with
the receipt of the responses to the RFP.
• The Elm Road landfill mitigation estimate remains unchanged at $110,000 for 2012.
• $40,000 of the $4.5m Parking Structure project is forecasted to occur in 2012.
Proposed 2013 Projects
• The Elm Road landfill project is budgeted at $175,000 for 2013, which is a placeholder
for an anticipated $1,000,000 over 5-6 years.
• The CVB remodel ($200,000) has been requested to be included for debate and
consideration.
• The bulk ($4.46m) of the cost of the Parking Structure project resides in 2013.
• Director Zurn has identified Performance Park as being in need of an overlay - $20,000.
• Street Improvements (STIP) are funded at the pre-2012 rate: $435,000 is being
transferred from the General Fund. 2012 STIP expenses continue to reside in the
General Fund. Director Zurn has identified Dry Gulch Road as the top priority for the
next large street project. As the amount needed for the Dry Gulch Road project exceeds
the $435,000 inflow budgeted for 2013, there is no specific STIP project budgeted for
2013. It is expected that the $435,000 listed in 2013 will in fact be used in 2014 as part
of the Dry Gulch Road project.
• CIRSA has identified portable bleachers used by Special Events at the fairgrounds and
for other venues is unsafe: $42,000 is budgeted to replace them.
• In a similar manner, the Birch Cabin ruins are becoming increasingly unsafe, and
concern has been voiced about objects falling onto the ground below. A fence would
mitigate the issue, and is budgeted at $18,000.
• Public Works and the Utility Departments are requesting an Office Remodeling. The
Utility Departments are prepared to contribute $70,000 towards the $100,000 remodel,
so the net of $30,000 is listed in the CRF. The remodel is requested to facilitate ease of
customer service and for increasing office space.
• The Transportation Hub has islands of vegetation throughout the area. These islands
are irrigated manually by staff. $150,000 (not provided through grant funding) is
requested to automate irrigation in the area.
Unfunded projects
The Town has made concerted efforts over the past two years to develop a capital
asset management plan (CAMP) and to attempt to loosely prioritize capital projects over
the next five years. Two of the most prominent of these programs are the Multipurpose
Event Center (MPEC), and the Riverwalk work (adjacent to the Park Theater Mall site).
The feasibility of the MPEC project will be better known once the MPEC proforma is
completed. The Riverwalk work is dependent upon progress made regarding
developments made at the Park Theater Mall site. Neither of these projects is funded.
“Earmarked” funds
The 2012 Budget listed $1,058,500 of fund balance as being earmarked for the
Performing Arts Center project and the Museum Storage Facility. When the Performing
Arts Center project was relinquished in 2012, the Museum Storage Facility remained as
the only project with earmarked funds. The 2013 Budget earmarks $450,000 for the
Museum Storage Facility. This project will probably come into better focus with the
completion of the Museum Master Plan.
Fund balance
Projected fund balance for 12/31/2013 is slated to be a deficit (-$1,489,103). State law
prohibits governmental entities from submitting budgets that have negative fund
balances. This document is not a finished product, and merely demonstrates that
identified projects exceed our current ability to fund them. Most likely, the Stall Barn
project would need to be funded from an exterior source. Placing the Stall Barn project
with the “Unfunded Projects” section would yield an available ending fund balance of
$1,110,897.
Budget:
The revised 2012 and original 2013 Community Reinvestment Fund Budgets will be
presented/approved during the October – December 2013 Budget process.
To: Honorable Mayor Pinkham
Board of Trustees
Town Administrator Lancaster
From: Scott A. Zurn, PE CFM
Date: September 11, 2012
RE: 100 Stall Barn Schematic Design
Background:
Currently the design team, consisting of Norris Design and their sub consultants, is
moving forward as directed with the development of the schematic design of the 100
stall barn project. As discussed in previous work sessions, the Board has asked staff to
proceed with the proposed project, to include restroom additions and required
infrastructure supporting animal and human occupancy or assembly use, as stipulated
in the International Building Code as currently adopted.
During this work session, staff will present the preliminary design of the proposed
project, along with a list of potential alternatives. The consulting team will have the
potential estimated costs of the various alternatives available for the Board’s
consideration. Through this study session, staff and the consultant intend to gain
direction on and authorization of the schematic design and the various alternatives so
the design can proceed into final documents for future bidding of the project.
It is also staff’s intention to have further discussion regarding schedule, phasing and
budget issues related to proposed Fairgrounds projects.
PUBLIC WORKS Memo
CONCEPT C
STANLEY PARK FAIRGROUNDFACILITY MASTER PLAN - AUGUST 2012
Proposed
Parking
Landscape Buffer
& Seating Area
Future Overhead
Connection to
MPEC
Senior
Center
Fourth StreetEx. Parking
PHASE 1PHASE 1
STALL BARNSTALL BARN
23,760 SF
MPEC
38,000 SF
140
93
PHASE 1 - ENLARGEMENT
0 30 60
SCALE: 1” = 30’ NORTH
ppppppppoooooooossssssseeeeeeeeeeedddddddddddd
kkkkkkkkiiiiiiinnnnnnnnnnggggggggggggg
LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLaaaaaaaaaaaaaaaaa
&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&
Future Sidewalk
Connection:
Senior Center/
MPEC
PLAN - A 27,120 SFT 23,760 SFTPLAN - U
NORTH ELEVATION
SOUTH ELEVATION
EAST ELEVATION
WEST ELEVATION
NOTE:
FINAL OVERALL DESIGN TO BE DETERMINED BY
BUDGET AND PROGRAM REQUIREMENTS.
STANLEY PARK FAIRGROUNDFACILITY MASTER PLAN - AUGUST 2012
ARCHITECTURE
8.14.12Probable Cost of Basic Stall Barn$1,976,000OptionsContractor cost$34,000Masonry accents$54,000Cupalas$20,000Office$16,000Restrooms$247,000Electrical upgrades$75,000Landscaping / irrigation$41,000PA System$15,000Subtotal of upgrades$502,000Additional contingency$51,000Additional overhead and profit $76,000Probable Cost of Upgraded Stall Barn$2,605,000Opinion of Probable CostsSummary - Cost Differences