HomeMy WebLinkAboutPACKET Town Board Study Session 2015-09-08
Tuesday, September 8, 2015
TOWN BOARD 4:30 p.m. – 6:40 p.m.
STUDY SESSION Rooms 202/203
4:30 p.m. Final Review of 2016 Strategic Plan
(Administrator Lancaster)
5:15 p.m. Dinner Served
5: 30 p.m. Discuss Possible Community Development Fees.
(Director Chilcott)
6:15 p.m. Trustee & Administrator Comments & Questions.
Board Salary Review.
6:25 p.m. Future Study Session Agenda Items.
(Board Discussion)
6:40 p.m. Adjourn for Town Board Meeting.
“Informal discussion among Trustees concerning agenda items or other Town matters may occur before this
meeting at approximately 4:15 p.m.”
AGENDA
TOWN ADMINISTRATOR Memo
To: Honorable Mayor Pinkham
Board of Trustees
From: Frank Lancaster, Town Administrator
Date: September 8th, 2015
RE: Review of Draft Town Board Strategic Plan for 2016
Objective:
For the Board to review their draft strategic plan and to give staff direction as to any
revisions they determine they would like to make.
Present Situation:
Each year the Board reviews the Town’s strategic plan and sets specific one year
objectives for tBoard activities that are in alignment with the overall goals and outcome
areas adopted by the Board. The Board has had two meetings this year to revise their
new objectives and this is an opportunity to finalize these objectives prior to the
upcoming budget discussion.
(Attached is the most recent redline draft of the strategic plan. A reformatted draft will
be provided prior to the meeting on Tuesday but was not available in time for inclusion
in the meeting packet.)
Proposal:
None – discussion only
Advantages:
Provide guidance for budget preparation
Provide priorities for staff efforts in the coming year
Communicate to the public the priorities of their Town government
Disadvantages:
none
Action Recommended:
None – discussion item only
Level of Public Interest
moderate
Note – Any item requiring a change to the Municipal Code, Development Code or any
other action requiring an Ordinance to be passed by the Town Board is required to have
the Ordinance included.
2016 Strategic Plan
Draft 2
VISION
The Town of Estes Park will enhance our position as a premier mountain community
MISSION
The Mission of the Town of Estes Park is to provide high‐quality, reliable services for the benefit of our
citizens, guests, and employees, while being good stewards of public resources and our natural setting.
KEY OUTCOME AREAS
Robust Economy ‐ We have a diverse, healthy year round economy
Infrastructure‐ We have reliable, efficient and up to date infrastructure serving our residents,
businesses and guests
Exceptional Guest Services ‐ We are the preferred Colorado mountain destination providing an
exceptional guest experience.
Public Safety, Health and Environment ‐ Estes Park is a safe place to live, work, and visit within
our extraordinary natural environment
Outstanding Community Services‐ Estes Park is an exceptionally vibrant, diverse, inclusive and
active mountain community in which to live, work and play, with housing available for all
segments in our community.
Governmental Services and Internal Support ‐ We provide high‐quality, reliable basic
municipal services for the benefit of our citizens, guests, and employees, while being good
stewards of public resources
Transportation ‐ We have safe, efficient and well maintained multi‐modal transportation
systems for pedestrians, vehicles and transit.
GOALS (5‐7 YEARS )
Robust Economy
We will work to make Town codes and regulations more user friendly and easier to understand
and use, while ensuring they are effective and enforceable and support reasonable
development. We encourage the new Board of Appeals to look at our regulations and codes and
give suggestions.
The Town encourages events, activities and development that enhance a year round economy
The Town participates as a partner in Local, Regional and State Economic Development Efforts
Deleted: 1
We will encourage optimal the use of the PRPA/Town fiber infrastructure
We will review the potential for redevelopment of areas of town where appropriate
Infrastructure
We will provide safe access for users to the trail system
We will continue to pursue grants and utilize available open space funding to develop
connectivity of trails in the Estes Valley in partnership with other local entities as described in
the Estes Valley Trails Master Plan.
We will continue to address parking options throughout the Town.
We will develop plans and build the financial strength for redundant raw water sources to our
Water Treatment Plants.
Exceptional Guest Services
The Events Center Complex meets the 2013 CH Johnson pro‐forma financial projections
Complete stall replacements at the Fairgrounds
We will plan for future upgrades and expansion of the Conference Center
Public Safety, Health and Environment
We will implement projects and policies which promote sustainability, to improve the quality of
the environment.
We will maintain safe and healthy environments on Town owned properties.
We will investigate alternative technologies for recycling and waste management
We will continue to pursue projects and funding to reduce flood risk and flood insurance costs
for the property owners and businesses of the Estes Valley
Outstanding Community Services
We will increase the capacity of the Senior Center, considering the recommendations of the
Museum and Senior Center Master Plan in coordination with the Estes Valley Recreation and
Parks District Community Center
We will plan and implement the celebration of the 100th Anniversary of the Town.
We will serve as a catalyst to develop available housing solutions for all segments of our
community.
We will continue to work with the Estes Valley Recreation and Parks District and the other
partners in the Community Center, to develop and build the Community Center, including the
Senior Center
We will work to make Town codes and regulations more user friendly and easier to understand
and use, while ensuring they are effective and enforceable and support reasonable
development. We encourage the Board of Appeals to look at our regulations and codes and give
suggestions.
Governmental Services and Internal Support
We will implement an enterprise wide document management system
We will maintain a well‐trained and educated town staff.
Deleted: <#>We will review the potential redevelopment of
areas affected by the FLAP grant ¶
Deleted: We will upgrade the Glacier Creek Water Treatment
plant to maintain redundant water treatment.
Deleted: ¶
Deleted: <#>We will increase the capacity of the Museum,
considering the recommendations of the Museum and Senior
Center Master Plan including addressing the need for artifact
storage facilities¶
We will conduct a citizen survey biennially to measure our performance and citizen preferences
We will ensure town finances are strong with adequate fund balances and sustainable reserves.
Transportation
We will continue to address downtown traffic issues
All Town Streets have a pavement condition index of 70 or above. The street rehabilitation
efforts will result in an average pavement condition index of 70 or above for the Town street
network by 2024
2016 Board Objectives (1 year time frame)
Robust Economy
Revise the sign code to be simpler and easy to understand but retaining the basic intent. (to be
completed in 2015)
Complete Downtown Neighborhood Plan and develop implementation options in partnership
with the downtown residents and businesses. (BID, DDA, URA, Etc.)
To be in a supportive role to the formation and operation of a Creative Arts District.
Coordinate with the EDC on the selection and implementation of options to provide increased
broadband access within the Estes Valley
Continue to participate in local, regional, and state economic development.
Define the role of Town Government in Economic development as it relates to the Estes Valley
EDC and other organizations
Infrastructure
Complete the environmental studies required for the extension of the Fall River Trail using the
Paul Sarbanes Grant
Pursue funding opportunities for construction of the Fall River Trail
Start planning for the use of the Trail sales tax dollars
Partner with the Rec District in updating an implementing the Estes Valley Trails Master Plan
Repair trails damaged during the flood, utilizing Larimer County open space $ for our match
portion of the funding
Complete construction of the Phase 1 of the Visitor's Center parking structure
Pursue funding for future phases of the Visitor’s Center Parking Structure
Pursue funding for additional parking structures $$
Complete repairs to utilities due to flood damage.
Develop and adopt a policy on Town installation of empty conduit with other Town projects.
Explore the need for a storm water master plan and the feasibility of a storm water utility
(including flood plain considerations) $$
Develop a facilities needs assessment for equipment and other storage, including the museum
storage facility
Exceptional Guest Services
Investigate ways to improve signage for special events $$
Complete a needs assessment and conceptual plan for improvements to the Conference Center
$$
Deleted: of our
Deleted: will be classified at a fair condition (~70%) or above
Commented [FL1]: Alternative language suggested by Greg
Muhonen
Deleted: 2015
Deleted: <#>Explore with the public and downtown business
partners, options for downtown improvements and
redevelopment (BID, DDA, URA, Etc.) ¶
Deleted: <#>Explore with the public and business partners and
the Transportation Advisory Committee, the option of paid
parking in some areas ¶
Start
Deleted: pahses
Deleted: <#>Make specific implementation decisions for the
improvement or replacement of the Glacier Creek Treatment
plan¶
Develop a sustainable funding plan for facility maintenance ¶
Deleted: <#>Implement the newly adopted strategy for
evaluating, recruiting and retaining special events in the Town,
including a strategy for events¶
Repair the roof at the Conference Center ¶
Public Safety, Health and Environment
Continue the program to provide bear resistant trash and recycling receptacles
Participate as a partner in the County's regional wasteshed planning
Work to restore the streams damaged by the flood and to redefine the flood plains within Town
boundaries.
Outstanding Community Services
Develop plans for the Town’s 100th Anniversary in 2017 $$
Reevaluate and implement phase 5 of Bond Park improvements
Revise the sign code to be simpler and easy to understand but retaining the basic intent.
Define the housing needs and identify potential plans for action.
o Develop a strategy for addressing seasonal housing demands
Define the role of the Town, the EDC, the EPHA and the Business community and private sector
in partnering to address the various housing needs in the Estes Valley
Consider the development of neighborhood development plans for specific areas throughout
the Estes Park Town Limits (after the conclusion of the Downtown Neighborhood plan, and in
conjunction with the Planning Commission)
o Identify additional neighborhoods for specific neighborhood plans to be incorporated
into the Comprehensive plan.
Governmental Services and Internal Support
Implement the capital planning process.
Complete a needs assessment and recommendation for an enterprise document management
system. $$
Conduct the biennial Citizen’s Survey $$
Develop a standard set of contracts for Town Activities
Transportation
Proceed with the next steps in the Loop Project, (to be determined after the completion of the
NEPA EA in 2015)
Complete preventative maintenance activities on Town roads, as adequate funds become
available.
Complete the reconstruction of Dry Gulch
Adopt a and implement a plan for utilization of the new sales tax funds for street improvements
Include bike/pedestrian lanes wherever possible along with the street improvements
Investigate the costs and opportunities to expanding transit services year round
Develop wayfinding plan for downtown neighborhood, as determined by Downtown
Neighborhood plan $$
Coordinate with CDOT improved signage on Highway 7, US 34 and US 36
Deleted: <#>Complete the mitigation work at the Elm Road
Landfill¶
Consider adopting the dangerous buildings and building
maintenance sections of the International Building Code¶
Deleted: <#>Update the comprehensive plan¶
Deleted: <#>Complete an updated housing needs study of
the Estes Valley¶
Deleted: <#>Develop and adopt a policy for accepting public
art, memorials and donations ¶
Continue to work with the Estes Valley Recreation and Parks
District and the other partners in the Community Center, to
develop and build the Community Center, including the Senior
Center¶
Participate with Rocky Mountain National Park in their 100th
Anniversary in 2015 ¶
Form a Centennial Celebration Committee¶
Deleted: <#>Complete the revision and updating of Board and
Administrative town policies.¶
Deleted: <#>Evaluate and prioritize implementation of
Transportation Visioning Committee signage recommendations¶
Complete the flood damage repairs to the Fish Creek corridor.¶
Complete the flood damage repairs to other Town roads.¶
Begin the Downtown Loop Project, starting with the NEPA
process and public outreach
COMMUNITY DEVELOPMENT Memo
To: Honorable Mayor Pinkham
Board of Trustees
Town Administrator Lancaster
From: Mallory Baker, Planning Consultant
Date: September 4th, 2015
RE: Discuss Possible Community Development Fees
Objective
1. To obtain direction from Honorable Mayor Pinkham and the Board of Trustees on the level
of cost recovery appropriate for the Community Development Department.
2. To obtain direction from Honorable Mayor Pinkham and the Board of Trustees on three
potential fee schedule models for the Town of Estes Park Planning Department. Each of the
three models aims to provide a fair and equitable fee schedule for development review while
improving coverage of department costs.
3. To obtain direction from Honorable Mayor Pinkham and the Board of Trustees on improved
cost recovery and equitability for building permit fees through changes in valuation and audit
procedures.
Present Situation and Methodology
The current Town of Estes Park Development Review Fee Schedule was last amended over
ten years ago. As the economy continues to strengthen and the development and construction
revert to pre-Recession levels, the Community Development Department has the opportunity
to reexamine its revenue potential. As such, the CDD has analyzed current revenue and
expenses, as well as fee schedules adopted by economically, regionally, and demographically
comparable communities, to devise three potential development review fee schedule models
for the Planning Division that will ensure a fair, equitable, and attractive development
environment while improving coverage of key department costs. Additionally, the CDD has
analyzed three potential valuation and audit procedure models that will improve cost recovery
in the Building Division and ensure fairness and equitability among different construction
projects.
Development Review Fee Schedule: The Community Development Department is expected
to yield $94,636 in revenue for 2015, procured from development review, planning fees, and
the Larimer County IGA. Based on the recorded Staff Time estimates for 2015 , including
estimated Planner I time, and applicable overhead, the total estimated Community
Development Department expense as it relates to Development Review for 2015 is
$274,526.72. The department is at an expense coverage level of 34% for Development
Review. The enclosed analysis examines development and plan review fees necessary to
recoup estimated expenses, including overhead, at 50%, 75%, 90%, and 100% (See Exhibit
A). The analysis also takes into account the fee schedules of demographically, economically,
and regionally comparable communities. The majority of such communities, as shown by the
enclosed analysis, have adopted some mechanism for covering costs for larger or more
complex projects, whether that be through an acreage fee, an additional review fee, or a cost
reimbursement model (See Exhibit C). With a clearer understanding of the fees that would be
needed to offset the Town’s actual costs, there are three potential fee structure models to
consider that would allow for improved coverage of department costs while ensuring a fair,
equitable, and attractive development environment.
Note: None of the following proposed fee structure models accounts for Public Works
or Utility Department expenses associated with Development Review.
Proposal
Option 1: Traditional (Current) Fee Model
Overview: The Traditional (Current) Fee Model would entail adoption of an updated version of
the current fee schedule based on a certain level of expense coverage (50%, 75%, 90%, or
100%), charging a standardized fee based on the type of application or project.
Advantages:
Simple, standardized model
Consistent with current fee structure format
Disadvantages:
No mechanism for accurate assessment of per-project staff time
More complex projects are subsidized by simpler ones
Option 2: Cost Reimbursement Model
Overview: The Cost Reimbursement Model would set forth reasonable non-refundable land
use fees sufficient to cover the cost of administration, inspections, publication of notices,
public hearing expenses and reproduction of materials. The non-refundable fees may not be
adequate to fully cover the Town’s expenses in reviewing land use applications so this model
would require the Town to collect a refundable cash deposit which would be sufficient to
cover the Town’s expenses in considering land use applications, including, but not limited to,
staff time, attorney fees, and other consultant fees (i.e., floodplain, planning, etc.). The Town
would expend the monies collected from the Applicant in the form of land use fees and cash
deposits, in the payment of expenses incurred in processing the Applicant’s request,
throughout the development review process, until final completion of the project. Any funds
held by the Town and not expended, will be refunded to the A pplicant upon completion or
termination of the project.
Advantages:
Development pays its own way
Accurate assessment and cost recovery per-project
Applicants have the ability to reduce their review fees by submitting complete, code-
compliant development review applications
Disadvantages:
More complex implementation
Option 3: Combination Model
Overview: The Combination Model would require a Cost Reimbursement structure for more
involved applications, such as Development Plans, Minor and Major Subdivisions, Code
Amendments, and Annexations, while simpler applications, such as Administrative Appeals,
Legal Lot Determinations, and ROW and Easement Vacations would use a flat fee.
Advantages:
Accurate assessment and cost recovery per-project
Simple, standardized model for less complex projects
Applicants have the ability to reduce their review fees in the case of some development
review applications by submitting complete, code-compliant documents
Disadvantages:
No mechanism for accurately assessing staff time per-project and per-project type for
typically smaller projects
More complex implementation
Building Permit Valuation: Though the current Building Permit Fee Schedule is equal to
comparable communities, such as the Larimer County Building Department, the City of
Loveland, the City of Longmont, the Town of Breckenridge, and the Town of Vail, the building
department only collects an estimated 60% of actual building permit fees because of
inaccurate valuations provided by applicants, particularly for new structures. Based on
anticipated 2015 building permit revenue, the Building Department will yiel d $175,000, or a
56% coverage rate of total expenses related to building permits, estimated at $310,632.60
(See Exhibit B). While coverage for the Building Department is comparatively strong,
equitability is a key issue only solvable through changes in the valuation assessment and audit
structure. According to data provided by the Chief Building Official, building valuations for new
structures are typically only estimated at 60% actual cost, while new additions, porches, etc.
are estimated at 100% actual cost. This inequity could be addressed through an Estes Park-
specific valuation model, as well as a regulated and standardized audit procedure for low
valuations.
Option 1: Maintain Existing System
Overview: This option would involve maintenance of the existing building permit valuation
system, audit system, and waivers. The existing system is expected to yield a 56% coverage
rate of departmental expenses related to building permits, including staff time and a pplicable
overhead costs.
Advantages:
No changes required
Disadvantages:
No anticipated improvements in cost recovery
Inequity among job types
Option 2: Use International Code Council Valuation System with the Colorado Regional Cost
Modifier of 0.99
Overview: This option would entail using the most recently issued International Code Council
Building Valuation Data (BVD), which is updated every six months, with the Colorado Regional
Cost Modifier of 0.99 to estimate the value of building permit re view projects.
Advantages:
Greater equity and uniformity for all construction and development types
Consistency with other Colorado communities
Disadvantages:
More complex implementation than maintaining existing system
Statewide cost modifier does not accurately depict Estes Park’s construction valuations
Option 3: Locally-based Assessment Model and Standardized Audit Procedure
Overview: This option would require the adoption of a locally-based valuation assessment
model and audit procedure.
Valuation Assessment Model: Because of higher construction costs in Estes Park, the current
assessment model is inaccurate and enables low valuations. This option would propose an
assessment model with per square foot calculations based on a range provided by a pool of
local contractors. The ranges would encompass each of the construction types typical to the
Town. For example, new residential construction would be based on whether the home is a
Basic Home, a Spec Home, a Custom Home, and a Log Home.
Audit Procedure: This option would also include the adoption of a standardized audit
procedure for low valuations. If a stated valuation on a building permit application deviated
from the average range compiled by local construction data, the formal bid would be
requested, and the project would be audited following construction.
Advantages:
Improved cost recovery through valuation accuracy and standardized project auditing
Adherence to ICC standards with a local modifier
Greater equity across project types
Disadvantages:
Would require feedback and consensus from the development community prior to
implementation
Most complex implementation
Budget
Changes to the Development Review Fee Schedule would impact Account Number 101 -1600.
Changes to the Building Permit Valuation and Audit Procedures would impact Account Number
101-2300.
Level of Public Interest
The level of public interest of the general citizenry is expected to be high for changes to
building permit valuation and audit procedures, as changes to the current system will impact a
wide range of construction projects and the fees incurred. The level of public interest is
expected to be high for the Planning Division development review fee schedule, specifically for
the development community, as any changes to the fee schedule will impact the overall costs
for development projects.
Next Steps
We recommend that any proposed changes to the Development Review Fee Schedule or
Building Permit Review Valuation and Audit Procedures are referred to the development
community via a Stakeholder Meeting to discuss options and perceived impact on
development pace and general environment.
Attachments
Exhibit A: Development Review Fee Schedule at Different Coverage Levels
Exhibit B: Building Permit Review Revenue and Expense Coverage
Exhibit C: Development Review Fee Schedule: Comparison Communities
EXHIBIT C
Community Development Department: Planning Division
Development Review Fee Schedule: Comparison Communities
Application Type Estes Valley (Town)Estes Valley (County)Loveland Longmont Thornton Nederland Crested Butte
Annexation 1,500.00$ N/A
$1,217 (PUD) + acreage
fee*
$2,282 (Not PUD)+
acreage fee*
$1,000 (up to 1 acre)
$2,000 (up to 10 acres)
$3,500 (up to 40 acres)
$3,500 + $10/acre (>40)
$300+ $75 per
each additional review
$16,900 (Standard)
$8,450 (Residential; no further
development)Cost reimbursement agreement
Rezoning 3,000.00$ 4,000.00$ 760.00$ $750 + $10/acre
$695 + 173.75 per each
additional review
$1,000 + $1,000 deposit for
review fees Cost reimbursement agreement
Easement Vacation 100.00$ 100.00$ $305 $250 +$100/additional
$250 + $62.50 per each
additonal review $500 N/A
Right-of-Way Vacation 100.00$ 200.00$ $305 $250 +$100/additional
$250 + $62.50 per each
additonal review $500 $20/25 ft
Administrative Appeal 300.00$ 200.00$ $300 N/A
90 + $22.50 per each
additional review N/A N/A
Variance: BOA Prior to Construction 500.00$ 500.00$ $229 $250 + $100/additional N/A N/A N/A
Variance: BOA After Construction 880.00$ 500.00$ 229.00$ " "N/A N/A N/A
Staff Level Minor Mod: Prior 100.00$ 50.00$ N/A
$100 (SF residential)
$250 (all others)
$250 + $62.50 per each
additonal review N/A N/A
Staff Level Minor Mod: After 185.00$ 50.00$ N/A " "" "N/A N/A
Pre-Application Conference 500.00$ 800.00$ N/A N/A N/A N/A N/A
Development Plan 2,000.00$ Varies
$100 General SDP
$1,217 PUD
Development Plan +
acreage fee**
$1,000 (3 year vesting)
$5,000 (> 3 year vesting)
$580 + $145 per each
additional review $1,000 + $1,000 Deposit Cost reimbursement agreement
Development Plan Amendment 600.00$ N/A N/A DP fees include amendments
$290 + $72.50 per each
additional review N/A Incl. in cost reimbursement agreement
Development/ Annexation Agreement 1,500.00$ N/A 300.00$
$750 (up to 10 lots or 10 acres)
$1,500 (up to 100 lots or 100
acres)N/A Cost reimbursement agreement Cost reimbursement agreement
Development Agreement Mod 600.00$ -$ 150.00$
$250 (administrative)
$500 (all others)N/A Incl. in cost reimbursement agreement Incl. in cost reimbursement agreement
Prelim Sub Plat 3,000.00$ Varies 913.00$
$750 (up to 10 lots or 10 acres)
$1,500 (up to 100 lots or 100
acres)
$2,500 (>100 lots or 100 acres)
$230 + $15.00/acre, +25% per
each additional review $500 Cost reimbursement agreement
Final Sub Plat 3,600.00$ 3,600.00$ 1,065.00$
$500 (up to 10 lots or 10 acres)
$1,000 (up to 100 lots or 100
acres)
$1,500 (>100 lots or 100 acres)" "$500 Cost reimbursement agreement
Amended Plat 560.00$ 600.00$ 264.00$ SD fees include amendments
$250 + $62.50 per each
additonal review $500 Incl. in cost reimbursement agreement
Prelim Condo Map 1,200.00$ 285.00$ N/A N/A N/A N/A N/A
Final Condo Map 285.00$ 285.00$ N/A N/A N/A N/A N/A
*Acreage fee:
PUD: Up to 400 $53.50 per acre; Over 400 $4.55 per acre
Non-PUD: Up to 400 $38.00 per acre; Over 400 $3.05 per acre
**Acreage fee:
Up to 1200 Acres $15.25 per acre
Above 1200 Acres $4.55 per acre
Town of Estes Park Community Development DepartmentFEE SCHEDULE ANALYSIS:DEVELOPMENT REVIEWBUILDING PERMITS
A NEW ENVIRONMENT: Fee Schedule amendments have not been completed in over 10 years. INEQUITY: The current systems are allowing certain projects to be subsidized by others. Changes could level the field for all applicants.COST RECOVERY: Fee Schedule changes would allow for greater internal cost recovery, and thus a more sustainable General Fund.Why is this important now?
Scope of Analysis•Development Review: Three methods to improve cost recovery based on current departmental revenue and expenses. •Building Permits: Three methods to address inaccuracy and inequity in valuation assessments for building permit fees.
Development ReviewThree Methods for More Equitable Fee Collection
What is Development Review?
What is Development Review? •A key step in the process between development concept and development reality•Ensures a development’s compliance with a municipality’s development code (in Estes Park, the Estes Valley Development Code) •Prevents future code compliance issues that impact the community•Forwards long-range planning goals, such as the Comprehensive Plan and the Downtown Plan
How and Why are Fees Collected?Development Review Fees help cover costs associated with the review process, including staff time and overhead costs. A standard fee is collected for pre-application meetings and formal applications, based on the type of application.
Typical Overhead Costs:Printing CostsOffice SuppliesSite Visit MileageAdministrationLegal FeesTypical Planning Staff Costs:Pre‐Application Meeting(s)Completeness ReviewCode Compliance ReviewPlanning Commission Hearing(s)Town Board Hearing(s)
Estes Park Development Review: Cost Coverage2015 Anticipated Expenses: $274,527(Staff Time, Legal Fees, Overhead)2015 Anticipated Revenue: $94,636(Larimer County IGA, Development Review Fees)
Estes Park Development Review: Cost Coverage2015 Anticipated Cost Coverage: 34%BRECKENRIDGE: 100%NEDERLAND: 68%STEAMBOAT: 26%BOULDER: 200%
Question: What level of cost coverage for development review is appropriate? Answer: It depends. Key Factors:1. How a community perceives new development2. How a community wants to fund its Community Development Department3. How a community wants to fund its long-range planning efforts
LOW EXPENSE COVERAGE: The department is currently covering 34% of related staff time and overhead costs. INEQUITY: The current fee model charges the same fee for the same project types, meaning more complex projects are subsidized by simpler ones. VOLUME: The current volume of applications has lead to increased staff time and department overhead.Current Estes Valley Development Review Fee Schedule: Key Disadvantages
Inequity: An Example220 Virginia Drive: Staff-Level Development PlanThe complexity of this project, stemming from jurisdictional issues related to a private court order, have resulted in increased staff time during both the pre-application phase and the formal application phase. Prior to a formal application submittal, the CDD spent a total of $1,064 in staff time on a pre-application meeting, informal meetings with the HOA and developer, and a site visit. $1064 is over 50% of the $2,000 application fee.
OPTION A: CURRENT FEE SCHEDULEOPTION B: COST REIMBURSMENT MODELOPTION C: COMBINATION MODELDevelopment Review Fee Schedule: OptionsStandard fee schedule based on a selected level of cost coverage. Developers responsible for tracked costs associated with application. Cost reimbursement or standard fee, depending on the application type.
Building Permit ReviewThree Methods for More Equitable Fee Collection
What is Building Permit Review?
What is Building Permit Review? •A key step in the process between development concept and development reality•Ensures that all buildings in the Town, from new homes, to porches and gazebos, to large-scale multi-family and commercial projects, adhere to international and local building, fire, and other standards that keep occupants and the community safe
How and Why are Fees Collected?Building Permit Fees help cover costs associated with the review process, including staff time and overhead costs. Fees are based on the dollar valuation of the job, which is provided by the applicant.
Estes Park Building Permit Review: Cost Coverage2015 Anticipated Expenses: $310,633(Staff Time, Administration, Overhead)2015 Anticipated Revenue: $175,000(Building Permit Fees)
Estes Park Building Permit Review:Cost Coverage2015 Anticipated Cost Coverage: 56%While the Building Division’s cost coverage for Building Permit Review is strong (over 50%), inequity among project valuations is a key disadvantage to the current system.
Estes Park Building Permit Review:Cost CoverageEstes Park’s Building Permit Fee Schedule is comparable to most communities in Colorado. However, the valuations provided by applicants, especially for new home builds, are not accurate when compared to actual construction costs in the Town. Because the fees are based on this valuation, the fee collected is inaccurate when the valuation is inaccurate.
DWARFED EXPENSE COVERAGE: The department’s expense coverage is limited by inaccurate valuations.INEQUITY: While new builds often lowball valuations, additions and other project types offer more accuracy, meaning their fees are assessed at a higher rate.VOLUME: The current volume of applications has lead to increased staff time and department overhead.Building Permit Fees: Key Issues
OPTION A: CURRENT SYSTEMOPTION B:ICC REGIONAL MODIFIEROPTION C: LOCALIZED VALUATIONDevelopment Review Fee Schedule: OptionsMaintain current system for assessing project valuations.Adopt the International Code Council’s Valuation System with the Colorado Regional Modifier (0.99) Assess project valuations based on average local construction costs.
To Recap…•The Planning Department yields a 34% expense coverage rate for Development Review, while the Building Department yields a 56% expense coverage rate for Building Permit review and issuance.•Changes to the Fee Schedules and Systems could offer improved cost recovery, a level playing field, and a more efficient department.
To Recap…•The Town Board should determine the level of expense coverage appropriate for the Community Development Department. •Next steps should include a stakeholder meeting with the development community to assess any negative impacts.
Timeline•Mid-October: Stakeholder Meeting to discuss potential changes to the Community Development Department Fee Schedules and Valuation Procedures•Tuesday, November 10th: Adoption of new Development Review Fee Schedule and Building Permit Valuation Procedures, concurrent with 2016 Budget Adoption
September 22, 2015
International Property Maintenance
Code (Dangerous Buildings Code) and
Adoption of New International Building
Code Draft Reviews
Briefing on Storm Drainage and Flood
Management Issues and Management
Options. Discussion of Storm Water
Utility.
October 19, 2015
Final Avalanche Economic
Development Strategy Report
November 10, 2015
Discussion of Noise Ordinance
Items Approved – Unscheduled:
(Items are not in order of priority)
Update on the Status of the Events
Center Finances
Update on Upcoming Construction
Schedules for Major Projects Through
2018
Fish Hatchery Property Discussion
Process for interviewing for Boards
and Commissions
Local Preference Purchasing Policy
Update on Environmental Assessment
NEPA Process Draft Concerning the
Loop
Follow Up on Broadband Issues
Study Session Items for Board
Consideration:
None
Future Town Board Study Session Agenda Items
September 8, 2015