Loading...
HomeMy WebLinkAboutPACKET Public Works, Utilities and Public Safety 2012-10-11Preparation date: October 1, 2012 * Revision date: 10/04/12 NOTE: The Public Safety, Utilities and Public Works Committee reserves the right to consider other appropriate items not available at the time the agenda was prepared. AGENDA TOWN OF ESTES PARK PUBLIC SAFETY, UTILITIES & PUBLIC WORKS COMMITTEE October 11, 2012 8:00 a.m. Board Room, Town Hall 1. PUBLIC COMMENT 2. PUBLIC SAFETY a) RECOMMENDATIONS TO THE TOWN BOARD i) None. b) REPORTS i) Verbal Updates and Committee Questions. 3. UTILITIES a) RECOMMENDATIONS TO THE TOWN BOARD i) Enterprise Fund Large Maintenance Expense Policy. Dir. Bergsten & Supt. Boles. ii) Conditional Waiver of Monthly Base/Minimum Charge Policy. Dir. Bergsten. b) REPORTS i) Conditional Waiver of Monthly Base/Minimum Charge Policy. Dir. Bergsten. ii) Accountable Water. Director Bergsten & Superintendent Boles. iii) Light & Power Capital Project Update (Verbal). Supt. Steichen. iv) Verbal Updates and Committee Questions. 4. PUBLIC WORKS a) RECOMMENDATIONS TO THE TOWN BOARD i) None. b) REPORTS. i) Stanley Fairgrounds Sanitary Sewer Civil Site Work Update. Dir. Zurn. ii) Bond Park Phases I & III and Phase V Construction Update. Dir. Zurn. iii) Verbal Updates and Committee Questions. 5. ADJOURN * * UTILITIES DEPARTMENT Memo To: Public Safety, Utilities & Public Works (PUP) Committee Town Administrator Lancaster From: Utilities Director Bergsten Finance Officer McFarland Water Superintendent Boles Date: October 11, 2012 RE: Enterprise Fund Large Maintenance Expense Policy Background: Historically, the largest operations and maintenance (O&M) cost incurred by the Utilities Department was the replacement of the filter media at Glacier Water Treatment Plant (~$150,000). Marys Lake Water Treatment Plant uses membrane treatment technology. The membrane replacement costs are estimated to be $900,000. A good financial practice would be to plan for these expenses by saving funds every year leading up to the actual large maintenance activity. Doing so addresses two important items: rate stabilization and compliance with our bond rate covenant. Finance Officer McFarland has worked with the Town's auditor and Platte River Power Authority (PRPA) to craft an implementation of Governmental Accounting Standards Board (GASB) Statement 62. This standard allows for the accrual of funds for future operations and maintenance costs. The Town is required to approve a policy which adopts the practice of accruing funds for the use of planned major maintenance costs based on GASB Statement 62. Attached to this memo is staff's recommended policy. Budget: $117,000 per year. Recommendation: Staff recommends approval of the adoption the attached Accrual of Major Maintenance Costs Policy to the Town Board, to be included on the Town Board agenda as an Action Item for October 23, 2012. TOWN OF ESTES PARK, COLORADO ACCRUAL OF MAJOR MAINTENANCE COSTS POLICY Policy This policy applies to all future major maintenance costs at enterprise fund utility facilities wholly owned by the Town of Estes Park that have estimated costs in excess of $150,000 (referred to as a “major maintenance cost”). Major maintenance costs are defined as overtime wages, materials, contracted labor and supplies related to major maintenance activities. Ninety percent of the total estimated major maintenance costs will be accrued on an annual basis as follows: The accrual period will begin with the first year after the last major maintenance activity and continue through the year of the next major maintenance activity. The amount charged to the large maintenance account each year will be based on the projected major maintenance costs divided by the number of years in the accrual period. Background The Marys Lake and Glacier Water Treatment Plants are wholly owned by the Town of Estes Park. Each plant faces major maintenance costs. For Marys Lake the manufacturer recommends the membranes be replaced every ten years. Glacier's filter media has historically required replacement every fifteen years. The next major maintenance is planned for 2017 at Glacier. This major maintenance involves removal and replacement of filter media and various inspections, maintenance of pumps, instruments, basins and other maintenance work with total estimated costs generally in excess of $150,000. The next major maintenance at Mays Lake is planned for 2022. This major maintenance involves removal and replacement of membranes and various inspections, maintenance of pumps, instruments, basins and other maintenance work with total estimated costs expected to be $900,000. In order to match the appropriate expenses with the revenues received, the accrual method of expensing major maintenance costs will be implemented. Governmental Accounting Standards Board Statement No. 62 - Codification of Accounting and Financial Reporting Guidance (formerly FAS Statement No. 71 – Accounting for the Effects of Certain Types of Regulation) recognizes and provides for accrual or deferral of expenses or revenues and states regulators sometimes include costs in allowable costs in a period other than the period in which the costs would be charged to expense by an unregulated enterprise. This accounting treatment has been approved by the Town's auditors. Accounting Treatment To assure expenses are not overstated prior to the large maintenance activity, 90% of the reasonably estimated overtime wages, materials and supplies, and replacement power costs are accrued. Regular labor costs will be paid in any period regardless of the activity and, therefore, are not included in the accrual calculation. Any difference between the actual costs incurred for the large maintenance activity and the accrued liability is charged or credited to expense at the time that the major maintenance costs occur. The accrual estimate for future years will be adjusted, if necessary, to reflect increases or decreases in large maintenance costs. Prior to the Major Maintenance: A separate maintenance expense account is charged at the beginning of each year during the accrual period for the major maintenance activity. The annual charge is calculated using 90% of the total estimated cost (overtime wages, materials, contracted labor and supply costs) of the major maintenance activity divided by the number of years in the accrual period. During the Major Maintenance: Actual maintenance charges will be coded to the normal accounts set up for the maintenance work. In the year when the major maintenance takes place, the major maintenance accrual will be transferred to those accounts being used to pay for the actual major maintenance charges. This policy is effective November 1, 2012. UTILITIES DEPARTMENT Report To: Public Safety, Utilities & Public Works Committee Town Administrator Lancaster From: Director Bergsten Superintendent Boles Date: October 11, 2012 RE: Conditional Waiver of Monthly Base/Minimum Charge Policy Background: The Utilities Department charges fixed monthly minimums to cover a number of fixed costs (e.g. meter reading, tree trimming, laboratory analysis…). It has been the practice of the Utilities Department to require payment of applicable monthly minimum charges to keep the account active. There are no exceptions to this practice. This practice is being reviewed in light of the loss of homes in the Woodlands Heights fire. The Utilities Department has been asked to consider a conditional waiver of monthly base/minimum charges in cases where customers have a personal disaster resulting in the temporary loss of service. The following tables display all related costs for such situations:  Electrical Service, Residential  (October 2012) Rates  1 Monthly minimum  $          10.00   2 Monthly Customer Charge  $             6.35  3 Overhead Connection Fee  $        290.00   4 Construction Temporary  $          50.00   5 Underground connection fee  $        190.00   6 New meter charge  (standard/time of use)  $   80 / $320  7 Deposit (depending on history)  $        100.00   Water Service, Residential‐3/4"  (October 2012) Rural Rates  1 Monthly Customer Charge  $          31.97   2 Connection Charge (materials,  Labor and equipment, 3/4")  $        250.00   3 Water Meter 3/4"  $        345.00   4 System development fees  $     5,263.00   5 Water rights fees  $     5,450.00   Electric Utility Current Practice By paying the monthly minimum charges, electric customers do not incur any charges associated with reconnecting their service. This also grandfathers the use of overhead electric service lines. If the customer chooses to not pay monthly minimum charges, the service account is closed and reactivation of the service location is treated like every new service. Their service must be underground and all charges 4 through 7 above apply. Water Utility Current Practice By paying the monthly minimum charges, water customers retain their "Tap" (charges 4 and 5 above: system development fees and water rights fees). Water service charges 2 and 3 above must be reviewed on a case by case basis. If the customer chooses to close the water service account and not pay monthly minimum charges, reactivation of the service location is treated like every new service. Charges 4 and 5 will apply. Charges 2 and 3 must be reviewed on a case by case basis. If the Town Board would like to consider a different practice, the Utility Department would recommend the following: Qualifying Customers - any utility customer unable to use the Town's utility service due to the loss of the use of their building and the Town's utility service in a natural disaster. Electric Utility Conditional Waiver of Monthly Base/Minimum Charges Upon request and approval, a customer's monthly minimum, base and/or customer charge may be waived for a period not to exceed nine (9) months or when service is restored, whichever comes first. Electric customers will not incur any charges associated with reconnecting their service. Any previously existing overhead electric service lines will remain as a viable option. If the customer does not restore service after nine (9) months, all monthly minimum, base and/or customer charges will be restarted. If these charges are not paid, the service account will be considered voluntarily closed under the guidelines of the utility billing department. Reactivation will be treated the same as a new service account i.e., their service must be underground and applicable charges 3 through 7 will apply. Water Utility Conditional Waiver of Monthly Base/Minimum Charges Upon request and approval, a customer's monthly minimum, base and/or customer charge may be waived for a period not to exceed nine (9) months or when service is restored, whichever comes first. These water customers will retain their "Tap" (system development fees, water rights fees). Meter and connection charges must be reviewed on a case by case basis. If the customer does not restore service after nine (9) months, all monthly minimum, base and/or customer charges will be restarted. If these charges are not paid, the service account will be considered voluntarily closed under the guidelines of the utility billing department. Reactivation will be treated the same as a new service account. A new "Tap" must be purchased (system development fees and water rights fees). Meter and connection charges must be reviewed on a case by case basis. UTILITIES DEPARTMENT Report To: Public Safety, Utilities & Public Works (PUP) Committee Town Administrator Lancaster From: Water Superintendent Boles Utilities Director Bergsten Date: October 11, 2012 RE: Accountable Water In response to Trustee Blackhurst’s request, we are providing information regarding accountable water. Background: Accounting for the loss of water in the distribution system is standard practice for water utilities. Losses can be categorized in three ways: • metered losses • estimated losses • unaccounted losses The Water Department places a value on these losses with the marginal cost of treatment. The latest marginal cost was included in the Town’s Water Conservation Plan. The marginal cost of water was calculated to be $0.77 per 1,000 gallons (see attached page 40 of the plan). Metered losses include water continuously discharged to maintain water quality in pipes that would otherwise result in stale water, i.e. "bleeders". Metered Water Losses for July Description Gallons Value ($)  Bleeders metered, not billed              635,070     Plant Analyzers/Sample Pumps              669,600    Plant Sewer              533,192     Total July Metered, not billed 1,837,862   $              1,415   Estimated losses include water drawn from fire hydrants for use by the Fire Department or water released from fire hydrants during annual flushing. Estimated Water Losses for July Meter adjustment @ 2%            1,387,273     Hydrant Use, Larimer County                       900     Main Leak, Driftwood Avenue                    6,500     Fire, High Drive                600,000     Main Flushing ‐ Tunnel Road                  17,600     Main Flushing ‐ Lexington Lane                  15,900     Main Flushing ‐ Pine Knoll  Drive                  2,900    Total July Estimated      2,031,073   $                 1,564   Unaccounted losses include losses from leaks in the distribution system. Unaccounted Water Losses for July Total July Unaccounted         3,490,162   $                 2,687   In water distribution systems, bleeders are installed at the end of dead-end mains to intentionally discharge water to prevent stagnation thus maintaining water quality. They are also used seasonally to prevent shallow water lines from freezing. The Town of Estes Park has four bleeders used for water quality. Other bleeders are activated between December and April to prevent freezing. The preferred application of bleeders would be along the distribution system where the water can be discharged into the sewer system. This can happen inside a private residence. In such cases the customer is not charged for consumption. Only the monthly base charge is collected. The monthly cost increase from bleeders used for freeze protection is approximately $1,219. Metered Water Losses February vs. July  Description Feb. Gallons Feb. Value ($) July Gallons July Value ($)  Bleeders metered, not billed             2,217,595  $1,708               635,070  $489  The annual figures are below. Total Water Treated in 2011: 507,021,281 GAL  Marginal value   85% accounted for      430,968,089     15% unaccounted for         76,053,192   $           58,560.96   Annual bleeders not billed         11,173,284   $             8,603.43   Water Conservation Plan 40 The cost of water supply only applies to the MWTP and covers a “carriage cost” and “power interruption cost” associated with the Town’s water rights through the Bureau of Reclamation. The cost of treatment is comprised of the operation and maintenance costs at the Town’s two water plants, which includes chemicals, power, and sewer discharge. The O&M costs do not include staff time because regardless of the number of gallons of water treated, the same equipment must be operated and maintained. No savings in staff time will be realized by conservation measures. Table 7-3 summarizes the cost components described above. Table 7-3 Estimated Cost to Supply Treated Water to Town Treated Water O&M Cost Item Cost per 1,000 Gallons of Treated Water Chemicals $0.33 Power $0.11 Sewer Discharge $0.048 Water Supply $0.28 Total $0.77 Notes: (1) Total treated water produced at GWTP and MWTP in 2011 was 537.43 million gallons. For the purposes of this evaluation, it is assumed that the Town will continue to operate the plants the same time periods during any given year. (2) Total chemical cost at GWTP and MWTP in 2011 was $178,000. (3) Total power cost for GWTP and MWTP in 2011 was $60,000. (4) Total sewer discharge cost at MWTP in 2011 was $26,000. GWTP does not have any costs associated with sewer discharge. The MWTP sewer discharge cost was divided by the total treated water production at both plants. (5) The cost of water supply at MWTP includes a "carriage cost" and "power interruption cost". The total water supply cost for MWTP in 2011 was $150,000. As shown in Table 7-3, the estimated cost to supply treated water to the Town is $0.77 per 1,000 gallons. To evaluate the cost effectiveness of the Town’s Conservation Program components, this cost was compared to the cost to “save the water” using the various conservation efforts identified. The cost to save the water was estimated by dividing the net present value (NPV) of each program component by the total water savings generated over the life span of the program component. The NPV calculation includes both the initial capital cost as well as the operation and maintenance costs over the life span of the program (see Table 7-1), discounted at a 4% interest rate. A copy of the NPV calculations is provided in Appendix D. A “cost effectiveness” number was generated by subtracting the cost to save the water from the cost to treat the water, with a positive result indicating that the conservation effort is cost effective and a negative result indicating that the conservation effort is not cost effective. Table 7-4 summarizes the cost effectiveness calculations described above. These calculations were only performed on the program components where an estimate of the potential water savings was available. Note, the cost of Third Stage Treatment will be addressed using a different calculation since this conservation effort is related to the cost to discharge water to the sewer in addition to the cost to retreat the water at the plant after the third stage process. ENGINEERING Re port To: Public Safety, Utilities and Public Works Committee Town Administrator Lancaster From: Scott Zurn, PE, CFM, Public Works Director Date: October 3, 2012 RE: Stanley Fairgrounds Sanitary Sewer Civil Site Work Update Update: The Public Works Department has been working with the design team of the Stall Barn to prepare the civil site and new sewer main at the Stanley Park Fairgrounds. As directed by the Town Board, Public Works is proceeding with the bidding of the MPEC and Stall Barn projects for completion as early as May of 2013. Consequently, staff is proceeding with the bidding of civil and site work of leveling and filling the areas that the two buildings will be constructed on and the sewer main which will serve these buildings. Public Works is moving forward on the civil package in order to get the ground related improvements done prior to frost conditions this winter. Please see the attached drawings for reference. OWNER: DATE: SHEET TITLE: SHEET NUMBER:CHECKED BY:DRAWN BY:AT STANLEY PARK FAIRGROUNDSESTES PARK, COTOWN OF ESTES PARK 170 MACGREGOR AVE. PO BOX 1200 ESTES PARK, CO 80517 STANLEY PARK FAIRGROUNDS MULTI-USE STALL BARN | BID DOCUMENTS MULTI-USE STALL BARN OWNER: DATE: SHEET TITLE: SHEET NUMBER:CHECKED BY:DRAWN BY:AT STANLEY PARK FAIRGROUNDSESTES PARK, COTOWN OF ESTES PARK 170 MACGREGOR AVE. PO BOX 1200 ESTES PARK, CO 80517 STANLEY PARK FAIRGROUNDS MULTI-USE STALL BARN | BID DOCUMENTS MULTI-USE STALL BARN OWNER: DATE: SHEET TITLE: SHEET NUMBER:CHECKED BY:DRAWN BY:AT STANLEY PARK FAIRGROUNDSESTES PARK, COTOWN OF ESTES PARK 170 MACGREGOR AVE. PO BOX 1200 ESTES PARK, CO 80517 STANLEY PARK FAIRGROUNDS MULTI-USE STALL BARN | BID DOCUMENTS MULTI-USE STALL BARN ENGINEERING Report To: Public Safety, Utilities and Public Works Committee Town Administrator Lancaster From: Scott Zurn, PE, Public Works Director Kevin Ash, PE, Public Works Civil Engineer Date: October 11, 2012 RE: Bond Park Phases I & III – MacGregor Avenue Paver Repair Bond Park Phase V Improvements Update: Construction activities are underway in Bond Park. On Monday, October 1st both Cornerstone Construction and Taylor Kohrs mobilized crews and began their respective projects. Bond Park Phases I & III – MacGregor Avenue Paver Repair Public Works has formalized a Change Order with Cornerstone that modifies the existing contract and extends the completion of the project to November 21, 2012. A construction schedule has been delivered that defines the details on how this will be achieved. The original project design and specifications will remain in place. The only addition will be the installation of a geogrid fabric between the subgrade and base material layers. Terracon will remain as the geotechnical materials testing company. Public Works has hired the Farnsworth Group to provide Construction Observation services during the construction schedule. On October 1, Cornerstone began placing orange construction fence arou the perimeter of the MacGregor Aven roadway and sidewalk. A crew of 7 pulled up pavers and stacked them in piles about 10 high across the roadway. This effort was completed by the end of day Tuesday (10/2). On Wednesday, pavers were cleaned, stacked on pallets and set off the roadway onto the adjacent sidewalk areas. Cornerstone’s schedule has them continuing this de-construction effort through the end of next week (10/12). This includes removal and disposal of existing sand, base material and substandard subgrade material. nd ue the Bond Park Phase V Improvements On October 1, Taylor Kohrs began placing chain link security fence around the project perimeter. Signs were placed along Elkhorn Avenue to re-direct pedestrian traffic around the construction zone. For the staging of materials and equipment, Taylor Kohrs is using the bus turnout and the parking spaces along the south side of Bond Park. Demolition activity came along quickly, and by the end of day Tuesday, removal of the sidewalk along Elkhorn, the pavers, drinking fountain, streetlights, trees and memorial plaques, irrigation, drinking fountain and sod were all complete. Bond Park Phase V has a 2–Phase construction schedule. Phase 1 has an end date of November 21 and focuses on the installation of underground utilities. Taylor Kohrs has committed to delivering an 8’ wide sidewalk prior to the Thanksgiving parade and festivities. Similar to the MacGregor Avenue paver repair project, Public Works has contracted with the Farnsworth Group to provide Construction Observation services and Terracon to provide geotechnical materials testing services. Phase 2 of construction will commence in the spring and will be completed by Memorial Day 2013.