HomeMy WebLinkAboutPACKET Public Works, Utilities and Public Safety 2011-01-13Preparation date: January 3, 2011
NOTE: The Public Safety, Utilities and Public Works Committee reserves the right to consider other
appropriate items not available at the time the agenda was prepared.
AGENDA
TOWN OF ESTES PARK
PUBLIC SAFETY, UTILITIES & PUBLIC WORKS COMMITTEE
January 13, 2011
8:00 a.m.
Board Room, Town Hall
1. PUBLIC COMMENT
2. PUBLIC SAFETY
a) RECOMMENDATIONS TO THE TOWN BOARD
i) Estes Valley Victim Advocate 2011 Contract. Chief Kufeld.
b) REPORTS
i) 3rd Quarter Fire District Statistic Report. Chief Dorman.
3. UTILITIES
a) RECOMMENDATIONS TO THE TOWN BOARD
i) Financial Software Upgrade. Utilities Engineer Bergsten.
a) REPORTS
i) Light & Power Update. Superintendent Steichen.
4. PUBLIC WORKS
a) REPORTS
i) Transportation Hub Funding. Director Zurn.
5. ADJOURN
Page 1
POLICE DEPARTMENT Memo
To: Public Safety, Utilities and Public Works Committee
From: Wes Kufeld, Chief of Police
Date: January 13, 2011
RE: Estes Valley Victim Advocates Contract
Background:
Each year, the Estes Valley Victim Advocates receive funding from the Town of Estes
Park for services rendered to crime victims who are residents of Estes Park. There are
no changes to the previous year’s contract.
Budget:
$7,920.00 as budgeted in 2011 which is distributed equally each quarter from line item
101-2100-421.22-98.
Recommendation:
Staff recommends the Estes Valley Victim Advocate Contract to the Town Board, to be
included on the Consent Agenda at the February 8, 2011 Town Board meeting.
CONTRACT FOR SERVICES
TOWN OF ESTES PARK
THIS CONTRACT, dated this ____________ day of______________, 2011, is by and between the TOWN OF
ESTES PARK, STATE OF COLORADO, 170 MacGregor Ave., Estes Park, CO, a body politic and corporate
(the "Town"), and ESTES VALLEY VICTIM ADVOCATES, INC. ("Contractor".)
RECITALS
WHEREAS, the Town plans to continue a project entitled, "ESTES VALLEY VICTIM
ADVOCATES," and
WHEREAS, the Town desires to retain the services of the Contractor to assist it in studies relative
thereto and the planning and designing thereof as set forth in this agreement.
AGREEMENT
NOW, THEREFORE, for and in consideration of the covenants and conditions set forth herein, and
for other good and valuable considerations, the sufficiency of which is hereby acknowledged, the Town and
the Contractor agree as follows:
1. CONTRACT DOCUMENTS: the "Contract Documents" shall consist of the following:
a. This Contract;
b. The Scope of Services, attached hereto as Exhibit "A;"
All of which are incorporated by reference as though set forth in full herein, whether or not
attached hereto, and shall form an integral part of this contract. If there is any conflict between this
Contract and the other Contract Documents, this Contract shall control.
2. THE WORK:
The Contractor shall furnish the labor, equipment, materials and supervision necessary for or
incident to the complete and timely performance of everything described or reasonably implied
from the Contract Documents (the "Work") except as provided for herein.
3. INSPECTION:
The Town reserves the right to monitor and evaluate the progress and performance of the
Contractor to ensure that the terms of this agreement are being satisfactorily met in accordance with
the Town and other applicable monitoring and evaluation criteria and standards. Contractor shall
cooperate with Town relating to such monitoring and evaluation.
4. PAYMENT:
Upon satisfactory completion of the Work, and provided that Contractor is not in default of the
Contract, the Town shall pay the Contractor the firm fixed price of SEVENTY NINE HUNDRED
AND TWENTY DOLLARS AND 00/00 ($7,920 to include pagers in total amount) in quarterly fund
distribution on or about January 2011, April 2011, July 2011 and October 2011, in equal increment
payments of $1,980.
5. TERMINATION:
The Town reserves the right to terminate this Contract, in whole or in part, with or without cause
upon thirty (30) days written notice to the Contractor.
In the event of termination, the Contractor shall incur no additional expenses and shall perform no
further services for the Town under this Contract as of the date of receipt of the notice of
termination unless otherwise specified by the Town.
The Town shall pay the Contractor for all services satisfactorily performed prior to receipt of the
notice of termination and for other services required by the Town to be completed prior to
termination and satisfactorily performed.
In the event of termination for cause, the Contractor shall be liable for any and all damages,
including without limitations, the cost of procuring similar supplies or services and all other costs
and expenses incurred by the Town because of such failure.
6. INDEPENDENT CONTRACTOR STATUS, PAYMENT OF TAXES AND UNEMPLOYMENT
INSURANCE:
In performing the Work, the Contractor acts as an independent contractor and is not acting as an
agent, servant or employee of the Town. The Contractor is solely responsible for necessary and
adequate worker's compensation insurance and shall be responsible for withholding and paying
all federal and state taxes. The Contractor and its employees are not entitled to unemployment
insurance benefits unless unemployment compensation coverage is provided by the Contractor
or an entity other than the Town.
The Contractor understands and agrees that it is an independent contractor under the terms and
conditions of this Agreement. As such, the Contractor is not entitled to employment or insurance
benefits through the Town. Also, the Contractor understands and agrees that it is solely
responsible for all Federal and State income tax, FICA taxes and unemployment insurance taxes.
The Contractor also understands and agrees that it is responsible for workers' compensation
coverage and taxes for itself and any employee.
7. INDEMNIFICATION:
The Contractor hereby agrees to and does indemnify, defend, save and hold the Town harmless from
any and all liability, loss, costs, charges, penalties, obligations, expenses, attorney's fees, litigation,
judgments, damages, claims and demands of any kind whatsoever in connection with, arising out of
or by any reason of any violation of the contract or of any law, ordinance or regulation by the
Contractor, his agents, employees, servants, subcontractors, business invitees; or by reason of any
injury or damage however occurring to any person or persons whomever (including the Contractor,
his agents, employees, servants, subcontractors, or business invitees) or to property of any kind
whatsoever and to whomever belonging (including the Contractor, his agents, employees, servants,
subcontractors or business invitees)- or from any cause or causes whatsoever arising out of the
performance of services hereunder.
1. INSURANCE REQUIREMENTS:
a. The Contractor and its subcontractors shall purchase and maintain such insurance in a company or
companies licensed to do business in the State of Colorado as will protect them from claims which may
arise out of or result from operations under the Contract whether such operations be by themselves or
by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for
whose acts any of them may be liable. The insurance required by this Contract is set forth below:
b. Comprehensive General Liability: The Contractor shall procure and keep in force during the
duration of this contract a policy of Comprehensive General Liability insurance insuring the Contractor
and naming the Town as an additional insured against any liability for personal injury, bodily injury, or
death arising out of the performance of services hereunder and against liability for property damage
with a combined single limit of at least $1,000,000. The limits of said insurance shall not be a limit to the
liability of the Contractor hereunder.
c. Comprehensive Automobile Liability: The Contractor shall procure and keep in force during the
duration of this contract a policy of Comprehensive Automobile Liability insurance, insuring the
Contractor and naming the Town as an additional insured against any liability for personal injury,
bodily injury, or death arising from the use of motor vehicles and shall cover operations on or off the
site of all vehicles controlled by the Contractor, whether they are owned, non-owned, or hired, with a
combined single limit of at least $1,000,000. The limits of said insurance shall not, however, be a limit to
the liability of Contractor hereunder.
d. Other Insurance: The Contractor shall procure and keep in force during the term of this Contract,
Worker's Compensation and such other insurance as may be required by any applicable law, ordinance
or governmental regulation.
e. Terms of Insurance: Insurance required shall be with companies qualified to do business in the State
of Colorado with a general policy holder's financial rating of not less than that of "A" as set forth in the
most current edition of "Best's Insurance Reports", and may provide for deductible amounts as the
Contractor may deem to be reasonable for completion of the Work, but in no case greater than $20,000.
The Contractor shall not do nor permit to be done anything which shall invalidate the insurance policies
referred to in this section, and the Contractor shall immediately advise the Town in writing if a
reduction in coverage or other modification of the insurance coverage occurs. Insurance policies shall be
for the mutual and joint benefit and protection of the Contractor and the Town. Such policies shall be
written as primary policies not contributing to and not in excess of coverage which the Town must
carry.
f. Proof of Insurance: Prior to the commencement of the Work, the Contractor shall furnish to the Town
certificates of insurance policies evidencing the required coverage. Such certificates shall provide that
cancellation of the policies in such insurance shall not be effective until thirty (30) days after written
notice to the Town.
The Contractor shall identify whether the type of coverage is "occurrence" or "claims made". If the type
of coverage is "claims made" which at renewal, Contractor changes to "occurrence", Contractor shall
carry a six-month tail.
The Contractor agrees to insert the substance of these insurance requirements in all subcontracts.
Furthermore, the Town will hold the Contractor responsible in the event the subcontractor fails to have
adequate insurance.
g. The Town reserves the right to approve variations in the above requirements upon request of the
Contractor, in the Town's sole discretion.
h. Nothing contained in this agreement constitutes a waiver of the Town’s governmental immunity
pursuant to the applicable provisions of the Colorado Governmental Immunity Act.
9. AMENDMENT:
a. This Contract contains the entire agreement of the parties relating to the subject matter
hereof and, except as provided; this Contract may not be modified or amended except by
written agreement of the parties.
b. The Town reserves the right to omit any of the tasks identified in the Scope of Services
upon written notice to the Contractor.
10. MISCELLANEOUS PROVISIONS:
Governing Law and Venue: This Contract shall be governed by the laws of the State of Colorado and
venue shall be in the County of Larimer, State of Colorado.
Assignability: This Contract is voidable by the Town if assigned by the Contractor without the prior
written consent of the Town.
Survival Clause: The indemnification provision of this Contract shall survive the completion of the
Work and the termination of this Contract.
Compliance with the Laws: The Contractor shall observe and comply with all applicable laws,
including but not limited to federal, state and local laws, regulations, rules or ordinances that effect
those employed or engaged by it, the materials or equipment used for the conduct of the Work, and
shall procure any and all necessary approvals, licenses and permits, all at its own expense.
Severability: If any provision in this Contract shall be declared by a court of competent jurisdiction to
be invalid, such decision shall not invalidate any other part or provision hereof.
Renewal: This contract is subject to renewal annually upon review and agreement of the Contractor
and the Town.
IN WITNESS WHEREOF, the parties hereto have executed this Contract.
TOWN OF ESTES PARK
BY: __________________________________
Mayor
ATTEST:
__________________________________________
Town Clerk
ESTES VALLEY VICTIM ADVOCATES, INC.
ATTEST: BY: ___________________________________
___________________________________________
EXHIBIT A
SCOPE OF SERVICES
1. Term of Service: The term of this agreement shall be from January 01, 2011, through December 31,
2011, unless earlier termination pursuant to the Contract. This Contract shall be renewed and/or
modified as necessary before the beginning of a new grant term and prior to the termination date of
the Contract.
2. Remuneration for Services:
The Town shall pay Contractor the amount of $7,920 for immediate victim assistance as set forth in
paragraph three ("Services Provided") herein. Providing services to victims of crime ($5,000) and
crisis intervention ($2,500) in non-criminal incidents and ($420) for pagers. The Town's obligation to
Contractor shall not exceed a total of $7,920 for the entire term of this Contract.
The Town shall also provide "in kind" contributions such as temporary use of a telephone and/or
office while in the service of victims at the Police Department.
The Town will also continue to provide monetary (which is included in total contract amount)
assistance to cover the expense of pagers not to exceed $420 per year. Pagers will be maintained by
the Contractor.
3. Services Provided:
Contractor shall provide the following services:
1. Representatives to respond by phone or in person for immediate crisis intervention and
counseling.
2. Contractor shall provide twenty-four (24) hour phone referral services and/or other assistance
to victims of all crimes in accordance to the laws of the State of Colorado.
4. INDEMNIFICATION:
By accepting referrals from the Town to Estes Valley Victim Advocates, Inc., Contractor hereby
agrees to fully comply with the provisions of the Americans with Disabilities Act ("ADA").
Contractor agrees to be fully responsible and liable for making counseling and support programs
available for use by disabled participants.
Contractor agrees to and does indemnify and hold the Town and its agents and employees harmless
from and against any and all claims, damages, losses, injuries, costs and expenses, including
attorney's fees relating to or arising out of Contractor's failure to comply with the ADA.
5. POLICE RECORDS RELEASES:
By accepting copies of official and confidential Police Reports, Contractor agrees to not release these
reports, or any information contained therein, to anyone except its own agents/representatives who
are acting in the capacity of providing the aforementioned services to the Town.
Contractor assumes full responsibility for any and all breaches of confidentiality or security of
records; and agrees to and does indemnify the Town for any and all liability, loss, damage, costs,
expenses and attorney's fees resulting from said breach by Contractor, its agents, servants, and
employees.
6. BI-ANNUAL AND ANNUAL REPORTS:
Contractor shall provide the Town with bi-annual reports on the type and total number of crimes
responded to through the Project.
These statistics shall include whether the victim was initially contacted at the time the crime
occurred, noting if response was either in person, at the scene, or by phone at the scene.
If initial victim contact transpires at a later time, the statistics shall indicate whether the victim was
contacted in person, by phone, or by mail.
Contractor shall provide the Town with bi-annual reports and adequate documentation referencing
any paid positions within their organization maintained in whole or in part by grant monies
obtained by the Town.
Depending upon the term and conditions of the grant, Contractor shall also provide the Town with
the total final statistics that, in turn will be submitted to the grantor for any required reporting
period.
ESTES VALLEY FIRE PROTECTION DISTRICT
2010- 3rd QUARTER & YEAR TO DATE
INCIDENT RUN REPORTS
OF THE
ESTES PARK VOLUNTEER FIRE DEPARTMENT
Page 1 of 35
Page 2 of 35
Page 3 of 35
Page 4 of 35
Page 5 of 35
Page 6 of 35
30405060708090100Number of calls3rd Quarter Comparison of Calls by Type200720082009201001020Type of callPage 7 of 35
Page 8 of 35
102030405060Number of calls2010 3rd Quarter Calls -within/outside city limitsin cityout city010Type of callsPage 9 of 35
Page 10 of 35
Page 11 of 35
Page 12 of 35
Page 13 of 35
Page 14 of 35
Page 15 of 35
ESTES VALLEY FIRE PROTECTION DISTRICT
2010 YEAR TO DATE
INCIDENT RUN REPORTS
Page 16 of 35
Page 17 of 35
Page 18 of 35
Page 19 of 35
Page 20 of 35
Page 21 of 35
Page 22 of 35
100150200250Number of callsYear to Date {01/01/2010} - {09/30/2010} Comparison of Calls by Type2007200820092010050Type of callPage 23 of 35
Page 24 of 35
406080100120140Number of callsYear to Date {01/01/2010} - {09/30/2010} within/outside city limitsin cityout city020Type of callsPage 25 of 35
Page 26 of 35
Page 27 of 35
Page 28 of 35
Page 29 of 35
Page 30 of 35
Page 31 of 35
ESTES VALLEY FIRE PROTECTION DISTRICT
2010 3rd QUARTER AND YEAR TO DATE
TRAINING REPORT
Page 32 of 35
Page 33 of 35
1442010 3rd Qtr Training Hours407.0560FIREDIVEEMSPage 34 of 35
428250.262010 Year to Date Training Hours2387.54FIREDIVEEMSPage 35 of 35
To: PUP Committee
From: Reuben Bergsten, Utilities Engineer
Date: 13 January 2011
RE: Financial Software Upgrade
Background:
The Town's current financial software, NAVILINE Series®, was purchased in 1992. It is
a very robust system that has served the Town for more than 18years with very few
changes. Many hardware and software advances have been made over the last 18
years creating barriers to productivity and cost savings. For example, a NAVILINE
server replacement is $35k as compared to a standard server cost of $7k. Compatibility
problems between NAVILINE and current internet and PC applications result in
duplication of data entry and lost opportunities in electronic customer services.
In March of 2010, Administration requested a committee be formed to consider
alternatives. There was a consensus to upgrade the existing software which led to
negotiations with Sungard Public Sector.
Using a five-year cost of ownership for the existing system, the Town was able to
negotiate a price which does not exceed our current annual costs while enabling new
modules to be added when available. The five-year cost of doing nothing includes
annual maintenance fees and hardware replacement costs totaling $339,168. The
negotiated five-year price for Sungard's OneSolution® is $292,367 which includes
maintaining our existing system, hardware for the new system and migration services.
The new software and hardware platform will enable the Town to take advantage of
additional software modules as they become available.
Budget:
625-2500-425.26-33, DATA PROCESSING EQUIPMENT, $34,400.00
502-7001-580.33-33, DATA PROCESSING EQUIPMENT, $53,667.12
Recommendation:
I recommend upgrading to the Sungard One Solution package, for a cost of $88,067.12,
to the Town Board, to be included on the Consent Agenda at the January 25, 2010,
Town Board meeting.
IT Memo
LIGHT & POWER Report
To: PUP Committee
From: Todd Steichen, Line Superintendent
Date: January 13, 2010
RE: Light & Power Update
Background:
On New Year’s Eve, Light & Power customers serviced by the (4) circuits out of the
Mary’s Lake Substation experienced a power outage lasting anywhere from 2 to 5
hours.
The outage began at approximately 5:30 pm and was caused by a combination of
events. Circuit load imbalances led to a relay tripping which opened the circuit switchers
de-energizing the Substation Transformers. With our seasonal loads it is very hard to
keep our system balanced year round within the 10% bandwidth the relay was set at.
(Industry standard is 10% to 20%)
With the extremely cold temperatures and increased electric loads due to the holiday,
we experienced a new peak load, exceeding 26.6 megawatts. Our last system peak
was 25.1 MW. In addition, we switched some of the load from the Fish Creek circuit
(E.P. Substation) to the Allenspark circuit (Mary’s Lake Substation) late Wednesday 12-
29-2010 due to a dig-in by our contractor. They damaged an underground primary cable
just south of the Uplands on the Fish Creek circuit. This required the switching and
along with the peak loads caused the load imbalances beyond its 10% bandwidth
settings.
It was determined that it would be faster to have Platte River Power Authority adjust the
relay bandwidth settings to 20% and re-energize the Mary’s Lake Substation than to
transfer all the load over to the Estes Park Substation.
After the relay setting had been adjusted and the Substation Transformers were re-
energized we started picking up load slowly. This is standard practice when dealing with
cold load pickup which can be as high as 7 times the normal load.
Most customers were without power for 2.5 hours while a few were out for up to 5
hours due to some cold load pickup issues in the field.
ENGINEERING Report
s
To: PUP Committee
From: Scott A. Zurn, PE, CFPM
Date: January 13, 2010
RE: Transportation Hub Funding
Background:
In 2003, the Transportation Alternatives Study by Felsburg, Holt and Ullevig, contained
a variety of recommendations to alleviate congestion and parking problems in Estes
Park, including the development of a transportation hub at Stanley Park.
In the spring of 2009, there was an opportunity to apply for American Recovery and
Reinvestment Act (ARRA) funding for this project. Due to the tight ARRA application
deadline, staff had two weeks to apply; David Evans Associates (DEA) of Denver
created the preliminary design for $27,241. DEA is recognized by the Colorado
Department of Transportation (CDOT) and the Federal Highwa ys Administration as an
expert in the field of transit design. DEA’s design scope included the assumption that
necessary drainage and utility relocation work would have already been completed as
part of the Multi-Purpose Events Center (MPEC) construction which was originally
scheduled to take place prior to the Transportation Hub project. With those
considerations, DEA’s bidding documents estimated the Transportation Hub would cost
approximately $1.2 million.
The Town was not successful in obtaining ARRA funds, but DEA’s design was used to
apply for Colorado Mitigation and Air Quality (CMAQ) grant funding, which the Town did
receive in two separate grant awards totally $913,000 in 2010. The CMAQ grants
required a local match and in September, 2010, the Town Board authorized $250,000 to
be funded from the Community Reinvestment Fund to meet this requirement and to fully
fund the project.
Since funding to construct the Transportation Hub had now been secured prior to
identifying funding for the MPEC, it was necessary to redesign the Transportation Hub
to include the utility relocations and drainage facilities. This brought the construction
estimate up to approximately $1.437 million, so it was necessary to consider eliminating
previously included features such as trees, bus shelters and lighting.
In the meantime, staff applied for an additional $245,750 in 2011 grant funding through
FASTER Local Transit Program. This award will not require additional matching funds
beyond the already budgeted $250,000 . In addition, these funds would allow the Transit
Hub construction project to include lighting, bus shelters, and trees as alternates.
Funding:
Amount Description Source
$913,000 CMAQ grant funding
(secured)
Colorado Department of
Transportation (CDOT)
$250,000 Local match to CMAQ
grants (required)(secured)
Community Reinvestment
Fund, 201-5400-511.35-52
$274,750 FASTER grant funding
(pending)
Applied for from CDOT
Total projected funding with FASTER grant:
1.437 million
Total projected funding without FASTER grant:
$1.163 million