HomeMy WebLinkAboutPACKET Community Development Community Services 2013-11-21
Thursday, November 21, 2013
Community Development & 8:00 a.m.
Community Services Committee Town Hall Board Room
1. PUBLIC COMMENT
2. COMMUNITY SERVICES
a) RECOMMENDATIONS TO THE TOWN BOARD
i. None.
b) REPORTS
i. Visitor Center Quarterly Report. Manager Salerno
ii. November/December Events Report Director Winslow
iii. Verbal Updates and Committee Questions.
3. COMMUNITY DEVELOPMENT
a) RECOMMENDATIONS TO THE TOWN BOARD
i. None
b) REPORTS
i. Code Compliance Program Update. CC Officer Kleisler
ii. Courtyard Shops Update. Dir. Chilcott
iii. Flood Recovery Update: Floodplain Management and Dir. Chilcott and
Stream/River Corridor Protection (Verbal Update). CBO Birchfield
iv. Verbal Updates and Committee Questions.
4. ADJOURN
AGENDA
Town of Estes Park, Larimer County, Colorado, October 24, 2013
Minutes of a Regular meeting of the COMMUNITY DEVELOPMENT /
COMMUNITY SERVICES COMMITTEE of the Town of Estes Park, Larimer
County, Colorado. Meeting held in Town Hall in said Town of Estes Park on the
24nd day of October, 2013.
Committee: Chair Ericson, Trustees Elrod and Norris
Attending: All
Also Attending: Town Administrator Lancaster, Directors Chilcott & Zurn,
Museum Director Fortini, Shuttle Coordinator Wells, Chief
Building Official/Floodplain Manager Birchfield, and
Recording Secretary Limmiatis
Absent: None
Chair Ericson called the meeting to order at 8:00 a.m.
PUBLIC COMMENT.
Outgoing Ambassador President Sandy Osterman introduced Mare Bradley, the newly
appointed Ambassador President. Ms. Bradley expressed her excitement over her new
position and looks forward to getting to know the Town Board and community.
COMMUNITY SERVICES DEPARTMENT.
REPORTS.
Reports provided for informational purposes and made a part of the proceedings.
Museum Quarterly Report – Director Fortini informed the committee the Museum
did not suffer any damage to the facilities due to the recent flooding, although
approximately one hundred feet of pipe (penstock) is now exposed at the
hydroplant. With extra hours put in by staff, the Museum was able to complete
the opening of the Sandzén exhibit on time. This was the first community event to
happen after the flood and the reception was well received. Trustee Elrod asked
for a clarification of the de-accession process. Director Fortini explained when
artifacts no longer fit within the mission or scope of the collection, either due to
deterioration or are no longer of historical value, staff attempts to find other
institutions that will benefit from these items. If no institution can be found that is
willing to accept these artifacts, staff will reach out to individuals. Not much
monetary value is generated during the de-accession process, but a high value is
placed on the rapport that is created with other institutions. Director Fortini
informed the Committee they are attempting to train the docents to lead the
Downtown Walking tours on a consistent basis so people know to go downtown
at a specific time and place to be able to go on a tour. Administrator Lancaster
Community Development / Community Services – October 24, 2013 – Page 2
pointed out we have all recently lived through a historical moment and asked if
the museum staff has considered taking in items to remember the flood of
September 2013. Director Fortini stated staff is crafting a policy on accepting
digital photos that relate to the flood. Staff anticipates to start building the history
in January 2014.
Year End Shuttle Report – Shuttle Coordinator Wells reported a 52.3% increase
in ridership in 2013. The trolley was one of the main contributing factors for the
increase. It is assumed a large portion of the riders were locals and summer
workers. The daily average increased by approximately 55%. Staff received a
number of requests to start the buses earlier in the day. Trustee Norris remarked
how the intention of the shuttles was to reduce traffic, but an unexpected benefit
of community bonding has also occurred. Elderly members of the population are
riding to get out of the house and socialize. Coordinator Wells stated there has
been an increase in the use of mobile devices to retrieve shuttle information
corresponding to a reduction in calls to the Visitor Center for information.
Additional discussion with local businesses would take place prior to the 2014
season to address shuttle stop locations. The Committee was very impressed
with the increase in ridership and commended Coordinator Wells for his work.
Verbal Updates:
o Ambassadors – Director Winslow stated staff has completed a
Memorandum of Understanding with the Ambassadors.
o Visitor Center – Several new computers were installed in the lobby for
visitors.
o Rodeo – The Town was again in the top 5 of the medium size Rodeo and
asked to give several presentations at PRCA.
o Scandinavian Festival – This event would return in the summer of 2014 as
a Town sponsored event.
o Fall Back Beer Festival – This new event would be held Saturday,
November 2, 2013 at Riverside Plaza and include beer brewing
demonstrations, tastings and pairings with local restaurants.
o Tree Lighting Ceremony – This year’s event would include honoring local
heroes from the flood event.
o Staff Update – Director Winslow informed the Committee on the various
activities the Community Services staff was involved in during the flood
such as coordinating food, fuel, and equipment deliveries, finding housing
and helping with the Disaster Assistance Center.
COMMUNITY DEVELOPMENT DEPARTMENT.
REPORTS.
Reports provided for informational purposes and made a part of the proceedings.
Community Development / Community Services – October 24, 2013 – Page 3
Floodplain Management Report Post Flood – Chief Building Official Birchfield,
acting as the Town’s Floodplain Manager, described the four floodplains in Town
– Black Canyon, Fish Creek, Fall River and the Big Thompson. He stated since
the Town of Estes Park participates in the National Flood Insurance Program any
property owner, including renters, can purchase flood insurance. The
Development Code has regulations that exceed the national guidelines, which
help staff manage the local floodplains properly. The Fish Creek and Fall River
floodplains incurred substantial damage in the recent flood, including the rivers
moving up to 50 feet in some places, the tremendous amount of deposited
material, stream beds have risen and been lowered, mud slides, rock slides,
major erosion in minor drainage channels, and damage to infrastructure along
the rivers. Some lots are no longer developable. Lots that used to be conforming
are no longer due to the movement of the water channel. He stated about half of
the 7,500 buildings in the Estes Valley have been effected by this event, with one
home considered substantially damaged, only the garage remains. Fourteen
additional buildings have received some structural damage, but are repairable.
All of the damaged structures are outside of the one percent chance floodplain.
The maps that were being used to manage the floodplain are no longer accurate.
Birchfield informed the Committee that the Community Development Department
has stopped issuing permits for permanent construction and enacted a temporary
suspension on issuing permits for existing and new building permits along
waterways. Individuals are not allowed to reclaim their land or reconfigure the
waterways to pre-flood conditions; however, temporary work to stabilize banks,
shore up buildings, repair bridges and protect investments continues to be
allowed. The suspension ends on November 12, 2013. As the Floodplain
Manager, Birchfield relies on the high water mark to manage the floodplains. He
stated staff has three to four people in the field collecting data to aid in future
decisions about the floodplains in the valley. In the short term, staff continues to
focus on the major concerns of bank stabilization prior to the ground freezing and
spring runoff, the remobilization of fine materials, and the shortage of available
construction materials. Fish Creek and Fall River floodplains have been made
the highest priority. Director Chilcott has identified public and private financial
resources available to restore the waterways. Private property owners are
responsible for their bank stabilization.
REVISION TO TOWN FLOODPLAIN REGULATIONS.
The State of Colorado has updated floodplain regulations, therefore, the Town has until
January 14, 2014 to get updated regulations in place to be in compliance. In reviewing
the Municipal Code, it was noticed there was a typo in the Appeals Board in the
Floodplain Ordinance, which should be the Board of Appeals rather than the Board of
Adjustment. The revised regulations come from the Colorado Water Conservation
Board and are higher than the National Flood Insurance Program. There were three
major changes: redefine the floodway from a 12 inch rise to a 6 inch rise, free board
Community Development / Community Services – October 24, 2013 – Page 4
standards will increase to one foot or more, and one may elevate a building out of the
floodplain, but may not in turn install a basement. Additional changes include items
which are already taking place administratively. Section 17.28.090 of the Municipal
Code would require an engineer to apply for a floodplain development permit and upon
completion of the work a Floodway No Rise Certificate shall be submitted by the
engineer of record.
PUBLIC COMMENT.
Cory LaBianca/town resident, questioned if floodplains are associated with natural
waterways not associated with the rivers. CBO Birchfield reported that the floodplain
ordinance does not regulate natural waterways, but it is addressed in the Development
Code.
Chuck Bonds/town resident questioned how the National Flood Insurance Program
arrives at their reimbursement numbers. He thanked Town staff in helping him address
building and flooding issues, and requested additional staff for the building division to
address the ongoing issues. Director Chilcott stated the Natural Resource Conservation
Service has a program that addresses restoration of streams and rivers and would be
providing support for rehabilitation in the valley.
REPORTS.
Reports provided for informational purposes and made a part of the proceedings.
Community Development Monthly Report –Director Chilcott, stated all activities
outside of flood related issues are being postponed. The Community
Development Department is attempting to keep up with the basic activities that
must be completed, but most staff activity has been focused on flood recovery.
Staff would resume the Comprehensive Plan update as soon as possible.
TEMPORARY SIGN POLICY.
This topic was not discussed at the meeting.
There being no further business, Chair Ericson adjourned the meeting at 10:02 a.m.
Barbara Jo Limmiatis, Recording Secretary
To: Community Development/Community Services Committee
Town Administrator Lancaster
From: Teri Salerno, Visitor Services Manager
Date: November 21, 2013
RE: Visitor Services Quarterly Report - 3rdQ: July / August / September
Third Quarter Visitor Center Traffic:
The Visitor Center experienced a decrease of 5.59% in foot traffic in July, August, and
September over the third quarter last year. In 2012, we saw 184,459 people come
through our doors, for an average of 2,005 people per day. This year we had 174,146
people during our third quarter, for an average of 1,893 each day.
It is interesting to note that before the September flood, July and August were both up
19.2% collectively over July and August in 2012; this equaled 23,505 more people. The
difference in foot traffic in September was so significant to cause the entire quarter to
fall below the same quarter last year. The Visitor Center saw 62,047 people in 2012 and
only 28,229 this September, to create the largest decrease in a single month during the
summer in our history: - 54.5%. This totals 33,818 less people just in the month of
September.
January through September 2013, visitor counts are down 4.35% overall when
compared to the same time-period in 2012. This means that the Visitor Center has seen
13,797 fewer people YTD through September; in 2012 we had 317,115 total visitors
compared to 303,318 this year. Again, had the flood not occurred, it is likely that the
Visitor Center would have seen an increase over last year, for the YTD count after
August 2013 was up by 7.85% or 20,021 people.
Rocky Mountain National Park also experienced increases in visitation in both July and
August. In July, the park saw 60,861 more visitors and in August, 32,721 more visitors
than the same months in 2012. By the end of August, RMNP was up 7.8% YTD over
2012. RMNP use reports are not yet available for September, but it is safe to assume
that the park’s visitation counts plummeted with the flood.
Community Services Memo
Visitor Center Traffic
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Total
2013 27,030 102,142 174,146 303,318
2012 31,464 101,192 184,459 47,275 364,390
2011 32,960 100,558 212,458 55,716 401,692
2010 19,877 76,080 179,627 49,394 324,978
2009 21,492 78,442 164,098 37,807 301,839
2008 16,797 64,642 144,648 37,433 263,520
2007 18,060 68,195 158,669 31,116 276,040
2006 8,999 54,602 139,046 29,522 232,169
Third Quarter Telephone Calls:
Visitor Services staff answered .85% less telephone calls during the third quarter of
2013 over the same time period in 2012. This is the smallest percent decrease we have
seen for the third quarter since 2009. The Visitor Center received 6,368 calls in July,
August and September in 2012, for an average of approximately 69.2 calls per day. This
year, we fielded 6,313 calls, for an average of 68.6 calls per day. It is interesting to note
that September call counts were actually up by 180 calls over the total calls in
September last year. The current trend would have indicated calls would be less than
the number received in 2012. The increase in calls in September can be attributed to
the many inquiries received in the call center about the flood.
Visitor Center Telephone Calls
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Total
2013 2,055 4,087 6,313 12,455
2012 2,357 5,112 6,368 2,341 16,178
2011 3,119 5,946 8,779 2,855 20,699
2010 3,934 7,162 9,772 3,224 24,092
2009 3,931 7,608 11,035 3,796 26,370
2008 3,538 6,615 10,122 3,281 23,556
2007 3,899 6,575 10,521 3,360 24,355
2006 3,891 6,127 9,298 3,002 22,318
Retail Sales:
Retail sales through the end of September total $25,463 and the sales for the third
quarter equal $15,927. Last year, third quarter sales totaled $17,911. Third quarter
sales have always been the highest. With the significant decrease in foot traffic in
September, it is understandable that sales are approximately $2,000 behind last year.
The year-end sales projection now comes in close to $30,000.
Total Retail Sales Revenue by year
2005 $17,675
2006 $39,299
2007 $43,554
2008 $36,485
2009 $42,582
2010 $40,175
2011 $39,192
2012 $34,499
2013 thru Sept 30 $25,463
Visitor Center Hours of Operation:
The Visitor Center hours of operation officially changed on Monday, September 30: The
center is now open Monday through Saturday, 9A – 5P and on Sunday, 10A – 4P.
Public-use Computers Now at the Visitor Center
In order to better serve our guests, the Visitor Center lobby now has four computers
available to the public. The computers have been well received and well used.
Volunteer Ambassadors:
The number of volunteer Ambassadors currently totals 63. This is a solid number going
into the winter. The change of hours at the center also brings a change in volunteer
assistance; Ambassadors now help at the Visitor Center front counter only on the
weekends.
There are six people at this time who are interested in spring training and becoming
Ambassadors in 2014. It would not be unusual for the number of interested people
wanting to volunteer to continue to increase until Spring Training next year.
Budget: N/A
Recommendation: None
To: Community Development/Community Services Committee
Town Administrator Lancaster
From: Bo Winslow, Director of Community Services
Date: November 21, 2013
RE: November Event Report
Report:
November is a busy time of the year preparing for all the holiday events. Staff has been
working on the Lighting Ceremony and the Catch the Glow Parade since our busy
summer season ended. There has also been a push to create new events for this
season as well. The Town, EALA, EVPC, the Restaurant Association, the Estes Park
Wedding Association, Visit Estes Park and local business leaders have partnered
together to bring several new events to the area. (See list below)
Ice Skating Rink opens – November 21
Lighting Ceremony – November 23
Catch the Glow Parade – November 29
Family Fun Holiday Weekend – December 6-8 (New)
o Holiday Movie Marathon
o YMCA Winter Day Camp
Dasher 5K & Tinsel Tavern Tour – December 14 (New)
Last Minute Holiday Shop-A-Thon – December 20-22 (New)
New Year’s Eve Celebration – December 31 (New)
Memo
Community Services Department
Tree Lighting Ceremony:
This year we will be partnering with the Recreation District for a new addition to the
celebration. This new activity will be added to the traditional ornament craft stations,
s’mores station, cookie decorating and community sing-a-long.
Another change for this year’s event is that we are changing the focus for the nominees
for the tree lighting ceremony to local heroes of those who served or made a difference
in our community during the devastating flood in September. We looking forward to
recognizing those individuals who went above and beyond the call of duty to help their
friends and neighbors.
Catch the Glow Parade:
Catch the Glow Parade is coming along nicely. Staff has worked hard on sponsorship
this year and it has paid off with all floats being sponsored. The design of the floats has
been taken to a level that everyone is excited about. There are seven new float designs
this year and an additional eleven floats receiving face lifts.
Recap of upcoming New December Events:
Family Fun Holiday Weekend in Estes Park, December 6‐8
This will be a weekend full of family fun activities, holiday shopping,
and recreation in the national park! Estes Park will be hosting a Holiday Movie
Marathon downtown all weekend. We will encourage guests to pop in and out
to see their favorite holiday flicks while shopping and visiting our unique and
family-friendly restaurants. The experience will really shine by having
downtown bustling with Santa, roaming carolers and Christmas characters.
The YMCA is also offering a Winter Day Camp so guests can drop their
children off for fun adventures, while they finish up their holiday shopping.
Dasher 5K & Tinsel Tavern Tour on December 14th
The Reindeer Dash 5K will take place downtown Estes Park, starting at 10 am
on Saturday, December 14th. The Tinsel Tavern Tour pub
crawl starts at 7pm at the Estes Park Resort for the kick‐off party.
Prizes will be given for the best costumes before participants hop aboard the
shuttle and head to the participating taverns around Estes Park.
Last-Minute Luminary Shop-a-thon, December 20-22:
Luminaries will line the streets and shops will extend their hours Friday and
Saturday nights. Getaway packages are being offered by local businesses to
entice guests into a pre-Christmas weekend escape. Restaurants will also
feature special menus and selections.
Staff is also working on events to take place starting the first of the year, including a
Winter Warm Up in lieu of the traditional Winter Festival. Details on those events are
still in the works. The goal for all involved in these events is to give our locals more
things to do, draw guests to town, benefit the local businesses and have minimal impact
on the budgets of those hosting the event.
All in all, we are looking forward to a very exciting year in 2014.
Page 1 of 4
To: Community Development/Community Services Committee
Town Administrator Lancaster
From: Phil Kleisler, Planner I/Code Compliance Officer
Alison Chilcott, Community Development Director
Date: November 21, 2013
RE: Six Month Code Compliance Report
Objective:
Report to Community Development/Community Services Committee on key code compliance
activities undertaken by staff during the last six months.
Present Situation:
I. Building a New Service
The Town of Estes Park hired a full-time Code Compliance Officer/Planner in March 2013.
The goal in establishing this position was to create a community-centric code compliance
program that focuses on education, outreach and enforcement, while also contributing to the
growing need for planning responsibilities.
Community Input:
During the spring of 2013 the Town held a series of community meetings to receive feedback
on code compliance priorities. These meetings were well attended and the participants
provided valuable feedback. Following these sessions Community Development staff visited
with numerous groups to gain additional feedback.
Based on what we heard, the Code Compliance Program’s mission statement is:
To contribute to the safety, aesthetics, and quality of life in the Estes Valley by attaining
compliance with adopted codes.
An effective code compliance program:
Partners with the community to advance the goals of the program.
Community Development
Memo
Page 2 of 4
Maintains a high level of consistency, reliability and proper follow-through.
Contributes to the Town’s high quality of life by prioritizing safety as a key concern and
addressing issues related to aesthetics.
Includes education, outreach and enforcement.
The highest priorities should include:
Animals: Work with the community and animal control to ensure safe animal-human
interactions.
Dark Sky Lighting: Address light pollution, including the past, current and future
violations.
Noxious Weeds: Create a multi-faceted approach to the management of noxious weeds
in the Estes Valley.
Vacation Rental Homes: Take measures to ensure that vacation homes are operating in
a manner consistent with our local codes.
Junk Accumulation: Seek to decrease junk and trash accumulation on residential and
commercial properties.
Wildfire Mitigation: Partner with other organizations to strengthen fire mitigation and
prevention in the Estes Valley.
Policy and Procedures
Following these outreach sessions, staff began drafting policies and procedures for the code
compliance program. The draft policy, scheduled to be completed later this month, was
informed by the comments received during the community meetings.
Staff are also taking proactive measures to address the highest community priorities (listed
above). To that end, program procedures are being drafted that outline steps staff will take to
proactively address certain issues. A draft copy of the junk accumulation procedures are
attached to this report as an example.
New Technology and Workflows
Community Development staff worked with Don Widrig to create a database program for code
compliance activities. The new database allows staff to create and track code cases, and
quickly generate official correspondence as needed. Various office management systems
were also established to effectively coordinate daily operations.
Page 3 of 4
II. Outreach and Education
Weeds
Noxious weeds are an increasing problem
in the Estes Valley. If not controlled, these
invasive plants can dominate the landscape
and permanently damage natural plant
communities and ecosystems.
In an effort to continue the battle against
noxious weeds, the Town coordinated the
first annual community weed pull day on
June 15, 2013. This event was a
partnership among the Town, Rocky
Mountain National Park, Estes Land
Stewardship Association, Association for
Responsible Development and Larimer
County. The clean-up area was a highly
visible space along High Drive, close to the
Rocky Mountain National Park south entrance. In addition to raising awareness of invasive
plants in the Estes Valley, participants helped control the spread of weeds to the National Park
and the Woodland Heights area.
Following the community weed pull day, staff met with the Estes Land Stewardship Association
to development a weed prioritization map. The new map will be used for staff’s proactive
enforcement efforts.
Presentations
During the first six months of the code compliance program, staff made the following
presentations:
Association for Responsible Development: overview of community input and code compliance
procedures;
Estes Land Stewardship Association: program overview;
Board of Realtors: priorities of their membership and sign code overview;
III. Enforcement
Dashboard Summary
The attached dashboard report summarizes key indicators for the months of July through
October, 2013. As the summary indicates, code compliance cases substantially decreased
during September and October (due to the flood). The types of complaints remain varied, with
most relating to junk accumulation, weeds and sign code cases. The number of sign code
cases was relatively high in September due to staff proactively seeking compliance in the
commercial downtown area.
Town employees, partners and volunteers
during the community weed pull event.
Page 4 of 4
Enforcement Actions
If possible, staff strives to resolve code compliance matters prior to taking any enforcement
actions. There are generally three enforcement steps taken when a resolution in not reached
in a timely matter:
1. Notice of Request: a letter allowing property owners and/or tenants 15 days to come into
compliance.
2. Notice of Violation: notice sent via certified mail stating the alleged violation, along with
applicable evidence. Such notices may be appealed through a Colorado court of competent
jurisdiction.
3. Summons to Municipal Court: states the alleged violation and court date.
From July through October, the Community Development Department issued 24 letters of
request and 20 notices of violation. Two (2) summonses to Municipal Court were issued: one
for screening of a trash receptacle along Big Thompson Avenue and another for screening of
equipment and vehicles along Moraine Avenue.
Vacation Home Rentals
Staff have taken proactive steps to ensure that vacation home rentals are licensed with the
Town and operative in a matter consistent with applicable codes. To that end, staff are
reviewing online listings of vacation home rentals and making contact with those not licensed
with the Town or not in compliance with Town codes. We estimate that approximately seventy
(70) vacation home rentals will be contacted during the month of November.
Proposal:
Report only. No action needed at this time.
Advantages:
N/A
Disadvantages:
N/A
Action Recommended:
Report only. No action needed at this time.
Budget:
N/A
Level of Public Interest:
Moderate
Sample Motion:
N/A
Town of Estes Park Code Compliance
Summary Report: July - October, 2013
Number of Cases Over Time Cases Opened/Closed
General Updates Cases by Category
Mission Statement:
To contribute to the safety, aesthetics, and quality of life in
the Estes Valley by attaining compliance with adopted codes.
Education/Outreach
Introduction to Estes Park Lodging Association
Special meeting with the Bear Task Force
Met with ELSA representative to create a weed priority map
Organize a community weed pull day
Presentations: ARD, ELSA, Board of Realtors
Enforcement
While the Town strives to achieve voluntary compliance
with local codes, enforcement actions are still necessary in
some cases.
Current Case Backlog 141
Official Correspondence
Courtesy Letter of Request 24
Notice of Violation 20
Summons 2
11
25
6
4
0
5
10
15
20
25
30
Jul-13 Aug-13 Sep-13 Oct-13
Business
License, 6
Signs, 9
Exterior
Lighting, 1
Junk/Trash,
11 Weeds, 6 Work w/o
Permit, 1
Private
Matter, 2
Vacation
Home, 2
Misc. Land
Use, 4
Other, 5 Flood-
Related
, 4
July August Sept October
Closed (5)(17)(6)(11)
Opened 11 25 6 4
Net Cases Open
(Closed)6 8 0 (7)
(20)
(15)
(10)
(5)
0
5
10
15
20
25
30
Contact: Phil Kleisler
Code Compliance Officer/Planner I
pkleisler@estes.org
Junk Accumulation
PROACTIVE ENFORCEMENT PROCESS
Revised November 2013
PROCESS SUMMARY:
1. Applicable Legislation
2. Education/Outreach
3. Calendar of Proactive Field Inspections, Investigations and Enforcement
4. Abatement
5. Follow up
6. Close case
PROCESS DETAIL:
1. Applicable Legislation
• Estes Park Municipal Code
o Chapter 8.04 General Disturbances
• Larimer County Rubbish Ordinance
o Ordinance No. 042120080-001—Ordinance Concerning Accumulation and
o Removal of Rubbish (“Rubbish Ordinance”)1 together with amendments 2.
2. Education/Outreach
• Press Release: early March
• Grant: determine availability by January
• Proactively communicate to homeowner associations and other interested groups
3. Calendar of Proactive Field Inspection, Investigation and Enforcement
• Early March
- Determine routes and timeline to proactively identify non-compliant
properties.
- Prepare materials for field visits (door hangers, educational handouts).
- Review applicable legislation (Section 1 above).
1 Effective May 24, 2008 (30 days after publication on 4/24/2008 of the Rubbish Ordinance approved by the Board of County
Commissioners on April 21, 2008).
2 2008 amendment re appeal process effective 12/21/2008.
1
• March – May
- Proactive Enforcement Routes:
o Along major corridors and select streets (see zone maps):
March: Zone 1, 2
April: Zone 3, 4, 5
May: 6, 7
o High visibility areas and large quantities of junk will be the highest
priority.
- General Proactive Enforcement Procedures
o Reconfirm that all materials and routes are prepared.
o Visually inspect and photo document the properties along routes
from public right-of-ways.
o Contact properties in violation via:
Verbal warning;
Leave door hanger if the property owner or tenant is not
available;
If only tenant is contacted, notice shall also be sent to
property owner.
o Log the address in the Code Compliance Database (“Database”) for
follow-up after the established deadline to come into compliance.
o If the address has been previously warned, the officer will take
photos and decide the follow up. Options include:
Issuance of Notice of Violation;
Issue summons to Municipal Court;
Further contact with responsible parties as necessary.
o When possible, multiple abatement procedures will be implemented
in bulk at the end of each month.
4. Abatement
• Examples of situations where abatement would be an appropriate method to
mitigate the hazard may include properties where the trash and/or junk hazards
build up dangerously:
Vacant properties with out of state owners;
Properties where the residents and/or owners are unavailable for
personal service of summonses and refuse to pick up summonses
sent by certified mail;
Repeat offenders;
High pedestrian neighborhoods, where a doorhanger, letter and/or
Notice of Violation have not achieved compliance.
2
The Downtown Commercial District.
• Trash/Junk Removal Contract
The code compliance officer will maintain an exterior contract with a
trash/junk removal contractor.
Officers will take photos of properties in violation that are put on the
list for the contractor to clear.
The contractor will generally clear the property within 24 hours of
receiving the list.
The contractor will take photos of the property before and after
clearing and provide those to the code compliance officer.
The contractor will provide an itemized bill to the Enforcement
Officer which separates the charges for each property.
The Community Development Department will bill the owner or
landlord of the property for the charges.
When the payment is received, the code compliance case will be
closed with the notation of payment. The applicable policies for
billing and receiving payment will be followed.
If payment is not received within 30 days after the owner of such
property is notified, the Town shall certify the charge or assessment
to the County Treasurer, to be placed by him or her upon the tax list
for the current year and collected in the same manner as other taxes
are collected, with a 10% penalty to defray the cost of collecting.
• Code Compliance Database
• All properties in violation that received a warning will be entered into
the Database. Warnings include a door hanger being left at the
property, a letter being mailed to the landlord, or a phone call or
personal contact with the tenant or landlord.
• Documentation of the findings during the investigation (information
gathered as a result of the site inspection and all interviews) will be entered
into the Database.
• If a warning letter is sent to the responsible party, it will be attached to the
case. That activity will be documented in the Database. The letter will detail
the requirements for bringing the property into compliance.
• Photos should be attached to the case.
• Summonses
• All summonses shall be documented in the Database. The code compliance
officer will consult with the Town Attorney when such cases must be heard in
Municipal Court.
3
• Keeping a Case Open:
• Cases on properties that have been cleared should stay open until the
payment for services has been received.
• Re-inspections may be necessary on some cases. Officers will look at the
history of the property, the tenants, the cooperation level of the tenants
and/or landlord, history of owners/managers etc. to determine if a property
should be actively re-inspected.
5. Follow up:
• If a complainant requests information about the case, the person will be
contacted after the initial inspection is completed and when enforcement action
is taken, as time allows. Resources will focus first on responding to complaints,
communicating with code violators and taking enforcement action necessary to
achieve compliance.
6. Close Case:
• Letter(s) of compliance shall be sent to all persons with a legal interest in the
property, electronically filed and noted in the Datebase.
4
E HIGHWAY 36W HIGHWAY 34BEAR LAKE RDFALL RIVER RDHIGHWAY 36HIGHWAY 7DEVILS GULCH RDS SAINT VRAIN AVEHIGHWAY 66MORAINE AVETRAIL RIDGE RDBIG THOMPSON AVETUNNEL RDW ELKHORN AVEN SAINT VRAIN AVEPEAK VIEW DRW WONDERVIEW AVEMACGR
E
G
O
R
A
V
ELAKE ESTESMARYS LAKELILY LAKEThis draft document was prepared for internal use by theTown of Estes Park, CO. The town makes no claim as tothe accuracy or completeness of the data contained hereon.Due to security concerns, the town requests that youdo not post this document on the internet or otherwisemake it available to persons unknown to you.0 0.85 1.7Miles±Town of Estes ParkCommunity DevelopmentJunk AccumulationInspection ZonesPrinted: 7/24/2013Created By: Phil KleislerLegendZone 1Zone 2Zone 3Zone 4Zone 5Zone 6Zone 7
LAKE ESTESFall RiverBig Thompson RiverBlack Canyon CreekBig Thompson RiverFall RiverBig Thompson RiverW EL
K
H
O
R
N
A
V
EBIG HORN DRW WONDERVIEW AVEMORAINE AVEMACGR
E
G
O
R
A
V
E
ROCKRIDGE RDCHAPIN LN CRAGS DRDAVIS STHIGH STSTANLEY AVEBIG THOMPSON AVESTEAMER
D
R
E ELKHORN AVEE RIVERSIDE DRN SAINT VRAIN AVEVALLEY RDFIR AVEELM AVESOUTH LNCLEAVE STBIRCH AVEE WONDERVIEW AVEFAR VIEW DRMOCCASIN CIRCLE DRJAMES STOLD RANGER DRJUNIPER LNASPEN AVERIVERSIDE DRSTANLEY CIRCLE DRCOURTNEY LNLOTT STMOONRIDGE RDPROSPECT AVEFALL RIV
E
R
L
N SPRUCE DRIVY LNCOLUMBINE AVEHIGHLAND LNVIRGINIA DRSUMMIT DR
CHIQUITA LNVISTA LN DRIFTWOOD AVEPANORAMA CIR
PARK LNFAR VIEW LNSUNNY LNFINDLEY CT
BOYD LNW RIVERSIDE DRPARK VIEW LNDUNRAVEN STFILBEY CTOVERLOOK CTMUMMY LNCOMANCHE STIVY STFAWN LNPECK LN
VIRGINIA DRThis draft document was prepared for internal use by theTown of Estes Park, CO. The town makes no claim as tothe accuracy or completeness of the data contained hereon.Due to security concerns, the town requests that youdo not post this document on the internet or otherwisemake it available to persons unknown to you.00.10.2Miles±Town of Estes ParkCommunity DevelopmentJunk AccumulationZone 1Printed: 7/24/2013Created By: Phil KleislerLegendZone 1Zone 2Zone 3Zone 4Zone 5Zone 6Zone 7
LAKE ESTESFall RiverBlack Canyon CreekBig Thompson RiverFall RiverFall RiverDEVILS GULCH RDDRY GULCH RDBIG THOMPSON AVEGEM LAKE TRLLORY LNNOTAIAH RDW ELKH
OR
N AVEMCGRAW RANCH RDN SAINT VRAIN AVEELM RDMORAINE AVECLARA DRE HIGHWAY 36EAST LNROCKRIDGE RDMACGREGOR LNBIG HORN DRWEST LNMANFORD AVEMACGR
E
G
O
R
A
V
E
HIGH DRSTANLEY AVE4TH STBIRCH AVECRAGS DRMALL RDRAVEN AVENORTH LNGRAVES AVEPINE LNWILDFIRE RDPUMA DR3RD STFALL RIVER DR OTIS LNRIDGE RDJUNIPER LNBELLEVUE DRRAVEN CIRJOEL ESTES DRFIR AVEVISTA LNJAMES STHIGH PINE DRPIONEER LNLOTT STRED TAIL HAWK DR1ST STThis draft document was prepared for internal use by theTown of Estes Park, CO. The town makes no claim as tothe accuracy or completeness of the data contained hereon.Due to security concerns, the town requests that youdo not post this document on the internet or otherwisemake it available to persons unknown to you.00.40.8Miles±Town of Estes ParkCommunity DevelopmentJunk AccumulationZone 2Printed: 7/24/2013Created By: Phil KleislerLegendZone 1Zone 2Zone 3Zone 4Zone 5Zone 6Zone 7
LAKE ESTESMARYS LAKEFish CreekBig Thompson RiverFall RiverFish CreekFall RiverFISH CREEK RDS SAINT VRAIN AVEE HIGHWAY 36MARYS LA
K
E
R
D
MORAINE AVEELM RDN SAINT VRAIN AVEHERMIT PARK RDPEAK VIEW DRRIVERSIDE DRCURRY LNROCKRIDGE RDCARRIAGE DRUTE LNWINDHAM DRSCOTT AVEMANFORD AVEW PEAK VIEW DRJUNIP
E
R
D
R
ARAPAHO RDSTANLEY AVELONG VIEW DRLARKSPUR AVEPAWNEE DRBRODIE AVE4TH STHILL RDBIRCH AVECRAGS DRJOHNSEN LNASPEN AVEDEVON DRW WONDERVIEW AVEMALL RDDAVIS STBROOK DRSTRONG AVETWIN DRHIGH STFLOWER LNMEADOW LN PINE MEADOW DRGRAVES AVEAVALON DRAXMINSTER LNDANDIE WAYOLD RANGER DR3RD STSPRUCE AVEKERR RDJUNIPER LNBELLEVUE DRACACIA DRINDIAN TRLLONGS DRWILLOW LNWINDHAM CT2ND STTALL PINES DRGRIFFITH CTBAILEY LNBIG THOMPSON AVEBLUEBIRD LNSPRING STUPLANDS CIRCEDAR LNJAMES STLLOYD LNPINE KNOLL DRSILVER TREE LNPOWE
R PLA
NTLOTT STMOONRIDGE RDHONDIUS CIR
SHAD CTLEXINGTON LNPROSPECT AVEPINEWOOD LN1ST STHIGHLAND LNDUNRAVEN STVIRGINIA DRDARCY DRCHEROKEE CTPARK LNRIVERSIDE LNFAR VIEW LNMATTHEW CIRBOYD LNBEACH LN6TH GREEN LNIVY STThis draft document was prepared for internal use by theTown of Estes Park, CO. The town makes no claim as tothe accuracy or completeness of the data contained hereon.Due to security concerns, the town requests that youdo not post this document on the internet or otherwisemake it available to persons unknown to you.0 0.25 0.5Miles±Town of Estes ParkCommunity DevelopmentJunk AccumulationZone 3Printed: 7/24/2013Created By: Phil KleislerLegendZone 1Zone 2Zone 3Zone 4Zone 5Zone 6Zone 7
MARYS LAKELILY LAKEFish CreekAspen Brook East Fork Fish CreekAspen
Br
o
o
kEast Fork Fish CreekFish Creek
HIGHWAY 7FISH CREEK RDS SAINT VRAIN AVEMARY
S L
A
K
E
R
D CARRIAGE DRLITTL
E
V
A
L
L
E
Y
R
DJACOB R
D
UTE LNSCOTT AVEARAPAHO RDEAGLEC
LI
F
F
D
R
CLIFF RDLONG VIEW DRLARKSPUR AVEPAWNEE DRROCKWOOD LNEIGER TRLW PEAK VIEW DRKIOWA DRWILDWOOD
D
R
PONDEROSA AVERAMBLING DRLAKESHORE DRSERENITY LNSPRUCE AVEASPEN DRKERR RDDOLLAR LAKE DRACACIA DRINDIAN TRLLONGS DRSTAR
W
A
Y
BLUEBIRD LNSANBOR
N
D
RUPLANDS CIRMEEKER DRSHAD CTPINEWOOD LNBAKER DRLAKO
T
A
C
T This draft document was prepared for internal use by theTown of Estes Park, CO. The town makes no claim as tothe accuracy or completeness of the data contained hereon.Due to security concerns, the town requests that youdo not post this document on the internet or otherwisemake it available to persons unknown to you.00.30.6Miles±Town of Estes ParkCommunity DevelopmentJunk AccumulationZone 4Printed: 7/24/2013Created By: Phil KleislerLegendZone 1Zone 2Zone 3Zone 4Zone 5Zone 6Zone 7
MARYS LAKEBeaver BrookBig Thompson RiverAspen
Brook Fish CreekWind RiverGlacier CreekBuck
Creek
Wind RiverAspen Brook
Glacier CreekBEAR LAKE RDHIGHWAY 66MARYS LAKE RD HIGHWAY 7TUNNEL RDHIGHWAY 36CLIFF RDMORAINE AVERIVERSIDE DRS SAINT VRAIN AVEUTE LNGRIFFITH CTW PEAK VIEW DRARAPAHO RDEAGLEC
LI
F
F
D
R
CARING LNMILLS DRUPPER BROADVIEWFISH CREEK RDEIGER TRL
HILL RD KIOWA DRCURRY LNMESA DRNIMBUS DRSTRONG AVEMEADOW LN
CHIEFS HEAD RDJEEP TRLTERRACE LN
CUMULUS DRKERR RDINDIAN TRLCLIFF LNHIGH DRLLOYD LNGLACIER VIEW LNSILVER TREE LNFAMILY LNSHAD CTBAKER DRLAKOTA CT
RIVERSIDE LNMIND STSPUR LNThis draft document was prepared for internal use by theTown of Estes Park, CO. The town makes no claim as tothe accuracy or completeness of the data contained hereon.Due to security concerns, the town requests that youdo not post this document on the internet or otherwisemake it available to persons unknown to you.00.30.6Miles±Town of Estes ParkCommunity DevelopmentJunk AccumulationZone 5Printed: 7/24/2013Created By: Phil KleislerLegendZone 1Zone 2Zone 3Zone 4Zone 5Zone 6Zone 7
MARYS LAKELAKE ESTESBig Thompson RiverBeaver BrookBuck C
r
e
e
kFall RiverAspen B
r
o
o
k
Glacier CreekBig Thompson RiverBuck
CreekFall RiverHIGH DRHIGHWAY 66MORAINE AVEHIGHWAY 36MARYS LA
K
E
R
D
ELM RD S SAINT VRAIN AVECLIFF RDPEAK VIEW DRRIVERSIDE DRCURRY LNROCKRIDGE RDUTE LNUPPER HIGH DRGRIFFITH CTW PEAK VIEW DREAGLE CLIFF RDJUNIPER DR
MILLS DRSTANLEY AVEARAPAHO RDPAWNEE DRTANAGE
R
R
D LARKSPUR AVEHILL RDBIRCH AVECARRIAGE DRCRAGS DRASPEN AVEDEVON DRDAVIS STSTRONG AVETWIN DRHIGH STMEADOW LN AXMINSTER LNCHIEFS HEAD RD3RD STE ELKHORN AVESPRUCE AVEE RIVERSIDE DRLONG VIEW DRKERR RDJUNIPER LNPINE MEADOW DRLAUREL LNINDIAN TRLLONGS DRMINERAL RDFIR AVE2ND STNOBLE LNTALL PINES DRCLIFF LNVISTA VIEWBLUEBIRD LNSPRING STPONDEROSA DRLLOYD LNGLACIER VIEW LNIVY LNCHICKADEE LNSILVER TREE LNPOWER PLANTLOTT STMOONRIDGE RDHONDIUS CIR
SHAD CTMIDDLE BROADVIEWPROSPECT AVEPINEWOOD LN1ST STGIANT TRACK RDHIGHLAND LNDARCY DRCHEROKEE CTPAWNEE LNRIVERSIDE LNSUTTON LNBOYD LNMORGAN STSPUR LNPECK LN CONCORD LNThis draft document was prepared for internal use by theTown of Estes Park, CO. The town makes no claim as tothe accuracy or completeness of the data contained hereon.Due to security concerns, the town requests that youdo not post this document on the internet or otherwisemake it available to persons unknown to you.00.20.4Miles±Town of Estes ParkCommunity DevelopmentJunk AccumulationZone 6Printed: 7/24/2013Created By: Phil KleislerLegendZone 1Zone 2Zone 3Zone 4Zone 5Zone 6Zone 7
Fall RiverBlack Canyon CreekBuck C
r
e
e
kBig Thompson RiverBig Horn CreekFall RiverFall RiverFALL RIVER RDW EL
K
H
O
R
N
A
V
E
W WONDERVIEW AVEELM RD
FISH HATCHERY RDMACGREGOR LNMACGREGOR AVE MORAINE AVEDAVID DRROCKRIDGE RDCHAPIN LN
HIGHWAY 36CRAGS DRDAVIS STUPPER HIGH DRFALL RIVER DR E RIVERSIDE DRFALL RIV
E
R
L
NDEVILS GULCH RDHOMESTEAD LNNOBLE LNFALL RIVER CT CLEAVE STSLEEPY HOLLOW RDJAMES STIVY LNJUNIPER LNLOTT STMOONRIDGE RDTANAGER RDVIRGINIA DRFAR VIEW LNBOYD LNFILBEY CTThis draft document was prepared for internal use by theTown of Estes Park, CO. The town makes no claim as tothe accuracy or completeness of the data contained hereon.Due to security concerns, the town requests that youdo not post this document on the internet or otherwisemake it available to persons unknown to you.00.20.4Miles±Town of Estes ParkCommunity DevelopmentJunk AccumulationZone 7Printed: 7/24/2013Created By: Phil KleislerLegendZone 1Zone 2Zone 3Zone 4Zone 5Zone 6Zone 7
Page 1 of 2
To: Community Development/Community Services Committee
Town Administrator Lancaster
From: Alison Chilcott, Community Development Director
Will Birchfield, Chief Building Official
Date: November 21, 2013
RE: Courtyard Shops Update
Objective:
Update the Community Development/Community Services Committee on life safety concerns
at the Courtyard Shops building.
Present Situation:
The Courtyard Shops is a mixed-use, 24-
unit development located on Virginia Drive
in the Commercial Downtown zone
district. The building was constructed in
1978 and includes various retail stores, a
restaurant, a salon and residential
dwelling units.
Staff have worked with three building
owners in the past two years on issues
ranging from zoning code violations to life
safety building/fire code violations. Due to
a change of use to residential
occupancies, sprinkler and alarm systems
must be installed throughout the building.
Plans have been submitted and approved,
but work has yet to begun.
Community Development staff has provided regular progress reports to the Committee.
Progress stopped in mid-summer and we have provided deadlines to the property owner.
Community Development
Memo
Page 2 of 2
Town staff and the Fire Marshall met with the building owner on November 14, 2013, to state
the Town’s official position in this matter:
1. Work must be started on the sprinkler system by January 1, 2013. The Town will initiate
an eviction process for all residential dwelling units if work is not started by this date.
2. A portion of the sprinkler system must be in operation by May 1, 2013. The Town will
initiate an eviction process for all residential dwelling units if a portion of the system is
not operating by this date.
3. The Town will not halt the eviction process once started.
The building owner understood the significance of these life safety requirements and indicated
his desire to meet the above deadlines. Staff will keep the Committee updated on this matter.
Proposal:
Report only. No action needed at this time.
Advantages:
A safe building, with reduced potential for loss of life, injury and property damage.
Disadvantages:
Residents face eviction if the property owner does not meet deadlines.
Action Recommended:
Report only. No action needed at this time.
Budget:
N/A
Level of Public Interest:
Low
Sample Motion:
N/A
COMMUNITY
DEVELOPMENT/COMMUNITY
SERVICES COMMITTEE
November 21, 2013
Report Item #iii. Flood Recovery Update:
Floodplain Management and Stream/River
Corridor Protection
This item will be a verbal report by
Director Chilcott and Floodplain
Manager Birchfield, who will bring all
documents to the meeting for
distribution.