5:15 p.m. - Dinner
5:30 p.m. Benefits of Roundabouts.
(Mark Johnson, PE & Design Consultant)
6:35 p.m. Trustee & Administrator Comments & Questions.
6:40 p.m. Future Study Session Agenda Items.
(Board Discussion)
6:45 p.m. Adjourn for Town Board Meeting.
Informal discussion among Trustees concerning agenda items or other Town matters may occur before this
meeting at approximately 5:00 p.m.
AGENDA
1
2
PUBLIC WORKS Report
To: Honorable Mayor Jirsa
Board of Trustees
Through: Town Administrator Lancaster
From: Greg Muhonen, PE, Public Works Director
Date: January 8, 2019
RE: Benefits of Roundabouts
Objective:
Provide the Town Board with an overview of the history, benefits, and challenges
associated with using roundabouts for roadway intersection traffic control.
Present Situation:
20 fatalities occur daily because of intersection car crashes in the United States, most
commonly at stop-controlled and signalized intersections.
Traffic speeds and congestion are commonly seasonally high at major roadway
intersections in Estes Park. Improved intersection control is needed in many locations.
The Town of Estes Park has no employees trained or equipped to maintain traffic
signals.
Proposal:
There are three roundabouts under design for installation in Estes Park. CDOT plans to
build a roundabout in 2020 at the Wonderview/MacGregor intersection. The Town
plans to build a roundabout in 2020 at the US36/Community Drive intersection. Central
Federal Lands Highway Division proposes to build a roundabout at the Moraine/Crags
intersection in 2022.
Advantages:
Roundabout control has been documented to provide:
o 90% reduction in fatalities
o 76% reduction in injuries from intersection crashes,
o 35% reduction in intersection crashes.
While initial construction typically exceeds the cost of stop signs and traffic
signals, the life-cycle costs are typically 60% less than a traffic signal.
3
Pedestrian crossings of the approaching roadways are shorter and safer than
crossing at signalized intersection.
Reduced idling, hard stops, and start-up acceleration at roundabouts reduces air
and noise pollution emission from cars and is kinder to the environment.
Agency experience with roundabouts documents many users who are initially
skeptical of roundabouts become avid supporters after observing and
experiencing roundabout operation.
Driver decision-making at a roundabouts is simplified where only one, instead of
several, other-driver movements must be processed when entering an
intersection. Simply—“Do I have a clear gap on my left to enter the roundabout?”
Disadvantages:
Unfamiliar drivers may experience apprehension when entering a roundabout for the
first time. This is beneficial, as the driver is typically fully engaged in driving and not
sharing their attention with the cell phone or other distractions.
Action Recommended:
n/a
Finance/Resource Impact:
The local match funds for the Moraine roundabout have been provided by CDOT.
CDOT has also budgeted for the full construction cost of the Wonderview roundabout.
The Town has budgeted $690k of local funds and $720k of CMAQ grant funds for the
design and construction of the Community Drive roundabout.
Level of Public Interest
The known level of public interest in this item is moderate.
Attachments:
None
Click on this link to a preliminary copy of consultant presentation slides
4
January 22, 2019
Social Media Archiving & as a
Public Record Under State Statute
Discussion of Legal Services
Building Department Operations
February 12, 2019
Presentation and Discussion of a
Complete Streets Policy
Stanley Park Master Plan
2019 Street Improvement Plan
February 26, 2019
EPIC Update
Stormwater Management Program
& Utility
E-Bike Policy
March 12, 2019
Update on Film Center Plans
Downtown Estes Loop Quarterly
Update
March 26, 2019
Removing 500 Foot Limit for Liquor
Licenses
“Open Space” Designations on
previous zoning maps
Introduction to Water Rates Study
Process
June 11, 2019
Downtown Estes Loop Quarterly
Update
September 10, 2019
Downtown Estes Loop Quarterly
Update
Items Approved – Unscheduled:
Estes Park Housing Authority
Project on Highway 7 – Part II
Discussion with Town Prosecutor
Review of County Wasteshed
Master Plan
Items for Town Board Consideration:
None
Future Town Board Study Session Agenda Items
January 8, 2019
5
6