HomeMy WebLinkAboutMINUTES Estes Park Board of Adjustment 2026-04-07Town of Estes Park, Larimer County, Colorado, April 7, 2026
Minutes of a Regular meeting of the ESTES PARK BOARD OF ADJUSTMENT of the
Town of Estes Park, Larimer County, Colorado. The meeting was held in the Town of
Estes Park on March 3, 2026.
Board: Jeff Moreau, Colin Godsey, Steven Neilson
Attending: Chair Moreau, Vice Chair Godsey, Member Neilson, Director Steve Careccia,
Planner II Kara Washam, Senior Planner Paul Hornbeck, Town Attorney Dan Kramer,
Recording Secretary Karin Swanlund
Absent: none
Chair Moreau called the meeting to order at 9:00 a.m. There were 4 people in attendance.
INTRODUCTIONS:
APPROVAL OF AGENDA
It was moved and seconded (Godsey/Neilson) to approve the agenda. The motion
passed 3-0.
APPROVAL OF CONSENT AGENDA
It was moved and seconded (Neilsen/Godsey) to approve the Consent Agenda, with
a correction to the page 3 motion. The motion passed 3-0.
ELECTION OF OFFICERS
Member Neilsen nominated Chair Moreau to continue as Chair. Chair Moreau
nominated Vice Chair Godsey to continue as vice chair. Member Neisen concurred.
The motion passed 3-0.
PUBLIC COMMENT: none
ACTION ITEMS:
1. Wetlands Setback 1754 Fish Hatchery Rd Senior Planner Hornbeck
At the March 3, 2026, meeting, the Board of Adjustment (BOA) considered a variance
request regarding activities within wetland setbacks at 1754 Fish Hatchery Road. The
BOA continued the item to the next scheduled meeting (April 7, 2026) with a request
that wildlife and wetland studies be provided for review. The applicant provided those
studies, which were first shared with the BOA in a Supplemental Memo dated March 16,
2026.
March 3 review:
The applicant submitted a subdivision application that depicts approximately 100
dwelling units and associated road and infrastructure improvements. Roads and
associated earthwork and grading are proposed to occur within the 50-foot wetland
setback required by Estes Park Development Code (EPDC) Section 7.6. E. The EPDC
goes on to describe activities prohibited within the 50-foot setback in Section 7.6.F.1:
Prohibited Activities. No person shall engage in any activity that will disturb,
remove, fill, drain, dredge, clear, destroy or alter any area, including vegetation,
within stream or river corridors, wetlands and their associated buffer/setback
areas, except as may be expressly allowed in this Section or Code.
No disturbance is proposed within any wetland; however, the applicant requests a
variance to EPDC Section 7.6.F.1 to allow activities that would disturb areas within
wetland buffer/setback areas as indicated in the table and map in the staff report, plus a
10% margin of error to allow for field changes during construction or other unforeseen
circumstances. Factoring in the 10% margin, the variances would allow disturbances
RECORD OF PROCEEDINGS
Board of Adjustment, April 7, 2026 - Page 2
with the following setbacks from wetlands: 8.7 feet in area B, 15.6 feet in area C, 25.8
feet in area H, and 22.5 feet in area I. Staff recommended that the BOA approve the
variance requests subject to the following condition of approval:
1. Best management practices outlined in the application materials shall be
adhered to prior to, during, and after construction.
DISCUSSION:
In answering Member Neilsen's questions, planner Hornbeck noted that the Estes Park
Housing Authority (EPHA) is responsible for ensuring that Best Management Practices
(BMPs) associated with the development proposal are implemented. The HOA board
explored the possibility of hiring a third party to oversee compliance with the BPMs and
report back to the EPHA, which was considered a reasonable idea. Also discussed was
the difference in the number of BMPs listed in the wildlife report versus the information
in the previous meeting packet. It was clarified that the wildlife report is more holistic,
addressing overall wildlife impacts, whereas previous documents were strictly focused
on wetland protection.
Pete Levine, EPHA Director of Real Estate Development, introduced the team. He
shared a slide showing the number of needed housing units in the Estes Valley, along
with other housing figures.
Ronnie Pelusi, Pel-Ona Land Planner for the project, discussed the importance of
wetlands and stated that the consultant noted no harm to them with this proposal.
Proposed modifications are intended to improve and formalize the wetlands' impact,
creating definitive buffers that prevent future damage to sensitive ecosystems. He
confirmed that BMPs are included and will be codified through the planning process,
including during construction and long-term maintenance, likely through a master HOA.
Project Engineer Rob Goss confirmed that erosion control measures are in place at a
preliminary level. This includes silt fencing, inlet protection and the use of water quality
control ponds to allow solids to settle before discharging clean water. BMP recommends
that the team conduct periodic site inspections for at least the first few years following
construction to assess erosion control during the first year or so.
The board asked about the Colorado Parks and Wildlife (CPW) preliminary
recommendation for a 300-foot construction buffer from wetlands and 500 feet from Fall
River. Goss explained that the project team is mitigating these concerns by isolating
construction activities through silt fencing, straw wattles and erosion control mats,
alongside plans to reroute water away from sensitive areas. Palusio argued that the
300-500-foot buffers suggested in the CPW report are exceptionally large and would
render the vast majority of existing riverfront development in the community non-
compliant. He noted that while federal and state agencies often propose large-scale,
generalized buffer requirements, local boards have the authority for discretionary
review. Palusio emphasized that the board's role is to determine if the proposal meets
the intent of the wetland protections at a site-specific level. He reiterated that, by
utilizing BPMs and third-party expert oversight, the project team believes they have
effectively satisfied the approval criteria.
Public Comment:
Sandy Cherman acknowledged the need for workforce housing; however, wetland
setbacks are in place for a reason and would like the project to be done without
encroachment.
Terry Rizzuiti agreed with Mr. Cherman, adding that the daycare center is a bad idea
because parents want their kids closer to their work, not their home.
RECORD OF PROCEEDINGS
Board of Adjustment, April 7, 2026 - Page 3
Kristine Poppitz noted that less than 5 units are affected, and granting the variance
could set a dangerous precedent for future development requests. She criticized the
project's evacuation plan and urged the board to deny the request, stating that requests
are not rights.
It was moved and seconded (Moreau/Godsey) to approve the variance request
with the following conditions: 1) survey to defined the setback area prior to
beginning construction 2) engineering firm to inspect erosion control measures
after they are instralled and 3) engineering firm to monitor the erosion control and
Best Practice Managemet and original conditions at a minimum of monthly and
give a report to the town. The motion passed 3-0.
REPORTS:
The Development Code is in draft mode, and an open house is scheduled for June.
With no further business, Chair Moreau adjourned the meeting at 9:33 a.m.