Loading...
HomeMy WebLinkAboutRESOLUTION Technical Review Committee 01-26TECHNICAL REVIEW COMMITTEE RESOLUTION 01-26 A RESOLUTION OF THE TECHNICAL REVIEW COMMITTEE OF THE STANLEY HISTORIC DISTRICT MASTER PLAN APPROVING THE FINAL PACKAGE FOR THE STANLEY HOTEL AND MANOR HOUSE EXPANSION WHEREAS, the Final Package of the project referenced in the title of this resolution meets the requirements of the Stanley Historic District Master Plan for a Final Package; and WHEREAS, the Technical Review Committee (TRC) determines that the materials included in the Final Package satisfy the conditions in TRC Resolution 01-25 approving the Stanley Hotel and Manor House Expansion Preliminary Package; and WHEREAS, the Final Package, considered in conjunction with the previously approved preliminary package, includes sufficient detail for the TRC to determine whether the plans meet the requirements of the Master Plan, Chapter 17.44 of the Estes Park Municipal Code and the applicable development agreements). NOW, THEREFORE, BE IT RESOLVED BY THE TECHNICAL REVIEW COMMITTEE OF THE STANLEY HISTORIC DISTRICT MASTER PLAN: 1. The Stanley Hotel and Manor House Expansion Final Package meets the standards and requirements in the Stanley Historic District Master Plan and Estes Park Municipal Code Chapter 17.44, and the applicable development agreement(s) and is approved conditioned upon submittal, review, and approval of the items outlined in Section 3 hereof in conjunction with the detailed construction plans, civil plans, and building-permit plans for construction of the Stanley Hotel and Manor House Expansion. 2. The variances approved by the TRC in TRC Resolution 01-25 remain in full force and effect with this Final Package. 3. The following conditions shall be satisfied in conjunction with submittal, review, and approval of the detailed construction plans, civil plans, and building-permit plans for construction of the Stanley Hotel and Manor House Expansion: a. Details on materials used in and around drainage facilities shall be provided to demonstrate river rock and cobbles are used rather than angular rip-rap or exposed concrete. b. Construction plans shall demonstrate slopes greater than 3-to-1 are properly stabilized. c. Limits of disturbance and tree protection standards shall be shown on construction plans. d. An easement parallel to the public right-of-way shall be established to completely contain the curvilinear sidewalk where it leads outside the right- of-way along Steamer Parkway. This easement must be conveyed to the Town in the form provided by the Town, and accepted by the Town, prior to the Town's issuance of any certificate of occupancy for the Stanley Hotel and Manor House Expansion Final Package. e. At the new entrance, on the southeast comer of the intersection: Remove paving as needed and reinstall curb and gutter which will delineate the northbound right turn lane; backfill between the existing two trees and the back of curb. /^DATED this ILt day of < \^U^\f 2026. Travis Machalek Chair, Technical Review Committee ATTEST: h^arin Swanlund Recording Secretary APPROVED AS TO FORM: Town Attorney