HomeMy WebLinkAboutPACKET Technical Review Committee 2020-08-20COMMUNITY DEVELOPMENT
To: Technical Review Committee (TRC)
From: Randy Hunt, Community Development Director
Date: August 24, 2020
RE: Stanley Hotel Carriage House
(Mark all that apply)
PUBLIC HEARING ORDINANCE LAND USE
CONTRACT/AGREEMENT RESOLUTION OTHER
QUASI-JUDICIAL YES NO
Objective:
The TRC will determine by majority vote whether the submitted project materials meet
applicable code requirements, including regulatory portions of the Stanley Historic
District Master Plan, the Stanley Historic District Procedures and Standards for
Development (Chapter 17.44, Estes Park Municipal Code), and other applicable
regulations.
This meeting and review are for the submitted Preliminary Package, per the Stanley
Historic District Master Plan Sec. I.C.2 (pp. 5-6.) A later TRC meeting will determinate
compliance with the Final (Revised) Package, consisting of substantially the same
materials with revisions as may be necessary and appropriate.
Present Situation:
The present TRC review is for the Carriage House improvements on the Stanley Hotel
Campus, and specifically for the interior arrangements for proposed use (primarily
restaurant, with accessory uses on the lowest level), and for ht architectural finishes to
the renovated building. Some background is in order first, regarding how this proposal
fits into the overall Stanley complex and vicinity.
Stanley Historic District Master Plan and Subdivision
The Stanley Historic District (SHD), as envisioned in the Stanley Historic District Master
Plan (“SHDMP” or just “MP”) originally consisted of nine separate lots. Staff does not
have access to a title report for the Stanley properties, but it is understood the original
subdivision into nine lots was approved and recorded in the 1970s. Exhibit 9 is an aerial
photo, serving as a vicinity map for this report, and also used to show the nine lots
overlaid and labeled for illustrative purposes.
The SHDMP itself was adopted in January 1994, and is still the primary applicable plan
for the main Stanley Hotel campus (generally coextensive with Lot 1 [Parcel 1] of the
nine lots), and it is also applicable in varying degrees to the other eight lots.
1
The SHDMP is a lengthy document (55 text pages and a number of exhibits). In order to
keep our focus on the tasks at hand, staff did not include the full MP in this packet;
however, it may be read at this link:
https://drive.google.com/open?id=0B3nwhu8qvVbcd3RIRndMY3VtbUk
Staff has, however, included in this packet the sections of the MP that directly apply to
the TRC in terms of authority, duties, and subject matter, as outlined in the Plan itself
(see Exhibit 7). These sections are pp. 4 – 11 (creation, jurisdiction, and duties of the
TRC) and pp. 16 – 32 (design guidelines overall, and site-specific development
standards and design guidelines for Parcel 1.)
Other applicable regulations for the SHD include the Estes Park Municipal Code, and
specifically the chapter addressing the SHD in ordinance form. The Chapter is not
replicated here, but may be found at:
https://library.municode.com/co/estes_park/codes/municipal_code
(please see Chapter 17.44 - Stanley Historic District Procedures and Standards for
Development.) Chapter 17.44 is not as elaborate and detailed as the SHDMP; however,
and important feature in the Chapter is that it gives certain elements in the MP the
weight of Code authority – specifically, the “Design and performance standards” in the
MP (Sec. 17.44.060.(a).(3)). Although that exact heading does not appear in the MP,
staff understands it to refer to the “Site Specific Development Standards” for the various
parcels in the SHD, which are in the SHDMP beginning on p. 27.
Other sections of the SHDMP are not specifically referenced in Chapter 17.44 as
regulatory, including the MP sections and language identified as “guidelines.” In
standard planning and zoning terminology, guidelines are interpreted as advisory but
not mandatory. Thus, staff’s analysis herein focuses on regulatory matters.
A third set of documents applicable to the SHD are three Development Agreements,
listed by name and date and incorporated by reference in Chapter 17.44 (see Sec.
17.44.080.) The agreements by and large do not add material with direct bearing on the
Carriage House TRC review. They are not linked here for the sake of economy.
Finally, one element in the SHDMP itself is worthy of attention: the “Exhibit B Stanley
Historic District Master Plan”, which is a graphic map drawing appearing on P. 56 (PDF
page numbering) of the SHDMP. This map has seemingly caused some confusion over
the years regarding whether it is a regulatory document, and the degree to which the
map precisely “locks in” features and dimensions shown on it. The text in the MP clearly
indicates that Exhibit B is an illustration, not a precise regulatory document. For
example, the MP states: “While the Master Land Use Plan graphic is intended to
establish appropriate land use areas, land use relationships and overall access, it must
be considered as illustrative only.” (p. 7) Elsewhere, the MP indicates: “It must be
understood that the Master Plan is illustrative in nature and that all development must
be further planned and designed to accommodate site specific opportunities and
constraints which were not accounted for as a part of this Master Planning process.” (p.
10)
Staff is obliged to conclude that features on Exhibit B are not to be interpreted as
mandatory in location or extent. This issue has come up during public comment from
2
time to time, with some citizens having understood that Exhibit B functions as a
development plan. This is not the interpretation given in the SHDMP itself.
Carriage House:
Our principal concern in this review, the Carriage House, is in the east-northeast area of
Lot 1. The Carriage House is an existing building on the Stanley campus, and in fact is
one of the oldest buildings there. The Carriage House has had a variety of very different
uses over the years, ranging from (as the name suggests) housing “horseless
carriages” in the early 20th Century – specifically, Stanley Steamer automobiles –
through brief use as hotel accommodations, to storage of miscellaneous stuff in recent
years. The building was built without a foundation – until recent rehabilitation work
began, the frame and siding essentially sat in direct contact with the ground.
Work began in early 2020 to rehabilitate the Carriage House structurally. A F&F
(footings and foundation) building permit was approved in late 2019 for the building, and
construction is now underway and getting close to completion to provide the building
with a designed foundation meeting current building codes. The foundation permit, and
a parallel permit (not yet approved, pending TRC decision) to allow core-and-shell
reconstruction, would also result in shifting the building slightly (12 feet) to the north,
and removing a small wing that was added in the mid-20th Century.
As this is rehabilitation work necessary for safety, the rehabilitation/reconstruction
permits did not need TRC approval; however, there is no permission to occupy the
building with a tenant or other use unless/until the TRC acts. Use of the building as a
restaurant is part of what is now requested of the TRC. It was understood by the
Stanley team and all parties that the foundation work proceeded at the applicants’ risk,
understanding that there is no assurance until TRC gives it that a restaurant or any
other particular use is confirmed for the building.
Other Nearby Changes on Lot 1, Stanley Historic District:
East Parking Lot: This new parking lot is currently under construction to the east
and north of the Carriage House. As with all parking lots on the Stanley campus, the lot
is not designated for any one use or complex of buildings; however, the new parking lot
will most likely serve the buildings and uses closest to it – in this case, the Carriage
House restaurant (if approved) and the future Arts (Film) Center north of the Carriage
House (see below.)
The East Parking Lot was reviewed and approved by staff in 2019 through the
grading (building) permit process. Questions have been raised by the public as to why
the parking lot did not undergo the TRC Review process. While there’s some
ambiguous language in the SHDMP on the matter of where the threshold for TRC
review lies, the MP has been interpreted by staff since 1994 to not require parking lots
as standalone projects to undergo TRC Review. The East Parking Lot, like the Carriage
House foundation work, has proceeded under the assumption there was no absolute
certainty there would be any occupied Stanley buildings next door to it. Again, all
parking at the Stanley can in principle be available to any use on the property.
Drainage (Grand) Swale: This swale is a riprap-lined ditch running along the
eastern boundary of Lot 1 from Lot 2 down to Steamer Parkway, running more or less
3
parallel to and just outside the single-family lots along the west side of Findlay Court,
whose backyards abut Stanley Lot 1 Although there’s been a drainageway in this
approximate location for several decades, the ditch was recently altered and improved
(mainly in capacity) following a court order to resolve drainage concerns between SHD
Lot 1 and Lot 2.
Surrounding elements in general, and the TRC’s role in review of them:
Although permits for these nearby developments are in place (except the ditch, which is
court-ordered) and construction is underway, there is a reasonable role for the TRC in
discussing them in context of the requested Carriage House review. The SHDMP
makes it clear that the Stanley development elements function together as a design
whole. The following sections in the SHDMP serve to show how this is the case:
p. 2: “The Stanley Hotel and the associated structures are to remain as the
"Crown Jewel" of the site with the surrounding adjacent development providing the
necessary support for this overall concept.”
p. 2: “The :intent of this document as a part of the Stanley Historic District Master
Plan is to … [m]aintain the visual and environmental quality of the property and
surrounding areas.”
The need to consider projects on the Stanley campus as part of a whole is within
the TRC’s charge:
p. 2: “Compliance and performance related to these goals and objectives shall be
carefully evaluated by the Technical and Architectural Review Committees during
project/ parcel review.” [The phrase “these goals and objectives” refers specifically to
the page 2 quotes above, and to similar statements elsewhere in the MP.]
This approach is underscored by sections such as this one from the opening
paragraphs of the SHDMP:
p. 1: “The development standards outline the specific criteria established on each
parcel regarding setbacks, building height, parking, and other site specific issues that
regulate development. The design guidelines also provide guidance regarding site
preparation, access, grading, vegetation and landscaping, as well as specific site
features.”
Inclusion of elements such as parking, access and landscaping – none of which
lie within the building’s shell – make it clear that the TRC’s guidance role is not confined
only to matters within the shell.
This is not to say that the TRC’s role includes revisiting and overriding terms of
already approved elements on the Stanley campus, whether those elements are as new
as the East Parking Lot or as venerable as the Stanley Hotel itself. However, staff holds
that it is fair and reasonable – in fact, expected – under the SHDMP that the TRC would
consider how the Carriage House fits in its context and what the surrounding elements
contribute to its design and operational character, and vice-versa. The TRC would not
vote to approve or disapprove of these surrounding elements, but the TRC would find
support in the MP for discussing and providing guidance regarding such elements, as
the TRC deems appropriate.
Staff is at some pains to make the above points, understanding that the Stanley
team may or may not agree that the TRC’s role is broader than review of the Carriage
4
House design and use within the building’s footprint. Staff also understands that some
neighbors of the Stanley view the development in northeast Lot 1 as a linked package,
not as a set of isolated elements. For permit purposes, each element may need its own
review and approval. For planning purposes it’s clear in the SHDMP that elements are
linked and that the TRC may reasonably discuss any of them and suggest guidance.
The TRC’s actual voting role, in the end, is to review and decide upon the specific
application before you, as the section on p. 1 quoted above also makes clear.
Proposal:
Project History:
Although plans for reuse of the Carriage House have been afoot for many years – there
have been different ideas suggested at various times… not unlike the variety of prior
uses for the building – the current formal application and review history begins with a
pre-application meeting on July 18, 2019. The pre-app meeting’s subject was a larger
project for the east-northeast part of the Stanley Lot 1 campus, including the Carriage
House and the adjacent Cultural Arts Center as identified in the SHDMP. Much attention
at the pre-app meeting was focused on the Arts Center (often called the Film Center
nowadays), as it was to be the predominant use in the overall project.
Later, a decision was made by the Stanley (with staff knowledge and concurrence) to
separate the Carriage House project review from the Film Center review and to submit
the Carriage House first – hence the less-formidable project before you now. At this
time it’s unknown when the Film Center may be forthcoming. As a separate project, it
will need to start over with a new pre-app meeting and will have to have its own staff
and TRC reviews.
Separately from the Carriage House TRC submittal, plans were submitted and permits
approved in 2019-2020 for the East Parking Lot and for structural stabilization and
renovation of the Carriage House, as noted above. The current submittal is expected to
be the next-to-last significant review process for the Carriage House, with only the Final
TRC review remaining before building permits, construction, and occupancy. Staff will
defer to the applicants for their current expected timeframe for those matters.
Submitted Materials:
The list of attachments that ends this staff report comprises a complete list of submitted
materials for TRC review (not counting earlier iterations of some items, plus some minor
items that typically do not need review – e.g., the check and receipt for payment of
review fees.) Here are the six primary documents provided – comprising the heart of the
matter that TRC is charged with reviewing:
Carriage House Interior TRC Narrative: (Exhibit 1) This document is just as the title
states – a project narrative. Here is where the bulk of the information is provided on the
restaurant use itself. Notwithstanding the “interior” label, the document also touches on
some external aspect of the building.
Also included in this document are an Aug. 2019 letter exchange between MOA
Architecture and Town staff confirming that the proposed use is in accord with the
SHDMP, and a 2019 letter from the Colorado Historical Foundation (CHF) (holders of
5
the historical conservation easements on the Stanley property) confirming their
preliminary approval of the project. (A 2020 letter from CHF is also included in your
packet as Exhibit 6, reaffirming their approval and containing one request for a minor
adjustment in design.)
The Stanley Hotel Carriage House, Estes Park, CO: Technical Review Committee
Submission: (Exhibit 2) This set is the architectural renderings for the proposed finish,
including perspective drawings. The set also includes a conceptual site plan for the
project (also showing its relationship to the future Film Center and other elements.) A
floor plan for the restaurant is on the last page of this document.
Parking Operations Plan: (Exhibit 3) This report was originally prepared for the joint Film
Center-Carriage House project, as the title indicates. Some of the report has been
refocused to deal with just the Carriage House, although much remains in it about the
joint project. The Film Center information is relevant and useful for context; for
regulatory purposes, the Carriage House parking information is primary.
Stanley Hotel Carriage House: Traffic Impact Analysis: (Exhibit 4) This is as the title
states. It is focused on traffic impacts for the Carriage House restaurant use. The study
does account for impacts on streets in the wider area around the Stanley Campus,
including state highways.
Carriage House Architectural Committee review: (Exhibit 5) Per the SHDMP (p. 6 et
seq.), an Architectural Review Committee (ARC) is also appointed for each Stanley
Historic District project meeting requirements for ARC review. This has been done for
the Carriage House project, and the ARC has conducted their review per the principles
and procedures in the SHDMP. Their letter of review and recommendation to the TRC is
included. Staff anticipates at least one ARC member will be available on the Aug. 24
call.
Colorado Historical Foundation (CHF) review: (Exhibit 6) The SHDMP envisions an
important role for the CHF in Stanley project review, particularly those with actual or
potential historical importance or impacts. The Carriage House is not a National
Register Historic Building and is not a direct contributing element to the Registered
property. However, the building is identified by many (including CHF) as having historic
value. A letter of approval and recommendation from CHF is included.
A sizeable number of other documents and sets are also included in your packet
(Exhibits 7 through 17). These serve as additional background on the project, its
context, its recent history, and some relevant procedural matters, such as the
memoranda formally appointing the TRC and ARC. Again, the six documents above
(Exhibits 1 through 6) are the core documents sets for TRC’s review and collective form
the basis for your review and decision on Aug. 24.
A final element (Exhibit 18) that needs to be identified is a presentation that the Stanley
team prepared for the TRC and provided for the packet. Staff understands the Stanley
team wishes to present this material as a slide show during the virtual meeting on
Monday.
6
Staff analysis:
Beginning with the pre-application meeting in July 2019, and gaining formal momentum
in June 2020 with the plan submittal, Town staff and allied agencies have engaged in
multiple rounds of review of the materials. The net outcome of the review is the final set
of materials in your packet.
Community Development Department / Planning Division staff are the lead in staff
development reviews in general, and that has been the case for this project. Planning
staff members are professionally obligated (as I interpret our Code of Ethics) to provide
a staff recommendation to all reviewing bodies on all projects within the respective
bodies’ jurisdiction. We would stress that the final decision in such cases is always at
the reviewing body’s discretion and best judgment.
In that context, staff offers this pair of linked recommendations:
• The Carriage House project meets the letter and the intent of the Stanley Historic
District Master Plan. Staff recommends approval by the TRC.
• We recommend that the approval include the conditions as stated at the
conclusion of this staff report.
Submitted materials – staff comments:
The narrative provides a clear and concise picture of the Carriage House project’s
purpose.
The architectural renderings and site layout provide illustrative proof that the project
building and site design are an attractive and functional addition to the Town of Estes
Park and the wider public who live, work or visit here. Perhaps more to the point, the
architectural design is faithful to the SHDMP standards and guidelines. We would
particularly note that the design is complementary to, but does not mimic or attempt to
replicate, the other historically significant buildings on the Stanley campus.
Staff in the Public Works Department are the primary arbiters of matters in the Parking
and Traffic Impact studies. Public Works staff are expected to be part of the Aug. 24
TRC meeting. Our understanding is that technical matters in the two motor-vehicle
transportation studies have been resolved to the general satisfaction of Public Works
staff.
The Architectural Review Committee’s narrative and conclusion in Exhibit 5 are self-
explanatory. Staff would note that the ARC has provided valuable input and identified
features that are valuable in illuminating the general architectural criteria in the SHDMP.
The Colorado Historical Foundation has pointed out the contextual historical value of
the Carriage House in its setting and as an artifact in its own right. With one minor
suggestion for a rooftop modification, they support the renovation. Staff will honor the
CHF’s wishes in the letter and not make the rooftop cresting modification an actual
condition. Nevertheless, it is commended to the Stanley team as a helpful
recommendation.
Additional staff comments:
7
•The Stanley Lot 1 campus is nearing “effective buildout.” By this we mean that,
although there is plenty of open space to be seen on Lot 1, the conservation
easements over much of the open area mean it will never be developed or
changed in any appreciable sense. The Film Center, and a potential modest
expansion of the main Hotel to the north and west, are the only remaining
elements easily discernible on the campus. Parking is basically maxed out,
space-wise. All these observations are supported in the SHDMP. We make this
observation to point out that this project means the SHDMP is near completion,
with just a few projects left to do.
•With that said, the area around the Stanley campus, and to some extent some
features on the campus itself, would benefit from additional attention. Not all of
this can be clearly identified as the Stanley’s responsibility – some arguably are
up to other developers to address, and some may be in the Town’s, CDOT’s, or
other governmental agencies’ spheres of interest. But they are worthy of
informational attention here. Public Works staff in particular have identified the
following:
o PW recommends that the Carriage House Restaurant project be required
to extend sidewalks and trails from the gatehouse driveway/Steamer
Parkway intersection to connect with existing sidewalks along Wonderview
Avenue to the west and along Steamer Drive to the east. This
recommendation is based on the understanding that the EP community
supports and desires walkable travelways and bikeways between key
destinations, as evidenced by the adoption of a Master Trails Plan in 2016
and the adoption of a Complete Streets Policy in 2019.
Advantages:
•The Carriage House proposal aligns with the 1994 Stanley Historic District Master
Plan.
•The proposed development is attractive, complements other development on the
Stanley site and in the Town, and will contribute to the economic, social, and
environmental well-being of the community as a whole.
Disadvantages:
•Some elements of the project, as with any significant project near a residential
area, will represent a change in residents’ settled living circumstances.
•A certain amount of disturbance during construction activity can be expected.
•The project will result in increased traffic and other activity on site and in the
vicinity.
Action Recommended:
Staff recommends approval with conditions of the project
Finance/Resource Impact:
n/a - No direct expenditures or revenue identified at this time.
Level of Public Interest
Low-medium in the overall community; high in the area adjacent to the Stanley campus.
8
Sample Motion:
I move for the approval of the Stanley Carriage House project, finding that the project
meets the standards and requirements in the Stanley Historic District Master Plan and
Estes Park Municipal Code Chapter 17.44, According to staff’s recommendation, and
including the following conditions:
1.The plan set as shown and articulated in Exhibits 1 through 6 are incorporated by
reference as required conditions of approval and development, with allowance for minor
modifications as may be reasonable and necessary during final design and construction;
2.The following conditions are additionally specified:
a.All public improvements associated with the Carriage House Restaurant project
in public use easements or public right-of-ways shall be addressed in a
Development Agreement.
b.The Carriage House Restaurant shall not receive a building permit for interior
finishes until all public improvements associated with the Carriage House
Restaurant project and all private/public improvements associated with the East
Parking Lot (currently B-11160) are constructed and accepted by the Town, or
properly securitized and addressed in a Development Agreement.
c.The Carriage House restaurant shall not receive a TCO or CO to operate in any
capacity unless and until all public improvements associated with the Carriage
House project and all private/public improvements associated with the East
Parking Lot (B-11160) are constructed and approved by the Town, and all other
obligations of any/all Development Agreement(s) are fulfilled.
Attachments / Exhibits:
1. 2020.05.28 - Carriage House Interior TRC Narrative Document with signature
2. 2020.05.28 - Carriage House Final TRC
3.Parking Operations Plan - UPDATE 07-08-2020
4.20028_Stanley Renovation Traffic Impact Study_updated 2020-07-08
5.Stanley Carriage House - ARC Review
6.CHF - Response to Req. for Review - Carriage House (6.20)
7.Stanley Historic District Master Plan TRC extracts
8.SHD Master Plan Exhibit B (p. 56)
9.SHD 9 lots aerial
10.E. 2020.04.07 - Stanley Carriage House Rev 7 drawings – Consolidated
11.Exhibit D REV 1 – Supplemental civil drawingS (07.15.2020)
12.Staff Round 1 comments - Stanley Carriage House TRC reviews - 2020-06
13.FT_Stanley_Response to Comments letter_2020-07-08_v2
14.Exhibit C.1 – Memorandum by Cassie Slade Re TIA (07.08.2020)
15.Email 2020-08-12 frm MOA
16. 06.04.2020 - TRC Appointments
17. 06.04.2020 - ARC Appointments
18.Carriage House TRC Slides FINAL
9
The Stanley Hotel Carriage House
Estes Park, CO
Technical Review Committee Submission
TRC Project Review Request
and
Project Narrative
May 28, 2020
Exhibit 1
Carriage House TRC Narrative 3 May 27, 2020
The Stanley Carriage House – Design Narrative
This TRC review package includes the review of the Stanley Carriage House for conformance with
surrounding site improvements. The Carriage House has submitted for, and received construction
permits for the Footings/Foundation and Building Enclosure via Town of Estes Park Construction Permit
B-11186 for the Carriage House Foundation and Enclosure Project. Additionally, the parking and
landscape development directly to the east of the Carriage House has submitted for, and received
construction permits per Town of Estes Park Construction Permit B-11160 for the East Parking Project.
As such, the parking and landscape area to the east of the Carriage House is not part of the TRC approval
review.
The Stanley Carriage House, where the famous Stanley Steamer vehicles were stored is currently in the
process of renovation and reconstruction. Built as a garage in 1905, the approximately 5,000 square-
foot building was also briefly used as a 26-room motel in the 1960’s. It has been used as a storage shed
ever since then. The Carriage House is the last Stanley building left to be fully renovated and preserved
since Grand Heritage Hotel Group bought the hotel 25-years ago.
One of the main difficulties with the Carriage House is that F.O. Stanley built it without a foundation
underneath and due to the current building codes, renovation of the building required appropriate
foundations. In order to preserve the building and allow renovations, the roof has been lifted off the
structure and set to the side. A foundation is currently under construction, and once completed, the
roof put back on. In this way, the foundation can be added to allow renovations to the building while
also preserving the historical core structure.
The Carriage House is an important part of the F. O. Stanley legacy and a key goal is to maintain the
building substantially as he designed. Historic and recycled materials are being used throughout the
project, including historically correct and energy-efficient glass placed where the garage doors to the
Carriage House for the Stanley Steamers were once located. But far more than just preserving an
important piece of Estes Park and Stanley Hotel history, the project is a large investment in economic
development in Estes Park.
The main floor of the Carriage House will house a restaurant tenant. Grand Heritage Hotel Group has
reached a tenant agreement with the Post Brewery. Post Brewery is associated with The Big Red F
Company, formed in 1994 by Chef Dave Query of Boulder. The restaurant is designed to accommodate
129 seats indoors, with an additional 110 seats on an outdoor patio.
The restaurant facility has been anticipated in coordination with site infrastructure, parking, and traffic.
The restaurant use was included in the Traffic Impact Study for the Stanley Film Center and Carriage
House as well as the Parking and Operations Plan for the Stanley Film Center and Carriage House. Those
documents are included as part of the TRC review package.
Carriage House TRC Narrative 4 May 27, 2020
The Stanley Carriage House – Allowed Use by Stanley Historic District Master Plan
The following correspondence to Mr. Randy Hunt, Community Development Director for the Town of
Estes Park, describes the Use as Allowed by the Stanley Historic District Master Plan for the restaurant
function within the Carriage House. Following MOA Architectures letter is the response received from
Mr. Hunt.
Carriage House TRC Narrative 5 May 27, 2020
Carriage House TRC Narrative 6 May 27, 2020
Carriage House TRC Narrative 7 May 27, 2020
The Stanley Film and Performing Arts Center – Colorado Historic Foundation Review
MOA Architecture coordinated extensively with the Colorado Historical Foundation on the design of the
Carriage House renovation and redevelopment. Following is correspondence provided during their
review process. In recent correspondence with Cindy Nasky, Colorado Historical Foundation Director of
Preservation Program regarding the exterior Carriage House design and window fenestration, Cindy
stated, “I think the windows are appropriate and quite nice.”
The following is correspondence of the Colorado Historical Foundations review of the Stanley Film
Center and Carriage House renovation/redevelopment design.
Carriage House TRC Narrative 8 May 27, 2020
Carriage House TRC Narrative 9 May 27, 2020
T H E S T A N L E Y H O T E L C A R R I A G E H O U S E
E S T E S P A R K , C O
Te c h n i c a l R e v i e w C o m m i t t e e S u b m i s s i o n
M a y 2 8 , 2 0 2 0
E x h i b i t 2
11
2
SHEET INDEX
1 - Cover Sheet
2 - Sheet Index
3 - TRC Review Scope Site Plan
4 - Site Plan
5 - Carriage House Elevations
6 - Carriage House Trimwork South
7 - Carriage House Trimwork East
8 - South Rendering
9 - West Rendering
10 - South Quadrant Rendering
11 - East Quadrant Rendering
12 - Post Restaurant Entry View
13 - Post Restaurant North View
14 - Post Restaurant Floor Plan
SHEET INDEX
12
3TRC REVIEW SCOPE SITE PLAN
FILM
CENTER
SERVICE
COURTYARD
CONCERT
HALL
CARRIAGE
HOUSE
EAST PARKING
PERMIT#
B-11160
FILM CENTER TRC
CARRIAGE HOUSE INTERIOR TRC
PERMIT # B-11186
13
4SITE PLAN
FILM
CENTER
SERVICE
COURTYARD
CONCERT
HALL
CARRIAGE
HOUSE
14
5CARRIAGE HOUSE ELEVATIONS
OA ARCHITECTURE Stanley Hotel Carriage House EXTERIOR ELEVATIONS
A-201333 E Wonderview Ave Estes Park, CO 80517
1/8" = 1'-0"
EAST ELEVATION4
1/8" = 1'-0"
SOUTH ELEVATION1
1/8" = 1'-0"
NORTH ELEVATION3
MOA ARCHITECTURE Stanley Hotel Carriage House EXTERIOR ELEVATIONS
A-201333 E Wonderview Ave Estes Park, CO 80517
1/8" = 1'-0"
EAST ELEVATION4
1/8" = 1'-0"
WEST ELEVATION2
CERTAINTEED LANDMARK
COLOR: COTTAGE RED
CEDAR BEVELED SIDING
CARRIAGE HOUSE ELEVATIONS
15
6CARRIAGE HOUSE TRIMWORK DETAIL
16
7CARRIAGE HOUSE TRIMWORK DETAIL
17
8SOUTH RENDERING
18
9WEST ENTRY 01
19
10SOUTH QUADRANT RENDERING
20
11EAST QUADRANT RENDERING
21
12POST RESTAURANT ENTRY VIEW
22
13POST RESTAURANT NORTH VIEW
23
14POST RESTAURANT FLOOR PLAN
24
Exhibit 3
25
26
27
28
29
30
o
o
o
31
32
33
34
35
36
37
Original Date: April 6, 2020
Updated Date: July 8, 2020
Submitted To:
MOA ARCHITECTURE
414 14th Street, Suite 300
Denver, CO 80202
Submitted By:
Fox Tuttle Transportation Group, LLC
1624 Market Street, Suite 202
Denver, CO 80202
The Stanley Hotel:
Carriage House
Traffic Impact Analysis
Exhibit 4
38
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 2 Updated July 8, 2020
TABLE OF CONTENTS
1.0 Introduction ............................................................................................................................ 4
2.0 Project Description .................................................................................................................. 5
3.0 Study Considerations ............................................................................................................... 5
3.1 Data Collection .................................................................................................................... 5
3.2 Evaluation Methodology ..................................................................................................... 5
3.3 Level of Service Definitions ................................................................................................. 6
4.0 Existing Conditions .................................................................................................................. 6
4.1 Roadways ............................................................................................................................ 6
4.2 Intersections ....................................................................................................................... 7
4.3 Pedestrian and Bicycle Facilities ......................................................................................... 8
4.4 Transit ................................................................................................................................. 8
4.5 Existing Intersection Capacity Analysis ............................................................................... 9
5.0 Future Traffic Conditions ....................................................................................................... 10
5.1 Annual Growth Factor and Future Volume Methodology ................................................ 10
5.2 Year 2024 Background Intersection Capacity Analysis ..................................................... 10
6.0 Proposed Carriage House Traffic ............................................................................................ 11
6.1 Trip Generation ................................................................................................................. 11
6.2 Trip Distribution and Assignment ..................................................................................... 11
7.0 Future Traffic Conditions with the Reconstruction ................................................................. 12
8.0 Future Multi‐Modal Trips and Facilities .................................................................................. 12
9.0 Parking Operations ................................................................................................................ 12
10.0 Conclusion ............................................................................................................................. 13
39
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 3 Updated July 8, 2020
LIST OF TABLES
Table 1 – Peak Hour Intersection Level of Service Summary ..................................................................... 15
Table 2 – Trip Generation Summary ........................................................................................................... 11
LIST OF FIGURES
Figure 1 – Vicinity Map and Existing Access ............................................................................................... 16
Figure 2 – Year 2019 Existing Traffic Volumes ............................................................................................ 17
Figure 3 – Year 2024 Background Traffic Volumes ..................................................................................... 18
Figure 4 – Trip Distribution and Site‐Generated Trip Volumes .................................................................. 19
Figure 5 – Year 2024 Background + Site‐Generated Traffic Volumes ......................................................... 20
APPENDIX
Transportation Impact Study Base Assumptions Form
Level of Service Definitions
Existing Traffic Data
Intersection Capacity Worksheets
40
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 4 Updated July 8, 2020
THE STANLEY HOTEL CARRIAGE HOUSE RENOVATION
TRAFFIC IMPACT STUDY
1.0 INTRODUCTION
The Fox Tuttle Transportation Group prepared this traffic impact study for the proposed reconstruction
of the Carriage House at The Stanley Hotel in Estes Park, CO. The project proposes to renovate the
existing Carriage House to provide a restaurant that will serve the existing hotel guests and future art
district guests. It is understood that this building has not been actively used in 50 years and is located in
the northeast corner of Steamer Parkway and the Main Entrance. Figure 1 includes a vicinity map for the
proposed project.
The purpose of this study is to assist in identifying potential traffic impacts within the study area as a
result of this project. The traffic study addresses existing and short‐term (Year 2024) peak hour
intersection conditions in the study area with and without the project generated traffic. The
information contained in this study is anticipated to be used by the Town of Estes Park staff in
identifying any intersection or roadway deficiencies and potential improvements for the short‐term
future conditions. This study focused on the weekday AM and PM peak hours which are typically the
highest traffic volumes for the proposed type of land use.
The traffic impact study is consistent with the requirements of the Town of Estes Park’s standards set
forth in Chapter 4 of the Larimer County Urban Area Street Standards (revised 2019). A copy of the
approved Transportation Impact Study Base Assumptions Form is attached in the Appendix for
reference.
41
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 5 Updated July 8, 2020
2.0 PROJECT DESCRIPTION
The Stanley Hotel project proposes to create an Art District that will include a future museum, film
center, and auditorium. It is understood that the new construction of the Carriage House is the first
phase of the overall project and is planned to become a full‐service restaurant with approximately 250
seats and outdoor seating. This traffic study focuses on the reconstruction of the Carriage House and the
other art district amenities will be evaluated in a separate traffic study with the film center submittal.
Access to the site is planned via the existing main entrance on Steamer Parkway and along the existing
internal loop roadway. Figure 1 includes a conceptual site plan for the project.
3.0 STUDY CONSIDERATIONS
3.1 Data Collection
Intersection turning movement volumes were collected by Delich and Associates in August 2019 at six
existing intersections during the weekday AM and PM peak hours. Per a request from Colorado
Department of Transportation (CDOT), traffic volumes were gathered on a busy weekend (September
28, 2019) at the intersection of Big Thompson Avenue/Elkhorn Avenue at Wonderview Avenue/St. Vrain
Avenue.
Historic daily volumes along Big Thompson Avenue (US 34/US 36), Wonderview Avenue (US 34), and St.
Vrain Avenue within the vicinity of the project site were gathered from the CDOT’s Transportation Data
Management System (TDMS). The existing traffic volumes are illustrated on Figure 2. The existing
intersection geometry and traffic control are also shown on this figure. Count data sheets are provided
in the Appendix.
3.2 Evaluation Methodology
The traffic operations analysis addressed the unsignalized intersection operations using the procedures
and methodologies set forth by the Highway Capacity Manual (HCM) 1. Assumed peak hour factor of
0.90 was applied to the intersections for the existing and future scenarios since the existing 15‐minute
count data was not available at the time of the analysis. Study intersections were evaluated using
Synchro (v10) software.
1 Highway Capacity Manual, Highway Research Board Special Report 209, Transportation Research Board, National
Research Council, 6th Edition (2016).
42
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 6 Updated July 8, 2020
3.3 Level of Service Definitions
To measure and describe the operational status of the study intersections, transportation engineers and
planners commonly use a grading system referred to as “Level of Service” (LOS) that is defined by the
HCM. LOS characterizes the operational conditions of an intersections traffic flow, ranging from LOS A
(indicating very good, free flow operations) and LOS F (indicating congested and sometimes
oversaturated conditions). These grades represent the perspective of drivers and are an indication of
the comfort and convenience associated with traveling through the intersections. The intersection LOS is
represented as a delay in seconds per vehicle for the intersection as a whole and for each turning
movement. A more detailed discussion of LOS methodology is contained in the Appendix for reference.
The Larimer County and Town standards consider LOS A through C to be good for the overall
intersection operations with LOS D as acceptable in peak hours. For individual movements, LOS E and F
may be acceptable for left‐turns or minor streets.
4.0 EXISTING CONDITIONS
4.1 Roadways
The study area boundaries are based on the amount of traffic to be generated by the project and
potential impact to the existing roadway network. The study area was defined in coordination with the
Town staff and CDOT and is outlined in the Transportation Impact Study Base Assumptions Form
provided by Delich and Associates (located in the Appendix). The primary public roadways that serve the
project site are discussed in the following text and illustrated on Figure 1.
US 34 (Big Thompson Avenue/Elkhorn Avenue) is a four‐lane arterial roadway with a center
median and left‐turn lane that is CDOT facility. US 34 provides east‐west access down the Big
Thompson Canyon to Loveland and the front range to the east, and access for commercial and
residential areas of Estes Park to the west. In Estes Park, the highway turns north onto
Wonderview Avenue to bypass the downtown area. West of Wonderview Avenue/St. Vrain
Avenue, Big Thompson Avenue becomes Elkhorn Avenue with a classification of Non‐Rural
Arterial (NR‐C) through downtown Estes Park and a speed limit of 25 miles per hour (mph). East
of Wonderview Avenue/St. Vrain Avenue, this highway is classified as Non‐Rural Principal
Highway (NR‐A) with a posted speed limit of 35 mph. Elkhorn Avenue currently serves
approximately 13,000 vehicles per day (vpd) west of Wonderview Avenue/St. Vrain Avenue and
Big Thompson Avenue 18,000 vpd east of the same intersection (Year 2019, CDOT).
43
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 7 Updated July 8, 2020
Wonderview Avenue is a bypass route for US 34 that routes north of downtown Estes Park
heading west towards the mountains. This arterial (NR‐A) is a two‐lane arterial with a center
median/turn‐lane within the study area. The posted speed limit is 40 mph. Wonderview Avenue
currently serves approximately 6,700 vpd north of Elkhorn Avenue (Year 2019, CDOT). Recently,
a single‐lane roundabout was installed at the intersection of Wonderview Avenue and McGregor
Avenue by CDOT to improve safety, increase capacity, and reduce conflict points between all
road users. The intersection improvements also enhanced the pedestrian crossings on the south
and east legs of the new roundabout with new sidewalks leading to The Stanley Hotel.
Steamer Parkway is the main roadway into and around The Stanley Hotel campus and providing
access to adjacent neighborhoods and the Aspire. This two‐lane local street has a posted speed
limit is 25 mph and will lead the new trips to the main entrance of The Stanley Hotel.
Steamer Drive is a two‐lane north‐south local street that provides access to residential homes
and the Stanley Village shopping center. The posted speed limit is 25 mph and links directly to
Big Thompson Avenue (US 34). It is understood that the intersection with the highway will be
signalized in the future when warranted. Steamer Drive is utilized to access The Stanley Hotel
from Big Thompson Avenue to Steamer Parkway.
4.2 Intersections
The study area includes six intersections that are listed below with the current traffic control and were
analyzed for existing and future background year traffic operations:
1. Steamer Parkway at SW Steamer Parkway (side‐street stop‐controlled)
2. Steamer Parkway at Aspire Access (side‐street stop‐controlled)
3. Steamer Parkway at The Stanley Hotel Main Entrance (side‐street stop‐controlled)
4. Steamer Parkway at Steamer Drive (side‐street stop‐controlled)
5. Big Thompson Avenue (US 34) at Steamer Drive / Golf Course Access (side‐street stop‐
controlled)
6. Wonderview Avenue (US 34) at SW Steamer Parkway (side‐street stop‐controlled)
The existing lane configuration at each of the study locations is illustrated on Figure 2. Note that the
counts were gathered on a busy weekend at the signalized intersection of Big Thompson Avenue at
Wonderview Avenue/St. Vrain Avenue for informational purposes. This intersection was not included in
the study area, but the existing conditions were evaluated per the request of CDOT.
44
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 8 Updated July 8, 2020
4.3 Pedestrian and Bicycle Facilities
The Town of Estes Park adopted the Complete Streets Policy (#851) in April 2019 to “promote and
encourage the development of a multi‐modal transportation network” that will serve all people driving,
walking, biking, and using transit. The policy is implemented with every “street project” which the
Carriage House reconstruction is not considered; however, The Stanley Hotel is committed to adhering
to the guidelines where possible.
The Stanley Hotel has an extensive sidewalk system that connects various facilities and amenities
around the property that are ADA compliant. On‐site sidewalks and paths link to external sidewalks that
are within a walkable radius (typically between ¼ and ½ mile radius).
Externally, sidewalks exist on the south side of Steamer Parkway along the Aspire property; along the
north side of Big Thompson Avenue from Steamer Drive into downtown; and portions of the south side
of Big Thompson Avenue and east side of Wonderview Avenue. The study roadways currently do not
provide designated bike facilities; however, bicyclists are permitted to ride with traffic on the arterial,
collector and local streets.
4.4 Transit
The Town of Estes Park provides a free shuttle service (named Estes Transit) for the summer months
linking The Stanley Hotel to the downtown area, Rocky Mountain National Park (RMNP), and other local
attractions. The existing visitor’s center on Big Thompson Avenue is the transportation hub for the
shuttles. The Stanley Hotel is serviced by the Gold Route that runs circulates the Town connecting to the
medical center, conference center, other lodging, events complex, and the visitor center. The Gold
Route also travels up US 34 to the Fall River Visitors Center to enter RMNP. This route provides patrons
the ability to transfer to
other local routes that lead
to many other attractions
and services around town.
The Estes Transit routes,
specifically the Gold Route,
are shown on the map to
the right which is beneficial
for existing and future
visitors of The Stanley Hotel
and the renovation of the
Carriage House.
45
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 9 Updated July 8, 2020
4.5 Existing Intersection Capacity Analysis
The existing volumes, lane configuration, and traffic control are illustrated on Figure 2. The results of the
LOS calculations for the study intersections are summarized in Table 1. The intersection level of service
worksheets and queue reports are attached in the Appendix. All study intersections are operating at
LOS C or better overall in the AM and PM peak hours. The following intersection currently has one
approach that operates at LOS E or F in one or both peak hours:
Big Thompson Avenue (US 34) at Steamer Drive / Golf Course Access: This currently
unsignalized intersection is calculated to operate at LOS A overall in the AM peak hour and LOS
C in the PM peak hour. The southbound left‐turn movement operates at LOS E in the AM peak
hour and LOS F in the PM peak hour. This delay is caused by the heavy flow of traffic on Big
Thompson Avenue. The 95th percentile queue was estimated to be two vehicles in the AM peak
hour and up to eight (8) vehicles in the PM peak hour.
Recommendations: It is understood that this intersection is planned to be signalized in late
2020. Fox Tuttle received a copy of the draft signal design plans and anticipated signal phasing
from the design engineer. The signal timing parameters and cycle length at the intersection of
Elkhorn Avenue and Wonderview Avenue/St. Vrain Avenue were assumed to be the same at the
new signal. It was assumed the left‐turns on Big Thompson Avenue would provide
protected+permitted phasing with flashing yellow arrow signal heads and the side‐streets would
operate as split phasing due to the offset alignment.
With the new signal and the listed assumptions, the intersection is anticipated to operate
overall at LOS A in the AM peak hour and LOS B in the PM peak hour. The northbound approach
(Golf Course Access) was estimated to operate at LOS F during the AM peak hour, which is
related to the split phasing. Drivers will be required to wait longer for their assigned green time
rather than with stop‐control when they can proceed when a safe gap in traffic is available.
During the PM peak hour, both side‐street approaches are anticipated to operate below LOS D
due to the split phasing.
For informational purposes, the intersection of Elkhorn Avenue at Wonderview Avenue/St. Vrain
Avenue was evaluated for a peak hour on a busy weekend. The analysis indicated that the intersection
currently operates overall at LOS D. The westbound left‐turn, northbound left‐turn, and northbound
left/through movements were calculated to operate at LOS E during the weekend peak. The estimated
queues will extend beyond the existing storage on the westbound left‐turn and northbound right‐turn. It
is understood that this traffic study did not have to evaluate this intersection beyond the existing
conditions.
46
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 10 Updated July 8, 2020
5.0 FUTURE TRAFFIC CONDITIONS
5.1 Annual Growth Factor and Future Volume Methodology
In order to forecast the future peak hour traffic volumes, background traffic growth assumptions were
estimated based on the CDOT 20‐year factors, as well as available historic traffic volumes. Based on this
data, it was assumed there will be an annual growth rate of 2.0% within the study area. Trips associated
with the Alarado Business Park2 located in the northeast corner of Big Thompson Avenue and Steamer
Drive were included in the background volumes. Using these assumptions, the Year 2024 background
traffic is summarized on Figure 3.
5.2 Year 2024 Background Intersection Capacity Analysis
The study area intersections were evaluated to determine baseline operations for the Year 2024
background scenario and to identify any capacity constraints associated with background traffic. The
background volumes, lane configuration, and traffic control are illustrated on Figure 3. It was assumed
that the intersection of Big Thompson Avenue (US 34) at Steamer Drive / Golf Course Access would be
signalized and the intersection design and signal timing assumptions listed in Section 4.5 were
implemented.
The level of service criteria discussed previously was applied to the study area intersections to
determine the impacts with the short‐term (Year 2024) background volumes. The results of the LOS
calculations for the intersections are summarized in Table 1. The intersection level of service worksheets
and queue reports are attached in the Appendix. The Year 2024 background analysis assumed the
existing lane configuration and traffic control would remain the same at the study intersections.
The study intersections are shown to operate similarly to the existing conditions with LOS B or better
overall in the AM and PM peak hours in Year 2024 Background. As presented in the existing conditions,
the new signal at Big Thompson Avenue and Steamer Drive/Golf Course Access will result in the side
street approaches operating below LOS D in one or both peak hours. The 95th percentile queues for the
southbound approach are estimated to be maintained within the existing storage.
2 Trips gathered from Alarado Business Park Traffic Impact Study. Delich Associate. August 2018.
47
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 11 Updated July 8, 2020
6.0 PROPOSED CARRIAGE HOUSE TRAFFIC
6.1 Trip Generation
Delich and Associates worked with The Stanley Hotel design team to understand the trips expected to
be associated with the reconstructed Carriage House. The trips associated with the restaurant were
estimated per rates provided by Institute of Transportation Engineers’ (ITE) Trip Generation Manual3.
Per the Base Assumptions Form, a conservative approach was taken by assuming all of the restaurant
trips would be external to The Stanley Hotel. It is anticipated that majority of the trips associated with
the renovated Carriage House will be completed by walk, bike, or transit from The Stanley Hotel or
nearby lodging.
The trip generation estimates are summarized in Table 2. Based on information from The Stanley Hotel
design team, the Carriage House restaurant will not be opened during the AM peak hour. For
conservative purposes, no adjustments were made to the trips for internal or multi‐modal trips.
Table 2. Trip Generation Summary
Land Use Size &
Unit
Daily Trips AM Peak Hour PM Peak Hour
Rate Total Rate In Out Rate In Out
ITE 932: High‐Turnover
Restaurant 5.7 ksf 112.18 640 In: 5.47
Out: 4.47 * * In: 6.06
Out: 3.71 35 21
* Not Open for Business at this time
6.2 Trip Distribution and Assignment
The estimated trip volumes presented in Table 2 were distributed onto the study area roadway network
based on existing traffic characteristics of the area, existing and future land uses, and the relationship of
this project to the greater Estes Park community. The overall assumed distribution and trip assignment
are is illustrated in Figure 4.
3 Trip Generation 10th Edition, Institute of Transportation Engineers, 2017.
48
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 12 Updated July 8, 2020
7.0 FUTURE TRAFFIC CONDITIONS WITH THE RECONSTRUCTION
This section discusses impacts associated with the proposed trips associated with the build out scenario
of The Stanley Hotel Carriage House restaurant. The site‐generated volumes were added to the
projected Year 2024 background volumes and are illustrated on Figure 5. The results of the LOS
calculations for the intersections are summarized on Table 1. The intersection level of service
worksheets and queue reports are attached in the Appendix. As assumed in the Year 2023 background
conditions, the intersection of Big Thompson Avenue (US 34) at Steamer Drive / Golf Course Access
would be signalized and the intersection design and signal timing assumptions listed in Section 4.5 were
implemented.
As shown on the Level of Service summary table, the Carriage House trips have little to no impact on
the delays and queuing at the majority of the study intersections during the PM peak hour when it is
opened for business. The southbound left‐turn at the intersection of Wonderview Avenue and SW
Steamer Parkway was projected to begin operating at LOS E in the PM peak hour due to the additional
trips (only account for 7% of the movement volume). The 95th percentile queue for this movement was
estimated to increase by 13 feet (less than one vehicle).
8.0 FUTURE MULTI‐MODAL TRIPS AND FACILITIES
The Carriage House was estimated to generate up to 56 trips in the PM peak hour (35 enter/21 exit). For
conservative purposes, this study assumed all trips were external to The Stanley Hotel and were not
reduced for walking or biking. It is anticipated that the internal and non‐auto trips associated with the
Carriage House would be between 30% and 85% since the new restaurant will be serving mostly
customers already staying at or visiting The Stanley Hotel. The proposed restaurant is also within ¼ mile
walking distance of the Lodge, the Aspire, and neighboring homes that may visit for a meal. The Carriage
House restaurant has the potential to attract people that live in or visit Estes Park; most of these patrons
are anticipated to utilize a personal vehicle, a Transportation Network Company (TNC) vehicle, or the
Estes Park transit system.
9.0 PARKING OPERATIONS
All lodging accommodations offered on the Stanley Campus host between 350 and 450 guests per night
in the peak season, including guests at The Stanley Hotel, the Lodge and the Aspire. It is anticipated that
many of the visitors to the Carriage House and future Film and Performing Arts Center will be guests
already parked in the respective guest parking lots. External attendees for either venue will park in the
49
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 13 Updated July 8, 2020
proposed parking lots are the Film and Performing Arts Center. Refer to the Parking Operations Plan, a
separate document, for the anticipated parking demand and proposed parking management for the
Carriage House and the future Film and Performing Arts Center.
10.0 CONCLUSION
The project proposes to renovate and reconstruct the existing Carriage House to provide a new
restaurant. Access to the site is planned via the existing main entrance on Steamer Parkway and along
the existing internal loop roadway. The internal roadway will continue to circulate through The Stanley
Hotel campus. The project plans to provide ADA pedestrian access between existing facilities to the
proposed restaurant.
Vehicular traffic volumes associated with Carriage House renovation project have been analyzed for the
existing and short‐term (Year 2024) scenarios. Using national trip rates, the project is anticipated to
generate up to 639 daily trips, with no trips in the AM peak hour since it will be closed, and 56 trips in
the PM peak hour. Although this traffic impact study assumed all of the restaurant trips would be
external to The Stanley Hotel, it is anticipated that a high percentage (up to 85%) of the trips would be
internal or completed by non‐auto transportation. Regardless, it was determined that the existing
roadways and intersections can accommodate the projected traffic volumes for buildout conditions of
the proposed reconstruction of the Carriage House at The Stanley Hotel.
50
FT# 20028 The Stanley Hotel Carriage House Traffic Impact Study
Estes Park, CO
7/8/2020
Intersection and AM Peak PM Peak AM Peak PM Peak AM Peak PM Peak AM Peak PM Peak
Cricital Lane Groups Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS
STOP SIGN CONTROL
Steamer Pkwy at SW Steamer Pkwy 6 A 6 A 6 A 6 A 6 A 7 A
Eastbound Through+Right 0 A 0 A not applicable 0 A 0 A 0 A 0 A
Westbound Left+Through 7 A 7 A 7 A 8 A 7 A 8 A
Northbound Left 10 A 10 B 10 A 11 B 10 A 11 B
Northbound Right 9 A 9 A 9 A 9 A 9 A 9 A
Steamer Pkwy at Aspire Access 1 A 1 A 1 A 1 A 1 A 1 A
Eastbound Through+Right 0 A 0 A not applicable 0 A 0 A 0 A 0 A
Westbound Left+Through 7 A 8 A 7 A 8 A 7 A 8 A
Northbound Left+Right 9 A 10 A 9 A 10 A 9 A 10 B
Steamer Pkwy at The Stanley Hotel
Main Entrance 4 A 5 A 4 A 5 A 4 A 6 A
Eastbound Left+Through 7 A 7 A not applicable 7 A 8 A 7 A 8 A
Westbound Through+Right 0 A 0 A 0 A 0 A 0 A 0 A
Southbound Left+Right 9 A 9 A 9 A 9 A 9 A 10 A
Steamer Pkwy at Steamer Dr.3 A 4 A 3 A 4 A 3 A 5 A
Eastbound Left+Right 9 A 9 A not applicable 9 A 9 A 9 A 9 A
Northbound Left+Through 7 A 7 A 7 A 7 A 7 A 7 A
Southbound Through+Right 0 A 0 A 0 A 0 A 0 A 0 A
Big Thompson Ave (US 34) at
Steamer Dr. / Golf Course 3 A 18 C
Eastbound Left 9 A 9 A Refer to Signal Control Refer to Signal Control Refer to Signal Control
Eastbound Through+Right 0 A 0 A
Westbound Left 8 A 9 A
Westbound Through 0 A 0 A
Westbound Right 0 A 0 A
Northbound Left+Through+Right 16 C 17 C
Southbound Left 40 E >120 F
Southbound Right 0 A 0 A
Wonderview Ave at SW Steamer
Pkwy 2 A 3 A 2 A 4 A 2 A 5 A
Eastbound Left 8 A 8 A not applicable 8 A 9 A 8 A 9 A
Eastbound Through 0 A 0 A 0 A 0 A 0 A 0 A
Westbound Through 0 A 0 A 0 A 0 A 0 A 0 A
Westbound Right 0 A 0 A 0 A 0 A 0 A 0 A
Southbound Left 14 B 26 D 16 C 34 D 16 C 38 E
Southbound Right 10 B 11 B 11 B 11 B 11 B 11 B
SIGNAL CONTROL
Elkhorn Ave at Wonderview Ave/ St.
Vrain Ave 48 D
Eastbound Left 30 C not applicable not applicable not applicable
Eastbound Through 40 D
Eastbound Right 40 D
Westbound Left 69 E
Westbound Through 40 D
Westbound Right 37 D
Northbound Left 65 E
Northbound Left+Through 56 E
Northbound Right 42 D
Southbound Left 40 D
Southbound Left+Through 49 D
Southbound Right 33 C
Big Thompson Ave (US 34) at
Steamer Dr. / Golf Course 10 A 12 B 10 A 13 B 10 A 13 B
Eastbound Left Refer to Signal Control 4 A 4 A 4 A 4 A 4 A 5 A
Eastbound Through+Right 5 A 7 A 5 A 8 A 5 A 9 A
Westbound Left 6 A 6 A 6 A 7 A 6 A 7 A
Westbound Through 7 A 7 A 8 A 8 A 8 A 8 A
Westbound Right 0 A 0 A 0 A 0 A 0 A 0 A
Northbound Left+Through+Right 88 F 101 F 88 F 101 F 88 F 101 F
Southbound Left+Through 52 D 59 E 53 D 59 E 53 D 59 E
Southbound Right 0 A 0 A 0 A 0 A 0 A 0 A
Note: Delay represented in average seconds per vehicle.
Year 2024 Background 2024 Background + Project Trips
Table 1 - Peak Hour Intersection Level of Service Summary
Year 2019 Existing
with ImprovementsYear 2019 Existing
(weekend peak
hour; for
informational
purposes)
Page 1 of 1 20028_LOS_v251
Existing Main
Entrance to
Remain Full
Movement and
Stop-Controlled
Existing
Stanley Hotel
PROJECT SITE
Stanley Hotel
Estes Park
Golf Course
Carriage House
Restaurant
Original ScaleProject #Date Drawn by Figure #
T r a n s p o r o puG rnoiatt
FOX TUTTLE
VICINITY MAP AND EXISITNG ACCESS
STANLEY HOTEL CARRIAGE HOUSE TRAFFIC IMPACT ANALYSIS - ESTES PARK, CO
20028 NTS 7/8/20 CRS 152
Big T
h
o
m
p
s
o
n
A
v
e
(
U
S
3
4
)
St
e
a
m
e
r
D
r
i
v
e
Steam
e
r
Pkwy
Wo
n
d
e
r
v
i
e
w
Av
e
St. Vrain Ave
Data on Peak
Weekend.
Informational
Purposes Only.
Original ScaleProject #Date Drawn by Figure #
T r a n s p o r o puG rnoiatt
FOX TUTTLE
YEAR 2019 EXISTING TRAFFIC VOLUMES
STANLEY HOTEL CARRIAGE HOUSE TRAFFIC IMPACT ANALYSIS - ESTES PARK, CO
20028 NTS 7/8/20 CRS 253
Big T
h
o
m
p
s
o
n
A
v
e
(
U
S
3
4
)
St
e
a
m
e
r
D
r
i
v
e
Steam
e
r
Pkwy
Wo
n
d
e
r
v
i
e
w
Av
e
St. Vrain Ave
Original ScaleProject #Date Drawn by Figure #
T r a n s p o r o puG rnoiatt
FOX TUTTLE
YEAR 2024 BACKGROUND TRAFFIC VOLUMES
STANLEY HOTEL CARRIAGE HOUSE TRAFFIC IMPACT ANALYSIS - ESTES PARK, CO
20028 NTS 7/8/20 CRS 354
Big T
h
o
m
p
s
o
n
A
v
e
(
U
S
3
4
)
St
e
a
m
e
r
D
r
i
v
e
Steam
e
r
Pkwy
Wo
n
d
e
r
v
i
e
w
Av
e
St. Vrain Ave
20%
To/From West
Wonderview Ave
40%
To/From South
Wonderview Ave
35%
To/From East
Big Thompson
Ave
5%
To/From West
Big Thompson
Ave via Steamer
Drive
Original ScaleProject #Date Drawn by Figure #
T r a n s p o r o puG rnoiatt
FOX TUTTLE
TRIP DISTRIBUTION & SITE-GENERATED TRIP VOLUMES
STANLEY HOTEL CARRIAGE HOUSE TRAFFIC IMPACT ANALYSIS - ESTES PARK, CO
20028 NTS 7/8/20 CRS 455
Big T
h
o
m
p
s
o
n
A
v
e
(
U
S
3
4
)
St
e
a
m
e
r
D
r
i
v
e
Steam
e
r
Pkwy
Wo
n
d
e
r
v
i
e
w
Av
e
St. Vrain Ave
Original ScaleProject #Date Drawn by Figure #
T r a n s p o r o puG rnoiatt
FOX TUTTLE
YEAR 2024 BACKGROUND + SITE-GENERATED TRAFFIC VOLUMES
STANLEY HOTEL CARRIAGE HOUSE TRAFFIC IMPACT ANALYSIS - ESTES PARK, CO
20028 NTS 7/8/20 CRS 556
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 14 Updated July 8, 2020
Appendix:
Transportation Impact Study Base Assumptions Form
Level of Service Definitions
Existing Traffic Data
Intersection Capacity Worksheets
57
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 15 Updated July 8, 2020
Transportation Impact Study
Base Assumptions Form
58
59
60
61
62
63
64
65
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 16 Updated July 8, 2020
Level of Service
Definitions
66
LEVEL OF SERVICE DEFINITIONS
In rating roadway and intersection operating conditions with existing or future traffic
volumes, “Levels of Service” (LOS) A through F are used, with LOS A indicating very good
operation and LOS F indicating poor operation. Levels of service at signalized and
unsignalized intersections are closely associated with vehicle delays experienced in
seconds per vehicle. More complete level of service definitions and delay data for signal
and stop sign controlled intersections are contained in the following table for reference.
Level
of Service
Rating
Delay in seconds per vehicle (a)
Definition
Signalized Unsignalized
A 0.0 to 10.0 0.0 to 10.0
Low vehicular traffic volumes; primarily free flow operations. Density is
low and vehicles can freely maneuver within the traffic stream. Drivers
are able to maintain their desired speeds with little or no delay.
B 10.1 to 20.0 10.1 to 15.0
Stable vehicular traffic volume flow with potential for some restriction
of operating speeds due to traffic conditions. Vehicle maneuvering is
only slightly restricted. The stopped delays are not bothersome and
drivers are not subject to appreciable tension.
C 20.1 to 35.0 15.1 to 25.0
Stable traffic operations, however the ability for vehicles to maneuver is
more restricted by the increase in traffic volumes. Relatively satisfactory
operating speeds prevail, but adverse signal coordination or longer
vehicle queues cause delays along the corridor.
D 35.1 to 55.0 25.1 to 35.0
Approaching unstable vehicular traffic flow where small increases in
volume could cause substantial delays. Most drivers are restricted in
ability to maneuver and selection of travel speeds due to congestion.
Driver comfort and convenience are low, but tolerable.
E 55.1 to 80.0 35.1 to 50.0
Traffic operations characterized by significant approach delays and
average travel speeds of one-half to one-third the free flow speed.
Vehicular flow is unstable and there is potential for stoppages of brief
duration. High signal density, extensive vehicle queuing, or corridor
signal progression/timing are the typical causes of vehicle delays at
signalized corridors.
F > 80.0 > 50.0
Forced vehicular traffic flow and operations with high approach delays
at critical intersections. Vehicle speeds are reduced substantially, and
stoppages may occur for short or long periods of time because of
downstream congestion.
(a)Delay ranges based on Highway Capacity Manual (6th Edition, 2016) criteria.
67
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 17 Updated July 8, 2020
Existing Traffic Data
68
69
70
The Stanley Hotel Film Center Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC April 6, 2020
Intersection Capacity Worksheets:
Existing
71
HCM 6th TWSC 2019 Existing - AM Peak Hour
07/07/2020 1: SW Steamer Parkway & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 1
Intersection
Int Delay, s/veh 5.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 11 15 50 17 31 24
Future Vol, veh/h 11 15 50 17 31 24
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 12 17 56 19 34 27
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 29 0 152 21
Stage 1 - - - - 21 -
Stage 2 - - - - 131 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1584 - 840 1056
Stage 1 - - - - 1002 -
Stage 2 - - - - 895 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1584 - 810 1056
Mov Cap-2 Maneuver - - - - 810 -
Stage 1 - - - - 1002 -
Stage 2 - - - - 863 -
Approach EB WB NB
HCM Control Delay, s 0 5.5 9.1
HCM LOS A
Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT
Capacity (veh/h)810 1056 - - 1584 -
HCM Lane V/C Ratio 0.043 0.025 - - 0.035 -
HCM Control Delay (s) 9.6 8.5 - - 7.4 0
HCM Lane LOS A A - - A A
HCM 95th %tile Q(veh) 0.1 0.1 - - 0.1 -
72
HCM 6th TWSC 2019 Existing - AM Peak Hour
07/07/2020 2: Aspire Access & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 2
Intersection
Int Delay, s/veh 1.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 27 8 3 59 8 3
Future Vol, veh/h 27 8 3 59 8 3
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 30 9 3 66 9 3
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 39 0 107 35
Stage 1 - - - - 35 -
Stage 2 - - - - 72 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1571 - 891 1038
Stage 1 - - - - 987 -
Stage 2 - - - - 951 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1571 - 889 1038
Mov Cap-2 Maneuver - - - - 889 -
Stage 1 - - - - 987 -
Stage 2 - - - - 949 -
Approach EB WB NB
HCM Control Delay, s 0 0.4 8.9
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)925 - - 1571 -
HCM Lane V/C Ratio 0.013 - - 0.002 -
HCM Control Delay (s) 8.9 - - 7.3 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh) 0 - - 0 -
73
HCM 6th TWSC 2019 Existing - AM Peak Hour
07/07/2020 3: Steamer Parkway & Stanley Main Entrance
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 3
Intersection
Int Delay, s/veh 4
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 20 10 34 8 3 28
Future Vol, veh/h 20 10 34 8 3 28
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 22 11 38 9 3 31
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 47 0 - 0 98 43
Stage 1 - - - - 43 -
Stage 2 - - - - 55 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1560 - - - 901 1027
Stage 1 - - - - 979 -
Stage 2 - - - - 968 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1560 - - - 888 1027
Mov Cap-2 Maneuver - - - - 888 -
Stage 1 - - - - 965 -
Stage 2 - - - - 968 -
Approach EB WB SB
HCM Control Delay, s 4.9 0 8.7
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1560 - - - 1012
HCM Lane V/C Ratio 0.014 - - - 0.034
HCM Control Delay (s) 7.3 0 - - 8.7
HCM Lane LOS A A - - A
HCM 95th %tile Q(veh) 0 - - - 0.1
74
HCM 6th TWSC 2019 Existing - AM Peak Hour
07/07/2020 4: Steamer Drive & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 4
Intersection
Int Delay, s/veh 3.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 2 20 27 25 35 8
Future Vol, veh/h 2 20 27 25 35 8
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 2 22 30 28 39 9
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 132 44 48 0 - 0
Stage 1 44 - - - - -
Stage 2 88 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 862 1026 1559 - - -
Stage 1 978 - - - - -
Stage 2 935 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 845 1026 1559 - - -
Mov Cap-2 Maneuver 845 - - - - -
Stage 1 958 - - - - -
Stage 2 935 - - - - -
Approach EB NB SB
HCM Control Delay, s 8.7 3.8 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h)1559 - 1006 - -
HCM Lane V/C Ratio 0.019 - 0.024 - -
HCM Control Delay (s) 7.4 0 8.7 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0.1 - 0.1 - -
75
HCM 6th TWSC 2019 Existing - AM Peak Hour
07/07/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 5
Intersection
Int Delay, s/veh 2.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 61 310 5 2 544 90 3 0 1 61 0 88
Future Vol, veh/h 61 310 5 2 544 90 3 0 1 61 0 88
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - Free
Storage Length 150 - - 150 - 220 - - - 135 - 0
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 68 344 6 2 604 100 3 0 1 68 0 98
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 704 0 0 350 0 0 789 1191 347 1092 - -
Stage 1 -- - - - - 483 483 - 608 - -
Stage 2 -- - - - - 306 708 - 484 - -
Critical Hdwy 4.13 - - 4.13 - - 7.33 6.53 6.23 7.33 - -
Critical Hdwy Stg 1 -- - - - -6.13 5.53 - 6.53 - -
Critical Hdwy Stg 2 -- - - - -6.53 5.53 - 6.13 - -
Follow-up Hdwy 2.219 - - 2.219 - - 3.519 4.019 3.319 3.519 - -
Pot Cap-1 Maneuver 892 - - 1207 - - 294 187 695 180 0 0
Stage 1 -- - - - - 564 552 - 450 0 0
Stage 2 -- - - - - 679 437 - 563 0 0
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 892 - - 1207 - - 277 172 695 169 - -
Mov Cap-2 Maneuver -- - - - - 277 172 - 169 - -
Stage 1 -- - - - - 521 510 - 416 - -
Stage 2 -- - - - - 678 436 - 519 - -
Approach EB WB NB SB
HCM Control Delay, s 1.5 0 16.2 39.9
HCM LOS C E
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h)326 892 - - 1207 - - 169 -
HCM Lane V/C Ratio 0.014 0.076 - - 0.002 - - 0.401 -
HCM Control Delay (s) 16.2 9.4 - - 8 - - 39.9 0
HCM Lane LOS C A - - A - - E A
HCM 95th %tile Q(veh) 0 0.2 - - 0 - - 1.8 -
76
HCM 6th TWSC 2019 Existing - AM Peak Hour
07/07/2020 6: Wonderview Ave (US 34) & SW Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 6
Intersection
Int Delay, s/veh 1.5
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 15 232 315 40 45 20
Future Vol, veh/h 15 232 315 40 45 20
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 145 - - 310 0 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 17 258 350 44 50 22
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 394 0 - 0 642 350
Stage 1 - - - - 350 -
Stage 2 - - - - 292 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1165 - - - 438 693
Stage 1 - - - - 713 -
Stage 2 - - - - 758 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1165 - - - 431 693
Mov Cap-2 Maneuver - - - - 431 -
Stage 1 - - - - 702 -
Stage 2 - - - - 758 -
Approach EB WB SB
HCM Control Delay, s 0.5 0 13.2
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h)1165 - - - 431 693
HCM Lane V/C Ratio 0.014 - - - 0.116 0.032
HCM Control Delay (s) 8.1 - - - 14.4 10.4
HCM Lane LOS A - - - B B
HCM 95th %tile Q(veh) 0 - - - 0.4 0.1
77
HCM 6th TWSC 2019 Existing - PM Peak Hour
07/07/2020 1: SW Steamer Parkway & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 1
Intersection
Int Delay, s/veh 6.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 13 48 84 15 24 99
Future Vol, veh/h 13 48 84 15 24 99
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 14 53 93 17 27 110
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 67 0 244 41
Stage 1 - - - - 41 -
Stage 2 - - - - 203 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1535 - 744 1030
Stage 1 - - - - 981 -
Stage 2 - - - - 831 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1535 - 699 1030
Mov Cap-2 Maneuver - - - - 699 -
Stage 1 - - - - 981 -
Stage 2 - - - - 780 -
Approach EB WB NB
HCM Control Delay, s 0 6.4 9.2
HCM LOS A
Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT
Capacity (veh/h)699 1030 - - 1535 -
HCM Lane V/C Ratio 0.038 0.107 - - 0.061 -
HCM Control Delay (s) 10.4 8.9 - - 7.5 0
HCM Lane LOS B A - - A A
HCM 95th %tile Q(veh) 0.1 0.4 - - 0.2 -
78
HCM 6th TWSC 2019 Existing - PM Peak Hour
07/07/2020 2: Aspire Access & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 2
Intersection
Int Delay, s/veh 0.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 105 7 7 85 14 1
Future Vol, veh/h 105 7 7 85 14 1
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 117 8 8 94 16 1
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 125 0 231 121
Stage 1 - - - - 121 -
Stage 2 - - - - 110 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1462 - 757 930
Stage 1 - - - - 904 -
Stage 2 - - - - 915 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1462 - 752 930
Mov Cap-2 Maneuver - - - - 752 -
Stage 1 - - - - 904 -
Stage 2 - - - - 910 -
Approach EB WB NB
HCM Control Delay, s 0 0.6 9.8
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)762 - - 1462 -
HCM Lane V/C Ratio 0.022 - - 0.005 -
HCM Control Delay (s) 9.8 - - 7.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh) 0.1 - - 0 -
79
HCM 6th TWSC 2019 Existing - PM Peak Hour
07/07/2020 3: Steamer Parkway & Stanley Main Entrance
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 3
Intersection
Int Delay, s/veh 5.1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 68 38 34 17 14 58
Future Vol, veh/h 68 38 34 17 14 58
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 76 42 38 19 16 64
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 57 0 - 0 242 48
Stage 1 - - - - 48 -
Stage 2 - - - - 194 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1547 - - - 746 1021
Stage 1 - - - - 974 -
Stage 2 - - - - 839 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1547 - - - 709 1021
Mov Cap-2 Maneuver - - - - 709 -
Stage 1 - - - - 925 -
Stage 2 - - - - 839 -
Approach EB WB SB
HCM Control Delay, s 4.8 0 9.2
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1547 - - - 941
HCM Lane V/C Ratio 0.049 - - - 0.085
HCM Control Delay (s) 7.4 0 - - 9.2
HCM Lane LOS A A - - A
HCM 95th %tile Q(veh) 0.2 - - - 0.3
80
HCM 6th TWSC 2019 Existing - PM Peak Hour
07/07/2020 4: Steamer Drive & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 4
Intersection
Int Delay, s/veh 4.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 9 37 50 47 35 3
Future Vol, veh/h 9 37 50 47 35 3
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 10 41 56 52 39 3
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 205 41 42 0 - 0
Stage 1 41 - - - - -
Stage 2 164 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 783 1030 1567 - - -
Stage 1 981 - - - - -
Stage 2 865 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 754 1030 1567 - - -
Mov Cap-2 Maneuver 754 - - - - -
Stage 1 945 - - - - -
Stage 2 865 - - - - -
Approach EB NB SB
HCM Control Delay, s 9 3.8 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h)1567 - 961 - -
HCM Lane V/C Ratio 0.035 - 0.053 - -
HCM Control Delay (s) 7.4 0 9 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0.1 - 0.2 - -
81
HCM 6th TWSC 2019 Existing - PM Peak Hour
07/07/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 5
Intersection
Int Delay, s/veh 18
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 92 571 3 1 434 110 1 0 2 115 2 192
Future Vol, veh/h 92 571 3 1 434 110 1 0 2 115 2 192
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - Free
Storage Length 150 - - 150 - 220 - - - 135 - 0
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 102 634 3 1 482 122 1 0 2 128 2 213
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 604 0 0 637 0 0 1084 1446 636 1325 1325 -
Stage 1 -- - - - - 840 840 - 484 484 -
Stage 2 -- - - - - 244 606 - 841 841 -
Critical Hdwy 4.13 - - 4.13 - - 7.33 6.53 6.23 7.33 6.53 -
Critical Hdwy Stg 1 -- - - - -6.13 5.53 - 6.53 5.53 -
Critical Hdwy Stg 2 -- - - - -6.53 5.53 - 6.13 5.53 -
Follow-up Hdwy 2.219 - - 2.219 - - 3.519 4.019 3.319 3.519 4.019 -
Pot Cap-1 Maneuver 972 - - 945 - - 183 131 477 ~ 123 155 0
Stage 1 -- - - - - 359 380 - 534 551 0
Stage 2 -- - - - - 739 486 - 358 379 0
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 972 - - 945 - - 166 117 477 ~ 113 139 -
Mov Cap-2 Maneuver -- - - - - 166 117 - ~ 113 139 -
Stage 1 -- - - - - 321 340 - 478 550 -
Stage 2 -- - - - - 735 486 - 319 339 -
Approach EB WB NB SB
HCM Control Delay, s 1.3 0 17.4 197
HCM LOS C F
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h)294 972 - - 945 - - 113 -
HCM Lane V/C Ratio 0.011 0.105 - - 0.001 - - 1.131 -
HCM Control Delay (s) 17.4 9.1 - - 8.8 - - 197 0
HCM Lane LOS C A - - A - - F A
HCM 95th %tile Q(veh) 0 0.4 - - 0 - - 7.9 -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
82
HCM 6th TWSC 2019 Existing - PM Peak Hour
07/07/2020 6: Wonderview Ave (US 34) & SW Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 6
Intersection
Int Delay, s/veh 3.4
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 45 405 332 78 106 26
Future Vol, veh/h 45 405 332 78 106 26
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 145 - - 310 0 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 50 450 369 87 118 29
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 456 0 - 0 919 369
Stage 1 - - - - 369 -
Stage 2 - - - - 550 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1105 - - - 301 677
Stage 1 - - - - 699 -
Stage 2 - - - - 578 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1105 - - - 287 677
Mov Cap-2 Maneuver - - - - 287 -
Stage 1 - - - - 668 -
Stage 2 - - - - 578 -
Approach EB WB SB
HCM Control Delay, s 0.8 0 23
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h)1105 - - - 287 677
HCM Lane V/C Ratio 0.045 - - - 0.41 0.043
HCM Control Delay (s) 8.4 - - - 26 10.6
HCM Lane LOS A - - - D B
HCM 95th %tile Q(veh) 0.1 - - - 1.9 0.1
83
Queues 2019 Existing (weekend) - Peak Hour
04/02/2020 7: St. Vrain Ave (US 36)/Wonderview Ave (US 34) & Elkhorn Ave (US 34)/Big Thompson Ave (US 34)
Stanley Hotel Expansion Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 186 342 482 400 373 381 324 682 336 179 313 70
v/c Ratio 0.47 0.43 0.66 0.96 0.45 0.57 0.87 0.87 0.62 0.43 0.71 0.15
Control Delay 28.0 40.7 8.3 66.1 40.2 7.5 66.3 56.2 18.7 40.3 49.8 3.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 28.0 40.7 8.3 66.1 40.2 7.5 66.3 56.2 18.7 40.3 49.8 3.2
Queue Length 50th (ft) 92 116 0 230 127 0 257 270 69 118 225 0
Queue Length 95th (ft) 148 162 94 #353 176 82 #431 #374 172 192 334 17
Internal Link Dist (ft)471 542 1112 375
Turn Bay Length (ft) 250 70 190 440 880 130 235 320
Base Capacity (vph) 420 793 728 418 838 665 374 781 541 420 441 473
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.44 0.43 0.66 0.96 0.45 0.57 0.87 0.87 0.62 0.43 0.71 0.15
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
84
HCM Signalized Intersection Capacity Analysis 2019 Existing (weekend) - Peak Hour
04/02/2020 7: St. Vrain Ave (US 36)/Wonderview Ave (US 34) & Elkhorn Ave (US 34)/Big Thompson Ave (US 34)
Stanley Hotel Expansion Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 167 308 434 360 336 343 411 494 302 179 264 63
Future Volume (vph) 167 308 434 360 336 343 411 494 302 179 264 63
Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Total Lost time (s)4.0 5.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 0.91 0.91 1.00 0.95 0.95 1.00
Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 0.99 1.00 0.95 1.00 1.00
Satd. Flow (prot)1770 3539 1583 1770 3539 1583 1610 3357 1583 1681 1764 1583
Flt Permitted 0.44 1.00 1.00 0.42 1.00 1.00 0.95 0.99 1.00 0.95 1.00 1.00
Satd. Flow (perm)823 3539 1583 777 3539 1583 1610 3357 1583 1681 1764 1583
Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 186 342 482 400 373 381 457 549 336 199 293 70
RTOR Reduction (vph) 0 0 374 0 0 291 0 0 173 0 0 53
Lane Group Flow (vph) 186 342 108 400 373 90 324 682 163 179 313 18
Turn Type pm+pt NA Perm pm+pt NA Perm Split NA Perm Split NA Perm
Protected Phases 5 2 1 6 8 8 4 4
Permitted Phases 2 2 6 6 8 4
Actuated Green, G (s) 39.5 26.0 26.0 42.5 27.5 27.5 27.0 27.0 27.0 29.0 29.0 29.0
Effective Green, g (s) 39.5 26.0 26.0 42.5 27.5 27.5 27.0 27.0 27.0 29.0 29.0 29.0
Actuated g/C Ratio 0.34 0.22 0.22 0.37 0.24 0.24 0.23 0.23 0.23 0.25 0.25 0.25
Clearance Time (s)4.0 5.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Vehicle Extension (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lane Grp Cap (vph) 390 793 354 413 838 375 374 781 368 420 441 395
v/s Ratio Prot 0.06 0.10 c0.13 0.11 0.20 c0.20 0.11 c0.18
v/s Ratio Perm 0.11 0.07 c0.23 0.06 0.10 0.01
v/c Ratio 0.48 0.43 0.31 0.97 0.45 0.24 0.87 0.87 0.44 0.43 0.71 0.04
Uniform Delay, d1 28.3 38.6 37.5 33.2 37.7 35.8 42.8 42.9 38.1 36.5 39.7 33.0
Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Incremental Delay, d2 1.3 1.7 2.2 35.9 1.7 1.5 22.7 12.9 3.8 3.1 9.3 0.2
Delay (s) 29.5 40.4 39.7 69.0 39.5 37.3 65.4 55.8 41.9 39.7 49.0 33.2
Level of Service C D D E D D E E D D D C
Approach Delay (s)38.1 49.0 54.6 44.0
Approach LOS D D D D
Intersection Summary
HCM 2000 Control Delay 47.5 HCM 2000 Level of Service D
HCM 2000 Volume to Capacity ratio 0.88
Actuated Cycle Length (s) 116.0 Sum of lost time (s)19.0
Intersection Capacity Utilization 75.3% ICU Level of Service D
Analysis Period (min)15
c Critical Lane Group
85
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 19 Updated July 8, 2020
Intersection Capacity Worksheets:
Existing
with Signal
86
Timings 2019 Existing - with Signal - AM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 1
Lane Group EBL EBT WBL WBT WBR NBT SBT SBR
61 310 2 544 90 0 0 88
61 310 2 544 90 0 0 88
pm+pt NA pm+pt NA Perm NA NA Free
5 2 1 6 8 4
2 6 6 Free
5 2 1 6 6 8 4
8.0 10.0 5.0 10.0 10.0 5.0 10.0
14.0 24.0 9.5 24.0 24.0 11.0 30.0
18.0 57.0 12.0 51.0 51.0 13.0 34.0
15.5% 49.1% 10.3% 44.0% 44.0% 11.2% 29.3%
3.0 4.0 3.5 4.0 4.0 4.0 4.0
1.0 1.0 1.0 1.0 1.0 1.0 1.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
4.0 5.0 4.5 5.0 5.0 5.0 5.0
Lead Lag Lead Lag Lag
Yes Yes Yes Yes Yes
None C-Min None C-Min C-Min None Min
93.4 90.8 88.2 83.3 83.3 5.5 11.0 116.0
0.81 0.78 0.76 0.72 0.72 0.05 0.09 1.00
0.10 0.24 0.00 0.24 0.08 0.02 0.40 0.06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Intersection Summary
Cycle Length: 116
Actuated Cycle Length: 116
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Yellow
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.40
Intersection Signal Delay: 7.2
Intersection Capacity Utilization 41.7%
Analysis Period (min) 15
Splits and Phases: 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
87
Queues 2019 Existing - with Signal - AM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 2
Lane Group EBL EBT WBL WBT WBR NBT SBT SBR
Lane Group Flow (vph) 68 350 2 604 100 4 68 98
v/c Ratio 0.10 0.24 0.00 0.24 0.08 0.02 0.40 0.06
Control Delay 1.4 3.3 4.0 6.8 0.6 0.2 56.5 0.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 1.4 3.3 4.0 6.8 0.6 0.2 56.5 0.1
Queue Length 50th (ft) 2 12 0 69 0 0 49 0
Queue Length 95th (ft) m11 181 3 138 8 0 94 0
Internal Link Dist (ft)859 801 142 412
Turn Bay Length (ft) 150 150 220 135
Base Capacity (vph) 710 1454 842 2540 1177 255 442 1583
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.10 0.24 0.00 0.24 0.08 0.02 0.15 0.06
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
88
HCM 6th Signalized Intersection Summary 2019 Existing - with Signal - AM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 61 310 5 2 544 90 3 0 1 61 0 88
Future Volume (veh/h) 61 310 5 2 544 90 3 0 1 61 0 88
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 68 344 6 2 604 0 3 0 1 68 0 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 676 1352 24 765 2429 7 0 2 154 0
Arrive On Green 0.06 0.74 0.74 0.00 0.68 0.00 0.01 0.00 0.01 0.09 0.00 0.00
Sat Flow, veh/h 1781 1833 32 1781 3554 1585 1296 0 432 1781 0 1585
Grp Volume(v), veh/h 68 0 350 2 604 0 4 0 0 68 0 0
Grp Sat Flow(s),veh/h/ln 1781 0 1865 1781 1777 1585 1728 0 0 1781 0 1585
Q Serve(g_s), s 1.1 0.0 7.0 0.0 7.5 0.0 0.3 0.0 0.0 4.2 0.0 0.0
Cycle Q Clear(g_c), s 1.1 0.0 7.0 0.0 7.5 0.0 0.3 0.0 0.0 4.2 0.0 0.0
Prop In Lane 1.00 0.02 1.00 1.00 0.75 0.25 1.00 1.00
Lane Grp Cap(c), veh/h 676 0 1376 765 2429 9 0 0 154 0
V/C Ratio(X)0.10 0.00 0.25 0.00 0.25 0.44 0.00 0.00 0.44 0.00
Avail Cap(c_a), veh/h 782 0 1376 875 2429 119 0 0 445 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 3.8 0.0 4.9 5.7 7.0 0.0 57.5 0.0 0.0 50.4 0.0 0.0
Incr Delay (d2), s/veh 0.1 0.0 0.4 0.0 0.2 0.0 30.7 0.0 0.0 2.0 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 0.0 2.5 0.0 2.7 0.0 0.2 0.0 0.0 2.0 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 3.9 0.0 5.4 5.7 7.2 0.0 88.3 0.0 0.0 52.4 0.0 0.0
LnGrp LOS A A A A A F A A D A
Approach Vol, veh/h 418 606 A 4 68 A
Approach Delay, s/veh 5.1 7.2 88.3 52.4
Approach LOS A A F D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.8 90.6 15.0 11.1 84.3 5.6
Change Period (Y+Rc), s 4.5 5.0 5.0 4.0 5.0 5.0
Max Green Setting (Gmax), s 7.5 52.0 29.0 14.0 46.0 8.0
Max Q Clear Time (g_c+I1), s 2.0 9.0 6.2 3.1 9.5 2.3
Green Ext Time (p_c), s 0.0 2.2 0.3 0.1 4.4 0.0
Intersection Summary
HCM 6th Ctrl Delay 9.5
HCM 6th LOS A
Notes
User approved pedestrian interval to be less than phase max green.
Unsignalized Delay for [WBR, SBR] is excluded from calculations of the approach delay and intersection delay.
89
Timings 2019 Existing - With Signal - PM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 1
Lane Group EBL EBT WBL WBT WBR NBT SBT SBR
92 571 1 434 110 0 2 192
92 571 1 434 110 0 2 192
pm+pt NA pm+pt NA Perm NA NA Free
5 2 1 6 8 4
2 6 6 Free
5 2 1 6 6 8 4
8.0 10.0 8.0 10.0 10.0 5.0 10.0
12.0 23.0 12.0 23.0 23.0 10.0 29.0
12.0 65.0 12.0 65.0 65.0 10.0 29.0
10.3% 56.0% 10.3% 56.0% 56.0% 8.6% 25.0%
3.0 4.0 3.0 4.0 4.0 4.0 4.0
1.0 1.0 1.0 1.0 1.0 1.0 1.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
4.0 5.0 4.0 5.0 5.0 5.0 5.0
Lead Lag Lead Lag Lag
Yes Yes Yes Yes Yes
None C-Min None C-Min C-Min None Min
90.3 87.4 86.5 77.5 77.5 5.5 14.1 116.0
0.78 0.75 0.75 0.67 0.67 0.05 0.12 1.00
0.14 0.45 0.00 0.20 0.11 0.02 0.60 0.13
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Intersection Summary
Cycle Length: 116
Actuated Cycle Length: 116
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.60
Intersection Signal Delay: 10.9
Intersection Capacity Utilization 61.7%
Analysis Period (min) 15
Splits and Phases: 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
90
Queues 2019 Existing - With Signal - PM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 2
Lane Group EBL EBT WBL WBT WBR NBT SBT SBR
Lane Group Flow (vph) 102 637 1 482 122 3 130 213
v/c Ratio 0.14 0.45 0.00 0.20 0.11 0.02 0.60 0.13
Control Delay 4.4 8.9 5.0 8.7 2.2 0.3 59.7 0.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 4.4 8.9 5.0 8.7 2.2 0.3 59.7 0.2
Queue Length 50th (ft) 13 120 0 61 0 0 94 0
Queue Length 95th (ft) 44 426 2 128 27 0 151 0
Internal Link Dist (ft)859 801 142 412
Turn Bay Length (ft) 150 150 220 135
Base Capacity (vph) 706 1402 597 2364 1098 177 367 1583
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.14 0.45 0.00 0.20 0.11 0.02 0.35 0.13
Intersection Summary
91
HCM 6th Signalized Intersection Summary 2019 Existing - With Signal - PM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 92 571 3 1 434 110 1 0 2 115 2 192
Future Volume (veh/h) 92 571 3 1 434 110 1 0 2 115 2 192
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 102 634 3 1 482 0 1 0 2 128 2 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 748 1371 6 541 2391 2 0 4 163 3
Arrive On Green 0.07 0.74 0.74 0.00 0.67 0.00 0.00 0.00 0.00 0.09 0.09 0.00
Sat Flow, veh/h 1781 1860 9 1781 3554 1585 548 0 1097 1755 27 1585
Grp Volume(v), veh/h 102 0 637 1 482 0 3 0 0 130 0 0
Grp Sat Flow(s),veh/h/ln 1781 0 1869 1781 1777 1585 1645 0 0 1783 0 1585
Q Serve(g_s), s 1.7 0.0 15.8 0.0 6.0 0.0 0.2 0.0 0.0 8.3 0.0 0.0
Cycle Q Clear(g_c), s 1.7 0.0 15.8 0.0 6.0 0.0 0.2 0.0 0.0 8.3 0.0 0.0
Prop In Lane 1.00 0.00 1.00 1.00 0.33 0.67 0.98 1.00
Lane Grp Cap(c), veh/h 748 0 1377 541 2391 7 0 0 166 0
V/C Ratio(X)0.14 0.00 0.46 0.00 0.20 0.46 0.00 0.00 0.78 0.00
Avail Cap(c_a), veh/h 752 0 1377 660 2391 71 0 0 369 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 4.0 0.0 6.1 6.4 7.2 0.0 57.6 0.0 0.0 51.5 0.0 0.0
Incr Delay (d2), s/veh 0.1 0.0 1.1 0.0 0.2 0.0 42.9 0.0 0.0 7.8 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 0.0 5.6 0.0 2.1 0.0 0.2 0.0 0.0 4.1 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 4.0 0.0 7.2 6.4 7.4 0.0 100.6 0.0 0.0 59.3 0.0 0.0
LnGrp LOS A A A A A F A A E A
Approach Vol, veh/h 739 483 A 3 130 A
Approach Delay, s/veh 6.8 7.4 100.6 59.3
Approach LOS A A F E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.3 90.5 15.8 11.7 83.0 5.5
Change Period (Y+Rc), s 4.0 5.0 5.0 4.0 5.0 5.0
Max Green Setting (Gmax), s 8.0 60.0 24.0 8.0 60.0 5.0
Max Q Clear Time (g_c+I1), s 2.0 17.8 10.3 3.7 8.0 2.2
Green Ext Time (p_c), s 0.0 4.8 0.5 0.1 3.5 0.0
Intersection Summary
HCM 6th Ctrl Delay 12.2
HCM 6th LOS B
Notes
User approved pedestrian interval to be less than phase max green.
Unsignalized Delay for [WBR, SBR] is excluded from calculations of the approach delay and intersection delay.
92
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 20 Updated July 8, 2020
Intersection Capacity Worksheets:
Year 2024 Background
93
HCM 6th TWSC 2024 Background - AM Peak Hour
07/07/2020 1: SW Steamer Parkway & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 1
Intersection
Int Delay, s/veh 5.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 12 17 55 19 34 27
Future Vol, veh/h 12 17 55 19 34 27
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 13 19 61 21 38 30
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 32 0 166 23
Stage 1 - - - - 23 -
Stage 2 - - - - 143 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1580 - 824 1054
Stage 1 - - - - 1000 -
Stage 2 - - - - 884 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1580 - 792 1054
Mov Cap-2 Maneuver - - - - 792 -
Stage 1 - - - - 1000 -
Stage 2 - - - - 850 -
Approach EB WB NB
HCM Control Delay, s 0 5.5 9.2
HCM LOS A
Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT
Capacity (veh/h)792 1054 - - 1580 -
HCM Lane V/C Ratio 0.048 0.028 - - 0.039 -
HCM Control Delay (s) 9.8 8.5 - - 7.4 0
HCM Lane LOS A A - - A A
HCM 95th %tile Q(veh) 0.1 0.1 - - 0.1 -
94
HCM 6th TWSC 2024 Background - AM Peak Hour
07/07/2020 2: Aspire Access & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 2
Intersection
Int Delay, s/veh 1.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 30 9 3 65 9 3
Future Vol, veh/h 30 9 3 65 9 3
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 33 10 3 72 10 3
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 43 0 116 38
Stage 1 - - - - 38 -
Stage 2 - - - - 78 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1566 - 880 1034
Stage 1 - - - - 984 -
Stage 2 - - - - 945 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1566 - 878 1034
Mov Cap-2 Maneuver - - - - 878 -
Stage 1 - - - - 984 -
Stage 2 - - - - 943 -
Approach EB WB NB
HCM Control Delay, s 0 0.3 9
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)912 - - 1566 -
HCM Lane V/C Ratio 0.015 - - 0.002 -
HCM Control Delay (s) 9 - - 7.3 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh) 0 - - 0 -
95
HCM 6th TWSC 2024 Background - AM Peak Hour
07/07/2020 3: Steamer Parkway & Stanley Main Entrance
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 3
Intersection
Int Delay, s/veh 4
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 22 11 37 9 3 31
Future Vol, veh/h 22 11 37 9 3 31
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 24 12 41 10 3 34
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 51 0 - 0 106 46
Stage 1 - - - - 46 -
Stage 2 - - - - 60 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1555 - - - 892 1023
Stage 1 - - - - 976 -
Stage 2 - - - - 963 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1555 - - - 878 1023
Mov Cap-2 Maneuver - - - - 878 -
Stage 1 - - - - 960 -
Stage 2 - - - - 963 -
Approach EB WB SB
HCM Control Delay, s 4.9 0 8.7
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1555 - - - 1008
HCM Lane V/C Ratio 0.016 - - - 0.037
HCM Control Delay (s) 7.4 0 - - 8.7
HCM Lane LOS A A - - A
HCM 95th %tile Q(veh) 0 - - - 0.1
96
HCM 6th TWSC 2024 Background - AM Peak Hour
07/07/2020 4: Steamer Drive & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 4
Intersection
Int Delay, s/veh 3.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 2 22 30 28 39 9
Future Vol, veh/h 2 22 30 28 39 9
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 2 24 33 31 43 10
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 145 48 53 0 - 0
Stage 1 48 - - - - -
Stage 2 97 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 847 1021 1553 - - -
Stage 1 974 - - - - -
Stage 2 927 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 828 1021 1553 - - -
Mov Cap-2 Maneuver 828 - - - - -
Stage 1 953 - - - - -
Stage 2 927 - - - - -
Approach EB NB SB
HCM Control Delay, s 8.7 3.8 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h)1553 - 1002 - -
HCM Lane V/C Ratio 0.021 - 0.027 - -
HCM Control Delay (s) 7.4 0 8.7 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0.1 - 0.1 - -
97
Timings 2024 Background - AM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 1
Lane Group EBL EBT WBL WBT WBR NBT SBT SBR
67 342 2 601 99 0 0 97
67 342 2 601 99 0 0 97
pm+pt NA pm+pt NA Perm NA NA Free
5 2 1 6 8 4
2 6 6 Free
5 2 1 6 6 8 4
8.0 10.0 8.0 10.0 10.0 5.0 10.0
12.5 23.0 12.5 23.0 23.0 10.0 29.0
16.0 57.0 14.0 55.0 55.0 12.0 33.0
13.8% 49.1% 12.1% 47.4% 47.4% 10.3% 28.4%
3.0 4.0 3.0 4.0 4.0 4.0 4.0
1.0 1.0 1.0 1.0 1.0 1.0 1.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
4.0 5.0 4.0 5.0 5.0 5.0 5.0
Lead Lag Lead Lag Lag
Yes Yes Yes Yes Yes
None C-Min None C-Min C-Min None Min
92.9 90.3 90.4 83.0 83.0 5.5 11.2 116.0
0.80 0.78 0.78 0.72 0.72 0.05 0.10 1.00
0.12 0.27 0.00 0.26 0.09 0.02 0.43 0.07
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Intersection Summary
Cycle Length: 116
Actuated Cycle Length: 116
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Yellow
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.43
Intersection Signal Delay: 7.5
Intersection Capacity Utilization 45.0%
Analysis Period (min) 15
Splits and Phases: 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
98
Queues 2024 Background - AM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 2
Lane Group EBL EBT WBL WBT WBR NBT SBT SBR
Lane Group Flow (vph) 74 387 2 668 110 4 74 108
v/c Ratio 0.12 0.27 0.00 0.26 0.09 0.02 0.43 0.07
Control Delay 1.4 3.5 4.0 7.2 1.8 0.2 57.1 0.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 1.4 3.5 4.0 7.2 1.8 0.2 57.1 0.1
Queue Length 50th (ft) 2 15 0 78 0 0 54 0
Queue Length 95th (ft) m9 m197 3 158 22 0 100 0
Internal Link Dist (ft)859 801 142 412
Turn Bay Length (ft) 150 150 220 135
Base Capacity (vph) 652 1445 854 2532 1164 201 427 1583
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.11 0.27 0.00 0.26 0.09 0.02 0.17 0.07
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
99
HCM 6th Signalized Intersection Summary 2024 Background - AM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 67 342 6 2 601 99 3 0 1 67 0 97
Future Volume (veh/h) 67 342 6 2 601 99 3 0 1 67 0 97
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 74 380 7 2 668 0 3 0 1 74 0 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 641 1356 25 740 2424 7 0 2 154 0
Arrive On Green 0.06 0.74 0.74 0.00 0.68 0.00 0.01 0.00 0.01 0.09 0.00 0.00
Sat Flow, veh/h 1781 1831 34 1781 3554 1585 1296 0 432 1781 0 1585
Grp Volume(v), veh/h 74 0 387 2 668 0 4 0 0 74 0 0
Grp Sat Flow(s),veh/h/ln 1781 0 1864 1781 1777 1585 1728 0 0 1781 0 1585
Q Serve(g_s), s 1.2 0.0 7.9 0.0 8.5 0.0 0.3 0.0 0.0 4.6 0.0 0.0
Cycle Q Clear(g_c), s 1.2 0.0 7.9 0.0 8.5 0.0 0.3 0.0 0.0 4.6 0.0 0.0
Prop In Lane 1.00 0.02 1.00 1.00 0.75 0.25 1.00 1.00
Lane Grp Cap(c), veh/h 641 0 1380 740 2424 9 0 0 154 0
V/C Ratio(X)0.12 0.00 0.28 0.00 0.28 0.44 0.00 0.00 0.48 0.00
Avail Cap(c_a), veh/h 714 0 1380 886 2424 104 0 0 430 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 4.0 0.0 4.9 5.7 7.2 0.0 57.5 0.0 0.0 50.5 0.0 0.0
Incr Delay (d2), s/veh 0.1 0.0 0.5 0.0 0.3 0.0 30.7 0.0 0.0 2.3 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.4 0.0 2.8 0.0 3.0 0.0 0.2 0.0 0.0 2.2 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 4.0 0.0 5.4 5.7 7.5 0.0 88.3 0.0 0.0 52.9 0.0 0.0
LnGrp LOS A A A A A F A A D A
Approach Vol, veh/h 461 670 A 4 74 A
Approach Delay, s/veh 5.2 7.5 88.3 52.9
Approach LOS A A F D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.5 90.9 15.0 11.3 84.1 5.6
Change Period (Y+Rc), s 4.0 5.0 5.0 4.0 5.0 5.0
Max Green Setting (Gmax), s 10.0 52.0 28.0 12.0 50.0 7.0
Max Q Clear Time (g_c+I1), s 2.0 9.9 6.6 3.2 10.5 2.3
Green Ext Time (p_c), s 0.0 2.5 0.3 0.1 5.1 0.0
Intersection Summary
HCM 6th Ctrl Delay 9.7
HCM 6th LOS A
Notes
Unsignalized Delay for [WBR, SBR] is excluded from calculations of the approach delay and intersection delay.
100
HCM 6th TWSC 2024 Background - AM Peak Hour
07/07/2020 6: Wonderview Ave (US 34) & SW Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 8
Intersection
Int Delay, s/veh 1.6
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 17 256 348 44 50 22
Future Vol, veh/h 17 256 348 44 50 22
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 145 - - 310 0 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 19 284 387 49 56 24
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 436 0 - 0 709 387
Stage 1 - - - - 387 -
Stage 2 - - - - 322 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1124 - - - 401 661
Stage 1 - - - - 686 -
Stage 2 - - - - 735 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1124 - - - 394 661
Mov Cap-2 Maneuver - - - - 394 -
Stage 1 - - - - 674 -
Stage 2 - - - - 735 -
Approach EB WB SB
HCM Control Delay, s 0.5 0 14.1
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h)1124 - - - 394 661
HCM Lane V/C Ratio 0.017 - - - 0.141 0.037
HCM Control Delay (s) 8.3 - - - 15.6 10.7
HCM Lane LOS A - - - C B
HCM 95th %tile Q(veh) 0.1 - - - 0.5 0.1
101
HCM 6th TWSC 2024 Background - PM Peak Hour
07/07/2020 1: SW Steamer Parkway & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 1
Intersection
Int Delay, s/veh 6.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 14 53 93 17 26 110
Future Vol, veh/h 14 53 93 17 26 110
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 16 59 103 19 29 122
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 75 0 271 46
Stage 1 - - - - 46 -
Stage 2 - - - - 225 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1524 - 718 1023
Stage 1 - - - - 976 -
Stage 2 - - - - 812 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1524 - 669 1023
Mov Cap-2 Maneuver - - - - 669 -
Stage 1 - - - - 976 -
Stage 2 - - - - 757 -
Approach EB WB NB
HCM Control Delay, s 0 6.4 9.3
HCM LOS A
Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT
Capacity (veh/h)669 1023 - - 1524 -
HCM Lane V/C Ratio 0.043 0.119 - - 0.068 -
HCM Control Delay (s) 10.6 9 - - 7.5 0
HCM Lane LOS B A - - A A
HCM 95th %tile Q(veh) 0.1 0.4 - - 0.2 -
102
HCM 6th TWSC 2024 Background - PM Peak Hour
07/07/2020 2: Aspire Access & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 2
Intersection
Int Delay, s/veh 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 116 8 8 94 16 1
Future Vol, veh/h 116 8 8 94 16 1
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 129 9 9 104 18 1
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 138 0 256 134
Stage 1 - - - - 134 -
Stage 2 - - - - 122 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1446 - 733 915
Stage 1 - - - - 892 -
Stage 2 - - - - 903 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1446 - 728 915
Mov Cap-2 Maneuver - - - - 728 -
Stage 1 - - - - 892 -
Stage 2 - - - - 897 -
Approach EB WB NB
HCM Control Delay, s 0 0.6 10
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)737 - - 1446 -
HCM Lane V/C Ratio 0.026 - - 0.006 -
HCM Control Delay (s) 10 - - 7.5 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.1 - - 0 -
103
HCM 6th TWSC 2024 Background - PM Peak Hour
07/07/2020 3: Steamer Parkway & Stanley Main Entrance
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 3
Intersection
Int Delay, s/veh 5.1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 75 42 38 19 15 64
Future Vol, veh/h 75 42 38 19 15 64
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 83 47 42 21 17 71
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 63 0 - 0 266 53
Stage 1 - - - - 53 -
Stage 2 - - - - 213 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1540 - - - 723 1014
Stage 1 - - - - 970 -
Stage 2 - - - - 823 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1540 - - - 683 1014
Mov Cap-2 Maneuver - - - - 683 -
Stage 1 - - - - 917 -
Stage 2 - - - - 823 -
Approach EB WB SB
HCM Control Delay, s 4.8 0 9.3
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1540 - - - 929
HCM Lane V/C Ratio 0.054 - - - 0.094
HCM Control Delay (s) 7.5 0 - - 9.3
HCM Lane LOS A A - - A
HCM 95th %tile Q(veh) 0.2 - - - 0.3
104
HCM 6th TWSC 2024 Background - PM Peak Hour
07/07/2020 4: Steamer Drive & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 4
Intersection
Int Delay, s/veh 4.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 41 55 52 39 3
Future Vol, veh/h 10 41 55 52 39 3
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 46 61 58 43 3
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 225 45 46 0 - 0
Stage 1 45 - - - - -
Stage 2 180 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 763 1025 1562 - - -
Stage 1 977 - - - - -
Stage 2 851 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 732 1025 1562 - - -
Mov Cap-2 Maneuver 732 - - - - -
Stage 1 938 - - - - -
Stage 2 851 - - - - -
Approach EB NB SB
HCM Control Delay, s 9 3.8 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h)1562 - 950 - -
HCM Lane V/C Ratio 0.039 - 0.06 - -
HCM Control Delay (s) 7.4 0 9 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0.1 - 0.2 - -
105
Timings 2024 Background - PM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 1
Lane Group EBL EBT WBL WBT WBR NBT SBT SBR
102 630 1 479 121 0 2 212
102 630 1 479 121 0 2 212
pm+pt NA pm+pt NA Perm NA NA Free
5 2 1 6 8 4
2 6 6 Free
5 2 1 6 6 8 4
8.0 10.0 8.0 10.0 10.0 5.0 10.0
12.0 23.0 12.0 23.0 23.0 10.0 29.0
12.0 65.0 12.0 65.0 65.0 10.0 29.0
10.3% 56.0% 10.3% 56.0% 56.0% 8.6% 25.0%
3.0 4.0 3.0 4.0 4.0 4.0 4.0
1.0 1.0 1.0 1.0 1.0 1.0 1.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
4.0 5.0 4.0 5.0 5.0 5.0 5.0
Lead Lag Lead Lag Lag
Yes Yes Yes Yes Yes
None C-Min None C-Min C-Min None Min
89.7 86.7 85.7 76.7 76.7 5.5 14.8 116.0
0.77 0.75 0.74 0.66 0.66 0.05 0.13 1.00
0.17 0.51 0.00 0.23 0.12 0.02 0.63 0.15
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Intersection Summary
Cycle Length: 116
Actuated Cycle Length: 116
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.63
Intersection Signal Delay: 11.5
Intersection Capacity Utilization 65.5%
Analysis Period (min) 15
Splits and Phases: 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
106
Queues 2024 Background - PM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 2
Lane Group EBL EBT WBL WBT WBR NBT SBT SBR
Lane Group Flow (vph) 113 703 1 532 134 3 143 236
v/c Ratio 0.17 0.51 0.00 0.23 0.12 0.02 0.63 0.15
Control Delay 4.8 10.1 5.0 9.3 2.3 0.3 60.1 0.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 4.8 10.1 5.0 9.3 2.3 0.3 60.1 0.2
Queue Length 50th (ft) 15 146 0 70 0 0 103 0
Queue Length 95th (ft) 49 508 2 146 29 0 163 0
Internal Link Dist (ft)859 801 142 412
Turn Bay Length (ft) 150 150 220 135
Base Capacity (vph) 667 1391 538 2338 1091 177 367 1583
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.17 0.51 0.00 0.23 0.12 0.02 0.39 0.15
Intersection Summary
107
HCM 6th Signalized Intersection Summary 2024 Background - PM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 102 630 3 1 479 121 1 0 2 127 2 212
Future Volume (veh/h) 102 630 3 1 479 121 1 0 2 127 2 212
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 113 700 3 1 532 0 1 0 2 141 2 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 710 1357 6 487 2361 2 0 4 177 3
Arrive On Green 0.07 0.73 0.73 0.00 0.66 0.00 0.00 0.00 0.00 0.10 0.10 0.00
Sat Flow, veh/h 1781 1861 8 1781 3554 1585 548 0 1097 1758 25 1585
Grp Volume(v), veh/h 113 0 703 1 532 0 3 0 0 143 0 0
Grp Sat Flow(s),veh/h/ln 1781 0 1869 1781 1777 1585 1645 0 0 1782 0 1585
Q Serve(g_s), s 2.0 0.0 18.9 0.0 6.9 0.0 0.2 0.0 0.0 9.1 0.0 0.0
Cycle Q Clear(g_c), s 2.0 0.0 18.9 0.0 6.9 0.0 0.2 0.0 0.0 9.1 0.0 0.0
Prop In Lane 1.00 0.00 1.00 1.00 0.33 0.67 0.99 1.00
Lane Grp Cap(c), veh/h 710 0 1363 487 2361 7 0 0 179 0
V/C Ratio(X)0.16 0.00 0.52 0.00 0.23 0.46 0.00 0.00 0.80 0.00
Avail Cap(c_a), veh/h 713 0 1363 606 2361 71 0 0 369 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 4.3 0.0 6.8 7.0 7.7 0.0 57.6 0.0 0.0 51.0 0.0 0.0
Incr Delay (d2), s/veh 0.1 0.0 1.4 0.0 0.2 0.0 42.9 0.0 0.0 7.8 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.0 6.8 0.0 2.5 0.0 0.2 0.0 0.0 4.5 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 4.4 0.0 8.2 7.0 7.9 0.0 100.6 0.0 0.0 58.8 0.0 0.0
LnGrp LOS A A A A A F A A E A
Approach Vol, veh/h 816 533 A 3 143 A
Approach Delay, s/veh 7.7 7.9 100.6 58.8
Approach LOS A A F E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.3 89.6 16.7 11.8 82.1 5.5
Change Period (Y+Rc), s 4.0 5.0 5.0 4.0 5.0 5.0
Max Green Setting (Gmax), s 8.0 60.0 24.0 8.0 60.0 5.0
Max Q Clear Time (g_c+I1), s 2.0 20.9 11.1 4.0 8.9 2.2
Green Ext Time (p_c), s 0.0 5.5 0.6 0.1 3.9 0.0
Intersection Summary
HCM 6th Ctrl Delay 12.8
HCM 6th LOS B
Notes
Unsignalized Delay for [WBR, SBR] is excluded from calculations of the approach delay and intersection delay.
108
HCM 6th TWSC 2024 Background - PM Peak Hour
07/07/2020 6: Wonderview Ave (US 34) & SW Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 8
Intersection
Int Delay, s/veh 4.4
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 50 447 367 86 117 29
Future Vol, veh/h 50 447 367 86 117 29
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 145 - - 310 0 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 56 497 408 96 130 32
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 504 0 - 0 1017 408
Stage 1 - - - - 408 -
Stage 2 - - - - 609 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1061 - - - 263 643
Stage 1 - - - - 671 -
Stage 2 - - - - 543 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1061 - - - 249 643
Mov Cap-2 Maneuver - - - - 249 -
Stage 1 - - - - 635 -
Stage 2 - - - - 543 -
Approach EB WB SB
HCM Control Delay, s 0.9 0 29.6
HCM LOS D
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h)1061 - - - 249 643
HCM Lane V/C Ratio 0.052 - - - 0.522 0.05
HCM Control Delay (s) 8.6 - - - 34.2 10.9
HCM Lane LOS A - - - D B
HCM 95th %tile Q(veh) 0.2 - - - 2.8 0.2
109
The Stanley Hotel Carriage House Renovation – Estes Park, CO Traffic Impact Study
(FT #20028)
Fox Tuttle Transportation Group, LLC Page 21 Updated July 8, 2020
Intersection Capacity Worksheets:
Year 2024 Background+
Project
110
HCM 6th TWSC 2024 Background + Project - AM Peak Hour
07/07/2020 1: SW Steamer Parkway & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 1
Intersection
Int Delay, s/veh 5.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 12 17 55 19 34 27
Future Vol, veh/h 12 17 55 19 34 27
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 13 19 61 21 38 30
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 32 0 166 23
Stage 1 - - - - 23 -
Stage 2 - - - - 143 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1580 - 824 1054
Stage 1 - - - - 1000 -
Stage 2 - - - - 884 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1580 - 792 1054
Mov Cap-2 Maneuver - - - - 792 -
Stage 1 - - - - 1000 -
Stage 2 - - - - 850 -
Approach EB WB NB
HCM Control Delay, s 0 5.5 9.2
HCM LOS A
Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT
Capacity (veh/h)792 1054 - - 1580 -
HCM Lane V/C Ratio 0.048 0.028 - - 0.039 -
HCM Control Delay (s) 9.8 8.5 - - 7.4 0
HCM Lane LOS A A - - A A
HCM 95th %tile Q(veh) 0.1 0.1 - - 0.1 -
111
HCM 6th TWSC 2024 Background + Project - AM Peak Hour
07/07/2020 2: Aspire Access & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 2
Intersection
Int Delay, s/veh 1.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 30 9 3 65 9 3
Future Vol, veh/h 30 9 3 65 9 3
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 33 10 3 72 10 3
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 43 0 116 38
Stage 1 - - - - 38 -
Stage 2 - - - - 78 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1566 - 880 1034
Stage 1 - - - - 984 -
Stage 2 - - - - 945 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1566 - 878 1034
Mov Cap-2 Maneuver - - - - 878 -
Stage 1 - - - - 984 -
Stage 2 - - - - 943 -
Approach EB WB NB
HCM Control Delay, s 0 0.3 9
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)912 - - 1566 -
HCM Lane V/C Ratio 0.015 - - 0.002 -
HCM Control Delay (s) 9 - - 7.3 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh) 0 - - 0 -
112
HCM 6th TWSC 2024 Background + Project - AM Peak Hour
07/07/2020 3: Steamer Parkway & Stanley Main Entrance
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 3
Intersection
Int Delay, s/veh 4
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 22 11 37 9 3 31
Future Vol, veh/h 22 11 37 9 3 31
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 24 12 41 10 3 34
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 51 0 - 0 106 46
Stage 1 - - - - 46 -
Stage 2 - - - - 60 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1555 - - - 892 1023
Stage 1 - - - - 976 -
Stage 2 - - - - 963 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1555 - - - 878 1023
Mov Cap-2 Maneuver - - - - 878 -
Stage 1 - - - - 960 -
Stage 2 - - - - 963 -
Approach EB WB SB
HCM Control Delay, s 4.9 0 8.7
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1555 - - - 1008
HCM Lane V/C Ratio 0.016 - - - 0.037
HCM Control Delay (s) 7.4 0 - - 8.7
HCM Lane LOS A A - - A
HCM 95th %tile Q(veh) 0 - - - 0.1
113
HCM 6th TWSC 2024 Background + Project - AM Peak Hour
07/07/2020 4: Steamer Drive & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 4
Intersection
Int Delay, s/veh 3.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 2 22 30 28 39 9
Future Vol, veh/h 2 22 30 28 39 9
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 2 24 33 31 43 10
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 145 48 53 0 - 0
Stage 1 48 - - - - -
Stage 2 97 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 847 1021 1553 - - -
Stage 1 974 - - - - -
Stage 2 927 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 828 1021 1553 - - -
Mov Cap-2 Maneuver 828 - - - - -
Stage 1 953 - - - - -
Stage 2 927 - - - - -
Approach EB NB SB
HCM Control Delay, s 8.7 3.8 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h)1553 - 1002 - -
HCM Lane V/C Ratio 0.021 - 0.027 - -
HCM Control Delay (s) 7.4 0 8.7 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0.1 - 0.1 - -
114
Timings 2024 Background + Project - AM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 1
Lane Group EBL EBT WBL WBT WBR NBT SBT SBR
67 342 2 601 99 0 0 97
67 342 2 601 99 0 0 97
pm+pt NA pm+pt NA Perm NA NA Free
5 2 1 6 8 4
2 6 6 Free
5 2 1 6 6 8 4
8.0 10.0 8.0 10.0 10.0 5.0 10.0
12.5 23.0 12.5 23.0 23.0 10.0 29.0
16.0 57.0 14.0 55.0 55.0 12.0 33.0
13.8% 49.1% 12.1% 47.4% 47.4% 10.3% 28.4%
3.0 4.0 3.0 4.0 4.0 4.0 4.0
1.0 1.0 1.0 1.0 1.0 1.0 1.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
4.0 5.0 4.0 5.0 5.0 5.0 5.0
Lead Lag Lead Lag Lag
Yes Yes Yes Yes Yes
None C-Min None C-Min C-Min None Min
92.9 90.3 90.4 83.0 83.0 5.5 11.2 116.0
0.80 0.78 0.78 0.72 0.72 0.05 0.10 1.00
0.12 0.27 0.00 0.26 0.09 0.02 0.43 0.07
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Intersection Summary
Cycle Length: 116
Actuated Cycle Length: 116
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Yellow
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.43
Intersection Signal Delay: 7.5
Intersection Capacity Utilization 45.0%
Analysis Period (min) 15
Splits and Phases: 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
115
Queues 2024 Background + Project - AM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 2
Lane Group EBL EBT WBL WBT WBR NBT SBT SBR
Lane Group Flow (vph) 74 387 2 668 110 4 74 108
v/c Ratio 0.12 0.27 0.00 0.26 0.09 0.02 0.43 0.07
Control Delay 1.4 3.5 4.0 7.2 1.8 0.2 57.1 0.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 1.4 3.5 4.0 7.2 1.8 0.2 57.1 0.1
Queue Length 50th (ft) 2 15 0 78 0 0 54 0
Queue Length 95th (ft) m9 m197 3 158 22 0 100 0
Internal Link Dist (ft)859 801 142 412
Turn Bay Length (ft) 150 150 220 135
Base Capacity (vph) 652 1445 854 2532 1164 201 427 1583
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.11 0.27 0.00 0.26 0.09 0.02 0.17 0.07
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
116
HCM 6th Signalized Intersection Summary 2024 Background + Project - AM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 67 342 6 2 601 99 3 0 1 67 0 97
Future Volume (veh/h) 67 342 6 2 601 99 3 0 1 67 0 97
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 74 380 7 2 668 0 3 0 1 74 0 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 641 1356 25 740 2424 7 0 2 154 0
Arrive On Green 0.06 0.74 0.74 0.00 0.68 0.00 0.01 0.00 0.01 0.09 0.00 0.00
Sat Flow, veh/h 1781 1831 34 1781 3554 1585 1296 0 432 1781 0 1585
Grp Volume(v), veh/h 74 0 387 2 668 0 4 0 0 74 0 0
Grp Sat Flow(s),veh/h/ln 1781 0 1864 1781 1777 1585 1728 0 0 1781 0 1585
Q Serve(g_s), s 1.2 0.0 7.9 0.0 8.5 0.0 0.3 0.0 0.0 4.6 0.0 0.0
Cycle Q Clear(g_c), s 1.2 0.0 7.9 0.0 8.5 0.0 0.3 0.0 0.0 4.6 0.0 0.0
Prop In Lane 1.00 0.02 1.00 1.00 0.75 0.25 1.00 1.00
Lane Grp Cap(c), veh/h 641 0 1380 740 2424 9 0 0 154 0
V/C Ratio(X)0.12 0.00 0.28 0.00 0.28 0.44 0.00 0.00 0.48 0.00
Avail Cap(c_a), veh/h 714 0 1380 886 2424 104 0 0 430 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 4.0 0.0 4.9 5.7 7.2 0.0 57.5 0.0 0.0 50.5 0.0 0.0
Incr Delay (d2), s/veh 0.1 0.0 0.5 0.0 0.3 0.0 30.7 0.0 0.0 2.3 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.4 0.0 2.8 0.0 3.0 0.0 0.2 0.0 0.0 2.2 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 4.0 0.0 5.4 5.7 7.5 0.0 88.3 0.0 0.0 52.9 0.0 0.0
LnGrp LOS A A A A A F A A D A
Approach Vol, veh/h 461 670 A 4 74 A
Approach Delay, s/veh 5.2 7.5 88.3 52.9
Approach LOS A A F D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.5 90.9 15.0 11.3 84.1 5.6
Change Period (Y+Rc), s 4.0 5.0 5.0 4.0 5.0 5.0
Max Green Setting (Gmax), s 10.0 52.0 28.0 12.0 50.0 7.0
Max Q Clear Time (g_c+I1), s 2.0 9.9 6.6 3.2 10.5 2.3
Green Ext Time (p_c), s 0.0 2.5 0.3 0.1 5.1 0.0
Intersection Summary
HCM 6th Ctrl Delay 9.7
HCM 6th LOS A
Notes
Unsignalized Delay for [WBR, SBR] is excluded from calculations of the approach delay and intersection delay.
117
HCM 6th TWSC 2024 Background + Project - AM Peak Hour
07/07/2020 6: Wonderview Ave (US 34) & SW Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 8
Intersection
Int Delay, s/veh 1.6
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 17 256 348 44 50 22
Future Vol, veh/h 17 256 348 44 50 22
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 145 - - 310 0 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 19 284 387 49 56 24
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 436 0 - 0 709 387
Stage 1 - - - - 387 -
Stage 2 - - - - 322 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1124 - - - 401 661
Stage 1 - - - - 686 -
Stage 2 - - - - 735 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1124 - - - 394 661
Mov Cap-2 Maneuver - - - - 394 -
Stage 1 - - - - 674 -
Stage 2 - - - - 735 -
Approach EB WB SB
HCM Control Delay, s 0.5 0 14.1
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h)1124 - - - 394 661
HCM Lane V/C Ratio 0.017 - - - 0.141 0.037
HCM Control Delay (s) 8.3 - - - 15.6 10.7
HCM Lane LOS A - - - C B
HCM 95th %tile Q(veh) 0.1 - - - 0.5 0.1
118
HCM 6th TWSC 2024 Background + Project - PM Peak Hour
07/07/2020 1: SW Steamer Parkway & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 1
Intersection
Int Delay, s/veh 6.6
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 14 53 106 17 26 131
Future Vol, veh/h 14 53 106 17 26 131
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 16 59 118 19 29 146
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 75 0 301 46
Stage 1 - - - - 46 -
Stage 2 - - - - 255 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1524 - 691 1023
Stage 1 - - - - 976 -
Stage 2 - - - - 788 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1524 - 637 1023
Mov Cap-2 Maneuver - - - - 637 -
Stage 1 - - - - 976 -
Stage 2 - - - - 727 -
Approach EB WB NB
HCM Control Delay, s 0 6.5 9.4
HCM LOS A
Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT
Capacity (veh/h)637 1023 - - 1524 -
HCM Lane V/C Ratio 0.045 0.142 - - 0.077 -
HCM Control Delay (s) 10.9 9.1 - - 7.6 0
HCM Lane LOS B A - - A A
HCM 95th %tile Q(veh) 0.1 0.5 - - 0.3 -
119
HCM 6th TWSC 2024 Background + Project - PM Peak Hour
07/07/2020 2: Aspire Access & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 2
Intersection
Int Delay, s/veh 0.8
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 137 8 8 107 16 1
Future Vol, veh/h 137 8 8 107 16 1
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 152 9 9 119 18 1
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 161 0 294 157
Stage 1 - - - - 157 -
Stage 2 - - - - 137 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1418 - 697 889
Stage 1 - - - - 871 -
Stage 2 - - - - 890 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1418 - 692 889
Mov Cap-2 Maneuver - - - - 692 -
Stage 1 - - - - 871 -
Stage 2 - - - - 884 -
Approach EB WB NB
HCM Control Delay, s 0 0.5 10.3
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)701 - - 1418 -
HCM Lane V/C Ratio 0.027 - - 0.006 -
HCM Control Delay (s) 10.3 - - 7.6 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.1 - - 0 -
120
HCM 6th TWSC 2024 Background + Project - PM Peak Hour
07/07/2020 3: Steamer Parkway & Stanley Main Entrance
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 3
Intersection
Int Delay, s/veh 5.5
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 96 42 38 33 23 77
Future Vol, veh/h 96 42 38 33 23 77
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 107 47 42 37 26 86
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 79 0 - 0 322 61
Stage 1 - - - - 61 -
Stage 2 - - - - 261 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1519 - - - 672 1004
Stage 1 - - - - 962 -
Stage 2 - - - - 783 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1519 - - - 624 1004
Mov Cap-2 Maneuver - - - - 624 -
Stage 1 - - - - 893 -
Stage 2 - - - - 783 -
Approach EB WB SB
HCM Control Delay, s 5.3 0 9.7
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1519 - - - 881
HCM Lane V/C Ratio 0.07 - - - 0.126
HCM Control Delay (s) 7.5 0 - - 9.7
HCM Lane LOS A A - - A
HCM 95th %tile Q(veh) 0.2 - - - 0.4
121
HCM 6th TWSC 2024 Background + Project - PM Peak Hour
07/07/2020 4: Steamer Drive & Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 4
Intersection
Int Delay, s/veh 4.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 49 69 52 39 3
Future Vol, veh/h 10 49 69 52 39 3
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 54 77 58 43 3
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 257 45 46 0 - 0
Stage 1 45 - - - - -
Stage 2 212 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 732 1025 1562 - - -
Stage 1 977 - - - - -
Stage 2 823 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 695 1025 1562 - - -
Mov Cap-2 Maneuver 695 - - - - -
Stage 1 927 - - - - -
Stage 2 823 - - - - -
Approach EB NB SB
HCM Control Delay, s 9.1 4.2 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h)1562 - 949 - -
HCM Lane V/C Ratio 0.049 - 0.069 - -
HCM Control Delay (s) 7.4 0 9.1 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0.2 - 0.2 - -
122
Timings 2024 Background + Project - PM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 1
Lane Group EBL EBT WBL WBT WBR NBT SBT SBR
103 630 1 479 134 0 2 213
103 630 1 479 134 0 2 213
pm+pt NA pm+pt NA Perm NA NA Free
5 2 1 6 8 4
2 6 6 Free
5 2 1 6 6 8 4
8.0 10.0 8.0 10.0 10.0 5.0 10.0
12.0 23.0 12.0 23.0 23.0 10.0 29.0
12.0 65.0 12.0 65.0 65.0 10.0 29.0
10.3% 56.0% 10.3% 56.0% 56.0% 8.6% 25.0%
3.0 4.0 3.0 4.0 4.0 4.0 4.0
1.0 1.0 1.0 1.0 1.0 1.0 1.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
4.0 5.0 4.0 5.0 5.0 5.0 5.0
Lead Lag Lead Lag Lag
Yes Yes Yes Yes Yes
None C-Min None C-Min C-Min None Min
89.4 86.3 85.2 76.2 76.2 5.5 15.2 116.0
0.77 0.74 0.73 0.66 0.66 0.05 0.13 1.00
0.17 0.51 0.00 0.23 0.14 0.02 0.65 0.15
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Intersection Summary
Cycle Length: 116
Actuated Cycle Length: 116
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.65
Intersection Signal Delay: 11.9
Intersection Capacity Utilization 65.9%
Analysis Period (min) 15
Splits and Phases: 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
123
Queues 2024 Background + Project - PM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 2
Lane Group EBL EBT WBL WBT WBR NBT SBT SBR
Lane Group Flow (vph) 114 703 1 532 149 3 151 237
v/c Ratio 0.17 0.51 0.00 0.23 0.14 0.02 0.65 0.15
Control Delay 5.0 10.3 6.0 9.5 2.2 0.3 60.5 0.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 5.0 10.3 6.0 9.5 2.2 0.3 60.5 0.2
Queue Length 50th (ft) 15 150 0 71 0 0 109 0
Queue Length 95th (ft) 51 514 2 149 31 0 170 0
Internal Link Dist (ft)859 801 142 412
Turn Bay Length (ft) 150 150 220 135
Base Capacity (vph) 664 1384 534 2325 1091 177 367 1583
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.17 0.51 0.00 0.23 0.14 0.02 0.41 0.15
Intersection Summary
124
HCM 6th Signalized Intersection Summary 2024 Background + Project - PM Peak Hour
07/08/2020 5: Golf Course Access/Steamer Drive & Big Thompson Ave (US 34)
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 103 630 3 1 479 134 1 0 2 134 2 213
Future Volume (veh/h) 103 630 3 1 479 134 1 0 2 134 2 213
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 114 700 3 1 532 0 1 0 2 149 2 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 705 1349 6 482 2345 2 0 4 185 2
Arrive On Green 0.07 0.72 0.72 0.00 0.66 0.00 0.00 0.00 0.00 0.11 0.11 0.00
Sat Flow, veh/h 1781 1861 8 1781 3554 1585 548 0 1097 1759 24 1585
Grp Volume(v), veh/h 114 0 703 1 532 0 3 0 0 151 0 0
Grp Sat Flow(s),veh/h/ln 1781 0 1869 1781 1777 1585 1645 0 0 1782 0 1585
Q Serve(g_s), s 2.0 0.0 19.3 0.0 6.9 0.0 0.2 0.0 0.0 9.6 0.0 0.0
Cycle Q Clear(g_c), s 2.0 0.0 19.3 0.0 6.9 0.0 0.2 0.0 0.0 9.6 0.0 0.0
Prop In Lane 1.00 0.00 1.00 1.00 0.33 0.67 0.99 1.00
Lane Grp Cap(c), veh/h 705 0 1355 482 2345 7 0 0 188 0
V/C Ratio(X)0.16 0.00 0.52 0.00 0.23 0.46 0.00 0.00 0.80 0.00
Avail Cap(c_a), veh/h 708 0 1355 601 2345 71 0 0 369 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 4.5 0.0 7.0 7.2 7.9 0.0 57.6 0.0 0.0 50.7 0.0 0.0
Incr Delay (d2), s/veh 0.1 0.0 1.4 0.0 0.2 0.0 42.9 0.0 0.0 7.8 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.0 7.0 0.0 2.5 0.0 0.2 0.0 0.0 4.7 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 4.6 0.0 8.5 7.2 8.1 0.0 100.6 0.0 0.0 58.6 0.0 0.0
LnGrp LOS A A A A A F A A E A
Approach Vol, veh/h 817 533 A 3 151 A
Approach Delay, s/veh 7.9 8.1 100.6 58.6
Approach LOS A A F E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.3 89.1 17.2 11.8 81.5 5.5
Change Period (Y+Rc), s 4.0 5.0 5.0 4.0 5.0 5.0
Max Green Setting (Gmax), s 8.0 60.0 24.0 8.0 60.0 5.0
Max Q Clear Time (g_c+I1), s 2.0 21.3 11.6 4.0 8.9 2.2
Green Ext Time (p_c), s 0.0 5.5 0.6 0.1 3.9 0.0
Intersection Summary
HCM 6th Ctrl Delay 13.3
HCM 6th LOS B
Notes
Unsignalized Delay for [WBR, SBR] is excluded from calculations of the approach delay and intersection delay.
125
HCM 6th TWSC 2024 Background + Project - PM Peak Hour
07/07/2020 6: Wonderview Ave (US 34) & SW Steamer Parkway
Stanley Hotel Carriage House Traffic Impact Study - Estes Park, CO Synchro 10 Report
Fox Tuttle Transportation Group, LLC Page 8
Intersection
Int Delay, s/veh 5
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 57 447 367 100 126 33
Future Vol, veh/h 57 447 367 100 126 33
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 145 - - 310 0 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 63 497 408 111 140 37
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 519 0 - 0 1031 408
Stage 1 - - - - 408 -
Stage 2 - - - - 623 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1047 - - - 258 643
Stage 1 - - - - 671 -
Stage 2 - - - - 535 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1047 - - - 243 643
Mov Cap-2 Maneuver - - - - 243 -
Stage 1 - - - - 631 -
Stage 2 - - - - 535 -
Approach EB WB SB
HCM Control Delay, s 1 0 32.5
HCM LOS D
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h)1047 - - - 243 643
HCM Lane V/C Ratio 0.06 - - - 0.576 0.057
HCM Control Delay (s) 8.7 - - - 38.2 10.9
HCM Lane LOS A - - - E B
HCM 95th %tile Q(veh) 0.2 - - - 3.3 0.2
126
Exhibit 5
127
128
TO: Randy Hunt, Town of Estes Park Planning Department
CC: MOA Architecture, The Stanley (Grand Heritage Hotels)
FROM: Cindy Nasky, Director of Preservation Programs
Colorado Historical Foundation
DATE: June 9, 2020
RE: Carriage House – Response to Request for Review
The Colorado Historical Foundation appreciates the opportunity to review and comment on the Carriage House
restoration/reconstruction project at the Stanley Hotel.
For starters, the Foundation is pleased to see this building being brought back into use at the Stanley Campus.
Within the development application, project architect Jack Mousseau remarks that during the design phase for the
Carriage House, there has been considerable communication between the design team and the Foundation staff.
This statement is true and the Foundation agrees that the Carriage House project, located within the Stanley
Historic District, meets the Secretary of the Interior Standards for Rehabilitation and is compatible with the terms
of the standard deed of conservation easement.
In a July 24, 2019 memo to MOA and Grand Heritage Hotels (Estes Park cc’d), the Foundation outlined some design
concerns for both the Carriage House and the proposed Film Center – at that time, the designs were conceptual in
form and approval to proceed was pending review of finalized drawings as available. Upon review of the
information contained in your recent email of 6.3.2020, the Foundation concurs with the design for the Carriage
House with one comment: the cresting along the roofline is not appropriate to the utilitarian nature of the building
and we request that an alternative solution to conceal the HVAC system be considered – note that this is a request
and not a condition of approval. As for the Film Center, Foundation staff and professional design members of the
committee look forward to reviewing the working construction drawings as they are developed and will consider
them keeping in mind the design concerns outlined in the July 24 th memo.
In regard to the Parking Operations Plan and the Traffic Impact Study, the Foundation is pleased to see that
alternatives are under negotiation with ‘several off-site guest properties’ as well as collaboration with public
parking properties (including with the Town of Estes Park) for ‘shuttle/trolley’ service. This is imperative for the
future health of the property and will assist in the alleviation of pressure for additional on-site parking. Open
space is limited, and frankly precious, at the Stanley. One of the Foundation’s concerns for the historic district is
not only the reduction of stress on the historic buildings, but also the maintenance of the historic park-like setting
and open space on the Stanley campus, particularly the viewshed from the front porch of the hotel toward Long’s
Peak. This was inarguably a view that was valued by F.O. Stanley.
As ever, the Foundation appreciates Grand Heritage Hotels/The Stanley, MOA Architecture and the Town of Estes
Park for their ongoing collaboration and partnership. Should you need clarification or would like to discuss any of
these suggestions in more detail, please do not hesitate to contact me at 303.520.6307.
Exhibit 6
129
)
l
J
January 11, 1994
1. Technical Review
a. The applicant and development design team (consultants) shall schedule a pre
application conference with the Community Development Director prior to
submittal of any project proposal. The intent of this initial meeting shall be
fourfold:
1) To informally discuss the overall context and development objectives for
of the proposed project.
2) To review the standards, guidelines, and criteria for development.
3) To prepare a reasonable schedule for technical review based on the
development schedule.
4) To review a sketch (concept) plan prepared by the Parcel owner which
illustrates overall site development, general roadway layout, and other
major site development components. The sketch plan is intended to be a
very preliminary sketch of the proposed development concept and not a
formal site plan.
b. A Technical Review Committee, appointed by the Town Administrator, will be
composed of five members, two public sector and two private sector
representatives, plus Town Administrator. The private sector representatives
shall be selected from a list approved by the property owners. The private
sector representatives shall not have a financial or employment interest in the
project. Technical Review Committee members shall be selected from the
following list:
Community Development Director, Public Works Director, Special Projects
Director, Urban Renewal Authority Executive Director, Street/Park
Superintendent, practicing architect, practicing engineer, and practicing
landscape architect.
The Committee shall be selected for their expertise related to the specific
proposed project and will serve for the duration of the review of a particular
project.
The Technical Review Committee has the right, by majority vote, to grant
variances or modify the Guidelines based on the applicant's ability to
demonstrate innovative approaches, design solutions or future market
conditions which the committee feels is advantageous to, and in conformity
with, the intent of the Master Plan and the Guidelines. In no event shall the
Technical Review Committee be allowed to grant a variance to the permitted
uses or density or square footage in a development parcel. The decision of the
Technical Review Committee may be appealed to the Town Board of Trustees.
Stanley Historic District Master Plan/ 4
Exhibit 7
130
I
I
l
l
l
J
l
J
January 11, 1994
c. At each step, the burden is on the applicant to demonstrate compliance with the
Guidelines. The Technical Review Committee and Architectural Review Board
may approve, approve with conditions, or deny an application.
d. Any approval with condition or denial shall be in writing with stated reasons for
conditions or denial
2. Preliminary Package
All submittals shall be prepared by a qualified land planner (LP), landscape
architect (LA), professional engineer (PE), and architect (AR) based on their
appropriate area of expertise. Please note the suggested professional designations
listed below. The following Preliminary Package (1 11 = 20') shall be required for the
entire development parcel:
Twenty-one (21) sets of the following are required at the time of submission:
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
Statement of Development Intent.
Property Survey including topography (2' contour interval), location and
sizing of existing trees and utilities.
Preliminary site plan. (LP /LA/ AR)
Preliminary grading plan. (LA/PE/ AR)
Preliminary drainage plan and report. (PE)
Preliminary landscape plan. (LA/ AR)
Preliminary utility service plan. (PE)
Preliminary roadway plan and profile. (PE)
Preliminary architectural plan and proposed materials showing typical
elevation, schematic floor plan, and style of architecture. (AR)
Photo survey of site illustrating proposed development and its
relationship to surrounding neighborhood as per Estes Park municipal
code 17.44.050 (C) and (D). (LA/ AR)
k. Proposed project phasing. (LP/ AR)
1. Preliminary plat if subdivision is proposed. (LP /PE)
The Technical Review Committee will meet with the applicant within three
weeks of notification of acceptance of receipt of the complete Preliminary
Package. During this three-week review period, the Architectural Committee
shall meet with the Technical Review Committee to preliminarily evaluate the
project. The Technical Review Committee will then issue its findings/ decision
within one week after its scheduled meeting with the applicant.
Stanley Historic District Master Plan/ 5
131
l
l
I
J
January 11, 1994
Upon approval of the Preliminary Package, the applicant shall submit a final
(revised) package for review and approval by the Technical Review Committee.
This package shall consist of final development plans, engineering, and site
design drawings (consisting of items a-k above, as revised).
3. Architectural Review
Upon approval of the Preliminary Package, the applicant shall prepare architectural
drawings to be submitted to the Architectural Review Board.
The Architectural Review Committee shall be composed of two Colorado licensed
architects to determine compliance with the Guidelines. The Architectural Review
Committee shall be appointed by the Town Administrator from a list of architects
approved by the property owner.
4. Application for Building Permit
Upon approval of the Final Package by the Technical Review Committee and the
Architectural Review Committee, the proposed project may be submitted for
building permit application. All drawings shall be in conformance with the
Uniform Building Code, current edition.
5. Final Walk-through
A final walk-through shall be performed by the Town to determine compliance with
project approval. All deficiencies shall be corrected prior to issuance of a Certificate
of Occupancy.
6. Fees
At the time of submittal of the preliminary package, the Town and the applicant
shall mutually agree upon a reasonable fee to be paid by the applicant for the
outside members of the Technical Review Committee and Architectural Review
Committee.
7. Improvement Guarantees
All landscaping street utility and site improvements shall be guaranteed as set forth
in the Town of Estes Park Zoning and Subdivision Regulations, as applied on a
Town-wide basis.
Stanley Historic District Master Plan/ 6
132
l
j
I
. J
j
January 11, 1994
II. MASTER LAND USE PLAN
The Master Plan for the Stanley Historic District responds primarily to the natural and
cultural features of the site. In order to develop a realistic plan, it was necessary to
understand the limits and capabilities of the site related to the proposed development
program. An environmental scan was conducted which reviewed and identified key
development opportunities and constraints. While the Master Land Use Plan graphic is
intended to establish appropriate land use areas, land use relationships and overall access,
it must be considered as illustrative only. The Development Agreement, Development
Standards and Design Guidelines have precedence over graphically depicted information.
The following statements are provided as guidance to the Technical Review Committee, the
Architectural Review Committee, and, in particularly, to the applicant and the planning
and design team.
A. Environmental Protection
1. Natural Resources
■ Slope
•
The slope on the 75 acre site varies from very flat (less than 5 % ), on the
southeast portion of the Historic District and along the drainage in the western
part of the site, to over 25 % in the northwest portion of the site. The steepest
slopes also correspond to several large rock outcroppings which exist on the site.
The majority of the site is less than 25 % , and is developable in terms of slope
constraints. In steeper parts of the site, where the slope is closer to 25 % , special
design considerations must be used to ensure minimal disruption to the site.
The site generally has a southern aspect, providing opportunities for passive
solar applications for heating.
Vegetation/Wildlife
The entire Stanley Historic District falls within elk and mule deer winter range
and migratory routes. While this does not create site specific design limitations
in certain areas of the site, it does create the need to consider wildlife in the
overall design and development within the site. Design considerations which
have been incorporated into the design of the Stanley Historic District Master
Plan acknowledge the need to accommodate wildlife. These include:
Minimal use of fencing
Cluster development which allow for open corridors between
development
Minimize non-native plant materials
Minimize the use of through-streets to reduce through traffic
Stanley Historic District Master Plan/7
133
I
•. J
l
j
!
·. 1
I
i
I I -
l
January 11, 1994
The native wildlife of Estes Park is considered a major asset of the community
by the majority of the residents in the community. Every effort shall be taken to
preserve the wildlife which currently migrate through the site.
The vegetation on the site consists of Ponderosa Pine, and native dryland shrubs
and grasses. Along the Black Canyon Creek on the western portion of the site,
willow and other riparian vegetation is present along the bottom of the
drainageway. Some exotic introduced species exist immediately adjacent to the
Stanley Hotel, but this has been kept to a minimum. Most of the site is open,
with few trees. This is most noticeable in the front of the Stanley Hotel, and in
the northern portion of the site, directly north of the hotel. The northeastern
portion of the site has numerous stands of Ponderosa Pine, which can be used to
successfully buffer and screen development. Care shall be taken to preserve as
much of the existing vegetation as possible to insure buffering of development
to adjoining properties and to limit the visual impact of new development on the
site.
■ Floodplain and Drainage
The Black Canyon Creek is the only drainageway that exists on the site. A one
hundred (100) year floodplain extends through the creek channel, limiting
development within the area. Approximately one third of the western portion
of the site drains into Black Canyon Creek. The eastern two-thirds of the site
sheet flows south and east. A drainageway exists east of the site, along the
eastern edge of Steamer Drive.
2. Cultural Resources
The Stanley Hotel is designated as a National Historic District, as well as being
listed on the National Register of Historic Places, including a designation as a Place
of National Significance. The prominence of the hotel from many locations in the
valley makes the hotel a regional landmark. The Manor House and Stanley Hall,
both of which are located just to the east of the hotel, provide context for the entire
site and support the dominance of the main hotel. It is imperative that any
development on the site acknowledge the importance of these structures.
The Town of Estes Park has designated several key viewsheds which must be
protected from any development. These are designated in the Stanley Historic
District Ordinance. Please refer to this ordinance to examine the visual exhibits
which further illustrate the protected viewsheds. They include the view of the hotel
from the porch of the Visitors Center, and the view along Highway 36 from its
intersection with Highway 7 to its intersection with Highway 34 .
Stanley Historic District Master Plan/ 8
134
I
January 11, 1994
B. Circulation
The circulation system for the Stanley Historic District consists of the primary public
roadway, secondary private roadways that serve the Stanley property, and the adjacent
residential development north and east of the Stanley.
The primary public road system accesses the site along Highway 34, along the southern
boundary of the site. Upon entering the site, there is a "T" intersection. The left turn
provides access to the future main access of the Stanley Hotel, as well as a cluster of
attached dwelling units located in Parcel 7 along the east side of Black Canyon Creek.
The public portion of the road provides access only as far as the attached dwelling
units. Permanent access to the future front entry to the Stanley Hotel shall be a private
road constructed by the Stanley Hotel and/ or Parcel 2.
At the "T" intersection, a right turn provides access to the majority of development
within the Historic District. The public road extends to the north and east, providing
access to the current entrance of the Stanley Hotel, and to future residential and
commercial development along the eastern and northern portions of the site. The
public road extends to Steamer Drive, providing a secondary access to the property.
A private road system provides access to the Stanley Hotel and associated buildings.
This private road also provides access to the site of the potential Cultural Arts Center,
which is to be located at the site of the existing Carriage House. Additional private
circulation is provided within the Stanley Campus area to future accommodations units
north of Stanley Hall.
Pedestrian/bike access throughout the site is provided by detached walkways along the
roads. Direct access is provided between the commercial development south of the
main entry road and the proposed cultural center. Future access may also be provided
from the Stanley Hotel campus to the Black Canyon Creek area.
Stanley Historic District Master Plan/ 9
135
j
l
I . '
I
. l
January 11, 1994
C. Land Use
Land uses have been graphically depicted in the Master plan to illustrate how they may
be developed on the site. It must be understood that the Master Plan is illustrative in
nature and that all development must be further planned and designed to
accommodate site specific opportunities and constraints which were not accounted for
as a part of this Master Planning process. Such site specific considerations may include,
by illustration only, geotechnical investigations, severe bedrock conditions, architectural
programming, and changing market conditions. Detailed design shall be subject to the
Development Agreement and Development Standards and Design Guidelines.
A variety of land uses are anticipated within the Stanley Historic District Master Plan.
The most prominent use on the site will occur at the Stanley Hotel (Parcel 1). The
existing operation of the hotel is anticipated to expand, and include ancillary uses such
as a recreation center, limited retail and restaurants. An addition to the existing hotel is
planned to the west of the existing hotel. Additional accommodations units may be
built behind the front facade of the Stanley Hotel Complex buildings. Additional
parking to accommodate the expansion of the hotel also will occur behind said front
facade. Future parking demand will be met by the phased construction of parking.
Construction phasing of parking is to be directly linked to development thresholds.
Stanley Hall will be used as a public Performing Arts Center. A Cultural Arts Center is
planned for the site east of Stanley Hall. This would include up to 40,000 square feet of
space, and would become a public facility. Parking for the Cultural Arts Center would
be located to the north and east of the building, and immediately to the south.
A commercial/ mixed use development is anticipated south of the Cultural Arts Center,
and directly to the north of the existing Stanley Village (Parcel 4). Up to 30,000 square
feet of commercial/ office/residential space could be built on this site with up to 20
residential units on the second floor. The buildings would be located along the public
roadway, with parking located to the south. An alternate use of Parcel 4 is a residential
multi-family with up to 40 dwelling units.
Residential development is planned for the northern (Parcel 2) and northeastern areas
(Parcel 3) of the Master Plan area. It is anticipated that these units would be attached,
with multiple units. A buffer will be provided between these units and the
developments to the north and east of the property. A variety of product types are
anticipated, with smaller footprints and building masses occurring on the perimeter,
and larger footprints being built on the interior of the site. Parcel 2 may have
accommodation units.
Stanley Historic District Master Plan/ 10
136
1 i
l
I
' l
. J
l
January 11, 1994
Office or multi-family development is planned in the southwest comer of the site
(Parcel 9), adjacent to MacGregor Avenue. Up to 10,000 square feet of office
development may occur, or 14 multi-family units. All access would occur from
MacGregor Avenue, with limited curb cuts. No development in this area will be
allowed to encroach into the flood plain along Black Canyon Creek. Portions of the site
are steep, and design on the parcel must be sensitive to environmental concerns, cut
and fill, and wildlife issues.
Residential development is planned for Parcel 7 just east of the open space (Parcel 8)
where Black Canyon Creek is located. Up to 20 units, or 15 units plus 1 bed and
breakfast with 5 bedrooms may be built within the parcel. The units should be sited to
mitigate the open space setting which makes up the foreground to the Stanley Hotel.
The units should be located to have minimal visual impact on the area as well.
Orientation toward Black Canyon Creek and the views to the west are recommended.
Two single family lots may be located on Parcel 1. No more than one single family
residence will be allowed on each lot. Creation of these lots must be approved through
the Town of Estes Park's normal subdivision process and access must be provided at
that time.
The following land uses are specifically prohibited in the Stanley Historic District:
mobile home parks, recreational vehicle parks, commercial storage (including self
storage) operations, light manufacturing and product assembly, motor vehicle service
stations, motor vehicle dealerships or repair operations, commercial amusements
including but not limited to go-kart tracks, water slides, miniature golf courses and
mazes, commercial kennels, and adult uses.
D. Utilities
Major utility lines currently exist on the site. The majority of the utilities are located to
serve the Stanley Hotel. Water, sewer, and natural gas are all available. A major
overhead electric line is in place which extends from north of the site, through the site to
the west of the Stanley Hotel, and extends off the site to the southwest.
Additional utility lines will be required to be built in order to serve the proposed
development within the site. All proposed utilities will be placed underground, and
have minimal visual and environmental impact on the site at roads and drainages. All
utilities will be installed at the expense of the Developer.
E. Signage
Signage on all development parcels shall be as permitted and as provided according to
the Stanley Historic District Ordinance .
Stanley Historic District Master Plan/ 11
137
January 11, 1994
I DESIGN GUIDELINES
l
C l
I
j
j
It is understood that The Stanley Historic District has not been subject to final design,
engineering, geotechnical analysis, architectural design, or market feasibility analysis.
The following guidelines shall apply to all development within the Stanley Historic District as
the Technical and Architectural Review Committees deem appropriate. Some of the allowed
uses and potential building sites within the Stanley Historic District may be exempted by the
Technical and Architectural Review Committees from the application of specific inappropriate
guidelines, where such exemptions are consistent with the principles, goals, and objectives set
forth in part I and II of the Master Plan.
A. Site Planning
1. Buildings shall be sited in a manner that preserves existing land forms.
Natural land forms are important in creating the appeal and the special character of the
Stanley Historic District. The objective is to fit buildings to their sites in a way that
leaves natural massing and features of the landscape intact. The most visually
dominant and distinctive natural characteristics of the parcels should be left in their
natural condition. Scale buildings so that they do not dominate the site.
2. New construction should be compatible with existing adjacent residential buildings and
~-
When planning new construction, analyze the setting for the new building. Look at the
siting and mass of other buildings in the residential neighborhood. Notice the setbacks,
heights, parking arrangements and building shapes. Observe the building forms and
materials of surrounding buildings. Be aware of the elements that are repeated nearby,
such as certain roof pitches, window shapes and porch and entrance orientations. New
construction should blend with the residential neighborhood without copying other
buildings.
3. Grading.
Overlot grading for the sole purpose of creating flat building pads is prohibited within
the Stanley Historic District. Foundations that step up or down with the natural slope
of the site can greatly reduce site disturbances. Extensive grading to create large flat
lawn areas is prohibited unless appropriate to grades at building site.
Stanley Historic District Master Plan/ 16
138
I
j
I
. l
I
January 11, 1994
4. Drainage.
Culverts and flow dissipaters are to be constructed in a manner that reflects the natural
character of streams in the Rocky Mountain region. River rock and cobbles are
required. Use of angular rip-rap and exposed concrete is prohibited.
Minor drainageways that are created to collect and convey storm water shall be
constructed of materials and revegetated so as to appear natural.
5. Buildings shall be sited in a manner that preserves significant vegetation.
New construction and landscaping shall respect and be compatible with natural
vegetative patterns. Consult the Landscape Section for additional discussion.
6. Buildings should be sited in a manner that preserves significant views.
The primary concerns relate to maintaining views to the site. Projects should be
designed so they complement rather than dominate the natural landscape. Views
should also be considered in the preparation of a landscape plan, particularly where
plant material will be considerably larger at maturity.
7. Site design should not change natural drainage patterns.
Site grading should be sensitive to existing land forms and topography in the area so
that the natural setting may be preserved to the greatest extent possible. Every effort
shall be to minimize the limits of construction on the site and all stock piling of
materials and equipment storage shall occur within those limits. Abrupt grade changes
on property lines are not permitted. Grade changes within tree driplines should be
avoided. When modifications are necessary, surface drainage systems such as swales
and detention basins are preferable to underground systems. Drainage designs should
avoid the concentration of runoff and acceleration of the rate of runoff. Site design
should be executed in a way which will avoid drainage impacts such as erosion and
road damage both on-site as well as downstream. Slopes steeper than 3-to-1 shall be
stabilized using natural materials and revegetated. Cuts and fills should have good
surface drainage and must be revegetated and terraced or controlled by retaining walls
to protect against erosion and sedimentation.
Silt fencing shall be established in a continuous barrier on all downslope boundaries of
the development site prior to earthmoving activity. Additional silt barriers and silt
settlement areas shall be established along drainage courses as necessary to prevent
erosion and the flow of transported sediments beyond site construction areas. These
erosion/ siltation control facilities shall be maintained throughout construction activity
until disturbed areas are successfully revegetated.
Stanley Historic District Master Plan/17
139
l
I
. 1
. l
I
J
January 11, 1994
8. Oustering of buildings and parking is encouraged
Efficiencies in design result from building clustering when it applies to appropriate
building types and land uses. Service needs can be combined in a central location.
Access roads and utility services to scattered areas within a site can be reduced and
disruption of the natural land forms and vegetation can be minimized through
clustering. Building clustering may result in a visually more cohesive design solution.
Clustering may also provide more usable open space.
B. Building Placement
1. Buildings should respect existing landforms.
Buildings should be located so that earthwork can be minimized. Emphasis should be
placed on building locations that fit existing contours rather than those that require a
building solution that would dominate the site.
2. The alignment of roads and driveways should follow the contours of the site.
By meandering roads to follow land forms, it is possible to minimize cuts and fills,
preserve natural drainage patterns, and produce roads that are easily negotiated.
Efforts should be made to construct roads parallel to contours. When roadways or
drives must be located on cross slopes, they are preferred to be cut into the slope rather
than placed in a location creating a fill condition.
3. Site design should consider solar access.
Building placement and planting materials should accommodate passive solar designs.
Maintaining solar access to adjoining building sites, roadways, and parking shall be
considered during the review process.
4. Site design must consider the placement and screening of service areas and auxiliary
structures.
Utility meters and service functions should not be visible on the primary facades of
buildings or in front yard areas. Minimize the visual impact of trash storage and
pickup areas. Screen trash and service areas with landscaping, berming or fencing.
Consider snow accumulation in planning access to trash receptacles and service areas.
Auxiliary structures should be architecturally compatible with the rest of the site
development.
Stanley Historic Dishict Master Plan/18
140
l i
, l
l
I l
' ' I
January 11, 1994
5. Site design around intersections must provide a clear view of intersecting streets.
In order to allow drivers a safe visibility at intersections, no obstruction in excess of two
feet high may be placed within a triangular area formed by the streets at property line
and a line connecting them at points 25' from the intersection of the street lines. Trees
pruned high enough to permit driver visibility may be permitted.
6. Site design should facilitate pedestrian circulation.
Care should be taken to provide pedestrian circulation that is separate from and does
not conflict with vehicular circulation. A master pedestrian circulation plan for each
parcel shall be developed by the developer at the time of initial development review
process.
7. Building Setbacks.
The Technical Review Committee may adjust interior line setbacks based upon
innovative site design, site planning, and access. Each parcel has perimeter setbacks
which shall be maintained.
C. Building Design
1. New buildings designed to imitate historic styles of the Stanley Hotel will not be
approved.
The Town considers that the integrity of the Stanley Hotel historic structures will be
compromised by the introduction of new buildings that appear to be older than they
really are and, therefore, will not approve historic imitations.
The following architectural styles and motifs are prohibited in Stanley Historic District
Ordinance:
•
•
•
•
•
•
•
•
•
A-frame structures,
Geodesic dome structures,
Mediterranean motifs,
Tudor or mock tudor,
Swiss chalets,
Highly ornate Victorian,
Rustic frontier,
Colonial, and
Other historical or period design motifs that have a strong connection or
association with other regions or which have no historical connection with Estes
Park.
Stanley Historic T encl Master Plan/ 19
141
l
'
I
J
I
January 11, 1994
2. Building designs should attempt to minimize the apparent scale of buildings.
Buildings can be made to seem larger or smaller depending on the proportional
relationship of the building elements that comprise the building front. Doors, windows,
roof shapes, siding, lighting and signs should all be considered carefully in order to
create an appropriate scale of development.
3. Rooflines of buildings should be designed to be compatible with surrounding building
forms.
Clashes in styles and materials should be avoided. The objective in determining roof
shape is to establish a visual order to building clusters. The following roof forms are
prohibited in Stanley Historic District:
• Mansard or fake mansard,
• Gambrel,
• Curvilinear,
• Domed,
• Geodesic domes,
• Conical, and
• A-frames .
4. Roof surfacing materials should be selected to help new buildings blend with their
surroundings.
The use of similar building materials throughout areas that are seen together provides a
very strong link that unifies the varying architectural features of the buildings.
Preferred materials are cedar shingles, resawn shakes (to give a less rustic appearance
than heavy shakes), standing seam metal roofs in colors that approximate the color of
weathered cedar shingles and composition shingles. The following roofing materials
are prohibited:
■ Untreated aluminum or metal,
• Reflective materials,
• Brightly colored roofing materials such as bright red, blue, yellow, or similar
colors that are highly visible,
■ Red tile roofs, (tile roofs may be allowed in shades of grays and browns that
approximate the color of weathered cedar shingles),
Roof color should approximate the color of weathered shingles; however, colors which
blend with the background natural materials, such as forest green, are acceptable.
Stanley Historic District Master Plan/ 20
142
1 ;
I
J
.. l
January 11, 1994
5. Skylights and solar panels must be designed in an unobtrusive manner.
Skylights and solar panels must be designed to fit flush with the roof's surface or up to
a maximum of 2' above the roof's surface. No reflective materials may be used unless
thoroughly shielded to prevent reflection onto adjoining or nearby properties.
The use of alternate energy sources is encouraged, however, the hardware associated
with these features should be incorporated as an integral part of the building's design
rather than as an add-on which detracts from the building and its surroundings.
6. Allowable Building Height.
Care must be exercised in siting structures and orienting roofs so that allowable height
of 30 feet as regulated by the Stanley Historic District Ordinance is not exceeded.
"Building height" is defined by ordinance as the vertical distance from the average of
the finished ground level at the center of all walls of a building to the highest point of
the roof surface, exclusive of chimneys, ventilators, pipes and similar apparatus.
7. Facade lengths must be varied.
The objective of this requirement is to ensure that buildings do not become
overpowering. A change in the planes of walls, changing the direction or providing
some variety in the roof form gives diversity and visual interest. Structures must
exhibit a prominent shift in the facade of the structure so that no building facade
appears unbroken. Each shift shall be in the form of either a change in building facade
alignment or a change in roofline height, or a combined change in facade and roofline.
8. Building should be constructed of natural wall materials.
The use of natural materials such as redwood and cedar, and accent stone is
encouraged. Wall materials should convey a sense of human scale and warmth. Stones
should be laid in a manner that conveys the appearance of a structural element rather
than as a veneer facing another material. They should not convey an overly urban or
industrial character. The following wall materials are prohibited:
Stanley Historic District Master Plan/ 21
143
l
I
I
' /
" J
l
l
j
1
9.
■
■
■
•
•
•
■
•
•
■
•
■
■
•
Thick shake shingles,
Ceramic tile,
Slump block,
Weeping mortar,
Plastic or vinyl siding,
Used brick,
Synthetic stone products,
Precast stone or concrete imbedded with stone fragments,
Lava rock,
Clinkers,
Asphalt siding,
January 11, 1994
Exposed concrete block (architectural or split-face block may be acceptable),
Plywood siding, and
Aluminum siding .
Exterior wall colors should harmonize with the site and surrounding buildings.
On exterior walls the predominant tone should tend toward warm earthy hues, whether
in the natural patina or weathered color of the wall surface itself or the color of the
paint, stain or other coating. White walls are not permitted. Accent colors on the wall
surfaces can enliven buildings; however, their location should be confined to entries
and gathering points which do not disrupt the overall harmony of the area. Body trim
and accent colors as per Historic Code. In most cases, only one or two accent colors
should be used in addition to the base color. Doors may be painted a bright accent
color or they may be left natural wood ·finish. Harshly contrasting color combinations
should be avoided. Brilliant, luminescent, or day-glow colors will not be approved.
The colors found in the landscape around Estes Park, the dark green of forests, the
gray-brown of mountains, and the tan of grasses all relate well to wood and stone
masonry. Colors indigenous or associated with other parts of the country should be
avoided, such as colonial and tropical paint schemes.
10. Exterior alterations and secondary structures are subject to the same guidelines as new
construction.
11. Exterior lighting systems should be chosen with care so that glare is not created and
light is not cast on neighboring properties.
The objective is to provide subdued night lighting illuminating only what needs to be lit
to promote safe and pleasant use. Lighting with a number of low intensity sources
close to the area requiring illumination will in nearly all cases be more effective than
lighting with a remote single source. Generally, exterior lighting should direct light
downward and the light sources should not be visible from neighboring property.
Stanley Historic District Master Plan/ 22
144
l
I
I
. I
l.
l
j
January 11, 1994
D. Landscaping
1. Landscape plan.
Off-site views of building masses shall be substantially softened with plantings of large
coniferous trees carefully located to create a natural appearance which blends with
existing vegetative patterns. The landscape plan should reflect the landscape character
of an area. On those sites where the existing vegetation is considered a significant
attribute of the site, the siting and design of buildings shall retain the existing
significant vegetation wherever possible.
The landscaping should reflect the native vegetation patterns and plant materials.
Outward orienting portions of the landscape shall be planted with the same species of
plants which are found on the adjacent undisturbed areas. New plantings should blend
in with the existing landscape so that several years hence all traces of the site
disturbance will have disappeared. Proper landscaping transition to adjacent properties
and natural areas should be provided without strong demarcation. All disturbed areas
must be revegetated. Landscaped areas should be planned as an integral part of the
project and not simply located in left-over space on the site. Landscaping should
complement the architecture of adjacent buildings and not hide it.
2. The design of fences and walls should harmonize with the site and the buildings.
Walls and fencing can only be used to provide privacy or service area screening.
Screening should not dominate the buildings or the landscape. Planting may be
integrated with screening schemes in order to soften the visual impact. The tops of
screens should generally be maintained horizontal. If the ground slopes, the screen
should be stepped. Fencing may be allowed around private areas provided it is
attached to the building, does not adversely impact elk or deer migration patterns, and
does not adversely impact common open areas. Fencing materials should be
compatible with the materials and color of the surrounding or the prevailing building
materials and color in adjacent developments. Unacceptable fencing materials include
chainlink, plywood, chain and bollard, and slump block.
Stanley Historic met Master Plan/ 23
145
l
I
l
I
• J
. l
j
January 11, 1994
3. Retaining walls should be compatible in form. scale, and materials with the architectural
details and materials of nearby buildings.
Retaining walls may not be faced with any material disallowed for buildings. Rock
facing on walls should be applied in a manner that makes the rock appear as a
structural element rather than a veneer. Specially formed architectural block or stone
are encouraged wall materials. Retaining walls over 24 inches high may require railings
or planting buffers for safety. Low retaining walls may be used for seating if capped
with a surface of at least 12 to 16 inches wide. Retaining walls must be designed to
minimize their impact on the site. Retaining walls over 5' tall are discouraged. In
situations where a series of walls occur, landscape material shall be planted within
benched terraces to soften the appearance of the walls. Architectural block or stone
construction material is encouraged. Exposed poured-in-place concrete retaining walls
are not acceptable.
4. Site furnishings and paving materials should be selected to complement the
architectural style of the building and the paving and site furnishings of surrounding
properties.
5. Consider site conditions, drought tolerance, and hardiness when selecting plant species.
Soil conditions, exposure, wind, temperatures, and other factors vary. These factors
should be considered in the choice of plant materials. Soils tests to determine soil
amendment mixes shall be required. Plant species selected should be compatible with
the activity of the particular area.
Drought tolerant plant species shall be used wherever possible to reduce water
demand. Only plant materials acclimated to the Historic District environment shall be
used. Select plant material to be tolerant of browsing by elk and deer.
6. Native vegetation shall be encouraged. The use of blue grass turf is not allowed except
in Parcel 1 and 4 (retail use).
Stanley Historic District Master P' an/ 24
146
CI
j
C j
I .1
j
January 11, 1994
7. Significant existing vegetation is an attribute to any site and the vegetation should be
protected and retained.
Areas that are not disturbed do not have to be revegetated and projects which retain
existing vegetation are much more desirable to prospective buyers. In addition, the
more areas left undisturbed as a result of construction, the less erosion problems will be
produced from the site.
Site disturbance shall be minimized in the layout, grading, and drainage design of all
development sites, drives, and parking areas. This goal of minimizing site disturbance
has been established in order to minimize the impacts of erosion, siltation, and removal
of existing vegetation. The removal of significant, mature trees should be avoided. In
the event of removal of existing mature trees, a tree replacement plan shall be submitted
to the technical review committee. To achieve these goals, site disturbance limits shall
be established based on approval site grading plans and fenced, prior to any
earthmoving or site preparation activity.
Site preparation activity will require fencing constructed of 2" x 4" lumber with
horizontal rails set at a maximum 30" height above grade. This fencing is required to
accommodate elk and deer, minimizing disturbance to the seasonal passage of wildlife
through the site.
Builders and developers should avoid the following hazardous situations, all of which
can kill trees:
•
•
•
•
•
•
•
Placing backfill into protected areas or on top of roots of trees to be saved .
Felling trees into protected areas .
Driving construction equipment into or through protected areas .
Bumping into trees with construction equipment and/ or driving over the top of
their roots.
Stacking or storing supplies in protected areas .
Changing site grades which cause drainage to flow into, or to collect in,
protected areas.
Trenching underground utilities through root zones .
Stanley Historic Di 0 frict Master Plan/ 25
147
\
l
l
_j
j
January 11, 1994
8. All trees to be removed shall be removed in a manner that will not damage the
remaining trees.
Any trees that are to remain that are damaged during the clearing operation must be
repaired in an approved manner or by a tree expert as soon as final clearing has been
completed. After construction is completed, temporary barriers, surplus materials, and
all trash, debris and rubbish shall be removed from the site. All backfill shall be clear of
building material, stone, and rubbish.
Retained existing trees (more mature trees, especially) will undergo "post operative
shock" caused by the construction activity. All possible safeguards should be taken to
minimize these effects and to provide optimum growth conditions. Foliage feeding and
liquid fertilizer root feeding may be appropriate. Branch and foliage thinning may be
desirable also.
9. There shall be construction limits set for every project.
Any vegetation which is removed without specific approval beyond those established
limits of disturbance must be replaced with large specimen plant materials of similar
species.
10. Generally the seasons for planting in Estes Park are from April to September.
11. Landscape Maintenance Requirements.
All planting areas except native seeded areas shall be irrigated until landscape material
is established.
Stanley Historic District Master Plan/ 26
148
l
l
I
l . J
!
• I
I
. J
l
. J
I
j
SITE SPECIFIC
DEVELOPMENT STANDARDS
AND DESIGN GUIDELINES
PARCEL 1-THE STANLEY HOTEL COMPLEX
Site Development Considerations
January 11, 1994
The Stanley Hotel Complex, located within Parcel 1 represents the "Crown Jewel" of the Stanley
Hotel Historic District. The cultural values this parcel holds for the Town of Estes Park with its
historic background, set amidst the rugged Rocky Mountain landscape have been central to the
efforts of this and many pervious planning and historic preservation designations. Recognition
must be granted to the fact that the economic viability of the hotel complex is a core issue in the
preservation of the historical structures that the Historic District has been established to
protect. Expansion of these facilities and the thoughtful accommodation of other, new facilities
to further enhance the activity base of the Historic District must be considered essential if these
structures are to be preserved well into the future.
Historic facade viewsheds have been established through the Historic District Ordinance of the
Town of Estes Park. As governed by the ordinance, these viewsheds protecting the facades of
the Stanley Hotel and Manor House must not be encroached upon by new development. The
natural dry land ponderosa pine landscape that defines this setting must be considered an
integral identity element in the overall appeal of the region and the hotel complex. The back
drop of Ponderosa pine also provides a significant contribution to this setting and, therefore,
deserves the greatest consideration possible in proposals of new development.
In keeping with the desire to create a Stanley Hotel Campus, land uses, pedestrian circulation
and outdoor space scale must contribute to a well integrated built environment setting that
encourages activity throughout Parcel 1. Pedestrian-oriented circulation is encouraged and
outdoor spaces of pedestrian scale should be created to achieve activity levels that are inviting
and varied in concentration. The pedestrian circulation system should provide access radiating
outward from Parcel 1 to surrounding development parcels, while providing primary linkages
along the east/west axial corridor established by the original Stanley Hotel complex structures.
To preserve the setting of the Stanley complex and Parcel 1 vehicular circulation and parking
should be integrated into the site .
Stanley Historic District Master Plan/ 27
149
l
I
l
l
l
j
.l
January 11, 1994
In the interest of invoking new activity within Parcel 1, impacts to adjacent development must
not be ignored. Building height of new development and removal of existing significant
vegetation will not only impact the historical setting of the Stanley complex, but also
surrounding development. View opportunities for development Parcels (2 and 3) above Parcel
1 must be accommodated to the greatest extent possible in planning new development in
Parcel 1. Traffic and service activity impacts must also be carefully considered in planning.
The stipulations set forth in the Town of Estes Park Historic District Ordinance must be
carefully considered in all development proposals.
Stanley Historic District Master Plan/ 28
150
j -
/
I
I
Parcel 1
DEVELOPMENT STANDARDS
Land Use:
Recommended Uses:
Maximum Allowable
Development:
Maximum Building
Floorplate:
Maximum Building
January 11, 1994
HoteUAccommodations
Commercial uses • Hotel, overnight, weekly, and monthly rentals,
attached and detached residential, small scale commercial uses,
museum, theater, recreation facilities.
75,000 s.f. Stanley Hotel expansion, 14,000 s.f. Manor House
expansion, 25,000 s.f. recreation/conference center, 22,800 s.f.
accommodations, 5,000 s.f. retail, performing arts center, 40,000 s.f.
cultural arts center, surface parking. Two single family detached
units.
Stanley Hotel Expansion:
Recreation/Conference Center:
Cultural Center:
Manor House Expansion:
33,000 s.f.
25,000 s.f.
40,000 s.f.
7,200 sf.
Height: 30 ft.
Off-street Parking:
Minimum Setback
From Property Lines
Buildings:
Parking/Drives:
Street right-of-way and/or
private street reservation:
Hotel: One and one quarter (1.25) spaces per room.
Commercial: Five (5) spaces per 1,000 s.f.
Residential: Two (2) spaces per dwelling unit.
Rec/Wellness: Three (3) spaces per 1,000 s.f.
Arts Center: Five (5) spaces per 1,000 s.f.
Minimum setback from perimeter: 25'
Minimum building separation: 1 O'
Minimum setback from private drives right-of-way: 1 O'
1 O' setback from all property lines
45' width
*Note: Mandatory build-to lines have been established on the drive bisecting the Cultural Arts and
Performing Arts Centers.
Stanley Historic District Master Plan/ 29
151
I
I
J -
I
I
)
J
January 11, 1994
Parcel 1
DEVELOPMENT STANDARDS
SPECIAL CONDITIONS
1. Historic facade easements as described in the Historic District Ordinance shall not be
encroached upon as prescribed in the Ordinance.
2. Preservation and rehabilitation of existing historic structures for reuse shall be fully evaluated
by a qualified historical architect prior to proposals for new construction that may displace
primary or contributing structures of historic significance. This evaluation shall emphasize
potential reuse on existing sites, but shall also consider possible relocation within the historic
district.
3. Expansion of the existing historic Stanley Hotel shall be located generally to the west and north
of the existing hotel structure. The expansion shall not interfere with or diminish historic views
established in the Historic District Ordinance. The expansion shall not exceed a maximum floor
plate of 33,000 s.f. and shall generally be located within a designated building envelope
extending 275 ft. to the west of the existing hotel structure, setback to the north from the
southwest comer, and extending northward approximately parallel with the east wing of the
existing hotel structure. Expansion will be subordinate to hotel building. All development will
be coordinated with the Colorado Historical Foundation and Colorado Historical Society.
4. Expansion of the historic Manor House shall be located generally to the north of the existing
structure. The expansion shall not interfere with or diminish historic views established in the
Historic Ordinance. The expansion shall not exceed a maximum floor plate of 7,200 s.f. and
shall be in conformance with the facade easement granted to the Colorado Historical
Foundation. All development will be coordinated with the Colorado Historical Society and
Colorado Historical Foundation.
5. Stanley Hall, designated for use in this plan as a performing arts center shall not be appreciably
expanded except for necessary improvements associated with access and service facilities.
6. The proposed cultural arts facility located to the east of Stanley Hall shall be located so as not
to diminish the setting established by the existing historic structures in Parcel 1. This facility
shall not extend beyond the southern-most facade of the Stanley Hotel structure.
Stanley Historic District Master Plan/ 30
152
l
j -
a 1
I
I
j
January 11, 1994
7. Additional accommodations structures, Recreation/Conference Center facilities shall be
generally located behind the Stanley Hotel complex structures. To mitigate building height
impacts to the Stanley complex buildings and adjacent development parcels to the north and
east, these structures shall employ foundations that are set into the hillside, accommodating
the natural existing slope. The structure shall not exceed 30 feet elevation or the existing
Stanley Hotel at its highest point to preserve view opportunities of properties to the north.
8. Two primary access points have been designated from public road right of way for Parcel 1.
A. An access point has been designated at the terminus of the public right of way at the
southwest of the Parcel to serve the relocated main guest entrance in the westward
expansion of the Stanley Hotel. Extension of a private roadway from this point is the
responsibility of the Stanley Hotel.
8. A second primary access point is located at the intersection of the existing entry drive to
the Stanley Hotel and the public right of way to the southeast of the existing Stanley Hotel.
9. Secondary access points have been designated with the CulturaUPerforming Arts Center, and to
the east of the Cultural Arts Center.
10. Parking requirements for expansion of facilities in Parcel 1 shall be met in the following phasing
approach:
A. The temporary parking lot located on the grass area to the south and east of the Stanley
Hotel may be used only as overflow parking until such time as new construction occurs for
the addition to the Stanley Hotel, or an addition is added to the Manor House. At such time
the temporary lot will be removed and revegetated. The existing parking area to the west of
the Stanley Hotel may remain in use.
8. Additional parking for Parcel 1 will occur behind the front facade of the Stanley Hotel
complex unless otherwise noted. As an alternative, temporary parking may be constructed
at and around the Carriage House (proposed Cultural Arts Center Site), subject to TRC
approval. This parking shall be paved, landscaped and screened. The Town shall have no
obligation to replace this parking upon construction of the Cultural Arts Center.
C. At such time that the Cultural Arts Center is constructed, a joint use for parking for the
Stanley Hotel and the Cultural Arts Center may become a part of the overall parking plan for
the Cultural Arts Center.
D. Regardless of other phasing considerations, parking facilities immediately south of the
Manor House shall be upgraded in circulation capability and landscape improvements
without significant capacity increase at the time of any new on site construction/expansion.
Stanley Historic District Master Plan/31
153
I
l
I
l
' j
J
J
January 11, 1994
E. Perfonning Arts Center parking shall be shared with existing Stanley Hotel parking, not
necessarily tied to the Cultural Arts Center.
F. Upon construction of the Cultural Arts Center, pennanent parking facilities shall be
provided to accommodate parking based on the total floor area of the Perfonning/Cultural
Arts facilities based on Gross Floor Area of the combined facilities.
11. A 50 ft. minimum landscape buffer shall be provided upon development of the Cultural Arts
Center adjacent to the property line between Parcel 1 and Parcel 3. Landscape density shall
provide effective buffering of Parcel 1 uses (within the character of the natural landscape).
12. Ancillary and support structures shall be generally located north of the front facade of the
Stanley Hotel complex.
13. Should Parcel 4 be developed in entirely residential uses, an additional 5,000 s.f. of retail use
shall be allowed on Parcel 1. However, this floor area shall be deducted from the allowable floor
area of another allowable use designated for Parcel 1, resulting in no net gain in developable
floor area.
14. Favorable consideration shall be given by the Technical Review Committee to an applicant who
provides a detailed circulation and parking plan prepared by a qualified transportation
consultant which clearly delineates the phasing and construction of all proposed access,
parking, and related circulation issues.
15. The use of exotic, non-native landscape species previously introduced on Parcel 1, including
blue grass lawns, may be used surrounding the Hotel, Hotel expansion, and Manor House,
Stanley Hall and proposed perfonning arts center.
16. Section 17.44.060, F of the Historic District Ordinance must be referred to for development of
Parcel 1.
Stanley Historic District Master Plan/ 32
154
&a
m
Ia
-
G)
U
;
0cu
C
U
Exhibit 8
155
•;)‘flT r --I-I ________
-
:-
t ______
/I
‘
N ______
-c !4f a
I ovEn
--
r
/
-t
___
*;
L%Ltt N :-
-‘
:*LM r-iL X ‘--4
7 1
i
1>
€I
I
-I%4
‘:
E
:
b
*2 -:
s4
/
.
•
$
/
-.t
-
--
-I //-:49
—----
-
k
_______
-4-/-
Exhibit 9
156
FOR
OF
3/
2
6
/
2
0
2
0
1
1
:
3
6
:
2
6
A
M
Stanley Hotel Carriage House
333 E Wonderview Ave Estes Park, CO 80517
Grand Heritage
SEPTEMBER 03, 2019
90% CONSTRUCTION DOCUMENTSFOUNDATIONS & ENCLOSURE PERMIT SET
PROJECT DIRECTORY
Contractor:
Sauders Heath
Architect:
MOA ARCHITECTURE
414 14th Street, Suite 300
Denver, CO 80202
303.308.1190
Jack Mousseau
jmousseau@moaarch.com
Architect's Consultants:Owner:Sheet Index
Structural Engineer:Mechanical / Electrical Engineer:
S. A. Miro, Inc.BCER
4582 S. Ulster St. Pkwy, Ste 750
Denver, Colorado 80237-2639
303.741.3737
John Karlsberg
jkarlberg@samiro.com
5420 Ward Rd
Suite 200
Arvada, CO 80002
303.422.7400
Paul Miskowicz
pmiskowicz@bcer.com
6380 S. Fiddlers Green Circle
Suite 400
Greenwood Village, CO 80111
John Cullen
jcullen@grandheritage.com
Civil Engineer:
S. A. Miro, Inc.
4582 S. Ulster St. Pkwy, Ste 750
Denver, Colorado 80237-2639
303.741.3737
Jason Carr
jcarr@samiro.com
Grand Heritage
Vicinity Map
CIVIL
C2-512 UTILITY PLAN
STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES
S-002 STRUCTURAL GENERAL NOTES
S-003 STRUCTURAL SPECIAL INSPECTIONS
S-100 FOUNDATION PLAN
S-101 LEVEL 1 FRAMING PLAN
S-102 ROOF FRAMING PLAN
S-201 TYPICAL FOUNDATION AND SOG DETAILS
S-211 FOUNDATION DETAILS
S-212 STAIR DETAILS
S-301 SLAB-ON-DECK/STEEL BEAM DETAILS
S-302 TYPICAL STEEL-CONCRETE CONNECTION DETAILS
S-311 FRAMING DETAILS
S-321 CONCRETE WALL AND FRAMING DETAILS
S-401 WALL ELEVATIONS
S-402 WALL ELEVATIONS
S-501 TYPICAL WOOD DETAILS
S-502 WOOD SCHEDULES & DETAILS
S-503 WOOD FRAMING DETAILS
S-504 EXISTING/NEW ROOF TRUSS ELEVATIONS
S-505 EXISTING ROOF TRUSS MODIFICATION DETAILS
S-506 EXISTING ROOF TRUSS MODIFICATION DETAILS
S-801 MASONRY DETAILS
ARCHITECTURAL
A2-101 PLANS AND ELEVATIONS
A2-102 ASSEMBLIES AND SECTIONS
REVISED AND RESUBMITTED MARCH 25, 2020
Architect:
1212 Riverside Avenue, Suite
130, Fort Collins, CO 80524
(970) 490-8044
David Stolte
d.stolte@saundersheath.com
REV
6
REV
6
Exhibit 10
157
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
SSM
2020.03.20
19131.00
FOUNDATIONS & ENCLOSURE PERMIT SET
JDC
REVISION DATE
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
REV 2 - COMMENTS 2019.10.15
REV 3 - UPDATED AREA WELL 2019.10.24
REV 4 - COMMENTS 2019.11.14
REV 5 - UPDATED FOOTPRINT 2020.02.07
REV 6 - BUILDING EXTENSION 2020.03.20
C2-512
UTILITY PLAN
(INTERIOR ONLY)
FLUSH WITH FLOOR SLAB
CONCRETE PAD SHOULD BE
LANDSCAPE PLACEMENT
4" RISER PIPE, PVC
LARGER THAN RISER PIPE
WATER - TIGHT PLUG
6"
6"
MI
N
.
2"
T
Y
P
.
6"
HARDSCAPE PLACEMENT
LONG SWEEP WYE OR
TYPE WYE SOLVENT
CEMENTED TO MAIN
APPROVED SADDLE
1.
2.
NOTES:
3.
100 FEET MAXIMUM SPACING.
AT ALL BENDS AND EVERY
CLEANOUTS SHALL BE LOCATED
CLEAN-OUT SHALL BE CONSTRUCTED
SO THAT THE SURFACE LOAD WILL
NOT BE TRANSFERRED TO THE MAIN.
CONCRETE PAD SHALL BE INSTALLED
SO THAT THE WATER WILL RUN
AWAY FROM THE INSTALLATION.
W/ 3,000 PSI CONCRETE
(6" MIN. AROUND FITTINGS)
CONC. ENCASE FITTING
FINISHED GRADE
(FOR LANDSCAPED AREAS ONLY)
2"-3" ABOVE EXISTING GRADE
CONCRETE PAD SHOULD BE
CONCRETE SURFACE AND SHALL BE SECURED
(JOSAM SERIES 58680, OR APPROVED EQUIV.)
WITH SCREWS TO THE COVER'S FRAME.
PLUG, COVER SHALL BE FLUSH WITH
IRON BODY FERRULE WITH BRASS SCREW
10
SCALE: 1" = 10'
100
NO SCALE
1
C2-512
CLEANOUT DETAIL
NO SCALE
2
C2-512
DOWNSPOUT CONNECTION DETAIL
TYPE 150, OR EQUIV.
SEALANT, WILL-SEAL
OPEN-CELLED FOAM
FIT I.D. OF HUB
DIAMETER OF PLATE TO
FOR DOWNSPOUT.
PLATE w/ SQUARE HOLE
1/2" THICK CAST IRON
CEMENT GROUT
BUILDING WALL CRIMP END TO FIT HUB
TAPPED TEE BRANCH W/ PLUG
4"
FINISHED GRADE
4" PVC PIPE
2"
4"x4" METAL DOWNSPOUT
VA
N
VA
N
VA
N
VA
N
SS SS
SS SS
SS
E E E E
G
G
G
G
G
G
G
G
G
G
G
W W W W
G G G G
E
E
E
E
E
FDCO-1
N:1382335.61
E:2995350.13
INV.=7586.96
FDCO-3
N:1382372.54
E:2995407.06
INV.=7587.41
FDCO-8
N:1382375.74
E:2995445.70
INV.=7586.82
31 LF~4" PERF. PVC @ 0.50%
42 LF~4" PERF. PVC @ 0.50%
99 LF~4" PERF. PVC @ 0.50%
12 LF~6" PVC @ 1.00%
RD-1
N:1382297.56
E:2995429.78
INV.=7592.12
54 LF~6" PVC @ 1.00
%
RD-2
N:1382293.12
E:2995376.06
INV.=7592.66
24 LF~6" PVC @ 1.00
%
RD-3
N:1382296.60
E:2995351.34
INV.=7592.96
41
L
F
~
6
"
P
V
C
@
1
.
0
0
%
RD-8
N:1382378.64
E:2995444.46
INV.=7594.70
40 LF~6" PVC @ 1.00
%
RD-5
N:1382337.89
E:2995353.50
INV.=7593.43
6 LF~6" PVC @ 1.00%
5 LF~6" PVC @ 1.00%
CONNECT TO EX. STUB
N:1382298.57
E:2995442.08
INV.=7592.00
CONNECT TO EX. STUB
N:1382301.39
E:2995451.84
INV.=7586.25
90° BEND
N:1382291.11
E:2995351.80
INV.=7592.91
90° BEND
N:1382293.27
E:2995353.63
INV.=7586.74
90° BEND
N:1382337.44
E:2995347.97
INV.=7593.37
4" PERF. PVC FOUNDATION DRAIN
RE: DTL. 1/ A2-102
6" PVC ROOF DRAIN
CARRIAGE HOUSE
BASEMENT FFE=7587.00
MAIN FLOOR FFE=7600.00
4"
P
V
C
8" PVC
FDCO-4
N:1382302.21
E:2995461.76
INV.=7586.30
FDCO-5
N:1382314.65
E:2995450.75
INV.=7586.42
90° BEND
N:1382315.47
E:2995460.67
INV.=7586.37
13 LF~4" PERF. PVC @ 0.50%
10 LF~4" PERF. PVC @ 0.50%
10 LF~4" PERF. PVC @ 0.50%
26 LF~4" PERF. PVC @ 0.50%
10 LF~4" PERF. PVC @ 0.50%
13 LF~4" PERF. PVC @ 0.50%
10 LF~4" PERF. PVC @ 0.50%
90° BEND
N:1382331.91
E:2995449.32
INV.=7586.50
FDCO-6
N:1382332.73
E:2995459.24
INV.=7586.55
90° BEND
N:1382345.20
E:2995458.21
INV.=7586.61
FDCO-7
N:1382344.38
E:2995448.29
INV.=7586.66
90° BEND
N:1382338.29
E:2995382.61
INV.=7587.12
FDCO-2
N:1382344.67
E:2995382.08
INV.=7587.15
90° BEND
N:1382346.91
E:2995409.18
INV.=7587.29
27 LF~4" PERF. PVC @ 0.50%
33 LF~
4" PERF. PVC
@ 0.50%
6 LF~4" PERF. PVC @ 0.50%
90° BEND
N:1382339.25
E:2995369.98
INV.=7593.59
RD-6
N:1382345.63
E:2995369.45
INV.=7593.66
90° BEND
N:1382348.73
E:2995407.02
INV.=7594.03
RD-7
N:1382375.37
E:2995404.82
INV.=7594.30
17 LF~
6" PVC
@ 1.00%
6 LF~6" PVC @ 1.00%
38 LF~6" PVC @ 1.00
%
27 LF~6" PVC @ 1.00%
17 LF~4" PERF. PVC @ 0.50%
03/19/20
158
1. GOVERNING DESIGN CODES:
A. INTERNATIONAL BUILDING CODE (IBC 2015)
w/ 2016 TOWN OF ESTES PARK AMENDMENTS
B. SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS (AISC 360-10)
MEMBER DESIGN BASIS IS LOAD AND RESISTANCE FACTOR DESIGN (LRFD)
CONNECTION DESIGN BASIS IS LOAD AND RESISTANCE FACTOR DESIGN (LRFD)
C. BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318-14)
D. MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES (ASCE 7-10)
E. BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES (ACI 530-13/ASCE 5-13/TMS 402-2013)
F. NATIONAL DESIGN STANDARD FOR WOOD CONSTRUCTION (NDS-2015)
2. SPECIAL INSPECTION REQUIREMENTS AND QUALITY CONTROL:
a. SEE "STATEMENT OF SPECIAL INSPECTIONS" FOLLOWING GENERAL NOTES FOR INSPECTION
REQUIREMENTS.
3. DEFERRED SUBMITTALS:
A. DEFERRED SUBMITTALS ARE REQUIRED FOR THE FOLLOWING ITEMS. THE CONTRACTOR SHALL
SUBMIT COPIES OF THESE ITEMS TO THE BUILDING DEPARTMENT AFTER REVIEW BY THE
ARCHITECT AND/OR ENGINEER OF RECORD:
a. PRE-ENGINEERED METAL STAIRS
b. EXTERIOR CLADDING
4. BUILDING CONSTRUCTION INFORMATION:
A. BUILDING CONSTRUCTION TYPE: TYPE 5-B
B. FIRE RESISTIVE RATINGS: 0 HOURS
ROOF CONSTRUCTION: 0 HOURS
FLOOR CONSTRUCTION: 0 HOURS
STRUCTURAL FRAME: 0 HOURS
C. COMPONENT FIRE RATING ASSEMBLIES:
01 - GENERAL REQUIREMENTS
ST
R
U
C
T
U
R
A
L
CO
M
P
O
N
E
N
T
OR
A
S
S
E
M
B
L
Y
DE
S
C
R
I
P
T
I
O
N
RE
Q
U
I
R
E
D
FI
R
E
R
A
T
I
N
G
MI
N
I
M
U
M
S
I
Z
E
O
R
TH
I
C
K
N
E
S
S
R
E
Q
'
D
.
PROVIDED
CONCRETE COVER
TO REINFORCING
UL
A
S
S
E
M
B
L
Y
NU
M
B
E
R
RE
S
T
R
A
I
N
E
D
/
UN
R
E
S
T
R
A
I
N
E
D
REMARKS
CO
N
C
R
E
T
E
TY
P
E
PR
E
S
T
R
E
S
S
E
D
ST
E
E
L
RE
I
N
F
O
R
C
I
N
G
MI
L
D
ST
E
E
L
RE
I
N
F
O
R
C
I
N
G
AC
T
U
A
L
S
I
Z
E
O
R
TH
I
C
K
N
E
S
S
PR
O
V
I
D
E
D
SCHEDULE OF FIRE PROTECTION PROVISIONS
FLOOR SLAB 2-HOUR N.W.4-1/2" 4-1/2"NA NA D916 RESTRAINED
1-3 HOURS NA NA NA NANANA
1-3 HOURS NA NA NA RESTRAINEDD916NANA
STRUCTURAL
FRAME
STEEL BEAMS,
GIRDERS, SPANDRELS
X701, X751
X752STEEL COLUMNS
STRUCTURAL
FRAME
SPRAY APPLIED FIRE RESISTIVE
MATERIALS (SEE NOTE BELOW)
SPRAY APPLIED FIRE RESISTIVE
MATERIALS (SEE NOTE BELOW)
NORMAL-WEIGHT
CONCRETE ON
COMPOSITE
STEEL DECK
G. DESCRIPTION OF LATERAL LOAD-RESISTING SYSTEM:
a. THE LATERAL LOAD-RESISTING ELEMENTS THAT PROVIDE LATERAL STRENGTH AND STABILITY
OF THE COMPLETED STRUCTURE ARE AS FOLLOWS:
1. WOOD FRAMED SHEAR WALLS
b. THE DIAPHRAGM ELEMENTS WITHIN THE LATERAL LOAD-RESISTING SYSTEM ARE AS FOLLOWS:
1. FLOOR CONCRETE SLABS ON STEEL DECK, INCLUDING THE CONNECTIONS OF THE STEEL
DECK AND CONCRETE SLAB TO THE LATERAL LOAD-RESISTING ELEMENTS.
2. ROOF WOOD SHEATHING, INCLUDING THE CONNECTIONS OF THE WOOD SHEATHING TO THE
LATERAL LOAD-RESISTING ELEMENTS.
3. DRAG STRUTS OF WOOD FRAMING OR STEEL REINFORCING AND ASSOCIATE CONNECTIONS.
4. HORIZONTAL WOOD DIAPHRAGM BRACING AND ASSOCIATED CONNECTIONS.
c. SEE DETAILS FOR SPECIAL ERECTION CONSIDERATIONS AND LATERAL LOAD-RESISTING
SYSTEM COMPONENTS NOT LISTED HERE.
d. TEMPORARY BRACING: DURING BUILDING ERECTION, THE ERECTOR SHALL DETERMINE,
FURNISH AND INSTALL ALL TEMPORARY SUPPORTS AND BRACING NECESSARY FOR LATERAL
STABILITY OF THE SUPERSTRUCTURE UNTIL THE LATERAL LOAD-RESISTING ELEMENTS AND
DIAPHRAGMS ARE IN PLACE AND ALL CONNECTIONS ARE COMPLETE.
6. DESIGN LOAD CRITERIA:
A. DEAD LOADS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
B. FLOOR LIVE LOADS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
C. ROOF LIVE LOADS . . . . . . . . . . . . . . . .
D. RISK CATEGORY (IBC 1604.5) . . . . . . . . . . . . . . . . . . . . . . . . . .
E. SNOW LOADS:
GROUND SNOW LOAD, Pg . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
FLAT ROOF SNOW LOAD, Pf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SNOW EXPOSURE FACTOR, Ce . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SNOW LOAD IMPORTANCE FACTOR, IS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
THERMAL FACTOR, Ct . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F. SEISMIC LOADS:
SEISMIC IMPORTANCE FACTOR, IE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
S1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SITE CLASS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SD1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SEISMIC DESIGN CATEGORY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
DESIGN SEISMIC FORCE RESISTING SYSTEM (S) . . . . . . . . . . . . .
DESIGN BASE SHEAR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SEISMIC RESPONSE COEFFICIENT, CS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
RESPONSE MODIFICATION FACTOR, R . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ANALYSIS PROCEDURE USED . . . . . . . . . . . . . . . . .
G. WIND LOADS:
ULTIMATE DESIGN WIND SPEED (3-SECOND GUST), Vult . . . . . . . . . . . . . . . . . . . . . .
NOMINAL DESIGN WIND SPEED (3-SECOND GUST), Vasd . . . . . . . . . . . . . . . . . . . . . .
WIND EXPOSURE CATEGORY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
INTERNAL PRESSURE COEFFICIENT . . . . . . . . . . . . . . . . . . . . . . . . . . .
COMPONENTS AND CLADDING WIND PRESSURES:
a. PRESSURE AND SUCTION VALUES:
02 - FOUNDATION CONSTRUCTION
5000 PSF
63 PSF
41 PSF
375 PSF
200 PSF
AS SHOWN ON PLANS
AS SHOWN ON PLANS
SEE SNOW AND WIND LOADS BELOW (20 PSF MINIMUM)
II - STANDARD OCCUPANCY
70 PSF
50 PSF
1.0
1.0
1.0
1.0
0.213
0.063
C
0.170
0.072
B
WOOD LIGHT FRAMED WALLS
SHEATHED w/WOOD SHEATHING
ORDINARY REINFORCED CONCRETE SHEAR WALLS
9.0 KIPS
0.035
4.0
EQUIVALENT LATERAL FORCE ANALYSIS
(ASCE-7 12.8)
175 MPH
138 MPH
C
± 0.18 (ENCLOSED)
LOCATION/
DESCRIPTION
ZONE
WIND SUCTION
WIND PRESSURE 28.5 PSF
ROOF AT
EDGES
ROOF NOT AT
EDGES/CORNERS
2
ROOF AT
CORNERS
3
WALLS NOT AT
CORNERS
4
WALLS AT
CORNERS
51
b. CANOPIES AND OVERHANGS: REFER TO ASCE 7 FOR DESIGN PROCEDURES TO DETERMINE
COMPONENT AND CLADDING WIND LOADING REQUIREMENTS.
I. SPECIAL LOAD REQUIREMENTS ARE DESCRIBED IN PLAN NOTES OR SPECIFIC LOCATIONS ON THE
CONTRACT DRAWINGS.
NOTES:
1. VALUES GIVEN ABOVE ARE FOR EFFECTIVE WIND AREAS OF 10 SQUARE FEET OR LESS. VALUES MAY
BE REDUCED FOR AREAS GREATER THAN 10 SQUARE FEET IN ACCORDANCE WITH PROCEDURES
GIVEN IN ASCE 7 "MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES".
2. VALUES GIVEN ABOVE WERE DETERMINED AT A MEAN ROOF HEIGHT OF 18.8 FT. WIND PRESSURE
VALUES MAY BE REDUCED FOR COMPONENTS AT LOWER ELEVATIONS IN ACCORDANCE WITH
PROCEDURES GIVEN IN ASCE 7 "MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES".
3. PRESSURE INDICATES LOAD ACTING TOWARDS SURFACES. SUCTION INDICATES LOAD ACTING AWAY
FROM SURFACES.
4. REFER TO ASCE 7 "MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES", TABLE 30.7-2,
FOR DEFINITION OF ZONES.
5. THE VALUES ABOVE DO NOT APPLY TO CHIMNEYS, TANKS, ROOFTOP EQUIPMENT, SIGNS OR OTHER
SIMILAR STRUCTURES.
6. CLADDING AND COMPONENTS SHALL BE DESIGNED FOR MAXIMUM PRESSURE AND SUCTION ACTING
INDEPENDENTLY.
1. FOUNDATION DESIGN CRITERIA:
A. GEOTECHNICAL REPORT: FOUNDATION DESIGN CRITERIA WAS TAKEN FROM RECOMMENDATIONS
SET FORTH IN GEOTECHNICAL REPORT NO. 1192076 BY EARTH ENGINEERING CONSULTANTS, LLC,
DATED SEPTEMBER 17, 2019.
a. ALLOWABLE SOIL BEARING PRESSURES USED FOR DESIGN:
ALLOWABLE SOIL BEARING PRESSURE . . . . . . . . . . . . . . . . . . . . . . . . . . . .
C. COEFFICIENT OF FRICTION RESISTING SLIDING EQUALS 0.50.
D. MINIMUM FROST DEPTH IS THREE FEET. BOTTOM OF FOOTINGS SHALL BE A MINIMUM OF FROST
DEPTH BELOW GRADE.
a. LATERAL EARTH PRESSURE FOR ON-SITE SOIL MATERIAL (DOES NOT INCLUDE HYDROSTATIC
OR SURCHARGE LOADS):
AT-REST CONDITION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ACTIVE CONDITION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PASSIVE CONDITION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F. MODULUS OF SUBGRADE REACTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2. FOOTINGS:
A. SPREAD FOOTINGS SHALL BEAR ON UNDISTURBED SOIL OR COMPACTED STRUCTURAL FILL GOOD
FOR A SAFE BEARING PRESSURE EQUAL TO OR GREATER THAN THE ALLOWABLE SOIL BEARING
PRESSURE GIVEN IN PARAGRAPH 1 ABOVE.
B. AREAS OF LOOSE OR SOFT SOIL MATERIAL ENCOUNTERED AT THE BOTTOM OF FOOTING
EXCAVATION SHALL BE REMOVED AND THE FOOTING EXTENDED TO MATERIAL WITH ADEQUATE
BEARING CAPACITY, OR, THE REMOVED MATERIAL SHALL BE REPLACED WITH NON-EXPANSIVE
STRUCTURAL FILL COMPACTED IN ACCORDANCE WITH PROJECT SPECIFICATIONS. REFER TO
PROJECT SPECIFICATIONS FOR DESCRIPTION OF ACCEPTABLE STRUCTURAL FILL MATERIAL.
C. MINIMUM ISOLATED FOOTING DIMENSION IS 3'-0. MINIMUM CONTINUOUS FOOTING WIDTH IS 2'-0.
MINIMUM FOOTING THICKNESS (ISOLATED OR CONTINUOUS) IS 1'-0.
D. EARTH CUTS SHALL NOT BE USED AS FORMWORK FOR FOOTINGS.
3. BUILDING PAD PREPARATION:
A. ALL EARTHWORK AND SITE PREPARATION SHALL BE PERFORMED IN ACCORDANCE WITH THE
PROJECT SPECIFICATIONS AND GEOTECHNICAL REPORT. ALL EXCAVATION AND BACKFILL
OPERATIONS SHALL BE OBSERVED AND APPROVED BY THE GEOTECHNICAL ENGINEER.
B. UNSUITABLE SOILS ENCOUNTERED AT THE BOTTOM OF THE SPECIFIED EXCAVATION SHALL BE
REMOVED AND REPLACED WITH STRUCTURAL FILL COMPACTED PER PARAGRAPH B ABOVE.
C. DO NOT EXCAVATE BELOW THE BOTTOM OF EXISTING FOOTINGS. EXCAVATIONS ADJACENT TO
EXISTING FOOTINGS SHALL BE OBSERVED AND APPROVED BY THE GEOTECHNICAL ENGINEER.
D. ROUGH GRADE TOP OF SUBGRADE TO +0",-1.5" TOLERANCE FROM SPECIFIED ELEVATION.
4. SLAB-ON-GRADE AND FOUNDATION CONSTRUCTION REQUIREMENTS
A. PROVIDE A GRANULAR SUB-BASE MATERIAL BELOW SLABS-ON-GRADE IN ACCORDANCE WITH THE
PLANS AND PROJECT SPECIFICATIONS. FINE GRADE TOP OF SUB-GRADE TO +0",-3/4" FROM
SPECIFIED ELEVATION.
B. VAPOR BARRIER: PROVIDE A VAPOR BARRIER ON TOP OF SUB-BASE AND DIRECTLY BELOW THE
SLAB-ON-GRADE AT FLOORS SCHEDULED TO BE FINISHED WITH WATER-SENSITIVE FINISHES.
REFER TO THE PROJECT SPECIFICATIONS FOR A DESCRIPTION OF THE VAPOR BARRIER MATERIAL.
C. ISOLATION JOINTS: PROVIDE 3/8"WIDE ISOLATION JOINT AT THE EDGES OF ALL SLABS-ON-GRADE
ABUTTING VERTICAL CONSTRUCTION (COLUMNS, WALLS, GRADE BEAMS, ETC.)
D. SLIP JOINTS: PROVIDE SLIP JOINTS AT THE TOP OF ALL PARTITION WALLS SUPPORTED BY THE
SLAB-ON-GRADE IN ACCORDANCE WITH THE GEOTECHNICAL REPORT.
E. PERIMETER DRAIN: PROVIDE A PERIMETER DRAIN AROUND THE BUILDING IN ACCORDANCE WITH
THE PROJECT SPECIFICATIONS AND GEOTECHNICAL REPORT. REFER TO CIVIL DRAWINGS FOR
ADDITIONAL INFORMATION. FOUNDATION WALLS HAVE NOT BEEN DESIGNED TO RESIST
HYDROSTATIC PRESSURE.
F1
F0
W1
W0
C1
C0
S0
S0
NW
NW
4,000FOUNDATIONS (WALLS, PILASTERS)
FOOTINGS
DESCRIPTION OF CONCRETE USE CONCRETE
TYPE
F0 W0 C1
DESCRIPTION OF CONCRETE
USE AND / OR EXPOSURE
FREEZE-THAW
(ACI 318, 19.3.1)
PERMEABILITY
(ACI 318, 19.3.1)
CHLORIDES
(ACI 318, 19.3.1)
SULFATES
(ACI 318, 19.3.1)
EXTERIOR EXPOSURE
(FLOORS, ROOFS)
28-DAY
COMPRESSIVE
STRENGTH (PSI)
NW 3,500INTERIOR SLABS-ON-GRADE
NW 3,500NORMAL WEIGHT TOPPING ON METAL DECK
NOTES:
1. NORMAL WEIGHT CONCRETE (NW): 145 PCF, STONE AGGREGATE.
2. LIGHT-WEIGHT CONCRETE (LW): 110 PCF, LIGHT-WEIGHT COARSE AGGREGATE.
FOUNDATIONS (FOOTINGS,
WALLS)
INTERIOR EXPOSURE
(ALL CONCRETE)
EXTERIOR EXPOSURE
(VERTICAL CONCRETE ONLY)
F2 W1 C1 S0
NOTES:
1. REFER TO ACI 318, CHAPTER 19 DEFINITION OF EXPOSURE CLASSIFICATIONS.
2. CONCRETE USED IN POST-TENSIONED CONCRETE IN ANY EXPOSURE CLASSIFICATION SHALL BE
LIMITED TO A CHLORIDE ION CONTENT OF 0.06% OR LESS (ACI 318, 19.3.2).
4,000
1. CAST-IN-PLACE CONCRETE:
A. ALL CONCRETE WORK INCLUDING FABRICATION AND PLACEMENT OF REINFORCING SHALL BE
PERFORMED IN ACCORDANCE WITH REQUIREMENTS GIVEN IN ACI 318 AND ACI 301 (REFERENCED
EDITIONS) EXCEPT AS MODIFIED BY THE PROJECT CONTRACT DOCUMENTS.
B. CONCRETE MIXES SHALL SATISFY THE REQUIREMENTS GIVEN IN THE PROJECT SPECIFICATIONS.
C. CONCRETE STRENGTH: CONCRETE MIXES USED ON THE PROJECT SHALL ATTAIN 28-DAY
COMPRESSIVE STRENGTHS AS FOLLOWS:
S0
03 - CONCRETE
D. DURABILITY REQUIREMENTS: CONCRETE MIXES USED ON THE PROJECT SHALL BE PROPORTIONED
TO SATISFY THE FOLLOWING DURABILITY REQUIREMENTS:
E. ALL CONCRETE IN CONTACT WITH ON-SITE SOILS SHALL CONTAIN TYPE I/II CEMENT.
F. ALL REINFORCING STEEL IN CONCRETE SHALL HAVE A MINIMUM YIELD STRENGTH OF 60,000 PSI
AND SHALL MEET THE REQUIREMENTS OF ASTM A615 OR ASTM A706. REINFORCING SHOWN AS
GRADE 75 SHALL HAVE A MINIMUM YIELD STRENGTH OF 75,000 PSI AND MEET THE REQUIREMENT
OF ASTM A615.
G. CONCRETE REINFORCING USED IN WELDED APPLICATIONS SHALL CONFORM TO ASTM A706 WITH A
MINIMUM YIELD STRENGTH OF 60,000 PSI.
H. MECHANICAL REINFORCING COUPLERS SHALL BE ZAP SCREWLOCK MANUFACTURED BY
BARSPLICE PRODUCTS, INC. (ICC REPORT ER-5461) OR APPROVED EQUIVALENT. COUPLERS SHALL
BE ZINC COATED WHERE USED IN PARKING STRUCTURES AND STRUCTURES CONTAINING LIQUIDS.
COUPLERS SHALL BE CAPABLE OF DEVELOPING 125% OF THE SPECIFIED YIELD STRENGTH OF THE
REINFORCING.
I. WELDED WIRE FABRIC SHALL BE SUPPLIED IN SHEETS ONLY AND SHALL MEET THE
REQUIREMENTS OF ASTM A185.
J. STEEL PLATES EMBEDDED IN CONCRETE SHALL CONFORM TO ASTM A36 UNLESS NOTED
OTHERWISE ON PLANS OR DETAILS. HEADED ANCHOR STUDS SHALL CONFORM TO ASTM A108,
60,000 PSI MINIMUM TENSILE STRENGTH. REINFORCING BARS WELDED TO PLATES SHALL
CONFORM TO ASTM A706, GRADE 60.
K. REINFORCING DETAILING:
a. ALL REINFORCING SHALL BE DETAILED IN ACCORDANCE WITH ACI 318 AND ACI 315 "DETAILS
AND DETAILING OF CONCRETE REINFORCEMENT".
b. CONCRETE COVER: UNLESS OTHERWISE SHOWN ON PLANS OR IN DETAILS, PROVIDE THE
FOLLOWING CONCRETE COVER TO REINFORCING:
i. AT ENDS WALLS AND GRADE BEAMS, TERMINATE TOP REINFORCING WITH STANDARD HOOKS
UNLESS SHOWN OTHERWISE ON PLANS OR DETAILS.
k. REINFORCING AROUND OPENINGS IN WALLS: UNLESS NOTED OTHERWISE ON PLAN OR IN
DETAILS, PROVIDE 2-#5 BARS (ONE BAR EACH FACE) AT EACH SIDE OF OPENING (CIRCULAR
OPENINGS SHALL BE CONSIDERED SQUARE WITH EQUIVALENT OPENING WIDTH EQUAL TO
DIAMETER OF CIRCULAR OPENING). EXTEND #5 BARS PAST EDGES OF OPENING A DISTANCE OF
24".
EXCEPTIONS:
RECTANGULAR OPENINGS WITH THE LARGEST OPENING DIMENSION LESS THAN 8" AND
CIRCULAR OPENINGS LESS THAN 8" IN DIAMETER DO NOT NEED ADDITIONAL REINFORCING AS
DESCRIBED ABOVE. MULTIPLE OPENINGS SHALL BE SPACED A MINIMUM OF 32" (CLEAR) APART
TO QUALIFY FOR THIS EXCEPTION.
WHERE UNIFORMLY SPACED WALL OR SLAB REINFORCING IS INTERRUPTED BY THE OPENING,
PROVIDE ADDITIONAL REINFORCING AT EACH EDGE EQUAL TO HALF THE AREA OF
INTERRUPTED REINFORCING. SIZE OF ADDITIONAL BARS AT EACH EDGE SHALL MATCH THE
SIZE OF INTERRUPTED REINFORCING. SPACE THE ADDITIONAL BARS AT 3" ON CENTER
STARTING 1" FROM THE SIDE OF THE OPENING AND EXTEND THE BARS PAST THE EDGES OF
THE OPENING THE LENGTH OF A CLASS 'B' SPLICE.
L. WELDING OF REINFORCING IS NOT ALLOWED UNLESS DETAILED OR AUTHORIZED BY THE
STRUCTURAL ENGINEER.
M. PLACING OF REINFORCING:
a. PROVIDE ALL ACCESSORIES NECESSARY TO SUPPORT REINFORCING AT POSITIONS SHOWN ON
PLANS AND TO MAINTAIN REQUIRED CONCRETE COVER.
b. PROVIDE ADDITIONAL BARS AND SUPPORTS AS NECESSARY TO SECURE REINFORCING IN
PLACE DURING CONCRETE PLACEMENT.
c. ALL STIRRUPS SHALL HAVE A #3 SPACER BAR AT ALL CORNERS OVER LENGTH OF STIRRUP
SPACING WHERE NO OTHER LONGITUDINAL REINFORCING BAR IS PRESENT.
d. WET-STABBING OF REINFORCING OR EMBEDS INTO PREVIOUSLY PLACED CONCRETE IS NOT
ALLOWED.
N. CONTROL JOINTS IN CONCRETE:
a. PROVIDE CONTROL JOINTS IN CONCRETE WALLS AT A MAXIMUM SPACING OF 30'-0 ON CENTER.
SEAL CONTROL JOINTS EXPOSED TO EARTH OR WEATHER WITH JOINT SEALANT.
b. PROVIDE CONTROL JOINTS IN SLABS-ON-GRADE AT A MAXIMUM SPACING OF 12'-0 ON CENTER
UNLESS OTHERWISE SHOWN ON PLAN OR IN DETAILS. COORDINATE JOINT LOCATIONS WITH
FLOOR FINISHES AND LOCATE JOINTS AT COLUMN CENTERLINES, AT ENDS AND CORNERS OF
WALLS, RE-ENTRANT CORNERS AND LOCATIONS PRONE TO CRACKING WHERE POSSIBLE.
CONTRACTOR SHALL SUBMIT A PLAN LOCATING CONTROL JOINTS TO ARCHITECT FOR REVIEW
AND APPROVAL PRIOR TO PROCEEDING WITH THE WORK.
O. CONSTRUCTION JOINTS:
a. LOCATE CONSTRUCTION JOINTS AT CONTROL JOINT LOCATIONS WHERE POSSIBLE. MAINTAIN
REQUIRED CONCRETE COVER.
b. SLABS, BEAMS, AND JOISTS SHALL NOT HAVE CONSTRUCTION JOINTS IN A HORIZONTAL PLANE.
ANY STOP IN CONCRETE WORK MUST BE MADE AT THIRD POINT OF SPAN WITH VERTICAL
BULKHEADS AND HORIZONTAL KEYS, UNLESS OTHERWISE SHOWN. ALL CONSTRUCTION JOINTS
SHALL BE AS DETAILED OR APPROVED BY THE STRUCTURAL ENGINEER.
c. FOR CONCRETE POURED ON METAL DECK, LOCATE CONSTRUCTION JOINTS FIVE FEET FROM
THE CENTERLINE OF PARALLEL STEEL BEAMS OR GIRDERS, OR, HALFWAY BETWEEN
ADJACENT BEAMS, WHICH EVER IS LESS.
d. ALL REINFORCING SHALL BE CONTINUOUS THROUGH CONSTRUCTION JOINTS, OR, PROVIDE
DOWEL BAR SPLICERS CAPABLE OF DEVELOPING THE STRENGTH OF THE REINFORCING. LAP
SPLICE DOWEL BAR EXTENSION AND DOWEL BAR SPLICER TO REINFORCING USING CLASS 'B'
LAP SPLICES.
P. CONCRETE TOLERANCES: TOLERANCES SHALL CONFORM TO REQUIREMENTS GIVEN IN ACI 117
AND THE FOLLOWING ADDITIONAL REQUIREMENTS:
a. ALIGNMENT OF WALLS AND COLUMNS:
1. FOR HEIGHTS 100 FEET OR LESS ADJACENT TO STONE OR BRICK VENEER. +0.50" OR -0.50"
FROM THEORETICAL PLAN LOCATION.
2. ALIGNMENT DIFFERENCE BETWEEN ADJACENT STORIES SHALL NOT EXCEED 0.50".
b. ALIGNMENT OF WALLS SUPPORTING STRUCTURAL STEEL:
1. FOR HEIGHTS 100 FEET OR LESS: ± 0.75" FROM THEORETICAL PLAN LOCATION.
c. LATERAL ALIGNMENT
1. EDGES OF SLABS AND BEAMS SUPPORTING STRUCTURAL STEEL OR PRECAST FRAMING: +
0.75, -1.00"
d. LEVEL ALIGNMENT:
1. ELEVATION OF TOP OF SLABS POURED ON METAL DECK.
• AT COLUMNS, WALLS AND OTHER VERTICAL SUPPORTS: +0.75", -0.75" FROM SPECIFIED
ELEVATION.
• OVER FLOOR FRAMING: SET SCREEDS AND ADJUST AS REQUIRED TO ACHIEVE
SPECIFIED UNIFORM SLAB THICKNESS OVER BEAMS, ALLOWING FOR BEAM CAMBER AND
DEFLECTION. ADDITIONAL SLAB THICKNESS BETWEEN BEAMS DUE TO DEFLECTION OF
METAL DECK IS ACCEPTABLE.
Q. CONCRETE PLACEMENT:
a. CONSOLIDATE ALL CONCRETE DURING PLACEMENT AND THOROUGHLY WORK AROUND
REINFORCING AND EMBEDDED ITEMS AND INTO CORNERS OF FORMS FOLLOWING ACI
RECOMMENDATIONS.
R.WHEN CONCRETE PLACEMENT IS INTERRUPTED, NOTIFY THE STRUCTURAL ENGINEER FOR
RECOMMENDATIONS. UNLESS DIRECTED OTHERWISE, PROVIDE A CONSTRUCTION JOINT BY
ROUGHENING THE CONCRETE SURFACE TO AN AMPLITUDE OF 1/4". COAT THE JOINT SURFACE
WITH SPECIFIED BONDING AGENT PRIOR TO POURING THE CONCRETE.
CONCRETE COVER
REINFORCEMENT LOCATION COVER (IN)
CONCRETE CAST AGAINST EARTH & PERMINENTLY EXPOSED TO EARTH
CONCRETE EXPOSED TO EARTH OR WEATHER:
- NO. 6 THROUGH NO. 18 BARS
- NO. 5 BAR, W31 OR D31 WIRE AND SMALLER
3
CONCRETE WALLS NOT EXPOSED TO WEATHER OR IN CONTACT WITH
GROUND:
- NO. 14 AND NO. 18 BARS
- NO. 11 BAR AND SMALLER
2
1 1/2
1 1/2
3/4
c. SPLICES OF REINFORCING BARS ARE PERMITTED ONLY AS DETAILED OR AUTHORIZED BY THE
STRUCTURAL ENGINEER. LAP SPLICES, WHERE PERMITTED, SHALL BE CLASS 'B' LAP SPLICES
UNLESS NOTED OTHERWISE.
d. REINFORCING WALLS NOTED AS CONTINUOUS SHALL BE LAP SPLICED WITH CLASS 'B' LAP
SPLICES AS FOLLOWS:
1. TOP REINFORCING BARS - AT MIDSPAN
2. BOTTOM REINFORCING BARS - OVER SUPPORTS
e. SPLICE WIRE FABRIC REINFORCING BY LAP SPLICING ONE FULL MESH PLUS 2" AT SIDE AND
END LAPS, BUT NOT LESS THAN 6" . LAP SPLICES SHALL BE WIRE TIED.
f. MAKE ALL REINFORCING BARS CONTINUOUS AROUND CORNERS OR PROVIDE CORNER BARS
OF EQUAL SIZE AND SPACING. SEE DETAILS FOR REINFORCING AT WALL INTERSECTIONS AND
CORNERS. SPLICE CORNER BARS WITH CLASS 'B' LAP SPLICES UNLESS SHOWN OTHERWISE.
g. AT LOCATIONS WHERE ALL REINFORCING WITHIN A STRUCTURAL ELEMENT WILL BE SPLICED,
THE SPLICES MUST BE STAGGERED UNLESS SHOWN OTHERWISE IN DETAILS OR SCHEDULES.
OTHERWISE, STAGGER ADJACENT SPLICES WHERE POSSIBLE.
h. REINFORCING BAR DEVELOPMENT AND LAP SPLICE LENGTHS: REFER TO DEVELOPMENT
LENGTH AND LAP SPLICE SCHEDULE SHOWN BELOW FOR MINIMUM SPLICE AND DEVELOPMENT
LENGTHS TO BE USED FOR DETAILING.
DEVELOPMENT AND SPLICE LENGTHS (IN.)
CONCRETE COVER = 0.75 IN.
BAR SIZE
CONCRETE STRENGTH = 3500 PSI CONCRETE STRENGTH = 4000 PSI
CLASS 'A'/
DEVELOPMENT LENGTH CLASS 'B'CLASS 'A'/
DEVELOPMENT LENGTH CLASS 'B'
TOP BAR OTHER TOP BAR OTHER TOP BAR OTHER TOP BAR OTHER
No. 3 12 12 16 16 12 12 16 16
No. 4 20 15 26 20 18 14 24 18
No. 5 29 22 38 29 27 21 35 27
No. 6 40 30 51 40 37 28 48 37
No. 7 64 49 83 64 60 46 78 60
No. 8 79 61 103 79 74 57 96 74
No. 9 96 74 124 96 90 69 116 90
No. 10 115 89 150 115 108 83 140 108
No. 11 135 104 176 135 126 97 164 126
No. 14 178 137 231 178 166 128 216 166
Bar Size
CONCRETE STRENGTH = 5000 PSI CONCRETE STRENGTH = 6000 PSI
TOP BAR OTHER TOP BAR OTHER TOP BAR OTHER TOP BAR OTHER
No. 3 12 12 16 16 12 12 16 16
No. 4 17 13 22 17 15 12 20 16
No. 5 24 19 32 24 22 17 29 22
No. 6 33 25 43 33 30 23 39 30
No. 7 53 41 69 53 49 37 63 49
No. 8 66 51 86 66 60 46 79 60
No. 9 80 62 104 80 73 56 95 73
No. 10 96 74 125 96 88 68 114 88
No. 11 113 87 147 113 103 79 134 103
No. 14 149 114 193 149 136 104 176 136
CONCRETE COVER = 1.50 IN.
BAR SIZE
CONCRETE STRENGTH = 3500 PSI CONCRETE STRENGTH = 4000 PSI
TOP BAR OTHER TOP BAR OTHER TOP BAR OTHER TOP BAR OTHER
No. 3 12 12 16 16 12 12 16 16
No. 4 16 12 21 16 15 12 19 16
No. 5 20 15 26 20 18 14 24 18
No. 6 24 18 31 24 22 17 29 22
No. 7 39 30 51 39 37 28 48 37
No. 8 49 38 64 49 46 36 60 46
No. 9 61 47 79 61 57 44 74 57
No. 10 75 57 97 75 70 54 91 70
No. 11 89 69 116 89 83 64 108 83
No. 14 121 93 157 121 113 87 147 113
Bar Size
CONCRETE STRENGTH = 5000 PSI CONCRETE STRENGTH = 6000 PSI
TOP BAR OTHER TOP BAR OTHER TOP BAR OTHER TOP BAR OTHER
No. 3 12 12 16 16 12 12 16 16
No. 4 13 12 17 16 12 12 16 16
No. 5 17 13 22 17 15 12 20 16
No. 6 20 15 26 20 18 14 24 18
No. 7 33 25 42 33 30 23 39 30
No. 8 41 32 54 41 38 29 49 38
No. 9 51 39 66 51 47 36 61 47
No. 10 63 48 81 63 57 44 74 57
No. 11 75 57 97 75 68 52 89 68
No. 14 101 78 131 101 92 71 120 92
NOTES:
1. LENGTHS SHOWN ARE SPLICE/DEVELOPMENT LENGTHS IN INCHES FOR UNCOATED BARS IN NORMAL
WEIGHT CONCRETE PER ACI 318-14. REINFORCE BAR YIELD STRENGTH, FY = 60KSI.
2. FOR LIGHTWEIGHT CONCRETE, DIVIDE LENGTH BY FACTOR PER ACI 318-14 TBL 25.4.2.4.
3. FOR EPOXY COATED BARS, MULTIPLY LENGTH BY FACTOR PER ACI 318-14 TBL 25.4.2.4.
4. IN THE CALCULATION OF CB, CONCRETE COVER IS ASSUMED TO CONTROL. IF THE BAR CENTER-TO-
CENTER SPACING IS LESS THAN 1.0*DB + 2*COVER, LENGTHS NEED TO BE CALCULATED SEPARATELY
PER ACI 318-14 §25.4.2.
5. TOP BARS ARE ANY HORIZONTAL BAR WITH MORE THAN 12" OF FRESH CONCRETE PLACED BELOW IT.
6. FOR GRADE 75 AND GRADE 80 REINFORCING BARS, MULTIPLY LENGTH BY 1.25 AND 1.33,
RESPECTIVELY.
7. VALUES IN TABLE ARE VALID FOR SINGLE BARS AND BUNDLES OF TWO. FOR BUNDLES OF THREE OR
MORE, BARS ARE TO BE PLACED AND DEVELOPED PER ACI 318-14 §25.6.
8. MECHANICAL COUPLERS MAY BE SUBSTITUTED FOR TENSION LAP SPLICED BARS PROVIDED THAT
THEY MEET THE REQUIREMENTS OF ACI 318-14 §25.5.7.
CLASS 'A'/
DEVELOPMENT LENGTH CLASS 'B'CLASS 'A'/
DEVELOPMENT LENGTH CLASS 'B'
CLASS 'A'/
DEVELOPMENT LENGTH CLASS 'B'CLASS 'A'/
DEVELOPMENT LENGTH CLASS 'B'
CLASS 'A'/
DEVELOPMENT LENGTH CLASS 'B'CLASS 'A'/
DEVELOPMENT LENGTH CLASS 'B'
HOOKED BAR DEVELOPMENT LENGTHS (IN.)
BAR
SIZE
CONCRETE STRENGTH (PSI)
3500 4000 5000 6000
No. 3 8 7 6 6
No. 4 10 9 8 8
No. 5 13 12 11 10
No. 6 15 14 13 12
No. 7 18 17 15 14
No. 8 20 19 17 15
No. 9 23 21 19 17
No. 10 26 24 22 20
No. 11 29 27 24 22
No. 14 34 32 29 26
NOTES:
1. LENGTHS SHOWN ARE HOOKED BAR DEVOLPMENT LENGTHS (Ldh)
IN INCHES FOR UNCOATED BARS IN NORMAL WEIGHT CONCRETE
PER ACI 318-14.REINFORCE BAR YIELD STRENGTH, FY = 60KSI.
2. HOOKS SHALL BE PLACED SUCH THAT THE BACK SIDE OF THE HOOK
IS AT THE FAR SIDE OF THE JOINT OR CONCRETE SECTION WHILE
MAINTAINING MINIMUM CONCRETE COVERS.
3. FOR LIGHTWEIGHT CONCRETE, DIVIDE LENGTH BY FACTOR
PER ACI 318-14 TBL 25.4.3.2..
4. FOR EPOXY COATED BARS, MULTIPLY LENGTH BY FACTOR
PER ACI 318-14 TBL 25.4.3.2.
28.5 PSF 28.5 PSF 64.2 PSF 64.2 PSF
70.2 PSF 117.7 PSF 177.2 PSF 70.2 PSF 85.6 PSF
NW 4.000EXTERIOR WALLS
1. CONCRETE MASONRY UNITS
A. ALL CONCRETE MASONRY WORK INCLUDING FABRICATION AND PLACEMENT OF REINFORCING
SHALL BE PERFORMED IN ACCORDANCE WITH REQUIREMENTS GIVEN IN ACI 530 AND ACI 530.1
(REFERENCED EDITIONS) EXCEPT AS MODIFIED BY THE PROJECT CONTRACT DOCUMENTS.
B. MASONRY BLOCK UNITS SHALL CONFORM TO ASTM C90 (LIGHTWEIGHT BLOCK).
C. MORTAR USED IN MASONRY CONSTRUCTION SHALL CONFORM TO ASTM C270 AS FOLLOWS:
a. EXTERIOR WALLS AND INTERIOR BEARING WALLS: TYPE S
b. FOUNDATION WALLS AND WALLS EXPOSED TO EARTH: TYPE M
c. INTERIOR, NON-BEARING WALLS: TYPE O (OR TYPE S)
D. GROUT USED IN MASONRY CONSTRUCTION SHALL CONFORM TO ASTM C476 AND SHALL DEVELOP
3,000 PSI (MINIMUM) COMPRESSIVE STRENGTH IN 28-DAYS WHEN TESTED IN ACCORDANCE WITH
C1019.
E. MASONRY SHALL DEVELOP 1,500 PSI (MINIMUM) COMPRESSIVE STRENGTH (f'm) IN 28 DAYS WHEN
TESTED IN ACCORDANCE WITH PROJECT SPECIFICATIONS.
F. ALL REINFORCING STEEL SHALL HAVE A MINIMUM YIELD STRENGTH OF 60,000 PSI AND SHALL MEET
THE REQUIREMENTS OF ASTM A615 OR ASTM A706.
G. REINFORCING USED IN WELDED APPLICATIONS SHALL CONFORM TO ASTM A706 WITH A MINIMUM
YIELD STRENGTH OF 60,000 PSI.
H. HORIZONTAL JOINT REINFORCING SHALL CONFORM TO ASTM A951 (LADDER-TYPE) WITH CROSS
WIRES AT 16" ON CENTER. SIDE RODS SHALL BE #9 SIZE AND SHALL CONFORM TO ASTM A82.
I. STEEL PLATES EMBEDDED IN GROUTED MASONRY SHALL CONFORM TO ASTM A36 UNLESS NOTED
OTHERWISE ON PLANS OR DETAILS. HEADED ANCHOR STUDS SHALL CONFORM TO ASTM A108,
60,000 PSI MINIMUM TENSILE STRENGTH. REINFORCING BARS WELDED TO PLATES SHALL
CONFORM TO ASTM A706, GRADE 60.
J. REINFORCING DETAILING:
a. ALL REINFORCING SHALL BE DETAILED IN ACCORDANCE WITH ACI 530 AND ACI 530.1.
b. VERTICAL REINFORCING SHALL EXTEND THE FULL HEIGHT OF THE WALL AND SHALL BE
GROUTED IN PLACE.
c. CONTINUOUS REINFORCING MAY BE SPLICED AS REQUIRED USING BARS OF LONGEST
PRACTICAL LENGTH. HORIZONTAL REINFORCING SHALL BE CONTINUOUS AROUND WALL
CORNERS AND INTERSECTIONS.
d. WHERE REQUIRED, REINFORCING SPLICES SHALL BE SHOWN ON REINFORCING SHOP
DRAWINGS AND SHALL CONFORM TO THE FOLLOWING SCHEDULE:
04 - MASONRY
MASONRY LAP SPLICE SCHEDULE
BAR CENTERED IN CELL
6" BLOCKBAR SIZE 8" BLOCK 10" AND 12"
BLOCK ALL BLOCK SIZES
BAR AT EDGE OF CELL
32
24
48
40
56
NOTES:
1. VALUES APPLY ONLY FOR MASONRY COMPRESSIVE STRENGTH (f'm) OF
1,500 PSI.
2. LAP LENGTHS IN TABLE ABOVE ARE GIVEN IN INCHES.
3. VALUES ONLY APPLY WHEN A SINGLE BAR IS WITHIN CELL.
4. PROVIDE MECHANICAL SPLICES FOR #8 BARS AND LARGER.
7
6
4
5
3
e. VERTICAL REINFORCING SHALL BE DOWELED INTO FOUNDATION OR SLAB SUPPORTING
MASONRY. PROVIDE DOWELS OF ADEQUATE LENGTH FOR DEVELOPMENT LENGTH INTO
FOUNDATION AND LAP SPLICE PROJECTION ABOVE. FOR MASONRY SUPPORTED ON SLABS,
PROVIDE DOWELS EMBEDDED INTO SLAB WITH STANDARD HOOKS. DOWEL SIZE AND SPACING
SHALL MATCH VERTICAL REINFORCING.
K. MINIMUM WALL REINFORCING:
a. REINFORCE MASONRY WALLS AS SHOWN ON THE DRAWINGS. WHERE NOT SHOWN, REINFORCE
WALLS (INCLUDING PARTITION WALLS) WITH #5 VERTICAL BARS AT 48" ON CENTER MAXIMUM
SPACING.
b. PROVIDE 1-#5 BAR AT ALL CORNERS, ENDS OF WALLS, EACH SIDE OF OPENINGS AND EACH
SIDE OF CONTROL JOINTS.
c. PROVIDE HORIZONTAL JOINT LADDER-TYPE REINFORCING AT 16" ON CENTER UNLESS NOTED
OTHERWISE ON DRAWINGS. PROVIDE PREFABRICATED JOINT REINFORCING ASSEMBLIES FOR
CORNERS AND INTERSECTIONS. LAP SPLICE JOINT REINFORCING 8" KEEPING CELL OPENING
CLEAR OF CROSS WIRES.
d. PROVIDE ADDITIONAL HORIZONTAL JOINT REINFORCING IN BED JOINT ONE MASONRY COURSE
ABOVE OPENINGS. EXTEND JOINT REINFORCING A MINIMUM OF 2'-6" PAST EDGE OF OPENINGS.
e. PROVIDE BOND BEAMS IN MASONRY WALLS AS SHOWN ON THE DRAWINGS. WHERE NOT
SHOWN, PROVIDE BOND BEAMS WITH 2-#5 BARS AS FOLLOWS:
1. AT TOP COURSE OF PARAPETS,
2. IN ONE OF THE UPPER THREE COURSES OF ALL WALLS,
3. UNLESS SHOWN OTHERWISE IN LINTEL SCHEDULE, OVER THE TOP OF ALL OPENINGS
GREATER THAN 24" WIDE, EXTENDING 2'-6" PAST EDGE OF OPENING.
L. OPENINGS IN WALLS:
a. REFER TO ARCHITECTURAL, MECHANICAL AND PLUMBING DRAWINGS FOR LOCATIONS OF
OPENINGS THROUGH MASONRY WALLS. PROVIDE LOOSE LINTEL OR BOND BEAM OVER TOP OF
OPENINGS GREATER THAN 24" WIDE.
M. REINFORCING PLACEMENT:
a. ALL REINFORCING SHALL HAVE A MINIMUM GROUT COVER OF ONE BAR DIAMETER.
b. BARS CENTERED IN CELLS SHALL BE HELD SECURELY IN PLACE. BARS NOTED AS "EACH FACE"
SHALL BE SECURED IN PLACE AT 4'-0" ON CENTER (VERTICAL) USING PREFABRICATED REBAR
POSITIONERS.
N. CONTROL JOINTS:
a. UNLESS SHOWN OTHERWISE ON STRUCTURAL OR ARCHITECTURAL DRAWINGS, PROVIDE
CONTROL JOINTS AT A MAXIMUM SPACING OF 30'-0" ON CENTER IN EXTERIOR WALLS AND 40'-0
ON CENTER IN INTERIOR WALLS.
O. GROUTING:
a. FILL ALL BLOCK CELLS CONTAINING REINFORCING WITH GROUT.
b. FILL ALL VOIDS AND CELLS WITH GROUT FOR A DISTANCE OF 24" BELOW AND 16" EACH SIDE OF
ALL BEAM AND LINTEL REACTIONS OR OTHER CONCENTRATED LOADS UNLESS SHOWN
OTHERWISE.
c. FILL ALL VOIDS AND CELLS OF MASONRY BLOCK SUPPORTING SLABS OR STEEL DECK FOR A
DISTANCE OF 8" BELOW BEARING ELEVATION.
d. UNLESS SHOWN OTHERWISE IN DETAILS, GROUT CELLS CONTAINING ANCHORS OR
EMBEDMENTS PLUS ADJACENT CELLS BELOW, ABOVE AND EACH SIDE.
e. FILL ALL CELLS BELOW GRADE WITH GROUT.
f. FILL ALL CELLS ABOVE ROOF LEVEL WITH GROUT AT PARAPETS.
g. WHERE A CHANGE IN WALL THICKNESS OCCURS, GROUT THE TOP COURSE OF THE THICKER
WALL.
h. GROUT BEAM AND JOIST POCKETS WHERE REQUIRED TO MAINTAIN FIRE RATING OF WALL.
P. SLIP JOINTS: PROVIDE SLIP JOINTS AT THE TOP OF ALL NON-LOAD BEARING WALLS. UNLESS
SHOWN OTHERWISE ON DRAWINGS, BRACE TOP OF WALLS TO STRUCTURE ABOVE USING L4x4x1/4"
BY 12" LONG EACH SIDE OF WALL AT 8'-0" ON CENTER. ATTACH ANGLES DIRECTLY TO FRAMING
ABOVE, OR USE L3x3x1/4" ANGLE FRAMING AS HANGERS AND KICKERS AS REQUIRED TO SUSPEND
L4x4x1/4" FROM FRAMING ABOVE.
Q. MAINTAIN SUPPORT OF MASONRY LINTELS FOR A MINIMUM OF SEVEN DAYS OR UNTIL MASONRY
HAS REACHED STRENGTH SUFFICIENT TO SAFELY SUPPORT IMPOSED LOADS.
R. MASONRY WALL CONSTRUCTION SHALL BE RUNNING BOND UNLESS NOTED OTHERWISE ON THE
DRAWINGS.
2. ANCHORED VENEER:
A. UNLESS NOTED OTHERWISE ON THE ARCHITECTURAL DRAWINGS OR PROJECT SPECIFICATIONS,
ANCHOR BRICK OR STONE VENEER TO BACKING AS DESCRIBED IN THE FOLLOWING PARAGRAPHS.
B. ANCHORS: VENEER ANCHORS SHALL BE ADJUSTABLE, TWO-PIECE ANCHORS WITH A MINIMUM W1.7
WIRE SIZE. SUBMIT ANCHOR INFORMATION TO ARCHITECT FOR REVIEW AND APPROVAL.
C. ANCHOR SPACING: LOCATE ANCHORS AT THE FOLLOWING MAXIMUM SPACING:
a. UNLESS OTHERWISE DIRECTED BY THE FOLLOWING PARAGRAPHS, LOCATE ANCHORS AT 24"
ON CENTER VERTICAL AND 16" ON CENTER HORIZONTAL MAXIMUM SPACING.
b. FOR SEISMIC DESIGN CATEGORIES D, E AND F: LOCATE ANCHORS AT 16" ON CENTER
VERTICALLY AND 16" ON CENTER HORIZONTALLY MAXIMUM SPACING.
c. REFER TO SECTION 01-GENERAL REQUIREMENTS, PARAGRAPH 6.F IN THE GENERAL NOTES
FOR SEISMIC DESIGN CATEGORY.
D. BACKING SUPPORT OF VENEER: COLD-FORMED FRAMING USED AS BACKING FOR ANCHORED
VENEER SHALL BE 18 GAGE MINIMUM, GALVANIZED, SPACED AT 16" ON CENTER. SCREWS USED
TO FASTEN ANCHORS TO STUDS SHALL HAVE A MINIMUM SHANK DIAMETER OF 0.190".
E. RELIEF ANGLE SUPPORTS: UNLESS SHOWN OTHERWISE ON THE DRAWINGS, STEEL RELIEF
ANGLES SHALL BE GALVANIZED AND HAVE A MINIMUM LEG THICKNESS OF 3/8". PROVIDE A
MINIMUM CLEAR GAP OF 3/8" BETWEEN BOTTOM OF ANGLE AND TOP OF VENEER BELOW.
32
24
48
40
56
32
24
48
40
56
32
24
48
40
56
4. POST-INSTALLED ANCHORS INTO CONCRETE:
A. PROVIDE POST-INSTALLED, CONCRETE ANCHORS AS SHOWN IN THE CONTRACT DOCUMENTS AND
IN THE SPECIFICATIONS.
B. ANCHORS SUPPORTING FIRE-RESISTANCE RATED FRAMING (FIRE-PROOFED STRUCTURAL
FRAMING), SHALL BE ONE OF THE FOLLOWING AS INDICATED ON PLANS AND DETAILS:
a. HILTI HDA UNDERCUT OR KWIK BOLT TZ ANCHORS
b. SIMPSON TORQ-CUT OR STRONG-BOLT 2 ANCHORS
c. POWERS ATOMIC+ UNDERCUT OR POWER-STUD+ SD1
d. RED HEAD TRUBOLT+ WEDGE ANCHOR BY ITW
ANCHOR INSTALLATION SHALL BE INSPECTED IN ACCORDANCE WITH THE REQUIREMENTS FOR
SPECIAL INSPECTIONS DESCRIBED IN PARAGRAPH 2, SECTION 01-GENERAL REQUIREMENTS IN
THE GENERAL NOTES AND SHALL BE PROTECTED WITH CEMENTITIOUS SPRAY-APPLIED FIRE
PROOFING IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
C. ANCHORS SUPPORTING NON-FIREPROOFED STRUCTURAL FRAMING SHALL BE ONE OF THE
FOLLOWING AS INDICATED ON PLANS AND DETAILS:
a. HILTI HDA UNDERCUT OR KWIK BOLT TZ ANCHORS
b. SIMPSON TORQ-CUT OR STRONG-BOLT 2 ANCHORS
c. POWERS ATOMIC+ UNDERCUT OR POWER-STUD+ SD1
d. RED HEAD TRUBOLT+ WEDGE ANCHOR BY ITW
ANCHOR ISTALLATION SHALL BE INSPECTED IN ACCORDANCE WITH THE REQUIREMENTS FOR
SPECIAL INSPECTIONS DESCRIBED IN PARAGRAPH 2, SECTION 01-GENERAL REQUIREMENTS IN
THE GENERAL NOTES.
D. ANCHORS SUPPORTING MISCELLANEOUS FRAMING SHALL BE AS SHOWN IN THE PLANS AND
DETAILS. IF NOT OTHERWISE SPECIFIED, THE ANCHORS SHALL BE ONE OF THE FOLLOWING:
a. HILTI KWIK BOLT TZ
b. SIMPSON STRONG-BOLT 2
c. POWERS POWER-STUD+ SD1
d. RED HEAD TRUBOLT+ WEDGE ANCHOR BY ITW
E. ANCHORS SUPPORTING ARCHITECTURAL COMPONENTS, ELECTRICAL AND MECHANICAL
EQUIPMENT SHALL BE ONE OF THE FOLLOWING AS INDICATED ON PLANS AND DETAILS:
a. HILTI HDI
b. SIMPSON DROP-IN
c. POWERS STEEL DROP-IN
d. RED HEAD MULTI-SET II DROP IN.
F. ANCHORS ATTACHING LIGHT-GAGE STEEL FRAMING TO CONCRETE SHALL BE ONE OF THE
FOLLOWING AS INDICATED ON PLANS AND DETAILS:
a. HILTI LOW-VELOCITY X-U UNIVERSAL POWDER DRIVEN TRACK FASTENERS
b. SIMPSON PDPA POWDER DRIVEN FASTENERS
c. POWERS POWDER ACTUATED FASTENERS
d. RAMSET TRUE EMBEDMENT (TE) POWER DRIVEN FASTENER
G. PRIOR TO ANCHOR INSTALLATION, LOCATE EXISTING REINFORCING WITHIN CONCRETE
SUBSTRATE. DO NOT DAMAGE EXISTING REINFORCING DURING INSTALLATION. CONTACT THE
STRUCTURAL ENGINEER IF ANCHOR LOCATION CONFLICTS WITH EXISTING REINFORCING.
H. PRODUCT SUBSTITUTION: THE CONTRACTOR MAY SUBMIT ALTERNATE ANCHORS FOR REVIEW
AND APPROVAL PROVIDED THE ACCOMPANYING PRODUCT DATA IS SATISFACTORY TO THE
ENGINEER FOR COMPARISION TO THE SPECIFIED ANCHORS.
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
3/
2
0
/
2
0
2
0
1
2
:
4
5
:
1
7
P
M
S-001
STRUCTURAL
GENERAL NOTES
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
3/26/2020
159
06 - WOOD
1.GENERAL:
A. FOUNDATION PLATES OR SILLS SHALL BE BOLTED TO THE FOUNDATION WITH NOT LESS THAN 5/8”
DIA. “L” BOLTS EMBEDDED AT LEAST 7” INTO THE CONCRETE AND SPACED NOT MORE THAN 4’-0”
O.C. UNLESS NOTED OTHERWISE. PROVIDE A MINIMUM OF TWO BOLTS PER WALL SEGMENT
LOCATED WITHIN 12” OF EACH END OF THE WALL. BOLTS SHALL BE ASTM F1554 GRADE 36.
B. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE PRESSURE TREATED.
C. ALL WOOD, INCLUDING WOOD SHEATHING, LESS THAN 8” FROM EXPOSED EARTH SHALL BE
PRESSURE TREATED.
D. ALL LAG BOLTS SHALL HAVE LEAD HOLES DRILLED THE SAME DIAMETER FOR THE SHANK AND 50%
OF THE SHANK DIAMETER FOR THE THREADED PORTION. LUBRICATE THREADS BEFORE
INSTALLATION.
E. DOUBLE TOP PLATES SHALL HAVE A MINIMUM LAP LENGTH OF 4’-0” FASTEN WITH 2 ROWS OF 16d
NAILS AT 6” O.C. UNLESS INDICATED OTHERWISE.
F. PROVIDE DOUBLE JOISTS UNDER ALL PARTITIONS RUNNING PARALLEL TO JOISTS AND SOLID
BLOCKING BETWEEN JOISTS UNDER ALL PARTITIONS RUNNING PERPENDICULAR TO JOISTS.
G. ALL POSTS, MULTIPLE STUDS, AND COLUMNS AT UPPER LEVELS SHALL HAVE MATCHING AND
ALIGNED POSTS, MULTIPLE STUDS, AND COLUMNS AT EACH LEVEL OF FRAMING BELOW, UNLESS
NOTED OTHERWISE. TIGHT FITTING, SOLID BLOCKING SHALL BE PROVIDED BETWEEN LEVELS
UNDER ALL SUCH POSTS, MULTIPLE STUDS AND COLUMNS.
H. ALL POSTS, MULTIPLE STUDS, AND COLUMNS SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE
CONTINUOUS UNLESS NOTED OTHERWISE.
I. FRAMING SHALL NOT BE NOTCHED, CORED, OR OTHERWISE CUT OR REDUCED IN SIZE UNLESS
SPECIFICALLY DETAILED OR APPROVED.
J. NAILING REQUIREMENTS NOT SPECIFIED ON THE DRAWINGS SHALL BE IN ACCORDANCE WITH THE
FASTENING SCHEDULE, TABLE 2304.9.1 IN THE IBC.
K. 2” MINIMUM CLEARANCE FROM FRAMING MATERIALS TO MASONRY AT ALL TRUE MASONRY FLUES.
L. FASTENERS IN PRESSURE TREATED & FIRE RETARDENT-TREATED WOOD SHALL BE HOT DIPPED
ZINC-COATED GALVANIZED OR STAINLESS STELL PER IBC 2304.9.5.
2. DIMENSIONAL LUMBER:
A. ALL STRUCTURAL FRAMING LUMBER SHALL BE VISUALLY-GRADED, DOUGLAS FIR – LARCH SPECIES
MARKED BY A LUMBER GRADING OR INSPECTION AGENCY THAT HAS BEEN APPROVED BY AN
ACCREDITATION BODY THAT COMPLIES WITH DOC PS 20 OR EQUIVALENT.
B. ALL SAWN LUMBER SHALL BE STAMPED WITH THE GRADE MARK AS SPECIFIED BELOW.
Fb, PSI Fv, PSI E, PSI Fc, PSI DESIGN BASIS
ALL LUMBER U.N.O………..900……………180………1,600,000……..…1,350 DF - L NO. 2
AS INDICATED ……………1000……………180………1,700,000……..…1,500 DF - L NO. 1
3. STRUCTURAL COMPOSITE LUMBER:
A. STRUCTURAL CAPACITIES AND DESIGN PROVISIONS FOR PREFABRICATED STRUCTURAL
COMPOSITE LUMBER SHALL BE ESTABLISHED AND MONITORED IN ACCORANCE WITH ASTM D 5456
B. ALL ENGINEERED WOOD PRODUCTS SHOWN ON THE DRAWINGS ARE PRODUCTS OF ‘TRUSJOIST A
WEYERHAUSER PRODUCT’ AND ARE DESIGNATED BY THE MANUFACTURERS STANDARD PRODUCT
NUMBERS.
C. THE INTENT OF THE DESIGN IS FOR THESE ITEMS TO BE ATTACHED TO EACH OTHER AND TO THE
SURROUNDING STRUCTURE TO BEHAVE AS A SYSTEM. WHETHER SHOWN OR NOT, PROVIDE
ACCESSORY ITEMS (BLOCKS, CLIPS, STIFFENERS, STRAPS, ETC.) DESIGNED BY THE
MANUFACTURER TO ENSURE A COMPLETE SYSTEM.
D. STRUCTURAL COMPOSITE LUMBER FROM OTHER MANUFACTURERS MAY BE SUBMITTED FOR
APPROVAL. APPROVAL WILL ONLY BE GIVEN IF IT CAN BE DEMONSTRATED THAT THE STRNEGTH
AND STIFFNESS OF THE MEMBER IS EQUAL TO, OR GREATER THAN, THE SPECIFIED PRODUCT, OR
MEETS THE PERFORMANCE CRITERIA NOTED IN THE DRAWINGS.
E. ALL ENGINEERED WOOD PRODUCTS SHALL HAVE DESIGN VALUES BASED ON THE FOLLOWING:
TRADE NAME ABBREVIATION GRADE CODE EVALUATIONS
MICROLAM LVL 2.0E ICC ES ESR-1387
TIMBERSTRAND LSL 1.55E ICC ES ESR-1387
TIMBERSTRAND RIM SL RIM 1.3E ICC ES ESR-1387
PARALLAM PSL 2.2E ICC ES ESR-1387
4. WOOD STRUCTURAL PANELS:
A. WHEN USED STRUCTURALLY, PANELS SHALL CONFORM TO THE REQUIREMENTS OF THEIR TYPE IN
DOC PS1 OR PS2. EACH PANEL OR MEMBER SHALL BE IDENTIFIED FOR GRADE AND GLUE TYPE BY
THE TRADEMARKS OF AN APPROVED TESTING AND GRADING AGENCY.
B. SHEATING FOR ROOFS, WALLS, AND FLOORS SHALL BE SPAN-RATED EXPOSURE 1 PANELS UNLESS
EXTERIOR PANELS ARE REQUIRED FOR LONG-TERM EXPOSURE TO WEATHER OR MOISTURE.
C. STAGGER ALL WOOD PANEL JOINTS. APPLY SHEETS WITH FACE GRAIN PERPENDICULAR TO JOISTS
AND RAFTERS.
D. FLOOR SHEATHING SHALL BE TONGUE AND GROVE, GLUED AND NAILED TO JOISTS.
E. REFER TO SHEARWALL SCHEDULE AND PLAN NOTES FOR THICKNESS AND NAILING OF SHEATHING
AT SHEAR WALLS, FLOORS, AND ROOFS.
F. USE RINK SHANK NAILS FOR ATTACHMENT OF FLOORS AND ROOF SHEATHING.
5. JOIST HANGERS AND CONNECTORS:
A. JOIST HANGER CAPACITIES SHALL BE DETERMINED IN ACCORDANCE WITH ASTM D 1761.
B. HANGERS AND CONNECTORS CALLED FOR ON THE DRAWINGS ARE AS MANUFACTURED BY THE
SIMPSON STRONG-TIE COMPANY. CONNECTORS BY OTHER MANUFACTURERS MAY BE USED IF THE
LOAD CAPACITY IS EQUAL TO OR GREATER THAN THE CONNECTOR SPECIFIED. USE
MANUFACTURER'S FURNISHED NAILS, SCREWS, AND BOLTS.
C. JOIST HANGERS AND CONNECTORS SHALL BE FURNISHED WITH A COATING OR MATERIAL AS
RECOMMENDED BY SIMPSON STRONG-TIE FOR THE SPECIFIC APPLICATION AND ENVIRONMENT IN
WHICH THE HANGER OR CONNECTOR WILL BE USED. THIS INFORMATION IS AVAILABLE IN THE
CURRENT SIMPSON CATALOG.
D. ALL "GENERAL INSTRUCTIONS FOR THE INSTALLER" AS FOUND IN THE CURRENT SIMPSON
CATALOG MUST BE FOLLOWED.
6. FASTENINGS:
A. NAILING OF ALL FRAMING AND SHEATHING SHALL BE PER TABLE 2304.9.1 OF THE INTERNATIONAL
BUILDING CODE UNLESS NOTED OTHERWISE ON THE DRAWINGS.
B. NAILS AND STAPLES SHALL CONFORM TO REQUIREMENTS OF ASTM F 1667.
C. BOLTS, LAG SCREWS, AND WOOD SCREWS SHALL CONFORM TO THE REQUIREMENTS OF ANSI-
ASME STANDARD B18.6.1.
D. NAILS, STAPLES, AND WOOD SCREWS SHALL HAVE MINIMUM AVERAGE BENDING YIELD
STRENGTHS AS FOLLOWS: 80 KSI FOR SHANKS DIAMETERS LARGER THAN 0.177" BUT NOT LARGER
THAN 0.254"; 90 KSI FOR SHANK DIAMETERS LARGER THAN 0.142" BUT NOT LARGER THAN 0.177";
100 KSI FOR SHANK DIAMETERS OF 0.142" OR LESS.
E. BOLTS HALL BE ASTM A36 STEEL AND HAVE A MINIMUM BENDING YIELD STRENGTH OF 45 KSI.
F. LAG SCREWS AND BOLTS SHALL BE FULL BODY DIAMETER. REDUCED BODY DIAMETER LAG
SCREWS AND BOLTS ARE NOT ALLOWED.
G. WOOD SCREWS SHALL HAVE AN UNTHREADED SHANK. TAPPING SCREWS WITH THREADS THE
FULL LENGTH OF THE SHANK ARE NOT ALLOWED.
H. PROVIDE LEAD HOLES FOR LAG SCREWS, WOOD SCREWS, AND DRIFT PINS PER SECTION 11 OF
THE CURRENT EDITION OF THE NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION
(NDS).
I. BOLT HOLES IN WOOD SHALL BE A MINIMUM OF 1/32" TO A MAXIMUM OF 1/16" LARGER THAN THE
BOLT DIAMETER.
J. A METAL PLATE, METAL STRAP, OR WASHER SHALL BE PLACED BETWEEN ALL NUTS AND HEADS
OF ALL BOLTS AND LAG SCREWS.
14 - CONVEYING EQUIPMENT
1. ELEVATORS:
A. THE ELEVATOR MACHINE ROOM FLOOR, ELEVATOR HOISTWAYS, ELEVATOR PITS, FLOOR AND
WALL BLOCKOUTS WERE DESIGNED USING INFORMATION OBTAINED FROM DRAWINGS, SKETCHES
AND DESIGN DATA SUPPLIED BY THYSSENKRUPP DATED JANUARY 07, 2020 THE ACCURACY AND
COMPLETENESS OF THE INFORMATION RECEIVED IS THE RESPONSIBILITY OF THE ELEVATOR
CONSULTANT AND MANUFACTURER.
B. DOCUMENTATION: REACTIONS FROM ELEVATOR EQUIPMENT ON MACHINE ROOM FLOOR,
ELEVATOR PITS AND SUPPORT BEAMS WERE PROVIDED BY OTHERS AND ARE SHOWN ON THE
DRAWINGS FOR INFORMATION ONLY.
C. DIVIDER BEAMS: PROVIDE DIVIDER BEAMS AS SHOWN ON THE DRAWINGS. PROVIDE ADDITIONAL
DIVIDER BEAMS AS REQUIRED TO SUPPORT GUIDE RAILS BETWEEN FLOORS IF VERTICAL
DISTANCE BETWEEN DIVIDER BEAMS SHOWN EXCEEDS MAXIMUM DISTANCE ALLOWED.
D. HOIST BEAMS: IF HOIST BEAMS ARE REQUIRED BY THE ELEVATOR MANUFACTURER AND ARE NOT
SHOWN ON THE STRUCTURAL DRAWINGS, PROVIDE HOIST BEAMS AT TOP OF ELEVATOR SHAFTS
AND CONNECT TO ADJACENT STRUCTURAL FRAMING. SUBMIT SHOP DRAWINGS OF HOIST BEAM
FRAMING FOR REVIEW AND APPROVAL PRIOR TO BEAM INSTALLATION.
E. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY PURCHASED ELEVATOR EQUIPMENT
AGAINST THE INFORMATION SHOWN ON THE STRUCTURAL DRAWINGS INCLUDING, BUT NOT
LIMITED TO, EQUIPMENT LOCATION, SIZE, LOADS, OPENINGS, HOISTWAY AND PIT REQUIREMENTS
AND SUPPORT REQUIREMENTS. REPORT DIFFERENCES TO THE ARCHITECT AND ENGINEER
BEFORE PROCEEDING WITH THE WORK.
F. REDESIGN: IF A REVIEW OF THE ELEVATOR SUBMITTAL REVEALS REDESIGN OF THE MACHINE
ROOM FLOOR, HOISTWAY, PIT OR SUPPORT BEAMS IS REQUIRED, THE CONTRACTOR SHALL
PROVIDE COMPENSATION TO THE STRUCTURAL ENGINEER FOR THE REDESIGN EFFORT.
G. MODIFICATIONS: NO MODIFICATIONS TO THE ELEVATOR MACHINE ROOM FLOOR, HOISTWAY, PIT OR
SUPPORT BEAMS TO ACCOMMODATE PURCHASED EQUIPMENT WILL BE ALLOWED WITHOUT
WRITTEN AUTHORIZATION FROM THE ARCHITECT AND ENGINEER.
H. LIMITATIONS: ELEVATOR CONSTRUCTION INFORMATION SHOWN ON THE STRUCTURAL DRAWINGS
IS LIMITED TO THE FOLLOWING ITEMS:
1. ELEVATOR PITS INCLUDING SUMP PIT AND ELEVATOR DIVIDER BEAMS
2. MACHINE ROOM CONSTRUCTION: FLOOR AND ROOF CONSTRUCTION, MACHINE BEAMS AND
HOIST BEAMS.
3. ELEVATOR SHAFT CONSTRUCTION: SHAFT OPENINGS IN FLOOR AND ROOF LEVELS INCLUDING
EDGE FRAMING, GUIDE RAIL SUPPORT FRAMING AT FLOORS AND BETWEEN FLOORS WHERE
FLOOR TO FLOOR DISTANCES EXCEED 14'-0" AND SUPPORT OF ELEVATOR HOIST MACHINERY
LOCATED IN SHAFTS.
4. ALL OTHER EQUIPMENT AND ACCESSORIES REQUIRED FOR ELEVATOR CONSTRUCTION SHALL
BE PROVIDED BY THE ELEVATOR MANUFACTURER.
22, 23, 26 - MECHANICAL AND ELECTRICAL TRADES
1. PRECEDENCE:
A. STRUCTURAL FRAMING COMPONENTS, INCLUDING BUT NOT LIMITED TO STEEL FRAMING,
CONCRETE FRAMING, REINFORCING, POST-TENSIONING CABLES AND EMBEDMENTS SHALL TAKE
PRECEDENCE OVER MECHANICAL, PLUMBING AND ELECTRICAL (MEP) ITEMS. STRUCTURAL
FRAMING COMPONENTS SHALL NOT BE MOVED, ADJUSTED OR OTHERWISE MODIFIED FROM THE
STRUCTURAL DRAWINGS TO ACCOMMODATE OTHER DISCIPLINES WITHOUT APPROVAL FROM THE
STRUCTURAL ENGINEER.
2. COORDINATION:
A. THE GENERAL CONTRACTOR AND MECHANICAL AND ELECTRICAL SUBCONTRACTORS SHALL
VERIFY PURCHASED EQUIPMENT AND REQUIRED OPENINGS THROUGH FLOORS, ROOF AND WALLS
ARE IN AGREEMENT WITH THE DESIGN INFORMATION SHOWN ON THE DRAWINGS.
B. DIFFERENCES OR CONFLICTS BETWEEN THE DRAWINGS AND MECHANICAL AND ELECTRICAL
REQUIREMENTS SHALL BE REPORTED TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK.
C. PENETRATIONS: THE GENERAL CONTRACTOR SHALL SUBMIT COORDINATED AND DIMENSIONED
DRAWINGS SHOWING ALL MECHANICAL, PLUMBING AND ELECTRICAL PENETRATIONS THROUGH
CONCRETE FLOOR AND ROOF SLABS FOR REVIEW AND APPROVAL AT LEAST THREE WEEKS PRIOR
TO STARTING THE WORK.
3. EQUIPMENT:
A. THE FLOOR AND ROOF FRAMING IS DESIGNED TO SUPPORT THE MECHANICAL AND ELECTRICAL
EQUIPMENT SHOWN ON PLANS. DIFFERENCES IN ACTUAL EQUIPMENT LOCATION, SIZE OR WEIGHT
MAY REQUIRE REDESIGN OF THE FRAMING AT THE EXPENSE OF THE CONTRACTOR.
B. PROVIDE 4" HIGH CONCRETE PADS UNDER FLOOR MOUNTED MEP EQUIPMENT. REINFORCE PADS
WITH #4 BARS AT 12" O.C. UNLESS NOTED OTHERWISE.
C. PROVIDE CONCRETE PADS UNDER ROOF TOP EQUIPMENT ONLY AS SHOWN ON THE STRUCTURAL
DRAWINGS.
4. SLEEVES AND CORE DRILLING: (CONCRETE ON METAL DECK)
A. SLEEVES AND CORE DRILLING THROUGH CONCRETE SLABS ON METAL DECK ARE PERMITTED
SUBJECT TO THE FOLLOWING RESTRICTIONS:
a. PENETRATIONS SHALL NOT EXCEED 6" IN DIAMETER
b. EDGE OF PENETRATION SHALL BE A MINIMUM OF 2" CLEAR FROM EDGE OF BEAM FLANGE.
c. MULTIPLE PENETRATIONS SHALL BE SPACED A MINIMUM OF 1 CORE DIAMETER APART USING
THE LARGER PENETRATION DIAMETER.
d. LOCATE SLAB REINFORCING PRIOR TO MAKING PENETRATION AND ADJUST PENETRATION
LOCATION TO AVOID REINFORCING. IF PENETRATION LOCATION CANNOT BE ADJUSTED,
OBTAIN ENGINEER'S APPROVAL PRIOR TO MAKING PENETRATION.
e. A MAXIMUM OF THREE PENETRATIONS WITH MINIMUM SPACING MAY BE GROUPED WITHOUT
ENGINEER'S APPROVAL. NO MORE THAN FOUR PENETRATIONS ARE ALLOWED BETWEEN
ADJACENT FLOOR BEAMS UNLESS APPROVED BY ENGINEER.
5. ELECTRICAL CONDUIT: (CONCRETE ON METAL DECK)
A. ELECTRICAL CONDUIT IS ALLOWED IN CONCRETE SLABS ON METAL DECK SUBJECT TO THE
FOLLOWING RESTRICTIONS:
a. CONDUIT O.D. SHALL NOT EXCEED 1". MINIMUM CLEAR DISTANCE BETWEEN CONDUITS IS 2".
b. NO MORE THAN THREE CONDUITS MAY BE BUNDLED IN ONE GROUP. BUNDLED CONDUITS
SHALL HAVE AT LEAST 12" CLEAR BETWEEN GROUPS.
c. CONDUIT MAY NOT CROSS WITHIN FLOOR SLAB THICKNESS.
d. CONDUIT SHALL REST DIRECTLY ON METAL DECK AND WILL BE SECURELY FASTENED DOWN.
6. SUPPORT OF EQUIPMENT:
A. SUPPORT OF MECHANICAL, PLUMBING AND ELECTRICAL ITEMS SUSPENDED FROM CONCRETE
FLOOR AND ROOF SLABS IS THE RESPONSIBILITY OF THE CONTRACTOR INCLUDING DETERMINING
THE NUMBER AND POSITION OF FASTENERS. THE FOLLOWING FASTENERS ARE APPROVED FOR
USE IN CONCRETE:
a. POWDER ACTUATED FASTENERS: HILTI UNIVERSAL KNURLED SHANK FASTENER (X-U) WITH
1-1/4" EMBEDMENT. IN POST-TENSIONED DECKS, USE 3/4" MAXIMUM EMBEDMENT.
b. DRILLED ANCHORS: HILTI DROP-IN CONCRETE EXPANSION ANCHOR (X-GN) WITH 1-1/2"
EMBEDMENT. IN POST-TENSIONED DECKS, USE POWERS 3/8" MINI DROP-IN ANCHOR WITH
EMBEDMENT NO MORE THAN 3/4".
c. EMBEDDED ANCHORS: USE HILTI HCI-WF OR HIS-MD AS APPROPRIATE OR UNISTRUT P3300
SERIES CONCRETE INSERT.
d. DO NOT SUSPEND LOADS GREATER THAN 1,000 LBS. FROM CONCRETE DECK. PROVIDE
SUPPORT FRAMING BETWEEN MAIN STRUCTURAL FRAMING.
e. THE CONTRACTOR MAY SUBMIT MANUFACTURER'S DATA FOR ALTERNATE FASTENERS FOR
REVIEW AND APPROVAL.
7. PRE-POUR OBSERVATION:
A. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND STRUCTURAL ENGINEER FOR REVIEW OF
MEP ITEMS EMBEDDED IN FLOOR AND ROOF SLABS PRIOR TO PLACEMENT OF CONCRETE.
NOTIFICATION SHALL OCCUR AT LEAST 48 HOURS PRIOR TO POUR.
8. OBSERVATION BY ARCHITECT OR ENGINEER DOES NOT RELIEVE CONTRACTOR FROM MEETING
REQUIREMENTS LISTED IN PRECEDING PARAGRAPHS.
30 - INSTRUCTIONS AND COORDINATION
1. COORDINATION:
A. ANY DIFFERENCES BETWEEN THE ARCHITECTURAL AND STRUCTURAL DRAWINGS SHALL BE
REPORTED TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK.
B. CONFLICTS WITHIN THE STRUCTURAL DRAWINGS OR BETWEEN THE STRUCTURAL DRAWINGS,
GENERAL NOTES AND/OR SPECIFICATIONS SHALL BE REPORTED TO THE STRUCTURAL ENGINEER
FOR RESOLUTION BEFORE PROCEEDING WITH MODIFICATIONS OR ADJUSTMENT.
C. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE MECHANICAL AND ELECTRICAL
EQUIPMENT PURCHASED WITH INFORMATION SHOWN ON THE STRUCTURAL DRAWINGS
INCLUDING, BUT NOT LIMITED TO, EQUIPMENT LOCATION, SIZE, WEIGHT, OPENINGS AND SUPPORT
REQUIREMENTS. REPORT DIFFERENCES TO THE ARCHITECT AND ENGINEER BEFORE PROCEEDING
WITH THE WORK.
D. EXISTING CONDITIONS: THE STRUCTURAL DRAWINGS HAVE BEEN PREPARED USING AVAILABLE
INFORMATION OF EXISTING CONDITIONS. NO ATTEMPT HAS BEEN MADE TO VERIFY EXISTING
CONDITIONS AGAINST INFORMATION RECEIVED FROM THE CLIENT OR OTHER SOURCES. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO COMPARE THE EXISTING CONDITIONS TO THE INFORMATION
SHOWN ON THE DRAWINGS AND NOTIFY THE ARCHITECT OF ANY DIFFERENCES BEFORE
PROCEEDING WITH THE WORK.
2. SUBSTITUTIONS:
A. SUBSTITUTIONS ARE NOT ALLOWED WITHOUT APPROVAL FROM THE ARCHITECT AND STRUCTURAL
ENGINEER. REQUEST FOR SUBSTITUTION MUST BE ACCOMPANIED BY PROPER INFORMATION
NECESSARY TO EVALUATE THE SUBSTITUTION AND COMPENSATION FROM THE CONTRACTOR MAY
BE REQUIRED TO CONDUCT THE EVALUATION PROCESS.
3. QUALITY CONTROL:
A. THE CONTRACTOR SHALL MAINTAIN A LOG OF DISCREPANCIES NOTED BY THE INDEPENDENT
TESTING AGENCY FOR THE DURATION OF THE PROJECT. EACH ITEM IN THE LOG SHALL BE
REFERENCED BY AN ITEM NUMBER WITH A DESCRIPTION OF THE DISCREPANCY, THE DATE THE
DISCREPANCY WAS NOTED, A DESCRIPTION OF THE CORRECTIVE ACTION TAKEN AND THE DATE
OF THE CORRECTIVE ACTION.
B. A LETTER OF ENGINEER'S STATEMENT USED TO OBTAIN A CERTIFICATE OF OCCUPANCY CANNOT
BE ISSUED UNTIL ALL ITEMS NOTED IN THE DISCREPANCY LOG ARE ADDRESSED TO THE
ENGINEER'S SATISFACTION.
C. PRECONSTRUCTION MEETINGS: THE GENERAL CONTRACTOR SHALL CONDUCT THE FOLLOWING
PRECONSTRUCTION MEETINGS IN ACCORDANCE WITH THE REQUIREMENTS OF THE PROJECT
SPECIFICATIONS:
a. DRILLED PIER INSTALLATION
b. CAST-IN-PLACE CONCRETE CONSTRUCTION
c. POST-TENSIONED CONCRETE CONSTRUCTION
d. SLAB-ON-GRADE CONSTRUCTION
e. LOAD-BEARING, PRECAST CONCRETE CONSTRUCTION
f. LOAD-BEARING CONCRETE MASONRY CONSTRUCTION
g. PRIOR TO DETAILING OF STRUCTURAL STEEL
4. STRUCTURAL STEEL ERECTION
EACH MEETING SHALL BE ATTENDED BY THE ARCHITECT AND/OR STRUCTURAL ENGINEER, THE
GENERAL CONTRACTOR, THE INDEPENDENT TESTING AGENCY AND REPRESENTATIVES OF THE
AFFECTED SUBCONTRACTORS.
EXPLANATION OF SECTION DIAGRAM USED (PLAN SHEET)
EXPLANATION OF SECTION DIAGRAM USED (DETAIL SHEET)
SECTION IDENTIFICATION
STRUCTURAL SHEET WHERE
SECTION IS DRAWN
SECTION IDENTIFICATION
STRUCTURAL SHEET WHERE
SECTION IS DRAWN
STRUCTURAL SHEET WHERE
SECTION IS FIRST CUT
ABBREVIATIONS
A.B.
@
ADDN'L
ANCH.
APPROX.
ARCH.
AVG
BLDG.
BLK.
BM.
BOD
BOT. OR B.
BRG.
BTWN.
BW
CANT.
C-C
CEIL. OR CLG.
C.I.P.
C.J.
CL OR CLR
C.M.U.
CL
CLR.
COL.
CONC.
CONN.
CONSTR.
CONT.
CONTR.
CTR. OR CNTR.
CTR'D.
DBL.
DEPR
DET OR DTL
DIA.
DIAG.
DIM.
DN.
DP
DWG.
DWL.
EA.
E.F.
E.J.
E. OR ELECT'L
EL. OR ELEV.
ENGR
EQ.
ES
EW
E-W
EXC
EXIST.
EXP.
EXT.
FAB
FDN
F.F.
FIN.
FLG.
FLR.
FS
FT.
FTG.
GA.
GALV.
GC OR GEN CONTR
GLU-LAM
GR OR GRD
H.A.S.
HORIZ.-HOR.
HT.
I.D.
I.F.
IN
INCL
INFO
INT
JT.
K
LB OR #
LG.
-ANCHOR BOLT(S)
-AT
-ADDITIONAL
-ANCHOR
-APPROXIMATE
-ARCHITECT OR
ARCHITECTURAL
DOCUMENTS
-AVERAGE
-BUILDING
-BLOCK
-BEAM
-BOTTOM OF DECK
-BEARING
-BOTTOM
-BETWEEN
-BUTT WELD
-CANTILEVER
-CENTER TO CENTER
-CEILING
-CAST IN PLACE
-CONTROL JOINT OR
CONSTRUCTION JOINT
-CLEAR
-CONCRETE MASONRY UNIT
-CENTER LINE
-CLEAR
-COLUMN
-CONCRETE
-CONNECTION
-CONSTRUCTION
-CONTINUE OR CONTINUOUS
-CONTRACTOR
-CENTER
-CENTERED
-DOUBLE
-DEPRESSION
-DETAIL
-DIAMETER
-DIAGONAL
-DIMENSION
-DOWN
-DEEP OR DEPTH
-DRAWING(S)
-DOWEL
-EACH
-EACH FACE
-EXPANSION JOINT
-ELECTRICAL
-ELEVATION
-ENGINEER
-EQUAL
-EACH SIDE
-EACH WAY
-EAST-WEST
-EXCAVATE
-EXISTING
-EXPANSION
-EXTERIOR
-FABRICATION
-FOUNDATION
-FAR FACE OR
FINISHED FLOOR
-FINISH
-FLANGE
-FLOOR
-FAR SIDE
-FOOT-FEET
-FOOTING
-GAGE OR GAUGE
-GALVANIZED
-GENERAL CONTRACTOR
-GLUE LAMINATED
-GRADE
-HEADED ANCHOR STUD
-HORIZONTAL
-HEIGHT
-INSIDE DIAMETER
-INSIDE FACE
-INCH
-INCLUDE
-INFORMATION
-INTERIOR
-JOINT
-KIP = 1000 LBS.
-POUND(S)
-LONG
L.L.H.
L.L.V.
LOC.
LT.-LGT.
LWC
MACH
MAS
MATL.
MAX.
M.B.
MECH.
MEMB.
MEZZ.
MFR. OR MFRR.
MID.
MIN.
MISC
MTL
NF
NO.
NS
N-S
N.T.S.
O.C. OR O/C
O.D.
O.F.
O.H.
OPNG.
OPP
OPP HD
P.C. OR P/C
PCF
PEN
PL
PERP.
P.L.
PLF
PLYWD
PP
PRELIM
PSI
R. OR RAD.
R
RE:
REINF.
REQ'D.
SCHED.
SECT
SHTHG
SH OR SHT
SIM.
SLV
SLH
SOG
SP OR SPCS
SPCG
SPEC.
SQ.
STD.
STIFF.
STL.
STRUCT.
SYMM.
T.
T AND B
T AND G
THK
THK'ND
TOC
TOF
TOPG
TOS
TR
TYP.
U.N.O.
VERT.
W/
W/O
WD
W.P.
WT.-WGT.
W.W.F. OR W.W.M.
X-BRACE
-LONG LEG HORIZONTAL
-LONG LEG VERTICAL
-LOCATION
-LIGHT
-LIGHT WEIGHT CONCRETE
-MACHINE
-MASONRY
-MATERIAL
-MAXIMUM
-MACHINE BOLT
-MECHANICAL
-MEMBRANE
-MEZZANINE
-MANUFACTURER
-MIDDLE
-MINIMUM
-MISCELLANEOUS
-METAL
-NEAR FACE
-NUMBER
-NEAR SIDE
-NORTH-SOUTH
-NOT TO SCALE
-ON CENTER
-OUTSIDE DIAMETER
-OUTSIDE FACE
-OVERHANG
-OPENING
-OPPOSITE
-OPPOSITE HAND
-PRECAST
-POUNDS PER CUBIC FOOT
-PENETRATION
-PLATE
-PERPENDICULAR
-PROPERTY LINE
-POUNDS PER LINEAL FOOT
-PLYWOOD
-PANEL POINT OR PARTIAL
PENETRATION
-PRELIMINARY
-POUNDS PER SQUARE INCH
-RADIUS
-RISER (STAIR)
-REFERENCE
-REINFORCED OR
REINFORCING
-REQUIRED
-SCHEDULE
-SECTION
-SHEATHING
-SHEET
-SIMILAR
-SLEEVE OR SHORT
LEG VERTICAL
-SHORT LEG HORIZONTAL
-SLAB ON GRADE
-SPACES
-SPACING
-SPECIFICATION
-SQUARE
-STANDARD
-STIFFENER
-STEEL
-STRUCTURE OR
STRUCTURAL
-SYMMETRICAL
-TOP OR TREAD (STAIR)
-TOP AND BOTTOM
-TONGUE AND GROOVE
-THICK OR THICKNESS
-THICKENED
-TOP OF CONCRETE
-TOP OF FOOTING
-TOPPING
-TOP OF STEEL, TOP OF SLAB
-TRUSS
-TYPICAL
-UNLESS NOTED OTHERWISE
-VERTICAL
-WITH
-WITHOUT
-WOOD
-WORKING POINT
-WEIGHT
-WELDED WIRE FABRIC
-CROSS BRACING
4.ENGINEERING DESIGN PERFORMED BY CONTRACTOR:
A.THE CONTRACTOR OR RESPONSIBLE SUBCONTRACTOR SHALL HAVE A PROFESSIONAL ENGINEER
LICENSED IN THE PROJECT JURISDICTION PERFORM ENGINEERING DESIGN OF THE FOLLOWING
BUILDING COMPONENTS INCLUDING, BUT NOT LIMITED TO, LOAD DETERMINATION, COMPONENT
ANALYSIS AND DESIGN AND CONNECTION ANALYSIS AND DESIGN:
a.PREFABRICATED STEEL STAIRS
b.EXTERIOR WALL ENCLOSURES
c.SUPPORT OF MECHANICAL, ELECTRICAL AND PLUMBING EQUIPMENT
THE ENGINEERING DESIGN SHALL CONSIDER THE EFFECTS OF SUPPORTING THE BUILDING
COMPONENTS FROM THE PRIMARY STRUCTURE AND INCLUDE ALL BRACING NECESSARY TO
MAINTAIN STABILITY OF THE AFFECTED STRUCTURAL FRAMING.
B.CORRECTIVE MEASURES DUE TO ERRORS OR DEFECTS IN CONSTRUCTION: THE CONTRACTOR
SHALL SUBMIT PLANS, DETAILS AND CALCULATIONS FOR PROPOSED CORRECTIVE MEASURES
FOR REVIEW BY ARCHITECT AND STRUCTURAL ENGINEER. WHEN REQUIRED, THE SUBMITTED
DOCUMENTS SHALL BE SEALED AND SIGNED BY A PROFESSIONAL ENGINEER LICENSED IN THE
PROJECT JURISDICTION.
5.INSTRUCTIONS TO CONTRACTOR:
A.TEMPORARY BRACING: DURING ERECTION OF THE BUILDING, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE DESIGN AND PLACEMENT OF TEMPORARY BRACING TO WITHSTAND ALL
LOADS TO WHICH THE STRUCTURE MAY BE SUBJECTED, INCLUDING LATERAL LOADS AND
STOCKPILES OF MATERIAL AND EQUIPMENT. BRACING SHALL BE LEFT IN PLACE AS LONG AS
NECESSARY FOR SAFETY AND UNTIL ALL STRUCTURAL FRAMING AND FLOOR AND ROOF
DIAPHRAGMS ARE IN PLACE WITH CONNECTIONS COMPLETED.
B.STORAGE: THE CONTRACTOR SHALL NOT STOCKPILE MATERIAL OR EQUIPMENT IN A MANNER
THAT EXCEEDS THE LOAD CAPACITY OF THE STRUCTURE OR CAUSES DAMAGE OR EXCESSIVE
DEFLECTION OF STRUCTURAL ELEMENTS.
C.BACKFILL OF FOUNDATION WALLS: DO NOT PLACE BACKFILL AGAINST FOUNDATION WALLS UNTIL
TOP AND BOTTOM OF WALLS ARE ADEQUATELY BRACED. ADEQUATE BRACING INCLUDES THE
FOLLOWING:
a.SLAB ON GRADE THAT HAS REACHED 75% OF ITS DESIGN STRENGTH INCLUDING COMPLETION
OF DELAY OR POUR STRIPS.
b.ELEVATED CAST-IN-PLACE CONCRETE FLOOR CONSTRUCTION THAT HAS REACHED 75% OF ITS
DESIGN STRENGTH INCLUDING COMPLETION OF DELAY OR POUR STRIPS
c.ELEVATED PRECAST FLOOR CONSTRUCTION WHERE CONNECTIONS BETWEEN PRECAST AND
WALL ARE COMPLETED AND CONCRETE TOPPING IS IN PLACE AND HAS REACHED 75% OF ITS
DESIGN STRENGTH.
d.ELEVATED STRUCTURAL STEEL-FRAMED FLOOR CONSTRUCTION WHERE FRAMING
CONNECTIONS TO THE WALL ARE COMPLETE AND CONCRETE TOPPING IS IN PLACE AND HAS
REACHED 75% OF ITS DESIGN STRENGTH.
6.DRAWING NOMENCLATURE:
EXPLANATION OF SECTION CUT CALL-OUT:
MINIMUM DECK SECTION PROPERTIES
DECK GAGE
(YIELD STRESS)
DECK
TYPEUSE Ip (IN4/FT)
18 (50)0.559 0.558 0.5040.495COMPOSITE
DECK 2 VLI
MINIMUM NUMBER OF BOLTS PER CONNECTION
NUMBER
OF BOLTS FRAMING MEMBER SIZES
2
3 W14, W16, W18, S15, S18, C15, MC18
4 W21, W24, S20, S24
5 W27, W30
6 W33, W36
7 W40, W44
05 - STEEL
1. STRUCTURAL STEEL:
A. REFERENCE STANDARDS: STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED IN
ACCORDANCE WITH THE AISC MANUAL OF STEEL CONSTRUCTION AND THE AISC CODE OF
STANDARD PRACTICE (REFERENCED EDITIONS) WITH EXCEPTIONS NOTED IN THE PROJECT
SPECIFICATIONS.
B. OSHA REQUIREMENTS:
a. THE CONTRACTOR SHALL PROVIDE ALL ADDITIONAL BOLTS, ANCHORS, STIFFENERS,
STABILIZERS, BRIDGING, BRACING, OPENING CLOSURES, ETC. AS NECESSARY TO COMPLY
WITH CURRENT OSHA REGULATIONS.
b. ALL RIGGING FOR SAFETY CABLES, LIFTING DEVICES, AND TEMPORARY BRACING SHALL BE
CONNECTED TO ANGLES, PLATES OR OTHER MEMBERS DESIGNED AND DETAILED BY THE
STEEL SUPPLIER AND SHALL BE SHOP WELDED TO STRUCTURAL MEMBERS. DO NOT PROVIDE
HOLES IN STRUCTURAL MEMBERS FOR CONNECTION OF RIGGING CABLES, LIFTING DEVICES OR
TEMPORARY BRACING UNLESS SPECIFICALLY SHOWN ON THE STRUCTURAL DRAWINGS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL ADDED MEMBERS WHERE
THEY INTERFERE WITH OTHER WORK OR ARE EXPOSED TO VIEW.
C. MATERIAL REQUIREMENTS: STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING
DESIGNATIONS UNLESS NOTED OTHERWISE ON THE DRAWINGS OR IN THE SPECIFICATIONS:
a. WIDE FLANGE SHAPES:ASTM 992, GRADE 50
b. ANGLES, CHANNELS AND PLATES:ASTM A36 OR ASTM A572, GRADE 50
c. ROUND HSS SECTIONS:ASTM A500, GRADE "B" (FY=42 KSI)
d. RECTANGULAR HSS SECTIONS:ASTM A500, GRADE "B" (FY=46 KSI)
e. STRUCTURAL PIPES:ASTM A53, GRADE "B" (FY=35 KSI)
f. HIGH-STRENGTH BOLTS:ASTM A325 OR ASTM A490
g. ANCHOR BOLTS:ASTM F1554, GRADE 36 (WELDABLE)
h. HIGH-STRENGTH ANCHOR BOLTS:ASTM F1554, GRADE 105
i. HEADED ANCHOR STUDS (H.A.S.):ASTM A108 AND AWS D1.1
j. DEFORMED BAR ANCHORS (D.B.A.):ASTM A496, GRADE 70 AND AWS D1.1
k. WELDING ELECTRODES:AWS D1.1 E70 SERIES
l. GALVANIZED FINISH:ASTM A123
D. SHOP PRIMING OF STEEL: STRUCTURAL STEEL SCHEDULED TO BE SPRAYED WITH FIRE RESISTIVE
MATERIAL SHALL NOT BE SHOP PRIMED UNLESS NOTED OTHERWISE. ALL OTHER STEEL SHALL BE
PAINTED WITH FABRICATOR'S STANDARD, RUST-INHIBITING PRIMER. OMIT PRIMER ON SURFACES
ENCLOSED IN CONCRETE, SURFACES TO BE WELDED, CONTACT SURFACES IN SLIP CRITICAL
CONNECTIONS AND TOPS OF BEAMS IN COMPOSITE CONSTRUCTION.
E. CONNECTIONS:
a. PROVIDE SIMPLE SHEAR BEAM CONNECTIONS AS SHOWN ON THE STEEL CONNECTION
SHEET(S) ON THE DRAWINGS, UNLESS NOTED OTHERWISE ON THE DRAWINGS.
b. SEE SPECIFICATIONS FOR ADDITIONAL CONNECTIONS SUBMITTAL REQUIREMENTS FOR
ALTERNATE CONNECTIONS AND FOR CONNECTIONS NOT COMPLETELY DETAILED OR NOT
INDICATED ON THE DRAWINGS.
c. SELECT CONNECTIONS TO SUPPORT THE REACTIONS SHOWN ON PLANS AND DETAILS.
REACTIONS ARE GIVEN AS SERVICE LOADS USING ASD LOAD COMBINATIONS UNLESS NOTED
OTHERWISE. WHERE REACTIONS ARE NOT SHOWN, PROVIDE CONNECTIONS TO SUPPORT A
SERVICE LOAD OF 8.0 KIPS FOR ASD DESIGN OR A FACTORED LOAD OF 14.0 KIPS FOR LRFD
DESIGN.
d. BOLTED CONNECTIONS:
1. MINIMUM CONNECTION REQUIREMENT: USE 3/4" DIAMETER, ASTM A325 HIGH-STRENGTH
BOLTS UNLESS NOTED OTHERWISE ON DRAWINGS.
2. FOR ALL HIGH-STRENGTH BOLTED CONNECTIONS, APPROPRIATE NUTS AND HARDENED
WASHERS SHALL BE PROVIDED PER PROJECT SPECIFICATIONS.
3. ALL CONNECTIONS SHALL BE TYPE N (BEARING OR SNUG-TIGHTENED) CONNECTIONS
UNLESS NOTED ON THE DRAWINGS AS TYPE SC (SLIP CRITICAL) OR PRETENSIONED (WITH
TENSION CONTROL BOLTS).
4. PROVIDE A MINIMUM OF TWO BOLTS FOR ALL CONNECTIONS EXCEPT AS NOTED IN THE
FOLLOWING TABLE:
e. WELDED CONNECTIONS:
1. ALL WELDERS SHALL HAVE EVIDENCE OF PASSING THE AWS STANDARD QUALIFICATION
TESTS.
2. WELD SIZES AND LENGTHS ARE SHOWN ON THE DRAWINGS. WELD SIZES ARE THE NET
EFFECTIVE SIZE REQUIRED. INCREASE WELD SIZE IF GAPS EXIST AT FAYING SURFACE.
MINIMUM FILLET WELD SIZE IS 3/16".
3. WELDS SHALL BE CONTINUOUS UNLESS SHOWN OTHERWISE.
4. GROOVE WELDS SHALL BE FULL PENETRATION WELDS UNLESS NOTED OTHERWISE.
BACKING BARS AND RUNOFF TABS SHALL BE REMOVED AFTER WELDING IS COMPLETE.
f. HEADED ANCHOR STUDS: WELD STUDS TO PLATES AND EMBEDDED ITEMS IN FABRICATOR'S
SHOP WHERE POSSIBLE. FOR COMPOSITE CONSTRUCTION, FIELD WELD CONNECTORS
THROUGH METAL DECK. PROVIDE WELDING WASHERS AT DECK GAGES LIGHTER THAN 22
GAGE. WELDS SHALL DEVELOP FULL STRENGTH OF CONNECTORS. WELDING FERRULES MUST
BE REMOVED PRIOR TO INSPECTION AND PLACEMENT OF CONCRETE.
g. ANCHOR BOLTS: PROVIDE ANCHOR BOLTS WITH HEX NUT TACK WELDED TO EMBEDDED END
OF BOLT.
F. GALVANIZING OF STEEL:
a. ALL STEEL PERMANENTLY EXPOSED TO WEATHER INCLUDING STRUCTURAL SHAPES, PLATES
AND FASTENERS SHALL BE PROTECTED BY HOT-DIP GALVANIZING OR PAINTED WITH A HIGH
PERFORMANCE PAINT SYSTEM PER PROJECT SPECIFICATIONS.
b. GALVANIZING:
1. STRUCTURAL STEEL SHAPES AND PLATES SHALL BE GALVANIZED IN ACCORDANCE WITH
ASTM A123 AND SHALL HAVE A MINIMUM COATING THICKNESS OF 3.9 MILS. FASTENERS
SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM A153 AND SHALL HAVE A MINIMUM
COATING THICKNESS OF 1.7 MILS. FIELD WELDING AND OTHER DAMAGE TO GALVANIZING
SHALL BE TOUCHED UP WITH ZINC RICH PAINT WITH A MINIMUM DRY FILM THICKNESS OF 4.0
MILS IN ACCORDANCE WITH ASTM A780. METAL DECK PERMANENTLY EXPOSED TO
WEATHER SHALL BE PROTECTED BY A GALVANIZED FINISH (G90 THICKNESS, MINIMUM) IN
ACCORDANCE WITH ASTM A653.
c. STEEL LINTELS SUPPORTING ANCHORED VENEER SHALL BE GALVANIZED UNLESS NOTED
OTHERWISE ON DRAWINGS OR IN SPECIFICATIONS.
G. FIELD MODIFICATION OF STEEL: STRUCTURAL STEEL SHALL NOT BE CUT IN FIELD OR MODIFIED
WITHOUT PRIOR APPROVAL OF THE ENGINEER. SPLICING STEEL MEMBERS IS NOT PERMITTED
EXCEPT WHERE SHOWN ON THE DRAWINGS OR WHERE APPROVED BY THE ENGINEER. WHERE
APPROVED, SPLICES SHALL NOT OCCUR AT LOCATIONS OF MAXIMUM STRESS AND SHALL
DEVELOP THE FULL CAPACITY OF THE MEMBER. SPLICE DETAILS SHALL BE SUBMITTED FOR
APPROVAL PRIOR TO BEGINNING THE WORK.
2. COMPOSITE CONSTRUCTION:
A. COMPOSITE BEAMS ARE DESIGNED FOR UNSHORED CONSTRUCTION. BEAMS SHALL BE
FABRICATED WITH THE CAMBER INDICATED ON THE STRUCTURAL DRAWINGS. BEAMS WITHOUT
SPECIFIED CAMBER SHALL BE ERECTED WITH INCIDENTAL CAMBER ORIENTED UPWARDS.
B. COMPOSITE DECK LAYOUT SHALL BE CONTINUOUS OVER THREE OR MORE SUPPORTS. PROVIDE
DECK SHORING FOR OTHER LAYOUTS AS REQUIRED BY THE DECK MANUFACTURER.
C. SET SCREEDS AND ADJUST AS NECESSARY TO ACHIEVE MINIMUM UNIFORM CONCRETE
THICKNESS OVER BEAMS AND GIRDERS, ALLOWING FOR CAMBER AND DEFLECTION. INCREASED
SLAB THICKNESS BETWEEN BEAMS DUE TO DECK DEFLECTION IS ACCEPTABLE. MINIMUM UNIFORM
SLAB THICKNESS SHALL NOT BE LESS THAN THICKNESS REQUIRED TO ACHIEVE FIRE RATING
SPECIFIED IN COMPONENT FIRE RATING ASSEMBLIES PARAGRAPH IN BUILDING CONSTRUCTION
INFORMATION GIVEN IN GENERAL NOTES.
D. THE NUMBER OF SHEAR STUDS REQUIRED FOR EACH COMPOSITE BEAM IS SHOWN ON THE PLANS
AND IS BASED, IN PART, ON THE DECK TYPE(S) SPECIFIED IN THE STEEL DECK SECTION IN THESE
GENERAL NOTES. ADDITIONAL SHEAR STUDS MAY BE REQUIRED FOR ALTERNATE DECK TYPES.
3. ARCHITECTURALLY EXPOSED STRUCTURAL STEEL (AESS):
A. STRUCTURAL STEEL NOTED AS AESS ON THE STRUCTURAL DRAWINGS SHALL BE CLASSIFIED AS
CATEGORY 1 UNLESS OTHERWISE SPECIFIED. REFER TO PROJECT SPECIFICATIONS FOR
DETAILING, FABRICATION AND ERECTION REQUIREMENTS FOR AESS.
B. FABRICATION OF AESS SHALL HAVE WELDS GROUND SMOOTH, MILL MARKS REMOVED AND PIECE
MARKS HIDDEN. SURFACE PREPARATION SHALL CONFORM TO SSPC SP-3 POWER TOOL CLEANING.
C. UNLESS NOTED OTHERWISE IN THE SPECIFICATIONS, FIELD WELDS EXPOSED TO VIEW SHALL BE
MADE CONTINUOUS AND GROUND SMOOTH WITH BACKING BARS AND RUNOFF TABS REMOVED.
4. MISCELLANEOUS STRUCTURAL STEEL:
A. MISCELLANEOUS STRUCTURAL STEEL IS DEFINED FOR THE PURPOSE OF THIS SECTION AS STEEL
ITEMS OTHER THAN THE MAIN SUPERSTRUCTURE FRAMING (COLUMNS, BEAMS, JOISTS, GIRDERS,
TRUSSES AND LATERAL BRACING).
B. THE STEEL SUPPLIER SHALL PROVIDE ALL MISCELLANEOUS STRUCTURAL STEEL ITEMS
NECESSARY TO FULFILL THE INTENT OF THE STRUCTURAL DRAWINGS WHETHER OR NOT THE
ITEMS ARE SHOWN ON THE STRUCTURAL DRAWINGS. SUCH ITEMS MAY INCLUDE BUT ARE NOT
LIMITED TO: EDGE ANGLES, CLOSURE PLATES AND DECK SUPPORT FRAMING.
C. DECK OPENINGS: FLOOR AND ROOF OPENINGS ARE SHOWN ON ARCHITECTURAL, STRUCTURAL,
AND OTHER DISCIPLINE DRAWINGS. IF OPENINGS ARE NOT SHOWN, LOCATED OR DIMENSIONED
ON STRUCTURAL DRAWINGS, REFER TO DRAWINGS LISTED ABOVE FOR REQUIRED INFORMATION.
UNLESS OTHERWISE NOTED, ALL OPENINGS THROUGH FLOOR AND ROOF DECK SHALL BE FRAMED
USING MISCELLANEOUS STRUCTURAL STEEL FRAMES OR REINFORCING AS FOLLOWS:
a. DECK SUPPORTING CONCRETE:
1. FOR OPENINGS WITH THE LARGEST DIMENSION LESS THAN 24", PROVIDE 1-#5 BAR IN
CONCRETE ABOVE DECK FLUTES ON EACH SIDE OF OPENING. EXTEND REINFORCING A
MINIMUM OF 24" BEYOND EDGES OF OPENING OR PROVIDE A STANDARD HOOK. OPENINGS
SHALL BE SPACED A MINIMUM OF 24" CLEAR. IF SPACING REQUIREMENT CANNOT BE MET,
THE OPENINGS SHALL BE CONSIDERED AS ONE LARGE OPENING AND A STEEL FRAME
AROUND OPENINGS SHALL BE PROVIDED AS DESCRIBED BELOW.
2. FOR ALL OTHER OPENINGS, PROVIDE A STEEL FRAME AROUND OPENING PER TYPICAL
OPENING FRAME DETAIL PROVIDED ON STRUCTURAL DRAWINGS.
b. ROOF DECK (NO CONCRETE TOPPING):
1. NO ADDITIONAL DECK SUPPORT FRAMING IS REQUIRED FOR OPENINGS WITH THE LARGEST
DIMENSION LESS THAN OR EQUAL TO 10". OPENINGS IN THIS CATEGORY MUST BE SPACED A
MINIMUM OF 24" APART (CLEAR) WHEN OPENINGS ARE NOT ALIGNED PARALLEL TO
DIRECTION OF FLUTES. IF SPACING REQUIREMENT CANNOT BE MET, THE OPENINGS SHALL
BE CONSIDERED AS ONE LARGE OPENING AND A DECK SUPPORT FRAME SHALL BE
PROVIDED AS DESCRIBED BELOW.
2. FOR ALL OTHER OPENINGS, PROVIDE A STEEL FRAME AROUND OPENINGS PER TYPICAL
OPENING FRAME DETAIL PROVIDED ON STRUCTURAL DRAWINGS.
a. STEEL DECK PROPERTIES LISTED IN TABLE ABOVE CONFORM TO DECK PRODUCED BY
VULCRAFT. STEEL DECK FROM OTHER SUPPLIERS MAY BE SUPPLIED PROVIDED SECTION
PROPERTIES ARE SIMILAR, LOAD CAPACITY IS EQUIVALENT, CONSTRUCTION SPANS ARE EQUAL
OR GREATER, AND SUBSTITUTION IS APPROVED BY THE STRUCTURAL ENGINEER.
b. THE CONTRACTOR SHALL PROVIDE ADDITIONAL SHEAR STUDS IF ALTERNATE DECK TYPE
REQUIRES MORE STUDS THAN SPECIFIED FOR COMPOSITE BEAMS TO MEET LEVEL OF
COMPOSITE ACTION ACHIEVED USING ORIGINAL DECK TYPE.
D. INSTALLATION:
a. DECKING SHALL BE 3-SPAN CONTINUOUS (FOUR SUPPORTS) AS A MINIMUM UNLESS NOTED
OTHERWISE.
b. DECK SHALL BEAR A MINIMUM OF 1-1/2" AT SUPPORTS.
c. ROOF DECK ENDLAPS SHALL BE A MINIMUM OF 2"
d. STEEL DECK SHALL BE FASTENED TO SUPPORTS PER INSTRUCTIONS ON THE PLANS OR
SPECIFICATIONS BUT NOT LESS THAN REQUIRED BY SDI.
e. DECK SHALL NOT BE SHORED DURING PLACEMENT OF CONCRETE UNLESS APPROVED BY THE
STRUCTURAL ENGINEER.
E. OPENINGS THROUGH STEEL DECK: SEE REQUIREMENTS GIVEN IN THE MISCELLANEOUS
STRUCTURAL STEEL SECTION IN THESE GENERAL NOTES.
F. HANGERS SUPPORTING DUCTWORK OR MECHANICAL EQUIPMENT SHALL NOT BE SUSPENDED
FROM STEEL ROOF DECK. ATTACH HANGERS DIRECTLY TO MAIN ROOF FRAMING OR PROVIDE
ADDITIONAL MISCELLANEOUS STEEL FRAMING CONNECTED TO MAIN ROOF FRAMING.
1. STAIR DESIGN:
A. THE CONTRACTOR SHALL PROVIDE COMPLETE DRAWINGS AND CALCULATIONS FOR ALL STAIR
CONSTRUCTION NOT SHOWN ON THE STRUCTURAL DRAWINGS. STAIR AND LANDING FRAMING
SHALL BE DESIGNED AND DETAILED BY A PROFESSIONAL ENGINEER LICENSED IN THE PROJECT
JURISDICTION. REFER TO PROJECT SPECIFICATIONS FOR SUBMITTAL REQUIREMENTS.
B. DESIGN REQUIREMENTS:
a. STAIRWAY FRAMING, LANDINGS AND ALL SUPPORT FRAMING SHALL BE DESIGNED FOR DEAD
LOADS, SEISMIC LOADS AND LIVE LOADS PER THE REQUIREMENTS OF THE REFERENCED
BUILDING CODE.
b. REFER TO ARCHITECTURAL DRAWINGS FOR STAIRWAY WIDTHS AND CLEARANCES. MINIMUM
HEADROOM CLEARANCES SHALL COMPLY WITH REQUIREMENTS OF THE REFERENCED
BUILDING CODE.
c. ALL REQUIRED EMBEDDED PLATES AND ANGLES SHALL BE INCLUDED AS PART OF THE STAIR
DESIGN.
d. THE STAIR MANUFACTURER SHALL PROVIDE ALL FRAMING, CONNECTIONS AND ACCESSORIES
AS NECESSARY TO SUPPORT STAIRS FROM THE PRIMARY STRUCTURE. CONNECTIONS TO
PRIMARY FRAMING SHALL BE LOCATED AND DETAILED TO PROPERLY TRANSFER FORCES TO
THE PRIMARY FRAMING WITHOUT CAUSING OVERLOAD OR DISTORTION OF THE SUPPORTING
ELEMENTS.
W8, W10, W12, S8, S10, S12, C8, C9, C10, C12, MC8,
MC9, MC10, MC12, MC13
In (IN4/FT)Sp (IN3/FT) Sn (IN3/FT)
a. PROVIDE STANDARD SIMPLE SHEAR BEAM CONNECTIONS AS SHOWN IN THE AISC STEEL
CONSTRUCTION MANUAL (REFERENCED EDITION) SUBMITTED IN ACCORDANCE WITH THE
SPECIFICATIONS, UNLESS NOTED OTHERWISE ON THE DRAWINGS.
5.STEEL DECK:
A.REFERENCE STANDARDS: STEEL DECK SHALL BE DESIGNED, FABRICATED AND ERECTED IN
ACCORDANCE WITH STANDARDS OF THE STEEL DECK INSTITUTE (SDI).
B.ALL STEEL DECK AND DECK ACCESSORIES SHALL BE FABRICATED FROM SHEET STEEL
CONFORMING TO ASTM A653 WITH G60 GALVANIZED FINISH. MINIMUM DECK YIELD STRESS SHALL
CONFORM TO THE VALUES GIVEN IN THE TABLE OF MINIMUM DECK SECTION PROPERTIES.
C.SPECIFIED STEEL DECK SHALL EXHIBIT THE FOLLOWING MINIMUM SECTION PROPERTIES: EDIT
TABLE OR ADD/DELETE DECK TYPES TO FIT PROJECT REQUIREMENTS
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
3/
2
0
/
2
0
2
0
1
2
:
4
5
:
2
2
P
M
S-002
STRUCTURAL
GENERAL NOTES
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
3/26/2020
160
1.Inspection of reinforcing steel. and placement.
2.Inspection of reinforcing steel welding in
accordance with Table 1705.2.2, Item 2b.
3.Inspection of anchors cast in concrete prior to and
during placement of concrete where allowable loads
have been increased or where strength design is
used.
5.Verifying use of required design mix.
6.At the time fresh concrete is sampled to fabricate
specimens for strength tests, perform slump and air
content tests, and determine the temperature of the
concrete.
7.Inspection of concrete placement for proper
application techniques.
8.Inspection for maintenance of specified curing
temperature and techniques.
9.Inspect formwork for shape, location and
dimensions of the concrete member being formed.
TABLE 1705.6
REQUIRED VERIFICATION AND INSPECTION OF SOILS
PERIODICALLY
DURING TASK LISTED
1.Verify materials below shallow foundations are adequate to
achieve the design bearing capacity.
2.Verify excavations are extended to proper depth and have
reached proper material.
3.Perform classification and testing of compacted fill materials.
4.Verify use of proper materials, densities and lift thicknesses
during placement and compaction of compacted fill.
5.Prior to placement of compacted fill, observe subgrade and
verify that site has been prepared properly.
1705.5 Wood construction -Inspect prefabricated wood structural elements
and assemblies in accordance with Section 1704.2.5.
1705.1.1 Special cases -Perform inspections required by the building official
for special cases.
CONTINUOUS DURING
TASK LISTEDVERIFICATION AND INSPECTION TASK
x-
x-
x-
-x
x-
TABLE 1705.3
REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION
x-
VERIFICATION AND INSPECTION CONTINUOUS PERIODIC REFERENCED
STANDARD IBC REFERENCE
ACI 318: 20, 25.2,
25.3, 26.5.1-26.5.3 1908.4
---AWS D1.4
ACI 318: 26.5.4
x-ACI 318: CH. 19,
26.4.3, 26.4.4
-x
x--
x-1908.9
-x
-x 1908.10
ACI 318: 26.10.1
ACI 318:
26.4.7-26.4.9
ACI 318: 26.4.5
ASTM C 172
ASTM C 31
ACI 318: 5.6, 5.8
1908.6, 1908.7,
1908.8
1904.1, 1904.2,
1908.2,1908.3
CONTINUOUS PERIODICVERIFICATION AND INSPECTION TASK (with IBC reference, where
applicable)
1704.2.5 Inspection of fabricators -Inspect structural load-bearing members
and assemblies where fabrication is being performed at a fabricator's shop per
the special inspection requirements of this schedule.
1704.2.5.1 Fabrication and implementation procedures -Verify fabricator's
fabrication and quality control procedures.
1705.2.1 Steel construction -Provide inspections per Table of Minimum
Requirements for Inspection of Structural Steel Buildings.
1705.2.3 Steel construction -Inspect welding of cold-formed steel framing
members such as studs and joists per Table 1705.2.3.
1705.3 Concrete construction -Provide inspections per Table 1705.3.
Post-installed anchors in concrete:
2.Verify hole diameter and depth, method of drilling using appropriate bit,
and hole preparation as recommended by anchor manufacturer.
1705.4 Masonry construction -Provide inspection and verification of masonry
construction as follows:
1705.5.1 High load diaphragms -Inspect high-load diaphragms as follows:
3.Verify nail or staple diameter and length, number of fastener lines and
spacing between fasteners in each line and at edge margins.
1705.6 Soils -Provide inspections per Table 1705.6.
1705.14 Sprayed fire-resistant materials -Inspect sprayed fire-resistant
materials as follows:
1.Inspect surface preparation for compliance with the approved fire-
resistance design and the approved manufacturer's written instructions.
1705.15 Mastic and intumescent fire-resistant coatings -Inspect mastic and
intumescent fire-resistant coatings in accordance with AWCI 12-B.
--
--
--
--
-
--
--
x
x
x
x
x
x
x
x
x
x
x
x
x
x
-
x
4.Measure average thickness per ASTM E605 and Section 1705.14.4.
1.Verify anchor description including product name, diameter and length.
3.Verify installation locations including anchor distance to edge of
concrete and anchor spacing.
1.Verify grade and thickness of sheathing.
2.Verify nominal size of framing members at adjoining panel edges.
2.Verify minimum ambient temperature before and after application.
3.Verify ventilation of area during and after application.
5.Verify density of material for conformance with the approved fire-
resistant design and ASTM E605.
6.Test cohesive/adhesive bond strength per IBC Section 1705.14.6.
SCHEDULE OF SPECIAL INSPECTIONS FOR STANDARD BUILDINGS
SCHEDULE OF SPECIAL INSPECTIONS FOR STANDARD BUILDINGS
x-
4.Inspection of anchors post-installed in hardened
concrete x-ACI 318: 17.8.2
ACI 318: 17.8.2
VERIFICATION AND INSPECTION TASK (with IBC reference)CONTINUOUS PERIODIC
1705.12.1 Structural steel -Special inspection in accordance
with Section 1705.12.1 and AISC 341.
1705.12.2 Structural wood -Inspect structural wood as follows:
1.Inspect field gluing operations of elements of the seismic-force-
resisting system.
x
x
x
1711.12.1 Reinforcing and prestressing steel -Test and verify reinforcing
steel as follows:
2.For ASTM A 615 reinforcing steel that is to be welded, verify tests to
determine weldability have been performed in accordance with Section
26.6.4 of ACI 318.
1705.13.1 Structural Steel -Test structural steel in accordance with the
quality assurance plan requirements of AISC 341.-
-
-
-
2.Where specified fastener spacing of the sheathing is 4 inches o.c. or
less, inspect nailing, bolting, anchoring, and other fastening of
components within the seismic-force-resisting system, including:
a.wood shear walls
b.wood diaphragms
c.drag struts
d.braces
e.shear panels
f.hold-downs
ACI 318 1.9.2 Reinforced Concrete -Inspection of the placement of the
reinforcement and concrete for special moment frames.
SCHEDULE OF SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE
x
ACI 530-11 TABLE 1.19.1
LEVEL A QUALITY ASSURANCE
MINIMUM TESTS
None
MINIMUM INSPECTION
Verify compliance with the approved submittals
1.Structures with empirically designed masonry, glass unit masonry or
masonry veneer designed in accordance with ACI 530-11, Chapters 5,
6 or 7 in Risk Category I, II or III shall be inspected and verified per
Table 1.19.1
--
2.Structures with masonry designed in accordance with chapters other
than 5, 6 or 7 in ACI 530-11 in Risk Category I, II or III shall be
inspected and verified per Table 1.19.2
--
3.Structures with masonry designed in accordance with chapters other
than 5, 6 or 7 in ACI 530-11 in Risk Category IV shall be inspected and
verified per Table 1.19.3
REFERENCEINSPECTION REQUIREMENT
Material identification procedures
Review of material test reports and certifications
Section 6.1 of Code of
Standard Practice
MINIMUM REQUIREMENTS FOR INSPECTION OF
STRUCTURAL STEEL BUILDINGS
AISC 360, N5.2
Quality Control (QC) Inspector Qualifications AISC 360, N4.1
Quality Assurance (QA) Inspector Qualifications AISC 360, N4.2
NDT Personnel Qualifications AISC 360, N4.3
Inspections performed in fabricator's shop:
Shop welding inspections performed prior, during, and after welding
Nondestructive testing of shop welded joints
Shop bolting inspections performed prior, during, and after bolting
Shop cut and finished surfaces
Shop heating for straightening, cambering and curving
Tolerances for shop fabrications
AISC 360, N5.4
AISC 360, N5.5
AISC 360, N5.6
AISC 360, N2, M2
AISC 360, N2, M2.1
Section 6 of Code of
Standard Practice
Inspections performed in field:
Field welding inspections performed prior, during, and after welding
Nondestructive testing of field welded joints
Field bolting inspections performed prior, during, and after bolting
Placement and fastening of composite steel deck
Installation of steel headed stud anchors
Field cut surfaces
Field heating for straightening
Tolerances for field erection
Inspection of erected steel for conformance to project documents
AISC 360, N5.4
AISC 360, N5.5
AISC 360, N5.6
AISC 360, N6
AISC 360, N6
AISC 360, N2, M2.2
AISC 360, N2, M2.1
Section 7.13 of Code of
Standard Practice
AISC N.7
Submittal of inspection and testing reports AISC 360, N5.2
Submittal of certificate of compliance AISC 360, N7
-
-
-
1705.11.1 Structural wood -Inspect structural wood as follows:
1.Inspect field gluing operations of elements of the main windforce-
resisting system.
x
x
2.Where specified fastener spacing of the sheathing is 4 inches o.c. or
less, inspect nailing, bolting, anchoring, and other fastening of
components within the main windforce-resisting system, including:
a.wood shear walls
b.wood diaphragms
c.drag struts
d.braces
e.hold-downs
-
STANDARD BUILDING SPECIAL INSPECTION REQUIREMENTS (per IBC Section 1704.2):
Provide inspections required in the Schedule of Special Inspections for Standard Buildings.
STATEMENT OF SPECIAL INSPECTIONS
WIND RESISTANCE SPECIAL INSPECTION REQUIREMENTS (per IBC Section 1705.11):
In addition to the inspections required in the Schedule of Special Inspections for Standard Buildings, provide
special inspection and testing for wind resistance for the following systems:
Special Inspection:
1. Conduct special inspection of the wind force-resisting systems in structures constructed of structural wood
framing or cold-formed steel light-gage framing in the following areas:
a. In wind Exposure Category B, where Vasd as determined in accordance with IBC Section 1609.3.1 is
120 mph or greater.
b. In wind Exposure Category C or D where Vasd as determined in accordance with IBC Section
1609.3.1 is 110 mph or greater.
2. Conduct special inspection of roof and wall cladding in structures in the following areas:
a. In wind Exposure Category B, where Vasd as determined in accordance with IBC Section 1609.3.1 is
120 mph or greater.
b. In wind Exposure Category C or D where Vasd as determined in accordance with IBC Section
1609.3.1 is 110 mph or greater.
STRUCTURAL OBSERVATION REQUIREMENTS:
The contractor shall notify the structural observer 48 hours in advance of the required structural observations for
scheduling purposes. Failure by the contractor to meet this requirement may require removal of any subsequent
work for observation.
Structural observations shall be performed at the following stages of construction:
1. Foundation construction:
a. After placement of reinforcing and prior to placement of concrete for lateral element foundations.
2. Steel construction:
a. After first tier has been erected and plumbed, and bolt tightening and joint welding is in progress.
b. After first floor level of steel deck is in place, welded shear studs are in place and slab reinforcing
placement is in progress.
c. After roof level steel deck is in place.
3. Concrete construction:
a. After placement of first level column and wall reinforcing and prior to closing of forms.
b. For concrete moment frames, after or during placement of beam reinforcement and prior to closing
of beam forms.
c. After placement of first level of slab reinforcing and prior to placement of slab concrete.
4. Masonry construction:
a. After placement of first lift of reinforcing and prior to first lift of grouting.
5. Wood construction:
a. After installation of shear wall hold-downs and prior to installation of sheathing.
b. After installation of shear wall sheathing.
c. After completion of the first level of floor or roof sheathing.
6. Cold formed steel construction:
a. After installation of shear wall hold-downs and prior to installation of sheathing.
b. After installation of shear wall sheathing.
c. After completion of first level of floor or roof sheathing.
STRUCTURAL OBSERVATION REQUIREMENTS FOR WIND RESISTANCE (per IBC Section 1704.6.2):
The owner shall employ a registered design professional to perform structural observations of structures where
Vasd as determined in accordance with IBC Section 1609.3.1 exceed 110 mph and where one or more of the
following conditions exist:
1. The structure is classified as Risk Category III or IV in accordance with IBC Table 1604.5.
2. The height of the structure is greated than 75 feet above the base.
3. When so designated by the registered design professional responsible for the structural design.
4. When such observation is specifically required by the building official.
This Statement of Special Inspections is submitted in accordance with the requirements of the 2015 International
Building Code (IBC) Sections 1704 and 1705.
Special Inspections and Structural Observations applicable to this project:
• Special Inspections for Standard Buildings (per IBC 1704.2)REQUIRED
• Special Inspections for Seismic Resistance (per IBC 1705.12)NOT REQUIRED
• Special Inspections for Wind Resistance (per IBC 1705.11)REQUIRED
• Structural Observations for Seismic Resistance (per IBC 1704.6.1)NOT REQUIRED
• Structural Observations for Wind Resistance (per IBC 1704.6.2)REQUIRED
This Statement of Special Inspections is intended to apply only to items within the scope of work of the Structural
Engineer. See Statement of Special Inspections prepared by the design professional in responsible charge for
additional special inspection requirements applicable to other disciplines.
The following Schedules of Special Inspections summarize the Special Inspections and Tests required. Special
Inspectors shall refer to the approved plans and specifications for detailed special inspection requirements. Any
additional tests and inspections required by the approved plans and specifications shall also be performed.
Special Inspections and Testing shall be performed in accordance with the approved plans and specifications, this
statement and IBC Sections 1704 and 1705. The owner shall retain and directly pay for the special inspections and
testing as required by IBC section 1704.2.
Interim Special Inspection Reports shall be submitted to the Building Official and the Registered Design Professional
in Responsible Charge in accordance with IBC Section 1704.2.4. A Final Report of Special Inspections shall be
submitted to the Building Official and the Registered Design Professional in Responsible Charge in accordance with
IBC Section 1704.2.4.
This Statement of Special Inspections has been developed with the understanding that the Building Official will:
• Review and approve the qualifications of the Special Inspectors who will perform the inspections.
• Monitor special inspection activities on the job site to assure that the Special Inspectors are qualified and are
performing their duties as called for in this Statement of Special Inspections.
• Review submitted inspection reports.
• Perform inspections as required by IBC Section 110 and the local building code.
Structural Observations, when required, will be performed by a registered professional engineer from S. A. Miro, Inc. At
the conclusion of the work included in the permit, the structural observer shall submit to the Building Official a written
statement that the site visits have been made and identify any reported deficiencies that, to the best of the structural
observer's knowledge, have not been resolved.
Structural Observation does not include or waive the responsibility for the Special Inspections included in this
Statement of Special Inspections or the inspections required by IBC Section 110.
VERIFICATION AND INSPECTION TASK (with IBC reference)CONTINUOUS PERIODIC
SCHEDULE OF SPECIAL INSPECTIONS FOR WIND RESISTANCE
STRUCTURAL GENERAL NOTES
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
3/
2
0
/
2
0
2
0
1
2
:
4
5
:
2
6
P
M
S-003
STRUCTURAL
SPECIAL
INSPECTIONS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
3/26/2020
161
A B C
E D C A
3
1
2
19
'
-
1
1
"
19
'
-
1
1
"
33
'
-
2
"
5
S-211
5
S-211
5
S-211
6
S-211
5
S-211
8"
9'
-
2
"
8"
6
"
F5.0
(84'-10")
F5.0
(85'-6")
S-201
3(TYP.)
(TYP.)
86'-11" F.D.
87'-0"
EDGES OF AREAWELL
SLAB (TYP.)
89'-5 3/8"
SILL
12
S-211
9'-7"8"
(SIM.)
SIM
4
B
87'-0"
86'-0"
85'-5"
84'-10"
84'-10"85'-0"
F3.0
(83'-0")
2'-0"
7 5/8"
4'-0 3/8" 3'-10 3/8"
7 5/8"
2'-0"
10
'
-
1
0
1
/
4
"
7
3
/
4
"
1'
-
6
"
1
'
-
0
"
FDN STEP
FDN STEP
FDN STEP
FDN. STEP
FDN STEP
FDN. STEP
86'-0"
86'-0"
86'-0"
T.O. FDN
7'-11"
4'
-
2
1
/
4
"
T.O. FDN
T.O. FDN
T.O. FDN
T.O. FDN.
T.O. FDN
T.O. FDN
T.O. FDN
T.O. FDN
T.O. FDN
T.O. FDN
T.O. FDN
1
S-212
HSS7x5x3/8 HSS7x5x3/8
HSS5x5x1/2
2
S-211
5
S-211
5
S-211
1'-4"
10"
1'-4"
1'
-
4
"
10
"
1'
-
4
"
T.O. SLAB
T.O. SLAB
T.O. SLAB
85'-0"
10" RETAINING WALL,
#5 @ 12" O.C. HORIZONTAL,
#5 @12" O.C. VERTICAL
10" RETAINING WALL,
#5 @ 12" O.C. HORIZONTAL,
#5 @12" O.C. VERTICAL
86'-11" F.D.
86'-5"
85'-10"
6'-2"
5'
-
1
1
"
10
'
-
7
"
3 3/8"
9'-10"10"9'-4"8"
9'
-
6
"
1'
-
0
"
32
'
-
2
"
73
'
-
0
"
6"
8"6"
6"
8"
6"
2
S-201
2
S-2012
S-201
2
S-201 2
S-201
~ RE: ARCH. FOR ALL
RAMP LOCATIONS
~ RE: ARCH. FOR ALL
RAMP LOCATIONS
2
S-201
~ RE: ARCH. FOR ALL
RAMP LOCATIONS
1'
-
5
"
10
'
-
7
"
T.O. FDN.
86'-0"
5
S-211
10
S-211
10" CMU BLOCK WALL
~ RE: 6/S-211
4
S-201
84'-10"
T.O. FDN
1'-4" SQ. PILASTER
TOP OF PILASTER
SHALL BE 6" LOWER
THAN LOWEST
FLOOR LEVEL ~ TYP.
3'
-
6
"
(
T
Y
P
.
)
1'
-
4
"
10
"
1'
-
4
"
TY
P
.
U.
N
.
O
.
10
"
8'
-
6
"
10
"
6
'
-
8
"
26
'
-
6
"
5
S-211
85'-0"
T.O. FDN
(SIM.)
87'-0"
7" 3"
10
"
3'
-
6
"
F
T
G
.
(
T
Y
P
.
)
1'
-
4
"
10
"
1'
-
4
"
TY
P
.
U.
N
.
O
.
21'-7"38'-2"10"
2'
-
6
"
11
'
-
6
"
1'-4" SQ. PILASTER
12
S-211
3" 3'-4"
DOOR
OPNG.
7
S-211
22'-8"10"
HSS5x5x1/2
1'-4" SQ. PILASTER12
S-211
F4.0
(83'-0")
4'-3"
16
'
-
8
"
6'-8"6'-6"
1'-6" DEEP
SUMP PIT
1'-4"
83'-0"
TOP OF FTG.
11
S-201
COL.
T.O. SLAB
S-100
1 ELEVATION
95'-11"
45'-5"14'-4"12'-8"23'-6"
6"
8"
6"
6"
8"
6"
6"
8"
6"
85'-0"
T.O. FDN.
3'-6"
85'-0"
T.O. FDN.
4'
-
0
"
FOUNDATION
STEP
FOUNDATION
STEP
86'-0"
85'-0"
T.O. FDN
6"
8"6"
87'-0"
EDGES OF AREAWELL
SLAB (TYP.)
88'-0"
SILL
TYP.
86'-0"
6"
6"
8'
-
1
1
1
/
2
"
2'
-
2
1
/
2
"
6"
86'-0"8'-2"
6'
-
0
"
6'
-
0
"
(VERIFY)
DOOR OPENINGS.
AT 8'-3" (TYP.)
3"
1'-8"11'-7"
1'
-
5
"
8'
-
4
"
XXXX'-XNOTES:
1. TOP OF SLAB ELEVATION NOTED THUS: ON PLAN.
2. SLAB ON GRADE SHALL BE 4" THICK NORMAL WEIGHT CONCRETE CONSTRUCTED OVER A VAPOR
BARRIER. PLACE THE VAPOR BARRIER OVER A 4" THICK LAYER OF GRANULAR MATERIAL, RE:
SPECIFICATIONS. REINFORCE SLAB WITH 6x6-W2.9xW2.9 W.W.F., UNLESS NOTED OTHERWISE ON
PLAN. WELDED WIRE FABRIC TO BE PLACED AT THE CENTER OF SLAB THICKNESS USING SLAB
BOLSTERS OR EQUIVALENT AT 4'-0 O.C.
3. RE: DETAIL 1/S-201 FOR SLAB ON GRADE JOINTING REQUIREMENTS. PROVIDE CONTROL JOINTS AT
A MAXIMUM SPACING OF 13 FEET O.C. UNLESS NOTED OTHERWISE ON PLAN. PROVIDE THICKENED
SLAB BENEATH ALL CMU WALLS WHERE NO FOUNDATION IS SHOWN.
4. FX ON PLAN INDICATES FOOTING TYPE/MARK. SEE FOOTING SCHEDULE ON SHEET THIS SHEET FOR
SIZE AND REINFORCEMENT.
5. TOP OF FOOTING ELEVATION = 86'-0 UNLESS NOTED OTHERWISE ON PLAN.
6. RE: DETAIL 7/S-201 AND GENERAL NOTES FOR CAST IN PLACE WALL JOINTING REQUIREMENTS.
7. RE: CONCRETE REINFORCING SPLICE SCHEDULE ON SHEET S-001.
8. RE: ARCHITECTURAL DRAWINGS FOR SIZE, DEPTH, AND LOCATION OF SLAB RECESSES. RE: DETAIL
2/S-201 FOR STRUCTURAL REQUIREMENTS.
9. PROVIDE 4" THICK CONCRETE HOUSEKEEPING PADS UNDER ALL FLOOR MOUNTED MECHANICAL
AND ELECTRICAL EQUIPMENT. RE: ARCHITECTURAL AND MEP DRAWINGS FOR SIZE AND LOCATION.
REINFORCE PAD WITH #4 BARS AT 12" O.C. EACH WAY.
10. DENOTES SLAB STEP ~ RE: 2/S-201.
11. RE: 8/S-201 FOR FOOTING STEP DETAIL.
12. RE: S-801 FOR TYPICAL MASONRY DETAILS.
2'-0"x2'-0"x1'-0"
REMARKSFOOTING SIZE REINFORCING
FOOTING SCHEDULE
MARK
F2.0
F4.0
NOTES:
1. FOOTINGS SHALL BE CENTERED UNDER COLUMNS UNLESS
INDICATED OTHERWISE.
2. REINFORCING INDICATED SHALL BE EACH-WAY, BOTTOM
UNLESS NOTED L.W. ~ LONGWAY, S.W. ~ SHORTWAY.
(4) #4 EACH WAY
4'-0"x4'-0"x1'-3" (6) #5 EACH WAY
F5.0 5'-0"x5'-0"x1'-6" (7) #5 EACH WAY
3'-0"x3'-0"x1'-0"F3.0 (7) #4 EACH WAY
SHEET S-101
3"
#4x @ 12" O.C.
3"
23'-6"12'-8"
10"12'-2"6'-0"10" WALL
4'
-
0
"
9'
-
0
"
13
'
-
0
"
1'
-
0
"
1'
-
0
"
87'-0"
100'-0"
FOUNDATION
WALL
(2) #5 X12'-0"
TOP & BOT.
FUTURE
WALL OPENING
WALL REINF. ~ RE: 5/S-211.
EXTEND THROUGH FUTURE
OPENING
SLAB ON
GRADE BEYOND
WALL FOOTING
FORM 1/2" DEEP x3/8"
WIDE GROOVE IN
WALL (INSIDE AND OUT-
SIDE FACES OF WALL)
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
7
/
2
0
2
0
7
:
3
4
:
1
5
A
M
S-100
FOUNDATION
PLAN
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
3/16" = 1'-0"
FOUNDATION PLAN
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
REVISION DATE
REVIEW COMMENTS R2 2019.10.15
AREAWELL WALL CHANGES R3 2019.10.24
UPDATED FOOTPRINT 2020.02.07
REVISION 6 2020.03.25
REVISION 7 2020.04.09
S-100S-100 1/8" = 1'-0"
1 WALL ELEVATION WITH FUTURE OPENING
.07
04/07/2020
162
E D C A
3
1
2
19
'
-
1
1
"
19
'
-
1
1
"
33
'
-
2
"
95'-11" (VERIFY)
45'-5"14'-4"12'-8"23'-6"
3'-0"
C.L. BEAM CONNECTION
8
S-212
5
S-211
6
S-211
FLOOR DECK, SEE PLAN NOTE 2.
EL
E
V
A
T
I
O
N
S-401
2
S-40
2
1
S-401
1
S-40
2
2
ELEVATION
EL
E
V
A
T
I
O
N
ELEVATION
4
do do do do do
do do do do do do do do
W8
x
1
0
W8
x
1
0
W16x31 [63]W24x55 [60]W24x68 [60] (1 7/8")
W18x35 [36]
W16x31 [31]
W1
2
x
1
6
[
1
8
]
W1
2
x
1
6
[
1
8
]
W1
2
x
1
6
[
1
2
]
W1
6
x
3
1
[
2
8
]
W14x30 [18]
W1
0
x
1
2
[
6
]
W1
2
x
1
4
[
6
]
B
W8x10 [6]W12x16 [16]
W1
2
x
2
2
[
2
0
]
1'
-
0
"
9'-0"5'-4"3'-8"
9"
7'
-
1
0
1
/
2
"
7'
-
1
0
1
/
2
"
8'
-
0
"
7'
-
1
0
"
10
"
5
1
/
2
"
4'
-
2
1
/
4
"
7'-6 1/2"
4'-10 3/4"
W8
x
1
0
[
6
]
S-40
2
3
EL
E
V
A
T
I
O
N
24
24
70 38 46
18
34
22
59
60
65 79
15882
51
34
8'-3 5/8"8'-6 3/4"
37S-311
1
2
S-311
6
S-212
9
S-212
3
S-311
HSS4x4x1/4 HSS4x4x1/4
5
S-311 5
S-311
TYP.
4
S-801
4
S-801
4
S-801
4
S-801O.H.
6x6 6x6 6x6
6x6
PROVIDE 'SIMPSON' CB COLUMN
BASE W/ BLACK POWDER CONT.
AT 6x6 POSTS, TYP OF 4
11
S-211 TYP'SIM'
TYP @ GLAZING
11
S-211
11
S-211
11
S-211
11
S-211
'SIM'
TYP @ GLAZING
SIM
73
'
-
0
"
SIM
COORDINATE T.O.
AREA WELL WALL
ELEVATIONS WITH
CIVIL GRADES TYP.
COORDINATE T.O.
AREA WELL WALL
ELEVATIONS WITH
CIVIL GRADES TYP.
10
S-211
W1
2
x
1
6
[
1
8
]
24
W1
2
x
1
6
[
1
8
]
24
7'-11"
HSS5x5 BELOW
7
S-211
5
S-211
5
S-211
11
S-211
TYP.
5
S-211
11
S-211
BELOW ~ RE
DETAIL 6 & 9/S-212
6"
10
'
-
6
"
19
'
-
4
"
10
'
-
6
"
32
'
-
2
"
19
'
-
1
1
"
19
'
-
1
1
"
33
'
-
2
"
16
'
-
6
"
16
'
-
8
"
10'-3"
W8
x
1
0
4'-9 1/2" 4'-9 1/2"
(G
A
L
V
.
)
19W4 1 1/4"x1/8"
GALV. BAR
GRATING
W8
x
1
0
4'-9 1/2" 4'-6 1/2"
(G
A
L
V
.
)
19W4 1 1/4"x1/8"
GALV. BAR
GRATING
10'-0"
9'-5"
7" 3"
SLOPE DOWN
93'-10"
99'-7 1/2"
4"
1
S-212
20
9'
-
7
3
/
8
"
6'
-
7
"
16
'
-
1
1
5
/
8
"
W1
4
x
2
6
[
2
6
]
22
W12x14 [14]
W12x19 [22]
W12x16 [16]
W14x26 [28]24
2018
23
1'-0"8'-11"5'-10"
3"
FLOOR DECK, SEE
PLAN NOTE 2.
4'-3"
DECK SPAN
HSS 5x5
BELOW
3'-11"6'-3"
6x6 WOOD POST
(ABOVE)
6x6 WOOD POST
(ABOVE)
3'-11"6'-3"
6x6 WOOD POST
6x6 WOOD POST11
S-211
2"8"
21'-7"38'-2"
11'-7"
10"
6'
-
8
"
26
'
-
6
"
10
"
99'-4"
T.O. LEDGE
99'-10 1/4"
100'-0"8"
6"
SL
A
B
SL
O
P
E
DN
.
7
S-801
EXTENT OF
METAL STUD
WALL FRAMING
6"10'-9"10'-9"10'-9"5'-5"6x6 POSTS
4x4
POST
4x4
POST
8'-8"
5'
-
9
"
5'
-
9
"
F2
(98'-0)
F2
(98'-0)
6'
-
0
"
8'-3" HIGH
OPNG.
7"
8'-3" HIGH
OPNG.
4"x
@12" O.C.
4'-6"
12
S-201
XXXX'-XNOTES:
1. TOP OF FLOOR SLAB ELEVATION = 100'-0 UNLESS NOTED THUS: ON PLAN.
2. FLOOR SLAB SHALL BE 4-1/2" NORMAL WEIGHT CONCRETE ON 2" DEEP, 19 GAGE GALVANIZED
COMPOSITE FLOOR DECK. (6-1/2" TOTAL THICKNESS, 3 SPAN DECK MINIMUM). REINFORCE SLAB WITH
6x6-W2.9xW2.9 WELDED WIRE FABRIC.
3. FRAMING NOMENCLATURE:
BEAM SIZE
NUMBER OF STUDS
17
BEAM CAMBER (IN.)
BEAM REACTION IN KIPS (FACTORED)
REACTION APPLIES AT EACH END OF BEAM
UNLESS NOTED OTHERWISE.
W18x35 [56] (2")
DESIGN LOADS:
DEAD LOADS: 1. FLOOR FINISH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 PSF
2. 4-1/2" NW CONCRETE ON 2" DEEP FLOOR DECK . . . . . . . . . . . . . . . . . . . . . . . 69 PSF
3. ADDITIONAL CONCRETE DUE TO DECK DEFLECTION . . . . . . . . . . . . . . . . . . . .5 PSF
4. MECHANICAL, CEILING, LIGHTS AND SPRINKLERS . . . . . . . . . . . . . . . . . . . . . 10 PSF
5. STEEL FRAMING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ACTUAL
TOTAL 89 PSF
+ACTUAL
LIVE: 1. DINING, ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .100 PSF
(NOT REDUCIBLE)
4. SHEAR STUDS SHALL BE 3/4"DIA.x3-1/2" (IN PLACE LENGTH) HEADED ANCHOR STUDS WELDED TO BEAM
FLANGE. RE: DETAIL 9/S-301 FOR LAYOUT AND SPACING OF STUDS.
5. BEAMS SHALL BE FABRICATED SUCH THAT AFTER ERECTION ANY CAMBER DUE TO ROLLING OR SHOP
FABRICATION IS UPWARD.
6. SEE GENERAL NOTES FOR CONNECTION DESIGN REQUIREMENTS.
7. BEAMS ARE EQUALLY SPACED BETWEEN GRIDS OR COLUMNS UNLESS DIMENSIONED OTHERWISE.
8. INDICATES FLOOR PENETRATION. COORDINATE OPENING SIZE AND LOCATION WITH
ARCHITECTURAL AND MECHANICAL DRAWINGS AND MECHANICAL CONTRACTOR. RE: DETAILS AND
GENERAL NOTES FOR STRUCTURAL REQUIREMENTS. THE CONTRACTOR SHALL SUBMIT DRAWINGS OF
ALL MISCELLANEOUS FLOOR PENETRATIONS NOT SHOWN ON PLAN FOR ARCHITECT'S AND ENGINEER'S
APPROVAL.
9. SEE GENERAL NOTES FOR REQUIREMENTS FOR ELECTRICAL CONDUIT PLACED IN SLAB AND CORE
DRILLING PENETRATIONS THROUGH SLAB.
10. RE: DETAIL 2/S-301 FOR TYPICAL DECK SUPPORT AT COLUMNS.
11. PROVIDE A TEMPORARY FLOOR OPENING FOR PLACEMENT OF MECHANICAL AND ELECTRICAL
EQUIPMENT INTO BASEMENT OF BUILDING. AFTER INSTALLATION IS COMPLETE, PLACE NEW BEAM
FRAMING AND NEW 2" DEPP, 19 GA. GALVANIZED COMPOSITE FLOOR DECK WITH 6x6 W2.9xW2.9 WELDED
WIRE FABRIC REINFORCEMENT. FILL OPENING WITH NORMAL-WEIGHT CONCRETE WITH A COMPRESSIVE
STRENGTH OF 3,500 PSI AT 28 DAYS. PROVIDE LIGHT GAGE CLOSURE PLATES AS REQUIRED TO PREVENT
LEAKAGE OF CONCRETE.
12. SEE SHEET S-302 FOR TYPICAL STEEL BEAM TO CNCRETE WALL CONNECTIONS U.N.O.
3/16" = 1'-0"
LEVEL 1 FRAMING PLAN
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
6
/
2
0
2
0
5
:
5
1
:
5
2
P
M
S-101
LEVEL 1 FRAMING
PLAN
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
23816JOHNM.KARLBERG
PROFESSIONA L ENGINEER
COLORADO REGISTERED
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
REVISION 6 2020.03.25
REVISION 7 2020.04.09
04/07/2020
163
E D C A
3
1
2
RELOCATED EXISTING ROOF STRUCTURE
19
'
-
1
1
"
19
'
-
1
1
"
33
'
-
2
"
5
S-501
2
S-321
5
S-501
5
S-501
TYP
TYP
4
B
W1
0
x
1
2
SA
F
E
T
Y
B
E
A
M
3
S-503
4
S-503
4
S-503
5 1/2" x 21" GLULAM(2
)
1
3
/
4
x
1
1
7
/
8
L
V
L
(2
)
1
3
/
4
x
1
1
7
/
8
L
V
L
(2)1 3/4x11 7/8 LVL
(2
)
1
3
/
4
x
1
1
7
/
8
L
V
L
7
S-503
ABOVE
6
S-503
6
S-503
5
S-503 PROVIDE 'SIMPSON'
HU412(MIN) HANGER
PROVIDE 'SIMPSON'
HU412(MIN) HANGER TYP
PROVIDE 'SIMPSON' HU412
(MIN) HANGER TYP
PROVIDE 'SIMPSON'
BA HANGER 5
S-503
114'-5 1/2"
T.O. SHTG.113'-2"
T.O. SHTG.
TYP
6x12 DF#1 6x12 DF#1 6x12 DF#1 6x12 DF#1
2x8 DF#2
RAFTERS AT 16" O.C.
8
S-503
TYP
45'-5"14'-4"12'-8"23'-6"
10
S-503
PROVIDE 'SIMPSON' CC
COLUMN CAP AT
POSTS, TYP OF 4
(2) 1x8 RIDGE MEMBER
(4) 2x12
CEILING JOISTS
BELOW @ 16" O.C.
(NOT SHOWN)
RAFTERS
EXIST.
TRUSS TYPE
T4 (4 TOTAL)
TRUSS TYPE T3
(3 TOTAL)
TRUSS TYPE T2 TRUSS TYPES T1 & T1A (35 TOTAL)
(7 TOTAL)
TRUSS TYPE T5
(3 TOTAL)
TRUSS TYPE T6
(5 TOTAL)
TRUSS TYPE T7 TRUSS TYPE
T8
RAFTERS
EXIST.
TRUSS AND RAFTER SPACING @ 16" O.C. (+/-)
CEILING JOISTS
BELOW @ 16" O.C.
(NOT SHOWN)
3/4" SHEATHING
2x
1
2
@
1
'
-4"
O
.
C
.
W1
2
x
1
9
W1
2
x
1
9
(1
1
3
'
-0
1
/
4
"
)
(1
1
3
'
-0
1
/
4
"
)
W12x19 (113'-0 1/4")
2x
1
2
@
1
'
-4"
O
.
C
.
2x
1
2
@
1
'
-4"
O
.
C
.
(2
)
2
x
1
2
@
1
'
-4"
O
.
C
.
2x12
2x12
6x6
BELOW
6x6
BELOW
3/4" PLYWOOD
SHEATHING, SEE
PLAN NOTES.
OVERFRAMED
MANSARD ROOF
(SHADED AREA)
95'-11" (VERIFY)
4"10'-2"13'-0"
16
'
-
8
"
16
'
-
6
"
19
'
-
1
1
"
19
'
-
1
1
"
73
'
-
0
"
OVERFRAMED
DORMER ~ RE:
ARCH. FOR GEOMETRY
8'-8"10"
1'
-
8
"
5
'
-
9
"
5'
-
9
"
1
'
-
8
"
111'-9"
T.O.
SHEATHING
W8
x
1
0
2x10 @
16" O.C.
4x4
POST
4x4
POST
5
S-502
9'-6"
7'
-
5
"
7'
-
5
"
11
S-502
9
S-502
112'-1"
TOP OF EXIST.
DOUBLE TOP
PLATE
EXISTING 2x6
RAFTERS (TYP.)
1
S-321
6'
-
2
"
27
'
-
0
"
10'-9"10'-9"10'-9"5'-5"
EXISTING OR NEW
2x6 RAFTERS @ 16" O.C.
(TYP.)
FRAME PORTION OF
ROOF WITH RECLAIMED
EXISTING LUMBER OR NEW,
ROUGH SAWN LUMBER AS
REQUIRED.
1
S-503
9
S-502
1
S-503
9
S-503
9
S-503
6x6
BEL
OW 6x6
BEL
OW
7
S-502
7
S-502
2x12
2x12
(4) 2x12
2x
1
2
@
1
'
-4"
O
.
C
.
(2) 2x12
2x12
2x12
(2
)
2
x
1
2
@
1
'
-4"
O
.
C
.
(2) 2x12
(2) 2x12
(2) 2x12
(2) 2x12
(1
1
1
'
-6
3
/
4
"
T
.
O
.
S
.
)
12
S-503
S-501
9
(ACCESS
HATCH)
8
S-801
9
S-506
9
S-506
2x
8
@
1
'
-4"
O
.
C
.
PLAN NOTES FOR RELOCATED ROOF FRAMING:
1. ROOF CONSTRUCTION CONSISTS OF COMPOSITE SHINGLES OVER A WATERPROOF
MEMBRANE OVER 1/2" THICK SHEATHING OVER AN INSULATION LAYER WITH SLEEPERS.
PROVIDE A ROOF UNDERLAYMENT LAYER BELOW THE INSULATION AND ABOVE ANOTHER
LAYER OF 1/2" THICK SHEATHING PLACED OVER THE EXISTING 1" THICK GAP BOARD
SHEATHING.
2. NEW SHEATHING SHALL BE PLYWOOD OR O.S.B. EQUIVALENT, APA RATED (STRUCTURAL 1)
WITH A SPAN RATING OF 48/24. FASTEN SHEATHING WITH 10d NAILS AT 6" O.C. AT PANEL
EDGES AND 12" O.C. AT INTERMEDIATE SUPPORTS. PANEL EDGES AND NAILING AT EDGES
ARE TO BE STAGGERED BETWEEN THE TWO LAYERS OF NEW SHEATHING.
3. SEE TYPICAL HEADER SCHEDULE ON SHEET S-401 FOR FRAMING OVER WINDOWS AND
DOORS NOT SHOWN ON PLAN.
4. OUTRIGGERS OR RAKES ARE NOT SHOWN ON PLAN. SEE DETAILS FOR ADDITIONAL
INFORMATION.
5. SEE DESIGN LOADS THIS SHEET AND GENERAL NOTES ON SHEET S-001 FOR DEFLECTION
CRITERIA USED FOR JOIST DESIGN.
6. CONTRACTOR SHALL COORDINATE ALL ROOF FRAMING WITH MECHANICAL PENETRATIONS.
PROVIDE ADDITIONAL FRAMING AS REQUIRED WHERE PENETRATION INTERRUPTS TYPICAL
ROOF FRAMING.
DESIGN LOADS: 1. COMPOSITE ROOFING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.0 PSF
2. PAPER FELT / SNOW SHIELD . . . . . . . . . . . . . . . . . . . . . . . 1.0 PSF
3. NEW SHEATHING (x2 LAYERS) . . . . . . . . . . . . . . . . . . . . . . 4.0 PSF
4. SLEEPERS (4'-0" O.C.) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.5 PSF
5. 4" INSULATION (1.5 PSF / IN. THICKNESS) . . . . . . . . . . . . . 6.0 PSF
6. EXISTING SKIP SHEATHING . . . . . . . . . . . . . . . . . . . . . . . . . 2.0 PSF
7. WOOD TRUSSES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.0 PSF
8. MECHANICAL, LIGHTS, SPRINKLERS . . . . . . . . . . . . . . . . . 5.0 PSF
TOTAL: 24.5 PSF
LIVE LOADS: 1. SNOW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .50.0 PSF
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
7
/
2
0
2
0
9
:
5
4
:
2
3
A
M
S-102
ROOF FRAMING
PLAN
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
3/16" = 1'-0"
ROOF FRAMING PLAN
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
REVISION DATE
REVIEW COMMENTS R2 2019.10.15
UPDATED FOOTPRINT 2020.02.07
REVISION 6 2020.03.25
REVISION 7 2020.04.07
FLAT ROOF PLAN NOTES:
1. ROOF CONSTRUCTION CONSISTS OF WATERPROOF MEMBRANE OVER INSULATION OVER A
ROOF UNDERLAYMENT ON TOP OF 3/4" SHEATHING ON TOP OF ROOF JOIST FRAMING.
2. ROOF SHEATHING SHALL BE PLYWOOD OR O.S.B. EQUIVALENT, APA RATED (STRUCTURAL 1)
WITH A SPAN RATING OF 48/24. FASTEN SHEATHING WITH 10d NAILS AT 6" O.C. AT PANEL
EDGES AND AT 12" O.C. AT INTERMEDIATE SUPPORTS.
3. DENOTES FUTURE CUPOLA AT ROOFTOP, ROOF SYSTEM HAS BEEN DESIGN FOR AN
ADDITIONAL 8,000# LOADING.
OVERFRAMED MANSARD ROOF FRAMING PLAN NOTES:
1. OVERFRAMED ROOF CONSTRUCTION CONSISTS OF COMPOSITE SHINGLES OVER A WATERPROOF
MEMBRANE OVER 1/2" THICK SHEATHING OVER 2x6 RAFTER FRAMING.
2. ROOF SHEATHING SHALL BE PLYWOOD OR O.S.B. EQUIVALENT, APA RATED (STRUCTURAL 1)
WITH A SPAN RATING OF 48/24. FASTEN SHEATHING WITH 10d NAILS AT 6" O.C. AT PANEL
EDGES AND AT 12" O.C. AT INTERMEDIATE SUPPORTS.
DEAD LOADS:1. WATERPROOF ROOF MEMBRANE:
2. INSULATION:
3. ROOF UNDERLAYMENT:
4. 3/4" SHEATHING:
5. (2) 2x12 JOISTS AT 16" O.C.:
6. MECH., CEILING, LIGHTS, SPRINKLERS:
TOTAL:
5.0 PSF
6.0 PSF
1.0 PSF
3.0 PSF
9.0 PSF
8.0 PSF
32.0 PSF
LIVE LOADS:1. SNOW:50.0 PSF
DEAD LOADS:1. COMPOSITE SHINGLES:
2. SNOW SHIELD:
3. 1/2" SHEATHING:
4. 2x6 RAFTERS AT 16" O.C.:
TOTAL:
2.0 PSF
1.0 PSF
2.0 PSF
1.5 PSF
6.5 PSF
LIVE LOADS:1. SNOW:50.0 PSF
04/07/2020
164
GRID
GRID
GRID
TYPICAL SLAB CONTROL JOINT
SEE PLANS AND SPECIFICATIONS FOR
LOCATIONS OF CONTROL JOINTS
1/4"
T/
4
SUBBASE ~ RE: PLAN
NOTES AND
SPECIFICATIONS
PREPARED SUBGRADE
OR UNDISTURBED SOIL.
SEE BUILDING PAD
OVER-EXCAVATION DETAIL
VAPOR BARRIER (IF REQ'D.)
~ RE: SPECIFICATIONS AND
ARCH. DRAWINGS. PROTECT
BARRIER FROM PUNCTURE
SLAB REINF.,
CONT. THROUGH
JOINT
CONTROL JOINT
~ RE: SPECIFICATIONS FOR
CONSTRUCTION OF JOINT
SL
A
B
T
H
I
C
K
N
E
S
S
'T
'
R
E
:
P
L
A
N
TYPICAL SLAB CONSTRUCTION JOINT
LOCATE UNDER PARTITION WHEN POSSIBLE SEE
SPECS. FOR POUR LIMITATIONS
SUBBASE
~ RE: SPECS.
1" x 2" CONT. KEY,
~ RE: SPECS
VAPOR BARRIER (IF REQ'D.)
~ RE: SPECIFICATIONS AND
ARCH. DRAWINGS. PROTECT
BARRIER FROM PUNCTURE
STOP SLAB
REINF. AT JOINT
FILL WITH JOINT
SEALANT
'T
'
APPLY BOND BREAKER
FULL LENGTH AND
DEPTH OF THE JOINT
T.O. SLAB
RE: PLAN
T.O. SLAB
RE: PLAN
SUBBASE AND SUBGRADE ~
RE: TYPICAL S.O.G JOINT DTL
VAPOR BARRIER (IF REQ'D.)
~ RE: SPECIFICATIONS AND
ARCH. DRAWINGS. PROTECT
BARRIER FROM PUNCTURE
1'-0"6"
'T
'
'H
'
# 5
@ 12" O.C.
3'-0"
SLAB REINF.
RE: PLAN
NOTE: PROVIDE CONTROL
JOINT IN CONCRETE 5'-0"
FROM SLAB STEP WHEN
'H' IS 4" OR GREATER.
# 5 x CONT.
NOTE: PROVIDE SLAB STEP REINF. BARS ONLY
AT LOCATIONS WHERE 'H' IS 4" OR GREATER
T.O. SLAB
RE: PLAN
T.O. SLAB
RE: PLAN
3/8" EXPANSION
JOINT MATERIAL
TUBE COLUMN
SLAB CONSTRUCTION
OR CONTROL JOINTS
~ RE: TYP. S.O.G.
DETAIL 1/S-201
CONC. CAST SEPARATELY
FROM SLAB ON GRADE
COLUMN BASE PLATE
6"
MIN
LENGTH VARIES
VERTICAL REINF. NOT SHOWN
FOR CLARITY. ALL SPLICES
FOR VERTICAL REINF. SHALL
BE CLASS B SPLICES.
CORNER BARS ~ SIZE AND
SPACING TO MATCH HORIZ.
WALL REINF. (TYP.)
HOOK MAIN WALL REINF.
AT END OR PROVIDE
CORNER BARS AS REQ'D.
SPLICE BAR SIZE AND
SPACING TO MATCH
HORIZ. WALL REINF. (TYP.)
RE: SCHEDULE
CLASS 'B' LAP SPLICE
RE: SCHEDULE
CLASS 'B' LAP SPLICE
(TYP.)
STD. HOOK
(TYP.)
STD. HOOK
ADD REINFORCING TO ALL
OPENINGS THRU ALL GRADE
BEAMS AS SHOWN (UNLESS
NOTED OTHERWISE)
LENGTH
DEVELOPMENT
MAXIMUM OPENING SIZE
26"Ø OR 3'-0"x3'-0" ~ NO
OPENINGS IN BOTTOM OR
TOP 3'-0" OF GRADE BEAM
WITHOUT ENGINEERS
APPROVAL
PIPING PENETRATIONS
THROUGH OPENING
SHALL ACCOMMODATE
DIFFERENTIAL MOVEMENT
ADD DIAGONAL BARS
AT ROUND OPENINGS
BY OPENING
BARS
INTERRUPTED
BY OPENING
BARS
INTERRUPTED
1/2 NUMBER OF
BARS INTERRUPTED
BY OPENING PLUS
ONE ~ TYP. EACH
EDGE OF OPENING
PLACE CONTROL JOINTS
AT 30'-0" O.C. (MAX.)
ALL KEYWAYS BEGIN AND
END 1'-0"± FROM TOP
AND BOTTOM OF POUR
PLACE CONSTRUCTION
JOINTS AS REQUIRED
~ SEE GENERAL NOTE
N.a FOR ADDITIONAL INFO.
3"7 1/4"18", 20", 24'
1 1/2"5 1/2"12", 14", 16"
1 1/2"3 1/2"8", 10"
DTW
KEY SCHEDULE
SOIL SIDE OF WALL
SEALANT ~ RE: SPECS.
CONTROL JOINT
WxDx1'-6" LONG
KEY AT 3'-0" O.C.
SOIL SIDE OF WALL
CONSTRUCTION JOINT
T
RE: SCHEDULE
CLASS 'B' LAP SPLICE
WALL THICKNESS
T
1/2"
3/4"3/4"
W
BASE PLATE 3/4"x12"x1'-0"
W/ 4 - 3/4" DIA.x14" LONG
ANCHOR BOLTS W/ PLATE
WASHER & DOUBLE NUTS @ BOT.
SCHEDULE
RE:
1" GROUT
4"
RE: SCHEDULE
FOOTING DIMENSION,
FOOTING REINFORCING,
~ RE: SCHEDULE
PAINT ALL BELOW-SLAB
STEEL W/ BITUMINOUS PAINT
1/4"
HSS6x6 COLUMN
T.O. SLAB
RE: PLAN
T.O. FTG.
RE: PLAN
POUR SLAB BLOCKOUT
DOWN TO COVER BASE PL.
RE: PLAN FOR
STEP LOCATION
RE: DETAILS FOR
FOOTING DEPTH
AND REINFORCING
1
1 T.O. FOOTING
RE: PLAN
T.O. FOOTING
RE: PLAN
1'-0"
#5x
@ 9" O.C.
CLASS 'B' SPLICE
CLASS 'B' SPLICE
PROVIDE STD. HOOK
87'-8"
6" DP. x20 GA.
STUDS @ 16" O.C.
EXTERIORINTERIOR
3'-0"
END OF INSULATION
INTO INTERIOR
4" SLAB
4" MIN. INSULATION
PROVIDE STYROFOAM
HIGHLOAD 40 INSULATION
BY DOW CHEMICAL CO.
SCHEDULE
RE:
T.O. FOOTING
RE: PLAN
4- #4x VERT.
4- #4 x CIRCULAR
TIES @ EQ. SPEC.
RE: PLAN
4x4 POST
SITE PAVEMENT
TOP OF PILASTER
TO MATCH TOP OF
FINISHED GRADE
FTG. SCHED.
RE:
ROUND PILASTER
DIAMETER TO
MATCH COLUMN
COVER
ROUND
COLUMN COVER,
RE: ARCH. DRWGS
SIMPSON POST
BASE (GALVANIZED)
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
7
/
2
0
2
0
7
:
4
1
:
2
4
A
M
S-201
TYPICAL
FOUNDATION
AND SOG
DETAILS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
S-201S-100-P 3/4" = 1'-0"
1 TYPICAL S.O.G. JOINT DETAILS
S-201S-100 3/4" = 1'-0"
2 TYPICAL DEPRESSED SLAB OR SLAB STEP
S-201S-100 3/4" = 1'-0"
3 TYPICAL SLAB-ON-GRADE BLOCKOUT AT STEEL COLUMN
S-201 3/4" = 1'-0"
9 TYPICAL CONCRETE FOUNDATION WALL DETAIL ~ T ≥ 10"
S-201 3/4" = 1'-0"
10 FOUNDATION WALL OPENING REINFORCING DETAIL - ELEVATION
S-201 3/4" = 1'-0"
7 TYPICAL CONC. FOUNDATION WALL JOINT PLAN DETAIL U.N.O.
S-201S-100 3/4" = 1'-0"
4 COLUMN AT FOOTING DETAIL
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
REVISION 6 2020.03.25
REVISION 7 2020.04.07
S-201 1/2" = 1'-0"
8 TYPICAL FOOTING STEP
S-201S-100 3/4" = 1'-0"
11 FOUNDATION WALL AT MECH. CONDENSER ROOM
S-201S-101 3/4" = 1'-0"
12 PILASTER DTL. AT ENTRY COLUMNS
04/07/2020
165
GRID
GRID
U.N.O.
1'-6"
U.N.O.
10"
U.N.O.
1'-6"
BASEMENT RETAINING WALL
CONCRETE
SLAB ON METAL DECK,
PLACE PRIOR TO
BACKFILLING
FOUNDATION WALLS
BASEMENT RETAINING
WALL FOOTING
~ RE: PLAN
100'-0"
T.O. FOOTING
RE: PLAN
CVR.
2" CLR.
6"4"
4
1
/
2
"
C
O
N
C
.
2"
D
E
C
K
W1
2
6
1
/
2
"
CVR.
2" CLR.
2"
C
L
R
.
3"
C
L
R
.
#5 @ 9" O.C.,
TOP & BOT.#4 @ 9" O.C. TOP & BOT.
4"
S
L
A
B
1'
-
0
"
#5 @ 9" O.C.
HORIZ. INSIDE FACE
& OUTSIDE FACE
WATER DRAINAGE
MAT & PROTECTION
BOARD
PERIMETER FOUNDATION
DRAIN, RE: ARCH.#5x
@ 9" O.C.
4'
-0"
#5x
@ 9" O.C.
4'
-0"
#5 @ 9" O.C.
VERTICAL I.F.
#5 @ 9" O.C.
VERTICAL O.F.
SLAB-ON-GRADE
S-211
9
T.O. SLAB
RE: PLAN
EMBED PLATE 3/4x12x1'-2"
WITH (4) 3/4"DIA.x8 3/16" H.A.S.
4'
-
8
"
LOUVER OPENING,
RE: MECH.
#5 @ 12" O.C.
VERTICAL
#5 @ 12" O.C.
HORIZONTAL
87'-0"
86'-11"
RE: PLAN
PERIMETER DRAIN,
RE: DTL. 5/S-211
89'-5 3/8"
T.O. SLAB
RE: PLAN
GROUTED BOND BEAM
@ TOP OF BLOCK WITH
(2) #4 HORIZ.
10" CMU WITH #5 @ 16" O.C.
VERT. IN GROUTED CELLS
T.O. FOOTING
RE: PLAN
OPENING
LOUVER
1 1/4"
95'-4"
(VERIFY WITH
LOUVER)
W8x10 ~ RE:
10/S-211
19W4 BAR GRATING
~ RE: PLAN
L3x3x5/16" xCONT. WITH
1/2" Ø x3" EMBED. EXPANSION
ANCHORS @ 1'-6" O.C. (TYP.)
#5x
@ 12" O.C.
3'
-
6
"
100'-0"
101'-4"
PROVIDE JOINT IN
GRATING @ BEAM
(2) #5 HORIZ.
(TYP.)
P/C SEAT
~ RE: ARCH.
SEAT SUPPORT
ANGLE & CONN.
BY P/C MANUF.
10"RE: PLAN 8"
WALL REINFORCING
~ RE: DETAIL 5/S-211
WALL FOOTING
~ RE: DETAIL 5/S-211
6"6"
(2) #5 HORIZ.
1'-0"
WOOD FRAMED WALL
RE: PLAN AND
ELEVATIONS
2x SILL PLATE AND
ATTACHMENT,
RE: 1/S-503
CLASS 'B' SPLICE
CONCRETE WALL
RE: PLAN AND
ELEVATION
WALL DOWEL
MATCH WALL
REINFORCING
SIZE AND SPACING
AT 'SIM.'TYP.
10"
6"
10"
#4 xCONT.
#4x @ 12" O.C.3'
-
0
"
SLAB-ON-GRADE
ELEVATOR SILL
L4x4x3/8xCONT.
W/ 5/8" Øx 4"
EXP. ANCHORS
@ 12" O.C
1 1/2"#4 x @ 12" O.C.
2'-0"
2'
-
0
"
MASONRY WALL BEYOND 8" CMU W/ #5 AT 16" O.C.
#5 x 5'-0" AT 16" O.C.
#5 @ 12" O.C. EACH WAY
SLAB-ON-GRADE
~ RE: PLAN
1/2" EXPANSION JOINT
#5 x DOWELS @ 12" O.C., TYP.
#5 x DOWELS @ 12" O.C.
#7 @ 12" O.C. EACH WAY, TOP & BOT
ELEVATOR
RE: PLANRE: PLAN RE: PLAN
2'-0"
10"
#5 @ 12" O.C. EACH WAY
10"
1'-4"
1'-6" DEEP SUMP PIT
BEYOND
FOUNDATION WALL
RE: PLAN
STEEL BEAM
RE: PLAN
SLAB ON METAL DECK
RE: PLAN
OVERPOUR SLAB
AT FOUNDATION WALL
#5x @ 12" O.C.
(EPOXT COATED)
2'-0"
2'-0"
(2) #4xCONT.
GLAZING AT 'SIM'
RE: ARCH
U.N.O.
1'-4"10"
U.N.O.
1'-4"
BASEMENT RETAINING WALL
BASEMENT WALL
FOOTING
~ RE: PLAN
T.O. FOOTING
RE: PLAN
CVR.
2" CLR.
2" CLR.
3" CLR.
1'-0"
#5 @ 12" O.C.
HORIZ. BOTH SIDES
WATER DRAINAGE
MAT & PROTECTION
BOARD
PERIMETER FOUNDATION
DRAIN, RE: ARCH.#5x
@ 12" O.C.
#5x
@ 12" O.C.
#5 @ 12" O.C.
VERTICAL I.F.
#5 @ 12" O.C.
VERTICAL O.F.
SLAB-ON-GRADE
T.O. SLAB
RE: PLAN
3'-10"
5'-10"10"
4"
6"
FTG. REINF.
~ RE: 5/S-211
#4 xCONT.
#4 x5'-0"
@ 12" O.C.
#4 x
@ 12" O.C.
CONCRETE
SLAB ON METAL DECK,
PLACE PRIOR TO
BACKFILLING
FOUNDATION WALLS
100'-0"
10"
4 1/2" CONC.
2" DECK
W12
6 1/2"
EMBED PLATE 3/4x12x1'-2"
WITH (4) 3/4"DIA.x8 3/16" H.A.S.
TOP OF
DOOR ELEV.,
RE: ARCH.
BASEMENT FOUNDATION
WALL BEYOND
100'-0"
2" 8"
3'-6"
8"
(2) #5 HORIZ. TOP
#5 @ 12" O.C. HORIZ.
#5@ 12" O.C.
x5'-8: LONG
VERTICAL
SLOPE DN.
SECTION BEYOND
@ BARRIER WALL
6" 4"
99'-10 1/4"
4" 6"
100'-0"
6"
#4 @ 12" O.C.
#4x @12" O.C.
#4x @12" O.C.
3'
-
0
"
3'
-
0
"
DOOR THRESHOLD SECTION
SHOWN, SEE DETAIL 8/S-212
FOR WALL CONDITION
BEYOND
4'
-
0
"
4'
-
0
"
FOOTING DIM. ~ RE: SCHEDULE
SCHEDULE
RE:
2"
EQ.
EQ.
2"
2"
8"
T.O. FOOTING
RE: PLAN
1'-4" SQ. PILASTER
FOOTING REINF.
~ RE: SCHEDULE
(4) #5x VERT.
(4) #4 TIES
SPACED AS
SHOWN
T.O. SLAB ELEV.
RE: PLAN
HSS COLUMN
~ RE: PLAN
SLAB STEP @
SOME LOCATIONS
BASE PLATE & ANCHOR
BOLTS ~ RE: 4/S-201
87'-0"
1'-6"
(VERIFY)
10'-6" LOUVER OPENING
1'-0"
4'-9 1/2"
CONCRETE FOUNDATION
WALL BEYOND
(2) #8 HORIZONTAL xCONT.
TOP & BOT., EXTEND
BARS 3'-4" BEYOND
EDGES OF OPENING
#6 xCONT. HORIZ.
#4 TIES @ 6" O.C.
#3 SINGLE LEG
STIRRUPS @ 6" O.C.
BAR GRATING
100'-0"
SINGLE PLATE CONNECTION
WITH (2) 3/4" Ø A307 BOLTS
GALVANIZED EMBED PLATE
1/2x12x1'-0" WITH 1/2" Ø
HD.A.S. @ 9" O.C. EACH WAY
WITH 5" EMBED
CONT. L3x3x5/16"
SUPPORT ANGLE
WITH 1/2" Ø x3"
EMBED EXPANSION
ANCHORS @ 18" O.C.
(TYP.)
AREA WELL
SLAB AND FOUNDATION
~ RE: DETAIL 6/S-211
6 1/2"
T.O. FOOTING
RE: PLAN
1'-0"
RE: 5/S-211 FOR
FOOTING REINF.
WALL FINISH
PROVIDE GAP FOR
P/C SEAT, BEYOND
~ RE: ARCH.
AREAWELL WALL BEYOND
~ RE: 6/S-211
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
3/
2
3
/
2
0
2
0
2
:
5
7
:
2
1
P
M
S-211
FOUNDATION
DETAILS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
S-211S-100 3/4" = 1'-0"
5 BASEMENT FOUNDATION WALL SECTION
S-211S-100 3/8" = 1'-0"
6 SECTION THROUGH AREA WELL
S-211S-211 3/4" = 1'-0"
9 TOP OF FOUNDATION WALL DETAIL
23816JOHNM.KARLBERG
PROFESSIONA L ENGINEER
COLORADO REGISTERED
S-211S-100 3/4" = 1'-0"
2 SECTION AT ELEVATOR PIT
REVISION DATE
REVIEW COMMENTS R2 2019.10.15
AREAWELL WALL CHANGES R3 2019.10.24
UPDATED FOOTPRINT 2020.02.07
S-211S-101 3/4" = 1'-0"
11 THRESHOLD DETAIL
S-211S-100 3/4" = 1'-0"
7 BASEMENT FOUNDATION WALL SECTION
S-211S-100 3/4" = 1'-0"
12 COLUMN @ PILASTER DETAIL
S-211S-100 3/8" = 1'-0"
10 SECTION THROUGH AREA WELL
3/26/2020
166
D C
C
D
C
3
3
4"
100' 0"
87' 0"
DRAINAGE MAT.
1/2" W.P. AND
4"
6 1/2"
4"
1/2"
6 1/2"
5'-6"
4"
1'-0"
1'-0"
4" SLAB
6'-10"
7" 3"
6"
SOIL FILL
10"
23'-0"14'-4"
SLAB
FTG.
S-212
3
S-212
4
S-212
5
6
S-212
9
S-212
87' 0"1'-0"
STAIR REINFORCING
#4 @ 12" O.C. EACH WAY
WALL REINFORCING
~ RE: 7/S-211
EL.
VARIES
10'-1"8"
103' -6"
6"
6" SLAB, RE: 7/S-211
FOR REINF.
CONC. WALL REINF.
W/ #5@12" O.C.
HORIZ. & VERT.
#4 x
DWLS. @ 12"O.C.
3'
-6"
S-211
7
(SIM.)
4"
1/2"
6 1/2"
EXTERIOR CONC.
STAIR AND LANDINGTREAD,
RE: ARCH.
100' 0"
RE: ARCH.
RISER HEIGHT,
5'-6"
4" TOPPING
1/2" W.P. AND DRAINAGE MAT
SLAB
6 1/2"
L4x4x5/16" SUPPORT
ANGLES BEYOND
~ RE: DETAIL 3/S-212
CONC. WALL
BEYOND
1"
93'-10''
6 1/2" SLAB
DRANAGE BOARD
1/2" W.P. AND
4"
4"
7" 3"
RE: ARCH.
10"
FOUNDATION WALL
EXTERIOR
CONC. STAIRS
18 GA. CLOSURE PL. W/
POWER DRIVEN FASTENERS
@ 12" O.C.BREAK FILL
L4x4x5/16" xCONT.
SUPPORT ANGLE WITH
1/2" Ø EXPANSION ANCHORS
WITH 3 1/2" EMBED. @
1'-6" O.C. (TYP.)
RISER, RE: ARCH.
CONC. WALL
BEYOND
4"
6 1/2"
TOOLED JT.
W/ SEALANT
INTERIOR
FLOOR SLAB
6 1/2"
W12 BEAM
L4x4x5/16
SUPPORT
ANGLE
CONC. WALL
BEYOND
100' 0"
6"
SHEATHING
5'-10"10"
10"
SLAB
6 1/2" STRUCT
BOARD
1/2" W.P. AND DRAINAGE
RE: DTLS. 1 & 3.
STAIR SLAB AND STEPS, LANDING,
5"
3'-6"
4 1/2"
6 1/2"
VERT. L 3x3x1/4
@ 16" O.C.
#4 x @ 12" O.C.2'
-
6
"
12
"
EL. VARIES
RE: DTLS. 1 & 2
1/4
1/4
1/4
1/4
COPE LEG. OF
VERT. ANGLE
AROUND L 4x4
BACK FACE OF
VERT. LEG OF L 4x4
CONT.
L 4x4x5/16 CONT. L4x4x5/16"
WITH 1/2" Ø EXPANSION
ANCHORS @ 18" O.C.
DRILL AND EPOXY #4 @
12" O.C. (2' -4" LONG W/ 6"
EMBED.)
TOOLED JOINTS W/
SEALANT
100' 0"
20 GA.
PLATE
CLOSURE
#4 @ 12" O.C. EACH WAY
1'
-
6
"
1' -6"
8"
8"
WALL REINFORCING
~ RE: 7/S-211
#4 @ 12" O.C. EACH WAY
COLD-FORMED
STEEL STUD WALL,
SEE DETAIL 8/S-212 FOR
ADDITIONAL INFORMATION
6"
SHEATHING
5'-10"10"
6 1/2"
TOOLED JOINTS W/
SEALANT (TYP.)
4"
DRAINAGE MAT
1/2" W.P. AND
6 1/2"
6"
6"
CONT. L 4x4x5/16
#4 @ 12" O.C.
#4 CONT.
SITE PAVING/SIDEWALK
1' -6"
1' -6"
CONT. L4x4x5/16"
WITH 1/2" Ø EXPANSION
ANCHORS @ 18" O.C.
DRILL AND EPOXY #4 @
12" O.C. (2' -4" LONG W/ 6"
EMBED.)
COLD-FORMED
STEEL STUD WALL,
SEE DETAIL 8/S-212 FOR
ADDITIONAL INFORMATION
WALL REINFORCING
~ RE: 7/S-211
10"
6 1/2"
3
AREA WELL
FRAME WALL WITH
600S162-54 METAL
STUDS @ 16" O.C.
SEE PLAN, SHEET
S-101 FOR EXTENT
OF WALL
WALL REINFORCING
~ RE: DETAIL 5/S-211
DOWEL
~ RE: DETAIL 5/S-211
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
6
/
2
0
2
0
5
:
5
1
:
5
7
P
M
S-212
STAIR DETAILS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
23816JOHNM.KARLBERG
PROFESSIONA L ENGINEER
COLORADO REGISTERED
S-212S-100 1/4" = 1'-0"
1 FULL STAIR SECTION
S-212S-212 3/4" = 1'-0"
4 TOP OF STAIR DETAIL
S-212S-212 3/4" = 1'-0"
3 STAIR TRANSITION DETAIL
S-212S-212 3/4" = 1'-0"
5 SLAB STEP DETAIL
S-212S-101 3/4" = 1'-0"
6 SECTION THROUGH STAIR
S-212S-101 3/4" = 1'-0"
9 SECTION THROUGH LANDING
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
REVISION 6 2020.03.25
REVISION 7 2020.04.09
S-212S-101 3/4" = 1'-0"
8 WALL SECTION AT AREA WELL
.07
04/07/2020
167
GRID
GRID
DECK
SPAN
GRID
GRID
GRID
A
A
A
A
A
A
SLAB REINF.
#4x @ 18" O.C. ONLY WHERE
OVERHANG IS GREATER THAN 3" ~
NOT REQ'D AT OPENINGS EDGES
WITHOUT STEEL BEAMS
BEAM CL
#4xCONT.RE: PLAN FOR
BEAM SIZE
T.O. SLAB
RE: PLAN
3' - 0"
CONTINUE DECK OVER OPENING
AND CUT OPENING IMMEDIATELY
PRIOR TO INSTALLING
MECHANICAL EQUIPMENT, ETC.
SECTION AT DECK PARALLEL TO BEAM
BEAM CL
SECTION AT DECK PERPENDICULAR TO BEAM
SEE "SECTION AT DECK
PARALLEL TO BEAM" FOR
ADDITIONAL INFO.
STEEL BEAMS, PROVIDE #4 IN FIRST
DECK FLUTE ~ EXTEND 3'-0" PAST
OPENING AT OPENING EDGES
WITHOUT
1"
C
L
E
A
R
RE: PLAN
RE: PLAN
SLAB OPENING
BLOCKOUT
SLAB OPENING
BLOCKOUT
STEEL COLUMN
~ RE: PLAN
L4x4x5/16 ~TYP
NOTES:
1. PROVIDE SUPPORT FOR ALL DECK WITH
UNSUPPORTED EDGE EXCEEDING 6".
2. CONTRACTOR MAY SUBMIT ALTERNATE
METHODS OF DECK SUPPORT AT COLUMNS
FOR APPROVAL.
3. SUPPORT SHALL BE CAPABLE OF SUPPORTING
CONSTRUCTION LOADS.
T.O. ANGLE FLUSH
WITH T.O. BEAM ~ TYP
L3x3x1/2 ~ TYP
TYP
2 1/
2
"CLR
.
3/16 TYP
3/16TYP
CONSTRUCTION JOINT
WF GIRDER ~TYP.
WF BEAM ~TYP.
CONSTRUCTION
JOINT
TYPICAL ARRANGEMENT OF SLAB-ON-DECK
CONSTRUCTION JOINTS
NOTE:
CONSTRUCTION JOINTS ARE SHOWN FOR RELATIVE
LOCATIONS. ACTUAL JOINT PLACEMENT AND SLAB POUR
SEQUENCE TO BE COORDINATED WITH THE ENGINEER.
CONTRACTOR TO SUBMIT PROPOSED CONSTRUCTION JOINT
LAYOUT FOR THE ENGINEER'S REVIEW. MINIMIZE NUMBER OF
JOINTS. PROVIDE #4x4'-0" @ 18" O.C. ACROSS JOINTS U.N.O.
GIRDER SPAN
+6
"
T
Y
P
I
C
A
L
1/
8
G
I
R
D
E
R
S
P
A
N
POUR #4 POUR #3
POUR #1POUR #2
E.Q.E.Q.E.Q.E.Q.
+6
"
T
Y
P
I
C
A
L
1/
8
G
I
R
D
E
R
S
P
A
N
POUR STOP GAGE SCHEDULE
SLAB THICKNESS
'T'<3"4" 5" 6" 7" 8" 9"10" 11" 12"
OVERHANG DISTANCE, 'OH'
T <= 4 20 18 18 16 14 12 12 12 10 10
4" < T <= 5 1/4"16 16 14 14 12 12 12 10 10 -
5 1/4" < T <= 6 1/2"14 14 12 12 12 12 10 10 - -
1-12
SLAB REINF.
#4x @ 18" O.C. ONLY WHERE
OVERHANG DISTANCE IS GREATER
THAN 3"
RE: PLAN
POUR STOP
RE: SHED.
FOR GAGE
#4xCONT.
RE: PLAN FOR
BEAM SIZE PROVIDE CELL CLOSURE
WHERE DECK IS PERP. TO
BEAM
T.O. SLAB
RE: PLAN
3' - 0"
DIST "OH"
OVERHANG
2" MIN.1/2
"
M
I
N
RETURN LIP AT
16 GA. AND
LIGHTER ONLY
METAL DECK
STEEL BEAM
~ RE: PLAN ~ TYP.
STEEL COLUMN
RE: PLAN
W.W.F.
#4x5'-0" @ 18" O.C.
~ TYP. OVER GIRDERS
SHEAR STUDS ~ RE: PLAN FOR
QUANTITY AND SIZE ~TYP.
CONCRETE SLAB
ON METAL DECK
1/2" COLUMN
CAP PLATE
~
R
E
:
P
L
A
N
SL
A
B
TH
I
C
K
N
E
S
S
T.O. SLAB
RE: PLAN
1"
C
L
R
'D
'
/
2
OPENING
NOTES:
1. STUDS SHOWN ARE IN ADDITION TO THOSE SHOWN ON PLAN.
2. ADDITIONAL STUDS/REBAR NOT REQUIRED AT UNTOPPED ROOF DECK.
3. OBTAIN ENGINEER APPROVAL BEFORE MODIFYING OPENINGS OR ADDING NEW OPENINGS.
'D
'
/
2
RE: PLAN
'W'
RE
:
P
L
A
N
'H
'
Ø RE: PLAN
RE: PLAN
CONCRETE ON
METAL DECK
WHERE SHOWN
ON PLAN
1 1/2" CORNER
RADIUS, TYP.
CONCRETE ON
METAL DECK
WHERE SHOWN
ON PLAN
#3 x 5'-0" @ 9" O.C.
EACH WAY
CENTERED OVER
OPENING. HOOK
BARS AT SLAB
EDGE.
2 STUDS PER FOOT
2'-6" MIN.
2 STUDS PER FOOT
2'-6" MIN.
CIRCULAR OPENING
RECTANGULAR OPENING
'D
'
T.O. SLAB
RE: PLAN
'D
'
#3 x 5'-0" @ 9" O.C.
EACH WAY
CENTERED OVER
OPENING. HOOK
BARS AT SLAB
EDGE.
2 STUDS PER FOOT
2'-6" MIN.
2 STUDS PER FOOT
2'-6" MIN.
T.O. SLAB
RE: PLAN
'D
'
/
2
OPENING
NOTES:
1. STUDS SHOWN ARE IN ADDITION TO THOSE SHOWN ON PLAN.
2. ADDITIONAL STUDS/REBAR NOT REQUIRED AT UNTOPPED
ROOF DECK.
3. OBTAIN ENGINEER APPROVAL BEFORE MODIFYING OPENINGS
OR ADDING NEW OPENINGS.
'D
'
/
2
RE: PLAN
'W'
RE
:
P
L
A
N
'H
'
Ø RE: PLAN
RE: PLANCONCRETE ON METAL
DECK WHERE SHOWN
ON PLAN
1 1/2" CORNER
RADIUS, TYP.
CONCRETE ON METAL
DECK WHERE SHOWN
ON PLAN
#3 x 5'-0" @ 9" O.C. EACH
WAY CENTERED OVER
OPENING. HOOK BARS AT
SLAB EDGE.
2 STUDS PER FOOT
2'-6" MIN.
2 STUDS PER FOOT
2'-6" MIN.
CIRCULAR OPENING
RECTANGULAR OPENING
'D
'
'D
'
#3 x 5'-0" @ 9" O.C. EACH
WAY CENTERED OVER
OPENING. HOOK BARS AT
SLAB EDGE.
2 STUDS PER FOOT
2'-6" MIN.
2 STUDS PER FOOT
2'-6" MIN.
3/8" THICK STIFFENER
PLATE TOP AND BOT.
OF OPENING EACH
FACE, CENTERED ON
BEAM WEB OPENINGS
3/8" MIN. STIFFENER
PLATE TOP AND BOT. OF
OPENING EACH FACE,
CENTERED ON BEAM
WEB OPENINGS
3/16TYP. 4 PLACES
SECTION A
WEB BEYOND
T.O. SLAB
RE: PLAN
T.O. SLAB
RE: PLAN
1" MIN.
EQUAL SPA.
XX STUDS
[XX] (X")
(X
"
)
[
X
X
]
NUMBER OF STUDS FOR
BEAM ARE INDICATED
THUS ON FRAMING PLAN
INDICATES REACTION (KIPS)
AT EACH END OF BEAM
INDICATES THE AMOUNT
OF CAMBER (INCHES)
INDICATES REACTION
(KIPS) THIS END OF
BEAM ONLY.
X
X
X
COLUMN OR
BEAM CL
NOTE: MULTIPLE LINE
SPCG. ONLY ALLOWED
ON BMS. W/ FLANGE
THICKNESS 0.3" OR
GREATER
DOUBLE LINE
SPACING W/ FLANGE
WIDTH < 5 3/4"
TRIPLE LINE
SPACING PLAN
4"
M
I
N
24" MAX.
4 1/2" MIN.
1'-4" MAX
1'-4" MAX
4" MIN 24" MAX.
4 1/2" MIN.
3" MIN.3" MIN.
1 3/8" MIN.
1 3/8" MIN.
NOTE:
NUMBER PER BEAM IS
INDICATED THUS: [XX]
ON FRAMING PLANS
1 3/8"
COLUMN OR
BEAM FLANGE
3" MIN.
WF OR HSS COLUMN
~ RE: PLAN
3" MIN.
CENTER WWF
MID-HEIGHT OF SLAB
DEPTH ABOVE FLUTES
SECTION A
T.O. SLAB
RE: PLAN
WF BEAM
~ RE: PLAN
CONCRETE SLAB ON
METAL DECK ~ RE: PLAN
CL OF BEAM SPAN
W.W.F.
SHEAR STUD ~ LOCATE
IN THE FLAT PART OF
THE DECK RIB THAT IS
FARTHEST FROM THE
CL OF THE BEAM SPAN
DECK RIB STIFFENER
RE: PLAN
T.O. SLAB
RE: PLAN
SLAB REINF. ~ RE: PLAN
DECK MFR. TO PROVIDE
DECK CLOSURES AND
FILLERS AS REQ'D.
CELL CLOSURES AT
HIGH HATS ONLY
#4x5'-0" @ 18"
O.C. ~ TYP.
AT CHANGE IN
DECK DIRECTION
T.O. SLAB
RE: PLAN
STEEL BEAM
~ RE: PLAN
SHEAR STUD
#4 CHAIR
BARS TYP.
SHEAR CONNECTION
~ RE: GENERAL NOTES
1" CLR.
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
3/
2
0
/
2
0
2
0
1
2
:
4
6
:
0
9
P
M
S-301
SLAB-ON-DECK/STEEL
BEAM DETAILS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
S-301 3/4" = 1'-0"
4 TYPICAL SLAB OPENING DETAIL
S-301 3/4" = 1'-0"
2 TYPICAL DECK SUPPORT AT COLUMNS
S-301 1/8" = 1'-0"
1 TYPICAL CONSTRUCTION JOINT PLAN
S-301 3/4" = 1'-0"
5 INTERIOR EDGE OF SLAB DETAIL WITH POUR STOP
S-301 3/4" = 1'-0"
3 TYPICAL TOP OF COLUMN CONNECTION DETAIL
S-301 3/4" = 1'-0"
6 TYPICAL UNREINFORCED STEEL BEAM WEB OPENING DETAIL
S-301 3/4" = 1'-0"
11 TYPICAL REINFORCED STEEL BEAM WEB OPENING DETAIL
S-301 3/16" = 1'-0"
8 TYPICAL SHEAR STUD AND FRAMING NOMENCLATURE
S-301 3/4" = 1'-0"
9 TYPICAL SHEAR STUD SPACING DETAIL
S-301 3/4" = 1'-0"
10 TYPICAL BEAM SECTION
S-301 3/4" = 1'-0"
7 TYPICAL GIRDER SECTION
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
3/26/2020
168
2" HOLE
2"6"6"2"
2"
6"
6"
6"
6"
6"
2"
EMBED PL TYPE F
18-3/4"Øx 8 3/16" H.A.S.
PL. 3/4"x1'-4"x2'-10"
2" HOLE
2"6"6"2"
2"
6"
6"
6"
6"
2"
PL. 3/4"x1'-4"x2'-4
2"1'-0"2"
2"
4"
8"
4"
2"
PL. 3/4"x1'-4"x1'-8"
EMBED PL TYPE E
15-3/4"Øx 8 3/16" H.A.S.
EMBED PL TYPE D
8-3/4"Øx 8 3/16" H.A.S.
RE: SCHEDULE
GAGE DIMENSION
6"
5/8"
5/
1
6
"
2 3/4" Ø ERECTION BOLTS
(HORIZ. SLOTTED HOLES)
BUILT-UP TEE
RE: SCHEDULE
AND PLATE DETAIL
EMBED PL.
RE: SCHEDULE
RE: PLATE TYPES FOR STUDS
TOP OF BEAM AND
EMBED PL.
3 3/4"
"A"
2 1/4" MIN.
RETURN TOP
AND BOTTOM
1/4 RE: NOTE 1
2"10"2"
2"
4"
6"
4"
2"
2"
9"
2"
2"5"5"2"
2"
8"
2"
2"10"2"
PL. 3/4"x1'-0"x1'-2"PL. 3/4"x1'-1"x1'-2"
PL. 3/4"x1'-2"x1'-6"
EMBED PL TYPE A
4-3/4"Øx 8 3/16" H.A.S.
EMBED PL TYPE B
6-3/4"Øx 8 3/16" H.A.S.
EMBED PL TYPE C
8-3/4"Øx 8 3/16" H.A.S.
TEE DETAIL
DO NOT WELD TOP OF TEE
TO EMBED PLATES, RE: NOTE 1
EMBED PLATE SCHEDULE -10" WALL AND THICKER
NOTE:
1. WELD FULL HEIGHT OF TEE EACH SIDE AND "2xWELD SIZE" RETURN TOP ONLY.
2. IF SHIMS ARE USED INCREASE THE WELD SIZE BY THICKNESS OF THE SHIMS (3/16" MAX. SHIM).
3. EMBED PLATE SETTING TOLERANCES ~ ± 1" VERT., ± 1 1/2" HORIZ.
4. FIELD VERIFY DIMENSIONS.
5. COORDINATE REQUIREMENTS FOR NAIL HOLES WITH GENERAL CONTRACTOR
6. AVAILABLE STRENGTHS ARE BASED ON A MINIMUM EDGE DISTANCE OF 12" FROM STUDS TO END
OF CONCRETE (SIDE EDGE DISTANCE ON ONE SIDE ONLY), 12" FROM STUDS TO TOP OF CONCRETE
(TOP EDGE DISTANCE) AND NO EDGE AT BOTTOM OF PLATE (LARGE BOTTOM EDGE DISTANCE).
WHEN THESE ARE VIOLATED RE: 5/S-302 AT TOP OF WALL AND 8/S-302 AT WALL CORNERS.
7. AVAILABLE STRENGTHS ARE BASED ON A MINIMUM CONCRETE STRENGTH OF 4000 PSI.
8. AVAILABLE STRENGTHS FOR PLATE SETTING TOLERANCE OF ± 4" HORIZ. PROVIDED.
9. AVAILABLE STRENGTHS BASE ON ANCHORS IN UNCRACKED CONCRETE.
10. WHERE TWO EMBEDS MEET AT A CORNER OR SIMILAR SITUATION, STAGGER ONE EMBED VERTICALLY 1" TO
AVOID CONFLICTS.
11. WHERE TWO EMBEDS MEET ON OPPOSITE SIDES OF A WALL OR SIMILAR SITUATION, STAGGER THE EMBED
WITH THE LIGHTER REACTION HORIZONTALLY 1" TO AVOID CONFLICTS.
25 k
40 k
50 k
60 k
70 k
90 k
125 k
10"
16"
18"
24"
27"
30"
36"
6"x0'-6"
6"x0'-8"
6"x0'-10"
8"x1'-0"
8"x1'-2"
8"x1'-4"
9"x1'-6"
5/16"
5/16"
5/16"
5/16"
3/8"
3/8"
3/8"
AVAILABLE
STRENGTH (LRFD)MAX. BEAM
DEPTH
TEE GAGE
AND HEIGHT
EMBED
PLATE TYPE
TOP OF WALL
EMBED PLATE
TYPE
WELD "A"
4" TOLERANCE
AVAILABLE
STRENGTH (LRFD)
SEE NOTE 8
15 k
15 k
30 k
30 k
30 k
70 k
90 k
A BT
A CT
B DT
C ET
D ET
E FT
F N/A
WHERE OCCURS U.N.O
12" MIN. TO TOP OF
WALL OR OPENING
5/16
5/16
PL. 3/4"x1'-4"x2'-10"
EMBED PL TYPE FT
18-3/4"Øx 8 3/16" H.A.S.
2" HOLE
2"
6"
6"
6"
6"
5"
3"
2"6"6"2"
PL. 3/4"x1'-4"x2'-4"
2" HOLE
2"
6"
6"
6"
5"
3"
2"6"6"2"
PL. 3/4"x1'-4"x1'-8"6"6"
2"1'-0"2"
2"
4"
7"
4"
3"
EMBED PL TYPE ET
15-3/4"Øx 8 3/16" H.A.S.
EMBED PL TYPE DT
9-3/4"Øx 8 3/16" H.A.S.
PL. 3/4"x1'-2"x1'-6"2"10"2"
3"
4"
5"
4"
2"
5"5"
2"5"5"2"
3"
8"
2"
PL. 3/4"x1'-1"x1'-2"
2"
7"
3"
2"10"2"
PL. 3/4"x1'-0"x1'-2"TYP. ALL PLATE TYPES
12" MIN. EDGE DISTANCE
BUILT-UP TEE
RE: 1/S-302 FOR PLATE DETAILS,
SCHEDULE, AND WELDS
T.O. BEAM
AND EMBED PL.
EMBED PL.
RE: PLATE TYPES
TOP OF WALL OR OPENING
WHERE OCCURS, MAY NOT
ALIGN W/ TOP OF EMBED/BEAM
RE: PLATE TYPES FOR STUDS
NOTE:
RE: 1/S-302 FOR INFORMATION NOT SHOWN
EMBED PL TYPE BT
6-3/4"Øx 8 3/16" H.A.S.
EMBED PL TYPE AT
4-3/4"Øx 8 3/16" H.A.S.
EMBED PL TYPE CT
9-3/4"Øx 8 3/16" H.A.S.
TOLERANCE
2 1/4" ~ COULD RANGE FROM
3/4" TO 3 3/4" WITH CONCRETE
3" MIN
SELECTION CONNECTION AND
EMBED PLATE PER 1/S-302
CL. BEAM AND CONN./EMBED
REPLACE STUDS NEAREST
CORNER WITH #6x4'-0" A706
BARS OR DBA
HEADED STUDS
PER 1/S-302
PLAN VIEW
8" (MIN)
RE: PLAN
PLAN NORTH
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
3/
2
0
/
2
0
2
0
1
2
:
4
6
:
1
4
P
M
S-302
TYPICAL
STEEL-CONCRETE
CONNECTION
DETAILS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
N.T.S.S-302
1 TOP STEEL BEAM TO CONCRETE CONNECTION - 10" WALL AND THICKER
N.T.S.S-302
5 TOP OF WALL CONCRETE CONNECTION - 10" WALL AND THICKER
S-302 1 1/2" = 1'-0"
8 CORNER CONNECTION - 10" WALL AND THICKER
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
3/26/2020
169
PL. 3/4"x10"x1'-8"
2"6"2"
2"
5"
6"
5"
2"
EMBED PL
9-#7x 7'-0" D.B.A.
1'
-
8
"
10"
STEEL BEAM
RE: PLAN
TEE CONNECTION
EMBED PL
RE: DETAIL
RE: GEN NOTES
LAP SPLICE
#7x7'-0" D.B.A.,
TYP OF 8
RE: 1 / S-302
CONCRETE WALL
RE: PLAN
U-BAR AT WALL END,
MATCH SIZE AND SPACING
OF HOR. WALL REINFORCING
1 1/2"
1 1/2"
1/2"
4"
2"
3
"
3
"
3
"
3
"
3
"
2
"
1'
-
7
"
1/4 3 SIDES
STEEL BEAM
RE: PLAN
PL1/2"x7 1/2"x1'-7"
SHEAR PLATE
1"Ø BOLT,
TYP OF 6
STEEL BEAM
RE: PLAN
2"
5
"
5"
2
"
1 1/2" 4" 1 1/2"
PL3/4"x7"x1'-2"
CAP PLATE
3/4"Ø BOLT,
TYP OF 4
STEEL POST
RE: PLAN
STEEL BEAM
RE: PLAN
SLAB ON METAL DECK
RE: PLAN
STEEL BEAM
RE: PLAN
PL3/4"x7"x1'-2"
CAP PLATE
3/4"Ø BOLT,
TYP OF 4
STEEL POST
RE: PLAN
SECTION
STEEL BEAM, TYP
RE: PLAN
1/2" THICK
STIFFENER PLATE,
EA. SIDE,
CENTER OVER COLUMN
2"
4
"
4"
2
"
1 1/2"4"1 1/2"
STEEL BEAM
RE: PLAN
PL1/2"x7"x1'-0"
CAP PLATE
3/4"Ø BOLT,
TYP OF 4
STEEL POST
RE: PLAN
SECTION B-B (AT SIM)
HSS POST,
AT SIM
RE: PLAN
3/4"Ø BOLT,
AT SIM,
TYP OF 4
PL1/2"x7"x1'-0"
CAP PLATE,
AT SIM
1/2" STIFFENER PLATE,
EA. SIDE OF BEAM,
AT SIM,
CENTER OVER POST
SLAB ON METAL DECK
RE: PLAN
HSS4x4x1/4
PL1/2"x5"x0'-5"
HSS3-1/2x3-1/2x5/16x0'-6"
STEEL BEAM
RE: PLAN
3/4"Ø BOLT,
TYP OF 2
HSS POST,
RE: PLAN
A
A
SECTION A-A
B B
HSS POST,
RE: PLAN
1/4
1/4
1/2" STIFFENER PLATE,
EA. SIDE OF BEAM,
AT SIM,
CENTER OVER POST
SLAB ON METAL DECK
RE: PLAN
1/4
1/4TYP. AT SIM
HSS POST,
AT SIM
RE: PLAN
1/4
PLAN NORTH
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
7
/
2
0
2
0
7
:
4
9
:
1
2
A
M
S-311
FRAMING
DETAILS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
S-311S-101 1 1/2" = 1'-0"
1 END OF WALL EMBED PLATE
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
S-311S-101 1 1/2" = 1'-0"
2 BEAM SPLICE DETAIL
S-311S-101 1 1/2" = 1'-0"
3 BEAM OVER POST DETAIL
S-311S-101 1 1/2" = 1'-0"
5 POST ON STEEL BEAM CONNECTION
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
REVISION 6 2020.03.25
REVISION 7 2020.04.07
1/4
04/07/2020
170
'SIMPSON' H2.5 AT EACH TRUSS
'SIMPSON' A35
@ 12" O.C.
'SIMPSON' LTP4 CLIP
@ 9" O.C.
2'
-
0
"
6"
EXISTING DOUBLE PLATE
ROOF BLOCKING
5/8"Ø J-BOLT,
W/ 12" EMBEDMENT,
@ 2' - 0" O.C. ALTERNATE:
USE 5/8"Ø EXP. BOLTS W/
5" EMBED. @ 2'-0" O.C.
#4 SINGLE LEG STIRRUPS
@ 8" O.C. ABOVE OPENINGS
BEAM REINFORCEMENT
RE: ELEVATIONS
CONCRETE HEADER BEAM
112'-1"
4"
EXISTING 2x6 RAFTER
NOTE:
RE: DETAIL 1/S-503
FOR OVERHANG
CONSTRUCTION
'SIMPSON' H2.5 AT EACH TRUSS
'SIMPSON' A35
@ 12" O.C.
'SIMPSON' LTP4 CLIP
@ 9" O.C.
EXISTING DOUBLE PLATE
ROOF BLOCKING
RE: 1/S-321
WALL REINFORCEMENT
RE: ELEVATIONS
CONCRETE WALL
RE: PLAN AND ELEVATIONS
112'-1"
EXISTING 2x6 RAFTER
NOTE:
RE: DETAIL 1/S-503
FOR OVERHANG
CONSTRUCTION
SECTION PLAN
SPLICE
CLASS 'B'
POUR BREAK
ST
A
G
G
E
R
S
P
L
I
C
E
S
ST
A
G
G
E
R
S
P
L
I
C
E
S
AT LOCATIONS WHERE REINFORCEMENT AT WALL BELOW
IS LARGER THAN REINFORCEMENT AT WALL ABOVE
PROVIDE CLASS 'B' LAP SPLICE OF SMALLER BAR OR
DEVELOPMENT LENGTH OF LARGER BAR, WHICHEVER IS
GREATER ~ RE: GENERAL NOTES FOR BAR DEVELOPMENT
AND SPLICE LENGTHS
SINGLE SLEEVES
4" MIN. BETWEEN
EQ.EQ.
BAR SPACING
1'-0" O.C. ~ TYP. HORIZ.
BAR SPACING
1'-0" O.C. ~ TYP. VERT.
UP TO 8 SLEEVES IN A
GROUP ~ 4x2 PATTERN
(SHOWN) OR 3x3
EQ.
EQ.
AND ADJACENT SLEEVES ~ E.W.
1'-4" MIN. BETWEEN GROUP
WALL REINFORCING
8" MAX. SLEEVE Ø
IN ANY ONE DIRECTION
MAX. OF 4 SLEEVES
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
7
/
2
0
2
0
7
:
5
0
:
1
2
A
M
S-321
CONCRETE WALL
AND FRAMING
DETAILS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
S-321S-102 1 1/2" = 1'-0"
1 CONCRETE HEADER BEAM
S-321S-102 1 1/2" = 1'-0"
2 ROOF CONNECTION AT CONCRETE WALL
S-321 3/4" = 1'-0"
3 REINFORCEMENT SPLICE DETAILS
S-321 1/2" = 1'-0"
4 TYPICAL REINFORCEMENT AROUND SLEEVES IN WALLS
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
REVISION 6 2020.03.25
REVISION 7 2020.04.07
04/07/2020
171
LEVEL 1
100'-0"
ROOF LEVEL
112'-1"
E D C A
TY
P
9'
-
8
1
/
2
"
5'-6 1/4"12'-10 1/2"5'-2 3/4"12'-8"5'-3 3/4" 3'-9 3/4" 8'-10 3/4" 5'-3 3/4"12'-8"5'-2 3/4"12'-10 1/2"5'-6 1/4"
45'-5"14'-4"36'-2"
SW1 SW1 SW1 SW1 SW1SW1
HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1
B
45'-5"14'-4"12'-8"23'-6"
(+/-)
8'-10"
(+/-)
10'-2"
TRUSS
TYPE T4
TRUSS
TYPE T8
5 1/8" x 18" GLULAM
w/(2) TRIMMERS & 2
KINGS
5 1/8" x 18" GLULAM
w/(2) TRIMMERS & 2
KINGS
LEVEL 1
100'-0"
ROOF LEVEL
112'-1"
EDC
4'-1 1/2"6'-4"15'-4"3'-10"15'-9 1/2"
45'-5"14'-4"
HD2
(+/-)
10'-2"
45'-5"14'-4"
TRUSS
TYPE T4
9'
-
8
1
/
2
"
BW1
HD28'
-
2
"
SEE DTLS. 8/S-212 & 12/S-503.
METAL STUD FRAMED WALL
SW2
PROVIDE HEADER AS
NOTED IN SCHEDULES,
PROVIDE FULL BEARING
TO HEADER FROM
GIRDER, PROVIDE
MINIMUM (3) TRIMMERS
(3) KINGS
5
S-501
12
S-503
4343
1 2
NOTES:
1. RE: S-501 AND S-502 FOR WALL DETAILS AND SCHEDULES.
2. CONTRACTOR TO VERIFY WALL DIMENSIONS AND OPENINGS ARE COORDINATED WITH
ARCHITECTURAL WALLS.
3. INDICATES WALL TYPE. RE: 1/S-502 FOR WALL TYPE SCHEDULE. WALL TYPE IS TO
APPLY TO ENTIRE WALL UNLESS NOTED OTHERWISE ON PLAN.
4. INDICATES HOLDDOWN. RE: 3/S-502 FOR HOLDDOWN SCHEDULE.
SWX
HDX
LEVEL 1
100'-0"
ROOF LEVEL
112'-1"
CAB
HD2 HD1
12'-8"23'-6"
4"10'-2"13'-0"
6x
6
P
O
S
T
6x
6
P
O
S
T
9'
-
8
"
9'
-
8
"
2'-8"
FUTURE OPENING
10'-0"10'-10"
FUTURE OPENING
10'-0"2'-8"
HD2
W12
ROOF BEAM
W12
ROOF BEAM
113'-0 1/4"
T.O. STEEL
SW2
BW1
BW1
11
S-503
11
S-503
KEY NOTES (COLD-FORMED FRAMED WALLS)
WALL CONSTRUCTION SHALL BE 600S162-54 STUDS AT 16" O.C. SHEATHED WITH 15/32" OSB ON
EXTERIOR FASTENED WITH #10 SELF DRILLING SCREWS AT 8" O.C. AT PANEL EDGES. PROVIDE LIGHT
GAGE BLOCKING AT PANEL EDGES. FASTEN SHEATHING TO INTERMEDIATE SUPPORTS WITH #10
SELF DRILLING SCREWS AT 12" O.C. FASTEN BOTTOM TRACK TO SLAB USING 5/8" DIA. BY 4-1/2"
EMBEDMENT EXPANSION ANCHORS AT 48" O.C.
WALL CONSTRUCTION SHALL BE 600S162-54 STUDS AT 16" O.C. SHEATHED WITH 15/32" OSB ON
INTERIOR AND EXTERIOR SIDES FASTENED WITH #10 SELF DRILLING SCREWS AT 8" O.C. AT PANEL
EDGES. PROVIDE LIGHT GAGE BLOCKING AT PANEL EDGES. FASTEN SHEATHING TO INTERMEDIATE
SUPPORTS WITH #10 SELF DRILLING SCREWS AT 12" O.C. FASTEN BOTTOM TRACK TO SLAB USING
5/8" DIA. BY 4-1/2" EMBEDMENT EXPANSION ANCHORS AT 24" O.C.
HOLD DOWN AT ENDS OF WALL SEGMENT SHALL BE SIMPSON HTT4 TENSION TIE FASTENED TO ONE
600S162-54 STUD AND ONE 5/8" DIA. BY 12" EMBEDMENT ANCHOR BOLT.
HOLD DOWN AT ENDS OF WALL SEGMENT SHALL BE SIMPSON HTT5 TENSION TIE FASTENED TO TWO
600S162-54 STUDS AND ONE 5/8" DIA. BY 14" EMBEDMENT ANCHOR BOLT.
1
2
3
4
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
7
/
2
0
2
0
7
:
5
1
:
4
7
A
M
S-401
WALL
ELEVATIONS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
S-401S-101 1/4" = 1'-0"
1 WALL 5 ELEVATIONS
S-401S-101 1/4" = 1'-0"
2 WALL 1 ELEVATION
RE: 1/S401 FOR NOTES.
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
REVISION 6 2020.03.25
REVISION 7 2020.04.07
S-401S-102-P 1/4" = 1'-0"
3 WALL 3 ELEVATION
RE: 1/S401 FOR NOTES.
04/07/2020
172
LEVEL 1
100'-0"
ROOF LEVEL
112'-1"
312
19'-11"19'-11"33'-2"
4
SW2
HD2
HD2 HD2 HD2 HD1 HD1
HD2 HD2 HD2
HD1
19'-11"19'-11"33'-2"
9'
-
8
1
/
2
"
9'
-
8
1
/
2
"
2'
-
1
0
1
/
2
"
6'
-
1
0
"
2'
-
1
0
1
/
2
"
6'
-
1
0
"
2'
-
1
0
1
/
2
"
6'
-
1
0
"
4'-4 3/4"6'-4 1/2"5'-11 3/4"3'-2"3'-2"5'-11 3/4"6'-4 1/2"4'-4 3/4"4'-5"6'-4"10'-8"6'-4 1/2"5'-4 1/2"
HD1
SW1 SW1
SW1
SW2SW2
LEVEL 1
100'-0"
ROOF LEVEL
112'-1"
3 12
4'-9"12'-4" 2'-10" 2'-10" 12'-4"4'-9"
#5@12" O.C.,
VERT #5@12" O.C.,
VERT
#5@12" O.C.,
VERT
#5@12" O.C.,
HOR
#5@12" O.C.,
HOR
#5@12" O.C.,
HOR
#8xCONT.
BEAM REINF.,ABOVE OPENING, TYP.
#4 STIRRUPS @ 8" O.C.
WALL DOWELS
MATCH SIZE AND
SPACING OF WALL
REINFORCEMENT
Ld
L
d
1
S-321
1
S-321
9'
-
9
"
9'
-
9
"
19'-11"19'-11"
4"
TOP OF CONCRETE
WALL
2
S-321
2
S-321
2
S-321
NOTES:
1. RE: GENERAL NOTES FOR CONCRETE AND REINFORCING INFORMATION.
2. RE: PLAN FOR WALL THICKNESS AND LOCATIONS.
3. CONTRACTOR TO VERIFY WALL DIMENSIONS AND OPENINGS ARE COORDINATED WITH
ARCHITECTURAL WALLS.
4. PROVIDE STANDARD HOOK FOR ALL HORIZONTAL REINFORCEMENT AT WALL ENDS AND
OPENINGS.
5. 'Ld' INDICATES DEVELOPMENT LENGTH. SEE GENERAL NOTES FOR LENGTHS.
6. RE: S-311 FOR REINFORCING SPLICE AND WALL PENTRATION DETAILS.
LEVEL 1
100'-0"
ROOF LEVEL
112'-1"
34
SW1
33'-2"
2'-2 1/2"12'-8 1/2"18'-3"
BW1
HD1 HD1
9'
-
8
1
/
2
"
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
7
/
2
0
2
0
7
:
5
4
:
0
4
A
M
S-402
WALL
ELEVATIONS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
S-402S-101 1/4" = 1'-0"
1 WALL 4 ELEVATION
S-402S-101 1/4" = 1'-0"
2 WALL 6 ELEVATION
RE: 1/S-401 FOR NOTES
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
REVISION 6 2020.03.25
REVISION 7 2020.04.07
S-402S-101 1/4" = 1'-0"
3 WALL 2 ELEVATION
RE: 1/S-401 FOR NOTES
04/07/2020
173
GRID
MAX BORED HOLE Ø IS 40%
OF STUD WIDTH (60% MAX
ALLOWED IF STUD IS DOUBLED ~
NO MORE THAN TWO SUCCESSIVE
DOUBLED STUDS ALLOWED)
2x4 - 1 3/8"Ø (40%), 2 1/8"Ø (60%)
2x6 - 2 3/16"Ø (40%), 3 5/16"Ø (60%)
CENTER HOLES IN STUD
MAX NOTCH DEPTH IS
25% OF STUD WIDTH
2x4 - 7/8" MAX.
2x6 - 1 3/8" MAX.
MAX BORED HOLE Ø
IS 60% OF STUD WIDTH
2x4 - 2 1/8"Ø
2x6 - 3 5/16"Ø
MAX NOTCH DEPTH IS
40% OF STUD WIDTH
2x4 - 1 3/8" MAX.
2x6 - 2 3/16" MAX.
TYPICAL NOTES FOR BEARING WALLS:
1.HOLES SHALL NOT BE LOCATED IN THE SAME STUD AS A CUT OR NOTCH.
2.CONTACT ARCHITECT PRIOR TO CUTTING OR NOTCHING TO VERIFY SIZE AND
LOCATION IF HOLES GREATER THAN 20% STUD WIDTH OR NOTCHES GREATER
THAN 10% STUD WIDTH ARE REQUIRED IN TWO OR MORE CONSECUTIVE STUDS.
EXTERIOR OR BEARING WALL NON-BEARING PARTITION WALL
STUD FACE
5/8" MIN TO
EQ EQ
LENGTH OF WALL (BETWEEN
CORNERS OR DEMISING
WALLS)
SPLICE LENGTH
(MINIMUM)
NAILS ALONG SPLICE
LENGTH
OVER 30'
OVER 20'
OVER 10'
LESS THAN 10'
4'-0"
4'-0"
4'-0"
4'-0"
18-16d
10-16d
6-16d
4-16d
TOP PLATE SPLICE
CENTERED OVER
STUD ~ TYP.
DOUBLE TOP PLATE NAILS BETWEEN SPLICE
LOCATION PER SCHEDULE ~ STAGGERED
SPLICE LENGTH PER SCHEDULE
NOTE:
DO NOT SPLICE TOP PLATES
WITHIN 6'-0" OF ENDS OF
WOOD SHEARWALLS
'SIMPSON' MST 37 STRAP TIE ACROSS BEAM
16d NAILS AT 4" O.C.
STAGGERED BOTH SIDES OF
BEAM
WOOD OR GLU-LAM BEAM
~ RE: PLAN FOR SIZE AND LOCATION
2x KING STUD
DBL. 2x TRIMMER MIN.
16d NAILS @ 12" O.C. STAGGERED
2x STUD WALL
~ RE: PLAN
DBL. 2x TOP PLATE
3
4
5
1
2
4
6
3
4
4
9
8
7
1 WOOD STUDS AT WALL ENDS, INTERSECTING
WALLS, JAMBS OF OPENINGS, AND @ 16" O.C.
2 2x BLOCKING AT MID-HEIGHT OR AT 5'-0" O.C. MAX
3 WOOD HEADER ~ RE: HEADER SCHEDULE
4 MINIMUM SINGLE TRIMMER AND JAMB STUD AT OPENINGS
~ RE: HEADER SCHEDULE FOR ADDIT. INFORMATION
5 RE: GENERAL NOTES FOR NAILING REQUIREMENTS
6 ANCHOR BOLTS IN TREATED WOOD SILL PLATE AT
FOUNDATIONS.
7 CONT. DOUBLE TOP PLATE. SPLICE ~ RE: TYP. DETAIL
8 FRAMING CLIP. ONLY OCCURS IS SHEATHING
DOES NOT EXTEND OVER SILL/TOP PLATES
9 SIMPSON A34 ~ TYPICAL AS SHOWN
10
11
DOUBLE SILL PLATE WHERE GYP-CRETE
FLOOR TOPPING OCCURS.
12
ROOF TRUSSES
ROOF SHEATHING
~ RE: PLAN NOTES
1
5
10
11 12
18
9
11
1 2x WOOD STUDS @ 16" O.C. MAX
2 SOLID BLOCKING IF SHEATHING PANEL
JOINT OCCURS
3 WOOD LINTEL
4 ROOF SHEATHING
~ RE: PLAN NOTES
5
7 ANCHOR BOLTS IN TREATED WOOD
SILL PLATE AT FOUNDATIONS.
8
9 BUILT-UP STUD POSTS AS
REQUIRED FOR STRAP HOLDOWN
10 EDGE ATTACHMENT AT SHEATHING EDGE
DOUBLE TOP PLATE
6 HOLDOWN ANCHOR
~ RE: HOLDOWN SCHEDULE
1
2
2
3 3
11 SHEAR WALL SHEATHING
~ RE: SHEAR WALL SCHEDULE
667
ROOF TRUSSES
10
12
NOTE: SEE TYPICAL WOOD STUD
EXTERIOR/BEARING WALL DETAIL FOR
INFORMATION SHOWN BUT NOT DENOTED
12
4 85
12
HOLDDOWN
~ RE: ELEVATIONS AND
HOLDDOWN SCHEDULE
9
EDGE ATTACHMENT
(E) WOOD TRUSS
~ RE: PLAN
WALL SHEATHING
EDGE ATTACHMENT
NEW 2X6 TOP PLATE
STUD WALL
~ RE: PLAN AND
TYPICAL DETAILS
'SIMPSON' H2.5 AT EACH TRUSS
'SIMPSON' A35 AT EACH
TRUSS TO TOP PLATE
'SIMPSON' LTP4 CLIP
~ RE: SHEAR WALL
SCHEDULE FOR
SPACING
2x BLOCKING
COLD ROOF AND OVERHANG
~ RE: ARCH
EXIST. DOUBLE 2xTOP PLATE
TRUSS TYPE T4
BOT. CHORD.
REMOVABLE
SECTION OF
CEILING JOIST,
RE: DETAIL
OF ROOF
ABOVE
TYP.
2"
1'-4"1'-4"1'-4"
EXIST.
CEILING
JOIST
1'
-
6
"
1'
-
6
"
2"
2"2"
PLAN OF
CEILING JOISTS
DETAIL
16 GA. PLATE x
3" WIDE & 6"
LONG W/ (2)
1/4" SCREWS
EXISTING
RAFTER
2x4 HANGER TO
MATCH EXISTING
EXISTING
CEILING JOIST
HINGE
-3'-0"
85°
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
7
/
2
0
2
0
9
:
4
8
:
2
8
A
M
S-501
TYPICAL WOOD
DETAILS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
S-501 1" = 1'-0"
6 TYPICAL STUD NOTCHES AND HOLES
S-501 1" = 1'-0"
7 TYPICAL TOP PLATE SPLICE
S-501 1" = 1'-0"
8 TYPICAL BEAM POCKET
S-501 3/4" = 1'-0"
1 TYPICAL WOOD STUD EXTERIOR/BEARING WALL
S-501 3/4" = 1'-0"
3 TYPICAL WOOD STUD SHEAR WALL FOR SHEAR PIERS
S-501S-102 1" = 1'-0"
5 WOOD TRUSS AT WOOD STUD WALL
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
REVISION 6 2020.03.25
REVISION 7 2020.04.07
S-501S-102 3/4" = 1'-0"
9 ACCESS MATCH PLAN & SECTION
04/07/2020
174
WALL TYPE
WALL SCHEDULE
WALL SHEATHING,
APA-RATED
BLOCKING & STUD SIZE
@ PANEL EDGES STUD SIZE
2x
2x 2x6 DF#2
STUD SPACING
16" O.C.
NAIL SIZE & SPACING
@ ALL PANEL EDGES
10d @ 6" O.C.
SILL PLATE ATTACHEMENT
ANCHOR BOLT & SPACING SILL PLATE SIZE
REMARKS
5/8" Ø @ 48" O.C.
5/8" Ø @ 24" O.C.
2x
2x
NOTES:
1. SEE SHEARWALL GENERAL NOTES
2. EQUIVALENT FASTENER TABLE MAY BE USED, SEE SCHEDULES
3. SEE TYPICAL SHEARWALL FRAMING DETAILS.
4. DO NOT RECESS ANCHOR BOLT NUT AND WASHER INTO SILL PLATE. EMBED 7" INTO CONCRETE.
5. LOCATE ANCHOR BOLTS 10" FROM EACH END OF EACH SILL PIECE WITH A MINIMUM OF (2) ANCHOR BOLTS PER PIECE.
6. LOCATE ANCHOR BOLTS 5" FROM END OF CONCRETE WALLS AND WALL STEPS.
BW1
15/32" OSBSW1 2x6 DF#2 16" O.C.
BLOCKING CONNECTION
TO TOP PLATE BELOW
A35 @ 24" O.C.
A35 @ 12" O.C.
8d @ 6" O.C.15/32" OSB RE: 1/S-501
RE: 3/S-501
2x10d @ 4" O.C.5/8" Ø @ 24" O.C.(2) 2x15/32" OSB
BOTH SIDESSW2 2x6 DF#2 16" O.C.
A35 @ 12" O.C.,
H2.5 @ EA. RAFTER,
LTP4 @ 9" O.C.
RE: 3/S-501
HOLDOWN SCHEDULE
MARK HOLDOWN ANCHORAGE STUD
HD1 HDU4 PER MANUFACTURERS
RECOMMENDATIONS (2) 2x6
NOTES:
1. BUILT UP MEMBER SCHEDULE MAY BE USED.
HD2 HDU14 PER MANUFACTURERS
RECOMMENDATIONS 4x6
NOTES:
1. RE: S-501 FOR ELEVATIONS AND DETAILS.
2. GLULAM GRADE TO BE 2.0E-2600Fb.
ROUGH OPENING
WIDTH
HEADER
SIZE
TYPICAL EXTERIOR HEADER SCHEDULE
JAMB STUDS
KING
STUDS
JAMB
STUDS
R.O. ≤ 4'-6"(3) 2x8 2 1
4'-6" ≤ R.O. ≤ 7'-8"(1) 6x12 2 2
7'-8" ≤ R.O. ≤ 12'-4"(3) 1.75x14 LVL2 3 3
BUILT-UP MEMBER FASTENER SCHEDULE
FASTENER
MAX WIDTH
3 1/2"
2-PLY
10d (0.128"x3")
1/2"Ø A307 BOLTS
MAX WIDTH
5 1/4"
3-PLY
1/4"x3 1/2" SDS
1/4"x6" SDS
3 3/8" TRUSSLOK
5 3/8" TRUSSLOK
MAX WIDTH
5 1/4"
2-PLY
MAX WIDTH
7"
3-PLY
MAX WIDTH
7"
2-PLY
MAX WIDTH
7"
4-PLY
2"
2"
(3) ROWS @ 12" O.C.NOT ALLOWED
(2) ROWS @ 16" O.C. w/ WASHERS EA. SIDE, MAX HOLE = 9/16"Ø
(2) ROWS @ 12" O.C.NOT ALLOWED
(2) ROWS @ 12" O.C.NOT ALLOWED
(2) ROWS @ 12" O.C.NOT ALLOWED
(2) ROWS @ 12" O.C.NOT ALLOWED
2"
NOTES:
1. SCHEDULE APPLIES TO 2x LUMBER, 3x LUMBER, 4x LUMBER, LVL, LSL, PSL, AND GL. EACH DIAGRAM ABOVE SHOWS ONLY
ONE OPTION FOR FASTENING ANY ALLOWABLE OPTION MAY BE USED.
2"
2"
A
4'-0"10"8'-8"
111'-9"
W8x10
CAP PL 3/8x5x0'-5" WITH
(2) 5/8" Ø THREADED
STUDS WELDED TO TOP
OF PLATE
1/4" PL x3"x0'-4" HIGH SIDE
PL (BOTH SIDES) WITH (2) 5/16" Ø
x1 1/2" LONG LAG SCREWS4x4 POST
DETAIL AT POSTS
EXISTING
RAFTERS
EXISTING
2x6 TOP PLATE
NEW 2x6
PLATE
NEW WALL
STUDS
2x10'S
@ 16" O.C.
3/4" SHEATHING
SIMPSON FACE MOUNT
JOIST HANGER
NEW 2x10 LEDGER.
CONNECT TO EACH STUD WITH
(3) 1/4" Ø SDS SCREWS AT
EACH STUD WITH 3" EMBED.
NEW 2x TRIM
2x4 PARAPET
WALL
2x10 EDGE
2x10 OUT-RIGGERS
@ 16" O.C.
SIMPSON TOP
MOUNT JOIST
HANGER
W8x10
SEE ADJACENT
DETAIL @ 4x4
POST
GRID A OR C
113'-1 3/4"
T.O.
SHEATHING
6'-8"
2x6 STUD WALL
2x6 @ 16" O.C.
2x4 @ 16" O.C.
DETAIL "B"
DETAIL "B"DETAIL "A"
2x10 ROOF JOISTS
@ 16" O.C.
SLOPE TO MATCH
EXIST. ROOF
DETAIL "B"
1" = 1'-0"
DETAIL "A"
1" = 1'-0"
GRID
2x10 AT 16" O.C.(ALIGN JOIST
WITH WALL STUD)
2x BLOCKING, TOE
NAIL TO TOP PLATE
DOUBLE 2x6
TOP PLATE
(4) 10d NAILS
2x4 BLOCKING
1/2" SHEATHING
2x4 @ 16" O.C.
(ALIGN WITH
JOISTS)
EXTEND 2x4
VERTS. PER
ARCH.
2x6 @ 16" O.C.
2x4 BOT.
PLATE
1/2" SHEATHING
(4) 10d
NAILS
NOTE:
FOR CONNECTION
INFORMATION AND
OVERHANG CONSTRUCTION,
RE: DETAIL 1/S-503.
4
113'-1 3/4"
T.O.
SHEATHING
6'-8"
2x6 STUD WALL
2x6 @ 16" O.C.
2x4 @ 16" O.C.
DETAIL "B"
9/S-502
DETAIL "B"DETAIL "A"
SLOPE TO MATCH
EXIST. ROOF
2x4 (FLAT)
2x
4
2x
4
REQUIRED
AS
TYP.
1'-4"
LOCATE JOIST TIGHT
TO 2x6 RAFTER
2x12 JOISTS
@ 16" O.C.
BLOCKING WITH
JOIST HANGERS
112'-1"
DOUBLE
2x12
DETAIL "B"
1" = 1'-0"
DETAIL "A"
1" = 1'-0"
GRID
2x BLOCKING
DOUBLE 2x6
TOP PLATE
2x4 @ 16" O.C.
(ALIGN WITH
JOISTS)
3/4" SHEATHING
FOR TOP OF WALL,
RE: DETAIL "B",
9/S-502
2x12
JOISTS
2x12 BLOCKING
WITH SIMPSON
FACE MOUNT
HANGERS
2x BLOCKING
16" O.C.
2x4 (FLAT)
VERT. 2x4
@ 16" O.C.
(2) 10d
NAILS
NOTE:
FOR CONNECTION
INFORMATION AND
OVERHANG CONSTRUCTION,
RE: DETAIL 1/S-503.
4
DETAIL
OF TOP
PLATE
112'-1" TOP
BEYOND
113'-1 3/4"
2x6 REFTER,
RE: DETAIL 11/S-502
COPE FLANGE
& WEB FOR
ROOF SLOPE
2x6 STUDS
ADJACENT
TO 6x6 POST
SECTION
W12
2x BLOCKING
2x6 TOP PLATES
POST CAP PLATE
1/2"x5 1/2"x0'-6" WITH
(2) 3/4" Ø THREADED
STUDS WELDED TO
TOP OF PLATE
1/4" SIDE PLATES: 1/4"x4"
x0'-6" HIGH WITH (2) 1/2" Ø
THROUGH BOLTS
2x NAILER
2x12 JOIST WITH
SIMPSON TOP
FLANGE HANGERW12 BEAM
SEE DETAIL
6x6 POST WITH
STEEL CAP PLATE
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
3/
2
3
/
2
0
2
0
9
:
2
5
:
1
8
A
M
S-502
WOOD
SCHEDULES &
DETAILS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
NO SCALES-502
1 WALL SCHEDULE - WOOD
N.T.S.S-502
3 SCHEDULES
N.T.S.S-502
4 BUILT-UP MEMBER FASTENER SCHEDULE
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
S-502S-102 1" = 1'-0"
5 ENTRY CANOPY SECTION
S-502S-102 1/2" = 1'-0"
9 MANSARD ROOF FRAMING DETAILS
S-502S-102 1/2" = 1'-0"
11 MANSARD ROOF FRAMING DETAIL
S-502S-102 1" = 1'-0"
7 ROOF SECTION AND DETAIL
3/26/2020
175
GRID
EDGE ATTACHMENT
2x FULL DEPTH
BLOCKING
ROOF JOIST
~ RE: PLAN
WALL SHEATHING
~RE: SHEARWALL
SCHEDULE
EDGE ATTACHMENT
DOUBLE 2x TOP PLATESTUD WALL
~ RE: PLAN AND
TYPICAL DETAILS
'SIMPSON' H2.5 AT EACH
ROOF JOIST
'SIMPSON' A35 AT EACH
ROOF JOIST TO TOP
PLATE
'SIMPSON' A35 CLIP
~ RE: SHEAR WALL
SCHEDULE FOR
SPACING
RE: ARCH.
2x4 SOFFIT FRAMING
DBL. 2x BLOCKING OR
3x BLOCKING
COLD ROOF
~RE: ARCH.
(E) ROOF TRUSS
~ RE: PLAN
'SIMPSON'
HUC212-3 MAX AT
EA TRUSS
ROOF SHEATHING
~ RE: PLAN NOTES
2x BLOCKING
ROOF BEAM
~ RE: PLAN
WALL SHEATHING, SHEATH
PER 'BW1' REQUIREMENTS
~ RE: WALL SCHEDULE
2x BLOCKING
EDGE ATTACHMENT
NEW TRUSS VERT
~RE: TRUSS ELEVATIONS
ROOF JOIST
~ RE: PLAN
NEW TRUSS DIAGONAL
~ RE: TRUSS ELEVATIONS
'SIMPSON' A35 AT 24" O.C.
ROOF JOIST
~ RE: PLAN
ROOF SHEATHING
~ RE: PLAN NOTES
ROOF BEAM
~ RE: PLAN
'SIMPSON' ITS1.81/11.88 TYP
DOUBLE BOND BEAM
W/ (2) #5 x CONT. EA.
5/8" Ø SIMPSON STRONG-BOLT 2
EXPANSION ANCHORS @ 24" O.C.
(STAGGERED)
DEPTH
5"
EMBED
8" CMU WALL WITH
#5 @ 2'-0" O.C. VERT.
ROOF SHEATHING
~ RE: PLAN NOTES
ROOF JOIST
~ RE: PLAN
T.O. SHEATHING
RE: PLAN NOTES
(2) 1 3/4"x11 7/8" LEDGER
DOUBLE BOND BEAM
W/ (2) #5 x CONT. EA.
5/8" Ø SIMPSON STRONG-BOLT 2
EXPANSION ANCHORS @ 24" O.C.
(STAGGERED)
DEPTH
5"
EMBED
8" CMU WALL WITH
#5 @ 2'-0" O.C. VERT.
ROOF SHEATHING
~ RE: PLAN NOTES
ROOF JOIST
~ RE: PLAN
(2) 1 3/4"x11 7/8" LEDGER
'SIMPSON' ITS1.81/11.88
TOP FLANGE HANGER
T.O. SHEATHING
RE: PLAN NOTES
2x FRAMING
ROOF SHEATHING
~ RE: PLAN
SAFETY BEAM
~ RE: PLAN
2x8 PRESSURE TREATED
SILL PLATE W/ 5/8" DIA .x 5"
SIMPSON TITEN HD AT 48" O.C.
2x10 RIM W/ SIMPSON
A35 CLIP @ 24" O.C.
DOUBLE BOND BEAM
W/ (2) #5xCONT. EA.
8" CMU WALL WITH
#5 @ 1'-4" O.C. VERT.
NOTES:
1. AT SIMILAR SECTION SAFETY BEAM IS NOT PRESENT
OR ROOF FRAMING IS RUNNING PERPENDICULAR
2. CONTRACTOR TO COORDINATE THE ELEVATION AND
LOCATION OF SAFETY BEAM WITH THE ELEVATOR
MANUFACTURER
T.O. SHEATHING
RE: PLAN
T.O. SAFETY BEAM
RE: MANUFACTURER
2"
C
L
R
.
113'-6"
T.O.S.
GLULAM BEAM
~ RE: PLAN
'SIMPSON' CC04
POST CAP
HSS COLUMN
~ RE: PLAN1/4
T.O. SHTG.
RE: PLAN NOTES
ROOF SHEATHING
~ RE: PLAN NOTES
2
12
WOOD BEAM
~ RE: PLAN
WOOD RAFTER
~ RE: PLAN
ROOF SHTG.
~ RE: PLAN NOTES
2'-0" MAX
2x10 LEDGER w/(2) 1/4"Ø
SDS SCREWS AT EA. STUD
3" EMBEDMENT MINIMUM
~ RE: PLAN
PROVIDE 12d TOE-NAILS AT
12" O.C. INTO BEAM
2x BLOCKING
LIGHT GAGE FRAMED WALL
~ RE: PLAN
WALL SHEATHING
~RE: SHEARWALL
SCHEDULE
STUD WALL BEYOND
~ RE: PLAN AND
TYPICAL DETAILS
(3) 11 7/8" LVL HEADER
AT FUTURE OPENING
WITH (2) TRIMMERS
AND (2) KING STUDS
AT ONE JAMB AND (1)
TRIMMER AND 6x6
POST AT OTHER JAMB
PROVIDE 2x6 STUDS
ABOVE FUTURE
OPENING BEAM AT 16"
O.C.
'SIMPSON' A35 AT EA.
PARAPET STUD
GRID
2x BLOCKING
DOUBLE 2x6
TOP PLATE
3/4" SHEATHING
VERT. 2x4
@ 16" O.C.
(2) 10d
NAILS
112'-1
109'-8
NOTE:
SEE DETAIL 11/S-502 FOR
ADDITIONAL INFORMATION.
1'-4"1'-4"
3/
4
"
S
H
E
A
T
H
I
N
G
1
1
/
2
"
W1
2
SINGLE PLATE CONN.,
PROVIDE (2) 3/4" Ø
A325 BOLTS
DOUBLE 2x12
POST TOP
CAP PLATE
~ RE: 8/S-502
2x NAILER
2x12 WITH SIMPSON
TOP FLANGE
HANGER
W12 BEAM
6x6 POST
CONNECT TRACK TO
EXIST. TOP PLATES W/ #10
TRAX SELF-DRILLING
SCREWS @ 16" O.C.
WALL STUDS, RE: DTL.
8/S212
3
EXISTING DOUBLE
TOP PLATE
112'-1
TRUSS
BRNG.
6"
4"
EXISTING
ROOF TRUSS
CONT. 16GA. TOP
TRACK
WALL
SHEATHING,
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
7
/
2
0
2
0
8
:
0
7
:
3
2
A
M
S-503
WOOD FRAMING
DETAILS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
S-503S-102 1" = 1'-0"
1 SECTION AT NEW ROOF FRAMING
NO SCALES-503
2 NOT USED
S-503S-102 1" = 1'-0"
3 NEW BEAM AT EXISTING ROOF TRUSSES
S-503S-102 1" = 1'-0"
4 SECTION AT ROOF BEAM
S-503S-102 3/4" = 1'-0"
5 FLOOR JOIST BEARING AT MASONRY WALL
S-503S-102 3/4" = 1'-0"
6 FLOOR JOIST BEARING AT MASONRY WALL
S-503S-102 3/4" = 1'-0"
7 SECTION AT ELEVATOR HOIST BEAM
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
REVISION 6 2020.03.25
REVISION 7 2020.04.07
S-503S-102 3/4" = 1'-0"
8 SECTION AT HSS POST AND GLULAM BEAM CONNECTION
S-503S-102 1" = 1'-0"
10 SECTION AT LOW ROOF
S-503S-401 1" = 1'-0"
11 ROOF SECTION AT FUTURE OPENING
S-503S-102 1" = 1'-0"
9 ROOF FRAMING DETAIL
S-503S-102 3/4" = 1'-0"
12 WALL SECTION AT STEEL STUDS
04/07/2020
176
2 31
2 31 2 31
2 31231
2 31
2 31
2 31
2x4 (E)
1x
6
(
E
)
1x
6
(
E
)
2x6 (E)2x6 (E)
1x6 (N,E)
2x6 (E)2x6 (E)
1x6 (N,E)
(O.H.)
(O.H.)
(O.H.)
(O.H.)
FIELD VERIFY
S-505
2
S-505
1
S-505
3
S-505
1
S-505
2
S-505
3
S-505
5
S-505
5
19'-11" (+/-)19'-11" (+/-)
39'-10" (FIELD VERIFY)
6'-6"6'-0"6'-0"6'-6"
NOTE: SEE DETAIL 1/S-504 FOR INFORMATION
REGARDING DIAGONAL MEMBERS.
ROOF LEVEL
112' - 1"
SEE
NOTE
LAP SPLICE
BOTTOM CHORD
S-505
6
SEE
NOTE
(2) 1x8 HIP RIDGE
MEMBER
2x4 (N)
2x6 (E)
2x4 (E)
1x
6
(
E
)
1x
6
(
E
)
2x6 (E)2x6 (E)
1x6 (N,E)
2x6 (E)2x6 (E)
1x6 (N,E)
(O.H.)
(O.H.)
S-505
2
S-505
1
S-505
3
S-505
4
S-505
3
S-505
5
EXISTING (2) 1x8
RIDGE MEMBER
19'-11" (+/-)19'-11" (+/-)
39'-10" (FIELD VERIFY)
6'-6"6'-0"6'-0"6'-6"
NOTE:SEE DETAIL 1/S-505 FOR ADDL.
INFORMATION
ROOF LEVEL
112' - 1"
SEE
NOTE
LAP SPLICE
BOTTOM CHORD
S-505
6
(F
I
E
L
D
V
E
R
I
F
Y
)
12
'
-
0
"
VERIFY
FIELD
5 1/2"
1'
-
0
"
NEW 5 1/2" WD. x
19 1/2" GLULAM BM.
S-505
8S-505
7
FIELD VERIFY
2x4 (N)
2x6 (E)
(2)1x8 (N)
S-505
2
FACE OF NEW
GLULAM BM.
1x
6
(
E
)
1x
6
(
E
)
2x6 (E)2x6 (E)
1x6 (N,E)
2x6 (E)2x6 (E)
1x6 (N,E)
(O.H.)
S-505
2
S-505
1
S-505
5
19'-11" (+/-)19'-11" (+/-)
39'-10" (FIELD VERIFY)
6'-6"6'-0"6'-0"6'-6"
NOTE:SEE DETAIL 2/S-505 FOR
ADDITIONAL INFORMATION
ROOF LEVEL
112' - 1"
SEE
NOTE
LAP SPLICE
BOTTOM CHORD
S-505
6
VERIFY
FIELD
5 1/2"
1'
-
0
"
S-505
8S-505
7
FIELD VERIFY
(2) 1x8 (N)
2x4 (E)
2x4 (N)
NEW 5 1/2" WD. x
19 1/2" GLULAM BM.
2x6 (E)
S-505
3
S-505
3
S-505
2
(O.H.)
FACE OF NEW
GLULAM BM.
(2) 1x8 HIP RIDGE MEMBER (E)
1x
6
(
N
)
2x6 (E)2x6 (E)
2x6 (E)
(O.H.)
S-505
1
19'-11" (+/-)19'-11" (+/-)
39'-10" (FIELD VERIFY)
ROOF LEVEL
112' - 1"
LAP SPLICE
BOTTOM CHORD
S-505
6
(2) 1x8 HIP RIDGE MEMBER (E)
1x
6
(
N
)
1x6 (N)1x6 (N)
2x8 (N)
VAIRES VAIRES
VE
R
I
F
Y
FI
E
L
D
(TYP.)
1'-4"
LOCATION OF
VERTICAL MEMBERS
VARIES (TYP.)
LOCATION
VARIES
TO
P
C
H
O
R
D
H
E
I
G
H
T
(4
T
R
U
S
S
E
S
)
DI
S
T
.
T
O
T
O
P
CH
O
R
D
V
A
R
I
E
S
2x6 (E)
2x6 (E)
S-505
1
S-505
2
S-505
10
(2) 1x8 (N)
S-505
11
S-505
2
(O.H.)
S-505
10
(O.H.)
S-505
12
S-505
12
(O.H.)
(2) 1x8 (N)
2x4 (E)
1x
6
(
E
)
1x
6
(
E
)
2x6 (E)2x6 (E)
1x6 (N,E)
2x6 (E)2x6 (E)
1x6 (N,E)
(O.H.)
(O.H.)
(O.H.)
(O.H.)
FIELD VERIFY
S-505
2
S-505
1
S-505
3
S-505
4
S-505
1
S-505
2
S-505
3
S-505
5
S-505
5
EXISTING (2) 1x8
RIDGE MEMBER
19'-11" (+/-)19'-11" (+/-)
39'-10" (FIELD VERIFY)
6'-6"6'-0"6'-0"6'-6"
NOTE: AT TRUSS TYPE T1A WHERE DIAGONAL MEMBERS
ARE MISSING, ADD NEW 1x6 DIAGONAL BRACE
MATCHING EXISTING DIAGONALS. SEE DETAILS 2 & 5/S-
505 FOR JOINT CONNECTIONS
ROOF LEVEL
112' - 1"
SEE
NOTE
LAP SPLICE
BOTTOM CHORD
S-505
6
SEE
NOTE
(F
I
E
L
D
V
E
R
I
F
Y
)
12
'
-
0
"
2x4 (N)
2x6 (E)
(2
)
1
x
6
(
N
)
2x6 (E)2x6 (E)
2x6 (E)
19'-11" (+/-)19'-11" (+/-)
39'-10" (FIELD VERIFY)
ROOF LEVEL
112' - 1"
S-505
6
(2) 1x8 HIP RIDGE MEMBER (E)
(2
)
1
x
6
(
N
)
1x6 (N)
2x8 (N)
VAIRES VARIES
VE
R
I
F
Y
FI
E
L
D
(TYP.)
1'-4"
LOCATION OF
VERTICAL MEMBERS
VARIES (TYP.)
LOCATION
VARIES
TO
P
C
H
O
R
D
H
E
I
G
H
T
(5
T
R
U
S
S
E
S
)
DI
S
T
.
T
O
T
O
P
CH
O
R
D
V
A
R
I
E
S
2x6 (E)
VERIFY
FIELD
FACE OF NEW
GLULAM BM.
5 1/2"
1'
-
0
"
S-505
8
1x8 (N)
NEW 5 1/2" WD. x
19 1/2" GLULAM BM.
2x6 (E)
1x8 (N)
S-505
1
S-505
2
S-505
10
S-505
11
S-505
12
1x8 (N)
S-505
9
S-505
10
(O.H.)
LAP SPLICE
BOTTOM CHORD
2x12 (N)
2x
6
(
N
)
2x12 (N)2x12 (N)
2x6 (N)
(O.H.)(O.H.)
MATCH
EXIST.
S-506
1
S-506
1S-506
5
S-506
5
19'-11" (+/-)19'-11" (+/-)
39'-10" (FIELD VERIFY)
6'-0"6'-0"
ROOF LEVEL
112' - 1"
2x
6
(
N
)
2x6 (N)
S-506
3
S-506
7
(2) 1x8 HIP
RIDGE MEMBER
(TYP.)
S-506
3
(O.H.)
(O.H.)
S-506
7
(V
E
R
I
F
Y
I
N
F
I
E
L
D
)
5'
-
4
"
(
+
/
-
)
NOTE: PLACE TRUSSES SIDE BY SIDE
IN PLACE OF ORIGINAL ROOF FRAMING
1 - (N), 1 - (E)
(2)2x6 1 - (N), 1 - (E)
(2) 2x6
(2) 2x12 (N)
10'-0"10'-0"
2x6 (N)
2x6 (N)
S-506
4
2x12 (N)2x12 (N)
1-(E) 1 - (N)2x10 (N)
(O.H.)
S-506
7
S-506
1
S-506
5
19'-11" (+/-)19'-11" (+/-)
39'-10" (FIELD VERIFY)
ROOF LEVEL
112' - 1"
VERIFY
FIELD
5 1/2"
1'
-
0
"
S-506
8
S-506
5
MATCH
EXIST
2x12 (N)
2x12 (N)
2x
6
(
N
)
(2) 2x12
S-506
3
S-506
3 (O.H.)
(O.H.)
VE
R
I
F
Y
FI
E
L
D
NEW 5 1/2" WD. x 21"
GLULAM BM.
FACE OF NEW
GLULAM BM.
2x
6
(
N
)
(2) 2x6
6'-0"6'-0"
10'-0"10'-0"
2x10 (N)2x10 (N)
(2) 2x12
S-506
4
TRUSS FRAMING NOTES:
1. NOMENCLATURE: TRUSS FRAMING NOTED (E) IS EXISTING FRAMING. TRUSS FRAMING NOTED (N) IS NEW FRAMING. ALL NEW FRAMING
SHALL BE ROUGH SAWN ARCHITECTURAL LUMBER INDICATED AS (R.S.).
2. ALL NEW FRAMING SHALL BE ROUGH SAWN DOUGLAS FIR LUMBER, SELECT STRUCTURAL.
3. PREFERRED CONNECTORS: ALL TRUSS JOINTS SHALL BE REINFORCED WITH NEW CONNECTORS AS SHOWN IN THE DETAILS. SCREW
CONNECTORS SHALL BE TrussLOK SCREWS OR APPROVED EQUAL. SCREW LENGTH SHALL BE 3-5/8” FOR CONNECTING ROUGH SAWN 2X
LUMBER AND 2-1/2” FOR CONNECTING ROUGH SAWN 1X LUMBER TO 2X LUMBER. THE NUMBER OF SCREWS AT EACH JOINT ARE SHOWN
IN THE DETAILS WITH A MINIMUM SPACING OF 3 1/2” TO ADJACENT SCREWS, 1-3/4” CLEAR DISTANCE TO LUMBER EDGES, AND 1 1/4"
WHERE ROWS ARE ALIGNED AND 5/8" WHERE ROWS ARRE STAGGERED. ALL TRUSS JOINTS SHALL BE JOINED WITH A MINIMUM OF TWO
SCREWS.
4. ALTERNATE CONNECTORS: ALTERNATE TRUSS JOINT CONNECTORS SHALL BE 1/2" DIAMETER A307 BOLTS WITH WASHERS AND NUTS.
BOLT LENGTH SHALL BE AS REQUIRED TO PENETRATE THE THICKNESSES OF THE JOINED MEMBERS WITH SUFFICIENT LENGTH TO
PROVIDE A MINIMUM OF TWO THREADS PAST THE NUT. ALTERNATE BOLT CONNECTORS CAN BE SUBSTITUTED FOR HEAVY DUTY
CONNECTOR SCREWS WHERE NECESSARY ON A 1 TO 2 BASIS (ONE BOLTS SUBSTITUTED FOR 2 SCREWS) WITH A MINIMUM OF TWO
BOLTS PER CONNECTION. SPACE BOLTS AT 2” O.C. MINIMUM TO ADJACENT BOLTS AND 2” CLEAR TO LUMBER EDGES.
5. CONNECTOR SCREWS MAY REQUIRE PREDRILLING TO PREVENT SPLITTING OR OTHER DAMAGE TO LUMBER. DETERMINE IF
PREDRILLING OF LUMBER IS NECESSARY BY INSTALLING SCREW CONNECTORS WITHOUT PREDRILLING INTO SAMPLE JOINTS
CONSTRUCTED OF SCRAP LUMBER MATCHING TYPICAL TRUSS JOINTS. CONSTRUCT A MINIMUM OF 10 SAMPLE JOINTS WITH DIFFERING
GEOMETRY AND NUMBER OF SCREWS. PROVIDE PHOTOS TO EOR FOR REVIEW PRIOR TO CONINUING ROOF RECONSTRUCTION.
6. INSPECTION OF EXISTING FRAMING: PRIOR TO REINFORCEMENT WORK ON THE EXISTING ROOF FRAMING, THE EXISTING FRAMING
SHALL BE INSPECTED BY THE STRUCTURAL ENGINEER, GENERAL CONTRACTOR AND FRAMING CONTRACTOR TO IDENTIFY MEMBERS
REQUIRED TO BE REPLACED OR REPAIRED DUE TO DAMAGE OR DEFECTS. SEE PARAGRAPHS 7 AND 8 FOR DESCRIPTIONS OF MEMBERS
REQUIRING REPLACEMENT OR REPAIR AND METHODS OF REPAIR.
7. DAMAGED OR DEFECTIVE LUMBER: EXISTING MEMBERS THAT ARE DAMAGED OR DEFECTIVE ARE REQUIRED TO BE REPLACED WITH
NEW LUMBER OF A SIZE MATCHING THE ORIGINAL. EXAMPLES OF DAMAGE OR DEFECTS THAT REQUIRE MEMBER REPLACEMENT
INCLUDE BROKEN OR SPLIT LUMBER AND MEMBERS WHERE KNOTS LOCATED AT JOINTS MAKE THE MEMBER SUBJECT TO SPLITTING IF
THE REQUIRED NUMBER OF NEW SCREWS WERE TO BE INSTALLED.
8. REPAIR OF LUMBER CONTAINING KNOTS: KNOTS THAT COMPROMISE THE INTEGRITY OF LUMBER TO RESIST LOAD WILL REQUIRE
REPAIR. REPAIR MAY INCLUDE MEMBER REPLACEMENT, THE ADDITION OF STEEL MENDING PLATES OR ADDING ADDITIONAL LUMBER
MEMBERS TO SPLICE OVER THE DEFECTIVE AREA. THE METHOD OF REPAIR WILL BE DETERMINED DURING THE FRAMING INSPECTION.
9. ACCEPTANCE OF REPAIR WORK: PRIOR TO INSTALLING REINFORCED ROOF SEGMENTS ONTO NEW CONSTRUCTION, THE REPAIRED
SEGMENTS SHALL BE INSPECTED AND APPROVED. SEGMENTS MAY NOT BE INSTALLED UNTIL REPAIRS AND REINFORCEMENT WORK IS
COMPLETE AND ACCEPTED.
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
6
/
2
0
2
0
1
0
:
3
7
:
1
9
A
M
S-504
EXISTING/NEW
ROOF TRUSS
ELEVATIONS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
MKH
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
JMK
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
(35 TRUSSES THUS)
(7 TRUSSES THUS)
(3 TRUSSES THUS)
(3 TRUSSES THUS)
REVISION DATE
REVISION 6 2020.03.25
S-504 3/16" = 1'-0"
2 TRUSS TYPE T2 - ELEVATION
S-504 3/16" = 1'-0"
5 TRUSS TYPE T5 - ELEVATION
S-504 3/16" = 1'-0"
6 TRUSS TYPE T6 - ELEVATION
S-504 3/16" = 1'-0"
3 TRUSS TYPE T3 - ELEVATION
S-504 3/16" = 1'-0"
1 TRUSS TYPE T1 & T1A - ELEVATION
S-504 3/16" = 1'-0"
7 TRUSS TYPE T7 - ELEVATION
S-504 3/16" = 1'-0"
4 TRUSS TYPE T4 - ELEVATION
S-504 3/16" = 1'-0"
8 TRUSS TYPE T8 - ELEVATION
(2 TRUSS THUS)
(4 TRUSSES THUS)
(1 TRUSS THUS) (5 TRUSSES THUS) S-504 3/16" = 1'-0"
9 TRUSS FRAMING NOTES
REVISION 7 2020.04.07
04/07/2020
177
EXISTING 2x6 RAFTER
(TOP CHORD)
EXISTING 1x6
DIAGONAL BRACE
w/ NEW 1X6
SISTERED TO
EXIST.
PROVIDE (4) TussLOK
STRUCTURAL SCREWS
TYP AT LAP
CONNECTIONS
PROVIDE TrussLOK
STRUCTURAL
SCREWS AT 6" O.C.
STAGGERED
EXISTING 2x6
BOT. CHORD
EXISTING 2x6
RAFTER (TOP
CHORD)
TO
P
P
L
A
T
E
2x
6
N
E
W
NEW 2x6
WALL STUD
E
X
I
S
T
.
T
O
P
P
L
A
T
E
S
4"
D
O
U
B
L
E
2
x
6
NEW FULL 2x BLOCKING
AND NEW BOTTOM CHORD
EXTENSION
2'-0" MIN.
NEW 2x BLOCKING
NEW BOTTOM CHORD
EXTENSION
PROVIDE (4)
1/2"Ø THRU
BOLTS
ENSURE NEW BOTTOM
CHORD EXTENSION
CONTINUES TO UNDERSIDE
OF SKIP SHEATHING
EXISTING
OVERHANG
PROVIDE 12 TrussLOK
STRUCTURAL SCREWS OR
PROVIDE (4) 1/2" Ø THRU
BOLTS
EXISTING & NEW
2x4 TOP CHORD
EXIST. 2x6
RAFTER (TOP
CHORD)
EXIST. 1x6
VERT.
PROVIDE (6) TrussLOK
STRUCTURAL SCREWS
TYP AT LAP
CONNECTIONS
PROVIDE TrussLOK
STRUCTURAL
SCREWS AT 8" O.C.
STAGGERED
ENSURE NEW
2x4 IS SNUG
TIGHT TO TOP
CHORD
EXISTING 2x6
RAFTER (TYP.)EXISTING (2) 1x8
RIDGE MEMBERS
(CONT.)
'SIMPSON' LSTA 15
CENTERED ON
RIDGE BEAM
(3) 3" WOOD TOE
SCREWS EA. RAFTER,
PROVIDE (2) ON ONE
SIDE AND ONE ON
OTHER TYP.
AT CONTRACTORS OPTION,
STRAPS MAY BE INSTALLED
ON TOP OF EXISTING SKIP
SHEATHING PROVIDE 16d
NAILS INTO RAFTERS BELOW
EXISTING 2x6
BOTTOM CHORD
(CEILING JOIST)
EXISTING 1x6
VERT.
EXISTING AND
NEW 1x6 DIAG.
BRACE
PROVIDE (6) TrussLOK
STRUCTURAL SCREWS
TYP AT LAP
CONNECTIONS
PROVIDE TrussLOK
STRUCTURAL
SCREWS AT 8" O.C.
STAGGERED TYP.
VARIES ENSURE MINIMUM 4'-0"
LAP LENGTH
EXISTING 2x6 BOT. CHORD
(CEILING JOIST)
EXISTING 2x6 BOT. CHORD
(CEILING JOIST)
PROVIDE (12) TrussLOK
SCREWS OVER LAP
LENGTH
EXISTING
1x6
NEW OR
EXISTING
1x6
(R.S.)
NEW 1x8
(R.S.)
EXISTING
2x6 CEILING
JOIST
WORK POINT
SLOPE
VARIES
PROVIDE (10) 1/4"Ø
SDS SCREWS AT 3"
O.C. TYP.PROVIDE (4) 3"
WOOD SCREW AT
VERT TO BOTTOM
CHORD
CONNECTION
PROVIDE (4)
SDS SCREWS
AT DIAGONAL
CONNECTION
1
1
/
2
"
2"
4"
4
"
1
1
/
2
"
1/
2
"
1'
-
1
"
NEW 2x12 (R.S.) FIT
BETWEEN EXIST.
RAFTER & CEILING
JOIST
WORK POINT @ INSIDE
CORNER
EXISTING & NEW SHEATHING
EXISTING 2x6 RAFTER
NEW
SHEATHING
ROOF LEVEL
112' - 1"
NEW ROOF
FRAMING
~ RE: PLAN
NEW GLULAM BEAM
~ RE: PLAN
TRUSS HANGER
~ RE: FRAMING DETAILS
NEW 14 GA. W/ PLATE
& 10 SCREWS
AS SHOWN
NEW 1x8 EA. SIDE
(ROUGH SWAN)
SLOPE
VARIES
EXISTING 2x6
CEILING JOIST
TYP
3 1/2"
TYP
1"
NEW 14 GA. PLATE EA.
SIDE w/(8) 1/4"Ø SDS
SCREWS AS SHOWN
(3) 5/8"Ø THRU BOLTS
NOTE:
ALL SCREWS SHALL BE
STAGGERED ON EITHER
SIDE TO ENSURE MINIMUM
ON 1 3/4" BETWEEN SCREWS
1 1/2"
3"
1 1/2"
1 1/2"
1"
EXISTING 2x6
CEILING JOIST
EXISTING 1x6
NEW 1x8 (R.S.)
SLOPE
VARIES
WORK POINT
NEW 1x6
(R.S.)
SLOPE
VARIES
PROVIDE (10) 1/4"Ø
SDS SCREWS AT 3"
O.C. TYP.
PROVIDE (6) 1/4"Ø SDS
SCREWS AT 3" O.C.
TYP.
(2) 1/2"Ø THRU
BOLTS AS
SHOWN EXISTING
2x6 RAFTER
NEW 2x8 TOP
CHORD (R.S.)
EXISTING & NEW
SHEATHING
NEW 1x6 (R.S.)
VERTICAL
PROVIDE (2) 1/2"Ø
BOLTS AT VERT TO
TOP CHORD
CONNECTION
PROVIDE (3) TrussLOK
SCREWS AT CHORD TO
CHORD CONENCTION
5/
8
"
M
I
N
3 1/2" MIN 1'-0" MIN
NEW 2x8 BLOCK, ENSURE
BLOCK IS SNUG TIGHT TO
TOP CHORD w/(4)
TrussLOK SCREWS.
3 1/2"
SYMMETRIC ABOUT
ENSURE SISTERED
DIAGONAL IS SNUG
TIGHT TO TOP CHORD
(2) NEW 1x6 (R.S.)(2) NEW 1x6 (R.S.)
SLOPE
VARIES
PROVIDE (4) TussLOK
STRUCTURAL SCREWS
TYP
PROVIDE TrussLOK
STRUCTURAL
SCREWS AT 6" O.C.
STAGGERED
NEW 2x8 (R.S.)
TOP CHORD NEW 1x6 (R.S.)
NEW 1x6
(R.S.)
EXISTING 2x6
CEILING JOIST
NEW 1x6 (R.S.)
SLOPE
VARIES
SLOPE TO
MATCH TRUSS
T1, T1A
TY
P
1
1
/
2
"
1 1/2"
3"
1 3/4"
1/2"Ø THRU
BOLTS AS
SHOWN
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
7
/
2
0
2
0
8
:
1
6
:
1
5
A
M
S-505
EXISTING ROOF
TRUSS
MODIFICATION
DETAILS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
MKH
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
JMK
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
S-505S-504 1" = 1'-0"
2 TRUSS JOINT REINFORCEMENT DETAIL
S-505S-504 1" = 1'-0"
1 TRUSS JOINT REINFORCEMENT DETAIL
S-505S-504 1" = 1'-0"
3 TRUSS JOINT REINFORCEMENT DETAIL
S-505S-504 1" = 1'-0"
4 TRUSS JOINT REINFORCEMENT DETAIL
S-505S-504 1" = 1'-0"
5 TRUSS JOINT REINFORCEMENT DETAIL
S-505S-504 1" = 1'-0"
6 TRUSS JOINT REINFORCEMENT DETAIL
S-505S-504 1" = 1'-0"
7 TRUSS JOINT REINFORCEMENT DETAIL
S-505S-504 1" = 1'-0"
8 TRUSS JOINT REINFORCEMENT DETAIL
S-505S-504 1" = 1'-0"
9 TRUSS JOINT REINFORCEMENT DETAIL
S-505S-504 1" = 1'-0"
10 TRUSS JOINT REINFORCEMENT DETAIL
S-505S-504 1" = 1'-0"
11 TRUSS JOINT REINFORCEMENT DETAIL
S-505S-504 1" = 1'-0"
12 TRUSS JOINT REINFORCEMENT DETAIL
REVISION DATE
REVISION 6 2020.03.25
REVISION 7 2020.04.07
04/07/2020
178
5" 5"TY
P
1
1
/
2
"
4"
4
"
TY
P
1
1
/
2
"
BOTTOM CHORD
~ RE: ELEVATIONS
TRUSS TOP CHORD
~ RE: ELEVATIONS
EXISTING DOUBLE TOP PLATE
NEW SINGLE TOP PLATE
EXTEND BOTTOM CHORD TO
FACE OF TOP PLATES AT A
MINIMUM
TYP
1 3/4"
2 1/2"
TRUSS BOTTOM CHORD
~ RE: ELEVATIONS
TRUSS TOP CHORD
~ RE: ELEVATIONS
1/4" STEEL PLATE w/(16)
1/2"Ø DIA. THRU BOLTS.
PROVIDE FULL THICKNESS 2x
SPACER BETWEEN STEEL PLATES
NEW 2x6 STUD FRAMING
PL. 1/2"THK. x 6" x 0'-8" EA. SIDE
OF TRUSS w/(4) THRU BOLTS EA.
SIDE OF TRUSS
8"
3"TYP
1 1/2"
2 1/2"
1 1/2"
3'-1"
1/4"
1/
2
"
1/
2
"
3/16TYP.
SECTION SECTION
3'-6 1/8"
30.25°
NOTE:
PLATE ANGLE SHALL
BE COORDINATED
WITH EXISTING
TRUSSES PRIOR TO
FABRICATION
TRUSS TOP CHORD
~ RE: ELEVATIONS
TRUSS VERT
~ RE: ELEVATIONS
14 GA. PLATE x SHOWN w/
(8) TrussLOK SCREWS
1"
3"
1"
1
1
/
2
"
3
"
3
"
3
"
1
1
/
2
"
6"
EQ EQ
TRUSS TOP CHORD
~ RE: ELEVATIONS
TRUSS DIAGONAL
~ RE: ELEVATIONS
14 GA. PLATE x SHOWN w/
(16) TrussLOK SCREWS
3"
8"
3"
1 1/2"
5"
1'-8 3/4"
36.19°
TRUSS BOTTOM CHORD
~ RE: ELEVATIONS
TRUSS DIAGONAL
~ RE: ELEVATIONS
CUT SINGLE BOTTOM CHORD
TIGHT TO DIAGONAL
4'-0"
4"
4
"
8"3" 3" 3" 3"
PROVIDE (2) 1/2"Ø THRU BOLTS
AT ALL DIAGONAL AND
VERTICAL TRUSS MEMBER
CONNECTIONS
TRUSS VERT
~ RE: ELEVATIONS
TRUSS DIAGONAL
~ RE: ELEVATIONS
PROVIDE (8) 1/2"Ø THRU BOLTS
AT BOTTOM CHORD SPLICE
1 1/2"
1 1/2"
TRUSS TOP CHORD
~ RE: ELEVATIONS
TRUSS DIAGONAL
~ RE: ELEVATIONS
TRUSS TOP CHORD
~ RE: ELEVATIONS
(8) 1/2"Ø THRU BOLTS AT
CHORD TO CHORD
CONNECTION
(5) 1/2"Ø THRU BOLTS,
AT CHORD TO STEEL PL
CONNECTION
1'-6"
EQ
E
Q
E
Q
E
Q
TYP
1 3/4"
TYP
3 1/2"
2x12 BLOCKING ON EITHER
SIDE OF THE TOP CHORD
MEMBER ATTACH WITH 22
TrussLOK SCREWS ON EA.
SIDE.
2"
1 1/2"
7"
1 1/2"
TYP
1 1/2"
1'-8 5/8"
49.31°
30.25°
TYP
4"
(2) 1/2"Ø THRU BOLTS AT
CHORD,PL,AND DIAGONAL
CONNECTION
2"
2
"
2
"
2
"
2
"
14GA PLATE ON EITHER
SIDE OF DIAGONAL
EXTENDING TO TOP OF
TRUSS AND AS SHOWN
DOWN CHORD/DIAGONAL
PROVIDE 2X BLKG,
BETWEEN STEEL PLATES
NOTE:
ALL ANGLES TO BE
FIELD VERIFIED BY
CONTRACTOR PRIOR
TO FABRICATION
(6) 1/2"Ø THRU BOLTS, AT
DIAGONAL TO STEEL PL
CONNECTION
1'-5 1/4"
1'-4"
6 3/4"
TRUSS BOTTOM CHORD
~ RE: ELEVATIONS
TRUSS TOP CHORD
~ RE: ELEVATIONS
TRUSS DIAGONAL
~ RE: ELEVATIONS
PROVIDE TrussLOK
SCREWS THROUGH
SANDWICHED TRUSS VERT
ON EITHER SIDE
STAGGERED AT 3" O.C.
GLULAM BEAM
~ RE: ROOF PLAN
TRUSS VERT
~ RE: ELEVATIONS
TRUSS VERT
~ RE: ELEVATIONS
1 1/2"2"2"2"
EQ
E
Q
E
Q
E
Q
TYP
4"
AT THIS
CONNECTION
LOCATION
1 1/2"
ALL FASTENERS SHOWN
ARE 1/2"Ø THRU BOLTS.
NOTE:
PROVIDE 14GA PLATE ON EITHER
SIDE OF TOP TRUSS CHORD
MEMBER, AS SHOWN BELOW
'SIMPSON' HGU5.25-SDS
GIRDER HANGER
EQ
EQ
EQ
TYP
1 1/2"
3" 3" 3"
1 1/2"
2"2"2"
ROOF RAFTER
NEW SHEATHING &
EXIST. SKIP SHEATHING
2x6 RAFTER
ATTACH RAFTERS TO
TOP CHORD OF TRUSS
TYPES T3 & T7 WITH
SIMPSON H2.5 CONN.
TRUSS TYPE T3, T7
TOP CHORD
(9 TRUSSES TOTAL)
ATTACH RAFTERS TO TOP CHORD OF
TRUSS TYPES T4 & T8 WITH SIMPSON H6 CONN.
TRUSS TYPE T4 & T8 TOP CHORD
(2 TRUSSES TOTAL)
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
7
/
2
0
2
0
8
:
5
7
:
3
1
A
M
S-506
EXISTING ROOF
TRUSS
MODIFICATION
DETAILS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
Checker
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
S-506S-504 1" = 1'-0"
1 T4/T8 TRUSS CONNECTION DETAIL
S-506S-504 1 1/2" = 1'-0"
3 T4/T8 TRUSS CONNECTION DETAIL
S-506S-504 1 1/2" = 1'-0"
4 T4/T8 TRUSS CONNECTION DETAIL
S-506S-504 1 1/2" = 1'-0"
5 T4/T8 TRUSS CONNECTION DETAIL
S-506S-504 1" = 1'-0"
7 T4/T8 TRUSS CONNECTION DETAIL
S-506S-504 3/4" = 1'-0"
8 T8 TRUSS CONNECTION DETAIL
REVISION DATE
REVISION 7 2020.04.07
S-506 1 1/2" = 1'-0"
9 RAFTER CONN. TO TRUSS TYPES T3, T4, T7 & T8
04/07/2020
179
WA
L
L
BE
L
O
W
TY
P
.
OP
E
N
I
N
G
AB
O
V
E
TY
P
.
1
1
BOND BEAM REINF. ~
TYP. RE: WALL SECT.
FOR REINF.
CORNER BAR
VERT. BARS IN
GROUTED CELLS
LAP SPLICE
RE: SCHEDULE
LAP SPLICE
RE: SCHEDULE
0"
40
B
A
R
Ø
0"
0"
0"
0"
BAR
SIZE DOWEL LENGTHEMBED
LENGTH LAP SPLICE LENGTH
MASONRY WALL REINFORCING EMBED / SPLICE SCHEDULE
(f'm=1500psi)
NOTES:
1. IF EMBED LENGTH CANNOT BE ACHIEVED, PROVIDE STANDARD HOOK
AT BOTTOM OF DOWELS.
2. DOWEL SPACING SHALL MATCH SIZE AND SPACING OF VERTICAL WALL
REINFORCING.
3. DOWEL LENGTH BASED ON EMBEDMENT INTO 4000 PSI CONCRETE.
4. MINIMUM MASONRY COVER IS 3.5".
#7
#8
#6
#4
#5
2'-8"
2'-3
3'-0"
1'-6"
2'-0"
6'-4"
8'-10"
4'-8"
2'-1"
2'-7
9'-6"
12'-3"
7'-3
4'-0"
5'-0"
CMU
WALL
CONCRETE
WALL
DO
W
E
L
L
E
N
G
T
H
NOTES:
1. FILL SILLS WITH GROUT TO SILL DEPTH SHOWN IN SILL DETAILS.
2. EXTEND SILL A MINIMUM OF 8" BEYOND CLEAR OPENING ON EACH END.
VERTICAL WALL
REINF. PER WALL
SCHED. ~ TYP.
2-#5
USE AT OPENINGS IN 12"
WALLS WITH WIDTHS OF 9'-0"
OR LESS U.N.O.
TYPE S1
LOCATE HORIZ. REINF.
TIGHT TO VERT. REINF. OR
PROVIDE 4" CLEAR WHERE
WALL REINF. IS CENTERED
IN WALL. ~ TYP.
2-#5
TYPE S2
TYPE S3
2-#5
TYPE S4
2-#5
2-#5
2-#5
USE AT OPENINGS IN 8"
WALLS WITH WIDTHS OF 9'-0"
OR LESS U.N.O.
USE AT OPENINGS IN 12" WALLS WITH
WIDTHS GREATER THAN 9'-0" U.N.O.
USE AT OPENINGS IN 8" WALLS WITH
WIDTHS GREATER THAN 9'-0" U.N.O.
SI
L
L
8"
4"
SILL
8"
8" NOM.
4"
8"
4"
1'-4" SILL
8" NOM.
4"
8"
4"
1'-4" SILL
(3) BOND BEAMS
W/ (2)-#5xCONT.
SLAB ON METAL DECK
RE: PLAN FOR SIZE,
REINFORCING, AND
ORIENTATION
CMU WALL
~ RE: PLAN
NOTE: ANCHORS
ARE LIMITED TO ONE
PER MASONRY CELL
L6x3-1/2x5/16xCONT.
SUPPORT ANGLE
1/2"Ø HILTI KWIK BOLT TZ,
4" MIN. EMBEDMENT
@ 16" O.C.
LAP SPLICE
MASONRY
CONTROL JOINT
~ RE: GENERAL NOTES
FOR REQUIREMENTS
TYPICAL
BOND BM.
TYPICAL
BOND BM.
PROVIDE BEARING
PAD OR BOND
BREAKER AT
CONTROL JOINT
TYPICAL HORIZONTAL
REINF. ~ RE:
GENERAL NOTES
DOWELS TO MATCH
SIZE AND SPACING
OF CMU WALL
REINF., U.N.O.
TYPICAL VERT.
REINFORCING
TYPICAL SILL
REINFORCING
FINISH FLOOR
TYPICAL JAMB
REINFORCING
SHALL BE
FULL HEIGHT
SPLICE (TYP)
MASONRY LAP
4"
HEIGHT
BOND BEAM
SECTION 1
MASONRY LINTEL SCHEDULE
OPENING
WIDTH
WALL
THICKNESS
BOND BEAM
HEIGHT REINFORCING
2-#51'-4"8"0 ft - 9 ft
NOTES:
1. LAP ALL VERTICAL AND HORIZONTAL REINFORCING AS NOTED IN GENERAL NOTES.
2. JAMB AND SILL REINFORCING SHALL BE THE SAME SIZE AS THE TYPICAL WALL
REINFORCING AND PLACED IN ADDITION TO THE TYPICAL WALL REINFORCING.
3. WHERE JAMB DIMENSION IS LESS THAN 32", PROVIDE (2)-#5 VERTICAL IN EACH CELL.
4. JAMB DIMENSION BETWEEN OPENINGS SHALL NOT BE LESS THAN 24" UNLESS
SPECIFICALLY DETAILED BY THE EOR.
2-#52'-0"8"9 ft - 16 ft
RE: 3/S-801 FOR DECK
SUPPORT EDGE ANGLE
STEEL BEAM
~ RE: PLAN
GROUT BEAM
POCKET SOLID
3/4" BEARING PL. SIZE
FOR BEAM REACTION
SHOWN ON PLAN
BOND BEAM
WITH (2) #5 BOTTOM
3/4"Ø x 6" H.A.S.
@ 8" O.C., MAX,
SEE BEARING PLATE DETAIL
GROUT SOLID MIN. 4 COURSES
BELOW BOND BEAM UNLESS
SHOWN OTHERWISE
GROUT POCKET SOLID
CONTINUOUS EDGE ANGLE
BEAM REACTION
60K OR LESS
80K OR LESS
5 1/2"x1'- 0
PLATE DIMENSIONS
REQUIRED BEARING PLATE SIZE
100K OR LESS
40K OR LESS 5 1/2"x0'- 8
5 1/2"x1'- 4
5 1/2"x1'-10
T.O. SLAB
RE: PLANCLR
1"
8"
MAX
8"
MAX3 3/4"
5 1/2"
TYP
1 1/2"
3/4"Ø x6" H.A.S.,
TYP
BEARING PLATE DETAIL
(8" CMU)
CMU WALL
~RE: PLAN FOR REINF.
1/4 3
1/4 3 TYP
1/4
1/43 SIDES, TYP
1/2" STIFFENER
PLATE, EA. SIDE
3 1/2"
(2) #5 CONT.
100'-0"
95'-3"
4'-9"
DO
O
R
O
P
E
N
I
N
G
EL
E
V
.
D
O
O
R
OP
E
N
I
N
G
6 1/2"
(2) #5x W/
HOOK @ NORTH END
#4x @ 8" O.C.
#4x @ 8" O.C.
SOLID GROUTED
BEAM OVER LOWER
LEVEL DOOR OPENING
3'
-
0
"
2'
-
3
"
W16 BMS.
WALL REINF.,
RE: 2/S-211
9'-0"
(2) #5x W/
HOOK @ NORTH
END
9'-0"
(2) #5 TOP,
INTERRUPT @
BEAM POCKETS
2X12 JOISTS
@ 1'-4" O.C.
WALL REINF.,
RE: 2/S-211
2-#5 HORIZ.
BOTTOM 2
COURSES
113'-1 3/4
T.O. SHTG.
LEDGER & CONNS.,
RE: 8/S-503
108'-3"
T.O. OPNG.
BOTTOM 3 COURSES
SOLID GROUT
ELEVATOR
SHAFT
ELEVATOR DOOR OPNG.
PLAN NORTH
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
4/
7
/
2
0
2
0
8
:
2
5
:
0
2
A
M
S-801
MASONRY
DETAILS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
Fo
u
n
d
a
t
i
o
n
a
n
d
E
n
c
l
o
s
u
r
e
JAK
02.06.2020
19-050
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
PERMIT SET
NPS
S-801 3/4" = 1'-0"
1 TYPICAL TYPICAL CMU REINFORCING DETAIL
S-801 3/4" = 1'-0"
2 STRUCTURAL CONCRETE MASONRY SILL DETAILS
S-801 3/4" = 1'-0"
3 DECK SUPPORT AT CMU WALL
S-801 1/4" = 1'-0"
5 TYPICAL WALL REINFORCING ELEVATION AT OPENINGS
23816J
OHN M.KARLBERG
PROFESSIONA L ENGINEER
COLORADO R EGISTERED
S-801S-101 3/4" = 1'-0"
4 FLOOR BEAM AT MASONRY WALL
REVISION DATE
UPDATED FOOTPRINT 2020.02.07
REVISION 6 2020.03.25
REVISION 7 2020.04.07
S-801S-101 3/4" = 1'-0"
7 MASONRY BEAM DETAIL AT LEVEL 1
S-801S-102 3/4" = 1'-0"
8 MASONRY BEAM DETAIL AT ROOF LEVEL
04/07/2020
180
DN
DN
UP
E
1
3
4
A2-101
6
A2-101
5
A2-101
7
A2-101
A
95' - 11"
33
'
-
2
"
39
'
-
1
0
"
ROUGH OPENINGS TO BE COVERED
WITH SHEATHING AND BUILDING
PAPER. REFER TO EXTERIOR
ELEVATIONS FOR DIMENSIONS, TYP.
TEMPORARY DOORS
INSTALLED IN ROUGH OPENING
RAIN LEADER, TYP
4
A2-102
D
2
MECHANICAL AREA WELL.
RE: STRUC FOR COVER
4
C
59' - 9"36' - 2"
5
A2-102
B
SLAB FLOOR
OPEN TO BELOW
MECHANICAL AREA WELL.
RE: STRUC FOR COVER
FUTURE METAL STAIREXTERIOR STAIR
RE: STRUC
32' - 4 1/8"27' - 4 7/8"
REV
6
REV
6
REV
6
RAIN LEADER, TYP
REV
6
ROOF DRAIN CHASEREV
6
REV
6
E
1
3
A
95' - 11"
33
'
-
2
"
39
'
-
1
0
"
SLAB FLOOR
PERIMETER DRAIN, RE: CIVIL
3
A-301
LOUVER OPENING, RE: STRUC
FLOOR DRAIN
D
2
3' - 1"
4
C
5
A2-102
B
39
'
-
1
0
"
LOUVER OPENING, RE: STRUC
FLOOR DRAIN
MAIN DISTRIBUTION PANEL, RE: ELEC
.
86' - 5"
.
85' - 10"
.
87' - 0"
.
87' - 0"
1"
/
1
'
-
0
"
1"
/
1
'
-
0
"
1"
/
1
'
-
0
"
1"
/
1
'
-
0
"
8'
-
6
"
17
'
-
8
"
12
'
-
0
"
FUTURE METAL STAIR
SUMP PIT
LOCATION
.
83' - 0"
21' - 3"38' - 6"36' - 2"
.
87' - 0"
.
87' - 0"
6'
-
1
0
"
26
'
-
4
"
REV
6 FUTURE OPENING
LEVEL 1
100' -0"
1 3 4
B.O. (E) TRUSS
112' -1"
4' - 5 1/4"6' - 3 1/2"18' - 4 1/2"6' - 3 1/2"9' - 10 13/16"6' - 2 7/8"9' - 7 1/16"6' - 3 1/2"5' - 7"
2 4
6'
-
9
1
/
2
"
2'
-
1
0
1
/
4
"
REV
6
LEVEL 1
100' -0"
EA
B.O. (E) TRUSS
112' -1"
4
A2-102
RAIN LEADER, TYP
RE: PLAN FOR LOCATIONS
DC
5
A2-102
B
TEMP DOORS INSTALLED AT
ROUGH OPENING
8'
-
0
"
4' - 2 1/16"6' - 2 7/8"15' - 4 11/16"3' - 10"
9'
-
6
"
REV
6
FUTURE OPENINGS
LEVEL 1
100' -0"
E B A
B.O. (E) TRUSS
112' -1"
4
A2-102
95' - 11"
RAIN LEADER, TYP
RE: PLAN FOR LOCATIONS
CONTINUOUS GUTTER
D
5
A2-102
B
TEMP DOORS INSTALLED AT ROUGH
OPENINGS
5' - 3 11/16"12' - 7 1/4"5' - 4 9/16"12' - 7 5/8"5' - 4 9/16"12' - 7 1/4"5' - 3 11/16"12' - 9 3/8"5' - 6 13/16"5' - 6 13/16"12' - 9 3/8"
9'
-
8
"
ENTRY CANOPY
REV
6
LEVEL 1
100' -0"
134
B.O. (E) TRUSS
112' -1"
33' - 2"39' - 10"
RAIN LEADER, TYP
RE: PLAN FOR LOCATIONS
24
4' - 11"12' - 0"6' - 0"12' - 0"4' - 11"
2' - 2 15/16"
12' - 7 5/8"
9'
-
6
"
REV
6
PLAN NORTH
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
3/
2
5
/
2
0
2
0
5
:
5
1
:
1
3
P
M
A2-101
PLANS AND
ELEVATIONS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
03.20.2020
19131.00
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
90% CONSTRUCTION DOCUMENTS
3/32" = 1'-0"
LEVEL 1 PLAN2
3/32" = 1'-0"
BASEMENT PLAN1
1/8" = 1'-0"
EAST ELEVATION5
1/8" = 1'-0"
NORTH ELEVATION7
1/8" = 1'-0"
SOUTH ELEVATION6
1/8" = 1'-0"
WEST ELEVATION4
FOUNDATIONS & ENCLOSURE PERMIT SET
ROOF PLAN GENERAL NOTES:
1. PROVIDE ICE AND WATER SHIELD AT ALL EDGES,
RIDGES, AND EAVES
2. PROVIDE SNOW GUARDS AT ALL GUTTER EAVES
3. ALUMINUM GUTTER AND LEADERS TO HAVE 2-LOOPS
OF SELF REGULATING HEAT CABLE, TYP.
REVISION DATE
REV 3 - UPDATED AREA WELL 2019.10.24
REV 2 - COMMENTS 2019.10.15
REV 4 - COMMENTS 2019.11.14
REV 5 - UPDATED FOOTPRINT 2020.02.07
REV 6 - BUILDING EXTENSION 2020.03.25
iU CO
\N Nf
(\
e-f
l
fi
181
LEVEL 1
100' -0"
1
BASEMENT
87' -0"
3
B.O. (E) TRUSS
112' -1"
A2-102
3
24
REV
6
5/8"
GRID
EXISTING RAFTER
EXISTING SKIP SHEATHING
BUILDING PAPER
R30 POLYISO INSULATION, 2 STAGGERED LAYERS
OSB NAIL BASE SCREWED THROUGH RIGID INSULATOIN TO RAFTERS
ROOFING PAPER
SHINGLES
OSB SHEATHING, PAINT UNDERSIDE BLACK BEFORE INSTALLATION
EXISTING JOIST
WOOD STUD FRAMING
OSB SHEATHING
K STYLE GUTTER AND LEADER
WOOD FASCIA AND SOFFIT
BUILDING PAPER
B.O. FASCIA
111'-6" AFF
VIF (EXISTING RAFTER LENGTH)
1' - 4"
ICE AND WATER SHIELD
GUTTER APRON
SNOW GUARD SPACED PER
MFR RECOMMENDATIONS
MAINTAIN 3-1/2" CLEAR FOR FUTURE CLADDING
IECC 2015
R -30ci
PROVIDED
R -30ci
IECC 2015
R13 + 3.8ci
PROVIDED
R13 + 6.5ci TO BE ADDED AT A LATER PHASE
1/
2
"
NOTE: SOFFIT WIDTH DEFINED BY
EXISTING RAFTER EXTENSION
WOOD BLOCKING
RE
:
S
T
R
U
C
T
U
R
A
L
RE: STRUCTURAL
GEOTEXTILE FABRIC ADHERED
TO INSULATION.
PERFORATED PIPE, 1/8" PER FOOT
SLOPE MIN.
FOUNDATION
RE: STRUCTURAL
9"7"
2" (R10) EXTRUDED POLYSTYRENE
INSULATION WITH DRAINAGE CHANNELS
ADHERED TO WATERPROOFING MEMBERANE
GRID
6"
MIN
4"
1 3/8"
9"
MIN
3"
IECC 2015
R 10ci
PROVIDED
R10ci
BASEMENT
87'-0"
20 MIL HDPE MEMBRANE W/ WELDED SEAMS;
EXTEND UNDER DRAIN TO LINE TRENCH.
1/4"X1-1/2" STAINLESS STEEL TERMINATION
BAR; FASTEN AT 12" O.C.
60 MIL DAMPROOFING MEMBRANE LAPPED
OVER SHEET MEMBRANE FLASHING AND
HDPE MEMBRANE
18" WIDE 40 MIL SELF-ADHERED MEMBRANE
FLASHING LAPPED OVER TERMINATION BAR
LEVEL OF FINISHED
FLOOR AT
BASEMENT
LEVEL 1
100' -0"
1
BASEMENT
87' -0"
B.O. (E) TRUSS
112' -1"
A2-102
2
RAIN LEADERS TIED
TO STORMWATER
12' - 1"
13' - 0"
PERIMETER DRAIN
A2-102
1
GRAVEL FLOOR
2' - 2"
ROUGH OPENING
FRAMING, RE: STRUC
SHEATHING AND
BUILDING PAPER TO
COVER ROUGH
OPENINGS FOR
FUTURE DOORS AND
WINDOWS.
6"4"
LEVEL 1
100' -0"
1
BASEMENT
87' -0"
3
B.O. (E) TRUSS
112' -1"
24
A2-102
3
OPEN TO
AREA WELL
OPEN TO
AREA WELL
REV
6
E
1
3
4
A2-101
6
A2-101
5
A2-101
7
A2-101
A
7"
/
1
'
-
0
"
7" / 1'-0"
7"
/
1
'
-
0
"
7" / 1'-0"
GUTTER
4
A2-102
95' - 11"
D
2
4
C
7" / 1'-0"
73' - 0"
5
A2-102
B
7"
/
1
'
-
0
"
7" / 1'-0"
7"
/
1
'
-
0
"
7"
/
1
'
-
0
"
2"
/
1
'
-
0
"
REV
6
REV
6
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
3/
2
5
/
2
0
2
0
5
:
5
1
:
1
7
P
M
A2-102
ASSEMBLIES AND
SECTIONS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
03.20.2020
19131.00
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
90% CONSTRUCTION DOCUMENTS
1/8" = 1'-0"
BUILDING SECTION4
1 1/2" = 1'-0"
ROOF ASSEMBLY / TOP OF WALL DETAIL2
1 1/2" = 1'-0"
WALL ASSEMBLY / FOUNDATION DETAIL11/2" = 1'-0"
WALL SECTION3
FOUNDATIONS & ENCLOSURE PERMIT SET
1/8" = 1'-0"
BUILDING SECTION 25
REVISION DATE
REV 5 - UPDATED FOOTPRINT 2020.02.07
REV 6 - BUILDING EXTENSION 2020.03.25
3/32" = 1'-0"
ROOF PLAN6
iU CO
\N Nf
(\
e-f
l
fi
182
J:
\
J
o
b
s
\
1
9
0
5
1
S
t
a
n
l
e
y
C
a
r
r
i
a
g
e
H
o
u
s
e
\
0
5
C
A
D
\
P
l
a
n
s
a
n
d
D
e
t
a
i
l
s
\
C
a
r
r
i
a
g
e
H
o
u
s
e
\
C
0
1
1
-
S
I
T
E
-
P
L
A
N
.
d
w
g
C
0
1
1
-
7
/
1
3
/
2
0
2
0
SITE PLAN
C-011
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
SSM
2020.07.15
19125.00
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
100% Construction Documents
JDC
REVISION DATE
2020.07.15
Co
r
e
S
h
e
l
l
C
o
n
s
t
r
u
c
t
i
o
n
D
o
c
u
m
e
n
t
s
CONCRETE PAVEMENT SECTIONA NO SCALE
CONCRETE PAVEMENT
COMPACTED SUBGRADE
6"
NO SCALE
1
C-011
PAVEMENT SECTIONS
4" CDOT CLASS 6
BASE COURSE
VA
N
VA
N
VA
N
VA
N
CARRIAGE HOUSE
EXISTING15' SANITARYEASEMENT
EXISTING 50' ACCESS,DRAINAGE AND UTILITYEASEMENT
2 STEPS
12'
PATIO
12'
PATIO
12'
PATIO
6'15.79'
LIMITS OF CARRIAGE
HOUSE IMPROVEMENTS
5'
9.06'
10
SCALE: 1" = 10'
100
LEGEND:
PROPOSED 6" CONCRETE PAVEMENT A
1
C-011
Exhibit 11
183
J:
\
J
o
b
s
\
1
9
0
5
1
S
t
a
n
l
e
y
C
a
r
r
i
a
g
e
H
o
u
s
e
\
0
5
C
A
D
\
P
l
a
n
s
a
n
d
D
e
t
a
i
l
s
\
C
a
r
r
i
a
g
e
H
o
u
s
e
\
C
2
4
1
-
E
R
O
S
-
P
L
A
N
.
d
w
g
C
2
4
1
-
7
/
1
3
/
2
0
2
0
EROSION CONTROL PLAN
C-241
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
SSM
2020.07.15
19125.00
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
100% Construction Documents
JDC
REVISION DATE
2020.07.15
Co
r
e
S
h
e
l
l
C
o
n
s
t
r
u
c
t
i
o
n
D
o
c
u
m
e
n
t
s
VA
N
VA
N
VA
N
VA
N
CARRIAGE HOUSE
76
0
0
7605
7610
7596
7597
7598
75
9
9
76
0
1
7602
7603
7604
7606
7607
7608
7609
7611
7612
7613
EX SD EX SD
EX SD EX SD
EX S
D
EX S
D
EX
S
D
EX S
D
EX
S
D
EX SD EX SD EX SD EX SD EX SD
12" PVC
12" RCP
8" PVC
4" P
V
C
EX
S
D
EX
S
D
EX
S
D
EX SD EX SD EX SD EX SD EX SD
EX
S
D
EX SD
EX SD
EX SD EX SD EX SD
EX SD
EX
S
D
EX
S
D
EX SDEX SD
EX SDEX SD
EX
S
D
4" PERF. PVC
6" PVC
SMC
SMC
IP
IP
CW
SSA
CF
VTC
EMERGENCY
OVERFLOW PATH
X
X
X
X
X
X
X
X
X
X
760
0760
5
760
1760
2760
3760
4760
6760
7
7597
7598
7599
7598
7599
75
9
7
75
9
8
7595
7594
7596
7597
7595
7593
7594
7600
7599
7601
7602
7603
7604
759
7
7598
7599
759
9
CF
CF
CF
EXISTING SWALE
SF
SF
759
7
7598
7599
7598
7599
7598
X
X
X SF
10
SCALE: 1" = 10'
100
LEGEND:
X
INLET PROTECTION
FLOW DIRECTION ARROW
SEED, MULCH AND CRIMP
SILT FENCE
VEHICLE TRACKING CONTROL
CONCRETE WASHOUT AREA
IP
VTC
SF
CW
SMC
CF CONSTRUCTION FENCE
STABILIZED STORAGE AREASSA
LIMITS OF CONSTRUCTION
184
J:
\
J
o
b
s
\
1
9
0
5
1
S
t
a
n
l
e
y
C
a
r
r
i
a
g
e
H
o
u
s
e
\
0
5
C
A
D
\
P
l
a
n
s
a
n
d
D
e
t
a
i
l
s
\
C
a
r
r
i
a
g
e
H
o
u
s
e
\
C
3
1
1
-
G
R
A
D
-
P
L
A
N
.
d
w
g
C
3
1
1
-
7
/
1
3
/
2
0
2
0
GRADING PLAN
C-311
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
SSM
2020.07.15
19125.00
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
100% Construction Documents
JDC
REVISION DATE
2020.07.15
Co
r
e
S
h
e
l
l
C
o
n
s
t
r
u
c
t
i
o
n
D
o
c
u
m
e
n
t
s
CUT
CUT/FILL TABLE (UNADJUSTED)
FILL
NET (FILL)
NUMBERS ARE TO FINISHED GRADE AND DOESN'T
ACCOUNT FOR UTILITY SPOILS
34 CY
48 CY
14 CY
VA
N
VA
N
VA
N
VA
N
2.0%
2.
0
%
2.
0
%
2.0%
2.0%
2.
0
%
2.0%
7.9%
15.9%
0.
5
%
0.5%
1.
2
%
1.4%
5.7
%
759
7
7598
7599
760
0760
5
760
1760
2760
3760
4760
6760
7
7597
7598
7599
7598
7599
75
9
7
75
9
8
7595
7594
7596
7597
7595
7593
7594
7600
7599
7601
7602
7603
7604
7598
7599
759
7
7598
7599
CARRIAGE HOUSE
759
9
76
0
0
7605
7610
7596
7597
7598
75
9
9
76
0
1
7602
7603
7604
7606
7607
7608
7609
7611
7612
7613
2.5%
EX SD EX SD
EX SD EX SD
EX S
D
EX S
D
EX
S
D
EX S
D
EX
S
D
EX SD EX SD EX SD EX SD EX SD
7599.77 ME
7599.66 TW/BW
7598.16 ME
7598.85 BW
7599.70 TS
7600.00
7598.56 BS/ME
7599.16 ME
7599.10 BS
7599.70 TS
7599.82
7599.89
7599.89
7599.76
7599.76
7599.76 TW
7600.00 TW
7598.73 BW
7600.00
7599.82
7600.00
7600.00
7600.00
7600.00
7600.00
7596.53
7597.73 BW
??? ME
7599.12 ME
7599.80
7599.80
FF=7600.00
7600.00
7600.00
7600.00
7598.62 BW
7599.80 TW
7599.80 TW
12" PVC
12" RCP
8" PVC
4" P
V
C
7599.10 BS/ME
7599.70 TS
7598.82 BS/ME
7599.70 TS
7599.00 ME
7598
7599.44 HP/ME
1.8%
7597.72 ME
7596.93 ME
7596.31 ME
7595.68 ME
EX
S
D
EX
S
D
EX
S
D
EX SD EX SD EX SD EX SD EX SD
EX
S
D
EX SD
EX SD
EX SD EX SD EX SD
EX SD
EX
S
D
EX
S
D
EX SDEX SD
EX SDEX SD
EX
S
D
4" PERF. PVC
6" PVC
7600.00
2.
0
%
2.
0
%
2.0%2.0%
8.
2
%
10
.
2
%
7600.00
7600.00
7600.00
7600.00
7600.00 7600.00
7600.00
10
SCALE: 1" = 10'
100
5345
5343 PROPOSED MINOR CONTOURS
PROPOSED MAJOR CONTOURS
PROPOSED SPOT ELEVATION43.50
MATCH EXISTING
TOP OF WALL AT FINISHED GRADE
BOTTOM OF WALL AT FINISHED GRADE
5345
5343 EXISTING MINOR CONTOURS
EXISTING MAJOR CONTOURS
EXISTING SPOT ELEVATION43.50
EXISTING STORM LINE
D
EXISTING STORM INLET
EXISTING STORM MANHOLE
EX SD
LEGEND:
ME
TW
BW
TOP OF STAIR
BOTTOM OF STAIR
TS
BS
185
Round 1 comments for Stanley Carriage House proposal (June 2020)
NOTE from Community Development staff: Any comments from an earlier round of
review may have been addressed or superseded by a subsequent resubmittal and
analysis. Please see most recent submittal for updated information.
Stanley Historic District Carriage House – Development Application
Public Works Comments
June 19, 2020
Summary
This review of a development application by Public Works (PW) is for a restaurant proposed in the
Carriage House building on the campus of the Stanley Historic District Subdivision. Although the
building is under review for tenant finishes, the submittal includes additional documents to facilitate
review of the impacts of this proposed project. As required in the Stanley HD Master Plan, the
restaurant addition will be considered by a Technical Review Committee (TRC) for a Final Review. The
following documents were distributed on June 3, 2020, for review:
A. TRC Project Review Request and Project Narrative (5/28/20)
B. The Stanley Film Center Parking Operations Plan (4/17/20)
C. The Stanley Hotel Film & Performing Arts Center Traffic Impact Analysis (4/6/20)
D. TRC Submission Renderings/Elevations/Drawings - 14 sheets (5/28/20)
E. Foundations & Enclosure Permit Set – 26 sheets (through 4/7/20, Revision 7)
Existing building permits include:
B-11160 for East Parking and Grading (updated for grease vault, June 2020); Final Drainage Report
(9/9/19)
B-11186 for Carriage House Foundation and Enclosure
G-005-19 for Carriage House Stockpile
Public Works requests revision of documents B. (Parking Ops Plan), C. (TIA), and the drawings
associated with existing permit B-11160. Revised documents and plans shall be submitted to
Public Works for re-review prior to consideration by a TRC.
Analysis
A. TRC Project Review Request and Project Narrative
• • Review of Carriage House “for conformance with surrounding site improvements” is
acknowledged.
• • “Parking and landscape area to the east of the Carriage House is not part of TRC approval
review” is acknowledged.
• • The outdoor patio, which connects the Carriage House restaurant with the surrounding site,
has been considered relative previously approved infrastructure and construction plans.
B. The Stanley Film Center Parking Operations Plan
• • “Simultaneous performances at the existing Concert Hall and the auditorium at the new Film
Center will not occur” is acknowledged.
• • “Primary use of the new auditorium for film and performing arts will occur during off-peak
tourism season so as not to conflict with peak season and visitor parking demands” is acknowledged.
Page 2 | Public Works Comments—Stanley Carriage House
Exhibit 12
186
•• What technical resources are available to the “parking control person” at the entry to “ensure
adequate parking is available?” Confirm if parking control at the gatehouse is proposed to be seasonal or
year-round (year-round is implied in the report).
• Graphic 1.0: o It appears this graphic is free-standing without reference or description within
the narrative; edit narrative as appropriate.
o Provide a legend to explain colors and linework.
o The red/black linework appears to be identifying a few sidewalks and trails. Expand the
linework to represent all sidewalks and trails to accurately represent the quantity and location of
pedestrian and bike facilities within the frame of the graphic.
o Confirm the parking lot information is accurate (the new 2020 parking map is available).
o Provide an explanation of the derivation of the 20 Minute
Walk Zone.
o The 20 Minute Walk Zone circle seems to be drawn very small, thus understating the distance
a patron may be able to walk in 20 minutes. Many Town employees park in the parking structure and
walk to Town Hall in well less than 15 minutes, a walking distance of about 2000'. Edit the circle as
appropriate.
• Pedestrian and bicycling patrons expected to be addressed in TIS. See related comment in the
TIA section below.
• ADA-compliant travel paths throughout the Stanley campus, with max running slope of 5%, is
acknowledged.
• Downtown Estes Park is within walking distance of the Stanley campus using existing
crosswalks and paths. Many tourists consider distances beyond ¼ mile to be walkable. Provide an
explanation of the derivation of the ¼ mile walkable distance used in the report narrative.
• Not all of the Stanley Hotel parking areas are marked with striping. Will these areas be
excluded from parking in the future?
• Update parking space counts by indicating the number of handicap accessible spaces. Confirm
that the Carriage House Restaurant will have a sufficient number of ADA stalls as required by ADA
standards. Confirm the location of these stalls and the associated ADA travel path.
• Confirm how, if at all, private or public shuttle bus traffic will be needed to service the Carriage
House Restaurant as an addition to the Stanley Hotel campus.
• This Operations Plan shall be updated and resubmitted with the proposed Film Center when
appropriate.
C. The Stanley Hotel Film & Performing Arts Center Traffic Impact Analysis (TIA)
• • Typos to be corrected: Steamer Parkway (page 4), Bear River Multi-Family Development (page
4), Big Thompson (page 7).
• • The Carriage House should be referenced as new construction as the space has not been
actively used in 50 years. Truly, only the Concert Hall currently exists. Correct references to renovating
the Concert Hall.
• • 1.0: LCUASS is being actively updated since 2019. Update Chapter 4 references and confirm
compliance with latest version.
Page 3 | Public Works Comments—Stanley Carriage House
187
• • Sections 4, 5, and 6: Our understanding in approving the Base Assumption Form (BAF) for
the TIA was that pedestrian and shuttle issues were being addressed via the Parking Operations Plan (see
attached email dated 9-26-19) to provide a full multi-modal analysis of the proposed project.
Accordingly, the TIA does not contain details of an analysis of alternative modes of transportation.
However, the Parking Operations Plan contains the following statements in the Alternative Means of
Site Access section: (1) “The expected number of patrons forecast to walk or bike to the Stanley Film
Center will be provided in the Traffic Impact Study,” and (2) “The expected number of patrons forecast
to take private transportation (e.g. Uber, Lyft, Estes Park Shuttle, etc.) to the Stanley Film Center will
also be provided in the Traffic Impact Study.” Since neither study has the details we expected regarding
full multi-modal analysis, resolve this conflict between both reports and revise accordingly.
• • 4.1: Wonderview Avenue – update section with information about the existing
Wonderview/MacGregor intersection roundabout.
• • 4.1: Wonderview Avenue: update the section to reflect that west of Wonderview/St. Vrain is
actually US36 (Elkhorn Ave), not US 34 Business Route (Big Thompson Ave).
• • 4.1: Steamer Drive – update the section to reflect that Steamer Drive also provides access to
the Stanley Hotel campus via Steamer Parkway.
• • 4.3: Acknowledge Complete Streets adoption by Town and its implications for TIS info.
• • 4.4: Transit – Shuttles will be using the western end of the parking structure starting in 2020. Is
the Stanley still on the Silver Route? Update transit map.
• • 4.5: This intersection will probably be signalized in late 2020.
• • 5.2 and Table 1: Confirm that the forecasts for this report take into account the forecasted
traffic and proposed mitigation improvements associated with the Alarado Business Park, a new
development on the north (NE) corner of US 34/Steamer Drive intersection. TIS, memo amendments,
and Traffic Signal Warrant Study were all completed by Delich Associates in 2018 and 2019 and available
upon request from PW. Identify/explain/resolve conflicts between reports. Address why the Carriage
House Restaurant project and/or the Film Center project should not share in the effort to mitigate
traffic impacts at the US 34/Steamer Drive intersection.
• • 5.2: Update Year 2024 info for signalized intersection at “Big Thompson at Steamer/Golf
Course.”
• • 6.1: The Parking Operations Plan identifies a Conference Center use for the hours of 8a to 6p,
but the TIA does not appear to account for the traffic generation associated with this use. Resolve this
apparent omission.
• • 7.0: Update for signalized intersection.
• • This TIA shall be updated and resubmitted with the proposed Film Center when appropriate.
Page 4 | Public Works Comments—Stanley Carriage House
188
D. TRC Submission Renderings/Elevations/Drawings - 14 sheets
• • Sheet 3 – Carriage House Interior TRC will ultimately be assigned a different permit number as
B-11186 applies only to the Foundation and the drawings reviewed in support of the permit.
E. Foundations & Enclosure Permit Set – 26 sheets
• • Sheet Index – Cloud Rev 7 for affected drawings.
B-11160
• • Update drawings as needed for B-11160 to reflect design changes currently proposed. Address
the new building shape and patios/walkways around the building, including ADA travel path between
the parking lot and building entrances.
• • Provide details to supplement the general grading plan in the Carriage house area that was
provided in the East Parking Lot plans.
• • Final Drainage Report – Confirm that the new building shape/size and provision of extensive
patios and walkway areas around the building do not alter any of the assumptions and conclusions of the
Final Drainage Report submitted in association with the East Parking Lot (B-11160). The drainage
report does not appear to address these amenities.
• • Update Erosion Control Plan as needed (in B-11160 also) to include construction activity and
site disturbance related to the Carriage House project.
PW recommended Stipulations for TRC consideration:
• • PW recommends that the Carriage House Restaurant project be required to extend sidewalks
and trails from the gatehouse driveway/Steamer Parkway intersection to connect with existing sidewalks
along Wonderview Avenue to the west and along Steamer Drive to the east. This recommendation is
based on the understanding that the EP community supports and desires walkable travelways and
bikeways between key destinations, as evidenced by the adoption of a Master Trails Plan in 2016 and the
adoption of a Complete Streets Policy in 2019.
• • PW recommends that all public improvements associated with the Carriage House Restaurant
project in public use easements or public right-of-ways be addressed in a Development Agreement.
• • PW recommends that the Carriage House Restaurant not receive a building permit for interior
finishes until all public improvements associated with the Carriage House Restaurant project and all
private/public improvements associated with the East Parking Lot (currently B-11160) are constructed
and accepted by PW or properly securitized and addressed in a Development Agreement.
• • PW recommends that the Carriage House Restaurant not receive a TCO or CO to operate in
any capacity unless and until all public improvements associated with the Carriage House Restaurant
project and all private/public improvements associated with the East Parking Lot (B-11160) are
constructed and approved by PW and all other obligations of any/all Development Agreement(s) are
fulfilled.
Re: Request for Review: Carriage House Restaurant
facility, Stanley Hotel campus
Inbox x
Vanessa Solesbee
189
to me, David, Jennifer
all
Good Evening Randy,
David, Jennifer and I spoke this morning regarding this project and David shared his
comments with me on the Parking Ops Plan and TIS. I reviewed both as well and have
very minor comments (both of which support comments made by David):
Parking Ops Plan
I can confirm that all of my comments from November 2019 have been addressed
except one (regarding the reference to "parking control person"). I think a bit more is
needed on this item to clarify what is meant by "parking control person" and/or parking
controls.
TIA (Section 4.4 Transit)
This section still needs to be updated per my emailed comments on April 15. Jack
Mousseau did email me last week and ask for information about the 2020 routes and I
directed him to our website.
Thank you and please don't hesitate to let me know if you have any questions!
Best,
Vanessa
--
Vanessa Solesbee, CAPP
Parking & Transit Manager
Public Works Department
Town of Estes Park
Re: Request for Review: Carriage House Restaurant
facility, Stanley Hotel campus
Inbox x
Steven Rusch
Randy,
As everyone copied on this email is well aware, The Town of Estes Park Utilities
Department has required the the entirety of Lot 1 must bring all water metering and
backflow protection into compliance as a condition of approval of any Certificates of
Occupancy or Temporary Certificates of Occupancy for this project. Our Department is
willing to allow permit approval to allow processes to keep moving forward. It is
190
acknowledged and appreciated that the property owner has hired Estes Park Plumbers
to accomplish this, and the work has begun. Once this is resolved entirely, signed off
by the plumber and approved by the Utilities Department, COs and/or TCOs can be
reviewed for approval.
Please feel free to contact me directly with any questions or for further discussion.
Best,
Steve Rusch
Utilities Coordinator. Town of Estes Park
170 MacGregor Ave. Suite 140. PO Box 1200. Estes Park, CO 80517
Direct: 970.577.3625
Mobile: 970.481.8417
RE: Request for Review: Carriage House Restaurant
facility, Stanley Hotel campus
Inbox x
James Duell <jduell@estesparksanitation.org>
Hello Randy Hunt,
As per review of the Carriage House Restaurant Facility the Estes Park Sanitation District has the
following comments:
1. The District comments are limited to Review for compliance with Stanley Master Plan and
Standard regulatory requirements as there are no detailed tenant finish drawings are
available for review.
2. The development will be installing a Fats, Oil and Grease interceptor. Staff has met with
project contractors, engineers and excavation companies to ensure the sewer line and
interceptor will be installed as per our requirements. Their comments are part of the changes to
G-002-20 grading permit.
3. Wastewater flow shall be towards Steamer Drive – not through Stanley Village.
4. Irrigation water shall be metered independently. Our requirements per a previous
landscaping review have not changed.
5. Fees associated with the project are unknown at this time. Determination of fees will be
during building permit review.
Thank you – James Duell, Estes Park Sanitation District
From: Randy Hunt [mailto:rhunt@estes.org]
Sent: Wednesday, June 03, 2020 3:35 PM
191
To: Karin Swanlund; Planning commdev; Gary Rusu; David Hook; Jennifer Waters; Megan Van Hoozer;
Steven Rusch; Shane Krell; Cliff Tedder; Joe Lockhart; Chris Thomas; James Duell; Kevin Sullivan;
Reuben Bergsten; Dan Kramer; Cindy Nasky; Catherine Rosset; Vanessa Solesbee
Cc: John Cullen; Jack Mousseau; Kasia Bulkowski
Subject: Request for Review: Carriage House Restaurant facility, Stanley Hotel campus
192
Jack Mousseau, AIA
...
[Message clipped] View entire message
Jack M. Mousseau AIA, A4LE, LEED AP Principal
M O A A R C H I T E C T U R E moaarch.com
414 14th
facebook.com/moaarch
193
The Stanley Hotel Carriage House Traffic Impact Study
Response to Comments
July 8, 2020
Page 2
analysis of the proposed project. Accordingly, the TIA does not contain details of an
analysis of alternative modes of transportation. However, the Parking Operations Plan
contains the following statements in the Alternative Means of Site Access section: (1)
“The expected number of patrons forecast to walk or bike to the Stanley Film Center
will be provided in the Traffic Impact Study,” and (2) “The expected number of patrons
forecast to take private transportation (e.g. Uber, Lyft, Estes Park Shuttle, etc.) to the
Stanley Film Center will also be provided in the Traffic Impact Study.” Since neither
study has the details we expected regarding full multi‐modal analysis, resolve this
conflict between both reports and revise accordingly.
Response: A discussion on multi‐modal and TNC use was added to the traffic study.
Comment 5. 4.1: Wonderview Avenue – update section with information about the existing
Wonderview/MacGregor intersection roundabout.
Response: Updated text to discuss the new roundabout.
Comment 6. 4.1: Wonderview Avenue: update the section to reflect that west of Wonderview/St.
Vrain is actually US36 (Elkhorn Ave), not US 34 Business Route (Big Thompson Ave).
Response: Updated text.
Comment 7. 4.1: Steamer Drive – update the section to reflect that Steamer Drive also provides
access to the Stanley Hotel campus via Steamer Parkway.
Response: Updated text.
Comment 8. 4.3: Acknowledge Complete Streets adoption by Town and its implications for TIS info.
Response: The Complete Streets Policy was discussed.
Comment 9. 4.4: Transit – Shuttles will be using the western end of the parking structure starting in
2020. Is the Stanley still on the Silver Route? Update transit map.
Response: The discussion on the transit routes was updated with the 2020 map, which
was not available at the time of the first submittal.
Comment 10. 4.5: This intersection will probably be signalized in late 2020.
Response: The analysis was updated to include a signal at the intersection of Big
Thompson Avenue (US 34) at Steamer Drive / Golf Course Access for the existing and
future scenarios. The following assumptions were made since the signal design and
194
The Stanley Hotel Carriage House Traffic Impact Study
Response to Comments
July 8, 2020
Page 3
timings were not provided: the golf course access would be realigned with Steamer
Drive and include one left‐turn pocket and one through/right‐turn lane; Steamer Drive
would add one southbound through lane; the signal timing parameters and cycle
length at the intersection of Elkhorn Avenue and Wonderview Avenue/St. Vrain
Avenue were assumed to be the same at the new signal; and the left‐turns on Big
Thompson Avenue would provide protected+permitted phasing.
Comment 11. 5.2 and Table 1: Confirm that the forecasts for this report take into account the
forecasted traffic and proposed mitigation improvements associated with the Alarado
Business Park, a new development on the north (NE) corner of US 34/Steamer Drive
intersection. TIS, memo amendments, and Traffic Signal Warrant Study were all
completed by Delich Associates in 2018 and 2019 and available upon request from PW.
Identify/explain/resolve conflicts between reports. Address why the Carriage House
Restaurant project and/or the Film Center project should not share in the effort to
mitigate traffic impacts at the US 34/Steamer Drive intersection.
Response: It was confirmed with Matt Delich that the background volumes include
the trips associated with the Alarado Business Park.
In regard to a contribution towards the signal cost, the carriage house restaurant goes
by square footage and by revenue are less than 2.5% of the total space of The Stanley
Hotel. Most of the guests going to that restaurant are already there and have been
going to The Stanley Hotel for a long time. It is not anticipated that the Carriage House
itself will be a destination for down valley visitors. Effectively, there is little to no
increase in visitors since the Carriage House patrons are expected to already be at The
Stanley Hotel. Note, that this TRC review does not include the Film Center, nor does
the revised TIS. As such, the Film Center does not pertain to the review or question as
it is currently a future, potential project and has not been submitted for planning
review. The Carriage House does not front either US 34 or Steamer Drive and the hotel
has agreed to improve multi‐modal connectivity adjacent to the project property.
In the traffic impact study, it was assumed that all of the Carriage House trips were
external per the Base Assumptions Form. If this were the case, then the estimated
trips would account for 1.3% of all the traffic traveling through the intersection of US
34 and Steamer Drive in Year 2024 in the PM peak hour. It is anticipated that the
majority of the restaurant trips will actually be people already visiting or staying at
The Stanley Hotel, which would bring the trips associated with the restaurant
traveling through the future signalized intersection to less than 0.3%. Also, the signal
at US 34 and Steamer Drive was warranted without the volume from the Carriage
House per the Signal Warrant Study conducted by Delich Associates (August 2019).
195
The Stanley Hotel Carriage House Traffic Impact Study
Response to Comments
July 8, 2020
Page 4
Comment 12. 5.2: Update Year 2024 info for signalized intersection at “Big Thompson at Steamer/Golf
Course.”
Response: See response to comment 10.
Comment 13. 6.1: The Parking Operations Plan identifies a Conference Center use for the hours of 8a
to 6p, but the TIA does not appear to account for the traffic generation associated with
this use. Resolve this apparent omission.
Response: Not applicable to the Carriage House. Any conference center will be
included in the Film Center traffic study at a later date.
Comment 14. 7.0: Update for signalized intersection.
Response: See response to comment 10.
Comment 15. This TIA shall be updated and resubmitted with the proposed Film Center when
appropriate.
Response: A separate traffic impact study will be completed for the Film Center
submittal at a later date.
Note that the updated traffic study focuses on the Carriage House only and does not include the Film and
Performing Arts Center. A separate traffic study will be submitted for this portion of the project at a later
date.
\CRS
196
1624 Market Street | Suite 202 | Denver, CO 80202
Phone: 303.652.3571 | www.FoxTuttle.com
MEMORANDUM
To: Town of Estes Park, Department of Public Works
From: Cassie Slade, PE, PTOE
Date: July 8, 2020
Project: Stanley Historic District Carriage House Traffic Impact Study
Subject: Response to Comments
Fox Tuttle Transportation Group received comments “Stanley Historic District Carriage House –
Development Application, Public Works Comments” dated June 19, 2020 from the Town of Estes Park in
reference to the submittal of the Stanley Hotel Film and Performing Arts Center traffic impact study (dated
April 6, 2020). We appreciate your thorough review. The responses for the traffic related comments are
listed below:
Comment 1. Typos to be corrected: Steamer Parkway (page 4), Bear River Multi‐Family Development
(page 4), Big Thompson (page 7).
Response: Updated text.
Comment 2. The Carriage House should be referenced as new construction as the space has not been
actively used in 50 years. Truly, only the Concert Hall currently exists. Correct references
to renovating the Concert Hall.
Response: Updated discussion on Carriage House. Removed Concert Hall and Film
Center for this traffic study. Future traffic study will be provided for the Concert Hall
and Film Center per discussions with Town staff.
Comment 3. 1.0: LCUASS is being actively updated since 2019. Update Chapter 4 references and
confirm compliance with latest version.
Response: The updates do not impact the traffic impact study. This update complies
with the latest version of LCUASS that is in the process of being updated.
Comment 4. Sections 4, 5, and 6: Our understanding in approving the Base Assumption Form (BAF)
for the TIA was that pedestrian and shuttle issues were being addressed via the Parking
Operations Plan (see attached email dated 9‐26‐19) to provide a full multi‐modal
Exhibit 14
197
The Stanley Hotel Carriage House Traffic Impact Study
Response to Comments
July 8, 2020
Page 2
analysis of the proposed project. Accordingly, the TIA does not contain details of an
analysis of alternative modes of transportation. However, the Parking Operations Plan
contains the following statements in the Alternative Means of Site Access section: (1)
“The expected number of patrons forecast to walk or bike to the Stanley Film Center
will be provided in the Traffic Impact Study,” and (2) “The expected number of patrons
forecast to take private transportation (e.g. Uber, Lyft, Estes Park Shuttle, etc.) to the
Stanley Film Center will also be provided in the Traffic Impact Study.” Since neither
study has the details we expected regarding full multi‐modal analysis, resolve this
conflict between both reports and revise accordingly.
Response: A discussion on multi‐modal and TNC use was added to the traffic study.
Comment 5. 4.1: Wonderview Avenue – update section with information about the existing
Wonderview/MacGregor intersection roundabout.
Response: Updated text to discuss the new roundabout.
Comment 6. 4.1: Wonderview Avenue: update the section to reflect that west of Wonderview/St.
Vrain is actually US36 (Elkhorn Ave), not US 34 Business Route (Big Thompson Ave).
Response: Updated text.
Comment 7. 4.1: Steamer Drive – update the section to reflect that Steamer Drive also provides
access to the Stanley Hotel campus via Steamer Parkway.
Response: Updated text.
Comment 8. 4.3: Acknowledge Complete Streets adoption by Town and its implications for TIS info.
Response: The Complete Streets Policy was discussed.
Comment 9. 4.4: Transit – Shuttles will be using the western end of the parking structure starting in
2020. Is the Stanley still on the Silver Route? Update transit map.
Response: The discussion on the transit routes was updated with the 2020 map, which
was not available at the time of the first submittal.
Comment 10. 4.5: This intersection will probably be signalized in late 2020.
Response: The analysis was updated to include a signal at the intersection of Big
Thompson Avenue (US 34) at Steamer Drive / Golf Course Access for the existing and
future scenarios. The following assumptions were made since the signal design and
198
The Stanley Hotel Carriage House Traffic Impact Study
Response to Comments
July 8, 2020
Page 3
timings were not provided: the golf course access would be realigned with Steamer
Drive and include one left‐turn pocket and one through/right‐turn lane; Steamer Drive
would add one southbound through lane; the signal timing parameters and cycle
length at the intersection of Elkhorn Avenue and Wonderview Avenue/St. Vrain
Avenue were assumed to be the same at the new signal; and the left‐turns on Big
Thompson Avenue would provide protected+permitted phasing.
Comment 11. 5.2 and Table 1: Confirm that the forecasts for this report take into account the
forecasted traffic and proposed mitigation improvements associated with the Alarado
Business Park, a new development on the north (NE) corner of US 34/Steamer Drive
intersection. TIS, memo amendments, and Traffic Signal Warrant Study were all
completed by Delich Associates in 2018 and 2019 and available upon request from PW.
Identify/explain/resolve conflicts between reports. Address why the Carriage House
Restaurant project and/or the Film Center project should not share in the effort to
mitigate traffic impacts at the US 34/Steamer Drive intersection.
Response: It was confirmed with Matt Delich that the background volumes include
the trips associated with the Alarado Business Park.
In regard to a contribution towards the signal cost, the carriage house restaurant goes
by square footage and by revenue are less than 2.5% of the total space of The Stanley
Hotel. Most of the guests going to that restaurant are already there and have been
going to The Stanley Hotel for a long time. It is not anticipated that the Carriage House
itself will be a destination for down valley visitors. Effectively, there is little to no
increase in visitors since the Carriage House patrons are expected to already be at The
Stanley Hotel. Note, that this TRC review does not include the Film Center, nor does
the revised TIS. As such, the Film Center does not pertain to the review or question as
it is currently a future, potential project and has not been submitted for planning
review. The Carriage House does not front either US 34 or Steamer Drive and the hotel
has agreed to improve multi‐modal connectivity adjacent to the project property.
In the traffic impact study, it was assumed that all of the Carriage House trips were
external per the Base Assumptions Form. If this were the case, then the estimated
trips would account for 1.3% of all the traffic traveling through the intersection of US
34 and Steamer Drive in Year 2024 in the PM peak hour. It is anticipated that the
majority of the restaurant trips will actually be people already visiting or staying at
The Stanley Hotel, which would bring the trips associated with the restaurant
traveling through the future signalized intersection to less than 0.3%. Also, the signal
at US 34 and Steamer Drive was warranted without the volume from the Carriage
House per the Signal Warrant Study conducted by Delich Associates (August 2019).
199
The Stanley Hotel Carriage House Traffic Impact Study
Response to Comments
July 8, 2020
Page 4
Comment 12. 5.2: Update Year 2024 info for signalized intersection at “Big Thompson at Steamer/Golf
Course.”
Response: See response to comment 10.
Comment 13. 6.1: The Parking Operations Plan identifies a Conference Center use for the hours of 8a
to 6p, but the TIA does not appear to account for the traffic generation associated with
this use. Resolve this apparent omission.
Response: Not applicable to the Carriage House. Any conference center will be
included in the Film Center traffic study at a later date.
Comment 14. 7.0: Update for signalized intersection.
Response: See response to comment 10.
Comment 15. This TIA shall be updated and resubmitted with the proposed Film Center when
appropriate.
Response: A separate traffic impact study will be completed for the Film Center
submittal at a later date.
Note that the updated traffic study focuses on the Carriage House only and does not include the Film and
Performing Arts Center. A separate traffic study will be submitted for this portion of the project at a later
date.
\CRS
200
Re: Stanley - East Parking Layout, island modification
Inbox x
Jack Mousseau
Aug 12, 2020, 4:16 PM (4 days
ago)
Reply to
all
Hi Randy and David,
Just to confirm, the tree in discussion here will be removed today. We will not be
reconfiguring the already permitted and approved parking lot layout. There have been
no requested changes to the parking lot configuration that is currently permitted and
under construction. We have modified earth work along its eastern edge at the request
and result of conversations with Findlay Court residential neighbors. None of the
earthwork modifications required any change to parking layout. The general contractor
will continue with the permitted construction, including placement of concrete beginning
next week. We will submit earthwork modifications tomorrow.
As for consideration of this parking lot in the Carriage House TRC. The parking lot and
Carriage House are two separate issues. One in for TRC review of the exterior
enclosure and restaurant, the other already permitted for construction. The intended
use of the Carriage House and its “context” have not changed since the east parking
was submitted for permit, and approved. We would expect the TRC discussions and
findings to reflect that. It was considered at that time. As for proportionality and scale,
the parking operations plan identifies the parking needs on the Stanley campus and
parking use in context with the Carriage House. Please clarify if your intent with
“context”, “scale and proportionality” have different intent.
Kind regards,
Jack Mousseau, AIA
Principal
MOA ARCHITECTURE
303-915-0482
From: Randy Hunt <rhunt@estes.org>
Sent: Wednesday, August 12, 2020 1:23 PM
To: Jack Mousseau
Cc: David Hook; Chris Schilling; John Cullen; EDWARD HAYEK; Kasia Bulkowski; Shane A.
Marquez
Subject: Re: Stanley - East Parking Layout, island modification
Exhibit 15
201
All,
I wasn't there for the walk through, but if the tree is aged to the point of questionable
viability, I can't argue that a reconfiguration just to spare it is warranted.
We agree that the current parking-lot plans can be followed through to completion per
the approved design drawings, but I caution that that does not mean issues regarding
parking can't be considered by the TRC. Each new project submitted for review has a
context, and that context is important in planning and land use. We (society) couldn't
make much progress if we held to a principle that once something is built and approved
for use, it can't ever be reconsidered again if development around it warrants that. The
Sydney Opera House or the Eiffel Tower (or the Stanley Hotel itself) may be exceptions,
as they are iconic... but a parking lot isn't iconic. Naturally, proportionality and scale
count also.
Thanks,
RAH
-----
Randy Hunt
Community Development Director
Town of Estes Park
170 MacGregor Ave.
PO Box 1200
Estes Park, CO 80517
direct: 970-577-3719
main: 970-577-3721
email: rhunt@estes.org
http://www.estes.org
On Wed, Aug 12, 2020 at 1:08 PM Jack Mousseau <jmousseau@moaarch.com> wrote:
Hi all,
It is our understanding that in today’s site walk, the reconfiguration of the island within
the east parking lot was discussed. This is the island we were contemplating
reconfiguring to save a large, existing tree. It is our understanding that those on site
weren’t concerned with the removal of this tree due to its current aged condition. It is
also understood that any change in the layout of the parking lot per the permit, would be
problematic. Thus, we are not going to change the configuration of the island or parking
lot from its permitted layout and landscape design, and this tree will be
removed. Please understand, the East Parking project is not under review of the
upcoming TRC for the Carriage House. The East Parking is currently under a permit
provided by the Town of Estes Park and construction will be ongoing based on those
approved documents.
Kind regards,
202
Jack Mousseau, AIA
...
[Message clipped] View entire message
Jack M. Mousseau AIA, A4LE, LEED AP Principal
M O A A R C H I T E C T U R E moaarch.com
414 14th
facebook.com/moaarch
203
Exhibit 16
204
Memo
_g_® -
TOWN OF ESTES PARI'-._
TOWN ADMINISTRATOR
To:
From:
File: Stanley Historic District -Carriage House -2020 TRC
Town Administrator Machalek
Date:
RE:
June 4, 2020
Appointment of Architectural Review Committee in Connection with the
Stanley Hotel Carriage House Preliminary Package (accepted for
processing by Community Development Dept. on June 3, 2020)
In accordance with the adopted Stanley Historic District Master Plan (January 11,1994),
Sec. I.C.3 (p. 6): As Town Administrator, I hereby appoint the following members to
serve on the Architectural Review Committee, each to serve for the duration of the
Stanley Hotel Carriage House technical review process through final disposition of said
project and process:
a.Jack A. Cook 111, AIA. CCCA-Principal, Fentress Architects
b.Curtis Martin, AIA, LEED AP -Design & Construction Team Manager, Kaiser
Permanente Facilities-Design & Construction
7�� Travis Machalek
Town Administrator
Town of Estes Park
Cc: Jack A. Cook 111
Curtis Martin
Dan Kramer, Town Attorney
Jackie Williamson, Town Clerk
Karin Swanlund, Administrative Assistant, Community Development Department
Randy Hunt, Director, Community Development Department
Exhibi t 17
205
T H E S T A N L E Y H O T E L C A R R I A G E H O U S E
E S T E S P A R K , C O
Te c h n i c a l R e v i e w C o m m i t t e e R e v i e w
A u g u s t 2 4 , 2 0 2 0
E x h i b i t 1 8
206
2VIEW FROM SOUTHWEST
207
3VICINITY PLAN
20 MIN W
A
L
K
Z
O
N
E
DESIGNATED BIKE LANES
20SDSSD
D
S
D
S
D
S
D
J
K
J
K
JK
20 MIN WALK ZONE FROM THE STANLEY FILM CENTER
WALK ZONE CENTER
POINT
FUTURE STANLEY FILM CENTER
STANLEY LOT 1
STANLEY LOT 2
STANLEY LOT
4
RIDGLINE RE-
SORT
ESTES PARK RE-
SORT
SAFEWAY SHOPPING
& RESTAURANT
CENTER
1 Hour Parking (May-Sept)
3 Hour Parking (May-Sept)
All Day Parking
Electric Car Charger
Shuttle Stop (June-Sept)
Restrooms
Visitor Info
Mo
r
a
i
n
e
A
v
e
E R
i
v
e
r
s
i
d
e
D
r
Weist Dr
Big Horn Dr
Spruce Dr
Cleave St
Big Thompson Ave
N Saint Vrain Ave
Big Thompson River
E Wonderview AveMacGregor Ave
E Elkhor
n
A
v
e
Fall River
Virginia Dr
Park Ln
Big Thompson River
W Elkhorn Ave
W Wonderview AveVirginia DrBig Horn Dr Black Canyon Creek
W Riverside Dr
Fall River
Steamer Dr
16
15
14 13
12
11 10
9
8
6
1817
7
5
4
3
2
1
VISITOR CENTERTOWN HALL
EVENTS COMPLEX
PARK-N-RIDE 0.5 MILES
EVENTS COMPLEX
PARK-N-RIDE
Overnight parking in designated locations allowed by permit only. Visit estes.org/parking for more information.
#Lot Name Spaces RV
1 Events Complex Park-n-Ride 454 √
2 Parking Structure 415
3 Visitor Center 151 √
4 Town Hall 279 √
5 MacGregor Ave 84
6 East Riverside 44
7 Virginia 30
8 Riverside
Post Office
94
9 99
10 West Riverside 38
11 Davis 43
12 Weist 141
13 Big Horn 77
14 Tregent 17
15 Spruce 41
16 Performance Park 81
17 Bond Park 77
18 Brownfield’s 6
4th st
N Saint Vrain A
v
e
S S
a
i
n
t
V
r
a
i
n
A
v
e
Manford Ave
TOWN OF ESTES PARK PUBLIC PARKINGRMNP Fall River Entrance LovelandGlen Haven
Boulder
RMNP Beaver
Meadows
Entrance
SEE INSET
INSET MAP
Revised 05/23/2019
FOR INFORMATIONAL PUPORSES ONLY. THIS IMAGE USES THE TOWN OF ESTES PARK PUB-
LIC PARKING MAP GRAPHICS SUPERIMPOSED ON A GOOGLE EARTH IMAGE.
ALL DAY
3 HOUR PARKING (MAY-SEPTEMBER)
BIKE PATH
RIVER
MAIN ROAD NETWORK
1 HOUR PARKING (MAY-SEPTEMBER)
PARKING AND CIRCULATION
STANLEY CARRIAGE HOUSE
208
4TRC REVIEW SCOPE SITE PLAN
FILM
CENTER
SERVICE
COURTYARD
CONCERT
HALL
CARRIAGE
HOUSE
EAST PARKING
PERMIT#
B-11160
FUTUREFILM CENTER
CARRIAGE HOUSE INTERIOR TRC
PERMIT # B-11186
209
5PROJECT TIMELINES
CARRIAGE HOUSE PROJECT TIMELINE
Stanley East Parking Permit Submittal - 07/01/2019
Stanley East Parking Permit Received - 11/20/2019
CURRENTLY UNDER CONSTRUCTION
Stanley Carriage House and Film Center Pre-App Meeting - 07/18/2019
Stanley Carriage House Foundation and Enclosure Submittal - 08/06/2019
Stanley Carriage House Foundation and Enclosure Permit Received - 11/18/2019
CURRENTLY UNDER CONSTRUCTION
Stanley Carriage House Shell Package Submittal - 05/04/2020
Stanley Carriage House Shell Package Permit Received - Pending
Stanley Carriage House TRC Submittal - 05/27/2020
Stanley Carriage House TRC Review - 8/24/2020
Stanley Film Center Submittal - Pending
Stanley Film Center TRC - Pending
210
6SITE PLAN - CARRIAGE HOUSE
G
G
G
G
SD SDSDSDSDSDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSD
SD SD SD SD
SD SD SD SD
SD SD SD SD
SD SD SD SD
SD SD SD SD
SDSDSDSDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S S
W
S
SS
SS
SS
SS
SS
SS
S
SS
SS
SS
SS SS
SS
SS
SS
E E
E
E
E
G
G
G
G
G
G
G
G
SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSD
SD SDSDSDSDSDSDSD
SD SD
SS
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSDSDSDSDSDSD
SDSDSDSDSD
W W W
G G E
E
E
E
E
E
E
VA
N
VA
N
VA
N
VA
N
17-YAR5-BGG4-MCK6-BGG3-YAR
4-THG3-GBS3-MTN
8-BGG3-TWS
3-MTN9-BGG5-THG
3-RHM5-IBC
9-YAR
15-THG
6-MCK
3-RHM
8-BGG 3-GBS
1-YFC9-BGG5-YAR
6-THG1-YFC4-BGG
7-IBC6-BGG5-POT
2-ASP
12-WLC
8-THG3-RHM
1-YFC8-GBS
6-GBS17-WLC
20-PCS
12-WLC 22-PCS
13-YAR
12-SIL
25-BGG3-WSC21-YAR
9-PCS
25-PCS
2-RAB
3-RAB
LIMIT OF WORK
CARRIAGE HOUSE
3-POT
6-TWS 5-YFC
7-POT
13-PCS
12-PCS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
MB
04.20.2020
19125.00
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
Permit Submittal
JB, DJ
REVISION DATE
1101 Bannock Street
Denver, Colorado 80204
P 303.892.1166
www.norris-design.com
L-200
0
NORTH SCALE:1"=20'-0"
10'20'40'
1. 50% OF DECIDUOUS TREES SHALL BE 4" CAL. B&B, AND 50% OF DECIDUOUS TREES SHALL BE
2" CAL. B&B
2. ALL IRRIGATION DESIGN AND CONSTRUCTION IS TO BE COORDINATED BY THE OWNER OR
OWNER'S REPRESENTATIVE. OWNER'S APPROVAL IS REQUIRED PRIOR TO BEGINNING ANY
SITE DISTURBANCE. AS-BUILT IRRIGATION PLANS WILL BE PROVIDED PRIOR TO CERTIFICATE
OF COMPLETENESS.
NOTES
ORNAMENTAL TREE
DECIDUOUS SHRUBS
EVERGREEN SHRUBS
NATIVE SEED MIX
LANDSCAPE MULCH
SPADE CUT EDGER
LEGEND
EXISTING TREE TO
REMAIN
LIMIT OF WORK
PERENNIALS
EXISTING TREE TO BE
REMOVED
LANDSCAPE PLANLANDSCAPE PLAN PLANT LIST
ORNAMENTAL TREES
DECIDUOUS SHRUBS - SMALL (2'-5' SPREAD)
EVERGREEN SHRUBS
PERENNIALS
ASP QUAKING ASPENPOPULUS TREMULOIDES 2" CAL. B&B
SIL
MTN
IBC
POT
MCK
SILVER BUFFALOBERRY
MOUNTAIN NINEBARK
IRIQUOIS BEAUTY CHOKEBERRY
PINK BEAUTY POTENTILLA
MCKAY'S WHITE POTENTILLA
SHEPERDIA ARGENTEA
PHYSOCARPUS MONOGYNUS
ARONIA MELANOCARPA 'MORTON'
POTENTILLA FRUTICOSA 'PINK BEAUTY'
POTENTILLA FRUTICOSA 'MCKAY'S WHITE'
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
GBS
RHM
DWARF GLOBE BLUE SPRUCE
RH MONTGOMERY SPRUCE
PICEA PUNGENS 'GLAUCA GLOBOSA'
PICEA PUNGENS 'RH MONTGOMERY'
#5 CONT.
#5 CONT.
WLC
YAR
PCS
WALKER'S LOW CATMINT
MOONSHINE YARROW
POWIS CASTLE SAGE
NEPETA X FAASSENII 'WALKER'S LOW'
ACHILLEA 'MOONSHINE'
ARTEMISIA 'POWIS CASTLE'
#1 CONT.
#1 CONT.
#1 CONT.
ORNAMENTAL GRASSES
BGG
THG
BLUE GRAMA GRASS
TUFTED HAIR GRASS
BOUTELOUA GRACILIS
DESCHAMPSIA CESPITOSA
#1 CONT.
#1 CONT.
DECIDUOUS SHRUBS - MEDIUM (5'-7' SPREAD)
YFC
RAB
TWS
WSC
YELLOW FLOWERING CURRANT
TALL BLUE RABBITBRUSH
TALL WESTERN SAGEBRUSH
WESTERN SAND CHERRY
RIBES AUREUM
ERICAMERIA NAUSEOSA SSP. NAUSEOSA
VAR. SPECIOSA
ARTEMISIA TRIDENTATA
PRUNUS BESSEYI
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
MULTI-COLOR HIGH ALTITUDE MIX
20 - 40 LBS.
2 - 4 LBS.
3 - 6 LBS.
3 - 6 LBS.
5 - 10 LBS.
6 - 12 LBS.
15%
15%
25%
30%EPHRAIM CRESTED WHEATGRASS
CANADA BLUEGRASS, RUBENS
CHEWINGS FESCUE
PERENNIAL RYE
SHEEP FESCUE, MEKLENBERGER
TOTAL 100%
% OF TOTAL
10%
COMMON NAMELBS. PER ACRE
1 - 2 LBS.ROCKY MOUNTAIN WILDFLOWER MIX5%
CONTACT :
ARKANSAS VALLEY SEED
4300 MONACO ST, DENVER, CO 80216
OR APPROVED EQUAL
QTY.
2
12
6
12
15
10
20
9
41
68
101
80
38
8
5
9
3
COBBLE MULCH
G
G
G
G
SD SDSDSDSDSDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSD
SD SD SD SD
SD SD SD SD
SD SD SD SD
SD SD SD SD
SD SD SD SD
SDSDSDSDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S S
W
S
S
SS
SS
SS
SS
SS
SS
S
SS
SS
SS
SS SS
SS
SS
SS
E E
E
E
E
G
G
G
G
G
G
G
G
SD
SD
SD
SD
SD
SD
SD
SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSD
SD SDSDSDSDSDSDSD
SD SD
SS
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSDSDSDSDSDSD
SDSDSDSDSD
W W W
G G E
E
E
E
E
E
E
VA
N
VA
N
VA
N
VA
N
17-YAR5-BGG4-MCK6-BGG3-YAR
4-THG3-GBS3-MTN
8-BGG3-TWS
3-MTN9-BGG5-THG
3-RHM5-IBC
9-YAR
15-THG
6-MCK
3-RHM
8-BGG 3-GBS
1-YFC9-BGG5-YAR
6-THG1-YFC4-BGG
7-IBC6-BGG5-POT
2-ASP
12-WLC
8-THG3-RHM
1-YFC8-GBS
6-GBS17-WLC
20-PCS
12-WLC 22-PCS
13-YAR
12-SIL
25-BGG3-WSC21-YAR
9-PCS
25-PCS
2-RAB
3-RAB
LIMIT OF WORK
CARRIAGE HOUSE
3-POT
6-TWS 5-YFC
7-POT
13-PCS
12-PCS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
MB
04.20.2020
19125.00
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
Permit Submittal
JB, DJ
REVISION DATE
1101 Bannock Street
Denver, Colorado 80204
P 303.892.1166
www.norris-design.com
L-200
0
NORTH SCALE:1"=20'-0"
10'20'40'
G
G
G
G
SD SDSDSDSDSDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSD
SD SD SD SD
SD SD SD SD
SD SD SD SD
SD SD SD SD
SD SD SD SD
SDSDSDSDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S S
W
S
S
SS
SS
SS
SS
SS
SS
S
SS
SS
SS
SS SS
SS
SS
SS
E E
E
E
E
G
G
G
G
G
G
G
G
SD
SD
SD
SD
SD
SD
SD
SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSD
SD SDSDSD
SD SDSDSD
SD SD
SS
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSDSDSD
SDSDSDSDSD
SDSDSDSDSDSDSDSDSDSD
SDSDSDSDSD
W W W
G G E
E
E
E
E
E
E
VA
N
VA
N
VA
N
VA
N
17-YAR5-BGG4-MCK6-BGG3-YAR
4-THG3-GBS3-MTN
8-BGG3-TWS
3-MTN9-BGG5-THG
3-RHM5-IBC
9-YAR
15-THG
6-MCK
3-RHM
8-BGG 3-GBS
1-YFC9-BGG5-YAR
6-THG1-YFC4-BGG
7-IBC6-BGG5-POT
2-ASP
12-WLC
8-THG3-RHM
1-YFC8-GBS
6-GBS17-WLC
20-PCS
12-WLC 22-PCS
13-YAR
12-SIL
25-BGG3-WSC21-YAR
9-PCS
25-PCS
2-RAB
3-RAB
LIMIT OF WORK
CARRIAGE HOUSE
3-POT
6-TWS 5-YFC
7-POT
13-PCS
12-PCS
St
a
n
l
e
y
H
o
t
e
l
C
a
r
r
i
a
g
e
H
o
u
s
e
MB
04.20.2020
19125.00
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
Permit Submittal
JB, DJ
REVISION DATE
1101 Bannock Street
Denver, Colorado 80204
P 303.892.1166
www.norris-design.com
L-200
0
NORTH SCALE:1"=20'-0"
10'20'40'
1. 50% OF DECIDUOUS TREES SHALL BE 4" CAL. B&B, AND 50% OF DECIDUOUS TREES SHALL BE
2" CAL. B&B
2. ALL IRRIGATION DESIGN AND CONSTRUCTION IS TO BE COORDINATED BY THE OWNER OR
OWNER'S REPRESENTATIVE. OWNER'S APPROVAL IS REQUIRED PRIOR TO BEGINNING ANY
SITE DISTURBANCE. AS-BUILT IRRIGATION PLANS WILL BE PROVIDED PRIOR TO CERTIFICATE
OF COMPLETENESS.
NOTES
ORNAMENTAL TREE
DECIDUOUS SHRUBS
EVERGREEN SHRUBS
NATIVE SEED MIX
LANDSCAPE MULCH
SPADE CUT EDGER
LEGEND
EXISTING TREE TO
REMAIN
LIMIT OF WORK
PERENNIALS
EXISTING TREE TO BE
REMOVED
COBBLE MULCH
G G
G
G
SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
SDSDSDSDSD
SD SD SD SD
SD
SD SD SD SD
SD
SD SD SD SD
SD
SD SD SD SD
SD
SD SD SD SD
SD
S S WSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSEEEE EGGGGGGGG SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSSSDSD
SD
SDSD
SD
SDSD
SD
SDSD
SD
SDSD
SD
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD W W WGGEE E
E
EEE VANVANVANVAN17-YAR5-BGG4-MCK6-BGG3-YAR 4-THG3-GBS3-MTN 8-BGG3-TWS3-MTN9-BGG5-THG3-RHM5-IBC9-YAR 15-THG6-MCK 3-RHM8-BGG 3-GBS 1-YFC9-BGG5-YAR6-THG1-YFC4-BGG7-IBC6-BGG5-POT2-ASP12-WLC 8-THG3-RHM1-YFC8-GBS6-GBS17-WLC20-PCS 12-WLC 22-PCS13-YAR12-SIL25-BGG3-WSC21-YAR9-PCS 25-PCS 2-RAB 3-RABLIMIT OF WORK CARRIAGE HOUSE3-POT 6-TWS 5-YFC 7-POT13-PCS 12-PCS Stanley Hotel Carriage House
MB
04.20.2020
19125.00
333 E Wonderview Ave Estes Park, CO 80517
Permit Submittal
JB, DJ
REVISION DATE
1101 Bannock StreetDenver, Colorado 80204P 303.892.1166www.norris-design.com
L-200
0
NORTH SCALE:1"=20'-0"
10'20'40'
1. 50% OF DECIDUOUS TREES SHALL BE 4" CAL. B&B, AND 50% OF DECIDUOUS TREES SHALL BE
2" CAL. B&B
2. ALL IRRIGATION DESIGN AND CONSTRUCTION IS TO BE COORDINATED BY THE OWNER OR
OWNER'S REPRESENTATIVE. OWNER'S APPROVAL IS REQUIRED PRIOR TO BEGINNING ANY
SITE DISTURBANCE. AS-BUILT IRRIGATION PLANS WILL BE PROVIDED PRIOR TO CERTIFICATE
OF COMPLETENESS.
NOTES
211
7SITE PLAN - EAST PARKING
G
W
W
W
W
G
G
G
G
G
D
S S
TRAN
E
W
W
S
S
SS
SS
SS
SS
S
SS
SS
SS
SS
E
E
E E E E
G
G
G
G
G
D
SS
SS
E
E
E
E
E E E E
W W
G
E
E
VA
N
VA
N
VA
N
VA
N
L-300
6
L-300
5
L-300
7
EXISTING LANDSCAPE
BED TO REMAIN
3-GLS5-YAR
3-RGB
9-BGG
2-RGB7-TWI2-CAN
8-POT
8-TWI3-RGB 6-MTN
3-TTJ1-ASP
3-UFS8-MCK
4-BRS
1-WIL
1-CMM3-BCJ
5-WAC
3-BCJ
8-WSB
9-POT
3-ASP7-MTN
3-TTJ
3-UFS
3-MTN
5-BCJ3-MCK
5-WSC
5-GBS4-TTJ
3-GGS8-TWI 3-YFC
14-LUP
3-TLS
3-UFS
4-IBC
7-TLS
3-GBS3-TLS3-POT
3-WSC7-RGB
6-WSC
1-CAN
5-CMO
9-MCK3-WSC8-UFS
20-BGG
STEAMER PARKWAY
3-CMO
3-GGS
3-WSC
5-WSC
15-MTN
5-IBC
BOULDER AREA, RE: CIVIL
LANDSCAPE
BOULDERS, TYP.
PHASE 1 LIMIT
OF WORK
FUTURE
DEVELOPMENT
PHASE 1 LIMIT
OF WORK
FUTURE
DEVELOPMENT
7-RAB
20.0' WATER
EASEMENT
12-TTJ3-MCK6-CMO
3-YFC3-RGB
7-CMO6-POT
10-WSB4-IBC
5-RAB 3-WSC1-RAB5-RGB
7-SIL6-GBS
3-TWI3-TWS
5-YFC
5-TTJ5-RMS
3-ASP
5-RTD
5-DAW3-RTD
5-RTD
3-RMS5-TLS5-UFS
3-RMS5-TWI
6-RAB5-WSB
3-CMO
6-RTD8-POT3-WSC
3-BCJ3-YFC5-YFC
3-TWS
4-ASP6-GGS
3-CMO10-BGG
8-YAR
6-TTJ3-PKC6-TWS6-MCK
3-RTD6-POT
5-RGB5-POT
2-RMW
4-TWI6-YFC3-RGB1-RBE
5-RTD
3-TWS10-BGG
6-WAC
5-TLS3-YFC1-WIL11-POT
7-CMO
7-TWS
7-YAR4-PCS
4-RMS
3-WSC3-TWS4-WSC
8-WAC9-BRS10-RTD3-UFS
8-SIL
8-BCJ6-TWI
6-CMO5-IBC3-YFC
5-RAB3-TWS8-RAB
3-TLS
4-SIL
1-CMM5-SIL8-TWI6-RAB
10-TWS8-SIL
7-TTJ3-RAB6-MTN10-BGG9-IBC
7-WLC
5-LUP
OVERSEED ALL AREAS OF DISTURBANCE
9-MTN
6-RTD
23-BGG6-WLC
7-YAR
12-SIL3-YFC5-GGS
6-RGB
7-LUP
13-IBC5-CMO
5-SIL3-CMM7-RAB
4-PCS
1-DAW39-THG
7-RMW
14-RMW
13-RMW9-RTD
1-DAW
52-THG
3-WIL
26-BGG7-RMW
9-DAW
8-MCK
6-TTJ
24-LUP
10-YAR17-THG
3-ASP
EXISTING GRAND SWALE
BIO-RETENTION POND, RE: CIVIL
BI-RETENTION POND, RE: CIVIL
SPADE CUT
EDGER, TYP.
3-SIL
1-ASP
8-GLS
1-PKC
1-PKC
8-IBC
10-GLS
1-ASP
5-TTJ
4-ASP
3-ASP
2-ASP
60-PON
10-RTD
ENHANCED
BOULDER EDGE, TYP.
7-DAW3-WIL
13-RMW
2-WIL
10-MCK7-RTD38-BGG
3-GGS
3-DAW
12-WLC21-LUP
15-WSB
10-YAR
3-MTN
3-GBS5-PCS
6-WSC5-MTN
4-WLC
15-BGG11-YAR
6-WRO
7-MTN8-THG
11-DAW
11-RTD9-RMS
7-RMW31-BGG
38-BGG
21-MNS22-YAR
12-WLC
1-1/2" IRRIGATION
METER TO BE SET
INSIDE BUILDING.
3-WRO
2-YFC
9-MNS
10-WLC
10-MNS
5-RGB
BIKE RACK (6 SPOTS MINIMUM)
KEYSTONE RIDGE, OR APPROVED EQUAL
MODEL: ATLANTA BIKE RACK, 8-BIKE CAPACITY
COLOR: BURGUNDY OR APPROVED EQUAL
9-THG
3-BCJ
6-PCS
St
a
n
l
e
y
H
o
t
e
l
E
a
s
t
P
a
r
k
i
n
g
MB
2020.02.07
19125.00
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
Permit Submittal
JB, DJ
REVISION DATE
1101 Bannock Street
Denver, Colorado 80204
P 303.892.1166
www.norris-design.com
L-200
0
NORTH SCALE:1"=30'-0"
15'30'60'
1. 50% OF DECIDUOUS TREES SHALL BE 4" CAL. B&B, AND 50% OF DECIDUOUS TREES SHALL BE
2" CAL. B&B
2. ALL IRRIGATION DESIGN AND CONSTRUCTION IS TO BE COORDINATED BY THE OWNER OR
OWNER'S REPRESENTATIVE. OWNER'S APPROVAL IS REQUIRED PRIOR TO BEGINNING ANY
SITE DISTURBANCE. AS-BUILT IRRIGATION PLANS WILL BE PROVIDED PRIOR TO CERTIFICATE
OF COMPLETENESS.
3. EXISTING TREES LOCATED WITHIN 25' OF PROPERTY LINE THAT ARE GREATER THAN 4" DBH
SHALL BE PRESERVED.
NOTES
LANDSCAPE PLAN PLANT LIST
ORNAMENTAL TREES
DECIDUOUS SHRUBS - SMALL (2'-5' SPREAD)
EVERGREEN SHRUBS
PERENNIALS
ASP
CAN
QUAKING ASPEN
CANADA RED CHERRY
POPULUS TREMULOIDES
PRUNUS VIRGINIANA 'SHUBERT'
2" CAL. B&B
2" CAL. B&B
RMS
RMW
WSB
WAC
SIL
MTN
TWI
IBC
POT
MCK
GLS
ROCKY MOUNTAIN SUMAC
ROCKY MOUNTAIN STREAMBANK WILLOW
WESTERN SNOWBERRY
WAX CURRANT
SILVER BUFFALOBERRY
MOUNTAIN NINEBARK
TWINBERRY HONEYSUCKLE
IRIQUOIS BEAUTY CHOKEBERRY
PINK BEAUTY POTENTILLA
MCKAY'S WHITE POTENTILLA
GROW LOW SUMAC
RHUS GLABRA 'CISMONTANA'
SALIX MONTICOLA
SYMPHORICARPOS OCCIDENTALIS
RIBES CEREUM
SHEPERDIA ARGENTEA
PHYSOCARPUS MONOGYNUS
LONICERA INVOLUCRATA
ARONIA MELANOCARPA 'MORTON'
POTENTILLA FRUTICOSA 'PINK BEAUTY'
POTENTILLA FRUTICOSA 'MCKAY'S WHITE'
RHUS AROMATICA 'GRO LOW'
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
BCJ
TTJ
GBS
GGS
BLUE CREEPER ROCKY MOUNTAIN JUNIPER
TABLE TOP BLUE ROCKY MOUNTAIN JUNIPER
DWARF GLOBE BLUE SPRUCE
DWARF GLOBE GREEN SPRUCE
JUNIPERUS SCOPULORUM 'MONAM'
JUNIPERUS SCOPULORUM 'TABLE TOP'
PICEA PUNGENS 'GLAUCA GLOBOSA'
PICEA PUNGENS 'ROUNDABOUT'
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
PCS
WLC
YAR
LUP
MNS
POWIS CASTLE SAGE
WALKER'S LOW CATMINT
MOONSHINE YARROW
LUPINE
MAY NIGHT SALVIA
ARTEMISIA 'POWIS CASTLE'
NEPETA X FAASSENII 'WALKER'S LOW'
ACHILLEA 'MOONSHINE'
LUPINUS
SALVIA SYLVESTRIS
#1 CONT.
#1 CONT.
#1 CONT.
#1 CONT.
ORNAMENTAL GRASSES
BGG
THG
BLUE GRAMA GRASS
TUFTED HAIR GRASS
BOUTELOUA GRACILIS
DESCHAMPSIA CESPITOSA
#1 CONT.
#1 CONT.
DECIDUOUS SHRUBS - MEDIUM (5'-7' SPREAD)
DECIDUOUS SHRUBS - LARGE (7'-9' SPREAD)
CMO
TLS
YFC
BRS
RAB
WRO
TWS
UFS
RTD
WSC
DAW
RGB
CHEYENNE MOCKORANGE
THREE LEAF SUMAC
YELLOW FLOWERING CURRANT
BOULDER RASPBERRY
TALL BLUE RABBITBRUSH
WILD ROSE
TALL WESTERN SAGEBRUSH
URAL FALSE SPIREA
ISANTI RED TWIG DOGWOOD
WESTERN SAND CHERRY
DWARF ARCTIC WILLOW
ROSE GLOW BARBERRY
PHILADELPHUS LEWISII 'BLIZZARD'
RHUS TRILOBATA
RIBES AUREUM
RUBUS DELICIOSUS
ERICAMERIA NAUSEOSA SSP. NAUSEOSA
VAR. SPECIOSA
ROSA WOODSII
ARTEMISIA TRIDENTATA
SORBARIA SORBIFOLIA
CORNUS SERICEA 'ISANTI'
PRUNUS BESSEYI
SALIX PURPUREA NANA
BERBERIS THUNBERGII 'ROSE GLOW'
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
RBE
CMM
PKC
WIL
RED BERRIED ELDER
COMMON MOUNTAIN MAHOGANY
PEKING COTONEASTER
DRUMMOND WILLOW
SAMBUCUS RACEMOSA
CERCOCARPUS MONTANUS
COTONEASTER LUCIDUS
SALIX DRUMMONDIANA
#5 CONT.
#5 CONT.
#5 CONT.
#5 CONT.
MULTI-COLOR HIGH ALTITUDE MIX
20 - 40 LBS.
2 - 4 LBS.
3 - 6 LBS.
3 - 6 LBS.
5 - 10 LBS.
6 - 12 LBS.
15%
15%
25%
30%EPHRAIM CRESTED WHEATGRASS
CANADA BLUEGRASS, RUBENS
CHEWINGS FESCUE
PERENNIAL RYE
SHEEP FESCUE, MEKLENBERGER
TOTAL 100%
% OF TOTAL
10%
COMMON NAME LBS. PER ACRE
1 - 2 LBS.ROCKY MOUNTAIN WILDFLOWER MIX 5%
25
3
CONTACT :
ARKANSAS VALLEY SEED
4300 MONACO ST, DENVER, CO 80216
OR APPROVED EQUAL
FOWL BLUEGRASS 14%CANADA WILDRYE 14%TICKLEGRASS14%TUFTED HAIRGRASS 12%NEBRASKA SEDGE 8%FOWL MANNAGRASS 5%SMALL WINGED SEDGE 5%CREEPING SPIKERUSH 5%BEAKED SEDGE5%SMALL FRUITED BULRUSH 5%BALTIC RUSH4%THREE SQUARE BULRUSH 4%WOOLY SEDGE3%MEADOW RUSH1%AQUATIC SEDGE 0.5%DAGGER LEAF RUSH 0.5%
PBSI MOUNTAIN WETLAND MIX
% OF TOTALCOMMON NAME LBS. PER ACRE
100%TOTALCONTACT :
PAWNEE BUTTES SEED
605 25TH ST. GREELEY CO 80631
OR APPROVED EQUAL
10 - 20 LBS.
14%14%14%12%8%5%5%5%5%5%4%4%3%1%0.5%0.5%
1.4 - 2.8 lbs.1.4 - 2.8 lbs.1.4 - 2.8 lbs.1.2 - 2.4 lbs.0.8 -1.6 lbs.0.5 - 1.0 lbs0.5 - 1.0 lbs0.5 - 1.0 lbs0.5 - 1.0 lbs0.5 - 1.0 lbs0.4 - 0.8 lbs.0.4 - 0.8 lbs.0.3 - 0.6 lbs.0.1 - 0.2 lbs.0.05 - 0.1 lbs.0.05 - 0.1 lbs.
EVERGREEN TREES
PON PONDEROSA PINE PINUS PONDEROSA 6' HT. B&B60
ORNAMENTAL TREE
DECIDUOUS SHRUBS
EVERGREEN SHRUBS
NATIVE SEED MIX
LANDSCAPE MULCH
SPADE CUT EDGER
WETLAND SEED MIX
LEGEND
EXISTING TREE TO REMAIN
PHASE 1 LIMIT OF WORK
EXISTING BED TO REMAIN
SLEEVES FOR IRRIGATION
EXISTING GRAND SWALE
PERENNIALS
EXISTING TREE NOT IN PHASE
1 LIMIT OF WORK
EVERGREEN TREE
PARKING ISLAND AREA
TOTAL PARKING
LOT AREA TOTAL ISLAND AREA PERCENTAGE OF
PARKING LOT AREA
47,852 SF 4,794 SF 10%
24
63
38
19
52
61
49
48
56
47
21
25
51
17
20
19
50
80
71
40
230
125
45
26
36
13
48
9
38
25
77
44
37
42
1
5
5
10
G L-3006L-3005 L-3007
EXISTING LANDSCAPE
BED TO REMAIN
3-GLS5-YAR3-RGB9-BGG 2-RGB7-TWI2-CAN 8-POT8-TWI3-RGB 6-MTN3-TTJ1-ASP3-UFS8-MCK 4-BRS1-WIL1-CMM3-BCJ5-WAC3-BCJ8-WSB9-POT3-ASP7-MTN3-TTJ3-UFS3-MTN 5-BCJ3-MCK5-WSC 5-GBS4-TTJ3-GGS8-TWI 3-YFC14-LUP 3-TLS3-UFS 4-IBC 7-TLS3-GBS3-TLS3-POT3-WSC7-RGB6-WSC1-CAN 5-CMO9-MCK3-WSC8-UFS20-BGG
STEAMER PARKWAY
3-CMO3-GGS3-WSC 5-WSC 15-MTN5-IBCBOULDER AREA, RE: CIVIL LANDSCAPEBOULDERS, TYP.PHASE 1 LIMITOF WORKFUTUREDEVELOPMENT PHASE 1 LIMITOF WORKFUTUREDEVELOPMENT7-RAB20.0' WATEREASEMENT12-TTJ3-MCK6-CMO3-YFC3-RGB 7-CMO6-POT10-WSB4-IBC5-RAB 3-WSC1-RAB5-RGB7-SIL6-GBS 3-TWI3-TWS5-YFC5-TTJ5-RMS 3-ASP 5-RTD 5-DAW3-RTD5-RTD3-RMS5-TLS5-UFS3-RMS5-TWI 6-RAB5-WSB3-CMO6-RTD8-POT3-WSC3-BCJ3-YFC5-YFC3-TWS 4-ASP6-GGS3-CMO10-BGG 8-YAR 6-TTJ3-PKC6-TWS6-MCK3-RTD6-POT 5-RGB5-POT2-RMW4-TWI6-YFC3-RGB1-RBE5-RTD3-TWS10-BGG6-WAC5-TLS3-YFC1-WIL11-POT7-CMO7-TWS7-YAR4-PCS4-RMS 3-WSC3-TWS4-WSC8-WAC9-BRS10-RTD3-UFS8-SIL8-BCJ6-TWI 6-CMO5-IBC3-YFC5-RAB3-TWS8-RAB 3-TLS4-SIL1-CMM5-SIL8-TWI6-RAB10-TWS8-SIL7-TTJ3-RAB6-MTN10-BGG9-IBC 7-WLC5-LUP OVERSEED ALL AREAS OF DISTURBANCE9-MTN 6-RTD 23-BGG6-WLC7-YAR 12-SIL3-YFC5-GGS6-RGB7-LUP13-IBC5-CMO 5-SIL3-CMM7-RAB 4-PCS1-DAW39-THG 7-RMW14-RMW 13-RMW9-RTD1-DAW52-THG3-WIL
26-BGG7-RMW
9-DAW
8-MCK6-TTJ24-LUP10-YAR17-THG3-ASP EXISTING GRAND SWALE BIO-RETENTION POND, RE: CIVILBI-RETENTION POND, RE: CIVILSPADE CUTEDGER, TYP.3-SIL1-ASP 8-GLS 1-PKC1-PKC8-IBC 10-GLS1-ASP 5-TTJ4-ASP 3-ASP2-ASP60-PON 10-RTD ENHANCEDBOULDER EDGE, TYP.7-DAW3-WIL 13-RMW
2-WIL
10-MCK7-RTD38-BGG
3-GGS
3-DAW 12-WLC21-LUP15-WSB10-YAR 3-MTN3-GBS5-PCS6-WSC5-MTN4-WLC15-BGG11-YAR
6-WRO7-MTN8-THG 11-DAW11-RTD9-RMS7-RMW31-BGG38-BGG 21-MNS22-YAR12-WLC1-1/2" IRRIGATIONMETER TO BE SETINSIDE BUILDING.3-WRO 2-YFC9-MNS 10-WLC 10-MNS 5-RGBBIKE RACK (6 SPOTS MINIMUM)KEYSTONE RIDGE, OR APPROVED EQUALMODEL: ATLANTA BIKE RACK, 8-BIKE CAPACITYCOLOR: BURGUNDY OR APPROVED EQUAL 9-THG3-BCJ6-PCS Stanley Hotel East Parking
MB
2020.02.07
19125.00
333 E Wonderview Ave Estes Park, CO 80517Permit Submittal
JB, DJ
REVISION DATE1101 Bannock StreetDenver, Colorado 80204P 303.892.1166www.norris-design.com
L-200
0
NORTH SCALE:1"=30'-0"
15'30'60'
1. 50% OF DECIDUOUS TREES SHALL BE 4" CAL. B&B, AND 50% OF DECIDUOUS TREES SHALL BE
2" CAL. B&B
2. ALL IRRIGATION DESIGN AND CONSTRUCTION IS TO BE COORDINATED BY THE OWNER OR
OWNER'S REPRESENTATIVE. OWNER'S APPROVAL IS REQUIRED PRIOR TO BEGINNING ANY
SITE DISTURBANCE. AS-BUILT IRRIGATION PLANS WILL BE PROVIDED PRIOR TO CERTIFICATE
OF COMPLETENESS.
3. EXISTING TREES LOCATED WITHIN 25' OF PROPERTY LINE THAT ARE GREATER THAN 4" DBH
SHALL BE PRESERVED.
PBSI MOUNTAIN WETLAND MIX % OF TOTALCOMMON NAME LBS. PER ACRE
100%TOTALCONTACT :
PAWNEE BUTTES SEED
605 25TH ST. GREELEY CO 80631
OR APPROVED EQUAL
10 - 20 LBS.
14%14%14%12%8%5%5%5%5%5%4%4%3%1%0.5%0.5%
1.4 - 2.8 lbs.1.4 - 2.8 lbs.1.4 - 2.8 lbs.1.2 - 2.4 lbs.0.8 -1.6 lbs.0.5 - 1.0 lbs0.5 - 1.0 lbs0.5 - 1.0 lbs0.5 - 1.0 lbs0.5 - 1.0 lbs0.4 - 0.8 lbs.0.4 - 0.8 lbs.0.3 - 0.6 lbs.0.1 - 0.2 lbs.0.05 - 0.1 lbs.0.05 - 0.1 lbs.
EVERGREEN TREESPON PONDEROSA PINE PINUS PONDEROSA 6' HT. B&B60 ORNAMENTAL TREEDECIDUOUS SHRUBSEVERGREEN SHRUBSNATIVE SEED MIXLANDSCAPE MULCHSPADE CUT EDGERWETLAND SEED MIXLEGENDEXISTING TREE TO REMAINPHASE 1 LIMIT OF WORKEXISTING BED TO REMAINSLEEVES FOR IRRIGATIONEXISTING GRAND SWALEPERENNIALSEXISTING TREE NOT IN PHASE1 LIMIT OF WORKEVERGREEN TREE
PARKING ISLAND AREA
TOTAL PARKING
LOT AREA TOTAL ISLAND AREA PERCENTAGE OF
PARKING LOT AREA
47,852 SF 4,794 SF 10%
24633819526149485647212551172019508071402301254526361348938257744374215510 G L-3006L-3005 L-3007
EXISTING LANDSCAPE
BED TO REMAIN
3-GLS5-YAR3-RGB9-BGG 2-RGB7-TWI2-CAN 8-POT8-TWI3-RGB 6-MTN3-TTJ1-ASP3-UFS8-MCK 4-BRS1-WIL1-CMM3-BCJ5-WAC3-BCJ8-WSB9-POT3-ASP7-MTN3-TTJ3-UFS3-MTN 5-BCJ3-MCK5-WSC 5-GBS4-TTJ3-GGS8-TWI 3-YFC14-LUP 3-TLS3-UFS 4-IBC 7-TLS3-GBS3-TLS3-POT3-WSC7-RGB6-WSC1-CAN 5-CMO9-MCK3-WSC8-UFS20-BGG
STEAMER PARKWAY
3-CMO3-GGS3-WSC 5-WSC 15-MTN5-IBCBOULDER AREA, RE: CIVIL LANDSCAPEBOULDERS, TYP.PHASE 1 LIMITOF WORKFUTUREDEVELOPMENT PHASE 1 LIMITOF WORKFUTUREDEVELOPMENT7-RAB20.0' WATEREASEMENT12-TTJ3-MCK6-CMO3-YFC3-RGB 7-CMO6-POT10-WSB4-IBC5-RAB 3-WSC1-RAB5-RGB7-SIL6-GBS 3-TWI3-TWS5-YFC5-TTJ5-RMS 3-ASP 5-RTD 5-DAW3-RTD5-RTD3-RMS5-TLS5-UFS3-RMS5-TWI 6-RAB5-WSB3-CMO6-RTD8-POT3-WSC3-BCJ3-YFC5-YFC3-TWS 4-ASP6-GGS3-CMO10-BGG 8-YAR 6-TTJ3-PKC6-TWS6-MCK3-RTD6-POT 5-RGB5-POT2-RMW4-TWI6-YFC3-RGB1-RBE5-RTD3-TWS10-BGG6-WAC5-TLS3-YFC1-WIL11-POT7-CMO7-TWS7-YAR4-PCS4-RMS 3-WSC3-TWS4-WSC8-WAC9-BRS10-RTD3-UFS8-SIL8-BCJ6-TWI 6-CMO5-IBC3-YFC5-RAB3-TWS8-RAB 3-TLS4-SIL1-CMM5-SIL8-TWI6-RAB10-TWS8-SIL7-TTJ3-RAB6-MTN10-BGG9-IBC 7-WLC5-LUP OVERSEED ALL AREAS OF DISTURBANCE9-MTN 6-RTD
23-BGG6-WLC
7-YAR
12-SIL3-YFC5-GGS
6-RGB
7-LUP
13-IBC5-CMO
5-SIL3-CMM7-RAB
4-PCS
1-DAW39-THG
7-RMW
14-RMW
13-RMW9-RTD
1-DAW
52-THG
3-WIL
26-BGG7-RMW
9-DAW
8-MCK
6-TTJ
24-LUP
10-YAR17-THG
3-ASP
EXISTING GRAND SWALE
BIO-RETENTION POND, RE: CIVIL
BI-RETENTION POND, RE: CIVILSPADE CUTEDGER, TYP.3-SIL1-ASP
8-GLS
1-PKC1-PKC8-IBC 10-GLS1-ASP 5-TTJ4-ASP
3-ASP
2-ASP60-PON
10-RTD
ENHANCEDBOULDER EDGE, TYP.
7-DAW3-WIL
13-RMW
2-WIL
10-MCK7-RTD38-BGG
3-GGS
3-DAW
12-WLC21-LUP
15-WSB
10-YAR
3-MTN
3-GBS5-PCS
6-WSC5-MTN
4-WLC
15-BGG11-YAR
6-WRO
7-MTN8-THG 11-DAW11-RTD9-RMS7-RMW31-BGG38-BGG 21-MNS22-YAR12-WLC1-1/2" IRRIGATIONMETER TO BE SETINSIDE BUILDING.3-WRO 2-YFC
9-MNS
10-WLC
10-MNS 5-RGBBIKE RACK (6 SPOTS MINIMUM)KEYSTONE RIDGE, OR APPROVED EQUALMODEL: ATLANTA BIKE RACK, 8-BIKE CAPACITYCOLOR: BURGUNDY OR APPROVED EQUAL 9-THG3-BCJ
6-PCS
Stanley Hotel East Parking
MB
2020.02.07
19125.00
333 E Wonderview Ave Estes Park, CO 80517
Permit Submittal
JB, DJ
REVISION DATE
1101 Bannock StreetDenver, Colorado 80204P 303.892.1166www.norris-design.com
L-200
0
NORTH SCALE:1"=30'-0"
15'30'60'
1. 50% OF DECIDUOUS TREES SHALL BE 4" CAL. B&B, AND 50% OF DECIDUOUS TREES SHALL BE
2" CAL. B&B
2. ALL IRRIGATION DESIGN AND CONSTRUCTION IS TO BE COORDINATED BY THE OWNER OR
OWNER'S REPRESENTATIVE. OWNER'S APPROVAL IS REQUIRED PRIOR TO BEGINNING ANY
SITE DISTURBANCE. AS-BUILT IRRIGATION PLANS WILL BE PROVIDED PRIOR TO CERTIFICATE
OF COMPLETENESS.
3. EXISTING TREES LOCATED WITHIN 25' OF PROPERTY LINE THAT ARE GREATER THAN 4" DBH
SHALL BE PRESERVED.
NOTES
LANDSCAPE PLAN PLANT LISTORNAMENTAL TREESDECIDUOUS SHRUBS - SMALL (2'-5' SPREAD)EVERGREEN SHRUBSPERENNIALSASPCANQUAKING ASPENCANADA RED CHERRY POPULUS TREMULOIDESPRUNUS VIRGINIANA 'SHUBERT'2" CAL. B&B2" CAL. B&BRMSRMWWSBWACSILMTNTWIIBCPOTMCKGLSROCKY MOUNTAIN SUMACROCKY MOUNTAIN STREAMBANK WILLOWWESTERN SNOWBERRYWAX CURRANTSILVER BUFFALOBERRYMOUNTAIN NINEBARKTWINBERRY HONEYSUCKLEIRIQUOIS BEAUTY CHOKEBERRYPINK BEAUTY POTENTILLAMCKAY'S WHITE POTENTILLAGROW LOW SUMAC RHUS GLABRA 'CISMONTANA'SALIX MONTICOLASYMPHORICARPOS OCCIDENTALISRIBES CEREUMSHEPERDIA ARGENTEAPHYSOCARPUS MONOGYNUSLONICERA INVOLUCRATAARONIA MELANOCARPA 'MORTON'POTENTILLA FRUTICOSA 'PINK BEAUTY'POTENTILLA FRUTICOSA 'MCKAY'S WHITE'RHUS AROMATICA 'GRO LOW'#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.BCJTTJGBSGGS BLUE CREEPER ROCKY MOUNTAIN JUNIPERTABLE TOP BLUE ROCKY MOUNTAIN JUNIPERDWARF GLOBE BLUE SPRUCEDWARF GLOBE GREEN SPRUCE JUNIPERUS SCOPULORUM 'MONAM'JUNIPERUS SCOPULORUM 'TABLE TOP'PICEA PUNGENS 'GLAUCA GLOBOSA'PICEA PUNGENS 'ROUNDABOUT'#5 CONT.#5 CONT.#5 CONT.#5 CONT.PCSWLCYARLUPMNS POWIS CASTLE SAGEWALKER'S LOW CATMINTMOONSHINE YARROWLUPINEMAY NIGHT SALVIA ARTEMISIA 'POWIS CASTLE'NEPETA X FAASSENII 'WALKER'S LOW'ACHILLEA 'MOONSHINE'LUPINUSSALVIA SYLVESTRIS #1 CONT.#1 CONT.#1 CONT.#1 CONT.ORNAMENTAL GRASSESBGGTHGBLUE GRAMA GRASSTUFTED HAIR GRASS BOUTELOUA GRACILISDESCHAMPSIA CESPITOSA #1 CONT.#1 CONT.DECIDUOUS SHRUBS - MEDIUM (5'-7' SPREAD)DECIDUOUS SHRUBS - LARGE (7'-9' SPREAD)CMOTLSYFCBRSRABWROTWSUFSRTDWSCDAWRGB CHEYENNE MOCKORANGETHREE LEAF SUMACYELLOW FLOWERING CURRANTBOULDER RASPBERRYTALL BLUE RABBITBRUSHWILD ROSETALL WESTERN SAGEBRUSHURAL FALSE SPIREAISANTI RED TWIG DOGWOODWESTERN SAND CHERRYDWARF ARCTIC WILLOWROSE GLOW BARBERRY PHILADELPHUS LEWISII 'BLIZZARD'RHUS TRILOBATARIBES AUREUMRUBUS DELICIOSUSERICAMERIA NAUSEOSA SSP. NAUSEOSAVAR. SPECIOSAROSA WOODSIIARTEMISIA TRIDENTATASORBARIA SORBIFOLIACORNUS SERICEA 'ISANTI'PRUNUS BESSEYISALIX PURPUREA NANABERBERIS THUNBERGII 'ROSE GLOW'#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.#5 CONT.RBECMMPKCWIL RED BERRIED ELDERCOMMON MOUNTAIN MAHOGANYPEKING COTONEASTERDRUMMOND WILLOW SAMBUCUS RACEMOSACERCOCARPUS MONTANUSCOTONEASTER LUCIDUSSALIX DRUMMONDIANA #5 CONT.#5 CONT.#5 CONT.#5 CONT.MULTI-COLOR HIGH ALTITUDE MIX 20 - 40 LBS.2 - 4 LBS.3 - 6 LBS.3 - 6 LBS.5 - 10 LBS.6 - 12 LBS.15%15%25%30%EPHRAIM CRESTED WHEATGRASSCANADA BLUEGRASS, RUBENSCHEWINGS FESCUEPERENNIAL RYESHEEP FESCUE, MEKLENBERGER TOTAL 100%% OF TOTAL10%COMMON NAME LBS. PER ACRE1 - 2 LBS.ROCKY MOUNTAIN WILDFLOWER MIX 5%253 CONTACT :
ARKANSAS VALLEY SEED
4300 MONACO ST, DENVER, CO 80216
OR APPROVED EQUAL
FOWL BLUEGRASS 14%CANADA WILDRYE 14%TICKLEGRASS 14%TUFTED HAIRGRASS 12%NEBRASKA SEDGE 8%FOWL MANNAGRASS 5%SMALL WINGED SEDGE 5%CREEPING SPIKERUSH 5%BEAKED SEDGE 5%SMALL FRUITED BULRUSH 5%BALTIC RUSH 4%THREE SQUARE BULRUSH 4%WOOLY SEDGE 3%MEADOW RUSH 1%AQUATIC SEDGE 0.5%DAGGER LEAF RUSH 0.5%
PBSI MOUNTAIN WETLAND MIX
% OF TOTALCOMMON NAME LBS. PER ACRE
100%TOTALCONTACT :
PAWNEE BUTTES SEED
605 25TH ST. GREELEY CO 80631
OR APPROVED EQUAL
10 - 20 LBS.
14%14%14%12%8%5%5%5%5%5%4%4%3%1%0.5%0.5%
1.4 - 2.8 lbs.1.4 - 2.8 lbs.1.4 - 2.8 lbs.1.2 - 2.4 lbs.0.8 -1.6 lbs.0.5 - 1.0 lbs0.5 - 1.0 lbs0.5 - 1.0 lbs0.5 - 1.0 lbs0.5 - 1.0 lbs0.4 - 0.8 lbs.0.4 - 0.8 lbs.0.3 - 0.6 lbs.0.1 - 0.2 lbs.0.05 - 0.1 lbs.0.05 - 0.1 lbs.
EVERGREEN TREESPON PONDEROSA PINE PINUS PONDEROSA 6' HT. B&B60 ORNAMENTAL TREEDECIDUOUS SHRUBSEVERGREEN SHRUBSNATIVE SEED MIXLANDSCAPE MULCHSPADE CUT EDGERWETLAND SEED MIXLEGENDEXISTING TREE TO REMAINPHASE 1 LIMIT OF WORKEXISTING BED TO REMAINSLEEVES FOR IRRIGATIONEXISTING GRAND SWALEPERENNIALSEXISTING TREE NOT IN PHASE1 LIMIT OF WORKEVERGREEN TREE
PARKING ISLAND AREA
TOTAL PARKING
LOT AREA TOTAL ISLAND AREA PERCENTAGE OF
PARKING LOT AREA
47,852 SF 4,794 SF 10%
24633819526149485647212551172019508071402301254526361348938257744374215510
L-300
6
L-300
5
L-300
7
EXISTING LANDSCAPE
BED TO REMAIN
3-GLS5-YAR
3-RGB
9-BGG
2-RGB7-TWI2-CAN
8-POT
8-TWI3-RGB 6-MTN
3-TTJ1-ASP
3-UFS8-MCK
4-BRS
1-WIL
1-CMM3-BCJ
5-WAC
3-BCJ
8-WSB
9-POT
3-ASP7-MTN
3-TTJ
3-UFS
3-MTN
5-BCJ3-MCK
5-WSC
5-GBS4-TTJ
3-GGS8-TWI 3-YFC
14-LUP
3-TLS
3-UFS
4-IBC
7-TLS
3-GBS3-TLS3-POT
3-WSC7-RGB
6-WSC
1-CAN
5-CMO
9-MCK3-WSC8-UFS
20-BGG
STEAMER PARKWAY
3-CMO
3-GGS
3-WSC
5-WSC
15-MTN
5-IBC
BOULDER AREA, RE: CIVIL
LANDSCAPE
BOULDERS, TYP.
PHASE 1 LIMIT
OF WORK
FUTURE
DEVELOPMENT
PHASE 1 LIMIT
OF WORK
FUTURE
DEVELOPMENT
7-RAB
20.0' WATER
EASEMENT
12-TTJ3-MCK6-CMO
3-YFC3-RGB
7-CMO6-POT
10-WSB4-IBC
5-RAB 3-WSC1-RAB5-RGB
7-SIL6-GBS
3-TWI3-TWS
5-YFC
5-TTJ5-RMS
3-ASP
5-RTD
5-DAW3-RTD
5-RTD
3-RMS5-TLS5-UFS
3-RMS5-TWI
6-RAB5-WSB
3-CMO
6-RTD8-POT3-WSC
3-BCJ3-YFC5-YFC
3-TWS
4-ASP6-GGS
3-CMO10-BGG
8-YAR
6-TTJ3-PKC6-TWS6-MCK
3-RTD6-POT
5-RGB5-POT
2-RMW
4-TWI6-YFC3-RGB1-RBE
5-RTD
3-TWS10-BGG
6-WAC
5-TLS3-YFC1-WIL11-POT
7-CMO
7-TWS
7-YAR4-PCS
4-RMS
3-WSC3-TWS4-WSC
8-WAC9-BRS10-RTD3-UFS
8-SIL
8-BCJ6-TWI
6-CMO5-IBC3-YFC
5-RAB3-TWS8-RAB
3-TLS
4-SIL
1-CMM5-SIL8-TWI6-RAB
10-TWS8-SIL
7-TTJ3-RAB6-MTN10-BGG9-IBC
7-WLC
5-LUP
OVERSEED ALL AREAS OF DISTURBANCE
9-MTN
6-RTD
23-BGG6-WLC
7-YAR
12-SIL3-YFC5-GGS
6-RGB
7-LUP
13-IBC5-CMO
5-SIL3-CMM7-RAB
4-PCS
1-DAW39-THG
7-RMW
14-RMW
13-RMW9-RTD
1-DAW
52-THG
3-WIL
26-BGG7-RMW
9-DAW
8-MCK
6-TTJ
24-LUP
10-YAR17-THG
3-ASP
EXISTING GRAND SWALE
BIO-RETENTION POND, RE: CIVIL
BI-RETENTION POND, RE: CIVIL
SPADE CUT
EDGER, TYP.
3-SIL
1-ASP
8-GLS
1-PKC
1-PKC
8-IBC
10-GLS
1-ASP
5-TTJ
4-ASP
3-ASP
2-ASP
60-PON
10-RTD
ENHANCED
BOULDER EDGE, TYP.
7-DAW3-WIL
13-RMW
2-WIL
10-MCK7-RTD38-BGG
3-GGS
3-DAW
12-WLC21-LUP
15-WSB
10-YAR
3-MTN
3-GBS5-PCS
6-WSC5-MTN
4-WLC
15-BGG11-YAR
6-WRO
7-MTN8-THG
11-DAW
11-RTD9-RMS
7-RMW31-BGG
38-BGG
21-MNS22-YAR
12-WLC
1-1/2" IRRIGATION
METER TO BE SET
INSIDE BUILDING.
3-WRO
2-YFC
9-MNS
10-WLC
10-MNS
5-RGB
BIKE RACK (6 SPOTS MINIMUM)
KEYSTONE RIDGE, OR APPROVED EQUAL
MODEL: ATLANTA BIKE RACK, 8-BIKE CAPACITY
COLOR: BURGUNDY OR APPROVED EQUAL
9-THG
3-BCJ
6-PCS
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING HEREIN SHALL NOT BE
DUPLICATED, DISCLOSED OR OTHERWISE
USED WITHOUT THE WRITTEN CONSENT
OF MOA ARCHITECTURE
6/
1
9
/
2
0
1
9
4
:
1
0
:
1
9
P
M
St
a
n
l
e
y
H
o
t
e
l
E
a
s
t
P
a
r
k
i
n
g
MB
2020.02.07
19125.00
33
3
E
W
o
n
d
e
r
v
i
e
w
A
v
e
E
s
t
e
s
P
a
r
k
,
C
O
8
0
5
1
7
Permit Submittal
JB, DJ
REVISION DATE
1101 Bannock Street
Denver, Colorado 80204
P 303.892.1166
www.norris-design.com
LANDSCAPE PLAN
L-200
0
NORTH SCALE:1"=30'-0"
15'30'60'
PBSI MOUNTAIN WETLAND MIX
% OF TOTALCOMMON NAME LBS. PER ACRE
100%TOTALCONTACT :
PAWNEE BUTTES SEED
605 25TH ST. GREELEY CO 80631
OR APPROVED EQUAL
10 - 20 LBS.
14%14%14%12%8%5%5%5%5%5%4%4%3%1%0.5%0.5%
1.4 - 2.8 lbs.1.4 - 2.8 lbs.1.4 - 2.8 lbs.1.2 - 2.4 lbs.0.8 -1.6 lbs.0.5 - 1.0 lbs0.5 - 1.0 lbs0.5 - 1.0 lbs0.5 - 1.0 lbs0.5 - 1.0 lbs0.4 - 0.8 lbs.0.4 - 0.8 lbs.0.3 - 0.6 lbs.0.1 - 0.2 lbs.0.05 - 0.1 lbs.0.05 - 0.1 lbs.
EVERGREEN TREES
PON PONDEROSA PINEPINUS PONDEROSA 6' HT. B&B60
ORNAMENTAL TREE
DECIDUOUS SHRUBS
EVERGREEN SHRUBS
NATIVE SEED MIX
LANDSCAPE MULCH
SPADE CUT EDGER
WETLAND SEED MIX
LEGEND
EXISTING TREE TO REMAIN
PHASE 1 LIMIT OF WORK
EXISTING BED TO REMAIN
SLEEVES FOR IRRIGATION
EXISTING GRAND SWALE
PERENNIALS
EXISTING TREE NOT IN PHASE
1 LIMIT OF WORK
EVERGREEN TREE
PARKING ISLAND AREA
TOTAL PARKING
LOT AREA TOTAL ISLAND AREA PERCENTAGE OF
PARKING LOT AREA
47,852 SF 4,794 SF 10%
24
63
38
19
52
61
49
48
56
47
21
25
51
17
20
19
50
80
71
40
230
125
45
26
36
13
48
9
38
25
77
44
37
42
1
5
5
10
212
8CARRIAGE HOUSE ELEVATIONS
MOA ARCHITECTURE04.20.2020 Stanley Hotel Carriage House EXTERIOR ELEVATIONS
A-201333 E Wonderview Ave Estes Park, CO 80517
1/8" = 1'-0"
EAST ELEVATION4
1/8" = 1'-0"
SOUTH ELEVATION1
1/8" = 1'-0"
NORTH ELEVATION3
MOA ARCHITECTURE04.20.2020 Stanley Hotel Carriage House EXTERIOR ELEVATIONS
A-201333 E Wonderview Ave Estes Park, CO 80517
1/8" = 1'-0"
EAST ELEVATION4
1/8" = 1'-0"
WEST ELEVATION2
CERTAINTEED LANDMARK
COLOR: COTTAGE RED
CEDAR BEVELED SIDING
CARRIAGE HOUSE ELEVATIONS
213
9
HISTORIC VIEW
HOTEL LODGE CONCERT HALL CARRIAGE HOUSE
HISTORICAL CONTEXT
214
10HISTORIC PHOTOS
215
11POST RESTAURANT ENTRY VIEW
216
12POST RESTAURANT SOUTHWEST VIEW
217
13POST RESTAURANT NORTH VIEW
218
14
MEMO
TO: MOA Architecture, The Stanley (Grand Heritage Hotels)
CC: Town of Estes Park Planning Department
FROM: Cindy Nasky, Director of Preservation Programs
Colorado Historical Foundation
DATE: July 24, 2019
RE: Proposed Film Center at The Stanley
Introduction: A special meeting of the Preservation Easement Committee of the Colorado Historical
Foundation was held at 10:00 am on July 10, 2019 in the offices of MOA Architecture, 414 14th Street in
Denver. The purpose of the meeting was to review the conceptual plans for the Stanley Film Center, to
be located within the Stanley Historic District. The Colorado Historical Foundation holds three deeds of
easement on this property.
Following the presentation, the Committee agreed that, conceptually, the proposed project is
acceptable in terms of location and massing per the standard easement language and the Secretary of
the Interior Standards for new buildings within historic districts. The committee offers the following
design suggestions for consideration:
Materials and Building Design (Overall)
• Simplification – The historic buildings within the district are simple in ornament and detail; the
new building roofline, planes and fenestration are quite complex (“busy”) and thus draw
attention. Consider simplifying the new roofline and the fenestration to be less mimicking of the
original buildings.
• Gapping - The original pattern of “Hotel/Manor/Concert/Carriage” is a series of buildings and
gaps and the current detailing of the proposed film center fills that last gap. In addition to the
complexity of both the massing and the fenestration, the mimicking of the color palette (with
the white walls and red roofs) contributes to that lack of separation and the unwanted “filling of
the gap.” Therefore, if this color scheme is applied, the connections to the adjacent buildings
will need to provide a strong visual sense of gapping.
• Connections - According to Secretary of the Interior Standards for new buildings and infill,
connection of new building should be light and a ‘soft touch’ to the historic buildings – the
current connection to the Concert Hall is more successful than the connection to the Carriage
House – consider a more transparent material or smaller scale for the new connection.
• East elevation – The east elevation of the new building feels quite contemporary and busy; calm
down the elements by ‘flattening’ out and/or eliminating extra planes. Currently, it feels
institutional. – consider a simple plane for the façade and a form and mass that complements
the building’s other components.
• “Ground” – Visually ground the new buildings so that they feel rooted – like the hotel and
manor house bases – consider different materials as the ‘base,’ either extending the same wall
or using a material different from the historic materials.
• Carriage House Exterior Walls – The Carriage House walls will be rebuilt due to severe alteration
and structural compromise over the years (namely garage to motel transition). The finished
design should reflect not only the historic ‘pattern’ of the garage doors on the south elevation
(main façade), but also the historic horizontal wood siding, corner detail and coursing rail where
the garage doors hung.
• Carriage House Terrace - Handrail as proposed is too “solid” and visually abrupt – if possible,
there should not be a fence/rail/wall here as it interrupts the visual access to the building and
introduces an element that was never there. The rock wall at the bottom was not historic
(visually there was never such a sharp line).
Landscaping and Hardscaping
• Site Entry – Change the contour of easternmost parking lot and/or add a berm to alleviate the
parking lot site-line upon entrance to The Stanley. Perhaps direct drainage more to the center
island for water quality instead of to basins at the side of the parking area or to make the basins
smaller.
• Planting Density & Visual Buffers – there seemed to be a lot of planting clusters associated with
the new parking area. Traditionally, the site was open space with native grasses, groupings of
forbs (herbaceous flowering plants), hardy trees and topography.
• The Retaining Wall - The courtyard introduces new hardscape elements; suggested
simplification in a simple wall designed as part of the architecture as was done historically and
with recent modifications to the original buildings. The proposed terrace conflicts with the
simplicity of the historic entry approach. Consider integrating the stairs with the terrace wall
and landscape.
Conclusion: Following the presentation, the committee consensus was that the location and massing as
proposed were excellent. The above suggestions are offered as ways to further enhance the design
success of this addition to the historic district. We encourage their consideration and implementation.
Foundation staff and professional design members of the committee look forward to reviewing the
working construction drawings for the Film Center as they are developed.
The Foundation appreciates The Stanley, MOA Architecture and the Town of Estes Park for their
partnership and recognizes that there are other stakeholders with competing interests at play in this
project.
As always, if you need clarification or would like to discuss any of these suggestions in more detail,
please contact Cindy Nasky, Director of Preservation Programs at the Foundation.
“I think all is going well there and we’ve done a really good job of
preserving the core elements of the building and preserving what
could be saved. The basement function and the restaurant tenancy will
give it to economic life that will self preserve it for the long run.”
Cindy Nasky
Colorado Historical Foundation
August 10, 2020
CHF SUPPORT
219
15CURRENT CONSTRUCTION STATUS
East Side of Carriage House
220
16CURRENT CONSTRUCTION STATUS
Sout/East Sides of Carriage House
221
17CURRENT CONSTRUCTION STATUS
North Side of Carriage House
222
18
Lower Parking Lot Looking South
CURRENT CONSTRUCTION STATUS
223
19
Upper Parking Lot Looking North
CURRENT CONSTRUCTION STATUS
224
20POST RESTAURANT FLOOR PLAN
225
21RESTAURANT PERMITTED USE BY ZONE
226
22EAST QUADRANT RENDERING
227
23SOUTH QUADRANT RENDERING
228
24CARRIAGE HOUSE EAST
229
25CARRIAGE HOUSE SOUTH
230
26CARRIAGE HOUSE WEST
231
27TIS & PARKING OPERATIONS PLANS
Original Date: April 6, 2020
Updated Date: July 8, 2020
Submitted To:
MOA ARCHITECTURE
414 14th Street, Suite 300
Denver, CO 80202
Submitted By:
Fox Tuttle Transportation Group, LLC
1624 Market Street, Suite 202
Denver, CO 80202
The Stanley Hotel:
Carriage House
Traffic Impact Analysis
232
28STANLEY CAMPUS PARKING DIAGRAM
HC
LOT A
49
LOT E
32, 2 HC
LOT F
30, 2 HC
LOT G
44
LOT H-1
14, 4 HC
LOT H-2
38
LOT J-1
11
LOT J-2
29, 2 HC
LOT B
62, 4 HC
STAFF PARK-
ING
53
LOT C-1
34
LOT C-2
28, 1 HC
LOT D
35
LOT C-3
5 HC
LOT J-3
24
STEAMER PARKWAY
FI
N
D
L
E
Y
C
O
U
R
T
HC - HANDICAP 483 REGULAR SPACES
20 HANDICAP SPACES
503 TOTAL SPACES
233
29
ACCESSIBLE PARKING
AND BUILDING
ACCESS ROUTE
ACCESSIBLE PARKING
AND BUILDING
ACCESS ROUTE
SHUTTLE DROP
OFF ZONE
BIKE
RACKS
ACCESSIBLE SHUTTLE BICYCLEPEDESTRIAN
SIDEWALK LOCATION DIAGRAM
234
30REQUESTED SIDEWALK LOCATIONS
235
236
Carriage House TRC Narrative 3 May 27, 2020
The Stanley Carriage House – Design Narrative
This TRC review package includes the review of the Stanley Carriage House for conformance with
surrounding site improvements. The Carriage House has submitted for, and received construction
permits for the Footings/Foundation and Building Enclosure via Town of Estes Park Construction Permit
B-11186 for the Carriage House Foundation and Enclosure Project. Additionally, the parking and
landscape development directly to the east of the Carriage House has submitted for, and received
construction permits per Town of Estes Park Construction Permit B-11160 for the East Parking Project.
As such, the parking and landscape area to the east of the Carriage House is not part of the TRC approval
review.
The Stanley Carriage House, where the famous Stanley Steamer vehicles were stored is currently in the
process of renovation and reconstruction. Built as a garage in 1905, the approximately 5,000 square-
foot building was also briefly used as a 26-room motel in the 1960’s. It has been used as a storage shed
ever since then. The Carriage House is the last Stanley building left to be fully renovated and preserved
since Grand Heritage Hotel Group bought the hotel 25-years ago.
One of the main difficulties with the Carriage House is that F.O. Stanley built it without a foundation
underneath and due to the current building codes, renovation of the building required appropriate
foundations. In order to preserve the building and allow renovations, the roof has been lifted off the
structure and set to the side. A foundation is currently under construction, and once completed, the
roof put back on. In this way, the foundation can be added to allow renovations to the building while
also preserving the historical core structure.
The Carriage House is an important part of the F. O. Stanley legacy and a key goal is to maintain the
building substantially as he designed. Historic and recycled materials are being used throughout the
project, including historically correct and energy-efficient glass placed where the garage doors to the
Carriage House for the Stanley Steamers were once located. But far more than just preserving an
important piece of Estes Park and Stanley Hotel history, the project is a large investment in economic
development in Estes Park.
The main floor of the Carriage House will house a restaurant tenant. Grand Heritage Hotel Group has
reached a tenant agreement with the Post Brewery. Post Brewery is associated with The Big Red F
Company, formed in 1994 by Chef Dave Query of Boulder. The restaurant is designed to accommodate
129 seats indoors, with an additional 110 seats on an outdoor patio.
The restaurant facility has been anticipated in coordination with site infrastructure, parking, and traffic.
The restaurant use was included in the Traffic Impact Study for the Stanley Film Center and Carriage
House as well as the Parking and Operations Plan for the Stanley Film Center and Carriage House. Those
documents are included as part of the TRC review package.
237
Carriage House TRC Narrative 4 May 27, 2020
The Stanley Carriage House – Allowed Use by Stanley Historic District Master Plan
The following correspondence to Mr. Randy Hunt, Community Development Director for the Town of
Estes Park, describes the Use as Allowed by the Stanley Historic District Master Plan for the restaurant
function within the Carriage House. Following MOA Architectures letter is the response received from
Mr. Hunt.
238
Carriage House TRC Narrative 5 May 27, 2020
239
Carriage House TRC Narrative 6 May 27, 2020
240
Carriage House TRC Narrative 7 May 27, 2020
The Stanley Film and Performing Arts Center – Colorado Historic Foundation Review
MOA Architecture coordinated extensively with the Colorado Historical Foundation on the design of the
Carriage House renovation and redevelopment. Following is correspondence provided during their
review process. In recent correspondence with Cindy Nasky, Colorado Historical Foundation Director of
Preservation Program regarding the exterior Carriage House design and window fenestration, Cindy
stated, “I think the windows are appropriate and quite nice.”
The following is correspondence of the Colorado Historical Foundations review of the Stanley Film
Center and Carriage House renovation/redevelopment design.
241
Carriage House TRC Narrative 8 May 27, 2020
242
Carriage House TRC Narrative 9 May 27, 2020
243
244
Estes Park Planning Commission Public Comment Form
The Planning Commission wants to hear from members of the community. The following
form was created for public comment on any current agenda items.
The Planning Commission will participate in the meeting remotely due to the Declaration of
Emergency signed by Town Administrator Machalek on March 19, 2020 related to COVID-19
and provided for with the adoption of Ordinance 04-20 on March 18, 2020.
Please enter your full name. (This information is required to ensure the Town keeps accurate records of public
comment.
Name *
Radio Button
Agenda Item Title
Public comment can be attached using the Upload button below or typed into the text box below.
Edward A Hayek
For Against Neutral
Carriage House.
If you do not see the Agenda Item Title please email public comment to planning@estes.org.
245
File Upload
Comments for the
Planning
Commission:*
Please note, all information provided in this form is considered public record and will be included as permanent record for
the item which it references.
If you have documents to include with your public comment they can be attached here.
Stanley Carriage House Technical Review
Committee Meeting Comment.docx 16.25KB
IMG_2423.jpg 128.93KB
IMG_2431.jpg 126.88KB
IMG_2435.jpg 151.66KB
Scan0034.pdf 472.55KB
25 MB limit.
Limited to a maximum of 1000 characters.
To The Technical Review Committee
Uploaded please find our Public Comment letter and supporting photos. Briefly, our
submission request is three-fold. 1)restrict through traffic in this parking lot. 2)Revise
improve berms to be effective screening from noise and headlights. 3) Effective
screening to hide the obnoxious utility box.
Thank you.
246
Stanley Carriage House Technical Review Committee Meeting Comment.
We appreciate the opportunity to address the TRC regarding this Carriage House development.
We feel there should have been an initial public input TRC meeting regarding all aspects of this
project. The parking lot plan is devastating in its impact on our home. Lights from traffic in
either direction shine directly into our living room as currently designed. Even though the
project is only feet from our home, there was never solicitation of neighbor input.
We have met with representatives from Public Works at the work site and home. Should you
need validation of what we are saying, we believe they can substantiate the massive impact this
project as designed will have on our home. We have also attached several photographs to
demonstrate this intrusion from our living room. Some berms are included along with a
promise of significant vegetation. It appears they will be inadequate to provide screening of
traffic flow unless significantly higher. In addition, Estes Park Utilities installed a huge,
obnoxious, electrical box just beyond our lot line.
Our request of the TRC is three-fold. 1) That an approved traffic plan for this parking lot restrict
travel into the parking lot, to lot parking, or servicing the Carriage House and proposed Film
Center only, not as a conduit for through traffic to other areas of the Stanley Campus. 2)
Revise/improve the berm in progress to be effective, including the addition of hardscape when
necessary, as was used by the Stanley for their guests at the Aspire. 3) Provide
berm/fencing/vegetation that totally and effectively hides the view of the Electrical box from
the East. Each is addressed in following paragraphs.
Traffic Plan The Current Applications documentation for the Carriage House doesn’t specifically
address traffic through the parking lot. Our concern stems from depictions of structures once
the film center is built. In those renditions, the street currently carrying traffic to the upper
campus areas appears to be eliminated. If that is the case, where will the traffic go? Traffic
should continue to be routed to the interior of the campus. The noisy Harley’s and loud trucks
are going to the Stanley, and for the benefit of the Stanley. The noise should not be rerouted to
the perimeter to be borne by neighbors who derive no benefit. Can you imagine what a group
of Harley’s charging up the hill would sound like from a deck a few feet away? It would be
unlivable. Please restrict traffic in any approved plan.
Parking Lot Operations Screening. When the Carriage House project was announced in the
newspaper, I inquired of Community Development if there was any associated parking, as we
had heard nothing. Learning of this massive and intrusive project, I sent notification to all the
HOA neighbors alerting them to the project. Mr. Cullen was included, as he owned two homes
on Findley Ct. He responded with a letter to the neighborhood (copy attached w/other
recipients address removed) implying he would spend money to make sure the development
was properly screened from the neighbors. This generous offer used the Aspire as an example
of what he could do, and stated he was willing to replicate that type of full and natural
247
landscaping along the entire border between the Stanley and Findley Ct. (Note that the Aspire
used fencing hardscape in areas to provide protection). Specific issues. To the Southwest, the
natural grade has been raised several feet for the parking lot, and the berm moved to the East
away from the parking, rendering the berm useless in line of sight protection from any
oncoming headlights. (See the picture of me on a ladder by the Electrical box and the
construction trailer in the background where parking and traffic will occur). It will take at least
eight feet of hardscape to shield this traffic, trees and vegetation are welcome and desirable
but they can’t effectively screen at the level of density required here. To the Northwest, The
project manager stated there will be a berm in this area to join the berm existing across from
our property to one farther North. We are concerned by the fact that all the other berm areas
have been at least partially completed, but there has been no material added here. Please view
photo again on a ladder that implies the berm or other hardscape should be at least eight feet
high to shield headlights coming from the North. The berm directly behind us would appear
adequate to shield headlights of vehicles head in parking there. It is the traffic traveling
through the parking lot in either direction we are concerned about. (We do question whether
the quality of the material would support any kind of vegetation, another reason we stress
hardscape).
We also stress hardscape as a solid deterrent to Stanley customers being able to access our
properties. One can imagine someone having had a good time, deciding to relieve themselves
in the bushes before getting into their car for a trip home. We request a continuous area
behind neighboring homes of some combination of berm and fencing approximately eight feet
high, softened by vegetation, including some significant trees, as proposed in the original
landscape plan. Earlier in the project, we had several interactions with Jack Mousseau, of MOA
Architecture, as requested by Mr. Cullen. In those discussions several attractive solutions using
a combination of materials were proposed. We ask that use of hardscape, such as fencing, to
be an option if necessary, to render an effective screening barrier. Due to elevation increase as
you move up Findley Ct., and given that the view is up to the mountains, not Safeway, more
large trees would appear to be desirable and not an issue as has been suggested.
Electrical Box. As stated previously sufficient berm/fencing/vegetation to totally hide this
obnoxious box from the neighborhood. Photos speak for themselves.
We invested significant retirement assets to live in such a beautiful area. We were not naïve,
visiting with the Community Development Director at the time, and reviewed the Stanley
Historic District Master Plan with him. The language in the document regarding views and
screening from Stanley operations, the protections of a Technical Review Committee, plus the
attachment of a development plan showing significant open space between any residential
units and parking for the Cultural Arts Center, made us comfortable moving forward with the
purchase of our retirement home. (Note that this was not a predetermined parking lot as has
been stated. When the Wellness Center proposal was criticized for cutting off wildlife
movement, the Stanley rendered a site plan that labeled the area the Upper Wildlife Corridor.
248
A realtor from the time has stated, residential lots on Findley Ct. were sold with rosy picture of
open area downplaying any potential for development.)
We respectfully ask this Technical Review Committee to help mitigate the impact of this project
on our homes by incorporating our requests into a final approved operating plan. In relation to
the total project, these additions are minimal, but will substantially accomplish promised
objectives. While minimal for the developer, they have a huge impact on our enjoyment of our
home for the rest of our lives.
Thank you.
Ed and Marlene Hayek
611 Findley Ct.
249
250
251
252
253
Estes Park Planning Commission Public Comment Form
The Planning Commission wants to hear from members of the community. The following
form was created for public comment on any current agenda items.
The Planning Commission will participate in the meeting remotely due to the Declaration of
Emergency signed by Town Administrator Machalek on March 19, 2020 related to COVID-19
and provided for with the adoption of Ordinance 04-20 on March 18, 2020.
Please enter your full name. (This information is required to ensure the Town keeps accurate records of public
comment.
Name *
Radio Button
Agenda Item Title
Public comment can be attached using the Upload button below or typed into the text box below.
File Upload
Comments for the
Planning
Commission:*
Please note, all information provided in this form is considered public record and will be included as permanent record for
the item which it references.
Jim Kelley
For Against Neutral
Carriage House.
If you do not see the Agenda Item Title please email public comment to planning@estes.org.
If you have documents to include with your public comment they can be attached here.
TRC Development Plan. Power Point 08142020
pptx.pptx 9.56MB
25 MB limit.
Limited to a maximum of 1000 characters.
I’ve been coming to Estes Park since the early 1960’s; my parents lived here for
almost 20 years after they retired. We bought our home on Findley Ct. August,
2019, largely because of the beautiful views of the Rockies from our home, which
faces west. Our great room, master bedroom, dining room, and kitchen are all on
the west side of our home, affording these beautiful views. We had elk and deer
migrate through our yard regularly. All of this was until dump trucks starting bringing
of dirt, rock, and debris on Dec 22, 2019. We did our due diligence in asking all the
questions about the possibility of anything being built behind our home on the
Stanley, and were assured there were no plans. We were stunned to find out that
there was now a plan for a parking lot directly behind our homes, with head-in
parking. It was then that we learned about the Stanley Master Plan. There is in fact
no mention or depiction of a parking lot in the 1994 Master Plan. Only a wildlife
corridor.
254
8/17/2020
1
TRC Development Plan
Aug 24, 2020
Ruth and Jim Kelley’s comments
641 Findley Ct, Estes Park, CO
Mitigation Concerns
Mitigation of Traffic Flow
Limit traffic
Limit traffic direction
Mitigate presence of the parking lot with Hardscape and Landscape
Vehicle Lights
Sounds
Prohibit Trespassing
Fencing
How did we get here?
Stanley Master Plan Jan 11, 1994
255
8/17/2020
2
Traffic Flow
Concern – The proposed parking lot will become a major
thoroughfare to the Stanley Campus and Overlook Residents
Mitigation Suggestion – Make the parking lot available to
one way traffic only.
Landscape / Hardscape Mitigation
The following slides will be used to demonstrate or help explain the view
from our property at 641 Findley Ct as it is today on top of the existing berm.
The purpose of the ladder is to show if an additional berm/fence of at
least 6 ft tall was placed on top of the existing berm, what the resulting
view would be for us.
For this demonstration a 6 ft household ladder was placed on the berm with
a level and a laser pointer.
The purpose of the pointer is to show a level point of reference to the
home. Even with the addition of a six foot barrier (fence) a clear view of
the parking lot is still evident from the main floor of our home.
256
8/17/2020
3
Landscape / Hardscape Mitigation
This is a picture of a 6ft Step
Ladder with a leveled level
and a laser pointer aimed
approximate mid point to our
home.
The ladder was placed on top
of the existing “berm” to
demonstrate our view of the
parking lot as it existed this
day.
Prior to this picture taken it
was relayed to us that the lot
was at final grade. With
additional sub fill and
concrete, the parking lot
would be raised an additional
6 inches to finished grade.
Landscape / Hardscape Mitigation
The circled point on the deck joist demonstrates a
line of site on top of the leveled 6ft step ladder.
For sake of argument; any
landscaping/hardscape i.e. earth berm, fencing
additional plantings will need to be higher or in
addition to any existing berm to block lights and
visual passing traffic as demonstrated by the
following slides. (The following pictures provided were taken from
the main level of our home.)
257
8/17/2020
4
Landscape / Hardscape Mitigation
This is a 2012 Jeep Grand Cherokee. Clearly,
a typical pickup or high profile van would be
more visible.
As demonstrated without additional barriers
of berm, fencing and landscaping this car is
clearly visible from our home’s main level.
Landscape / Hardscape Mitigation
•Without additional barriers of earth berm, fencing and landscaping the above pictures demonstrate our views of a
vehicle approaching a head in parking position behind our home. Headlights are visible up until all the way in.
(remember the lot elevation will be raised approximately 6 inches for sub fill and finished concrete) With the
additional concrete surface, a vehicle of this size and type which is very common, will be seen entirely until the
headlights are turned off.
•Additionally, any loud merriment, doors slamming, beeping car locks and car alarms will be heard and seen by us
without abatement.
•Additionally, trespassers from the parking lot will be more apt to look for and find areas to relieve themselves (and
possibly seen by us) rather than walk the long distance to an indoor restroom.
258
8/17/2020
5
Landscape / Hardscape Mitigation
The above pictures depict the existing hardscape (fencing) and landscaping installed at the Aspire.
To mitigate our new “Downtown Chicago Experience” from the sights, sounds and trespass of the Stanley’s patrons; as recommended
previously by John Cullen, the same hardscape and landscape should be installed facing the affected properties, continuously, from
the lower end and to the upper end and exit of the parking lot.
An approved plan should be installed to be able to report sick or dead vegetation for treatment or replacement.
The town of Estes Park should hold the Stanley accountable to maintain said hardscape and landscape to the existing town guidelines
and standards. If there are no existing guidelines one should be installed to maintain said property and landscape to a highly
attractive standard in an effort to mitigate the negative effects this parking lot provides the home owners or subsequent future buyers.
Fencing should be a minimum of 8ft from the existing berm surface(on our property and adjacent properties) to block 80-90% of
anticipated vehicle lights and views of high profile vehicles .
(Supporting documents offering to mitigate the parking lot with additional fencing and landscaping by John Cullen, Jack Mousseau and
Stewart Olive can be provided. Documents and acknowledged conversations offering the above mitigation plans were presented by
John Cullen to the affected home owners via email dated Dec 31, 2019. Additional supporting confirmations of mitigation offers were
extended and accepted by Jack Mousseau of MOA Architecture (agent for John Cullen) Jan 22, 2020, April 6, 2020, April 13, 2020 and
Stewart Olive, Attorney for John Cullen , Apr 13, 2020. )
Landscape / Hardscape Mitigation
Summary
How’d we get here?
According to John Cullen via an email dated Dec 31, 2019
John Cullen writes, “The parking lot depending on weather should be completed by early
May. “ (False)
John Cullen writes, “The parking lot was part of the 1986 and 1994 master plan.” (False)
259
8/17/2020
6
Landscape / Hardscape Mitigation
The parking lot was originally slated to be completed by early May as stated by John
Cullen in an email to the Stanley View members dated Dec 31, 2019. With no advance
warning or notice with the advent of dumping of fill beginning Dec 22, 2019; we had no
clue as residents this project was approved and was moving forward. Thank you John
Cullen. Thank you town of Estes Park.
The delay of this unwanted project has impacted us quite adversely with noise, dust, dirt
and an ugly back yard landscape for far longer than the anticipated completion date of
early May. There have been no offers to mitigate this unacceptable situation or no
updates to the affected homeowners adjacent to the property regarding an updated
time line or date of completion. There has been absolutely no communication by anyone
attached or responsible for this project to the residents affected, until now with this TRC;
which in our opinion should have been scheduled prior to the building permit being
submitted back in July 2019, per guidelines within the Stanley Master Plan.
This entire situation has been compounded with the advent of the Covid pandemic
limiting our abilities to travel and get away from this continuing sustained construction
project.
Landscape / Hardscape Mitigation
Unobstructed views & sounds of continuous construction activity (all pictures from week 8/9/2020)
1. Construction equipment
parked and left for days
2. This is new- a trash dumpster
positioned behind our house for days
3. Daily loud earth moving equipment
action (sounds like a tank with the
accompanying beep beep beep !!!)
4. Hidden behind this berm, ironically is the bull dozer in picture 3. This property
coincidently belongs to John Cullen, which coincidently is not nearly affected by the
parking lot with no head in parking designed to park behind his house and no view of
cars assin b .
260
8/17/2020
7
Landscape / Hardscape Mitigation
As John Cullen states in his email dated Dec 31, 2019, “The parking lot was part of a 1986 and
1994 master plan.” This is not true.
To the Right: Exhibit B from the Stanley
Historic District Master Plan
Development Standards and Design
Guidelines dated Jan 11,1994.
The highlighted area in yellow is the
location of the current parking lot.
As evident from the Master Plan this
parking lot was not part of the Master
Plan. Furthermore neither was the
Carriage house Restaurant/Pub, or
the Aspire.
While the Carriage house remains; its
purpose, location and footprint have
all been greatly modified to adapt to
the new commercial use.
261
Estes Park Planning Commission Public Comment Form
The Planning Commission wants to hear from members of the community. The following
form was created for public comment on any current agenda items.
The Planning Commission will participate in the meeting remotely due to the Declaration of
Emergency signed by Town Administrator Machalek on March 19, 2020 related to COVID-19
and provided for with the adoption of Ordinance 04-20 on March 18, 2020.
Please enter your full name. (This information is required to ensure the Town keeps accurate records of public
comment.
Name *
Radio Button
Agenda Item Title
Public comment can be attached using the Upload button below or typed into the text box below.
File Upload
Comments for the
Planning
Commission:*
Please note, all information provided in this form is considered public record and will be included as permanent record for
the item which it references.
Mark Campbell
For Against Neutral
Carriage House.
If you do not see the Agenda Item Title please email public comment to planning@estes.org.
If you have documents to include with your public comment they can be attached here.
25 MB limit.
Limited to a maximum of 1000 characters.
Hello,
I live on Findley Court next to the Carriage House Film Center development.
I am concerned about being able to have adequate ingress and egress in and out of
Findley Court during peak times for residents, deliveries and emergency services
etc.
For example if traffic gets backed up on Steamer Parkway will we be able to get in
and out of our neighborhood?
Other than that it looks like a nice addition to the Stanley.
Thank you for your time and dedication to Estes Park.
Mark Campbell
262
Estes Park Planning Commission Public Comment Form
The Planning Commission wants to hear from members of the community. The following
form was created for public comment on any current agenda items.
The Planning Commission will participate in the meeting remotely due to the Declaration of
Emergency signed by Town Administrator Machalek on March 19, 2020 related to COVID-19
and provided for with the adoption of Ordinance 04-20 on March 18, 2020.
Please enter your full name. (This information is required to ensure the Town keeps accurate records of public
comment.
Name *
Radio Button
Agenda Item Title
Public comment can be attached using the Upload button below or typed into the text box below.
File Upload
Comments for the
Planning
Commission:*
Please note, all information provided in this form is considered public record and will be included as permanent record for
the item which it references.
Gayle White
For Against Neutral
If you do not see the Agenda Item Title please email public comment to planning@estes.org.
If you have documents to include with your public comment they can be attached here.
25 MB limit.
Limited to a maximum of 1000 characters.
Thank you for taking comments. Our only concern is noise-related. Serving alcohol
often results in noise that caries quite a distance, especially if there is any outdoor
seating or access for customers.
We simply request that the TRC review outdoor access for patrons and how noise
will be minimized during operations. How noise-drift is prevented is a design factor
and we ask that it be addressed if it has not already been addressed. We suggest
things like (1) outside access with food and beverage be limited, (2) no outdoor
stages/entertainment areas be provided, (3) bands or other entertainment be limited
to indoors with closed doors to limit noise in nearby neighborhoods. There are many
residences just over the rocks from the Stanley Hotel that could be adversely
impacted.
Thanks for taking public comments. Our comments are not intended to preclude the
Stanley Hotel from progressing, just to ensure any designs limit noise from drifting
into adjacent neighborhoods at night.
263