Loading...
HomeMy WebLinkAboutRESOLUTION 095-25RESOLUTION 95-25 A RESOLUTION APPROVING DESIGN SERVICES AND CONSTRUCTION CONTRACTS FOR THE MRS. WALSH'S GARDEN POND WITH WHITESTONE CONSTRUCTION WHEREAS, the Town Board wishes to enter into the design and construction contracts referenced in the title of this resolution for the design and construction of a pond water feature located within Mrs. Walsh's Garden; and WHEREAS, the cost of the contracts with Whitestone Construction, Inc. is $114,206.40; and WHEREAS, the Board intends to authorize the Public Works Director to sign, without additional Board action, change orders that total up to but do not exceed $11,420.00 (10%) of the combined contract value within the project budget. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF ESTES PARK, COLORADO: The Board approves, and authorizes the Mayor to sign, the design and construction contracts referenced in the title of this resolution in substantially the form now before the Board. The Board authorizes the Public Works Director to spend up to $125,627.04 total under these contracts. DATED this 12th day of November, 2025. TOWN OF ESTES PARK 'i.' \ i. '-V--,-f~ -V- Mayor <" / ATTEST: '- —/ >.~si .. e3 0 ^^"A/^v\/^^<; Tovtfi\ Clerk APPROVED AS TO FORM: Town Attorney