HomeMy WebLinkAboutPLANS 231 Moraine Full Throttle Distillery Exterior Finishes Revision 22-03-31FULL THROTTLE DISTILLERY EXTERIOR FINISHES 231 Moraine Ave. Estes Park, CO 80517 ©2022 Interstice Architectural Studio, LLC Demoltion Isometric Not to Scale nort h New Construction Isometric Not to Scale nor t h 18'-0"Remove existing asphalt roofing - maintain roof decking & framing below Remove roof and beam below at new gable construction Remove two posts - retain for possible reuse Remove concrete piers (or at lest upper portion of the piers) where log posts are removed/relocated Remove lower lean-to roof construction Retain beam for reinstallation Remove (5) log posts and kickers at lower lean-to roof - retain for reinstallation - refinish Remove (4) light fixtures - relocate power for new lighting and signs Site Plan Scale: 1" = 10'-0"north 0 5 10 15 20 New and replacement log posts and roof eave 13 ' - 6 " 54'-6"5'-5" Install new curb and gutter to match existing 8'-3" clr 8'-10"3'-7½" 3' - 7 ½" 5' - 8 " 5' - 1 " c l r 4'-9⅝"± S 89°43'32" W 105.00' N 0 0 ° 1 6 ' 2 8 " W 1 0 0 . 0 4 ' N 0 0 ° 1 6 ' 2 8 " W 1 0 0 . 0 4 ' LOT 8A 1st Resubdivision of Buenna Vista Terrace 5,252 sf LOT 9A 1st Resubdivision of Buenna Vista Terrace 5,252 sf Existing Building to be remodeled 4,000 sf footprint Mo r a i n e A v e n u e Finish Floor Elevation 7553.43' = 100'-0" on other sheets OH E OH E OH E OH E OH E OH E OH E Re s i d e n t i a l U s e 75 6 0 75 6 5 75 7 0 75 7 5 75 8 0 S 89°43'32" W 105.00' Public Parking Town of Estes Park 75 5 8 7558 7559 New grain silo (non-functional) as support for monument sign - signs to be approved through separate permit - Silo by Owner - foundation by GC E E E G G W SS G SSSSSS Maintain existing siding and trim 2 Permit Information Documents and Resources are available on the project web site… http://www.intersticearch.com/epdistil/ Electronic Documents A1 Title Sheet, Site Plan and Demolition A2 Floor Plan, Framing Plan and Roof Plan A3 Exterior Elevaions A4 Sections A4 Metal Roofing and Siding Details A6 Timber and Log Details Sheet Index Color Legend In these drawings colors represent... Demolition New Construction Items that have no color represent existing conditions to be maintained. Furniture and Appliances by Owner - Not In Contract Existing roof with new roofing Re v i s i o n 2 P e r m i t S e t – 3 / 3 1 / 2 2 1 1 Feb 22, 2022 2 March 31, 2022 2 APPLICABLE CODES: 2015 International Building Code (IBC) 2020 National Electric Code (NEC) MUNICIPALITY:Town of Estes Park CONSTRUCTION TYPE: Type V-B (IBC Classification) - sprinklered Risk Category II BUILDING HEIGHT: Approx 21'-8" (highest ridge above exist grade) STRUCTURAL DESIGN CRITERIA: Project Elevation: 7560' Ground Snow Load (Pg): Tabular: 60 psf at 7000'; 70 psf at 8000' Interpolation: 60 + 10x0.56 = 66 psf Roof Snow Load: Importance Factor (Is) = 1.0 Exposure Factor (Ce) = 1.0 (Exposure C) Thermal Factor (Ct) = 1.1 (Heated Structure) Pf = 0.7 x Ce x Ct x Is = 0.77 x 66 psf = 51 psf Sloped Roof Load (Ps) - low slope No reduction taken Roof Dead Load: 15 psf At solar panels 3 psf - typical for such Wind Speed: 175 mph Exposure C Altitude Correction Factor: 0.81 Seismic Design Category: B Minimum Roofing Classification: Class B Class B roof & ice barrier: Required Assumed Soil Bearing Pressure: 2,500 psf ENERGY CONSERVATION: No part of this project affects the existing building thermal envelope nor insulation - Shading of openings is improved on the South, East and North. 1/17/22 Sheet Number A1 Joseph E Calvin Date Sheet Title Title Sheet, Site Plan and January 17, 2022 of 7 FU L L T H R O T T L E D I S T I L L E R Y EX T E R I O R F I N I S H E S 23 1 M o r a i n e A v e . Es t e s P a r k , C O 8 0 5 1 7 Pr o j e c t : 2 1 3 1 – F U L L T H R O T T L E D I S T I L L E R Y EX T E R I O R F I N I S H E S F i l e : " 2 1 3 1 E x t F i n C D " M o d i fi e d : T h u , M a r 3 1 , 2 2 P r i n t : T h u , M a r 3 1 , 2 2 D r a w n b y : J E C C h e c k e d b y : X X X Reinstall existing log posts and kickers - refinish wood - new round concrete piers See detail 1/A6 similar for pier 3 A4 4 A4 1 A4 2 A4 Floor Plan Scale: 1/4" = 1'-0"noth 0 1 2 4 6 8 Roof Plan Scale: 1/4" = 1'-0"noth 0 1 2 4 6 8 New 10" log posts to support log truss and gable roof See dtl 1/A6 for pier and base Existing posts to remain 18'-0" 6' - 0 " 6' - 0 " Roof Framing Plan Scale: 1/4" = 1'-0"noth 0 1 2 4 6 8 Manufacturer's standard Ridge/Hip Trim install per Installation Guide page 12 with Snap-Z system cleats and caulking 1 A4 Nailing Schedule Joint Description Number of Common Nails Number of Box Nails Nail Spacing ROOF FRAMING Blocking to Rafter (Toe-Nailed)(2) 8d (2) 10d each end Rim Board to Rafter (End-Nailed)(2) 16d (3) 16d each end ROOF SHEATHING Wood Structural Panels 8d 10d see sheathing notes this sheet Diagonal Board Sheathing 1"x6" or 1"x8" 1"x10" or wider (2) 8d (3) 8d (2) 10d (3) 10d per support per support CEILING SHEATHING Gypsum Wallboard 5d coolers 5d coolers 7" edge / 10" field 1' - 1 0 ½" 1' - 6 " 9'-0"9'-0" 12 ' - 0 " 1'-6"1'-6" at 24"oc 2x8 at 2 4 " o c 2x 8 at 2 4 " o c 2x 8 2x8 eave 2x 8 e a v e 2x 8 e a v e Log Truss - see dtl 1/A6 10 " l o g b e a m TO B e a m = 1 1 4 ' - 6 " 10 " l o g b e a m TO B e a m = 1 1 0 ' - 1 " 10 " l o g b e a m TO B e a m = 1 1 0 ' - 0 " 5 A6 4 A6 4 A6 Simpson H2.5A at each rafter Attach ledger to face of CMU with Simpson Titan HD anchors 12"oc stagger top to bottom (existing ledger may be maintained if in good condition) 1 A5 2 A5typ2 A5typ 2 A5typ 3 A5 4 A5typ Refer to detail 5/A5 for metal roofing Refer to detail 6/A5 for metal roofing Refer to detail 5/A5 similar for metal roofing 2 A6 3 A6 8 A5 typ Refer to detail 6/A5 for metal roofing 8 A5typ 8 A5typ SnapLock standing seam metal roofing refer to details and notes on Sheet A5 Ri d g e Va l l e y Vall e y 1 A 5 Sign by Others - Separate Sign Permit required Reinstall exist 6x12 beam SnapLock standing seam metal roofing over high-temperature Grace Ice&Water Shield on existing roof deck at this location - refer to details and notes on Sheet A5 6:12 Slope Dn 6:12 Slope Dn 4: 1 2 Sl o p e D n 6: 1 2 ± e x i s t Sl o p e D n Existing membrane flat roof Existing barrel vault roof Maintain existing gutter Prefinished metal gutters and downsputs Prefinished metal gutters and downsputs DSDS DS DS DS Prefinished metal downspout Prefinished metal downspouts concealed Soffit lights - re: Sheet A6 (4) additional on east elev Simpson A66 angle at each rafter Simpson A66 angle at each rafter 2x8 ridge blocking between rafters at each rafter space - toe nail Simpson A66 angle at each rafter 2 2 2 2 2 2 2 2 March 31, 2022 Rafters at Eave2Not to Scale Rafters at Ridge1Not to Scale 2 2x8 rafters at 24"oc Simpson A66 angles at each rafter Scribe rafters to log beam - or alternately remove top of log for sloped bearing 2x8 rafters at 24"oc 10" log ridge beam - cut top on slope to allow for joist bearing (approx ⅝" deep and 4⅜" wide) Simpson A66 angles at each rafter 2x8 ridge blocking between rafters at each rafter space - toe nail 1 A2 2 A2 2 1/17/22 Sheet Number A2 Joseph E Calvin Date Sheet Title Floor Plan, Framing Plan and Roof Plan January 17, 2022 of 7 FU L L T H R O T T L E D I S T I L L E R Y EX T E R I O R F I N I S H E S 23 1 M o r a i n e A v e . Es t e s P a r k , C O 8 0 5 1 7 Pr o j e c t : 2 1 3 1 – F U L L T H R O T T L E D I S T I L L E R Y EX T E R I O R F I N I S H E S F i l e : " 2 1 3 1 E x t F i n C D " M o d i fi e d : T h u , M a r 3 1 , 2 2 P r i n t : T h u , M a r 3 1 , 2 2 D r a w n b y : J E C C h e c k e d b y : X X X ©2022 Interstice Architectural Studio, LLC No work west side of building No work west side and west portion of south wall of building Address Numerals by Others (shown at 15" tall) Sign by Others - Separate Sign Permit required Reinstall log posts and kickers approx 6'-0" from building face New Roof Construction New barrel cradle 4x8 construction - re: dtl 3/A6 (3) new half 8" log posts with 4" log kickers 6' - 0 " 10 ' - 8 " Barrels by Owner 8'-0" 2'-6" North Elevation Scale: 1/4" = 1'-0" 0 1 2 4 6 8 New log truss - See Elevation 1/A6 East Elevation Scale: 1/4" = 1'-0" 0 1 2 4 6 8 South Elevation Scale: 1/4" = 1'-0" 0 1 2 4 6 8 5' - 1 1 " 9' - 3 " 14"ϕ x 4'-6" concrete piers with (4)#4 vert & (4)#3 ties - verify dimensions with Owner 3' - 0 " 1' - 6 " 15 ' - 2 3 / 4 " ± Grain bin by Owner (for aesthetics only - not functional) Sign lighting by Electrical Contractor 4'-8"± ϕ 3'-7½"oc 10'-8" Manufacturer's standard Ridge/Hip Trim install per Installation Guide page 12 with Snap-Z system cleats and caulking Steel plate - see dtl 5/A6 Prefinished metal gutter Prefinished metal downspouts Prefinished metal gutter Prefinished metal downspouts 6 A6 6 A6 LED tape lighting within steel frame re: Sheet A7 LED tape lighting within steel frame re: Sheet A7 Existing stone base Window trim - re: dtl 4/A5 typ Corrugated metal siding - re: Sheet A5 Window trim - re: dtl 4/A5 typ Metal parapet cap - re: dlt 8/A5 Corner trim sim to dtl 3/A5 Existing gutterTrim around vent/louvers similar to window trim - dtl 4/A5 Trim around door sim to window trim - dtl 4/A5 Window awnings - re: dtls 1/A4 & 6/A5 Barrels cradle - re: dtl 3/A6 - barrels by Owner Log truss - see dtl 1/A6 New barrel shelf 4x8 construction - re: dtl 2/A6 1 A4 2 A4 3 A4 4 A4 Prefinished metal gutter & downspout Window awnings - re: dtls 1/A4 & 6/A5 Truss features - re: dtls 2/A4 & 5/A5 Metal parapet cap - re: dlt 8/A5 Metal parapet cap - re: dlt 8/A5 Corrugated metal siding - re: Sheet A5 Remove and reinstall existing grill Window trim - re: dtl 4/A5 typ Overhead door jamb and head - re: dtl 2/A5Existing stone base No work in this area at this time - to be finished in future phase Corner trim sim to dtl 3/A5 Existing gutter Overhead door jamb and head - re: dtl 2/A5 2 2 March 31, 2022 Gain Bin post by mfgr Mfgr's proprietary post base plate & bolts 1"ϕ x 18" embed F-1554 anchor bolt with double nut and washer at bottom ½"± structural grout 14"ϕ x 4'-6" concrete piers with (4)#4 vert & (4)#3 ties - verify dimensions with Owner ¾" bevel Line of grade Grain Bin Post Base Not to Scale 2 1/17/22 Sheet Number A3 Joseph E Calvin Date Sheet Title Exterior Elevations January 17, 2022 of 7 FU L L T H R O T T L E D I S T I L L E R Y EX T E R I O R F I N I S H E S 23 1 M o r a i n e A v e . Es t e s P a r k , C O 8 0 5 1 7 Pr o j e c t : 2 1 3 1 – F U L L T H R O T T L E D I S T I L L E R Y EX T E R I O R F I N I S H E S F i l e : " 2 1 3 1 E x t F i n C D " M o d i fi e d : T h u , M a r 3 1 , 2 2 P r i n t : T h u , M a r 3 1 , 2 2 D r a w n b y : J E C C h e c k e d b y : X X X Sign Section4Scale: 3/4" = 1'-0" 0 6”1’-0”2’-0”1’-6”2’-6”East Truss Section3Scale: 3/4" = 1'-0" 0 6”1’-0”2’-0”1’-6”2’-6”North Truss Section2Scale: 3/4" = 1'-0" 0 6”1’-0”2’-0”1’-6”2’-6”Window Awning Section1Scale: 3/4" = 1'-0" 0 6”1’-0”2’-0”1’-6”2’-6” 3'-8" 4'-0" 4'-0 " 6' - 0 " 12 4 FlatIron Steel Snap-Lock Standing Seam Metal Roof over High-Temperature Grace Ice&Water Shield ¾" Densglass exterior grade sheathing with bottom painted 2½"x2½"x¼" Steel Angles - paint - typ Refer to detail 6/A5 for trim FlatIron Steel 7/8" Corrugated Siding over existing siding FlatIron Steel Snap-Lock Standing Seam Metal Roof over high-temperature Grace Ice&Water Shield over ⅝" plywood New 2x8 at 24"oc rafters FlatIron Steel 7/8" Corrugated Siding over existing siding Compatible Trim TBD Cap flashing per detail 8/A5 North Truss Assembly beyond - See 2/A4 12 4 Quantity: (5) Awning Roofs, (10) such Steel Angle TrussesQuantity: (3) North Roof Features, (6) such Steel Angle TrussesQuantity: (1) East Roof Feature, (4) such Steel Angle TrussesQuantity: (1) Blade Sign, (1) such Steel Angle Truss Cap flashing to match roofing - see detail 8/A5 Cap flashing to match roofing - see detail 8/A5 4'-10" 14 ' - 6 " 10 ' - 0 " 5'-7 " 2'-2" 1'-8" 1'-1½" 3'-8 " 3'-0 " 14 ' - 1 0 " 5'-0" 4'- 0 " 2'-6" 3' - 6 " 10 ' - 6 " 4'-10" 5'-0" 10 ' - 1 0 " 2'-2" 1'-7" 1'-2½" 5'-6 " 9' - 0 " 3'-8 " FlatIron Steel Snap-Lock Standing Seam Metal Roof over ¾" Densglass exterior grade sheathing with bottom painted off-white FlatIron Steel Snap-Lock Standing Seam Metal Roof over ¾" Densglass exterior grade sheathing with back-side painted off-white FlatIron Steel Snap-Lock Standing Seam Metal Roof over ¾" Densglass exterior grade sheathing with bottom painted off-white FlatIron Steel Snap-Lock Standing Seam Metal Roof over ¾" RS plywood with RS face inward Refer to detail 5/A5 for trim Refer to detail 5/A5 for trim Refer to detail 5/A5 for trim similar Refer to detail 5/A5 for trim similar Refer to detail 5/A5 for trim similar Sign by Others - Separate Sign Permit required FlatIron Steel Snap-Lock Standing Seam Metal Roof over ¾" Densglass exterior grade sheathing with bottom painted off-white 2½"x2½"x¼" Steel Angles - paint - typ 2½"x2½"x¼" Steel Angles - paint - typ ½" through bolts and nuts - typ ½" through bolts and nuts - typ ½" through bolts and nuts - typ FlatIron Steel 7/8" Corrugated Siding over existing siding FlatIron Steel 7/8" Corrugated Siding over existing sidingFlatIron Steel 7/8" Corrugated Siding over existing siding 5' - 0 " 3'-4" Refer to detail 5/A5 for trim Refer to detail 5/A5 for trim similar Refer to detail 5/A5 for trim similar Refer to detail 5/A5 for trim similar 4 A5 2x6 at 16"oc soffit framing ½" RS plywood soffit with batons at joints½" RS plywood soffit with batons at joints 2x6 at 16"oc soffit framing New 2x8 at 24"oc rafters FlatIron Steel Snap-Lock Standing Seam Metal Roof over high-temperature Grace Ice&Water Shield over ⅝" plywood Existing 12" concrete block wall Existing floor structure Existing roof structure Existing 12" concrete block wall Existing floor structure Existing roof structure Existing 12" concrete block wall Existing roof structure Existing floor structure 2½"x2½"x¼" Steel Angles - paint - typ - coordinate with Sign Company Attach 2x8 ledger to CMU with Simpson Titan HD anchors 12"oc stagger top to bottom Attach 2x8 ledger to CMU with Simpson Titan HD anchors 12"oc stagger top to `bottom See detail 6/A6 for attachment to wall See detail 6/A6 for attachment to wall See detail 6/A6 for attachment to wall (4) ½"ϕ x 8" epoxy screen anchors at 16"oc± similar to detail 7/A6 6 A66 A6 2 1/17/22 Sheet Number A4 Joseph E Calvin Date Sheet Title Sections January 17, 2022 of 7 FU L L T H R O T T L E D I S T I L L E R Y EX T E R I O R F I N I S H E S 23 1 M o r a i n e A v e . Es t e s P a r k , C O 8 0 5 1 7 Pr o j e c t : 2 1 3 1 – F U L L T H R O T T L E D I S T I L L E R Y EX T E R I O R F I N I S H E S F i l e : " 2 1 3 1 E x t F i n C D " M o d i fi e d : T h u , M a r 3 1 , 2 2 P r i n t : T h u , M a r 3 1 , 2 2 D r a w n b y : J E C C h e c k e d b y : X X X Custom/Modified Trim Profiles7Scale: 3" = 1'-0" 0 1”3”2”4”5”6”7”8” ¾"¾" 11" verify with existing condition 19/16 " 1⅞" 7" 4" Standard snap lock metal roogint panel for reference 1¼"1¼" Rake Locking Closures Parapet Cap Point Cap Corrugated Metal Siding Mfgr: Flatiron Steel Profile: 7/8" Corrugated Gauge: 24 ga Color: Galvalume Standing Seam Metal Roofing Mfgr: Flatiron Steel Profile: Snap Lock Standing Seam Seam Height: 1¾" Spacing: 16"oc Gauge: 24 ga Color: Northern Rust -or- CoreTen Testing: UL 580 Wind Uplift (Class 90*) * roofing is to be continuously backed with plywood or densglass as shown UL 2218 Class 4 Hail Impact UL 790 Class A Fire Rating Valley, Gutter & Gable Flashing1Not to Scale Overhead Door Jamb and Head Trim2Scale: 3" = 1'-0" General Wall Panels, Base & Corner3Not to Scale Parapet and Cap Flashing8Not to Scale Standing Seam Panels & Trim at Awning6Not to Scale North Standing Seam / Truss Feature5Not to Scale Window Trim & Top of Slope to Wall4Not to Scale 1. These notes cover Metal Roofing Panels, Wall Panels, Underlayment, Accessories, Flashing, Sheet Metal, Gutters and Downspouts. 2. Manufacturer: FlatIron Steel or approved substitute. FlatIron Steel "Snap Lock Installation Guide" and "7/8" Corrugated Installation Guide" are included as requirements and references herein. 3. Proper installation shall include selection of screws per the Installation Guides and determination of spacing in both directions as directed by the Manufacturer based on imposed wind loads. All screws shall be gasketed and properly driven to assure optimum seal and strength. 4. SnapLock panels at sloping roofs shall be installed over a continuous layer of high-temperature Grace Ice&Water Shield underlayment. Installation shall include all foam closure strips, caulking, mastic sealant, butyl tape and other accessories as illustrated in the Manufacturer's Installation Guides. 5. Quality Control: Manufacturer shall have at least 10 years experience in fabrication of pre-finished sheet metal products. Contractor shall have at least 2 years experience applying these types of material with successful completion of projects of similar scope using the same manufacturer's products. 6. Submittals: Submit to the Architect, 2 complete sets (or PDF files) of product information, sample warranty, profile and any other drawings necessary to installation, material and color samples. Certification shall be submitted based on independent testing laboratory indicating no measurable water penetration or air leakage through the system tested in accordance with ASTM E-1680-95 and ASTM E-1646-95. 7. Warranties: 20-year finish guarantee from the manufacturer; 5-year watertightness guarantee 8. Underlayment: Grace High-Temperature Ice and Water Shield over all sloped surfaces surfaces - not required on vertical wall surfaces 9. Roofing accessories include galvanized steel fasteners and washers, sealants and vinyl wheatherseal inserts 10. All Flashing, gutters and downspouts shall match finish of roofing panels. Hem all exposed edges of flashing on underside min ½". 11. Snow Guards: Aluminum strap, hood and gasket - Kynar 500 finish - (2) mechanical fasteners each - locations per drawings - Mfgr: Ice Blox, Alpine Snow Guards, Sno-Gem or approved substitute 12. Execution: Comply with mfgr specifications for application and attachment. Conform to standards set forth by SMACNA in the Architectural Sheet Metal Manual. Verify that decking (existing and new) is suitable for installation, clean, free of depressions or projections - notify Architect of any issues. Verify that roof openings, curbs, pipes, sleeves and vents are complete and solidly set. 13. Cleaning: Only minor scratches will be allowed to be touched up. Any other damaged material shall be replaced. Clean any grease, finger marks, or stains from the panels per mfgr recommendations. Remove all strippable film, scraps and debris from construction site. Metal Roofing & Siding Notes Metal Roofing and Siding Materials Varies up to 18" - GC to verify Overhead door trim (Galvalume color) Overhead door trim J-metal Existing trim Existing siding Galvalume corrugated siding Existing concrete block wall Existing overhead door hardware Existing jamb seal Manufacturer's standard gable flashing profile w/ 4" drop edge length Z-closure tall cleat Valley splash guard to match and attach to gutter Standard gutter (downspout not shown) Continuous Raised Cleat Cut back raised seam portions of panel and hem fold end edge of SnapLock min ¾" around edge of cleat Snap lock standing seam roof panels over high-temperature Grace Ice&Water Shield Cap exposed ends of gutters (not shown) SnapLock clip angle See Dtl 4/A5 for additional notes Extend gutter metal or additional flashing min 6" up slope Cut SnapLock panel edge on diagonal and hem fold edge min ¾" around edge of cleat Manufacturer's standard W-shape valley flashing Raised Cleat installed through valley flashing Raised Cleat installed through valley flashing New or existing sloping roof deck (High-temperature Grace Ice&Water Shield not shown) 2x gable fascia Snap lock standing seam roof panels over high-temperature Grace Ice&Water Shield Manufacturer's standard Gable flashing with 3" drop edge length - Awning roof does not penetrate or seal to wall siding panels at this point 4'-0" sq x ¾" thick exterior grade Densglass sheathing - paint bottom side off-white 4'-0"W x 5'-0"L x ¾" thick exterior grade Densglass sheathing - paint bottom side off-white 4'-0"W x 10'-10"T x ¾" thick exterior grade Densglass sheathing - paint back-side off-white Note: Similar at Door Trim below Custom Rake Locking Closure - See Detal 7/A5 Custom Rake Locking Closure - See Detal 7/A5 Custom Rake Locking Closure - See Detal 7/A5 Custom Rake Locking Closure - See Detal 7/A5 Snap lock standing seam roof panels over high-temperature Grace Ice&Water Shield Snap lock standing seam roof panels Custom Rake Locking Closure - See Detal 7/A5 Custom Rake Locking Closure - See Detal 7/A5 Mfgr's standard 7/8" J-Metal Trim Raised Cleat Z-closure tall cleat in each space Custom point cap - similar to Mfgr's standard "front cap" - see detail 7/A5 for dimensions East Standing Seam / Truss Feature similar We s t P a n e l s over l a p E a s t Pre v a i l i n g W i n d West Panels overlap Eas t Prevailing W i n d West P a n e l s overla p E a s t Prevai l i n g W i n d West P a n e l s overlap E a s t Prevail i n g W i n d Nort h P a n e l s over l a p S o u t h Sola r E x p o s u r e No r t h P a n e l s ov e r l a p S o u t h So l a r E x p o s u r e Z-closure tall cleat in each space SnapLock clip angle See Dtl 4/A5 for additional notes Mfgr's standard 7/8" J-Metal Trim Raised Cleat Note that there is NO J-Metal Trim at this location Cut back raised seam portions of panel and hem fold end edge of SnapLock min ¾" around edge of cleat Cut back raised seam portions of panel and hem fold end edge of SnapLock min ¾" around edge of cleat Raised Cleat SnapLock Clips Steel angle truss See detail 2/A4 Steel angle trusses - see detail 1/A4 West P a n e l s overl a p E a s t Preva i l i n g W i n d Upper portion of profile to match panel profile Upper portion of profile to match panel profile 24 ga metal cap flashing to match standing seam metal roofing color/finish 1" hem to receive raised cleat Return to snap below wood cap 1" hem to receive raised cleat 68 ° Slope to Drain 2x12 plate - ripped - fasten down with #11 x 3" deck screws at 12"oc staggered as shown Custom profile metal cap flashing - See detail 7/A5 for profile & dimensions Raised Cleat fastened to top plate at 12"oc 1x4 taper cut to slope Existing wood plate - verify condition Existing CMU parapet wall Maintain ⅜" gap between top of metal panels and bottom of new wood plate Screws in every third troff and 4'-0" oc vertically and within 4" of top of panel in pre-drilled slotted holes Existing wood siding to remain Existing wood siding to remain Existing wood corner trim to remain Where possible, run metal panels up full height of wall in single piece Screws in every third troff and 4'-0"oc vertically above bottom three courses in pre-drilled slotted holes to accomodate panel expansion/movement Stitch screw seams per Installation Guide At north and south wals, lap western panels over eastern panels by typ one corrugation For lower section of panel, screws in every third troff and 18"oc vertically in pre-drilled holes At east wall, lap northern panels over southern panels by typ one corrugation Manufacture's standard outside corner L-angle trim - install per Installation Guide page 17 Mfgr's standard square base trim Existing stone base Snap lock standing seam roof panels over high- temperature Grace Ice&Water Shield 7/8" galvalume corrugated metal siding panel 7/8" galvalume corrugated metal siding panel Manufacturer's standard Locking Endwall Flashing Z-closure tall cleat in each space Manufacturer's standard 7/8" J-Metal Trim at jambs and sill - caulk to window frame Manufacture's standard 1" Window Drip Cap Existing wood trim to remain 7/8" galvalume corrugated metal siding panel 7/8" galvalume corrugated metal siding panel Existing wood siding to remain Z-closure tall cleat in each space SnapLock clip angle at each seam and at 18"oc unless otherwise specified by the manufacturer for imposed wind load New or existing sloping roof deck (High-temperature Grace Ice&Water Shield not shown) New of existing rafters Extend drip cap min 1" past J-metal jamb - notch siding panel to accommodate 1/17/22 Sheet Number A5 Joseph E Calvin Date Sheet Title Metal Roofing and Siding Details January 17, 2022 of 7 FU L L T H R O T T L E D I S T I L L E R Y EX T E R I O R F I N I S H E S 23 1 M o r a i n e A v e . Es t e s P a r k , C O 8 0 5 1 7 Pr o j e c t : 2 1 3 1 – F U L L T H R O T T L E D I S T I L L E R Y EX T E R I O R F I N I S H E S F i l e : " 2 1 3 1 E x t F i n C D " M o d i fi e d : T h u , M a r 3 1 , 2 2 P r i n t : T h u , M a r 3 1 , 2 2 D r a w n b y : J E C C h e c k e d b y : X X X 14"ϕ x 4'-6" concrete piers with (4)#4 vert & (4)#3 ties - Refer to Sheet A2 for locations 14"ϕ x 4'-6" concrete piers with (4)#4 vert & (4)#3 ties - Refer to Sheet A2 for locations Log Posts, Beams and Truss1Scale: 3/4" = 1'-0" 0 6”1’-0”2’-0”1’-6”2’-6”Barrel Shelf2Not to Scale Barrel Cradle3Not to Scale 6' - 0 " 8' - 0 " 8" 2' - 0 " 8'-0" 2'-6" 2' - 1 " 8'-0" 2'-6" 9' - 3 " 18'-0" 5' - 3 " 12 6 12 6 Top of stone elevation Top of stone elevation Overhead door opening (2) soffit lights in bottom of structure - see cut sheet above (2) soffit lights in bottom of structure - see cut sheet above ¾" x 14" lag bolt with 1¾" washer down through continuous ridge beam into truss post ¾" x 18" through bolt with 1¾" washers at both ends ⅝"ϕ x 12" lag bolt 6"6" ⅝"ϕ x 8" lag bolts ¾" x 18" through bolt with 1¾" washers at both ends 1'-0"5'-2" 9'-0" 1" ⅝"ϕ x 8" lag bolts 4 5 ° 8"ϕ log top chord 8"ϕ log top chord 6"ϕ log web members 10"ϕ x 20'-9" cont log bottom chord 10"ϕ x 13'-0" log beam back to wall see detail 5/A6 10"ϕ x 12'-0" log beam back to wall (scribe to back of truss) - attach to truss with (2) ¾"x18" lag bolts at 3"oc through bottom chord - see detail 4/A6 - see left for outlooker not shown here Simpson CPT66Z post base with 1" standoff - typ Simpson CPT66Z post base with 1" standoff - typ 110'-0" TO Steel113'-2" TO Steel 1' - 4 " 1'-6" 1'-6" 8" 1'- 0 " ⅜" steel plates (2) ¾"ϕ x8" through bolts with washers at both ends 2" from end of plate and 4"oc 2" 4" 2" (4) ¾"ϕ x 4" epoxy scrren anchor bolts(6) ¾"ϕ x 4" epoxy scrren anchor bolts 2' - 8 " 9" 8" 5" 8" (2) ¾"ϕ x8" through bolts with washers at both ends 2" from end of plate and 4"oc ½" steel plate ⅜" steel plate 4" 2" 2" Side Log-to-Wall Steel Plate4Not to Scale Middle Log-to-Wall Steel Plate5Not to Scale Truss Feature Plan Cut6Scale: 1 1/2" = 1'-0" 0 3”6”1’-0”9”1’-3” LED Tape Lighting behind vertical angles at north and east Truss Features Epoxy Screen Anchors per detail 7/A6 (similar at awnings) 4" log kicker4" log kicker Cradle Middle East Face ⅜" steel plate with (3) ¾"ϕ x 5" bolts Qty: 2 Back Corner Angles ⅜" steel plate or L4x4x⅜ with (1) ¾"ϕ x 5" thru bolts, (2) ⅝"ϕ x4" lag bolts, and (1) ¾"ϕ x 6" lag bolt Qty: 6 Cradle East Corner Angles ⅜" steel plate or L8x8x½ with (4) ¾"ϕ x 5" thru bolts, Qty: 4 Shelf East Corner Angles ⅜" steel plate or L4x4x⅜ with (2) ¾"ϕ x 5" thru bolts, Qty: 2 6" 4"4" 6" 8"8" 6" 1'-4" 6" 4"4" 4x8 x 8'-0" rim Recess all bolt heads (and washers) ¾" at exposed sides of timbers 8" 4x8 x 2'-2" rim 8"ϕ 6'-0" tall half log post with (4) ¾"x10" epoxy screen anchors at 24"oc± (Shown schematically in purple) 4" log kickers with (2) ⅝"ϕ x 8" lag bolts 8"ϕ x 7'-8" long half log ledger with (8) ¾"x10" epoxy screen anchors at 12"± stagger top & bottom - wood putty plug holes (Shown schematically in purple) 8"ϕ x 1'-9" long half log 4x8 x 7'-4" with (8) ¾"x8" epoxy screen anchors at 12"oc± stagger top & bottom (Shown schematically in purple) 4x8 x 7'-4" with (8) ¾"x8" epoxy screen anchors at 12"oc± stagger top & bottom (Shown schematically in purple) 4x4 x 10'-8" RS post slope top to drain & seal 4x8 x 10'-8" RS post slope top to drain & seal 4x4 exposed joists at 8"oc w/ (2) ½"ϕ x 8" lag bolts at each end Steel angles and bolts see detail to right - prime & paint (1) 4x8 & (1) 4x4 x 10'-8" RS wood posts screwed together - slope top to drain & seal Recess all bolt heads (and washers) ¾" at exposed sides of timbers 4x8 x 1'-6" RS rim 4x8 x 3'-0" RS rim ¾" plywood decking with 26 ga sheet metal cover with 2" drop edges (match color of standing seam metal roofing) (metal not shown) 8"ϕ 6'-0" tall half log post with (4) ¾"x10" epoxy screen anchors at 24"oc± (Shown schematically in purple) 4" log kickers with (2) ⅝"ϕ x 8" lag bolts (11) decorative barrels by Owner - GC verify dimensions, notify Architect of discrepancies - GC drill holes in downward surfaces to assure barrel cannot retain water - Secure barrels to structure 3' - 4 " t a l l v e r i f y 2'-6"ϕ verify Barrel wight: 110 lbs each, empty (verify) ¾" x 10" lag bolts through top chord into ridge beam - countersink head & washer ¾" x 14" lag bolt through top of bottom chord down into post 20'-9" 1'-4½" 10"ϕx12'-0" log beam beyond back to building - see detail 4/A16 - see to right for attachment for attachment to truss 10"ϕx1'-6" log outlooker out to fascia (scribed to face of truss) (2)¾"ϕx14" lag bolts at 45° (in plan) through outlooker into bottom chord (1) 3/4" x14" lag bolt through bottom chord up into post (4) ⅝"ϕ x 12" lag bolt2'-9" ¾" x 14" lag bolt through top of bottom chord down into post ¾"ϕx16" lag bolt through top of perpendicular beam down at angle into top of post 9' - 2 " 1" 10"ϕ x 9'-2" log post 10"ϕ x 9'-2" log post 2 March 31, 2022 2 Drill ¾"ϕ hole through metal siding and existing wood siding - take care to not penetrate existing concrete block Drill hole through concrete block cell wall or min 3¾" (ho) into grouted cell or dividing cell wall - verify hole ϕ with screen anchor mfgr After cleaning hole per mfgr recommendations, insert 3¾" (ho) screen followed by epoxy After mfgr recommended delay, insert ½"ϕ x 6" long all thread rod 3¼" (hef) into epoxy After mfgr recommended setting delay install jamb nut over rod and firmly against metal siding Place framing angle onto exposed rod Tighten nut onto rod per screen anchor mfgr's maximum allowed torque Screen Anchor Installation7Not to Scale Anchors to be installed at min 16" oc along length of vertical angle 2 26 ga sheet metal cover with 2" drop edges (match color of standing seam metal roofing)¾" plywood decking 2x8 at 16"oc with Simpson LUS28 hangers 4x8 x 7'-4" with (8) ¾"x8" epoxy screen anchors at 12" stagger top & bottom (Shown schematically in purple) 2 2 2 2 2 2 1/17/22 Sheet Number A6 Joseph E Calvin Date Sheet Title Timber and Log Details January 17, 2022 of 7 FU L L T H R O T T L E D I S T I L L E R Y EX T E R I O R F I N I S H E S 23 1 M o r a i n e A v e . Es t e s P a r k , C O 8 0 5 1 7 Pr o j e c t : 2 1 3 1 – F U L L T H R O T T L E D I S T I L L E R Y EX T E R I O R F I N I S H E S F i l e : " 2 1 3 1 E x t F i n C D " M o d i fi e d : T h u , M a r 3 1 , 2 2 P r i n t : T h u , M a r 3 1 , 2 2 D r a w n b y : J E C C h e c k e d b y : X X X Submitting Agency:Description:DHE1/X-E18/XX-CL3- Project:HABER Notes: Type: S BASELITE CORPORATION 12260 EAST END AVE. CHINO, CA 91710 PH: 909-548-4554 FAX: 909-548-4774 EMAIL: SALES@BASELITE.COM WEBSITE:WWW.BASELITE.COM PAGE 6 R3.5" 48.25" 9" 29.75" 12" R8" 22.25" 40.25" 28.5" 10" R7.5" 35" R3.5"8.5" 18" 9" 24.75" 5" R7.5" 12" 4" 14.5" 22.25" R3.50" 9" 5" 24.75" R7.5" 22.25" 14.5" R3.5" R12.5" 37" 15" R3.5" 22.25" 9" R15" 54.25" 18" 25.25" 30" R7.5" VVVVV BASELITE RLM CATALOG PROJECT NAME: PROJECT TYPE: BASELITE VAPOR JAR CATALOG PROJECT NAME: PROJECT TYPE: C - MOUNTING OPTIONS B1 E4 E1 E3A E3 E4A E5 E6 E8 E9 E7 E10 E13 E11 1/2" ARM EXTENSIONS 3/4" ARM EXTENSIONS Isometric Side Seciton Proposed locations for LED tape lighting tightly tucked into structural corners Parapet CapTypical "truss feature" per Construction Drawings Direct light from LEDs practically impossible to see from surrounding Site due to structural steel angle frame Very little direct light passes between top of parapet and bottom of feature roof, but it is directed downward - no direct light passes above opposite far side parapet Typical LED tape light location Upward light is cut off by structural steel angles Exterior Soffit Lights (or similar) Exterior Gooseneck Lights (or similar) 1/17/22 Sheet Number A7 Joseph E Calvin Date Sheet Title Exterior Lighting January 17, 2022 of 7 FU L L T H R O T T L E D I S T I L L E R Y EX T E R I O R F I N I S H E S 23 1 M o r a i n e A v e . Es t e s P a r k , C O 8 0 5 1 7 Pr o j e c t : 2 1 3 1 – F U L L T H R O T T L E D I S T I L L E R Y EX T E R I O R F I N I S H E S F i l e : " 2 1 3 1 E x t F i n C D " M o d i fi e d : T h u , M a r 3 1 , 2 2 P r i n t : T h u , M a r 3 1 , 2 2 D r a w n b y : J E C C h e c k e d b y : X X X 2 March 31, 2022