Loading...
HomeMy WebLinkAboutMINUTES Estes Park Board of Adjustment 2024-10-01Town of Estes Park, Larimer County, Colorado, October 1, 2024 Minutes of a Regular meeting of the ESTES PARK BOARD OF ADJUSTMENT of the Town of Estes Park, Larimer County, Colorado. The meeting was held in the Town of Estes Park on October 1, 2024. Board: Chair Jeff Moreau, Vice-Chair Wayne Newsom, Board Member Joe Holtzman Attending: Chair Moreau, Vice-Chair Newsom, Member Holtzman, Senior Planner Paul Hornbeck, Planner Kara Washam, Community Development Director Steve Careccia, Town Board Liaison Bill Brown, Recording Secretary Karin Swanlund Absent: none Chair Moreau called the meeting to order at 9:08 a.m. APPROVAL OF AGENDA It was moved and seconded (Holtzman/Newsom) to approve the agenda. The motion passed 3-0. APPROVAL OF CONSENT AGENDA It was moved and seconded (Newsom/Holtzman) to approve the Consent Agenda. The motion passed 3-0. PUBLIC COMMENT: none ACTION ITEMS: 1. Variance to the Side Setback 1041 Pine Lane Planner Washam The Applicant requests a variance to allow a reduced side setback of three feet (3') along the east property line in lieu of the ten feet (10') side setback required in the R- 2 (Two-Family Residential) Zone District. The proposal is to construct an attached garage with a new access drive, and the existing driveway will be removed. The rock outcropping makes it impossible to build the garage within the setbacks. Staff recommends the Board of Adjustment approve the variance request, subject to the findings described in the report. DISCUSSION: The code allows two curb cuts for a driveway. Mike Daley, Architech, stated the applicants agree with staff conditions. It was moved and seconded (Moreau/Holtzman) to approve the variance request for a three-foot (3') side setback along the east property line for the subject property, with the conditions and findings outlined in the staff report. The motion passed 3-0. 2. Variance to the River Setback 375 Moraine Ave Senior Planner Hornbeck The Applicant desires to replace the existing bumper car building with a new amusement ride in the same general footprint, encroaching into the required 30' river setback. The Applicant requests a variance from Estes Park Development Code Sec. 7.6.E.1.a(2)(b) requiring a 30' setback from the annual high-water mark of the river. The amusement ride would be constructed as close as 5.5' from the high water mark of the Big Thompson River. The existing building is located approximately 4.7' from the river at its closest point. Staff recommended approval of the request with no conditions. DISCUSSION Lonnie Sheldon, Van Horn Engineering, was available to answer questions. Board of Adjustment, October 1, 2024 – Page 2 It was moved and seconded (Moreau/Holtzman) to approve the variance with the findings as outlined in the staff report. The motion passed 3-0. REPORTS: Planning Staff will attend the State Planning Conference in Loveland later this week. With no further business, Chair Moreau adjourned the meeting at 9:27 a.m. Jeff Moreau, Chair Karin Swanlund, Recording Secretary