HomeMy WebLinkAboutINSPECTION Multi Family Building 1616 Continental Peaks Circle (Building B) 2024-09-11INSPECTION CARD
Estes Park
170 MacGregor Ave Suite 230, Estes Park, CO 80517
POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE
AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE.
APPLICATION NO.:23-EP-00047 TYPE:
New Multi-Family
Building ISSUED DATE:06/14/2023 EXPIRATION DATE:04/05/2025
PROJECT ADDRESS:1616 Continental Peaks Cir. Building B, Estes Park, CO 80517 PARCEL NO.:
OWNER:Wildfire Homes CONTRACTOR:Treeline Construction CONTRACTOR PHONE:(970) 227-0403
DESCRIPTION OF WORK:7 new construction town homes, Building B addresses are: 1616, 1618, 1720, 1724, 1726, 1728 Continental Peaks Cir
INSPECTION INSP
DATE
PASSED COMMENTS
Footings JG 10/7/2024
Underground Plumbing JG 10/10/2023 See Notes
Rough Mechanical JG 4/9/2024
Gas Test JG 3/18/2024 See Notes
Fire Resistive Wall
Assembly
JG 4/9/2024
Above Ceiling
Mechanical
JG 4/15/2024
Drywall JG 4/15/2024
Final Plumbing JG 9/11/2024
Energy Code
Compliance
JG 10/7/2024
Final Public Works/CO JW 10/4/2024
Final Water/CO JL 5/24/2024
Final Sanitation/CO SP 9/13/2024 See Notes
Final Building/CO JG 10/7/2024
Other Mechanical
(Fireplace)
JG 4/15/2024
INSPECTION INSP
DATE
PASSED COMMENTS
Foundation GR 8/4/2023
Rough Plumbing JG 3/18/2024 See Notes
Rough Frame JG 4/9/2024
Wall Sheathing JG 1/22/2024
Firestopping JG 4/9/2024
Gas Pressure Test JG 10/7/2024
Insulation JG 4/11/2024
Final Mechanical JG 9/11/2024
Final Building JG 9/11/2024
Final Planning/CO LB 9/12/2024 See Notes
Final P&C/CO AE 9/11/2024
Final Fire/CO SS 8/15/2024 See Notes
Final/CO JG 10/7/2024
House Wrap JG 2/6/2024
CONSTRUCTION TYPE:VB OCCUPANT LOAD:
Page 1 of 1
Fire Approval:Date:Engineering
Approval:Date:
PW Approval:Date:Other ( ):Date:
To request an inspection: