Loading...
HomeMy WebLinkAboutINSPECTION Multi Family Building 1616 Continental Peaks Circle (Building B) 2024-09-11INSPECTION CARD Estes Park 170 MacGregor Ave Suite 230, Estes Park, CO 80517 POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE. APPLICATION NO.:23-EP-00047 TYPE: New Multi-Family Building ISSUED DATE:06/14/2023 EXPIRATION DATE:04/05/2025 PROJECT ADDRESS:1616 Continental Peaks Cir. Building B, Estes Park, CO 80517 PARCEL NO.: OWNER:Wildfire Homes CONTRACTOR:Treeline Construction CONTRACTOR PHONE:(970) 227-0403 DESCRIPTION OF WORK:7 new construction town homes, Building B addresses are: 1616, 1618, 1720, 1724, 1726, 1728 Continental Peaks Cir INSPECTION INSP DATE PASSED COMMENTS Footings JG 10/7/2024 Underground Plumbing JG 10/10/2023 See Notes Rough Mechanical JG 4/9/2024 Gas Test JG 3/18/2024 See Notes Fire Resistive Wall Assembly JG 4/9/2024 Above Ceiling Mechanical JG 4/15/2024 Drywall JG 4/15/2024 Final Plumbing JG 9/11/2024 Energy Code Compliance JG 10/7/2024 Final Public Works/CO JW 10/4/2024 Final Water/CO JL 5/24/2024 Final Sanitation/CO SP 9/13/2024 See Notes Final Building/CO JG 10/7/2024 Other Mechanical (Fireplace) JG 4/15/2024 INSPECTION INSP DATE PASSED COMMENTS Foundation GR 8/4/2023 Rough Plumbing JG 3/18/2024 See Notes Rough Frame JG 4/9/2024 Wall Sheathing JG 1/22/2024 Firestopping JG 4/9/2024 Gas Pressure Test JG 10/7/2024 Insulation JG 4/11/2024 Final Mechanical JG 9/11/2024 Final Building JG 9/11/2024 Final Planning/CO LB 9/12/2024 See Notes Final P&C/CO AE 9/11/2024 Final Fire/CO SS 8/15/2024 See Notes Final/CO JG 10/7/2024 House Wrap JG 2/6/2024 CONSTRUCTION TYPE:VB OCCUPANT LOAD: Page 1 of 1 Fire Approval:Date:Engineering Approval:Date: PW Approval:Date:Other ( ):Date: To request an inspection: