RE: 260 Stanley Ave
1 message
James Duell <jduell@estesparksanitation.org>Mon, Jul 23, 2018 at 10:38 AM
To: "Phillips, Charlie" <cphillips@estes.org>
Cc: Mike Kingswood <mike@homesbykingswood.com>
Hello Charlie – attached is the routing slip for the detached garage at 260 Stanley Avenue. Mike you should ask
Fairbanks to be diligent and watch for the service line to the existing house. We know it eventually extends north east but
the exact path is not known. If it’s hit/ broken please contact the lines staff for inspection/ repair. RD (970) 481-1458 or
CT (970) 481-3494.
Jim Duell
260_Stanley_Garage 180723.pdf
232K
Received Date: Permit Number:
Received By: Address:
Division of Building Safety
www.colorado.gov/townofestespark/
970-577-3726
PO Box 1200 170 McGregor Ave
Estes Park, CO 80517
EXTERIOR ROOF AND WALL SHEATHING
INSTALLATION AND
AFFIDAVIT OF COMPLIANCE
The work and conditions described on the Town approved plan matches the field installation.
No changes have been made without written approval from the Division of Building Safety.
Fasteners sizes and nailing patterns have been installed as per Engineering detail on the approved plan.
Fastener heads / crowns are flush with the sheathing surface and are not overdriven.
Roof sheathing has been install as per Engineering detail on the Town approved plan.
Roof sheathing has been installed along the correct axis.
Wall sheathing orientation matches Engineering detail on the Town approved plan.
Wall sheathing shall be capable of resisting the wind pressures listed in Table R301.2 (2).
Sheathing material and thickness matches the approved plan or Table R602.3 (3).
Gypsum sheathing has been installed vertically as per Table R602.3(1) footnote d.
Hold down connections match the approved plan and are located and attached as per the approved plan.
Backing and required blocking at horizontal joints are installed as per Engineering detail on Town approved plan.
The horizontally applied end joints of wall sheathing are offset so that four panel corners will not meet.
(OPTIONAL) Photos of the ongoing installation have been provided.
With my signature I verify the roof and wall sheathing was installed in accordance with the manufacturers’ installation
specifications, Chapters 6 & 8 of the 2015 IRC or Chapters 16 & 23 the 2015 IBC.
I release the Town of Estes Park from all liability*.
Contractor Signature:
Date:
Company Name:
Town Business License Number:
*A Contractors’ Affidavit of Compliance shall not exemp0t work from corrections if the building official determines the work does not comply with the provisions of this code.