Loading...
HomeMy WebLinkAboutINSPECTION Commercial Remodel 920 Big Thompson Ave 2022-10-26INSPECTION CARD Estes Park 170 MacGregor Ave Suite 230, Estes Park, CO 80517 POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE. APPLICATION NO.:21-EP-00603 TYPE: Commercial Remodel ISSUED DATE:03/21/2022 EXPIRATION DATE:04/24/2023 PROJECT ADDRESS:920 Big Thompson Avenue, Estes Park, CO 80517 PARCEL NO.:2519336904 OWNER:Archdiocese of Denver CONTRACTOR:CONTRACTOR PHONE: DESCRIPTION OF WORK:Our Lady of the Mountains Catholic Church kitchen addition INSPECTION INSP DATE PASSED COMMENTS Foundation CW 4/22/2022 See Notes Rough Plumbing JG 7/29/2022 Rough Frame CW 6/29/2022 See Notes Wall Sheathing CW 6/17/2022 Firestopping GR 10/26/2022 Above Ceiling Plumbing JG 10/5/2022 Insulation JG 7/29/2022 Final Mechanical JG 10/14/2022 Final Fire RE 10/26/2022 See Notes Final Planning/CO LB 10/18/2022 See Notes Roof Sheathing CW 6/17/2022 See Notes Wall Sheathing CW 7/15/2022 House Wrap CW 6/17/2022 Block and Tie JG 7/29/2022 Other Frame (Partial shingle roofing) JG 8/18/2022 See Notes Final Sanitation/CO JD 10/24/2022 INSPECTION INSP DATE PASSED COMMENTS Underground Plumbing CW 4/29/2022 See Notes Rough Mechanical JG 10/5/2022 Gas Test JG 7/29/2022 Fire Resistive Wall Assembly GR 10/26/2022 Above Ceiling Mechanical JG 8/4/2022 See Notes Drywall JG 9/1/2022 Final Plumbing JG 10/14/2022 Final Building GR 10/26/2022 Final Public Works/CO JW 10/14/2022 See Notes Other Frame CW 7/15/2022 See Notes Stucco/Stone Lathing JG 8/1/2022 Other Mechanical GR 10/26/2022 Other Frame JG 8/1/2022 See Notes Insulation JG 8/1/2022 Final Sanitation/CO JD 10/24/2022 CONSTRUCTION TYPE:OCCUPANT LOAD: Page 1 of 1 Fire Approval:Date:Engineering Approval:Date: PW Approval:Date:Other ( ):Date: To request an inspection: