Loading...
HomeMy WebLinkAboutSITE PLAN Commercial Remodel 920 Big Thompson Ave 2022-03-07S S S S S E E E E E E E E E T T T T T T T T T T T T T T LANDCADD 1987 LANDCADD 1987 LANDCADD 1987 S S N 57 ° 5 2 ' E 2 1 7 . 4 ' EM GM W 7 5 4 0 IR IR IR E IR IR IR IR IR IR IR IR IR IR IR I R I R FF=(7550.74) X FF=(7552.24)X X X 50.5 FG X 52.0 X 50.7 FG (7554.34) X X 50.6 TC 50.10 FG X 50.35 FG X X OHP OHP OHP OHP PROPOSED STEPS W/ HANDRAIL PROPOSED ADA RAMP (SEE DETAIL) 16.75 20 . 2 2 6.50 19 . 9 2 6.04 EXISTING RAMP TO BE REMOVED AND REPLACED EXISTING DECK UP EGRESS EXIT EGRESS EXIT EXISITNG ASPHALT PARKING TO BE RE-SURFACED 30 SPACES EXISTING 28 SPACES PROPOSED PROPOSED ADDITION EXISITNG STRUCTURE S 4 i n S 4in PROPOSED GREASE TRAP W/ 4" SCH 35 SEWER SERVICE (SEE NOTE #39) 2 5 ' B U I L D I N G S E T B A C K X 50.6 FG PROPOSED CONCRETE SIDEWALK TAPER CURB PAN 6"-0" OVER 6' (END CURB AND GUTTER) PROPOSED CONCRETE CURB AND GUTTER 50 48 46 44 1.4% 1 . 4 % EX I S T I N G C O N C R E T E SI D E W A L K T O R E M A I N PROPOSED CONCRETE SIDEWALK EXISTING ADA RAMP X50.7 FG X 50.6 X 50.5 TC 50.0 FG PROPOSED 14' ADA RAMP @ 1:12 (MAX.) EXISTING LANDING 7540 7550 1 7 . 5 0 X 50.25 FG ADJUST MANHOLE RIM TO MATCH FINISHED GRADE X 52.0 X 50.5 (7552.30)X CONCRETE SLOPE END CURB & GUTTER ADA PATHWAY (5% MAX. SLOPE) PROPOSED ADA PARKING SPACE X 49 FG REMOVE AND RESET CONCRETE WHEEL STOPS (TYP.) EXISTING TRASH ENCLOSURE NOT IN SCOPE OF WORK PROPOSED SIDEWALK CHASE (TYP.) (SEE ARCH. DRAWINGS TO COORDINATE WITH ROOF DRAIN LOCATION 10' (MIN . ) 1 15 16 28 W S E OHP G SUBJECT PROPERTY LINE EXISTING INTERMEDIATE CONTOUR EXISTING WATER LINE EXISTING SEWER LINE EXISTING UNDERGROUND ELECTRIC LINE EXISTING OVERHEAD POWER LINE EXISTING GAS LINE ADJACENT PROPERTY LINE EXISTING SEWER MANHOLE EXISTING EASEMENT LINE EXISTING INDEX CONTOUR W/ ELEVATION7690 BUILDING SETBACK LINE DENOTES TOP OF CURB ELEVATIONTC DENOTES FLOW LINE OF CURB ELEVATIONFL DENOTES FINISHED GRADE ELEVATIONFG S S E W W W LANDCADD 1987 LANDCADD 1987 LANDCADD 1987 LANDCADD 1987 LANDCADD 1987 LANDCADD 1987 LANDCADD 1987 25' BUILDING SETBACK T S 3 2 ° 0 8 ' E 3 1 3 . 0 7 ' N 57°52' E 217.4' 200.0' N 3 2 ° 0 8 ' W 3 1 3 . 0 7 ' N 57°52' E 417.42' 25 1 1 19 14 1 "R - M " - M U L T I - F A M I L Y R E S I D E N T I A L "R - 2 " - T W O - F A M I L Y R E S I D E N T I A L EM G M "R - 2 " - T W O - F A M I L Y R E S I D E N T I A L LO T 1 9 LA K E V I E W T R A C T S "R-2" - TWO-FAMILY RESIDENTIAL W W 18 W 62 IR IR IR I R 11' "R-2" - TWO-FAMILY RESIDENTIAL "R - 2 " - T W O - F A M I L Y R E S I D E N T I A L LA K E V I E W T R A C T S LO T 1 8 IR IR IR 5' 10' B U I L D I N G S E T B A C K 50 48 46 44 PROPOSED ADDITION T 16 1718 19 PROJECT LOCATION 10 SCALE 1" = 10' 0 10 20 30 N OUR LADY OF THE MOUNTAIN CATHOLIC CHURCH SITEPLAN OUR LADY OF THE MOUNTAINS SHEET TITLE: BY:REVISION:DATE: CLIENT: SHEET 2 SHEET 1501.008 JOB NO.MST DATE SCALE APPROVED BY AS SHOWN 07/30/2021 MST JLR MST DRAWN BY CHECKED BY DESIGNED BY PROJECT TITLE: KITCHEN REMODEL/ADDITION 2021 CORNERSTONE ENGINEERING & SURVEYING, INC. COPYRIGHT - ALL RIGHTS RESERVED 1692 BIG THOMPSON AVE. SUITE 200 ESTES PARK, CO 80517 PH: (970) 586-2458 FAX: (970) 586-2459R Know what's below. Call before you dig. CALL 3-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. LEGEND: PROPERTY OVERVIEW SCALE 1"=60' VICINITY MAP SCALE 1"=600' N N LOCATED IN THE SW 1/4 OF SECTION 19 T5N, R72W OF THE 6TH P.M., LARIMER COUNTY, COLORADO OUR LADY OF THE MOUNTAINS CATHOLIC CHURCH KITCHEN REMODEL/ADDITION Utilities: Water Town of Estes Park Electric Town of Estes Park Sewer Estes Park Sanitation District Gas Xcel Telephone Century Link SITE STATISTICS: 920 BIG THOMPSON AVE. ESTES PARK, CO 80517 SITE ADDRESS: JLRREVISE ADA PATH FROM PARKING03/06/2020 JLRPERMIT SET07/30/2021 JLRPLANNING DEPT RESPONSE01/28/2022 2% 6" #5 REBAR @ 16" O.C. EW CENTERED SEE ARCHITECTURAL DRAWINGS FOR HANDRAIL SEE DETAIL 2" CLEAR VARIES 0-24" 12" 3" CLEAR 6" #5 REBAR @ 16" O.C. EW COMPACTED GRAVEL OR UNDISTURBED SOIL CONCRETE SIDEWALK SPAN WITH 1/2" THICK 18" WODE HIGH STRENGTH, LIGHTWEIGHT ALUMINUM ALLOY NONSKID TREAD PLATE. LENGTH VARIES 8" 12" 14.95 18.00 0.50 OUR LADY OF THE MOUNTAIN CATHOLIC CHURCH GENERAL NOTES/DETAILS OUR LADY OF THE MOUNTAINS SHEET TITLE: BY:REVISION:DATE: CLIENT: SHEET 2 SHEET 2501.008 JOB NO.MST DATE SCALE APPROVED BY AS SHOWN 07/30/2021 MST JLR MST DRAWN BY CHECKED BY DESIGNED BY PROJECT TITLE: KITCHEN REMODEL/ADDITION 2021 CORNERSTONE ENGINEERING & SURVEYING, INC. COPYRIGHT - ALL RIGHTS RESERVED 1692 BIG THOMPSON AVE. SUITE 200 ESTES PARK, CO 80517 PH: (970) 586-2458 FAX: (970) 586-2459R Know what's below. Call before you dig. CALL 3-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. LOCATED IN THE SW 1/4 OF SECTION 19 T5N, R72W OF THE 6TH P.M., LARIMER COUNTY, COLORADO OUR LADY OF THE MOUNTAINS CATHOLIC CHURCH KITCHEN REMODEL/ADDITION SIDEWALK RAMP/CURB RAMP GENERAL NOTES: 1.ALL SIDEWALK RAMPS TO HAVE LANDINGS BOTH TOP AND BOTTOM OF RAMP. LANDING TO BE MIN. 5-FEET IN LENGTH AND SHALL HAVE A CROSS-SLOPE NOT STEEPER THAN 1:48. 2.ALL CURB RAMPS TO HAVE LANDINGS AT TOP OF RAMP. LANDING TO BE MIN. 36-INCHES IN LENGTH AND SHALL HAVE A CROSS-SLOPE NOT STEEPER THAN 1:48. GENERAL NOTES: 1.ALL SUBGRADE TO BE COMPACTED TO 95% STANDARDS PROCTOR. 2.STARIWAYS, RAMPS AND HANDRAILS SHALL BE IN CONFORMANCE WITH 2015 I.B.C. SECTION 1011 & 1012. NOTES: CORNERSTONE ENGINEERING AND SURVEYING, INC. IS NOT A GUARANTOR OF THE PERFORMANCE OF THE WORK. CORNERSTONE ENGINEERING AND SURVEYING, INC. IS NOT RESPONSIBLE FOR SAFETY, IN, ON, OR ABOUT THE PROJECT SITE, NOR FOR COMPLIANCE BY THE APPROPRIATE PARTY WITH ANY REGULATIONS RELATED THERETO. CORNERSTONE ENGINEERING AND SURVEYING, INC. EXERCISES NO CONTROL OVER THE SAFETY OR ADEQUACY OF ANY EQUIPMENT, BUILDING COMPONENTS, FORMS, OR OTHER WORK AIDS USED IN OR ABOUT THE PROJECT, OR OVER THE SUPERINTENDING OF THE SAME. WRITTEN SCALES ON PLAN ARE FOR FULL SIZED 22" x 34" PLANS AND DO NOT APPLY TO REDUCED PLAN SETS. 19.DILUTED EMULSIFIED ASPHALT FOR TACK COAT SHALL CONSIST OF 1 PART EMULSIFIED ASPHALT AND 1 PART WATER. RATES OF APPLICATION SHALL BE AS DETERMINED BY THE ENGINEER AT THE TIME OF APPLICATION. 20.A TACK COAT IS REQUIRED PRIOR TO THE PLACEMENT OF SUBSEQUENT LIFTS OF HBP. THE COST OF THE TACK COAT SHALL BE INCLUDED IN THE COST OF H.B.P. (GR. S). 21.BEFORE PLACEMENT OF THE TACK COAT, THE CONTRACTOR SHALL CLEAN THE PRESENT ROADWAY AS DIRECTED. CLEANING WILL NOT BE PAID FOR SEPARATELY BUT SHALL BE INCIDENTAL TO THE HBP. 22.A SKI TYPE DEVICE AT LEAST 50 FEET IN LENGTH WILL BE REQUIRED WITH EACH BITUMINOUS PAVER. THIS DEVICE SHALL BE USED ON EACH PASS AND LIFT OF BITUMINOUS PAVEMENT PLACED. 23.ANY LAYER OF BITUMINOUS PAVEMENT THAT IS TO HAVE A SUCCEEDING LAYER PLACED THEREON SHALL BE COMPLETED FULL WIDTH BEFORE SUCCEEDING LAYER IS PLACED. 24.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE TOWN OF ESTES PARK STANDARDS INCLUDING BUT NOT LIMITED TO - THE TOWN OF ESTES PARK RIGHT-OF-WAY PERMIT APPLICATION AND CONSTRUCTION GUIDELINES AND THE TOWN OF ESTES PARK LIGHT AND POWER OPERATIONAL MANUAL RULES AND REGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY, ALL WORK SHALL BE INSPECTED AND APPROVED BY THE LOCAL ENTITY. 25.NO WORK MAY COMMENCE WITHIN ANY IMPROVED PUBLIC RIGHT-OF-WAY UNTIL A RIGHT-OF-WAY PERMIT OR DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH M.U.T.C.D., TO THE TOWN OF ESTES PARK, FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE RIGHT-OF WAY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THE CONSTRUCTION ACTIVITIES. 26.THE CONTRACTOR SHALL HAVE, ON-SITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, A COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB, AND EASEMENTS. 27.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE. 28.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIAL NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED OTHERWISE. 29.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24 HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR. 30.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OR RECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE AND AVAILABLE TO THE LOCAL ENTITY'S INSPECTOR AT ALL TIMES. THIS INFORMATION SHALL BE PROVIDED TO PROJECT MANAGER UPON COMPLETION OF THE PROJECT. 31.ALL EROSION CONTROL MEASURES SHALL BE INSTALLED, AT THE LIMITS OF THE CONSTRUCTION AND AT THE AREAS WITH DISTURBED SOIL, ON OR OFF-SITE, PRIOR TO ANY OTHER GROUND-DISTURBING ACTIVITY. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE CONTRACTOR, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREA IS STABILIZED WITH HARD SURFACE OR LANDSCAPING. TO MITIGATE EROSION, THE CONTRACTOR SHALL USE STANDARD EROSION CONTROL TECHNIQUES DESCRIBED IN "A GUIDE FOR EROSION AND SEDIMENT CONTROL IN URBANIZED AREAS OF COLORADO" AS PUBLISHED BY THE NATURAL RESOURCES CONSERVATION SERVICE, U.S. DEPT. OF AGRICULTURE, OR PER THE PROJECT MANAGERS DIRECTION. 32.TO THE MAXIMUM EXTENT FEASIBLE, TOPSOIL THAT IS REMOVED DURING CONSTRUCTION SHALL BE STOCKPILED AND CONSERVED FOR LATER USE ON AREAS REQUIRING REVEGETATION OR LANDSCAPING, SUCH AS CUT-AND-FILL SLOPES. 33.ALL DISTURBED AREAS SHALL BE RESTORED AS NATURAL-APPEARING LAND FORMS, WITH CURVES THAT BLEND IN WITH THE ADJACENT UNDISTURBED SLOPES. ABRUPT ANGULAR TRANSITIONS AND LINEAR SLOPES SHALL BE AVOIDED. 34.AREAS DISTURBED BY GRADING SHALL BE CONTOURED SO THEY CAN BE REVEGETATED AND SHALL BE REVEGETATED WITHIN ONE (1) GROWING SEASON AFTER CONSTRUCTION, USING NATIVE SPECIES SIMILAR TO THOSE GROWING ON THE SITE WHEN SUCH REVEGETATION DOES NOT CONTRIBUTE HAZARDS. REVEGETATION SHALL BE SUFFICIENT TO PROVIDE EROSION CONTROL AND TO PREVENT THE INVASION OF WEEDS. 35.ON MAN-MADE SLOPES OF TWENTY-FIVE PERCENT (25%) OR GREATER, PLANT MATERIALS WITH DEEP ROOTING CHARACTERISTICS SHALL BE SELECTED THAT WILL MINIMIZE EROSION AND REDUCE SURFACE RUN-OFF. 36.ON MAN-MADE SLOPES GREATER THAN FIFTY PERCENT (50%), THE STAFF SHALL REQUIRE ADDITIONAL STABILIZATION MEASURES SUCH AS EROSION NETTING OR HYDRO-MULCH TO ENSURE ADEQUATE STABILIZATION AND REVEGETATION. 37.ALL PARKING LOT STRIPING TO BE WHITE. 38.4-FEET MINIMUM COVER OVER PROPOSED SEWER SERVICE. 39.CONTRACTOR TO POTHOLE EXISTING SEWER LINE TO VERIFY SLOPE AND CLEARANCE FOR SEWER SERVICE TO THE PROPOSED GREASE TRAP. 1.DEPTH OF MOISTURE-DENSITY CONTROL FOR THIS PROJECT SHALL BE AS FOLLOWS: FULL DEPTH OF ALL EMBANKMENTS BASES OF CUTS AND FILLS 0.5 FEET 2.EXCAVATION REQUIRED FOR COMPACTION OF BASES OF CUTS AND FILLS WILL BE CONSIDERED SUBSIDIARY TO THAT OPERATION AND WILL NOT BE PAID SEPARATELY. 3.THE CONTRACTOR SHALL CUT THE EDGE OF THE EXISTING ASPHALT MAT TO PROVIDE A CLEAN JOINT BETWEEN EXISTING ROADWAY AND A CONCRETE CURB AND GUTTER. A CUTTING WHEEL SHALL BE REQUIRED TO OBTAIN A VERTICAL CUT APPROXIMATELY 8" FROM THE EDGE OF EXISTING PAVEMENT OR AS DIRECTED BY THE ENGINEER. THE CUTTING SHALL BE DONE TO A NEAT VERTICAL WORK LINE WITH A CUTTING WHEEL ATTACHED TO A BLADE OR OTHER METHOD AS APPROVED BY THE ENGINEER. THE CONTRACTOR WILL BE REQUIRED TO PAINT THE EDGE OF CUT PAVEMENT WITH DILUTED EMULSIFIED ASPHALT (SLOW SETTING) PRIOR TO PAVEMENT OPERATION. THE CONTRACTOR WILL NOT BE ALLOWED TO LEAVE THE CUT VERTICAL EDGES OVERNIGHT. 4.WATER SHALL BE USED AS A DUST PALLIATIVE WHERE REQUIRED. LOCATIONS SHALL BE AS ORDERED. COST FOR DUST PALLIATIVE WILL NOT BE MEASURED OR PAID FOR SEPARATELY BUT SHALL BE INCLUDED IN THE WORK. 5.IT IS ESTIMATED THAT 8 HOURS OF POT HOLING WILL BE REQUIRED ON THIS PROJECT. 6.THE CONTRACTOR SHALL PROTECT ALL WORK AREAS AND FACILITIES FROM WATER AT ALL TIMES. AREAS AND FACILITIES SUBJECT TO FLOODING, REGARDLESS OF THE SOURCE OF WATER SHALL BE PROMPTLY DEWATERED AND RESTORED AT NO COST TO THE TOWN. 7.EMBANKMENT MATERIAL SHALL HAVE A RESISTANCE VALUE OF AT LEAST 40 WHEN TESTED BY THE HVEEM STABILOMETER. 8.RELOCATION OF EXISTING UTILITIES IS NOT PART OF THIS CONTRACT EXCEPT AS SHOWN ON THESE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF UTILITY RELOCATIONS BY UTILITY COMPANIES IN HOW IT IMPACTS HIS WORK SCHEDULE AND WORK PROGRESS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING UTILITIES DURING CONSTRUCTION AND SHALL HOLD THE DEVELOPER AND IT'S ENGINEER HARMLESS FOR DAMAGES ARISING FROM THE CONTRACTOR'S FAILURE TO ADEQUATELY PROTECT EXISTING UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO SCHEDULE UTILITY ADJUSTMENTS TO ELIMINATE CONFLICT WITH PROGRESS OF THE WORK. 9.UTILITIES SANITARY SEWER: ESTES PARK SANITATION DISTRICT CONTACT: JAMES DUELL (970) 586-2866 ELECTRIC: ESTES PARK LIGHT AND POWER CONTACT: JOE LOCKHART (970) 577-3601 WATER: ESTES PARK WATER DEPARTMENT CONTACT: CHRIS ESHELMAN (970) 577-3630 UTILITY LOCATE: 1-800-922-1987. 10.TRENCHES OVER FIVE FEET IN DEPTH SHALL BE EITHER SHORED OR TRENCH WALLS SHALL BE SLOPED TO THE APPLICABLE OSHA REGULATIONS. 11.THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL APPROPRIATE OSHA REGULATIONS AND STANDARDS INCLUDING, BUT NOT LIMITED TO, 29 CFR PART 1926, OSHA STANDARDS-EXCAVATIONS. THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN OF SLOPING AND BENCHING FOR PROTECTION OF EMPLOYEES IN EXCAVATIONS PLUS METHODS FOR PHYSICAL PROTECTION FOR FALL PROTECTION. 12.CONTRACTOR SHALL NOTIFY OWNERS OF PRIVATE PROPERTY 48 HOURS IN ADVANCE OF ANY POSSIBLE UTILITY DISTURBANCE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ANY INTERFERENCE AT THE DISCRETION OF THE AFFECTED PROPERTY OWNER. 13.THE CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE PROPERTIES AT ALL TIMES DURING CONSTRUCTION. 14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING, AT HIS EXPENSE, ANY PROPERTY PINS OR SURVEY MONUMENTS DESTROYED DURING CONSTRUCTION. 15.OVERHEAD POWER AND TELEPHONE LINES ARE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTING OVERHEAD UTILITIES LOCATIONS AND TAKING NECESSARY PRECAUTIONS TO PREVENT INTERFERENCE WITH OVERHEAD LINES PRIOR TO AND DURING CONSTRUCTION. 16.THE CONTRACTOR SHALL COORDINATE WITH EMERGENCY ASSISTANCE AGENCIES TO INSURE THAT EMERGENCY VEHICLES ARE NOT HINDERED DURING CONSTRUCTION. 17.THE PHYSICAL FEATURES WITHIN THE LIMITS OF THE PROJECT HAVE BEEN SHOWN BASED ON THE BEST AVAILABLE INFORMATION. 18.EXISTING UTILITIES: KNOWN SEWER, WATER MAINS, GAS MAINS, TELEPHONE CONDUITS, ELECTRIC CABLES, AND OTHER UNDERGROUND STRUCTURES ARE SHOWN ON THE DRAWINGS ONLY TO THE EXTENT SUCH INFORMATION HAS BEEN MADE AVAILABLE TO OR DISCOVERED BY THE ENGINEER. THERE IS EXPECTED TO BE DISCREPANCIES AND OMISSIONS IN THE LOCATION AND QUANTITY OF UTILITIES AND STRUCTURES SHOWN. THIS INFORMATION IS SHOWN FOR THE CONVENIENCE OF THE CONTRACTOR BUT IS NOT GUARANTEED TO BE EITHER CORRECT OR COMPLETE. THE CONTRACTOR WILL MAKE THE INVESTIGATION DEEMED NECESSARY TO VERIFY THE CORRECTNESS AND EXTENT OF THE UTILITIES. THE CONTRACTOR SHALL, AHEAD OF EXCAVATION, LOCATE ALL UNDERGROUND UTILITIES AND STRUCTURES SO THEY WILL NOT BE ACCIDENTALLY DAMAGED DURING CONSTRUCTION. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY AND LIABILITY FOR ANY DAMAGE TO UNDERGROUND UTILITIES AND STRUCTURES. SEWER SERVICES HAVE NOT BEEN FIELD LOCATED. GENERAL NOTES:GENERAL NOTES (CONT'D): ACCESSIBLE RAMP SECTION NOT TO SCALE CURB AND GUTTER/ASPHALT DETAIL NOT TO SCALE JLRPERMIT SET07/30/2021 SIDEWALK CHASE DETAIL NOT TO SCALE JLRPLANNING DEPT RESPONSE01/28/2022