Loading...
HomeMy WebLinkAboutPLANS Deck 164 Stanley Circle Dr 2022-04-19Flash over ledger and behind wall finish Handrail cannot break at intermidiate post, it must be continuous. Open Hole Inspection required Handrail must provide a gripable surface Reviewed by SAFEbuilt; 2015 International Codes Subject to inspection and compliance to all Relevant, adopted Building & Municipal Codes 04/19/2022 Reviewed by SAFEbuilt 04/19/2022 Reviewed by SAFEbuilt 04/19/2022