HomeMy WebLinkAboutPLANS Deck 164 Stanley Circle Dr 2022-04-19Flash over ledger and
behind wall finish
Handrail cannot break
at intermidiate post, it
must be continuous.
Open Hole Inspection
required
Handrail must provide a
gripable surface
Reviewed by SAFEbuilt;
2015 International Codes
Subject to inspection and compliance to all
Relevant, adopted Building & Municipal
Codes
04/19/2022
Reviewed by
SAFEbuilt
04/19/2022
Reviewed by
SAFEbuilt
04/19/2022