Loading...
HomeMy WebLinkAboutPLANS 23-577 901 Black Canyon Dr, deck 2023-10-16PROJECT INFORMATION PARCEL NUMBER: 3524105016 SCHEDULE: 0601349 LEGAL DESCRIPTION: LOT 16, BLACK CANYON HILLS ADD, ESTES PARK LOT INFORMATION: LOT SIZE: .98 ACRES ZONING: E1 - ESTATE UTILITIES: WATER: ESTES PARK WATER SEWER: ESTES PARK SANITATION ELECTRICITY: ESTES PARK ELECTRIC GAS: XCELL NATURAL GAS DECK PROJECT SQ FT: EXISTING DECK: 445 SQFT PROPOSED DECK: 445 SQFT FENCED IN DOG RUN: EXISTING: 0 SQFT PROPOSED: 600 SQ FT A1 - TITLE SHEET: INFORMATION, DEMOLITION PLAN, SITE PLAN A2 - FRAMING PLAN AND DETAILS THE PROJECT LOCATION FOR THIS DECK REPLACEMENT IS 901 BLACK CANON DR. THE NEW DECK IS TO HAVE THE SAME FOOTPRINT AS THE EXISTING DECK, WITH THE EXCEPTION OF THE STAIRS AND STAIR LANDING. THE PURPOSE OF THIS DECK IS TO REPAIR HAIL DAMAGE AND BRING THE DECK UP TO CODE STRUCTURALLY. THE EXISTING FOOTPRINT IS NOT GOING TO CHANGE. DECK FRAMING TO BE WEATHER TREATED 2X8 OR 2X10. THE TOP OF THE JOISTS ARE TO BE PROTECTED WITH BUTYL TAPE PRIOR TO INSTALLATION OF THE NEW TREX DECKING. THE EXISTING 4X4 POSTS ARE TO BE RE-USED WHERE POSSIBLE. THE 8" PIERS ARE TO BE REMOVED AND REPLACED AS CALLED OUT ON THE PLANS. THE NEW DECK RAILINGS ARE TO BE RDI METAL RAILINGS W/ A TREX TOP CAP. THE UPPER DECK WATER PROOF SYSTEM IS TO BE TAKEN APART AND REPLACED WITH NEW EPDM MEMBRANE AS NEEDED. A NEW ELECTRICAL BOX IS TO BE INSTALLED WHILE THE DECK WORK IS BEING DONE IN ORDER TO PROVIDE POWER FOR THE NEW AWNING TO BE INSTALLED. ADDITIONALLY, ALONG THE WEST SIDE OF THE HOUSE THE OWNERS WOULD LIKE TO CONSTRUCT A NEW FENCED-IN DOG AREA. THIS NEW FENCE IS TO BE A +/- 6' TALL, MATTE BLACK POWDER COATED STEEL FENCE APPROXIMATELY 600 SQ FT IN SIZE. 1) ALL DIMENSIONS ARE FROM FACE OF STRUCTURE TO FACE OF STRUCTURE, UNLESS NOTED OTHERWISE. 2) THIS IS DECK PROJECT IS IN ADDITION TO AN EXISTING STRUCTURE AND DIMENSIONS MAY NEED TO BE VERIFIED IN FIELD. 3) ALL DIMENSIONS MARKED WITH ± ARE APPROXIMATE. 4) INSPECT AND VERIFY EXISTING CONDITIONS. NOTIFY OWNER/G.C. OF ANY DISCREPANCIES OR QUESTIONS. 5) ALL WORK SHALL COMPLY WITH LOCAL CODES AND REGULATIONS. 6) MAINTAIN A CLEAN AND SAFE WORK-SITE AT ALL TIMES. CLEAN UP CONSTRUCTION DEBRIS ON A REGULAR BASIS. 7) THE AGE AND CONDITION OF EXISTING STRUCTURE SUGGESTS NO PRESENCE OF ASBESTOS OR HAZARDOUS MATERIALS. SHALL ANY SUSPICIOUS MATERIALS BE DISCOVERED, THE G.C. SHALL HALT WORK UNTIL TESTING AND PROPER DISPOSAL CAN BE ACCOMPLISHED. 8) ALL NEW MATERIALS AND FINISHES SHALL MATCH EXISTING UNLESS SPECIFIED IN THESE DRAWINGS OR DICTATED BY CLIENT/OWNER. COORDINATE ALL FINAL SELECTIONS WITH G.C. AND CLIENT/OWNER PRIOR TO ORDERING OR INSTALLING. 10) ALL FRAMING AND LUMBER ARE TO BE WEATHER TREATED UNLESS OTHERWISE NOTED. TOP OF JOIST TO BE WEATHER PROTECTED WITH JOIST OR BUTYL TAPE. 11) THE BOTTOM OF EACH POST TO BE TREATED WITH COPPER COAT WEATHER TREATMENT OR ANOTHER COMPARABLE ALTERNATIVE. PROJECT TEAM CLIENT / OWNER JOHN NOSBISCH PHONE: (970) 775-3664 johnnynosbisch@gmail.com DESIGN and DRAFTING VOYAGER ONE DESIGN CO.- STEVE RANDALL PHONE: (970) 443.0704 voyageronedesign@gmail.com ENGINEER OF RECORD VAN HORN ENGINEERING - FRANK ROBERTS PHONE: (970) 586.9388 frank@vanhornengineer.com EXISTING COLOR KEY NEW DEMOLITION BY OWNER STRUCTURAL NOTES Building Code Information: 2015 IRC Risk Category II Ground snow load = 67.3 psf (at 7730' elev) Dead Load = 10 psf Vult = 175 mph, Exp C Seismic Design Category B Flood Zone: X 1. All lumber shall be pressure treated Hem Fir, #2 or better. 2. LVLs shall be fully wrapped and protected from weather w/ 1x cedar and/or soffit, caulked and painted. 3. Bottom of posts shall be protected from decay with copper coat or alternative wood preservative. 4. Anchor bolts shall be ASTM F1554 Grade 36 w/ ASTM F436 washers, and ASTM A563 Grade A nuts; all components hot dipped galvanized. 5. Minimum concrete strength shall be 3,000 psi for piers. Rebar shall be ASTM A615. 6. Assumed soil bearing pressure: 2500 psf Note: This deck is NOT designed to received the load of a future hot tub. SHEET INDEX PROJECT NARRATIVE PROJECT GENERAL NOTES DEMOLITION PLAN Scale: 1/8" = 1'-0" VICINITY MAP NOT TO SCALE N UPPER AND LOWER DECKS TO BE REMOVED South Aerial View N BL A C K C A N Y O N D R . 901 BLACK CANYON DR. SITE PLAN Scale: 1" = 60'N HOMESTEADER LN. ±445 SQ FT - REMOVAL OF ALL UPPER AND LOWER DECKS, DECK RAILING, DECK PIERS, DECKING, AND STAIRS, EXISTING POSTS, SOFFIT, FASCIA BOARDS, AND GUTTER TO BE RE-USED WHERE POSSIBLE PEAK VIEW DR. SCOTT AVE.FI S H C R E E K R D . LAKE SHORE DR. 36 34 PROJECT SITE 901 BLACK CANYON DR. LAKE ES T E S 36 34 7 NEW DECK LOCATION NEW FENCE AREA +/- 32' +/ - 2 0 ' +/- 20' 25'-0" SETBACK B L A C K C A N Y O N D R . A1 September 7, 2023 NO S B I S C H R E S I D E N C E A D e c k C o n s t r u c t i o n P r o j e c t 90 1 B l a c k C a n y o n D r . Es t e s P a r k C O 8 0 5 1 7 OF 2 SHEET NUMBER ISSUE DATE REVISIONS Cover Page: Information and Demolition SHEET TITLE - - - VOYAGER ONE DESIGN CO 9/7/2023 PERMIT #23-EP-00557 Field Copy Print out legibly & in color and have on site for inspector REVIEWED BY SAFEbuilt - PBLAND 6 FRAMING PLAN SCALE: 3/16" = 1'-0"N AERIAL VIEW SOUTH ELEVATION SCALE: 3/32" = 1'-0" ELECTRICIAN TO HARDWIRE LOCATION FOR AUTOMATIC RETRACTABLE AWNINGS MIN. 4" SPHERICAL OPENING RDI EXCALIBUR STEEL RAILING, MATTE BLACK FENCE DETAIL SCALE: 3/16" = 1'-0" SIMPSON AB POST BASE ANCHOR TREX SQUARE END TOP CAP RDI EXCALIBUR STEEL RAILING, MATTE BLACK 4X4 POST TO BE RE-USED IF IN GOOD CONDITION 12" PIER W/ (2) #4 VERT BAR AND (1) SIMPSON AB POST BASE ANCHOR WEATHER TREATED 2x10 @ 16" O.C. W/ (1) LUS210 EA. END TREX PROTECT JOIST TAPE, EA. JOIST 2X10 @ 16" O.C. (2) 2X10 RIM JOISTS W/ (2) 2 7/8"FASTENMASTER HEADLOK @ 16" O.C. 4X4 WOOD POST (EXISTING POSTS TO BE RE-USED WHERE POSSIBLE) TREX DECKING COLOR: TBD 2 A02 NEW MATCHING STONE TO REPLACE OLD CONCRETE PAD 4X4 POST TO BE RE-USED IF IN GOOD CONDITION MIN. 36" DEPTH TOP OF PIER 6" ABOVE GRADE 3 DECK SECTION SCALE: 3/16" = 1'-0" 12" PIER W/ (2) #4 VERTICAL BAR WEST ELEVATION SCALE: 3/32" = 1'-0" 2X10 @ 16" O.C. 1 + / - 1 0 ' - 0 " 4'-7" TREX DECKING - COLOR AND STYLE TBD BY OWNER 1x NATURAL WOOD FASCIA BOARD TREX PROTECT JOIST TAPE EA. JOIST RE-USE EXISTING GUTTER IF POSSIBLE, INSTALL NEW FLASHING 7'-4 1/4"7'-4 1/4" 2 A2 FRAMING PLAN, UPPER SCALE: 3/16" = 1'-0"N2 EPDM MEMBRANE SLOPED 1/8" - 1/4" PER FOOT 2X8 @ 16" O.C. W/ LUS28 HANGER EA. END (2) 1.75X9.5 LVL WRAPPED BEAM W/ (1) SIMPSON LCE4/AC4 POST TO BEAM EA. END 2X SLEEPERS 4 PIER ON BEDROCK DETAIL SCALE: 1/4" = 1'-0" (2) 2X10 W/ (2) 2 7/8" FASTENMASTER HEADLOK @ 16" O.C. WEATHER TREATED 2X10 @ 16" O.C. 2X10 LEDGER W/ (2) LEDGERLOKS @ 8" O.C. 12" PIER W/ (2) #4 VERT BAR AND (1) AB POST BASE ANCHOR 1/4" 1'-0" 1'-0" 1'-0"1'-4"1'-0" 1'-0" (4) SIMPSON DTT2Z AT ALL EDGES (4) SIMPSON DTT2Z AT ALL EDGES WEATHER TREATED 2X8 LEDGER W/ (2) LEDGERLOKS @ 16" O.C. (2) 1.75X9.5 LVL RIM BOARD, WRAPPED FOR WEATHER PROTECTION WEATHER TREATED 2X8 @ 16" O.C. W/ (1) LUS28 EA. END 2X8 @ 16" O.C. 2X10 LEDGER W/ (2) LEDGERLOKS @ 8" O.C. (4) SIMPSON DTT2Z AT ALL EDGES (9) WEATHER TREATED 2X12 STRINGERS 16" PIER W/ (3) #4 VERT BAR AND (1) SIMPSON AB POST BASE ANCHOR: SOILS CONDITIONS TO BE ASSESSED BY ENGINEER AFTER MIDDLE PIERS ARE REMOVED STYLE TBD W/ OWNERS IF BEDROCK FOUND DRILL AND EPOXY (2) #4 VERT. BAR, OPEN HOLE INSPECTION REQUIRED FOR FURTHER REVIEW OF POSSIBLE REDUCED PIER SIZES 1X CEDAR FASCIA BOARD PAINTED TO MATCH HOUSE 2X10 @ 16" O.C. W/ (1) LUS210 EA. END TREX TOP RAILS TO MATCH DECKING (4) SIMPSON DTT2Z AT HOUSE TO LEDGER CONNECTIONS TREX DECKING (2) 2X10 W/ (1) SIMPSON LUS210-2 AT EACH END 1'-0" 2X10 W/ (1) SIMPSON LS90 EA. END 5 STAIR ON TIMBER DETAIL SCALE: 1/4" = 1'-0" 2X12 STRINGERS W/ (1) SIMPSON LSCZ ADJUSTABLE HANGER EA JOIST +/- 7 1/2" NEW MATCHING PATIO STONE TO REPLACE OLD CONCRETE PAD +/- 600 SQ FT DOG FENCE AREA GATE LOCATION 16" PIER W/ (3) #4 VERT BAR AND (1) AB POST BASE ANCHOR 13 ' - 3 " 14'-8 1/2" 12 ' - 1 1 / 2 " 5' - 0 " 5'-1" 12'-1 1/2" 1'-0"1'-0"12" PIER W/ (2) #4 VERT BAR AND (1) AB POST BASE ANCHOR (2) 6X6 GROUND CONTACT TIMBERS W/ (1) 10" TIMBERLOK EA. STRINGER +/- 3'-0 " +/ - 5 ' - 6 " +/- 14'-8 1/2" (2) 2X10 W/ (2) 2 7/8" FASTENMASTER HEADLOK @ 16" O.C. (2) 2X10 RIM JOISTS W/ (2) 2 7/8" FASTENMASTER HEADLOK @ 16" O.C. +/- 11" SOFFIT TO BE RE-USED IF POSSIBLE 1 A2 (2) GROUND CONTACT 6X6 TIMBERS W/ (2) 12" TIMBERLOK @ 16" O.C. PRE-DRILL AND INSTALL (1) 12" TIMBERLOK EA STRINGER 1'-0" A2 September 7, 2023 NO S B I S C H R E S I D E N C E A D e c k C o n s t r u c t i o n P r o j e c t 90 1 B l a c k C a n y o n D r . Es t e s P a r k C O 8 0 5 1 7 OF 2 SHEET NUMBER ISSUE DATE REVISIONS Plan Page and Framing SHEET TITLE - - - VOYAGER ONE DESIGN CO 1'-4" 1'-4" 9/7/2023 PERMIT #23-EP-00557 Field Copy Print out legibly & in color and have on site for inspector REVIEWED BY SAFEbuilt - PBLAND Plastic composite decking, treads and handrail to comply with R507.2.2 & ASTM D7032. Verify composite decking can span the required joist spacing OPEN HOLE INSPECTION REQUIRED BEFORE CAISSON CONCRETE IS POURED Stairs, Handrails & Guardrails to meet requirements of R311.7 - R312 APPROVED by SAFEbuilt; 2018 International Codes Subject to inspection and compliance to all Relevant, adopted Building & Municipal Codes 10/23/2023