HomeMy WebLinkAboutPLANS 23-362 461 Marcus Ln, PV System 2023-07-17GENERAL NOTES 1.1.1 PROJECT NOTES: 1.1.2 THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE (NEC) ARTICLE 690, ALL MANUFACTURERS’S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION’S (AHJ) APPLICABLE CODES. 1.1.3 THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION 1.1.4 GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS INTEGRATED WITH THE MICROINVERTER IN ACCORDANCE WITH NEC 690.41(B) 1.1.5 ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC 690.4: PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY 1.1.6 MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED ACCORDING TO NEC 690.7. 1.1.7 ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS FROM LISTING OR LABELING [NEC 110.3]. 1.1.8 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE NEC AND AHJ. 1.2.1 SCOPE OF WORK: 1.2.2 PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT. *NEC2020M 1.3.1 WORK INCLUDES: 1.3.2 PV ROOF ATTACHMENTS - IRONRIDGE FLASH VUE 1.3.3 PV RACKING SYSTEM INSTALLATION - IRONRIDGE XR-100 1.3.4 PV MODULE AND INVERTER INSTALLATION - HANWHA Q-CELLS Q.PEAK DUO G10+ 405W / ENPHASE IQ8A-72-2-US 1.3.5 PV EQUIPMENT GROUNDING 1.3.6 PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX 1.3.7 PV INSTALLING SYSTEM MONITORING EQUIPMENT 1.3.8 PV LOAD CENTERS (IF INCLUDED) 1.3.9 PV METERING (IF INCLUDED) 1.3.10 PV DISCONNECTS 1.3.11 PV GROUNDING ELECTRODE & BONDING TO (E) GEC 1.3.12 PV FINAL COMMISSIONING 1.3.13 (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV OWNER NAME:SCOTT MONTGOMERY AUTHORITIES HAVING JURISDICTION BUILDING: ZONING: UTILITY: ESTES ESTES TOWN OF ESTES PARK UTILITIES DESIGN SPECIFICATIONS OCCUPANCY: ІІ CONSTRUCTION: SINGLE-FAMILY ZONING:RESIDENTIAL GROUND SNOW LOAD: 70 PSF WIND EXPOSURE: C WIND SPEED: 175 MPH APPLICABLE CODES & STANDARDS BUILDING: IBC 2015 RESIDENTIAL:IRC 2015 ELECTRICAL: NEC 2020 FIRE:IFC 2018 PROJECT INFORMATION PROJECT MANAGER NAME:CLAY COLE PHONE:970-401-0391 CONTRACTOR NAME:AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR PHONE:720-504-0005 B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 T-001.00 COVER PAGE (SHEET 1) 01 AERIAL PHOTO NOT TO SCALE N EW S 02 PLAT MAP NOT TO SCALE SHEET LIST TABLE SHEET NUMBER SHEET TITLE T-001 COVER PAGE G-001 NOTES A-101 SITE PLAN A-102 ELECTRICAL PLAN A-103 SOLAR ATTACHMENT PLAN E-601 LINE DIAGRAM E-602 DESIGN TABLES E-603 PLACARDS S-501 ASSEMBLY DETAILS R-001 RESOURCE DOCUMENT R-002 RESOURCE DOCUMENT R-003 RESOURCE DOCUMENT R-004 RESOURCE DOCUMENT R-005 RESOURCE DOCUMENT R-006 RESOURCE DOCUMENT R-007 RESOURCE DOCUMENT MA R C U S L N NEW PV SYSTEM: 11.340 kWp DC /9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 ASSESSOR'S #: 3536421001 SCOPE OF WORK SYSTEM SIZE: ATTACHMENT TYPE: MSP UPGRADE: STC: 28 X 405W = 11.340KW PTC: 28 X 383.13W = 10.728KW (28) HANWHA Q-CELLS Q.PEAK DUO G10+ 405W (28) ENPHASE IQ8A-72-2-US IRONRIDGE FLASH VUE NO PEAK VIEW DR PARK PARK 2.1.1 SITE NOTES: 2.1.2 A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 2.1.3 THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 2.1.4 THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 2.1.5 PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26. 2.1.6 ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. 2.2.1 EQUIPMENT LOCATIONS: 2.2.2 ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26. 2.2.3 WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND NEC TABLE 310.15 (B)(1). 2.2.4 JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO NEC 690.34. 2.2.5 ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 2.2.6 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES. 2.2.7 ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. 2.3.1 STRUCTURAL NOTES: 2.3.2 RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS. 2.3.3 JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. 2.3.4 ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED W/ APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 2.3.5 ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 2.3.6 WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. 2.4.1 WIRING & CONDUIT NOTES: 2.4.2 ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 2.4.3 CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7. 2.4.4 VOLTAGE DROP LIMITED TO 1.5%. 2.4.5 DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS. 2.4.6 AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GRAY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [NEC 110.15]. 2.5.1 GROUNDING NOTES: 2.5.2 GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVICES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 2.5.3 PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC TABLE 250.122. 2.5.4 METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). 2.5.5 EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 690.45 AND MICROINVERTER MANUFACTURERS' INSTRUCTIONS. 2.5.6 EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 2.5.7 THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 2.5.8 GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119] 2.5.9 THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47 AND AHJ. 2.5.10 GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.41(B)(1) THROUGH (3) TO REDUCE FIRE HAZARDS 2.6.1 DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 2.6.2 DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 2.6.3 DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 2.6.4 PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION TO REDUCE SHOCK HAZARD FOR EMERGENCY RESPONDERS IN ACCORDANCE WITH 690.12(A) THROUGH (D). 2.6.5 ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, AND 240. 2.6.6 MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH NEC 110.3(B). 2.6.7 IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO NEC 690.11 AND UL1699B. 2.7.1 INTERCONNECTION NOTES: 2.7.2 LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH NEC 705.12 2.7.3 THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR, PV DEDICATED BACKFEED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [NEC 705.12(B)(3)(2)]. 2.7.4 AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO NEC 705.12 (B)(3)(3). 2.7.5 FEEDER TAP INTERCONNECTION (LOAD SIDE) ACCORDING TO NEC 705.12 (B)(1) AND (2) 2.7.6 SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.11 WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42 2.7.7 BACKFEEDING BREAKER FOR ELECTRIC POWER SOURCES OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [NEC 705.12 (E)]. *NEC2020M *NEC2020M B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 G-001.00 NOTES (SHEET 2) A-101.00 SITE PLAN (SHEET 3) B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 01/48" = 1'-0" SITE PLAN01 24'48' N EW S N EW S PROPERTY LINE GENERAL NOTES 1. FIELD VERIFY ALL MEASUREMENTS 2. ITEMS BELOW MAY NOT BE ON THIS PAGE FUSED AC DISCONNECT ENTRANCE AREA OF WORK (28) ENPHASE IQ8A-72-2-US 2'-2" 32'-10" 279'-1" MA R C U S L N PEAK VIEW DR 01/16" = 1'-0" SITE PLAN02 8'16' N EW S N EW S 47'-2" PEDESTAL UTILITY METER PV METER NON-FUSED AC DISCONNECT 08/22/2023 MODULE: HANWHA Q-CELLS Q.PEAK DUO G10+ 405W 405 WATTS 41.1" 74" B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 A-102.00 ELECTRICAL PLAN (SHEET 4) 01/12" = 1'-0" ELECTRICAL PLAN016'12' N EW S A MODULE STRINGING B MODULE STRINGING C MODULE STRINGING D MODULE STRINGING FIRE CLEARANCE GENERAL NOTES 1. FIELD VERIFY ALL MEASUREMENTS 2. ITEMS BELOW MAY NOT BE ON THIS PAGE (N) (1) JUNCTION BOX 18" FIRE ACCESS PATH 3' FIRE ACCESS PATH ARRAY 1 - 9.720 KW [x24] (N) MODULES TILT: 17 DEGREES ROOF PITCH: 4:12 AZIMUTH: 176 DEGREES 3' FIRE ACCESS PATH EXTERIOR PV EQUIPMENT (N) (1) AC COMBINER BOX (N) (1) FUSED AC DISCONNECT (E) (1) MAIN ELECTRICAL PANEL INTERIOR PV EQUIPMENT 3' FIRE ACCESS PATH A ARRAY 2 - 1.620 KW [x4] (N) MODULES TILT: 17 DEGREES ROOF PITCH: 4:12 AZIMUTH: 176 DEGREES 18" FIRE ACCESS PATH A A A A A A AВ В В В В В В В С С С ССССС D D D D 18" FIRE ACCESS PATH 18" FIRE ACCESS PATH (N) (1) PV METER (E) (1) PEDESTAL (E) (1) UTILITY METER EXTERIOR PV EQUIPMENT (N) (1) NON-FUSED AC DISCONNECT 08/22/2023 MODULE: HANWHA Q-CELLS Q.PEAK DUO G10+ 405W 405 WATTS 41.1" 74" B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 A-103.00 SOLAR ATTACHMENT PLAN (SHEET 5) 01/8" = 1'-0" SOLAR ATTACHMENT PLAN014'8' ROOF TRUSSES GENERAL NOTES 1. FIELD VERIFY ALL MEASUREMENTS 2. ITEMS BELOW MAY NOT BE ON THIS PAGE FLUSH MOUNT SOLAR MODULES ATTACHED TO ROOF SURFACE (SEE SHEET S-501 FOR MOUNTING DETAILS) ROOF MATERIAL IS ASPHALT SHINGLE N E W S 37'-11" 13'-9" 08/22/2023 PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN DISCONNECT PER NEC 690.12 SYSTEM COMPLIANT WITH NEC 690.13 EQUIPMENT LEFT OF LINE IS (N) NEW UNLESS OTHERWISE NOTED. EQUIPMENT RIGHT OF LINE IS (E) EXISTING UNLESS OTHERWISE NOTED. L1 N L2 ENPHASE ENVOY COMMUNICATIONS GATEWAY G CB5 15A CB1 20A CB2 20A CB3 20A CB4 20A G SW1 (N) AC DISCONNECT, 60A 2 (E) GROUNDING ELECTRODE COLD WATER PIPE TO UTILITY GRID (UG) L1 L2 N (Е) MAIN ELECTRICAL PANEL 240/120 V 1Ø, 3W MAIN BUSS: 200A GN TO (E) LOADS 3 BLACK RED G BLACK RED BLACK RED BLACK RED IN BRANCH IN BRANCH IN BRANCH IN BRANCH 1 (N) (28) HANWHA Q-CELLS Q.PEAK DUO G10+ 405W 405 WATTS (N) (28) ENPHASE IQ8A-72-2-US RATED POWER: 349W (N) JUNCTION BOX A 8 B 8 C 8 D 4 L2 L1 NNN TAP 125A AC COMBINER BOX ENPHASE IQ COMBINER 4 (X-IQ-AM1-240-4) 120/240V, 1Ø, 3W MAX. CONTINUOUS CURRENT: 65A MAX. OCPD: 90A DC SYSTEM SIZE: 11.340 KWP AC SYSTEM SIZE: 9.772 KWP (E) MAIN 200A V M1 (N) PV METER 4 (E) UTILITY METER (E) UTILITY METER G SW2F1-2 (N) AC DISCONNECT, 60A WITH FUSES, 60A 5 CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS ID TYPICAL CONDUCTOR CONDUIT CURRENT-CARRYING CONDUCTORS IN CONDUIT OCPD EGC TEMP. CORR. FACTOR CONDUIT FILL FACTOR CONT. CURRENT MAX. CURRENT (125%)BASE AMP.DERATED AMP.TERM. TEMP. RATING AMP. @ TERMINAL 1 1 10 AWG THWN-2, COPPER 0.75'' DIA EMT 8 20A 10 AWG THWN-2, COPPER 0.91 (35.3 °C)0.7 11.6A 14.5A 40A 25.48A 75°C 35A 2 1 6 AWG THWN-2, COPPER 0.75'' DIA EMT 2 N/A 6 AWG THWN-2, COPPER 0.91 (35.3 °C)1 40.6A 50.75A 75A 68.25A 75°C 65A 3 1 6 AWG THWN-2, COPPER 0.75'' DIA EMT 2 N/A 6 AWG THWN-2, COPPER 0.91 (35.3 °C)1 40.6A 50.75A 75A 68.25A 75°C 65A 4 1 6 AWG THWN-2, COPPER 0.75'' DIA EMT 2 60A 6 AWG THWN-2, COPPER 0.91 (35.3 °C)1 40.6A 50.75A 75A 68.25A 75°C 65A 5 1 6 AWG THWN-2, COPPER 0.75'' DIA EMT 2 N/A 6 AWG THWN-2, COPPER 0.91 (35.3 °C)1 40.6A 50.75A 75A 68.25A 75°C 65A B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 E-601.00 LINE DIAGRAM (SHEET 6) MODULE STRINGING MODULE STRINGING A B MODULE STRINGINGC MODULE STRINGINGD SYSTEM SUMMARY BRANCH #1 BRANCH #2 BRANCH #3 BRANCH #4 INVERTERS PER BRANCH 8 8 8 4 MAX AC CURRENT 11.6A 11.6A 11.6A 5.8A MAX AC OUTPUT POWER 2,792W 2,792W 2,792W 1,396W ARRAY STC POWER 11,340W ARRAY PTC POWER 10,728W MAX AC CURRENT 40.60A MAX AC POWER 9,772W DERATED (CEC) AC POWER 9,772W DISCONNECTS INVERTERS OCPDS MODULES ASHRAE EXTREME LOW -27°C (-16.6°F), SOURCE: FORT COLLINS (AWOS) (40.45°; -105°) ASHRAE 2% HIGH 35.3°C (95.5°F), SOURCE: FORT COLLINS (AWOS) (40.45°; -105°) REF.QTY.RATED CURRENT MAX VOLTAGE CB1-4 4 20A 240VAC CB5 1 15A 240VAC F1-2 1-2 60A 240VAC REF.QTY.MAKE AND MODEL RATED CURRENT MAX RATED VOLTAGE SW1 1 EATON DG222URB OR EQUIV.60A 240VAC REF.QTY.MAKE AND MODEL PMAX PTC ISC IMP VOC VMP TEMP. COEFF. OF VOC FUSE RATING PM1-28 28 HANWHA Q-CELLS Q.PEAK DUO G10+ 405W 405W 383.13W 11.17A 10.83A 45.34V 37.39V -0.122V/°C (-0.27%/°C)20A REF.QTY.MAKE AND MODEL AC VOLTAGE GROUND OCPD RATING RATED POWER MAX OUTPUT CURRENT MAX INPUT CURRENT MAX INPUT VOLTAGE CEC WEIGHTED EFFICIENCY I1-28 28 ENPHASE IQ8A-72-2-US 240V FLOATING 20A 349W 1.45A 15A 60V 97.5% SW2 1 EATON DG222NRB OR EQUIV.60A 240VAC B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 E-602.00 DESIGN TABLES (SHEET 7) B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 E-603.00 PLACARDS (SHEET 8) N EW S !CAUTION! POWER TO THIS BUILDING IS ALSO SUPPLIED FROM ROOF MOUNTED SOLAR ARRAYS WITH SAFETY DISCONNECTS AS SHOWN: PV ARRAY MAIN DISTRIBUTION UTILITY DISCONNECT BACK FRONT LABELING NOTES 1.1 LABELING REQUIREMENTS BASED ON THE 2020 NATIONAL ELECTRICAL CODE, INTERNATIONAL FIRE CODE 605.11, OSHA STANDARD 1910.145, ANSI Z535 1.2 MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 1.3 LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. 1.4 LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8” AND PERMANENTLY AFFIXED. 1.5 ALERTING WORDS TO BE COLOR CODED. “DANGER” WILL HAVE RED BACKGROUND; “WARNING” WILL HAVE ORANGE BACKGROUND; “CAUTION” WILL HAVE YELLOW BACKGROUND. [ANSI Z535] ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING LABEL 1 AT EACH DISCONNECTING MEANS FOR PHOTOVOLTAIC EQUIPMENT (2" X 4"). [NEC 690.13]. POWER SOURCE OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE WARNING LABEL 2 AT POINT OF INTERCONNECTION OVERCURRENT DEVICE (2" X 4"). [NEC 705.12(B)(2)(3)(B)]. LABEL 3 AT POINT OF INTERCONNECTION, MARKED AT DISCONNECTING MEANS (4" X 3"). [NEC 690.54] LABEL 4 AT EACH AC DISCONNECTING MEANS (4" X 1"). [NEC 690.13(B)]. INTERACTIVE PHOTOVOLTAIC SYSTEM CONNECTED PHOTOVOLTAIC SYSTEM DISCONNECT LOCATED SOUTH SIDE OF THE GARAGE DIRECTORY PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECTING MEANS IF NOT IN THE SAME LOCATION (5 3/4" X 1 1/8"). [NEC 690.56(B)] WHERE THE PV SYSTEMS ARE REMOTELY LOCATED FROM EACH OTHER, A DIRECTORY IN ACCORDANCE WITH 705.10 SHALL BE PROVIDED AT EACH PV SYSTEM DISCONNECTING MEANS. PV SYSTEM EQUIPMENT AND DISCONNECTING MEANS SHALL NOT BE INSTALLED IN BATHROOMS [NEC 690.4(D),(E)] PHOTOVOLTAIC POWER SOURCE LABEL 9 AT EXPOSED RACEWAYS, CABLE TRAYS, AND OTHER WIRING METHODS; SPACED AT MAXIMUM 10 FT SECTION OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS (5 3/4" X 1 1/8"). [NEC 690.31(G)] LETTERS AT LEAST 3/8 INCH; WHITE ON RED BACKGROUND; REFLECTIVE [IFC 605.11.1.1] SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY SOLAR ELECTRIC PV PANELS LABEL 6 AT RAPID SHUTDOWN SYSTEM (3 3/4" X 5 1/4"). [NEC 690.56(C)(1)(A)]. WARNING DUAL POWER SUPPLY SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM LABEL 7 AT POINT OF INTERCONNECTION (2 3/4" X 1 5/8"). [NEC 705.12(B)(3)] WARNING SOLAR ELECTRIC CIRCUIT BREAKER IS BACKFED LABEL 8 AT POINT OF INTERCONNECTION (2" X 1"). [NEC 705.12(B)(3)] CAUTION MULTIPLE SOURCES OF POWER LABEL 10 AT UTILITY METER (5 3/4" X 1 1/8") [NEC 690.56(B)] RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM LABEL 5 AT RAPID SHUTDOWN DISCONNECT SWITCH (5 1/4" X 2"). [NEC 690.56(C)(3)]. AC DISCONNECT PHOTOVOLTAIC SYSTEM POWER SOURCE RATED AC OUTPUT CURRENT NOMINAL OPERATING AC VOLTAGE AMPS VOLTS PHOTOVOLTAIC SYSTEM DISCONNECT 40.6 240 20 12141315182211 S-501 D5 13 S-501 D4 54 252423 8 27 2 SHEET KEYNOTES 1. ROOF MATERIAL: ASPHALT SHINGLE 2. ROOF STRUCTURE: TRUSS 3. ATTACHMENT TYPE: IRONRIDGE FLASH VUE 4. MODULE MANUFACTURER: HANWHA Q-CELLS 5. MODULE MODEL: Q.PEAK DUO G10+ 405W 6. MODULE LENGTH: 74'' 7. MODULE WIDTH: 41.1'' 8. MODULE WEIGHT: 48.5 LBS. 9. SEE SHEET A-104 FOR DIMENSION(S) 10. FIRE OFFSET: 18" FROM RIDGE, 36" FROM EDGE 11. TRUSS SPACING: 24 IN. O.C. 12. TRUSS SIZE: 2X4 IN. NOMINAL. 13. LAG BOLT DIAMETER: 3/8". 14. LAG BOLT EMBEDMENT: 4". 15. TOTAL # OF ATTACHMENTS: 65 16. TOTAL AREA: 591.38 SQ. FT. 17. TOTAL WEIGHT: 1573.71 LBS. 18. WEIGHT PER ATTACHMENT: 24.21 LBS. 19. DISTRIBUTED LOAD: 2.66 PSF 20. MAX. HORIZONTAL STANDOFF: 48 IN. 21. MAX. VERTICAL STANDOFF: IN ACCORDANCE WITH MODULE MANUFACTURER'S INSTRUCTIONS. 22. STANDOFF STAGGERING: YES 23. RAIL MANUFACTURER (OR EQUIV.): IRONRIDGE 24. RAIL MODEL (OR EQUIVALENT): XR-100 25. RAIL WEIGHT: 0.68 PLF 26. MAX. TRUSS SPAN: N/A. 27. MODULE CLEARANCE: 3 IN. MIN., 6 IN. MAX. 1.FIELD VERIFY ALL MEASUREMENTS 2.ITEMS BELOW MAY NOT BE ON THIS PAGE GENERAL NOTES RO O F S L O P E 910 10 6 21 7 B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 RACKING DETAIL (TRANSVERSE)D1 SCALE: NOT TO SCALE RACKING DETAIL (LONGITUDINAL)D2 SCALE: NOT TO SCALE RACKING DETAIL (TOP)D3 SCALE: NOT TO SCALE DETAIL (LONGITUDINAL)D5 SCALE: NOT TO SCALE DETAIL (TRANSVERSE)D4 SCALE: NOT TO SCALE S-501.00 ASSEMBLY DETAILS (SHEET 9) B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 R-001.00 RESOURCE DOCUMENT (SHEET 10) B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 R-002.00 RESOURCE DOCUMENT (SHEET 11) B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 R-003.00 RESOURCE DOCUMENT (SHEET 12) B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 R-004.00 RESOURCE DOCUMENT (SHEET 13) B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 R-005.00 RESOURCE DOCUMENT (SHEET 14) B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 R-006.00 RESOURCE DOCUMENT (SHEET 15) B F A D E 2 3 DESIGN BY: A C D E G H B C F G H 1 4 5 6 DATE: CHECKED BY: REVISIONS V.T. M.M. 06.21.2023 PAPER SIZE: 11" x 17" (ANSI B) V.1.9 CONTRACTOR PHONE: LIC. NO.: HIC. NO.: ELE. NO.: ADDRESS: AFFORDABLE ALTERNATIVE ENERGY DBA ARE SOLAR 1155 S TEJON ST DENVER, CO 80223 720-504-0005 LSVL-001411-2018 ENGINEER OF RECORD UNAUTHORIZED USE OF THIS DRAWING SET WITHOUT WRITTEN PERMISSION FROM CONTRACTOR IS IN VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO CIVIL DAMAGES AND PROSECUTIONS. NEW PV SYSTEM: 11.340 kWp DC / 9.772 kWp AC MONTGOMERY RESIDENCE 461 MARCUS LN, ESTES PARK, CO 80517 APN: 3536421001 R-007.00 RESOURCE DOCUMENT (SHEET 16)