Loading...
HomeMy WebLinkAboutPLANS Accessory Building 610 Pinewood Ln 2023-08-046.2.23 APPROVED by SAFEbuilt; 2015 International Codes Subject to inspection and compliance to all Relevant, adopted Building & Municipal Codes 08/04/2023 This installation must comply with the requirements of the 2023 National Electrical Code 6/2/2023 FOUNDATION SIMPSON STHD14 EMBEDDED STRAP LOCATION 6.2.23 Approved by SAFEbuilt 08/04/2023 8:40:56 AM Approved by SAFEbuilt 08/04/2023 8:41:02 AM Landers Shop Notes Applicable Codes –but not limited to 2015 IRC Structural Notes General 1. 68 PSF snow load 2. 175 MPH Vult wind speed 3. 40 PSF floor load Footings, foundations and slabs 1. Sized assuming standard soils with 2500 pounds per square foot bearing capacity (without having actual soils borings or soil testing).Assumptions and size of required footing and foundations to be verified by Van Horn Engineering after excavation and before footings are formed.Call (303Ͳ931Ͳ7362) Frank Roberts, for open hole inspection.Once Van Horn Engineering reviews the excavated soils, they will provide an acceptable letter to the county, and\or require any revisions, prior to the footing pour. 2. Concrete to be 3000 PSI mix for foundations and 3500 PSI for slabs, place concrete continuously without horizontal cold joints. 3. Floor slabs shall be placed on approved materials by Van Horn Engineering, 1” deep wet saw cut control joints at 10’ O.C. maximum. 4. All rebar to be 60 ksi steel and minimum 2” clear to concrete edge or 3” to bottom of footing. 5. CastͲin anchors shall be in accordance with ASTM F1554 Grade 36 or equivalent with ASTM A563 Grade A nuts, and ASTM F436 washers or 2”x2”x3/16” plate washers.All parts to be hot dipped galvanized in accordance with ASTM A153 or ASTM F2329. 6. Excavation contractor to assure that all footing is placed on undisturbed soil or compacted soil per Van Horn Engineering written approval. 7. Perimeter footings shall have 30” minimum embedment from final grade to bottom of footing. General 1. Backfill 4” perforated perimeter drainpipe with gravel.Daylight to the closest point feasible. Gravel shall be 1½” washed rock or #57 stone, wrap gravel in Mirafi 140N filter fabric or equivalent.Gravel shall extend not less than 1’Ͳ0” beyond edge of footing and not less than 6” above top of footing. 2. Provide temporary bracing to withstand all construction, snow and wind loads until all field connections are completed. Framing 1. All sill plate touching concrete to be treated and attached with ½” diameter by 9” anchor bolts with 7” embedment at 32” O.C. and within 12” of the end of each sill plate. 2. All headers to be (2) #2HF 2 x 10 unless noted otherwise. 6/2/2023 FOUNDATION 6/5/23 Approved by SAFEbuilt 08/04/2023 8:41:02 AM 3. Allroofframingwoodtobe#2HemFirorbetter. 4. WithinjoistcavitiesbeneathsolidorbuiltͲupcolumnsprovidesquashblockingofarea equivalenttothecolumnsabove. 5. Fireblockpercode 6. FastenwoodmemberswithcommonnailsaccordingtotherequirementslistedintheIBC fasteningScheduleTable2304.9.1.AnchorengineeredjoistandpreͲengineeredtrussesperthe manufacturer’srequirements. 7. AllOSBwallsheathingtobeinstalledhorizontally,withendjointsoffsetaminimumof32”, attachedwith8dnailsat6”o.c.atedgesand12”o.c.inthefield. 8. Fastenroofsheathingwith8dnailsat6”o.c.atedgesand12”o.c.inthefield ProvidethefollowingSimpsonconnectorsatthenotedlocations. 1. Trussorraftertietowall–H3unlessotherwiserecommendedbytrussmanufacturer. 2. Sloped2x10joisthangers–LRU210Z. Windows Allwindowssizesshownarebasedonoverallsizes,horizontalslider. Allnewwindowsarealuminumcladwoodwindows AllwindowsareminimumU.30orbetter PrescriptiveEnergyRequirements–per1102.1.2Ufactoralternative Roof RͲ60 WallRͲ21battandRͲ5CI FoundationRͲ10 Floors NA Windows.30U Lighting–80%ormoreLEDorbetter UnitHeater–indirectcombustionhighefficiencygasunit  GeneralNotes Entrydoorsaremetalorfiberglass RoofisclassA   Approved by SAFEbuilt 08/04/2023 8:41:02 AM Garagedoorsaremetalinsulated. Crawlspaceisexisting. Ventilationairispersection1103.5.1(contractortoprovideequipmentlistingandmethodventilation airwillbedistributedthroughoutthehabitableareasofthedwelling) .01xSF+7.5(#ofbedrooms+1)=30CFM AcopyofManualJandManualDreportsmustbesubmittedtotheBuildingSafetyandInspection Servicespriortoroughinspectionsbythecontactor. ProvideCOdetectionandsmokedetectionpercode. Coordinateallelectricandlightfinallocationswiththeowner.  Approved by SAFEbuilt 08/04/2023 8:41:02 AM