Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PLAN Basement Power Revisions Post Restaurant 333 E Wonverview Ave 2021-06-17
VFD M VFD M TOM TOM TOM J J M M M VFD M VFD M VFD M M TOM TOM M M TOM TOM TOM TOM TOM TOM TOM TOM TOM TOM 4 3 2 1 AC DE MDP XLDP XLBA HBALBA HMALDP LBT E6 LBA-1 MECH ROOM B06 BAR B03 B.O.H. B02A MEN'S RESTROOM B04 WOMEN'S RESTROOM B05 LOUNGE B02 LOBBY B01 TI STORAGE B08 ELECTRICAL B07 LBT-1 LBT-3 LBA-3 LBA-5 JANITOR B01A LBA-8 LBA-6 LBA-10 ac ac E13 DOAS-1 MAU-1 AC-1 B-1 CP-1 CP-2 +36" FCU-2FCU-2 FCU-1 FCU-3 CU-1 CU-2 CU-3 B LBA-12 LBA-20 LBA-22 LBA-24 INV E16 UH-1 E18 DWH-1 DCP-1 SP-1 ESP-1 LBA-26 MECH CONDENSER ROOM B07A 1 E21 BS-1A BS-1B BS-1C BS-2A BS-2B BS-2C BS-3A BS-3B BS-3C 1 IBT-1 E22 LBA-39 1 ac LBA-2 UC FRIG DW LBA-38 LBA-40 LBA-42 acPOS 7 ASI 07 E25 8 © Copyright BCER Engineering ALL DRAW INGS, SPECIFICATIONS, AND OTHER W ORK PRODUCT PREPARED BY BCER ENGINEERING FOR THIS PROJECT ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN THE PROPERTY OF BCER ENGINEERING. BCER ENGINEERING SHALL RETAIN ALL COMMON LAW , STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO. Date Drawn By Checked By: Project Number Sheet Name Copyright: ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF MOA ARCHITECTURE E-300 BASEMENT POWER PLAN DAP 2020.05.04 19131.00 100% CONSTRUCTION DOCUMENTS DKH BCER PROJECT 89319007 N 0 4'4'2' 1/4" = 1'-0" 1 BASEMENT POW ER PLAN WORK NOTES E6 PROVIDE G.E. FUSIBLE SHUNT TRIP ELEVATOR SW ITCH, PART #ES1T48R2GC OR APPROVED EQUAL. PROVIDE ALL REQUIRED CONNECTIONS TO FIRE ALARM. COORDINATE RELAY VOLTAGE W ITH FIRE ALARM CONTRACTOR PRIOR TO ORDERING. PROVIDE WITH J-CLASS FUSES, REFER TO ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION. E13 PANEL TO BE PROVIDED FOR THEATER COMPANY USE. EXACT LOCATION TO BE COORDINATED W ITH OW NER PRIOR TO INSTALLATION. E16 PROVIDE PLYW OOD BACKING FOR OW NER'S TELECOM EQUIPMENT. COORDINATE EXACT SIZE AND LOCATION W ITH OW NER'S TELECOM CONTRACTOR. E18 FOR GLYCOL FEEDER. COORDINATE EXACT LOCATION W ITH MECHANICAL CONTRACTOR. E21 PROVIDE DOOR W ITH PANIC HARDW ARE. E22 POW ER FOR CONTROL PANEL HEATER ENCLOSURE. FIELD VERIFY AND COORDINATE ALL REQUIREMENTS W ITH EQUIPMENT PROVIDED PRIOR TO ROUGH IN. E25 BLANK GFCI OUTLET DEVICE FOR PROTECTION OF ADJACENT DEDICATED DISHWASHER AND REFRIGERATOR RECEPTACLES. COORDINATE ACCESSIBLE LOCATION OF SUCH DEVICE W ITH ARCHITECT AND OW NER. 1 REVISION DATE ADDENDUM 1 07/14/2020 ASI 07 03/17/2021 ASI 09 06/16/2021 7 ASI 07 06/16/21David Hughes Digitally signed by David Hughes DN: C=US, E=dhughes@bcer.com, O="BCER Engineering, Inc", CN=David Hughes Date: 2021.06.16 10:40:53-06'00'