Loading...
HomeMy WebLinkAboutPLANS Garage Addition 1209 Brook Dr 2021-01-0612/10/2020 APPROVED by SAFEbuilt; 2015 International Codes Subject to inspection and compliance to all Relevant, adopted Building & Municipal Codes 01/06/2021 12/10/2020 CAUTION AS TO NOT BLOW OUT STUD WITH LAGS, LAGS SHALL BE CENTERED IN 1.5" STUD, OBSERVATION BY ENGINEER MAY BE REQUIRED Per conversation with the contractor lags are to be place at every stud 12/10/2020