HomeMy WebLinkAboutPLANS Garage Addition 1209 Brook Dr 2021-01-0612/10/2020
APPROVED by SAFEbuilt;
2015 International Codes
Subject to inspection and compliance to all
Relevant, adopted Building & Municipal
Codes
01/06/2021
12/10/2020
CAUTION AS TO
NOT BLOW OUT
STUD WITH LAGS,
LAGS SHALL BE
CENTERED IN 1.5"
STUD,
OBSERVATION BY
ENGINEER MAY BE
REQUIRED
Per conversation with
the contractor lags
are to be place at
every stud
12/10/2020