Loading...
HomeMy WebLinkAboutPLAN Porch Roof 750 University Dr 2021-01-0612/17/2020 Open hole Inspection Required for all piers Load cannot use fasteners for support and sit on the deck, frost depth footings required these post will need to bear on a pier, APPROVED by SAFEbuilt; 2015 International Codes Subject to inspection and compliance to all Relevant, adopted Building & Municipal Codes 01/06/2021 12/17/2020 frost depth footings required ties req for uplift 12/17/2020 12/17/2020 750 UNIVERSITY DR. ESTES PARK, CO 80517 SOUTH PORCH ROOF STRUCTURAL NOTES BUILDING CODE INFORMATION 2015 IRC GROUND SNOW LOAD = 67.5 PSF (7,750 ft. elev.) ROOF SNOW LOAD = 56.7 PSF VULT = 175 MPH, EXP C SEISMIC DESIGN CATEGORY B 1. NEW POST FOUNDATIONS SHALL BE SONO-TUBE FOUNDATIONS EXTENDING 30" MINIMUM DEPTH BELOW GRADE, DIAMETER AS NOTED ON PLAN. CONCRETE COMPRESSIVE STRENGTH SHALL BE MINIMUM 3,000 PSI AT 28 DAYS. INSTALL (2) #4 VERTICAL REBAR FOR PIERS 12” DIAMETER AND SMALLER, (4) #4 VERTICAL REBAR FOR PIERS LARGER THAN 12” DIAMETER. SHOULD SOLID ROCK BE ENCOUNTERED AT LESS THAN 30” DEPTH, DRILL AND EPOXY REBAR TO 6” DEPTH. 2. SOIL/ROCK BEARING CAPACITY IS ASSUMED TO BE 3,000 PSF FOR DESIGN OF FOUNDATIONS. AN OPEN HOLE INSPECTION SHALL BE PERFORMED BY VHE TO VERIFY THE ASSUMPTION. 3. INSTALL SIMPSON LRU212Z SLOPEABLE RAFTER HANGERS OR L90 ANGLES (EACH SIDE) AT 2X12 RAFTER HANGER CONNECTION TO RIDGE BEAM. INSTALL SIMPSON H2.5 OR H1 TIES AT ALL RAFTER TO EAVE BEAM CONNECTION. INSTALL FULL DEPTH BLOCKING BETWEEN RAFTERS OVER EAVE BEAMS. 4. AT ROOF FRAME OVER, INSTALL 2X6 PLATE AT PERIMETER OF NEW ROOF ATTACHED WITH (2) 5/16” X 8” LONG LEDGERLOKS TO EACH EXISTING RAFTER. ATTACH EACH RAFTER TO PLATE WITH HOLD DOWN STRAP, SIMPSON CS20 COIL STRAP OVER TOP OF RAFTER OR EQUIVALENT WITH (4) 8D COMMON NAILS EACH END OF THE STRAP INTO 2X6 PLATE. PROVIDE THE SAME HOLD DOWN CONNECTION FOR THE (2) 2X12 BEAM BELOW THE RIDGE BEAM. PROVIDE FULL DEPTH BLOCKING BETWEEN RAFTER ENDS OVER 2X6 PLATE. 5. PROVIDE SIMPSON AB POST BASE AND LCE (END OF BEAM) OR AC (CONTINUOUS BEAM) POST TO BEAM CONNECTION OR EQUAL. 6. ATTACH 6X6 POSTS ALONG HOUSE TO COMPETENT WALL FRAMING WITH A MINIMUM OF (24) 8” LONG TIMBER LOK FASTENERS. 12/17/2020