Loading...
HomeMy WebLinkAboutINSPECTION Remodel 203 Cleave St 2023-08-16INSPECTION CARD Estes Park 170 MacGregor Ave Suite 230, Estes Park, CO 80517 POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE. APPLICATION NO.:23-EP-00074 TYPE: Commercial Remodel ISSUED DATE:04/04/2023 EXPIRATION DATE:02/12/2024 PROJECT ADDRESS:203 Cleave Street, Estes Park, CO 80517 PARCEL NO.:3525224016 OWNER:Barbara Marshall CONTRACTOR:Glacier Creek Construction CONTRACTOR PHONE:(970) 586-1685 DESCRIPTION OF WORK: Remodel of an existing building to become a beer tasting room on the lower level while maintaining residential use on the upper level. The building becomes classified as a group R2 Live/work unit. INSPECTION INSP DATE PASSED COMMENTS Footings JG 8/16/2023 Rough Plumbing JG 5/3/2023 Rough Frame GR 8/4/2023 Fire Resistive Wall Assembly GR 8/4/2023 Above Ceiling Mechanical GR 8/4/2023 Gas Pressure Test JG 5/3/2023 Insulation JG 5/19/2023 Final Mechanical GR 8/4/2023 Final Building JG 8/16/2023 See Notes Final Public Works/CO JW 8/9/2023 See Notes Final Water/CO SR 8/8/2023 Final Sanitation/CO JD 8/7/2023 Final Building/CO JG 8/16/2023 See Notes INSPECTION INSP DATE PASSED COMMENTS Underground Plumbing JG 4/5/2023 Rough Mechanical JG 5/3/2023 Wall Sheathing JG 8/3/2023 Firestopping GR 8/4/2023 Above Ceiling Plumbing GR 8/4/2023 Drywall JG 5/26/2023 Final Plumbing GR 8/4/2023 Energy Code Compliance GR 8/4/2023 Final Fire JJ 8/7/2023 Final Planning/CO LB 8/8/2023 See Notes Final P&C/CO SR 8/8/2023 Final Fire/CO JJ 8/7/2023 Final/CO JG 8/16/2023 See Notes CONSTRUCTION TYPE:OCCUPANT LOAD: Page 1 of 1 Fire Approval:Date:Engineering Approval:Date: PW Approval:Date:Other ( ):Date: To request an inspection: