Loading...
HomeMy WebLinkAboutINSPECTION Remodel 232 E Riverside Dr 2024-09-05INSPECTION CARD Estes Park 170 MacGregor Ave Suite 230, Estes Park, CO 80517 POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE. APPLICATION NO.:24-EP-00254 TYPE:Miscellaneous ISSUED DATE:07/02/2024 EXPIRATION DATE:03/04/2025 PROJECT ADDRESS:232 East Riverside Drive, Estes Park, CO 80517 PARCEL NO.: OWNER:Deverick Jordano CONTRACTOR:Monarch Construction Collective, LLC CONTRACTOR PHONE:(214) 384-1435 DESCRIPTION OF WORK: -- Scope of Work – Build Back -- 1. Remove existing flooring and substrate, inspect and repair foundation footings as per structural engineer at Units 14 and 15, installation included engineer-appointed joists, fasteners, and Simpson Strong-tie hangers throughout 2. Cut drywall approx. 24” from interior floor at perimeter of rooms damaged by boulder to inspect wall framing, included kitchen and bathroom at Unit 15, bedroom at Unit 14 3. Correct all framing as per structural engineer at Units 14 and 15, installation included engineer-appointed studs, headers, etc as well as fasteners, and Simpson Strong-tie brackets throughout 4. Reconnect existing electrical wire at exterior wall where boulder entered Units 14 and 15, boulder disconnected the wire connecting the two outlets together 5. Reconnect existing gas line at exterior wall where boulder entered Unit 15, boulder damaged gas line so line replacement needed, to route the same route as existing 6. Install new zip green board sheathing with zip tape and fasteners every 6” on-center throughout sheet 7. Remove damaged exterior cedar shake siding and replace with same style, type, and shape siding as existing at Units 14 and 15 8. Install new plywood flooring substrate, ¾” tongue and groove, with qualified nails and screws in Units 14 and 15 9. Install new insulation qualified by building and energy codes at Units 14 and 15 where damaged by boulder 10. Install new ½” drywall, tape, bed, and texture 11. Install new tile flooring at bathroom and kitchen in Unit 15, included mortar, grout and grout caulk at corners to allow for movement of pier-and-beam foundation to prevent cracks in tile, grout, or mortar 12. Install new shower pan (Schluter system) with drain kit, field tested drain for leaks 13. Install new LVT flooring at hallway and both bedrooms at Unit 14, flooring is click to fasten and free-float, also includes underlayment mat 14. Install two fixed glass windows at Units 14 and 15, will install new vinyl windows with sashes in place of these two fixed glass windows within 3 months 15. Remove existing furnace and replace with same, install new AC unit and air handler for Unit 14 16. Replace gas hot water heater at exterior utility closet with a new one of same style and type as existing 17. Replace existing gas line between Units 14 and 15 with qualified ¾” underground gas line valves and fittings, to be pressure tested and connected upon City inspections/approvals 18. Install new cabinets in place of existing cabinets with new layout, still located along back wall 19. Connect new appliances in similar sites as existing, includes refrigerator, microwave, oven, and dishwasher 20. Remove and replace gutters at approx. 3 building entrances 21. Install new landscaping with approx. 1” stones at flower beds or other commons areas 22. Paint all interior drywall and exterior siding 23. Remove all existing walkways and install new walkways with concrete, approx. 4” thick, to have rebar and framed with form boards throughout 24. Replace 5 existing metal electrical cut in boxes with plastic boxes to update to safer box, in kitchen of Unit 15 -- New Work -- 25. Route new electrical home run wire from main panel to washer and dryer 26. Install new concrete wall, approx. 60’ long and 4’ tall made of cinder blocks, poured centers with concrete and rebar set into 3’ concrete footings, to be located behind new deck 27. Route new gas line to rebuilt deck behind Units 14 and 15 for new fire pit, route new gas lines to area immediately behind Unit 14 and 15 respectively for two new fire pits, route new gas line for new location of fire pit at front community yard near Unit 11 CONSTRUCTION TYPE:OCCUPANT LOAD: Page 1 of 2 To request an inspection: INSPECTION INSP DATE PASSED COMMENTS Final JG 9/5/2024 Final Plumbing JG 9/4/2024 INSPECTION INSP DATE PASSED COMMENTS Final Mechanical JG 9/5/2024 Page 2 of 2 Fire Approval:Date:Engineering Approval:Date: PW Approval:Date:Other ( ):Date: To request an inspection: