HomeMy WebLinkAboutLETTER Joist Conformance 356 Elkhorn Ave Unit 11 2023-03-13Project Description: I-Joist reinforcement Date: March 29, 2023
Project Location: 356 E Elkhorn, Unit 11 Engineer: M. Khachaturian 55436
General Contractor: Docter Construction Architect: Interstice Architectural Studio
Permit # 22-EP-00835
ATTN: Joe Calvin, Cari Docter
RE: I-joist web reinforcement for plumbing
Joe Calvin has engaged Sky Pond Engineering to design and analyze a web reinforcement (due to new plumbing) located at 356 E
Elkhorn, Unit 11. The purpose of this is to ensure the I-joist has sufficient strength to carry design live loads of 100psf, as stipulated
by ASCE 7. The following picture was taken at the site showing an acceptable alteration of the design located on Sheet A10 of the
architectural drawings.
Matthew Khachaturian, P.E., P.M.P
Sky Pond Engineering
PO Box 1497
Estes Park, CO, 80517