HomeMy WebLinkAboutPLAN Remodel 600 S Saint Vrain Ave #1B 2022-12-18A1 Title Sheet
A2 Upper Level Demolition Plan
A3 New Construction Floor Plan
A4 Upper Level Power and Lighting Plan
A5 Lower Level Plumbing Plan
A6 Skylight Spec and Detail
Sheet Index
Vicinity Map
Estes Park, Colorado
Not to Scale north
Salon Margaux
Aspenwood Professional Center
600 S Saint Vrain, Unit #1B, Estes Park CO 80517
Electronic Documents
Documents and Resources are
available on the project website…
http://www.intersticearch.
com/margaux/
Project Narrative
Remodel of approximately 480 sf of existing office space to become a hair
dressing salon. This Level-2 Alteration entails the removal of some interior non-
load-bearing walls. and the creation of some thru-wall openings. An investigation
has been performed and results were negative for the presence of asbestos.
The salon shares a larger unit space and common restrooms with an existing
exercise studio. The exercise studio is operated by the Owner/Landlord.
Occupant load is not significantly increased. Egress is appropriate and somewhat
improved by this project through the elimination of some interior barriers and
doorways. Additional restrooms are not required. One of the existing restrooms
provides accessibility in compliance with the currently adopted 2015 IBC and 2009
ICC A117.1 accessibility guidelines.
The project also involves rearrangement of electrical lighting and convenience
outlets to accommodate the working arrangement of the salon. Electrical work is
illustrated on the Demolition Plan on Sheet A2 and the Power and Lighting Plan on
Sheet A4. A small amount of plumbing work is required to add one hairwash sink
in proximity to other existing plumbing fixtures and vents.
New interior finishes are to be selected by the Tenant and approved by the
Landlord. The work is to be completed in a single phase. A new skylight in the
roof is shown on the Floor Plan on Sheet A3 and detailed on Sheet A6. This
skylight is to be quoted by the GC as an add alternated with decision on its
installation occurring at a later date. Similarly, another add alternate is the addition
of a second hairwash sink.
General Notes
1. Do not scale drawings for dimensions. Dimensions are typically to face of
framing member, unless otherwise noted.
2. Clean-up of rubbish and debris resulting from work shall be collected regularly
from project site and legally disposed of.
3. Contractors are responsible for all materials and quantities shown in these
drawings graphically as well as those called for by note.
4. The Contractor shall obtain all necessary permits to complete the proposed
work and shall comply with all local, state, and federal regulations.
5. All materials and construction shall be completed in accordance with the
requirements of Town of Estes Park and the 2015 IBC.
6. Provide shoring, temporary bracing, barricades and other measures as
necessary to ensure a safe building construction site.
7. Contractor to verify existing conditions and review discrepancies or
inconsistencies of site and drawings with Architect prior to commencing
construction.
8. Refer to Sheet A3 for additional code compliance information, and color-
coding legend.
Cari Remmerde
DOCTER CONSTRUCTION
515 Grand Estates Dr.
Estes Park, CO 80517
(970)486-3033
docterconstruction@gmail.com
Dr. Patti Aldridge
228 Pinyon Tr.
Estes Park, CO 80517
(512) 415-3886
patti@createinestes.com
Owner / Landlord:
Joe Calvin, AIA
PO Box 1555
Estes Park, CO 80517
(970) 420-8264
joe@intersticearch.com
Gail Giron
Salon Margaux
(970) 231-1401
gailsdesignsco@gmail.com
Tenant:
General Contractor:Architect:
Walt Steige, PE
STEIGE ASSOCIATES
(970) 577-1070
waltbf13@aol.com
Electrical Engineer:
9/30/22
A1
of 6
P# 2203
September 30, 2022
Salon Margaux
Aspenwood Professional Center
600 S Saint Vrain, Unit #1B, Estes Park CO 80517
Title Sheet
9/30/22
north
0 1 2 4 6 8
A2
of 6
P# 2203
September 30, 2022
Salon Margaux
Aspenwood Professional Center
600 S Saint Vrain, Unit #1B, Estes Park CO 80517
Upper Level Demolition Plan
9/30/22
north
0 1 2 4 6 8
A3
of 6
P# 2203
September 30, 2022
Salon Margaux
Aspenwood Professional Center
600 S Saint Vrain, Unit #1B, Estes Park CO 80517
New Construction Floor Plan
9/30/22
north
0 1 2 4 6 8
A4
of 6
P# 2203
September 30, 2022
Salon Margaux
Aspenwood Professional Center
600 S Saint Vrain, Unit #1B, Estes Park CO 80517
Upper Level Power & Lighting Plan
APPROVED by SAFEbuilt;
2015 International Codes
Subject to inspection and compliance to all
Relevant, adopted Building & Municipal
Codes
12/16/2022
This structure must comply
with the requirements of the
2020 National Electrical Code
9/30/22
A6
of 6
P# 2203
September 30, 2022
Salon Margaux
Aspenwood Professional Center
600 S Saint Vrain, Unit #1B, Estes Park CO 80517
Skylight Spec & Detail
11/30/2
2
north
0 1 2 4 6 8
A5
of 6
P# 2203
November 30, 2022
Salon Margaux
Aspenwood Professional Center
600 S Saint Vrain, Unit #1B, Estes Park CO 80517
Lower Level Floor Plan
Approved
by
SAFEbuilt
12/16/2022
8:54:46 AM
HVAC LEGEND:
ROUND DUCT (NEW SHADED/EXISTING UNSHADED)
RECT TAKE-OFF W/ DAMPER FROM ROUND MAIN
RECT TAKE-OFF W/ DAMPER FR OM RECT MAIN
ROUND TAKE-OFF W/ DAMPER FROM ROUND MAIN
ROUND TAKE-OFF W/ DAMPER FR OM RECT MAIN
DUCT WITH MOTORIZED DAMPER
DUCT WITH COUN TERBALANCED DAMPER
RETURN/EXHAUST GRILLE (DUCTED)
AIRFLOW PATTERNS
THERMOSTAT WITH ZON E TAG
DUCT WITH VOLUME DAMP ER
RETURN GRILLE (UNDUCTED)
DIFFUSER WITH FLEX DUCT
RECT DUCT SIZE CHANGE
RECT DUCT CHANGE TO ROUN D
RECT ELBOW UP (SUPPLY)
RECT ELBOW UP (NO N-SUPPLY)
RECT ELBOW DOWN (SUPPLY)
RECT ELBOW DOWN (NON-SUPPLY)
ROUND ELBOW DOWN
ROUND ELBOW UP
ROUND ELBOW
RECT ELBOW W/ TURN ING VANES
RECT DUCT (NEW SHADED/EXISTING UNSHADED)
DEMOLISHED DUCTWORK
T
Z-*
MECHANICAL DRAWING INDEX
SHEET
NUMBER SHEET NAME
MECHANICAL DRAWING INDEX
SHEET
NUMBER SHEET NAME
H0.1 HVAC NOTES, LEGEND, AND DRAWING INDEX
H2.1 HVAC FLOOR PLANS, SCHEDULES, AND DETAILS
GENERAL MECHANICAL REQUIREMENTS:
CODES AND PERMITS
WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL CODES, REGULATIONS AND
ORDINANCES. PERMITS NECESSARY FOR PERFORMANCE OF WORK SHALL BE SECURED AND PAID FOR BY THE CONTRACTOR.
DRAWINGS AND COORDINATION
DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC IN NATURE, AND ARE NOT INTENDED TO BE SCALED FOR EXACT
MEASUREMENTS NOR TO SERVE AS SHOP DRAWINGS. CHANGES FROM THE PLANS MADE WITHOUT CONSENT OF THE
ENGINEER SHALL RELIEVE THE ENGINEER OF RESPONSIBILITY FOR ALL CONSEQUENCES ARRIVING OUT OF SUCH CHANGES.
INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. WHERE CONDITIONS REQUIRE
REASONABLE CHANGES TO THOSE INDICATED ON THE DRAWINGS, MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE
OWNER. COORDINATE ALL WORK WITH OTHER TRADES.
WARRANTY
WORKMANSHIP, MATERIALS, EQUIPMENT AND PROPER OPERATION SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR
FROM THE DATE OF FINAL ACCEPTANCE FROM THE OWNER. INITIAL ACCEPTANCE OF WORK SHALL NOT WAIVE THIS
GUARANTEE. THIS GUARANTEE SHALL NOT INCLUDE NORMAL MAINTENANCE REQUIRED BY THE OWNER AS DESCRIBED IN
EQUIPMENT OPERATION AND MAINTENANCE MANUALS.
SUBMITTALS
CONTRACTOR SHALL SUBMIT TO THE ARCHITECT/ENGINEER A PORTABLE DOCUMENT FORMAT "PDF" COPY OF SUBMITTAL
BROCHURES FOR REVIEW. PROVIDE INFORMATION ON ALL MAJOR EQUIPMENT AS LISTED ON DRAWING EQUIPMENT SCHEDULES,
AS WELL AS VALVES, DUCTWORK ACCESSORIES AND TEMPERATURE CONTROL DIAGRAMS AS APPLICABLE.
OPERATION AND MAINTENANCE MANUALS
CONTRACTOR SHALL FURNISH AT THE COMPLETION OF THE PROJECT A PORTABLE DOCUMENT FORMAT "PDF" COPY OF
COMPLETE OPERATION AND MAINTENANCE MANUALS TO THE ARCHITECT/ENGINEER FOR REVIEW PRIOR TO TURNOVER TO
OWNER. MANUALS TO BE BOUND AND INCLUDE INSTALLATION INSTRUCTIONS, REPLACEMENT PARTS LISTS AND MAINTENANCE
INFORMATION ON ALL EQUIPMENT AS DESCRIBED IN THE SUBMITTALS SECTION. COMPLETED OPERATION AND MAINTENANCE
MANUALS ARE TO BE FORWARDED TO THE OWNER WITHIN 90 DAYS AFTER OWNER BUILDING ACCEPTANCE.
PRODUCT SUBSTITUTIONS
MANUFACTURER MODEL NUMBERS LISTED ON THE DRAWINGS AND/OR SPECIFICATIONS ARE TO BE CONSIDERED AS THE
BASIS OF DESIGN. WHERE TWO OR MORE ALTERNATE MANUFACTURERS OR MATERIALS ARE LISTED, THE CHOICE OF THESE
SHALL BE OPTIONAL WITH THE CONTRACTOR. PRIOR TO THE AWARDING OF THE CONTRACT, CONTRACTOR MAY REQUEST A
PROPOSED SUBSTITUTION OF MATERIALS IN WRITING TO THE ARCHITECT/ENGINEER NO LATER THAN SEVEN DAYS PRIOR TO
THE RECEIPT OF BIDS. THE COST OF ANY CHANGES REQUIRED BY OTHER TRADES, INCLUDING A/E DESIGN, DUE TO THE
USE OF EQUIPMENT AND/OR MATERIALS OTHER THAN THAT OF THE BASIS OF DESIGN SHALL BE PAID BY THE
CONTRACTOR.
RECORD DRAWINGS
CONTRACTORS SHALL MAINTAIN A COMPLETE AND ACCURATE SET OF MARKED UP DRAWINGS SHOWING ACTUAL LOCATIONS
OF INSTALLED WORK. THESE DRAWINGS ARE TO BE FORWARDED TO THE OWNER AS PART OF THE OPERATION AND
MAINTENANCE MANUALS AT THE COMPLETION OF THE PROJECT.
ACCESS DOORS
PROVIDE ALL ACCESS DOORS/PANELS AS REQUIRED FOR ACCESS TO VALVES, DAMPERS, CONTROL DEVICES, FILTERS AND
ANY OTHER ITEMS FOR WHICH ACCESS IS REQUIRED FOR EITHER OPERATION OR SERVICING. WHERE ACCESS DOORS ARE
TO BE INSTALLED IN ASSEMBLIES REQUIRED TO HAVE A SPECIFIC FIRE RATING, ACCESS DOORS SHALL ALSO BE FIRE
RATED.
PIPING AND DUCTWORK SEALANT THROUGH RATED ASSEMBLIES
PENETRATIONS SHALL BE SEALED AS REQUIRED IN ACCORDANCE WITH BUILDING AND MECHANICAL CODES TO RESIST THE
PASSAGE OF FLAME AND PRODUCTS OF COMBUSTION IN ORDER TO MAINTAIN THE RESISTANCE RATING OF THE
CONSTRUCTION BEING PENETRATED.
PROTECTION OF MATERIALS AND EQUIPMENT
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ALL WORK, MATERALS, AND EQUIPMENT PROVIDED UNDER THIS
SECTION. PIPE OPENINGS SHALL BE CLOSED WITH CAPS OR PLUGS TO PREVENT THE ENTRANCE OF DEBRIS DURING
CONSTRUCTION. ALL DUCTWORK OPENINGS SHALL BE SEALED CLOSED DURING CONSTRUCTION.
EQUIPMENT AND PIPING IDENTIFICATION
PROVIDE EQUIPMENT LABELS FOR ALL MAJOR EQUIPMENT, INCLUDING BUT NOT LIMITED TO AIR HANDLING SYSTEMS, FANS,
VAV BOXES, CONTROLS, DAMPERS, CONTROL VALVES AND PUMPS.
PROVIDE PIPE MARKERS ON CW, HW AND HWC SYSTEMS. LABELS TO BE AT MAXIMUM 8 FEET APART, WITH FLOW DIRECTION
INDICATED, AS APPLICABLE.
ADDITIONALLY, PROVIDE LABELING ON POTABLE WATER MANIFOLDS INDICATING PLUMBING FIXTURE SERVED BY THE OUTLET,
AS APPLICABLE.
LABELS SHALL BE AFFIXED OR ADHERED PERMANENTLY TO EQUIPMENT. EQUIPMENT INSTALLED INDOORS TO BE LABELED
WITH EMBOSSING TAPE.
EQUIPMENT INSTALLED OUTDOORS TO BE LABELED WITH ENGRAVED PLASTIC LAMINATE SIGNS.
PIPE MARKERS TO BE SELF-ADHESIVE, MANUFACTURED FOR SUCH PURPOSE.
STARTERS AND DISCONNECTS
EQUIPMENT STARTERS SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR AND INSTALLED BY THE ELECTRICAL
CONTRACTOR. EQUIPMENT DISCONNECTS SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR UNLESS NOTED OTHERWISE
ON THE DRAWINGS. STARTERS SHALL BE NEMA TYPE, AND SHALL INCLUDE PHASE MONITORING FOR MOTORS 5 HP AND
LARGER.
TESTING
TESTING SHALL BE PERFORMED ON THE FOLLOWING SYSTEMS SPECIFIED. ALL SYSTEMS LISTED MAY NOT BE INCLUDED IN
PROJECT, REFER TO DRAWINGS FOR APPLICABLE SYSTEMS.
SOIL, WASTE AND STORM DRAINAGE PIPING SHALL BE TESTED IN ACCORDANCE WITH APPLICABLE STATE AND LOCAL CODES.
DOMESTIC WATER PIPING SHALL BE TESTED AND PROVEN WATERTIGHT UNDER A PRESSURE NOT LESS THAN THE WORKING
PRESSURE OF THE SYSTEM FOR A 24 HOUR PERIOD.
DOMESTIC WATER PIPING SYSTEM SHALL BE CHLORINATED AND STERILIZED IN ACCORDANCE WITH REQUIREMENTS OF LOCAL
JURISDICTION.
NATURAL GAS PIPING SHALL BE TESTED WITH AN AIR PRESSURE OF MINIMUM TWO TIMES THE DESIGN SYSTEM PRESSURE,
BUT NO LESS THAN 3 PSIG, FOR A PERIOD OF 24 HOURS WITHOUT PRESSURE DROP.
BALANCING
SYSTEM BALANCING SHALL BE PERFORMED BY A CERTIFIED BALANCING CONTRACTOR. BALANCE ALL SYSTEMS INCLUDING
AIRFLOW TO AND FROM ALL OPENINGS, AND PUMPED WATER SYSTEMS INCLUDING DOMESTIC WATER RECIRCULATION
SYSTEMS AS APPLICABLE. MAKE ANY ADJUSTMENTS NECESSARY TO RESULT IN CONDITIONS INDICATED AND PROVIDE
READJUSTMENTS TO ITEMS IN REPORT AS MAY BE REQUESTED BY ARCHITECT/ENGINEER. SUBMIT TWO COPIES OF TEST
AND BALANCE REPORT FOR APPROVAL. FAN AND PUMP SYSTEMS TO BE BALANCED WITHIN PLUS OR MINUS 5 PERCENT
OF LISTED VALUES. AIR INLETS AND OUTLETS TO BE BALANCED WITHIN PLUS 10 PERCENT OR MINUS 5 PERCENT OF
LISTED VALUES. BALANCE REPORT TO INCLUDE:
UNIT IDENTIFICATION
MANUFACTURER AND NAMEPLATE DATA
EQUIPMENT NAMEPLATE AMPERAGE AND ACTUAL AMPERAGE
RPM (DESIGN AND ACTUAL)
FAN CFM (DESIGN AND ACTUAL)
FAN STATIC PRESSURE (DESIGN AND ACTUAL)
PUMP GPM (DESIGN AND ACTUAL)
PUMP DISCHARGE AND SUCTION PRESSURE
REGISTER, GRILLE, DIFFUSER REFERENCE NUMBER AND LOCATION
INLET/OUTLET CFM (DESIGN AND ACTUAL)
FLOW DEVICE PRESSURE DROP, CFM OR GPM
A FINAL BALANCING REPORT SHALL BE PROVIDED TO THE OWNER AFTER COMPLETION OF THE PROJECT.
CLEANING
AT THE COMPLETION OF WORK, ALL FIXTURES AND EQUIPMENT SHALL BE THOROUGHLY CLEANED AND DELIVERED IN A
CONDITION SATISFACTORY TO THE ARCHITECT. ALL FILTERS SHALL BE REPLACED WITH NEW PRIOR TO OWNER ACCEPTANCE
OF THE BUILDING.
PRE-BID
FOR EXISTING BUILDINGS, THE BIDDERS SHALL PERFORM A BUILDING AND SPACE SITE VISIT PRIOR TO BID. THE ACT OF
SUBMITTING A BID INDICATES THE BIDDER DOES AGREE THEY HAVE A FULL UNDERSTANDING OF THE SCOPE OF WORK
INVOLVED WITH THE EXISTING CONDITIONS.
ALTITUDE
SUPPLIERS SHALL CONFIRM THAT ALL EQUIPMENT BEING FURNISHED IS APPROPRIATE FOR USE AT THE ALTITUDE OF THE SITE. GENERAL MECHANICAL NOTES
1 THE MECHANICAL DESIGN IS BASED ON THE 2015
INTERNATIONAL MECHANICAL CODE. MECHANICAL WORK SHALL
COMPLY WITH ALL APPLICABLE CODES AND LOCAL CODE
AMENDMENTS. VERIFY ALL REQUIREMENTS PRIOR TO
SUBMITTING BID OR COMMENCING WORK.
2 ALL DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED SHEET
METAL - CONSTRUCTION AND INSTALLATION SHALL CONFORM TO
THE CURRENT EDITION OF SMACNA OR AS REQUIRED BY ALL
APPLICABLE CODES.
3 CONSTRUCT ALL EXHAUST DUCTWORK TO SMACNA 1" PRESSURE
CLASS.
4 DIMENSIONS OF DUCTWORK SHOWN INDICATES CLEAR INSIDE
DIMENSIONS - WHERE DUCT LINER IS TO BE ADDED, INCREASE
THE SIZE OF SHEET METAL ACCORDINGLY.
5 MAINTAIN A MINIMUM 10'-0" SEPARATION FROM OUTSIDE AIR
INTAKES TO EXHAUST TERMINATIONS AND PLUMBING VENTS.
6 TEMPORARY HEATING: THE PERMANENT HVAC SYSTEM MAY
NOT BE UTILIZED FOR HEATING UNTIL ALL GYPSUM WORK IS
COMPLETED AND HAS BEEN PAINTED. IF THE PERMANENT
HVAC SYSTEM IS UTILIZED DURING CONSTRUCTION, ALL DUCT
INTAKES SHALL BE COVERED WITH FILTER MEDIA (MERV-8
RATING). IF EXCESSIVE DUST OR DEBRIS HAS ENTERED THE
SYSTEM THEN ALL COIL AND DUCT SURFACES SHALL BE
CLEANED. NEW FILTERS ARE TO BE PROVIDED JUST PRIOR TO
TURNOVER TO OWNER. TEMPORARY HEATING OF THE BUILDING
PRIOR TO ANY USE OF THE PERMANENT HVAC SYSTEM SHALL
BE THE RESPONSIBILITY OF THE G.C.
7 HANGING, ANCHORING AND SUPPORT OF EQUIPMENT, DUCTS,
PIPING AND ACCESSORIES IS DESIGN BUILD BY THE MC. THE
SUPPORTS SHALL MEET CODE.
8 ALWAYS INSTALL EQUIPMENT PER MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
9 MAINTAIN A MINIMUM OF 3'-0" SEPARATION FROM EXHAUST
TERMINATIONS TO OPERABLE WINDOWS OR DOORS.
MECHANICAL ENERGY CODE
INSULATION NOTES AND
1 THE MECHANICAL DESIGN IS BASED ON THE 2015
INTERNATIONAL ENERGY CONSERVATION CODE.
2 ALL SUPPLY, RETURN AND EXHAUST DUCTWORK SHALL BE
SEALED AIRTIGHT WITH DUCT SEALANT ALONG ALL SEAMS AND
JOINTS.
DRAWN
BY:
CHECKED
BY:
JOB
N UMBER:
DATE:
H0.1
HV
A
C
N
O
T
E
S
,
L
E
G
E
N
D
,
AN
D
D
R
A
W
I
N
G
I
N
D
E
X
GJS
11-17-2022
SAK
MARGAUX SALON
600 S SAINT VRAIN, UNIT #1B,
ESTES PARK, CO 80517
22-227
17 NOV 2022
Approved
by
SAFEbuilt
12/16/2022
8:52:26 AM
'RR
U
'
/
H
D
I
6
R
O
L
G
F
R
S
\
'RR
U
'
/
H
D
I
*
O
D
V
V
F
R
S
\
'RRU'-DPEFRS\
'RR
U
'
-
D
P
E
F
R
S
\
'RR
U
'
/
H
D
I
6
R
O
L
G
F
R
S
\
'RR
U
'
/
H
D
I
6
R
O
L
G
F
R
S
\
'RR
U
'
/
H
D
I
*
O
D
V
V
F
R
S
\
:LQ
G
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
:LQ
G
R
Z
'
*
O
D
V
V
F
R
S
\
:LQ
G
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
:LQ
G
R
Z
'
*
O
D
V
V
F
R
S
\
:LQ
G
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
:LQGRZ'0XOOLRQFRS\:LQGRZ'*ODVVFRS\:LQGRZ'0XOOLRQFRS\
:LQ
G
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
:LQ
G
R
Z
'
*
O
D
V
V
F
R
S
\
:LQ
G
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
:LQ
G
R
Z
'
*
O
D
V
V
F
R
S
\
:LQ
G
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
:LQGRZ'0XOOLRQFRS\:LQGRZ'*ODVVFRS\:LQGRZ'0XOOLRQFRS\:LQGRZ'*ODVVFRS\:LQGRZ'0XOOLRQFRS\
'RR
U
'
-
D
P
E
F
R
S
\
:LQGRZ'0XOOLRQFRS\:LQGRZ'*ODVVFRS\:LQGRZ'0XOOLRQFRS\:LQGRZ'*ODVVFRS\:LQGRZ'0XOOLRQFRS\
:LQG
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
T
(E)FUR
HAIR SALON
ADA RESTROOM RESTROOM
JAZZERCISE
STAIRS
EF-1
16"x4 "
D-4
(E)D
(E)G
(E)G
(E)D
(E)D (E)D
(E)D
(E)D
(E)D(E)D
(E)D
(E)D
1
1
1 1
1
1
1
1
1 1
2
2
3
4 5
(E)CU
10"ø
EXHAUST FAN SCHEDULE
NUMBER MAKE & MODEL NUMBER CFM FAN
SPEED
EXT
STATIC
D RIVE
TYPE REMARKS
EF-1 COO K GEMINI GCVF-180 EC0.5"79W 7.0 DIRECT
DUTYTYPE MOTOR
HP/W SON ES ELEC
DATA
SPEED
CONTROL
GRILLE
TYPE
HOUSIN G
CONST CO NTROL
CEILING
CABINET
1631
RPM PLASTIC G ALV 120/1A 1
1 GRAVITY BACKDRAFT DAMPER
A
2 SPEED CONTROLLER MOUNTED AT FAN FOR PURPOSES OF BALANCING
2EXHAUST240
TIME CLOCK, SET TO OPERATE DURIN G OCCUPIED HOURS (ADJ.), WITH WALL SWITCH OVERRIDE.
EXISTING FLOOR SA DIFFUSERS SHALL REMAIN IN PLACE, AS-IS.
EXISTING RA GRILLES SHALL REMAIN IN PLACE, AS-IS.
REMOVE EXISTING WALL MOUNTED RA G RILLE D URING WALL
DEMOLITION. PROVIDE NEW FLO OR GRILLE TO COVER EXISTIN G
RA FLOOR PENETRATION. FIELD VERIFY EXACT SIZE OF FLOOR
OPENING PRIOR TO ORD ERING NEW FLOOR GRILLE.
INSTALL NEW CEILIN G EXHAUST FAN IN THIS APPROXIMATE
LOCATION. FIELD VERIFY FAN LOCATION AND EXHAUST DUCT
ROUTE PRIOR TO INSTALLATION. REFER TO CEILING EXHAUST
FAN DETAIL O N THIS SHEET FOR INSTALLATION INFORMATION.
ROUTE EXHAUST D UCT ABO VE CEILING TO EXTERIOR WALL.
TERMIN ATE THROUGH WALL WITH MAN UFACTURER'S WALL CAP
WITH BIRD SCREEN. GC TO FIELD PAINT WALL CAP TO MATCH
EXTERIOR. COORDINATE WALL PENETRATION AND WALL CAP
PAINTING WITH GC.
FLAG NOTES:
1
2
3
4
5
SCALE:
CEILING EXHAUST FAN
DETAIL NONE
INTEGRAL
BACK DRAFT DAMPER
DISCHARGE DUCT
REFER TO HVAC
FLOOR PLAN FOR
SIZE
FLEX CO NN ECTION
INTEGRAL PLASTIC GRILLE
RUBBER GROMMETS, TYP
TRANSFER FAN
REFER TO SCHEDULE
ADJUSTABLE
FLANGE
SUPPORT FROM
STRUCTURE
SPEED CONTROL SWITCH
FOR BALANCING. MOUN T
INSIDE FAN HO USING WHEN
PO SSIBLE. O THERWISE LOCATE
SWITCH IN A CONCEALED
ACCESSIB LE LOCATION NEAR
FAN.
REFER TO EQUIPMENT SCHEDULE
FOR CONTROL.
DRAWN
BY:
CHECKED
BY:
JOB
N UMBER:
DATE:
H2.1
HV
A
C
F
L
O
O
R
P
L
A
N
S
,
SC
H
E
D
U
L
E
S
,
A
N
D
DE
T
A
I
L
S
GJS
11-17-2022
SAK
MARGAUX SALON
600 S SAINT VRAIN, UNIT #1B,
ESTES PARK, CO 80517
22-227
0" 1" 2"
1/4" = 1'-0"
HVAC FLOOR PLAN
GRILLES, REGISTERS AND DIFFUSERS SCHEDULE
TAG MAKE & MODEL NUMBER DESCRIPTION
NECK
SIZE DUTY COLOR
FRAME
SIZE
FRAME
TYPE
FRAME
CONST DAMPER REMARKS
D-4 TITUS 300RL-1 SIDEWALL SUPPLY
DIFFUSER
16"x4"SUPPLY WHITE NECK
+2
SIDEWALL STEEL YES
MC SHALL FIELD VERIFY EXACT FLOOR OPEN ING SIZE PRIOR TO O RDERIN G
17 NOV 2022
403.2.1 Recirculation of air.
3. Where mechanical exhaust is required by Note b in
Table 403.3.1.1, recirculation of air from such
spaces shall be prohibited. Recirculation of air that
is contained completely within such spaces shall not
be prohibited. Where recirculation of air is prohibited,
all air supplied to such spaces shall be
exhausted, including any air in excess of that
required by Table 403.3.1.1.
Approved
by
SAFEbuilt
12/16/2022
8:52:31 AM
PLUMBING LEGEND:
V
LP
G
VAC
CA
F
FLOOR DR AIN/SINK
RD
ORD
W
GW
HWC
HW
TW
CW
CD
PIPE ELBOW UP
PIPE TEE DOWN
PIPE TEE UP
HOT WATER CIRC.
TEMPERED WATER
PROPANE PIPING
NATURAL G AS PIPING
PIPE ELBOW DO WN
WASTE PIPING
VENT PIPING
HOT WATER PIPING
COLD WATER PIPING
PIPE CONTINUATION
ROOF DRAIN PIPE
OVERFLOW RD P IPE
SOLENOID VALVE
PIPE CAP
UNION
CHECK VALVE
BALANCE VALVE
PRESS. RED. VALVE
GATE VALVE
GAS COCK
BALL VALVE
PIPE TO BE REMOVED
FLOOR/GRADE CLEANOUT
WALL CLEANOUT
ROOF DRAIN
VACUUM PIPING
COMP AIR PIPING
GREASE WASTE PIPING
INVERT ELEVATIONI.E.
NEW(N )
EXISTING(E)
X
SHT #
DETAIL X
SHEET #
RELOCATE(R)
101 REFERENCE
DETAIL
OR ISOMETRIC
FIRE PIPING
T & P RELIEF VALVE
CONDENSATE PIPING
~
SCALE:
TYPICAL SHAMPOO
SINK DETAIL NONE
HW
CW
FLOOR LEVEL
CEILIN G LEVEL
TMV-1
SHAMPOO SIN K
(BY OTHERS)
0.75"
TYP.ISOLATION BALL VALVE
(E )HW & CW PIPING
WITHIN BASEMEN T.
SHAMPOO SINK
(B Y OTHERS)
ISOLATION
BALL VALVE
TMV-1
CONTR ACTOR SHALL PROVIDE
VACUUM BR EAKER ON OWNER
PR OVIDED SHAMPOO SINKS IF
INTEGR AL VACUUM BREAKER IS
N OT PROVIDED.
SCALE:
SHAMPOO SINK WASTE
AND VENT ISOMETRIC NONE
~
CONTRACTOR SHALL PROVIDE
HT-1 ON OWNER PRO VIDED
SHAMPOO SIN KS IF IN TEG RAL
HAIR TRAP IS NOT PROVIDED.
SHAMPOO
SINK/CHAIR,
TYPICAL OF 2
(B Y OTHERS)
W2"
HT-1
HT-1
2" AAV-1
2" AAV-1
CONNECT NEW 2"
WASTE TO EXISTING
WASTE IN BASEMENT.
REFER TO PLUMBING
BASEMEN T FLOO R
PLAN FOR
CONTINUATION
2"
FLOOR
LEVEL
W
~
GENERAL MECHANICAL REQUIREMENTS:
CODES AND PERMITS
WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL CODES, REGULATIONS AND
ORDINANCES. PERMITS NECESSARY FOR PERFORMANCE OF WORK SHALL BE SECURED AND PAID FOR BY THE CONTRACTOR.
DRAWINGS AND COORDINATION
DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC IN NATURE, AND ARE NOT INTENDED TO BE SCALED FOR EXACT
MEASUREMENTS NOR TO SERVE AS SHOP DRAWINGS. CHANGES FROM THE PLANS MADE WITHOUT CONSENT OF THE
ENGINEER SHALL RELIEVE THE ENGINEER OF RESPONSIBILITY FOR ALL CONSEQUENCES ARRIVING OUT OF SUCH CHANGES.
INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. WHERE CONDITIONS REQUIRE
REASONABLE CHANGES TO THOSE INDICATED ON THE DRAWINGS, MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE
OWNER. COORDINATE ALL WORK WITH OTHER TRADES.
WARRANTY
WORKMANSHIP, MATERIALS, EQUIPMENT AND PROPER OPERATION SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR
FROM THE DATE OF FINAL ACCEPTANCE FROM THE OWNER. INITIAL ACCEPTANCE OF WORK SHALL NOT WAIVE THIS
GUARANTEE. THIS GUARANTEE SHALL NOT INCLUDE NORMAL MAINTENANCE REQUIRED BY THE OWNER AS DESCRIBED IN
EQUIPMENT OPERATION AND MAINTENANCE MANUALS.
SUBMITTALS
CONTRACTOR SHALL SUBMIT TO THE ARCHITECT/ENGINEER A PORTABLE DOCUMENT FORMAT "PDF" COPY OF SUBMITTAL
BROCHURES FOR REVIEW. PROVIDE INFORMATION ON ALL MAJOR EQUIPMENT AS LISTED ON DRAWING EQUIPMENT SCHEDULES,
AS WELL AS VALVES, DUCTWORK ACCESSORIES AND TEMPERATURE CONTROL DIAGRAMS AS APPLICABLE.
OPERATION AND MAINTENANCE MANUALS
CONTRACTOR SHALL FURNISH AT THE COMPLETION OF THE PROJECT A PORTABLE DOCUMENT FORMAT "PDF" COPY OF
COMPLETE OPERATION AND MAINTENANCE MANUALS TO THE ARCHITECT/ENGINEER FOR REVIEW PRIOR TO TURNOVER TO
OWNER. MANUALS TO BE BOUND AND INCLUDE INSTALLATION INSTRUCTIONS, REPLACEMENT PARTS LISTS AND MAINTENANCE
INFORMATION ON ALL EQUIPMENT AS DESCRIBED IN THE SUBMITTALS SECTION. COMPLETED OPERATION AND MAINTENANCE
MANUALS ARE TO BE FORWARDED TO THE OWNER WITHIN 90 DAYS AFTER OWNER BUILDING ACCEPTANCE.
PRODUCT SUBSTITUTIONS
MANUFACTURER MODEL NUMBERS LISTED ON THE DRAWINGS AND/OR SPECIFICATIONS ARE TO BE CONSIDERED AS THE
BASIS OF DESIGN. WHERE TWO OR MORE ALTERNATE MANUFACTURERS OR MATERIALS ARE LISTED, THE CHOICE OF THESE
SHALL BE OPTIONAL WITH THE CONTRACTOR. PRIOR TO THE AWARDING OF THE CONTRACT, CONTRACTOR MAY REQUEST A
PROPOSED SUBSTITUTION OF MATERIALS IN WRITING TO THE ARCHITECT/ENGINEER NO LATER THAN SEVEN DAYS PRIOR TO
THE RECEIPT OF BIDS. THE COST OF ANY CHANGES REQUIRED BY OTHER TRADES, INCLUDING A/E DESIGN, DUE TO THE
USE OF EQUIPMENT AND/OR MATERIALS OTHER THAN THAT OF THE BASIS OF DESIGN SHALL BE PAID BY THE
CONTRACTOR.
RECORD DRAWINGS
CONTRACTORS SHALL MAINTAIN A COMPLETE AND ACCURATE SET OF MARKED UP DRAWINGS SHOWING ACTUAL LOCATIONS
OF INSTALLED WORK. THESE DRAWINGS ARE TO BE FORWARDED TO THE OWNER AS PART OF THE OPERATION AND
MAINTENANCE MANUALS AT THE COMPLETION OF THE PROJECT.
ACCESS DOORS
PROVIDE ALL ACCESS DOORS/PANELS AS REQUIRED FOR ACCESS TO VALVES, DAMPERS, CONTROL DEVICES, FILTERS AND
ANY OTHER ITEMS FOR WHICH ACCESS IS REQUIRED FOR EITHER OPERATION OR SERVICING. WHERE ACCESS DOORS ARE
TO BE INSTALLED IN ASSEMBLIES REQUIRED TO HAVE A SPECIFIC FIRE RATING, ACCESS DOORS SHALL ALSO BE FIRE
RATED.
PIPING AND DUCTWORK SEALANT THROUGH RATED ASSEMBLIES
PENETRATIONS SHALL BE SEALED AS REQUIRED IN ACCORDANCE WITH BUILDING AND MECHANICAL CODES TO RESIST THE
PASSAGE OF FLAME AND PRODUCTS OF COMBUSTION IN ORDER TO MAINTAIN THE RESISTANCE RATING OF THE
CONSTRUCTION BEING PENETRATED.
PROTECTION OF MATERIALS AND EQUIPMENT
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ALL WORK, MATERALS, AND EQUIPMENT PROVIDED UNDER THIS
SECTION. PIPE OPENINGS SHALL BE CLOSED WITH CAPS OR PLUGS TO PREVENT THE ENTRANCE OF DEBRIS DURING
CONSTRUCTION. ALL DUCTWORK OPENINGS SHALL BE SEALED CLOSED DURING CONSTRUCTION.
EQUIPMENT AND PIPING IDENTIFICATION
PROVIDE EQUIPMENT LABELS FOR ALL MAJOR EQUIPMENT, INCLUDING BUT NOT LIMITED TO AIR HANDLING SYSTEMS, FANS,
VAV BOXES, CONTROLS, DAMPERS, CONTROL VALVES AND PUMPS.
PROVIDE PIPE MARKERS ON CW, HW AND HWC SYSTEMS. LABELS TO BE AT MAXIMUM 8 FEET APART, WITH FLOW DIRECTION
INDICATED, AS APPLICABLE.
ADDITIONALLY, PROVIDE LABELING ON POTABLE WATER MANIFOLDS INDICATING PLUMBING FIXTURE SERVED BY THE OUTLET,
AS APPLICABLE.
LABELS SHALL BE AFFIXED OR ADHERED PERMANENTLY TO EQUIPMENT. EQUIPMENT INSTALLED INDOORS TO BE LABELED
WITH EMBOSSING TAPE.
EQUIPMENT INSTALLED OUTDOORS TO BE LABELED WITH ENGRAVED PLASTIC LAMINATE SIGNS.
PIPE MARKERS TO BE SELF-ADHESIVE, MANUFACTURED FOR SUCH PURPOSE.
STARTERS AND DISCONNECTS
EQUIPMENT STARTERS SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR AND INSTALLED BY THE ELECTRICAL
CONTRACTOR. EQUIPMENT DISCONNECTS SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR UNLESS NOTED OTHERWISE
ON THE DRAWINGS. STARTERS SHALL BE NEMA TYPE, AND SHALL INCLUDE PHASE MONITORING FOR MOTORS 5 HP AND
LARGER.
TESTING
TESTING SHALL BE PERFORMED ON THE FOLLOWING SYSTEMS SPECIFIED. ALL SYSTEMS LISTED MAY NOT BE INCLUDED IN
PROJECT, REFER TO DRAWINGS FOR APPLICABLE SYSTEMS.
SOIL, WASTE AND STORM DRAINAGE PIPING SHALL BE TESTED IN ACCORDANCE WITH APPLICABLE STATE AND LOCAL CODES.
DOMESTIC WATER PIPING SHALL BE TESTED AND PROVEN WATERTIGHT UNDER A PRESSURE NOT LESS THAN THE WORKING
PRESSURE OF THE SYSTEM FOR A 24 HOUR PERIOD.
DOMESTIC WATER PIPING SYSTEM SHALL BE CHLORINATED AND STERILIZED IN ACCORDANCE WITH REQUIREMENTS OF LOCAL
JURISDICTION.
NATURAL GAS PIPING SHALL BE TESTED WITH AN AIR PRESSURE OF MINIMUM TWO TIMES THE DESIGN SYSTEM PRESSURE,
BUT NO LESS THAN 3 PSIG, FOR A PERIOD OF 24 HOURS WITHOUT PRESSURE DROP.
BALANCING
SYSTEM BALANCING SHALL BE PERFORMED BY A CERTIFIED BALANCING CONTRACTOR. BALANCE ALL SYSTEMS INCLUDING
AIRFLOW TO AND FROM ALL OPENINGS, AND PUMPED WATER SYSTEMS INCLUDING DOMESTIC WATER RECIRCULATION
SYSTEMS AS APPLICABLE. MAKE ANY ADJUSTMENTS NECESSARY TO RESULT IN CONDITIONS INDICATED AND PROVIDE
READJUSTMENTS TO ITEMS IN REPORT AS MAY BE REQUESTED BY ARCHITECT/ENGINEER. SUBMIT TWO COPIES OF TEST
AND BALANCE REPORT FOR APPROVAL. FAN AND PUMP SYSTEMS TO BE BALANCED WITHIN PLUS OR MINUS 5 PERCENT
OF LISTED VALUES. AIR INLETS AND OUTLETS TO BE BALANCED WITHIN PLUS 10 PERCENT OR MINUS 5 PERCENT OF
LISTED VALUES. BALANCE REPORT TO INCLUDE:
UNIT IDENTIFICATION
MANUFACTURER AND NAMEPLATE DATA
EQUIPMENT NAMEPLATE AMPERAGE AND ACTUAL AMPERAGE
RPM (DESIGN AND ACTUAL)
FAN CFM (DESIGN AND ACTUAL)
FAN STATIC PRESSURE (DESIGN AND ACTUAL)
PUMP GPM (DESIGN AND ACTUAL)
PUMP DISCHARGE AND SUCTION PRESSURE
REGISTER, GRILLE, DIFFUSER REFERENCE NUMBER AND LOCATION
INLET/OUTLET CFM (DESIGN AND ACTUAL)
FLOW DEVICE PRESSURE DROP, CFM OR GPM
A FINAL BALANCING REPORT SHALL BE PROVIDED TO THE OWNER AFTER COMPLETION OF THE PROJECT.
CLEANING
AT THE COMPLETION OF WORK, ALL FIXTURES AND EQUIPMENT SHALL BE THOROUGHLY CLEANED AND DELIVERED IN A
CONDITION SATISFACTORY TO THE ARCHITECT. ALL FILTERS SHALL BE REPLACED WITH NEW PRIOR TO OWNER ACCEPTANCE
OF THE BUILDING.
PRE-BID
FOR EXISTING BUILDINGS, THE BIDDERS SHALL PERFORM A BUILDING AND SPACE SITE VISIT PRIOR TO BID. THE ACT OF
SUBMITTING A BID INDICATES THE BIDDER DOES AGREE THEY HAVE A FULL UNDERSTANDING OF THE SCOPE OF WORK
INVOLVED WITH THE EXISTING CONDITIONS.
ALTITUDE
SUPPLIERS SHALL CONFIRM THAT ALL EQUIPMENT BEING FURNISHED IS APPROPRIATE FOR USE AT THE ALTITUDE OF THE SITE.
GENERAL PLUMBING NOTES
1 THE PLUMBING DESIGN IS BASED ON THE 2015 INTERNATIONAL
PLUMBING CODE. PLUMBING WORK SHALL COMPLY WITH ALL
APPLICABLE CODES AND LOCAL CODE AMENDMENTS. VERIFY ALL
REQUIREMENTS PRIOR TO SUBMITTING BID OR COMMENCING
WORK.
2 WASTE AND VENT PIPING ABOVE SLAB (NOT IN RETURN AIR
PLENUM) SHALL BE SCHEDULE 40, DWV, PVC, PLASTIC.
FITTINGS SHALL BE PVC.
3 POTABLE WATER PIPING 2" AND SMALLER SHALL BE PEX-A
TUBING MANUFACTURED BY UPONOR/WIRSBO OR APPROVED
EQUAL. FITTINGS SHALL BE EXPANSION TYPE WITH SECONDARY
EXPANSION RING (NOT CRIMPED). CW SHALL BE RUN IN BLUE
PIPE, HW & HWC IN RED, OTHER SYSTEMS CLEAR. PIPING
SHALL BE PROPERLY SUPPORTED USING PLENUM RATED
GALVANIZED TROUGHS OR CHANNELS HUNG AT MAXIMUM 8'
INTERVALS. UNSUPPORTED PEX MAY NOT EXCEED 32".
4 PUSH-TO-CONNECT PLUMBING FITTINGS (I.E. SHARKBITE OR
SIMILAR) AND PULLED TEE FITTINGS WILL NOT BE ACCEPTED.
5 POTABLE WATER VALVES SHALL BE FULL PORT, BALL TYPE.
6 HANGING, ANCHORING AND SUPPORT OF EQUIPMENT, PIPING
AND ACCESSORIES IS DESIGN BUILD BY THE PC. THE
SUPPORTS SHALL MEET CODE.
7 ALWAYS INSTALL EQUIPMENT PER MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
8 PRIOR TO BUILDING TURNOVER, THE POTABLE WATER SYSTEM
SHALL BE CLEANED AND DISINFECTED PER IPC SECTION 610.
THE SYSTEM SHALL BE FLUSHED, CHLORINATED AND PURGED.
REPEAT UNTIL THE SYSTEM HAS BEEN PROVEN TO PASS
BACTERIAL EXAMINATION. A REPORT SHALL BE SUBMITTED TO
THE AUTHORITY HAVING JURISDICTION.
PLUMBING ENERGY CODE
INSULATION NOTES AND
1 THE PLUMBING DESIGN IS BASED ON THE 2015 INTERNATIONAL
ENERGY CONSERVATION CODE.
2 COMMERCIAL POTABLE HOT WATER PIPING, 140 DEG F,
SHALL BE INSULATED USING FIBERGLASS INSULATION, WITH ALL
SERVICE JACKET, HAVING MAXIMUM 'K' FACTOR OF 0.27.
INSULATION THICKNESS SHALL BE:
* 1" FOR 1.5" PIPE AND SMALLER
* 1.5" FOR PIPES LARGER THAN 1.5"
3 COMMERCIAL POTABLE COLD WATER PIPING SHALL BE
INSULATED USING FIBERGLASS INSULATION WITH ALL SERVICE
JACKET HAVING MAXIMUM 'K' FACTOR OF 0.27. INSULATION
THICKNESS SHALL BE 0.5". DO NOT REMOVE THIS ITEM FROM
THE PROJECT AS IT IS REQUIRED FOR CONDENSATE CONTROL.
DR AWN
BY:
CHECKED
BY:
JOB
N UMBER:
DATE:
P0.1
PL
U
M
B
I
N
G
N
O
T
E
S
,
LE
G
E
N
D
,
I
S
O
M
E
T
R
I
C
,
DE
T
A
I
L
S
,
S
C
H
E
D
U
L
E
S
,
AN
D
D
R
A
W
I
N
G
I
N
D
E
X
GJS
11-17-2022
SAK
MARGAUX SALON
600 S SAINT VRAIN, UNIT #1B,
ESTES PARK, CO 80517
22-227
PLUMBING DRAWING INDEX
SHEET
NUMBER SHEET NAME
PLUMBING DRAWING INDEX
SHEET
NUMBER SHEET NAME
P0.1 PLUMBING NOTES, LEGEND, ISOMETRIC, DETAILS, SCHEDULES, AND
DRAWING INDEX
P2.1 PLUMBING FLOOR PLANS
PLUMBING FIXTURE SCHEDULE
FIXTURE
TAG FIXTURE SPECIFICATIONS
AAV-1 AIR ADMITTANCE VALVE - STUDOR MINI VENT 20301 ONLY (NO
ALTERNATES ALLOWED), PVC, WITH SCREEN, LIFETIME WARRANTY -
SEE PLAN FOR PIPE SIZE
HT-1 HAIR TRAP - PETLIFT PL5000 PLASTIC HAIR TRAP WITH
REMOVABLE BASKET STRAINER, MECHANICAL JOINTS - 1.5"
DIAMETER
PWH-1 POTABLE WATER HEATER - PROVIDED BY OTHERS.
TMV-1 THERMOSTATIC MIXING VALVE - LEONARD 170A-LF, 0.375" INLET
AND OUTLETS, MIN 0.25 GPM, MAX 4 GPM FLOW AT 20 PSI
PRESSURE DROP, BRASS BODY CONSTRUCTION, FIELD
TEMPERATURE ADJUSTABILITY, CHECK STOPS, SET FOR 110° F
DISCHARGE TEMPERATURE, ASSE 1070
STEEL 12 FEET 15 FEET
PVC > 2"4 FEET 10 FEET
PVC 2"4 FEET 5 FEET
PEX > 2"32 INCHES 10 FEET
PEX 2"32 INCHES 5 FEET
COPPER > 1.25" 10 FEET 10 FEET
COPPER 1.25"6 FEET 10 FEET
CPVC > 2"4 FEET 10 FEET
CPVC > 1" AND 2"4 FEET 5 FEET
CPVC 1"3 FEET 5 FEET
PIPING MATERIAL MAX HORIZ
SPACING
MAX VERT
SPACING
PIPE SUPPORT SCHEDULE
17 NOV 2022
Approved
by
SAFEbuilt
12/16/2022
8:53:17 AM
'RR
U
'
/
H
D
I
6
R
O
L
G
F
R
S
\
'RR
U
'
/
H
D
I
*
O
D
V
V
F
R
S
\
'RRU'-DPEFRS\
'RR
U
'
-
D
P
E
F
R
S
\
'RR
U
'
/
H
D
I
6
R
O
L
G
F
R
S
\
'RR
U
'
/
H
D
I
6
R
O
L
G
F
R
S
\
'RR
U
'
/
H
D
I
*
O
D
V
V
F
R
S
\
:LQG
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
:LQG
R
Z
'
*
O
D
V
V
F
R
S
\
:LQG
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
:LQG
R
Z
'
*
O
D
V
V
F
R
S
\
:LQG
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
:LQGRZ'0XOOLRQFRS\:LQGRZ'*ODVVFRS\:LQGRZ'0XOOLRQFRS\
:LQG
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
:LQG
R
Z
'
*
O
D
V
V
F
R
S
\
:LQG
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
:LQG
R
Z
'
*
O
D
V
V
F
R
S
\
:LQG
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
:LQGRZ'0XOOLRQFRS\:LQGRZ'*ODVVFRS\:LQGRZ'0XOOLRQFRS\:LQGRZ'*ODVVFRS\:LQGRZ'0XOOLRQFRS\
'RR
U
'
-
D
P
E
F
R
S
\
:LQGRZ'0XOOLRQFRS\:LQGRZ'*ODVVFRS\:LQGRZ'0XOOLRQFRS\:LQGRZ'*ODVVFRS\:LQGRZ'0XOOLRQFRS\
:LQ
G
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
:LQ
G
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
:LQG
R
Z
'
0
X
O
O
L
R
Q
F
R
S
\
'RR
U
'
-
D
P
E
F
R
S
\
'RR
U
'
/
H
D
I
6
R
O
L
G
F
R
S
\
'RR
U
'
-
D
P
E
F
R
S
\
'RRU'-DPEFRS\
HAIR SALON
ADA RESTROOM RESTROOM
JAZZERCISE
STAIRS
SHAMPOO
CHAIR (BY
OTHERS)
55
66
PWH (BY
OTHERS)
HW
CW
HW
CW
W
(E)CW
(E)HW
(E)W
~
~
~
~
W
2 2
33
4
5 5
66
1
0.75"0.75"
3"
2"
REMOVE THE EXISTING POTABLE WATER HEATER. PREP CW
AND HW FOR RECONNECTION. E XISTIN G EXPANSION TAN K
SHALL R EMAIN IN PLACE AND RECONNECTED AS REQUIRED.
INSTALL NEW PWH (BY OTHERS) PER MANUFACTURER'S
RECOMMENDATION S. CON NECT EXISTING CW AND HW PIPING TO
NEW PWH PER MANUFACTURER 'S RECOMMENDATIONS.
CONNE CT N EW 0.75" CW TO (E)CW PIPE IN THIS APPROXIMATE
LOCATION. FIELD VERIFY EXACT TAP LOCATION PRIOR TO
INSTALLATION. REFER TO PLUMBING MAIN FLOOR P LAN ON
THIS SHEET FOR CONTINUATION.
CONNE CT N EW 0.75" HW TO (E)HW PIPE IN THIS APPROXIMATE
LOCATION. FIELD VERIFY EXACT TAP LOCATION PRIOR TO
INSTALLATION. REFER TO PLUMBING MAIN FLOOR P LAN ON
THIS SHEET FOR CONTINUATION.
CONNECT N EW 3" WASTE PIPE TO E XISTING WASTE PIP E 3"
OR LARGER WITHIN THE BASEMENT AREA. FIELD VERIFY
EXACT CONNECTION LOCATION PRIO R TO INSTALLATION.
0.75" CW AND 0.75" HW UP FROM BA SEMEN T LEVEL, CONN ECT
TO SHAMPOO CHAIR/SINK (BY OTHERS) PER MANUFACTURER'S
RECOMMENDATIONS. REFER TO SHAMPOO DETAIL ON SHEET
P0.1 FO R ADDITIONAL SHAMPOO CHAIR INSTALLATION
INFORMATION.
NEW 2" WASTE UP FROM BASEMENT LEVEL. CONNECT TO
SHAMPOO CHAIR/SINK (B Y OTHER S) PER MAN UFACTURER'S
RECOMMENDATIONS. REFER TO SHAMPOO CHAIR WASTE AND
VENT ISOMETR IC ON SHEET P0.1 FOR ADDITIONAL SHAMPOO
CHAIR WASTE PIPE INSTALLATION INFORMATION .
FLAG NO TES:(ALL P LANS THIS SHEET)
1
2
3
4
5
6
DRAWN
BY:
CHECKED
BY:
JOB
N UMBER:
DATE:
P2.1
PL
U
M
B
I
N
G
F
L
O
O
R
PL
A
N
S
GJS
11-17-2022
SAK
MARGAUX SALON
600 S SAINT VRAIN, UNIT #1B,
ESTES PARK, CO 80517
22-227
0" 1" 2"
1/4" = 1'-0"PLUMBING MAIN FLOOR
PLAN
0" 1" 2"
1/4" = 1'-0"PLUMBING BASEMENT
FLOOR PLAN
17 NOV 2022
Approved
by
SAFEbuilt
12/16/2022
8:53:22 AM