HomeMy WebLinkAboutPLANS Remodel 415 Parkview Ln 2022-07-22N
Bill Riley
415 Park View Lane
Estes Park, CO 80517
186'
157'
206'
97'
8
5
'
155'
1
0
8
'108'
281'
20'
Existing Garage
Existing House
Proposed
20' x 14'
Addition
50'
80'150'
PERMIT #22-EP-00373
Field Copy
Print out legibly & in color and have on
site for inspector
REVIEWED BY SAFEBUILT - PBLAND
PERMIT #22-EP-00373
Field Copy
Print out legibly & in color and have on
site for inspector
REVIEWED BY SAFEBUILT - PBLAND
Matched to Soils Report
PERMIT #22-EP-00373
Field Copy
Print out legibly & in color and have on
site for inspector
REVIEWED BY SAFEBUILT - PBLAND
PERMIT #22-EP-00373
Field Copy
Print out legibly & in color and have on
site for inspector
REVIEWED BY SAFEBUILT - PBLAND
PERMIT #22-EP-00373
Field Copy
Print out legibly & in color and have on
site for inspector
REVIEWED BY SAFEBUILT - PBLAND
All work shall be performed by Licensed
Contractors OR work shall be performed
by the homeowner residing in the dwelling.
Issuance of a permit or approval of these construction
documents shall not be construed to be a permit for, or
an approval of, any violation of any of the provisions of
the adopted codes or of other ordinances of this
jurisdiction.
A permit presuming to give authority to violate or cancel
the provisions of these codes shall be invalid. R105.4
PLANS AND CONSTRUCTION SHALL MEET
THE 2018 IRC AND ALL APPLICABLE
MUNICIPAL CODES & ORDINANCES
ALL PERMIT DOCUMENTS: ARCHITECTURAL PLANS,
ENGINEERED PLANS, SOILS REPORTS, TRUSS
DRAWINGS, ENERGY CODE REPORTS/RESCHECKS,
ETC... MUST BE KEPT TOGETHER & ONSITE FOR
INSPECTORS REVIEW.
DO NOT COVER WORK UNTIL IT HAS BEEN
APPROVED BY INSPECTION -
IF YOU HAVE FAILED A ROUGH INSPECTION
YOU MUST HAVE AN APPROVED REINSPECTION
BEFORE YOU COVER THE WORK UP.
This structure must comply
with the requirements of the
2020 National Electrical
Code Fire Block shall be provided in
enclosed wood framed walls per
R302.11
Access doors from Conditioned
spaces to unconditioned spaces
(E.G. Attics and Crawlspaces) shall
be weatherstripped and insulated.
Provide attic access of min. of 22"x30" to
enclosed attic space of combustible roof
construction with a vertical height of 30"
APPROVED by SAFEbuilt;
2015 International Codes
Subject to inspection and compliance to all
Relevant, adopted Building & Municipal
Codes
07/22/2022
PERMIT #22-EP-00373
Field Copy
Print out legibly & in color and have on
site for inspector
REVIEWED BY SAFEBUILT - PBLAND
STAMPED ENGINEERED TRUSS DRAWINGS SHALL BE
ON-SITE FOR INSPECTOR TO REVIEW
OK
REFER TO ENGINEERS LETTER FOR
STRUCTURAL DETAILS
PERMIT #22-EP-00373
Field Copy
Print out legibly & in color and have on
site for inspector
REVIEWED BY SAFEBUILT - PBLAND
R-49 CEILING INSULATION
OK
FOLLOW MANUFACTURER'S INSTRUCTIONS:
Manufacturer's installation instructions, as required
by code, shall be available on the job site at the
time of inspection. R106.1.2
STAMPED ENGINEERED TRUSS
DRAWINGS SHALL BE ON-SITE FOR
INSPECTOR TO REVIEW
Seal all longitudinal joints on all ducts,
supply, return, vent, and exhaust.
CONDITION CRAWLSPACE - ADD INSULATION & VAPOR
RETARDER ON GROUND PER SECTION R408
Provide Air Barriers/insulation for
all components as listed per Table
N1102.4.1.1 & 2012 ICC 400
Standard for Lot Structures
R-20
2015 PRESCRIPTIVE INSULATION VALUES:
CRAWLSPACE = R-15/19
WALLS = R-20 or R-13+R-5 continuous
ATTIC/CEILING = R-49
FENESTRATION U-FACTOR VALUE:
WINDOWS = 0.32
Prescriptive path must follow Section N1101
through N1104 of Chapter 11 of the 2015 IRC
PERMIT #22-EP-00373
Field Copy
Print out legibly & in color and have on
site for inspector
REVIEWED BY SAFEBUILT - PBLAND