Loading...
HomeMy WebLinkAboutLETTER Framing SFD 851 Vista Ln 2023-03-28 March 28, 2023 Project #19182 Integration Design Group 730 17th Street, Suite 104 Denver, CO 80202 Re: Our Lady of the Mountains – Rectory Deck Joist Hangers Permit# 22-EP-00320 Based upon photos of the installed LUS28 hanger with proper nailing, it is our opinion that the installed hangers are structurally adequate in lieu of LUS210 hangers as specified on the approved construction documents. Please call if you have any questions regarding this information. Sincerely, GEBAU, INC. Paul Gallagher, P.E. PG/qpg Cc: Chris Dierks (cdierks@coeconstruction.com ) GEBAU Inc. Consulting Structural Engineers 168 Centennial Parkway, Suite 180 · Louisville, Colorado 80027 · (303) 444-8545 03/29/2023