Loading...
HomeMy WebLinkAboutPLANS Sign 251 Moraine Ave 2022-06-16Reviewed by SAFEbuilt 06/16/2022 7' 3.5' From: Ingrid Bush <ingrid@thebarrel.beer> Sent: Thursday, June 16, 2022 6:33 AM To: Barry Kramer <BKramer@safebuilt.com> Subject: Re: Sign Barry The building is concrete covered with faux stucco. Sign is supported by to 2 x 6 with Timberlakes into existing framing members. Sign is lagbolted into two 2x6 Excuse typos I'm sending this from my iPhone On Jun 14, 2022, at 11:01, Barry Kramer <BKramer@safebuilt.com> wrote: Please provide information as to how the sign will be attached to the building, type of anchors, number of and spacing of anchors and what is the building made of that it’s being anchored to IE: brick, wood, metal Barry Kramer Plan Review Manager SAFEbuilt 11409 Business Park Circle Ste 320 Firestone, CO 80504 303-774-1388 X 103 bkramer@safebuilt.com Reviewed by SAFEbuilt 06/16/2022