Loading...
HomeMy WebLinkAboutPLANS Deck 1100 Big Thompson Ave 2022-06-03SEE STAMPED ENGINEERS PLANS FOR STRUCTURAL REQUIRMENTS I-CODES 2015 22-ep-00227 PRINT PLANS IN COLOR AND HAVE FOR INSPECTOR AT TIME OF INSPECTION SAFEbuilt APPROVED Subject to inspection and compliance to all relevant Adopted Building and Municipal codes. Changes in Plans MUST be approved. D.GRAHAM 06/03/2022 REVIEWED BY SAFEBUILT 06/03/2022 4730 South College Ave, Suite 201, Fort Collins, CO 80525 Phone (970) 225.2422 - Fax (970) 225.2622 May 19, 2022 Three Leaves Woodwork & Construction, LLC. Attn. Terrrence Re: Appenzell Deck Ramp 1100 Big Thompson Ave. Estes Park, Colorado Gentlemen: A representative of Weeks & Associates reviewed the proposed replacement of the deck joists, dropped beam, and connections at existing ramp section of the deck at the referenced site. Our review did not include the review of structural members of the rest of the existing deck and the existing boardwalk. Our review referenced the International Building Code (2018) and used a live load of 100 psf, a snow load of 66 psf and a dead load of 12 psf. Our review indicates the deck joists should be (2) 2x12 PWT Treated LVL at 12” O.C. with a maximum cantilever of 2’-0”. The joists should be attached to the existing flush beam with Simpson LUS210-2 flush-mount hangers. The dropped beam should be a (2) 4x10 Douglas Fir #2, with (1) 4x10 Douglas Fir #2 on each side of the existing posts. The (2) 4x10 Douglas Fir #2 should be attached to the existing posts with (3) 5/8” thru bolts at each side of the beam. If we can be of further assistance please contact us. Sincerely, Weeks & Associates, Inc. Evan Birschbach, E.I.T. Gary G. Weeks, P.E. Staff Engineer Structural Engineer Gary Weeks Digitally signed by Gary Weeks DN: cn=Gary Weeks, o=Weeks & Associates, Inc, ou, email=gary.weeks@weeksinc.com, c=US Date: 2022.05.19 15:58:07 -06'00' REVIEWED BY SAFEBUILT 06/03/2022 PRINT IN COLOR AND HAVE FOR INSPECTOR AT TIME OF INSPECTION THIS AREA IS TO BE REBUILT TO THE SPECFICATIONS OF THE ENGINEERS STAMPED PLANS REVIEWED BY SAFEBUILT 06/03/2022 REVIEWED BY SAFEBUILT 06/03/2022 THIS AREA IS TO BE REBUILT TO THE SPECFICATIONS OF THE ENGINEERS STAMPED PLANS. AREA OF WORK ON DECK LAYOUT PLAN. THIS AREA IS TO BE REBUILT TO THE SPECFICATIONS OF THE ENGINEERS STAMPED PLANS. AREA OF WORK ON DECK LAYOUT PLAN. REVIEWED BY SAFEBUILT 06/03/2022 THIS AREA IS TO BE REBUILT TO THE SPECFICATIONS OF THE ENGINEERS STAMPED PLANS REVIEWED BY SAFEBUILT 06/03/2022