HomeMy WebLinkAboutPLANS Deck 1100 Big Thompson Ave 2022-06-03SEE STAMPED ENGINEERS PLANS FOR STRUCTURAL REQUIRMENTS
I-CODES 2015
22-ep-00227
PRINT PLANS IN COLOR AND HAVE FOR
INSPECTOR AT TIME OF INSPECTION
SAFEbuilt
APPROVED
Subject to inspection and
compliance to all relevant
Adopted Building and Municipal
codes.
Changes in Plans MUST be
approved.
D.GRAHAM
06/03/2022
REVIEWED
BY SAFEBUILT
06/03/2022
4730 South College Ave, Suite 201, Fort Collins, CO 80525
Phone (970) 225.2422 - Fax (970) 225.2622
May 19, 2022
Three Leaves Woodwork & Construction, LLC.
Attn. Terrrence
Re: Appenzell Deck Ramp
1100 Big Thompson Ave.
Estes Park, Colorado
Gentlemen:
A representative of Weeks & Associates reviewed the proposed replacement of the
deck joists, dropped beam, and connections at existing ramp section of the deck at the
referenced site. Our review did not include the review of structural members of the rest
of the existing deck and the existing boardwalk. Our review referenced the International
Building Code (2018) and used a live load of 100 psf, a snow load of 66 psf and a dead
load of 12 psf. Our review indicates the deck joists should be (2) 2x12 PWT Treated LVL
at 12” O.C. with a maximum cantilever of 2’-0”. The joists should be attached to the
existing flush beam with Simpson LUS210-2 flush-mount hangers. The dropped beam
should be a (2) 4x10 Douglas Fir #2, with (1) 4x10 Douglas Fir #2 on each side of the
existing posts. The (2) 4x10 Douglas Fir #2 should be attached to the existing posts
with (3) 5/8” thru bolts at each side of the beam.
If we can be of further assistance please contact us.
Sincerely,
Weeks & Associates, Inc.
Evan Birschbach, E.I.T. Gary G. Weeks, P.E.
Staff Engineer Structural Engineer
Gary
Weeks
Digitally signed by Gary Weeks
DN: cn=Gary Weeks, o=Weeks &
Associates, Inc, ou,
email=gary.weeks@weeksinc.com, c=US
Date: 2022.05.19 15:58:07 -06'00'
REVIEWED
BY SAFEBUILT
06/03/2022
PRINT IN COLOR AND HAVE FOR
INSPECTOR AT TIME OF INSPECTION
THIS AREA IS TO BE REBUILT TO THE
SPECFICATIONS OF THE ENGINEERS
STAMPED PLANS
REVIEWED
BY SAFEBUILT
06/03/2022
REVIEWED
BY SAFEBUILT
06/03/2022
THIS AREA IS TO BE REBUILT TO THE
SPECFICATIONS OF THE ENGINEERS
STAMPED PLANS. AREA OF WORK ON DECK
LAYOUT PLAN.
THIS AREA IS TO BE REBUILT TO THE
SPECFICATIONS OF THE ENGINEERS
STAMPED PLANS. AREA OF WORK ON DECK
LAYOUT PLAN.
REVIEWED
BY SAFEBUILT
06/03/2022
THIS AREA IS TO BE REBUILT TO THE
SPECFICATIONS OF THE ENGINEERS
STAMPED PLANS
REVIEWED
BY SAFEBUILT
06/03/2022