Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PLANS Deck 1681 Ptarmigan Ln 2020-09-29
REQUIRED INSPECTIONS FOR RESIDENTIAL ADDITIONS All of the following must be inspected prior to covering. Inspections labeled “Rough-in” and those labeled “Final” should be grouped. ❑ Setbacks (property lines must be identifiable or an ILC certificate may be required.) ❑ Footing and Foundation inspection, prior to concrete pour when all reinforcing is in place. (If you choose, these inspections can be performed by the engineer of record with a report indicating that the footing and foundation meet all code requirements. Provide all inspection reports to SAFEbuilt Colorado for review and approval.) 1 ❑ Rough-in mechanical ❑ Rough-in framing 2 ❑ Insulation (must be inspected prior to covering) ❑ Final mechanical ❑ Final building 1, 2 1 Note: Final Building will not be signed off until all engineers’ inspection reports have been received. 2 Note: Rough-in framing and final building will not be signed off until the plumbing, electrical, and mechanical work has been approved. All electrical is subject to State permitting, inspections, and approval. Re v i s i o n 3 S e t - 9 / 2 8 / 2 0 KLIPSTEIN RESIDENCE ADDITIONS 1681 Ptarmigan Ln Estes Park, CO 80517 ©2020 Interstice Architectural Studio, LLC 7620' 7630' 7640' T E SS W SS W E SS W E SS W E E E 76 2 0 ' 7630' 7640' Existing Electric Meter Existing 2-story HouseProposed West Sunroom Addition Proposed West Deck Addition 79'-5"± 88'-7"± 12 0 ' - 0 " ± Proposed South Deck Addition Proposed Upper Level Sunroom Addition (no change to building footprint) Existting Driveway 25'-0" setba c k 25'-0" setback 25 ' - 0 " s e t b a c k 25 ' - 0 " s e t b a c k 2 5 ' - 0 " s e t b a c k Existing Utilities GC to locate Site Plan Scale: 1" = 30'-0" pl a n true 0 30 6040501020 1 A1 Site Plan and Project Information A2 Demolition A3 Foundation Plan and Details A4 Floor Plans A5 Framing Plans A6 Exterior Elevations A7 Wall Sections, Trusses and Openings Sheet IndexGeneral Notes 1. Do not scale drawings for dimensions. Dimensions are typically to face of masonry or concrete and face of framing member, unless otherwise noted. 2. Clean-up of rubbish and debris resulting from work shall be collected regularly from project site and legally disposed of. 3. Contractors are responsible for all materials and quantities shown in these drawings graphically as well as those called for by note. 4. The Contractor shall obtain all necessary permits to complete the proposed work and shall comply with all local, state, and federal regulations. 5. All materials and construction shall be completed in accordance with the requirements of Town of Estes Park and the 2015 IRC. The Contractor shall obtain all necessary permits to complete the proposed work and shall comply with all local, state, and federal regulations 6. Provide shoring, temporary bracing, barricades and other measures as necessary to ensure a safe building construction site. 7. Provide blocking in all walls as required for door stops, fixtures, accessories, cabinetry and shelving (including items by Owner) - verify locations with Architect/Owner prior to drywall. Blocking may be either 2x8 Douglas Fir lumber or 8" wide 24 ga galvanized steel strapping may be used per GC's option. 8. Electrical systems shall be design-build. Coordinate the shutoff of power and other utilities with Owner. 9. The Contractor shall be responsible for the locations and protection of all existing utilities. Contractor shall contact representatives from the respective utility companies to have all of their utilities and facilities located prior to construction. 10. Contractor shall protect all adjacent improvements from damage and erosion. All disturbed areas shall be restored to a minimum of their original condition. 11. Contractor to verify positive drainage away from building with top of foundation wall & finish floor elevation. 12. When excavating for west addition, investigate condition of existing footing drain. Modify and extend footing drain around new addition. Confirm day- lighting of drains. 13. GC to provide tree protection around all trees within construction proximity. 14. Excavated organic soils are to be reclaimed and stored on site for reuse in final grading. 15. In these drawings, colors represent... Demolition New Construction Items that have no color represent existing conditions to be maintained. 16. The Owner shall have a thorough Asbestos Investigation performed. Any abatement required by the Investigation shall be completed by a qualified Abatement Contractor prior to the work of the General Contractor commencing. 17. The drawings illustrate (6) new exterior post-mounted lights on the west and south deck additions. These lights are to be Kichler 49063OZ Outdoor Post Lantern with (1) R14 40W low-voltage light with a 12" diameter cone. Finish: Olde Bronze. These lights comply with "dark sky" requirements. Install 60W lamps at the (2) taller posts at the west deck. 18. At the Owner's option, the (3) existing exterior wall sconces at the existing garage may be removed and replaced with Kichler 49059OZ fixtures which are essentially identical to the post-mounted lights described above, except being wall mounted. These lights comply with "dark sky" requirements. Project Narrative Permit Information APPLICABLE CODES: 2015 International Residential Code (IRC) with April 12, 2016 Estes Park Amendments 2017 National Electric Code (NEC) MUNICIPALITY:Town of Estes Park PARCEL #: 2520259007 SCHEDULE:1615453 ZONING CLASSIFICATION: E-1 - Estate 1 acre Setbacks 25'-0" all sides LOT AREA: approx 2.1 Acres = approx 91,770 sf OCCUPANCY: Single-Family Residence CONSTRUCTION TYPE: Type V-B (IBC Classification) - not sprinklered FLOOR AREA: Lower Level Existing Conditioned Floor Area 1003 sf Existing Garage 518 sf Proposed Unconditioned Addition 171 sf Proposed Uncovered Deck Additions 280 sf Upper Level Existing Conditioned Floor Area 1230 sf Existing Porch / Proposed Sun Room Addition 220 sf Total Conditioned Floor Area (Exist / Unchanged) 2233 sf BUILDING HEIGHT: Highest Edge = 27'-5" above natural grade Per EVDC 1.9,E = 22'-2" (Existing / Unchanged) PROJECT ELEVATION:7630' DESIGN CRITERIA: Ground Snow Load: Tabular: 60 psf at 8000' and 70 psf at 8000' Interpolated: 60 + 10x(7630-7000)÷1000 = 67 psf Roof Snow Load: (No reduction taken for roof slopes) Pf = 0.7 x Ce x Ct x Is = 0.7 x 67 psf = 47 psf Roof Dead Load: 15 psf Floor Live Load: 40 psf Floor Dead Load: 10 psf Deck Live Load: (no hottubs) 67 psf Deck Dead Load: 10 psf Wind Speed: 175 mph Exposure C Seismic Design Category: B Subject to Damage From Weather: Moderate to Severe Frost Line Depth: 30" Termites: Slight to Moderate Climate Winter Design Temperature: 1°F Ice Barrier Underlayment: Required Flood Hazard: FEMA Zone X Minimal Flood Hazard Air Freezing Index: 920 Mean Annual Temperature: 43°F Roofing Classification: Class A Class B roof & ice barrier: Required Assumed Soil Bearing Pressure: 2,500 psf Fireplace Restrictions: No PLUMBING FIXTURES: Existing quantities not changed by Proposed Work ENERGY CONSERVATION: Building Thermal Envelope not changed by Proposed Work. However one replacement window is proposed... window E with a maximum U-value of 0.26 - See Sheet A8. Graphics Legend XX'-X" Elevation 12 6 XX'-X"XX'-X" X AXX X AXX X AXX X XXX AXX XXXXX Slope Dn AdditionExisting 1 Drawing # Sheet # SECTION AND DETAIL REFERENCES INTERIOR ELEVATION REFERENCES ROOM NAME & NUMBER Floor Area may be shown instead of room number ELEVATION MARKERS - Relative to Elevation 100'-0" which is typically the Main Level Finish Floor elevation SLOPE INDICATORS - For Elevations/ Sections and Plans respectively CHANGE IN CONDITION REVISION CLOUD AND NUMBER Refer to revision dates listed in the title block below the sheet title Four additions are proposed to the existing house... The west main level sunroom addition entails new concrete pier foundations, new floor framing, two sliding glass doors, new fixed windows, limited wall framing, a pre-engineered trussed roof, and open trellis over the west deck. The new roof is covered with prefinished standing seam metal roofing. The floor and deck are framed with pressure treated lumber due to proximity to grade. The timber beams of the trellis are protected by sheetmetal flashing with Ice and Water Shield stripping. The south deck is also framed with pressure treated lumber. Both decks use synthetic decking. A factory steel railing with wood cap is provided around the south deck, although it is low enough above grade to not require guards. Post mounted lights will comply with Town's "dark sky" exterior lighting restrictions. Both decks are low to grade, directly supported by concrete, and not susceptible to lateral movement or sway - heavy duty ties to house structure are not required. The east upper level sunroom addition replaces the existing roof-top deck and includes extensive windows below a new stick-framed cathedral ceiling roof with pre-finished standing seam metal roofing. This addition interferes with the current required means of egress for the upper level east bedroom, in that the sliding doors from the bedroom will be within the proposed sunroom. A pair of existing smaller casement windows on the south side of the bedroom will be removed and replaced with a single larger casement window to meet emergency escape and rescue requirements. The last addition is a small north entrance roof on an existing doorway on the north side of the existing garage. That roof structure is supported from the existing SIPs panel wall and is not supported from the ground. The extent of demolition of exterior siding and existing flat roofing are above the trigger limits requiring hazardous materials investigation and possible abatement. See General Note #15 to the left. The two sunroom additions are to be unconditioned space without mechanical/ electrical heating or cooling, although ceiling fans will be installed in these spaces. These additions do not expand or modify the existing thermal envelope of the building. The existing walls of the house are structural insulated (SIPs) panels. Architect Joe Calvin (970) 420-8264 joe@intersticearch.com Civil & Structural Engineer David Bangs (970) 308-8221 dbangs@trailridgece.com Owner Jeff & Kathy Klipstein 1681 Ptarmigan Ln Estes Park, CO 80517 (970) 308-0033 bioklip@yahoo.com Room Name Room # or Area Project Site 1681 Ptarmigan Ln Dr y G u l c h R d to Do w n t o w n Estes Park, Colorado Not to Scale north 36 34 7 Vicinity Map Ptarmig a n L n Electronic Documents Documents and Resources are available on the project web site… http://www.intersticearch.com/klipstein/ Crawlspace access well Existing flagstone walk 9/28/20 Sheet Number A1 Joseph E Calvin Date Sheet Title Site Plan and Project Information June 8, 2020 of 7 KL I P S T E I N R E S I D E N C E AD D I T I O N S 16 8 1 P t a r m i g a n L n Es t e s P a r k , C O 8 0 5 1 7 Z APPROVED by SAFEbuilt; 2015 International Codes Subject to inspection and compliance to all Relevant, adopted Building & Municipal Codes 09/29/2020 20-EP-00209 Reviewed by SAFEbuilt 09/29/2020 All electrical is subject to State inspections and approval. The approved plans must be on site for all inspections. General Notes 1. Provide temporary structural support for existing roof and floor structure where existing structural elements are to be demolished or modified. 2. Provide temporary building and site barricades where and when necessary. 3. Provide temporary enclosure for security and weather resistance. 4. Asbestos abatement procedure shall be fully completed and signed off before any work may proceed by GC. 5. Coordinate with Plumbing, Mechanical, and Electrical Design-Build Contractors for additional demolition requirements. 6. The Contractor shall be responsible for legally disposing of all removed items and materials not to be reused or returned to the Owner. 7. Contractor shall protect all adjacent improvements/properties from damage and erosion. Any disturbed areas shall be restored to a minimum of their original condition per the erosion and sedimentary control plan. 8. Free standing furniture to be removed by Owner prior to demolition. 9. Conditions depicted on these drawings have been compiled from available information and must be verified with on-site conditions. Notify Architect of any discrepancies between these drawings and the actual conditions. Beginning of work by Contractors indicates acceptance of all readily visible existing conditions. 10. Coordinate all utility shut-off, security, and temporary weather protection with the Owner. 11. Contractor shall clean-up work premises each day and thoroughly clean at completion of work.Main Level Demolition Plan Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8 Upper Level Demoltion Plan Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8 Exist Deck Exist Living Room Exist Kitchen Exist Bedroom Exist Bathroom Exist Laundry Exist Garage Exist Stair Exist Stair Exist Bedroom Exist Living Room Exist Bathroom Exist Bathroom Exist Closet Exist Bedroom Exist Roof Deck Remove existing double casement window Remove trim and siding east of window opening Remove railings Remove railings Remove posts and trellis structure above At Owner's option, replace existing wall sconce light fixtures per General Note #18 on Sheet A1 Remove finish decking and roofing materials below including any rigid/above-deck insulation - Prepare surface for new flooring - Floor surface will slope slightly to the East Maintain existing stone and wall framing behind Maintain existing stone and wall framing behind Remove existing finish decking and joists Maintain concrete foundation below Remove existing steps Maintain post and structur above Fascia and siding may be removed, but maintain all structure and sheathing in this area Remove siding and trim as illustrated Maintain and protect tree during demolition and construction Maintain existing door Create opening high on wall for relocation of fireplace direct vent Prepare for new interior soffit at relocated fireplace direct vent Remove fireplace direct vent and retain for reinstallation on south wall - completely fill existing opening with insulation and patch wall sheathing Maintain and extend downspout extension Locate and maintain existing sanitary sewer line and cleanouts Maintain existing sliding glass door Maintain existing siding exterior wall finishes as interior finish - Remove select areas as needed for structural ledgers above - see drawings at right Maintain existing gutter and downspout Maintain existing door Remove existing light fixture and reroute electrical to new light fixture in new roof Remove existing trellis structure, and railings Maintain existing fascia and soffit Maintain stone and wall framing behind Prepare for new entry roof construction Remove existing light fixture and reroute electrical to new light fixture in new roof It may be necessary to clip off this corner of existing soffit Remove select portions of siding and trim to allow for installation on new structural ledgers Remove select portions of siding and trim to allow for installation on new structural ledgers Remove existing trellis structure and railings 9/24/20 Sheet Number A2 Joseph E Calvin Date Sheet Title Demolition June 8, 2020 of 7 KL I P S T E I N R E S I D E N C E AD D I T I O N S 16 8 1 P t a r m i g a n L n Es t e s P a r k , C O 8 0 5 1 7 Z Reviewed by SAFEbuilt 09/29/2020 Foundation Plan Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8 8' - 6 " 7'-11"6'-5½"7'-11"1'-3" verify 7'-7" v e r i f y 1'-4" 6' - 0 " 6' - 0 " Existing crawlspace access Foundation Notes REINFORCING STEEL: a. All detailing, fabrication, and placement of reinforcing steel shall be in accordance with the "ACI Manual of Concrete Practice". b. Reinforcing bars shall conform to ASTM Specification A615 and shall be Grade 60, except ties, field bent bars where permitted by Note on Plan, or bars to be welded which shall be Grade 40. c. At splices, lap bars 36 diameters. At splices in masonry, lap bars 42 diameters. At corners, make horizontal bars continuous or provide corner bars. Around openings in walls and slabs, provide (2) #5's extending 2'-0" beyond edge of opening. d. Except as noted on the Drawings, minimum concrete protection for reinforcement shall be in accordance with ACI 318. e. Welded wire fabric shall conform to ASTM Specification A-185. ANCHOR BOLTS: Not applicable this project HOLD DOWNS This graphic illustrates the location of Holdown Strap Ties. Simpson STHD14 or STHD14-RJ BACKFILLING: Do not backfill against foundation walls until all adjacent floor framing is in place and securely anchored or until adequate temporary shoring is installed. COORDINATION: Electrical Contractor shall review sleeve locations and other blockouts as needed in formwork for lighting before concrete is placed. FOUNDATION DESIGN: Design of individual and continuous footings is based on a maximum allowable bearing pressure of 2000 lbs per square foot (dead load plus full live load) placed on the undisturbed natural soils, compacted structural fill or native stone, below frost depth. CAST-IN-PLACE CONCRETE: a. All concrete design is based on the "Building Code Requirements for Reinforced Concrete" (ACI 318). b. All structural concrete shall have minimum 28-day compressive strengths as follows: Footings 3000 psi; slabs on grade 3500 psi. c. Concrete shall be proportioned utilizing Type 1/11 cement. Concrete susceptible to freezing shall be formulated for maximum frost resistance in accordance with "ACI Manual of Concrete Practice". d. Contractor shall notify Architect of cold joint locations prior to or during concrete forming. e. Cold weather and/or hot weather concreting procedures shall be provided, if conditions warrant, as recommended in the "ACI Manual of Concrete Practice". f. All anchor bolts shall be located at a minimum of 5 bolt diameters from concrete edge. Concrete footing and foundation shall have min frost protection of 30" to grade. Exterior deck piers shall be poured to elevations as shown on plans. g. Contractor verify top of footing and top of concrete elevations with existing and proposed grade. h. Saw-cut slab control joints shall be min 1" deep & min 12'-0" oc or less as may be shown on Plans. j. Place new slabs over 2" sand over 10-mil poly vapor barrier over existing compacted soil. Refer to Sections for below-slab insulation. 10'-0"5'-9 1/4" 2¾" 2'-6" 2' - 6 " 2' - 9 " 2' - 9 " 6' - 0 " 5½"1'-4"2'-8" 2' - 8 " Existing crawlspace below existing deck - Once exposed, verify exterior ventilation on interconnection with larger crawlspace for proper ventilation 12" ϕ concrete piers to minimum 36" below grade with (4) #4 vert and #3 ties at max 18"oc 12" ϕ concrete piers on 30" sq x 10" pads with (4) #5 12"x36" L-shape bars, #3 ties at 18" oc and (3) #4 each way in footing Existing Foundations Existing foundation 12" ϕ concrete piers to minimum 36" below grade with (4) #4 vert and #3 ties at max 18"oc Concrete Piers Reinforcing1Not to Scale H 2'-6" 2'- 6 " 10 " 3' - 0 " v e r i f y 2'-8 " 2'-8" 5' - 8 " v e r i f y 10 " 1'-4" sq 1'-0" ϕ (3) #5 at 120°38 " 10" (4) #5 at 90°38 " 10" (4) #5 x 5'-6" #3 ties at 20" oc#3 ties at max 18" oc (3) #4 each way TO Conc = 98'-7" VIF TO Conc = 98'-7" VIF TO Pier = 99'-1" VIF TO Pier = 99'-1" VIF TO Footing = 96'-1" TO Footing = 96'-1" TO Footing = 96'-2"TO Footing = 96'-2" TO Pier = 101'-10" TO Pier = 101'-10" TO Pier = 98'-9" VIF Refer to other drawings for cast in concrete post bases and hold downs New concrete pier foundations 12" ϕ conc pier on 18" sq x 10" pad with(3) #4 6"x30" L-shape bars, #3 ties at 18" oc and (2) #4 each way in footing TO Pier = 98'-7" VIF 1' - 6 " 1'-6" 7' - 0 " 7' - 0 " 2 Sept 24, 20202 9/24/20 Sheet Number A3 Joseph E Calvin Date Sheet Title Foundation Plan and Details June 8, 2020 of 7 KL I P S T E I N R E S I D E N C E AD D I T I O N S 16 8 1 P t a r m i g a n L n Es t e s P a r k , C O 8 0 5 1 7 Z Reviewed by SAFEbuilt 09/29/2020 Main Level Floor Plan Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8 Upper Level Floor Plan Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8 A B D1 E F H L above M Furniture by Owner West Sunroom 162 sf Exist Living Room Exist Kitchen Exist Bedroom Exist Bathroom Exist Laundry Exist Garage Exist Stair Exist Stair Exist Bedroom Exist Living Room Exist Bathroom Exist Bathroom Exist Closet Exist Bedroom West Deck 110 sf South Deck 170 sf East Sunroom 220 sf Post-mounted light fixture per General Note #17 on Sheet A1 - dark sky compliant Post-mounted light fixture per General Note #17 on Sheet A1 - dark sky compliant Post-mounted light fixture per General Note #17 on Sheet A1 - dark sky compliant At Owner's option, replace existing wall sconce light fixtures per General Note #18 on Sheet A1 - dark sky compliant At Owner's option, replace existing wall sconce light fixtures per General Note #18 on Sheet A1 - dark sky compliant 4'-11"2'-11"1'-10½" 22 ' - 0 " 2' - 2 " 6' - 0 " 5' - 8 " 6' - 0 " 2' - 2 " 1'-10"6'-0"2'-2" 10'-0"2'-11"4½"± 1' 4 ½" 11 ' - 8 ⅞" x 8 ' - 0 " T R O 1' 4 ½" 14 ' - 6 " 2'-2¾"9'-9¼" 6'-0"12'-0" 8' - 6 " 9' - 5 ½" 1'-0"5'-0"5½" Refer to Fundation Plan Sheet A3 for dimensions Align surfaces Extend gutter to west Trellis Framing See Sheet A5 6: 1 2 Sl o p e D n 6: 1 2 v e r i f y Sl o p e D n Ridge Vent Reinstall fireplace direct vent - re: Sheet A6 Construct soffit at reconfigured fireplace direct vent C1 D2 C2 G above J G above aboveabove 6:12 Slope Dn 6:12 Slope Dn Coordinate new floor finish with Owner - Floor will slope slightly to East New egress window within existing opening with additional furring Vertical 6x6 supports on wall for New Entry Roof Re: Detail ______ 6'-6½" oc centered on door General Notes 1. Do not scale drawings for dimensions. Dimensions are typically to face of masonry or concrete and face of framing member, unless otherwise noted. 2. All interior walls to be framed to structure above except where otherwise noted. 3. Field verify all rough openings and wall widths prior to fabrication and/or ordering of materials. 4. Contractor to run a continuous bead of sealant around all doors, windows, and other openings or joints. Leave adjacent surfaces clean and provide backer rod where needed. 1 A7 Steel retaining plates per detail 1/A7 Ceiling fan Recommended can lighting locations - EC coordinate with Owner Low profile ceiling fan Recommended can light locaions3 A7 3 A7 2 A7 1 A6 Maintain existing wall finishes 4' - 0 " 9'-0" New prefinished standing seam metal roofing 9/24/20 Sheet Number A4 Joseph E Calvin Date Sheet Title Floor Plans June 8, 2020 of 7 KL I P S T E I N R E S I D E N C E AD D I T I O N S 16 8 1 P t a r m i g a n L n Es t e s P a r k , C O 8 0 5 1 7 Z Reviewed by SAFEbuilt 09/29/2020 Note: Smoke detectors must be installed inside and outside all bedrooms throughout the home. CO detectors must be located within 15' of all bedrooms throughout the home. All existing bedrooms must be brought into compliance. Double 2x10 treated 12'-0" 6 x 6 x 1 2 ' - 0 " tr e a t e d Framing Notes otherwise noted shall utilize hangers of a size specifically designed for the member supported, as shown in Manufacturer's published tables. The floor joist and roof truss manufacturers shall specify specific hangers on their shop drawings. l. All wood framing members in contact with concrete or CMU shall be either redwood or pressure treated. m. All architecturally exposed beams to be weather-resistant with stained finish. Exterior Walls: a. All exterior walls are 2x6 studs at 16" oc unless noted or dimensioned otherwise. Exterior bearing wall heights above 10'-0" are to be constructed of 2x6 Hem Fir #2 Studs at 16" oc. b. Provide (2) 2x10 header with (1) trimmer and (2) king studs at all new door & window openings unless otherwise noted. c. At beam bearing locations in stud walls, provide multiple-stud posts equal to width of bearing member unless noted otherwise. Overframing: a. Shaded areas on Roof Plan represent overframing. Provide 2x6 or 2x8 rafters at 16" oc with 2x4 cripple posts at 48" oc max to trusses/framing below (stagger posts) use (2) 2x8 at ridge & valley members. Interior Walls: a. Interior walls shall be 2x4 studs full height at 16" oc unless noted or dimensioned otherwise. b. Provide (2) 2x4 header with (1) 2x4 trimmer and (2) 2x4 king studs at each side of door & window openings typical unless noted otherwise on Plan. Nailing Schedule Joint Description Number of Common Nails Number of Box Nails Nail Spacing ROOF FRAMING Blocking to Rafter (Toe-Nailed)(2) 8d (2) 10d each end Rim Board to Rafter (End-Nailed)(2) 16d (3) 16d each end WALL FRAMING Top Plate to Top Plate (Face-Nailed)(2) 16d (2) 16d per foot Top Plates at Intersection (Face-Nailed)(4) 16d (5) 16d joints-each side Stud to Stud (Face-Nailed)(2) 16d (2) 16d 24" oc Header to Header (Face-Nailed 16d 16d 16" oc along edges Top or Bottom Plate to Stud (End-Nailed)(3) 16d (3) 40d per stud Bottom Plate to Floor Joist, Bandjoist, Endjoist or Blocking (Face-Nailed)(2) 16d (2) 16d per foot FLOOR FRAMING Joists to Sill, Top Plate or Girder (Toe-Nailed)(4) 8d (4) 10d per joist Bridging to Joist (Toe-Nailed)(2) 8d (2) 10d each end Blocking to Joist (Toe-Nailed)(2) 8d (2) 10d each end Blocking to Sill or Top Plate (Toe-Nailed)(3) 16d (4) 16d each block Ledger Strip to Beam (Face-Nailed)(3) 16d (4) 16d each joist Joist on Ledger to Beam (Toe-Nailed)(3) 8d (3) 10d per joist Band Joist to Joist (End-Nailed)(3) 16d (4) 16d per joist Band Joist to Sill or Top Plate (Toe-Nailed)(2) 16d (3) 16d per foot ROOF SHEATHING Wood Structural Panels 8d 10d see sheathing notes Sheet A3 Diagonal Board Sheathing 1"x6" or 1"x8" 1"x10" or wider (2) 8d (3) 8d (2) 10d (3) 10d per support per support CEILING SHEATHING Gypsum Wallboard 5d coolers 5d coolers 7" edge / 10" field WALL SHEATHING Wood Structural Panels 8d 10d see sheathing notes Sheet A3 Structural Fiberboard Panels 1/2" 25/32" 11 ga. Galv. Roofing nail (0.120" x 1½" long x 7/16" head) 11 ga. Galv. Roofing nail (0.120" x 1¾" long x ⅜" head) – – 3" edge / 6" field 3" edge / 6" field Gypsum Wallboard 5d coolers 5d cooler 7" edge / 10" field Hardboard 8d 8d see Wood Frame Construction Manual Table 3.11 Particleboard Panels 8d 8d (see manufacturer) Diagonal Board Sheathing 1"x6" or 1"x8" 1"x10" or wider (2) 8d (3) 8d (2) 10d (3) 10d per support per support FLOOR SHEATHING Wood Structural Panels 1" or less greater than 1" 8d 10d 10d 16d 6" edge / 12" field 6" edge / 12" filed Diagonal Board Sheathing 1"x6" or 1"x8" 1"x10" or wider (2) 8d (3) 8d (2) 10d (3) 10d per support per support North Roof Framing Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8 East Sunroom Roof Framing Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8West Addition Roof Framing Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8 at 1 8 ½" o c 4x 8 t i m b e r b e a m s 4x 8 T i m b e r B e a m STRUCTURAL WOOD FRAMING: a. Except where noted otherwise, all 2" lumber shall be Douglas Fir-Larch S4S #2 or better, and all solid timber beams and posts shall be Douglas Fir-Larch #1. Any proposed reclaimed lumber certified or graded by qualified professional to have equal or better properties than Douglas Fir Larch #1. b. 2x6 studs shall be Douglas Fir-Larch #2 or better. 2x4 studs shall be Stud grade or better Douglas Fir-Larch or Hem-Fir unless noted otherwise on the Drawings. c. Top and bottom plates shall be Douglas Fir-Larch #2 and better. d. Provide solid blocking at supports for wood joists. Within floor joist spaces beneath solid or built-up columns noted on Plans, blocking of area equivalent to column above shall be provided for proper load transfer. e. Provide solid blocking between joists above wall framing below and below wall framing above. f. Provide wind/seismic anchors at supports for all roof joists and trussed rafters. Anchor type shall be approved by Structural Engineer. g. Except as noted otherwise, minimum nailing shall be provided per the Nailing Schedule on Sheet A5. h. 2x6 studs shall be nailed to top plate with (2) 16d end nails and to sill plate with (3) 8d toenails or (2) 16d end nails. i. All floor and roof sheathing shall be APA rated sheathing, Exposure C. j. Panel identification index and/or thickness shall be as noted on the Drawings. Screw and glue plywood floor sheathing to floor joists with adhesive conforming to Manufacturer's directions. k. Unless otherwise noted, steel connectors such as those manufactured by the Simpson Company shall be used to join rafters, trusses, joists, or beams to other members at flush-framed conditions. Connector conditions no 16 " o c 2x 1 0 t r e a t e d 12 " o c 2x 8 t r e a t e d Double 2x8 treated Double 2x8 treated Do u b l e 2 x 8 t r e a t e d Tr i p l e 2 x 1 0 t r e a t e d 2x 8 l e d g e r t r e a t e d d r o p p e d (3 ) 2 x 1 0 t r e a t e d 2x 1 0 l e d g e r t r e a t e d This deck is not designed for future hot tub loading 6x6 x 1 2 ' - 0 " trea t e d 16"oc2x10 treated Adjust joist spacing and interrupt ledger to accommodate downspout 6x6 x 4 ' - 1 " trea t e d 6x6 x 4 ' - 1 " treate d Double 2x10 treated Double 2x10 treated Double 2x10 treatedDo u b l e 2 x 1 0 t r e a t e d 2x10 ledger 2x10 rim treated 2x10 rim treated Align height with and attache to exist deck rim Joist spaces open to crawlspace and exterior grade below - lightly insulated non-conditioned space above - install 20-mil poly vapor barrier below decking West Addition Floor Framing Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8 6x10 Timber Beam 6x 1 0 T i m b e r B e a m 6x 1 0 T i m b e r B e a m 2x8 Fascia 2x6 framing & ridge board 1 A7 2x 1 0 s l o p e d l e d g e r 2x 1 0 s l o p e d l e d g e r 3 A7 3 A7 24"oc2x10 ra f t e r s 6'-0" 9' - 5 ½" 2 A7 6x6 x 8'-0" step 2x4 trim around step perimeter 2x10 ledger 2x10 x 8'-0" ledger - fasten to SIPs panel skin with 8d nails in 3 rows at 4" oc (approx 60 nails) 2x12 x 5'-8" ledger - fasten to SIPs panel skin with 8d nails in 3 rows at 4" oc (appox 50 nails) Steel retaining plates - re: detail 1/A7 Refer to truss elevations - Sheet A7 24"oc2x10 ra f t e r s 2x6 eave framing at 24" oc Sister 2x6 eave framing Refer to Section 2/A7 for headers 3x3 x ⅜" HSS header 3x3 x ⅜" HSS Install Simpson MSTC28 straps over steel and onto both sides of double jack studs - typical (4) locations 3½" x 12" Glulam Beam 3½" x 12" Glulam Beam (2) 2x10 ridge board Cut ridge board down to 2x6 at eave 5' - 8 " 18" eaves - typ 2x10 x 8'-0" ledger below - fasten to SIPs panel skin with 8d nails in 3 rows at 4" oc (approx 60 nails) 2x12 x 5'-8" ledger below - fasten to SIPs panel skin with 8d nails in 3 rows at 4" oc (appox 50 nails) Simpson CJT6Z concealed timber hangers Simpson CBS66 post base Simpson HUC4.75/9 tripple joist hanger Simpson HUC4.75/9 tripple joist hanger Simpson CBS66 post base Simpson JB28 hangers Simpson JB210 hangers - typical Simpson JB28 hangers - typ (2) ¾" x 5" lag bolts 2x10 blocking between joists (2) ¾" x 5" lag bolts Simpson CBS66 post base Simpson CBS66 post base (1) ¾" thru bolt Simpson HUC210-2 both sides Simpson HUC210-2 typ Roof Tr u s s e s Pre-eng i n e e r e d En d w a l l t r u s s a b o v e (2) ¾" x 6" lab bolts - typ (2) ¾" thru bolts (2) ¾" thru bolts 6x 1 2 t i m b e r b e a m b e l o w 2x6 eave framing at 24" oc See additional connection requirements in Section 3/A7 6x12 timber beam Simpson HCCLLQ666SDS connector between post & beams Simpson HUC612 beam hanger 18" eave - typ Refer to Detail 1/A7 for connections Refer to Section 2/A7 for additional connections Sister 2x6 eave framing Pack solid blocking below post above Steel retaining plates per detail 1/A7 3' - 1 0 ½" 5'-6½" 16 " o c 2x 1 0 t r e a t e d (3)2x6 stud pack below beam + (1) trimmer for window headers (3)2x6 stud pack below beam + (1) trimmer for window headers 1 1 Aug 6, 20201 Sept 24, 20202 2 Attach ledger to floor rim joist or SIPs panel with ⅜"x3 ⅝" LedgerLok at 8"oc stagger top to bottom 3 Solid blocking below Sept 28, 20203 9/28/20 Sheet Number A5 Joseph E Calvin Date Sheet Title Framing Plans June 8, 2020 of 7 KL I P S T E I N R E S I D E N C E AD D I T I O N S 16 8 1 P t a r m i g a n L n Es t e s P a r k , C O 8 0 5 1 7 Z Reviewed by SAFEbuilt 09/29/2020 West Elevation Scale: 1/4" = 1'-0" 0 1 2 4 6 8 East Elevation Scale: 1/4" = 1'-0" 0 1 2 4 6 8 South Elevation Scale: 1/4" = 1'-0" 0 1 2 4 6 8 North Elevation Scale: 1/4" = 1'-0" 0 1 2 4 6 8 A B D1 E F G L Post-mounted light fixture per General Note #17 on Sheet A1 - dark sky compliant Post-mounted light fixture per General Note #17 on Sheet A1 - dark sky compliant At Owner's option, replace existing wall sconce light fixtures per General Note #18 on Sheet A1 - dark sky compliant Reinstall fireplace ventExtend gutter west 1 A7 New garage entrance roof Maintain existing gutter New siding to match existing Maintain existing stone veneer M H J K D2 C1 C2 2 A7 3 A7 Accent shake siding 3½" corner trim - match existing Prefinished standing seam metal roofing Fiberglass frame windows - Re: Sheet A7 1 A7 Wood trim to close height between new roof and existing soffit Install flashing and/or cricketing to assure ` drainage from these 2 corners 109'-0"± TO Trellis Beams 111'-0"± TO Post Provide additional cap flashing if and as needed 4x8 timber trellis beams 6x6 timber post (2) ¾" thru-bolts with washers countersunk - dark finish Synthetic decking 99'-4¼" min Lower Deck (2) ¾" thru-bolts with washers Wood or synthetic wood rail cap 28" Fortress railing East Sunroom Interior1 Stone cap & stone veneer to match exist 6x6 x 8'-0" treated step with 2x4 trim Vented ridge 100'-0" Exist Finish Floor 12 6 12 6 12 6 12 6 12 6 12 6 New standing seam metal roofing Vented ridge 9/24/20 Sheet Number A6 Joseph E Calvin Date Sheet Title Exterior Elevations June 8, 2020 of 7 KL I P S T E I N R E S I D E N C E AD D I T I O N S 16 8 1 P t a r m i g a n L n Es t e s P a r k , C O 8 0 5 1 7 Z Reviewed by SAFEbuilt 09/29/2020 8' - 0 " 11'-8⅞" 8' - 0 " 5'-0" 3' - 5 " 2' - 7 ⅞" v e r i f y 2'-11" A Pella Reserve LTraditional Sliding Patio Door Four-Panel Fixed-Vent-Vent-Fixed No Grilles Duel-Pane Advanced Low-E Insulated Glass Standard Aluminum Clad Color to be selected by Owner B Pella Reserve Traditional Sliding Patio Door - No Grilles Duel-Pane Advanced Low-E Insulated Glass Standard Aluminum Clad Color to be selected by Owner D2 Pella - Direct Set - Fixed Duel-Pane Advanced Low-E Insulated Glass Standard Aluminum Clad Color to be selected by Owner E Pella - Casement - Egress Duel-Pane Advanced Low-E Insulated Glass Max U-Value U-0.26 Standard Aluminum Clad Color to be selected by Owner F Pella Impervia - Slider Duel-Pane Advanced Low-E Argon High Altitude Glass Standard Solid Fiberglass Color to be selected by Owner G Pella - Impervia - Direct Set - Fixed Duel-Pane Advanced Low-E Argon High Altitude Glass Standard Solid Fiberglass Color to be selected by Owner M Pella Impervia - Fixed Sash Duel-Pane Advanced Low-E Argon High Altitude Glass Standard Solid Fiberglass Color to be selected by Owner Door and Window Elevations Scale: 1/4" = 1'-0" 0 1 2 4 6 8 Install new egress window into existing opening Install blocking & insulation between new window and existing framing T T T T T T T 4' - 0 " 6'-0" D1 Pella - Awning Duel-Pane Advanced Low-E Insulated Glass Standard Aluminum Clad Color to be selected by Owner C2C1 2'-5"5½"2'-5" 1' - 9 " 5' - 9 " 6" 6'-0" 2' - 1 0 " ± 4' - 0 " 7¼" 3' - 0 " 6'-0"6'-0" 3' - 0 " 7¼" 4' - 0 " 2' - 1 0 " ± H Identical to F K Pella Impervia - Slider Duel-Pane Advanced Low-E Argon High Altitude Glass Standard Solid Fiberglass Color to be selected by Owner J Pella - Impervia - Direct Set - Fixed Duel-Pane Advanced Low-E Argon High Altitude Glass Standard Solid Fiberglass Color to be selected by Owner L Pella - Impervia - Awning Duel-Pane Advanced Low-E Argon High Altitude Glass Standard Solid Fiberglass Color to be selected by Owner Factory Mul together 1' - 9 " 2' - 3 " Factory Mul together 2'-11" Truss Elevations Scale: 1/4" = 1'-0" 0 1 2 4 6 8 3' - 2 ¾" G C v e r i f y t o ma t c h e x i s t i n g e a v e 3' - 8 ⅝" G C v e r i f y 12 6 12 6 Wall Section at West3Scale: 3/4" = 1'-0" 0 6”1’-0”2’-0”1’-6”2’-6”Wall Section at West2Scale: 3/4" = 1'-0" 0 6”1’-0”2’-0”1’-6”2’-6” Prefinished standing seam metal roofing Grace high-temperature Ice & Water Shield ⅝" structural wood sheathing Min 2" vertical prefinisehd metal fascia 1x3 fascia build-out - paint to match existing 2x8 sub fascia - paint to match existing James Hardie vented smooth soffit board 2x6 ladder framing at 24" oc Simpson H2.5A hurricane clip at each joist 2x10 trim over Tyvek House Wrap over ½" OSB sheathing (2) 2x10 header R28 FG batt insulation - interior space is not conditionedVentilation baffle in each joist space to provide min 1" clear to BO roof sheathing R28 FG batt insulation - interior space is not conditioned 2x10 joists at 16" oc 6-mil poly vapor barrier At Owner's/Contractor's option, ½" plywood, OSB or ⅝" gypsum board may be installed above finish T&G wood ceiling T&G Carsiding wood ceiling - nominally ¾" thick - pine - shown graphically parallel to joists, but run perpendicular to josts 2x4 blocking 1x trim as shown G H Pella Impervia FG direct set fixed window 2x8 trim over Tyvek House Wrap over ½" OSB sheathing (2) 2x8 header Pella Impervia FG sliding sash window Match Elevation TO Existing Stone beyond Prefinished metal flashing from below window frame 1x3 trim - match existing Prefinished metal flashing from below window frame Prefinished metal flashing (2) 2x4 plate Lap siding to match existing over Tyvek House Wrap over ½" OSB sheating R15 FG batt insulation - interior space is not conditioned 6-mil poly vapor barrier ½" gypsum board 1x4 base trim Flooring to be selected by Owner Remove existing finish decking and roofing Crosshatching represents existing construction to remain Prefinished metal flashing Solidly fasten 2x4 base plate to existing construction 2x4 studs at 16" oc 1x10 or 2x10 trim to cover exposure between new and existing material Extend ½" OSB sheathing over existing construction as possible Composite shingle roofing to match existing 30 lb builders felt or Ice & Water Shield at Contractor's Option ⅝" structural wood sheathing Pre-engineered wood roof trusses at 16" oc - See elevations below left Simpson H2.5A hurricane clip at each joist Prefinished metal drip flashing 1x3 fascia build-out - paint to match existing 2x8 fascia - paint to match existing James Hardie vented smooth soffit board 1x3 trim Lap siding to match existing over Tyvek House Wrap over ½" OSB sheating Min R28 FG batt insulation - interior space is not conditioned 6-mil poly vapor barrier ⅝" gypsum board ceiling ½" gypsum wallboard Endwall truss - see Elevation below left (3) Simpson GA angles at ends and middle of truss 3 ½" wide min 20ga galvanized flashing over Grace Vycor Deck Protector Ice & Water Sheild tape cut to 3¼" wide 4x8 timber trellis member at 18½" oc Simpson CTJ3Z concealed kerf hanger 2x12 trim over Tyvek House Wrap over ½" OSB sheathing 6x12 timber beam 1x wood trim as illustrated A 4-Panel sliding glass door - refer to Elevation below ¾" T&G wood flooring or other flooring as selected by Owner ¾" structural wood decking Min R28 FG batt insulation - interior space is not conditioned 18 ga wire at 8" oc 20-mil poly vapor barrier - installed into space and stapled to joist faces 4" screws at 32" oc Simpson LSTA9 plates at 32" oc in alternate joist spaces (3) PT 2x10 rim joist 2x10 PT joists at 16" ocSimpson JB28 or similar joist hangers 2x8 PT ledger 2x8 PT joists at 16" oc Synthetic or wood decking as selected by Owner 109'-0"± TO Trellis Beams 100'-0" match existing house Finish Floor Elevation 7 ¾" m a x Approx line of grade General Notes 1. Truss elevations are provided for overall dimensions and general configuration. Member sizes and web arrangement shall be determined and certified by Truss Manufacturer. Truss depths should be verified by the GC in the field so that roofing finishes align. 2. Field verify all rough openings and finish wall thickness prior to ordering or fabrication of materials. 3. Door and window details indicate typical situations. Consult Architect regarding special conditions if encountered. 4. Contractor to run a continuous bead of sealant around all doors, windows, and other openings or joints. Leave adjacent surfaces clean. Provide backer rod where necessary. 5. Provide hardware finish samples for Owner's selection prior to ordering. 6. Typical gyp bd level of finish is to be #4 on this project except where noted otherwise. Ceilings are to be #3 level to receive texture finish and paint. 7. All interior trim & base boards are to be 1x4 except as shown otherwise. Species and stains to be selected by Owner. 8. Provide metal drywall corner bead at all exposed interior gyp bd corners. 9. Panes of glass marked "T" on Window Elevations are to be tempered (safety glass). Door and window supplier shall be responsible for bidding and supplying tempered unit as required by code, including but not limited to those shown. 10. Supplier shall be responsible for verification of all window quantities, window sizes, and rough opening sizes as related to matching door & window rough openings so that trim aligns. 11. All exterior window elevations this sheet depict the exterior side of windows. T Wall Section at West1Scale: 3/4" = 1'-0" 0 6”1’-0”2’-0”1’-6”2’-6” (2) 6x10 x 3'-9" timber beams (2) 6x6 x 3'-0" vertical supports fastened lower end through wall with (4) total ¾" x 12" bolts with washers at 4" oc with 4"x8"x¼" steel retaining plates inside Protect existing electric meter Existing door to Garage (2) 4x8 x 2'-6" kickers with ¾" x 7" lag bolts into beam and vertical support Simpson CJT4Z hang between ledger and beam 6x10 x 5'-1" timber beam fasten to side beams with Simpson CJT4Z or with (2) ¾" x 8" lag bolts at both ends 2x8 fascia and 1x3 build-out to match existing gable over main entanance 2x6 joists at 24" oc w/ 2x6 ridge board Prefinished standing seam metal roofing similar to section 2/A7 Carefully cut and remove existing siding as needed to install 2x10 x 8'-0" ledger - fasten to SIPs panel skin with 8d nails in 3 rows at 4" oc (approx 60 total nails) Nail all members per Schedule on Sheet A5 unless otherwise noted 14'-6" 1'-4½"14'-6"1'-4½" 2 2 Sept 24, 20202 9/24/20 Sheet Number A7 Joseph E Calvin Date Sheet Title Wall Sections, Trusses and Openings June 8, 2020 of 7 KL I P S T E I N R E S I D E N C E AD D I T I O N S 16 8 1 P t a r m i g a n L n Es t e s P a r k , C O 8 0 5 1 7 Z Reviewed by SAFEbuilt 09/29/2020