Loading...
HomeMy WebLinkAboutINSPECTION New Multi-Family Building 1826 Widfire Rd Building E 2022-04-21INSPECTION CARD Estes Park 170 MacGregor Ave Suite 230, Estes Park, CO 80517 POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE. APPLICATION NO.:20-EP-00037 TYPE: New Multi-Family Building ISSUED DATE:02/08/2021 EXPIRATION DATE:05/28/2023 PROJECT ADDRESS:1836 Wildfire Rd Building E Units 1834-1862, Estes Park, CO 80517 PARCEL NO.: OWNER:Wildfire Homes CONTRACTOR:Treeline Construction CONTRACTOR PHONE:(970) 227-0403 DESCRIPTION OF WORK:New Multi-Family Building- 16 units; 3 levels with garage INSPECTION INSP DATE PASSED COMMENTS Footings BM 2/12/2021 Rough Plumbing CW 4/20/2022 Rough Frame JG 8/9/2021 Wall Sheathing CW 4/20/2022 Firestopping GR 11/19/2021 Drywall JG 7/12/2021 Final Plumbing CW 4/20/2022 Energy Code Compliance CW 4/20/2022 Final Fire SG 4/22/2022 Final Planning/CO LB 4/20/2022 Final Building/CO CW 4/21/2022 Footings/Foundation BM 3/3/2021 Footings JG 8/18/2021 Rough Frame (cantilever) JG 12/9/2021 Drywall GR 2/7/2022 Rough Frame JG 10/12/2021 Rough Frame CW 2/21/2022 Insulation (insulation in parking garage) CW 3/8/2022 Final Water/CO SR 4/21/2022 INSPECTION INSP DATE PASSED COMMENTS Underground Plumbing JG 8/18/2021 Rough Mechanical GR 11/18/2021 Gas Test JG 8/13/2021 Fire Resistive Wall Assembly GR 1/26/2022 Above Ceiling Plumbing JG 8/9/2021 Insulation JG 11/30/2021 Final Mechanical CW 4/20/2022 Final Building CW 5/23/2022 Final Public Works/CO JW 4/20/2022 See Notes Final Fire/CO SG 4/22/2022 Final/CO JG 11/29/2022 Slab JG 7/19/2021 See Notes Firestopping GR 2/7/2022 Insulation JG 1/18/2022 See Notes Drywall JG 10/8/2021 See Notes Drywall JG 12/16/2021 See Notes Rough Frame CW 3/2/2022 See Notes Drywall CW 3/23/2022 See Notes Final P&C/CO SR 4/21/2022 CONSTRUCTION TYPE:VB OCCUPANT LOAD: Page 1 of 1 Fire Approval:Date:Engineering Approval:Date: PW Approval:Date:Other ( ):Date: To request an inspection: