Loading...
HomeMy WebLinkAboutLETTER Commercial Remodel 184 E Elkhorn Ave 2020-03-19 LARIMER COUNTY | HEALTH AND ENVIRONMENT 1601 Brodie Avenue, Estes Park, Colorado 80517, 970.577.2050, Larimer.org/health March 19, 2020 Jan Theriot dba Old Fashion Candy & General Store 184 E. Elkhorn Ave. Estes Park, Colorado 80517 Dear Ms. Theriot, The plans and specifications submitted for the construction of Old Fashion Candy & General Store to be located at 184 E. Elkhorn Ave. in Estes Park, Colorado, have been reviewed by this department. The following items are specific to the submitted plans and must be completed in order to maintain compliance with the Colorado Retail Food Establishment Rules and Regulations. The plans are approved at this time. PLEASE NOTE: This letter contains important information and advisements for the construction of the establishment. Establishment owners are responsible for items noted in this letter. Please share this letter with all involved parties, including the construction superintendent and contractors at the construction site. If there are any questions regarding information in this letter or anything else related to the construction and operation of the establishment, please contact me at (970) 577-2051 or dmenzies@larimer.org. Menu and Food Handling: 1. A menu was provided as part of the plan review submission. The menu will include prepacked candy, bulk dispensed candy and ice coffee. The menu does not include foods requiring time/temperature control for safety. 2. Please review Larimer County Department of Health and Environment’s food safety resource page which includes valuable information to assist with safe food service practices including temperature logs, date marking guidance, a list of accredited food safety managers courses, a sick employee policy, and several additional resources. https://www.larimer.org/health/safety-sanitation- programs/food-safety-program 3. Written food handling procedures for the operation were not submitted, but food handling procedures were outlined in the plan review application. To promote active managerial control for safe food handling, written procedures should be created and employees should be properly trained on written procedures. Staff should also be regularly monitored to ensure the proper procedures are being practiced. Please incorporate the following: a. Please be advised, The Colorado Department of Health & Environment has adopted the 2013 FDA Food Code as part of the Colorado Retail Food Establishment Rules and Regulations. A requirement under the Rules and Regulations is that food employees and conditional employees are informed in a verifiable manner of their responsibility to report information about their health as it relates to diseases that are transmissible through food. It is required that documentation is available upon request verifying that food employees and conditional employees are informed of their responsibility to report illness to management. For a printable illness policy template that meets these requirements, please visit: https://www.larimer.org/sites/default/files/uploads/2017/lcdhe- employee-illness-policy-contract.pdf b. An employee must be excluded from work if the food employee is symptomatic with vomiting or diarrhea, jaundice, sore throat with fever, except when the symptom is from a noninfectious condition (examples: allergic reaction/intolerance). The employee cannot return until they are symptom free for a minimum of 24 hours, but 48 to 72 hours is recommended. c. Employees diagnosed with a Health Department reportable illness such as Norovirus, Hepatitis A virus, Shigella spp., Enterohemorrhagic or Shiga Toxin-Producing Escherichia coli, Salmonella Typhi; or other enteric bacterial pathogen such as Salmonella or Campylobacter, must be excluded from work. d. A physician’s approval and the health department’s approval are required before an employee can return to work if diagnosed with any of the infections listed above. e. Keep records to identify employee schedules to monitor scheduled hours, sick leave and shift changes. f. Procedures for employees to follow when responding to vomiting or diarrheal events within the establishment must be developed. For a printable guidance document regarding Clean-up Procedures for Vomit/Fecal Events, please visit: https://www.larimer.org/sites/default/files/uploads/2017/lcdhe -vomit- diarrheal-guidance.pdf g. Please be advised, employees must be excluded from working with food, beverages and clean equipment when wounds are expressing fluids and not able to be contained. Wounds and cuts on fingers, hands or wrists, must be properly covered with a double barrier, such as a cut covered with a band aid then covered with a finger cot or glove. h. Please be advised, barehand contact with ready-to-eat foods is prohibited. Gloves are required when utensils and other barriers cannot be used when handling or preparing ready-to-eat foods that will not be further cooked. Employees are required to wash hands prior to applying gloves. Equipment, Cleaning, and Accessibility: 4. All food service equipment must be designed for its intended use and should be certified or classified for sanitation by an American National Standards Institute (ANSI) accredited certification program, such as NSF, ETL Sanitation, UL Sanitation, or BISSC Certified. 5. Custom made and used equipment cannot be approved until it is visually inspected. This also includes cabinetry and other millwork. 6. Heavy counter mounted equipment which cannot be easily moved for cleaning must be installed on four inch sanitary legs or neatly sealed to counters to facilitate cleaning. 7. Please be advised pallets, dunnage racks, shelves and other floor racking systems, must be installed in a manner that will not inhibit or prevent easy cleaning of floors and surrounding surfaces. Storage shelves located in all food preparation areas, storage areas and walk-ins must be situated at least six inches off the floor. 8. Hard to clean spaces or gaps around equipment, counters, utilities and plumbing must be eliminated to provide for easy cleaning. All equipment, cabinets or counters that are not mounted on casters or are not easily moveable (curb mounted or legs) must be: a. Neatly sealed to adjoining walls, equipment, cabinets or counters; or, b. Spaced in accordance with Section 4-402.11 of the Rules and Regulations so the surfaces of the floors, walls and exterior surfaces of equipment and cabinets can be easily cleaned; or c. Neatly sealed to adjoining walls, equipment, cabinets or counters. 9. Stationary equipment must be neatly sealed in place to the floors, walls and surrounding equipment. Ventilation: 10. This operation is not approved for any type of cooking. 11. Restrooms must be provided with mechanical exhaust ventilation to the o utside. Plumbing: 12. Please be advised the 3-compartment warewashing sink basins must be large enough to accommodate all equipment used in food preparation and storage . A small 4 compartment sink has been proposed. Since the iced coffee machine is a clean-in-place equipment, the small sink basins of the 4 compartment sink are adequate in size for washing the scoops used for bulk dispensing candy. 13. Warewashing drain boards must be self-draining and directed to warewashing sink basins, pre-rinse sinks, scuppers or warewashing machines. Two 18” drainboards have been proposed for the 4 compartment sink and are approved. a. It is recommended that a wall mounted wire rack be installed above the 3- compartment sink that is as long as the length of the sink to accommodate air drying and storage of cleaned equipment. 14. Hand washing sinks must be easily accessible in all areas where food is prepared, served or where utensils and equipment are washed. The proposed hand washing sink locations are approved and include a hand washing sink in the restroom and a 4 compartment sink with 1 basin dedicated to hand washing located at the front service counter. a. All hand washing sinks must be provided with hot and cold running water under pressure through a mixing valve, single service hand towels from a dispenser and hand soap. b. The height of the hand washing sink must be between 30 inches and 48 inches above the floor. c. The sink’s basin must be a minimum of 10 inches in any direction. 9 inches by 9 inches hand sink basins are not approved. d. When installed in a countertop, the hand sink basin must be within 24 inches of the front of the counter. e. The space between the flood rim of the hand sink and the base or underside of any cabinet located above the sink must be at least 24 inches. f. Hand sink faucets must be installed on the side of the sink basin directly opposite the user. g. A sign or poster that notifies food employees to wash their hands will need to be displayed at all hand washing sinks. 15. A mop sink for the disposal of mop water and for the purpose of filling mop buckets and cleaning mops has been proposed. a. The mop sink must be provided with hot and cold running water. b. Mop and broom hangers must be provided at the mop sink to properly hang and air dry mops. c. Storage shelves should also be provided to properly store cleaning supplies. 16. The proposed water heating system, Rheem model PROE47 52 RH95, with 21 gallons/hour recovery rate at 80°F rise is approved. The water heating system must have a minimum recovery rate of 19 gallons/hour at 80°F rise. 17. Please be advised, the water heater is required to be installed on a six inch leg kit if the heater is installed on the floor. A minimum of six inches of clearance must be provided between the walls and the water heater to facility cleaning around the water heater. 18. Please be advised, all drains from equipment such as ware washing sinks and water heaters must be properly air gapped. 19. Please be advised approved, properly installed, backflow devices must be provided on all submerged inlets. Backflow devices on water lines subject to back pressure or continuous pressure must be equipped with backflow preventers that are designed for continuous pressure. 20. Exposed water pipes, sewer lines, gas lines or electrical conduit running along the surface of the walls, ceiling or floors are not approved . a. All drain lines, water lines, gas lines and electrical conduit running along the walls in finished rooms must be boxed in or completely conce aled along the wall to facilitate easy cleaning. b. The above also applies for bars, service stations and expo areas . All utility lines must be installed behind cabinetry or within the framed wall; or a durable sheath created to run utility lines behind equipment. c. External floor or wall mounted Uni-strut or hard to clean brackets are not approved to support utility and drain lines. d. Sewer lines, waste water lines and roof drains can not be located above stored foods, single use items, utensils and equipment in warehouse areas unless guttered or protected. Structure, Finishes, General: 21. Adequate lighting must be provided where food is processed or stored, where equipment and utensils are cleansed, as well as in the restrooms. 22. Please be advised foods must be adequately protected from customer contamination, such as coughing, sneezing and handling. 23. To help prevent insect and rodent entry into the building all outer openings including doors and windows must be kept closed or permanent screens or air curtains must be installed on outer openings that will be left open periodically . a. Weather stripping, threshold and/or broom sweeps must be installed on all outside doors to eliminate gaps to the outside. b. All exit and restroom doors must be fitted with self-closures. 24. Please be advised floors, walls, ceilings, counter tops, storage shelves, cabinets and all work surfaces, located within food preparation areas, storage areas, restrooms, serving areas, and ware washing areas must be of an approved material that is smooth, durable, non-absorbent and easily cleanable. a. Sealed wood flooring and sealed wood wall finishes have been proposed. Please be advised the wood surface must be smooth and without groves to be approved. b. All floor/wall junctures and stationary equipment floor junctures in the above listed areas must be provided with approved concave coving. 25. The outside trash and recycling areas must be located on a cleanable surface of concrete or machine laid asphalt. Submit information as to how this area is to be constructed. 26. Please be advised, in order to protect wildlife from intrusion onto the grounds of the establishments, all refuse, oil and grease must be deposited of in a Wildlife Resistant Container or Wildlife Resistant Enclosure. a. Wildlife Resistant containers must meet the standards of testing by the Living with Wildlife Foundation and have a “passing” rating by the Interagency Grizzly Bear Committee (IGBC) as bear resistant for 60 minutes. b. Wildlife Resistant Enclosures means an enclosed structure consisting of four sides, a roof, and a secure door or cover, which shall have a latching device of sufficient design and strength to prevent access by wildlife. 27. Toxic materials and surplus cleaning supplies must be stored below or away from food preparation areas, food, utensil and single service item storage areas and ware washing facilities. 28. Provide an approved area for adequate storage of employee’s personal items, such as coats, clothing, backpacks and handbags, that is separate from food and clean equipment. 29. The following items are required where food handling and warewashing occur in the establishment: a. food product thermometers scaled 0 to 220°F, digital thermometers or thermocouple b. food handlers’ gloves and finger cots c. approved sanitizer d. test strips for the sanitizer Please review all items, with emphasis on items #3, 14, 15, 17, and 18. Items requiring information can be submitted either in written form or as an addendum to the plans submitted. The written plans are approved at this time. In addition to the $100 plan review application fee paid at the time the plans were submitted for review, a review fee is assessed for the actual review time . The review fee is assessed at a rate of $85 per hour. The final review cost for this project is $170. Please be advised, before the department can give any approval for operation all plan review fees must be paid. The plan review billing invoice for this project is attached to the hard copy of the final approval letter. Be advised approval of plans, including the above modifications outlined in this plan review letter, does not constitute acceptance of the completed structures. Construction checks are a critical and are considered a continuation of the plan review process. At least one construction check is required for all establishments undergoing plan review and will be charged at $85.00 per hour. Additional construction checks may be required based on request or establishment need. Please feel free to contact this department if questions arise, or if I can be of further service at (970) 577-2051 or at dmenzies@larimer.org. Sincerely, David Menzies, REHS Sr. Environmental Health Specialist cc: Town of Estes Park Division of Building Safety via electronic mail