Loading...
HomeMy WebLinkAboutINSPECTION Accessory Building 1802 Widfire Rd Building F 2023-01-24INSPECTION CARD Estes Park 170 MacGregor Ave Suite 230, Estes Park, CO 80517 POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE. APPLICATION NO.:20-B-00016 TYPE: Accessory Building - Commercial ISSUED DATE:01/08/2021 EXPIRATION DATE:07/23/2023 PROJECT ADDRESS:1802 Wildfire Rd Building F, Estes park, CO 80517 PARCEL NO.: OWNER:Widlfire Homes CONTRACTOR:Treeline Construction CONTRACTOR PHONE:(970) 227-0403 DESCRIPTION OF WORK: new condo units 2 floors 16 bedrooms 1st flr- 4815sqft 2nd fl- 4265 sqft garages- 4620 sqft porch -96sqft deck w/o roof- 684sqft INSPECTION INSP DATE PASSED COMMENTS Setbacks GR 1/28/2022 See Notes Footings GR 1/28/2022 Foundation GR 1/21/2021 Rough Plumbing GR 7/2/2021 Rough Frame JG 7/19/2021 Wall Sheathing JG 8/10/2021 Firestopping GR 6/15/2021 Above Ceiling Mechanical JG 8/13/2021 Gas Pressure Test GR 1/28/2022 Drywall KD 6/23/2021 Final Mechanical GR 1/28/2022 Final Building GR 1/28/2022 Final Public Works/CO JW 1/27/2022 See Notes Final Water/CO SR 1/25/2022 Final Sanitation/CO SP 1/24/2022 Final Building/CO JG 1/24/2023 Slab GR 6/9/2021 Drywall JG 7/7/2021 See Notes Drywall JG 9/3/2021 INSPECTION INSP DATE PASSED COMMENTS Footings GR 2/15/2021 See Notes Grounding GR 1/28/2022 Underground Plumbing GR 1/28/2022 Rough Mechanical GR 1/28/2022 Gas Test GR 1/28/2022 Fire Resistive Wall Assembly JG 7/23/2021 Above Ceiling Electric GR 9/21/2021 Above Ceiling Plumbing JG 8/24/2021 Insulation JG 10/28/2021 Final Plumbing GR 1/28/2022 Energy Code Compliance GR 1/28/2022 Final Fire JJ 1/27/2022 Final Planning/CO LB 11/30/2022 Final P&C/CO GR 1/28/2022 Final Fire/CO JJ 1/27/2022 Final/CO JG 1/24/2023 Drywall KD 6/28/2021 See Notes Insulation GR 1/28/2022 CONSTRUCTION TYPE:VB OCCUPANT LOAD: Page 1 of 2 To request an inspection: INSPECTION INSP DATE PASSED COMMENTS Fire Resistive Wall Assembly JG 9/10/2021 Above Ceiling Plumbing JG 9/10/2021 Rough Frame JG 9/28/2021 Drywall JG 9/29/2021 Rough Frame JG 9/29/2021 Insulation GR 1/28/2022 Drywall GR 1/28/2022 Final Planning/CO GR 1/27/2022 INSPECTION INSP DATE PASSED COMMENTS Drywall JG 9/8/2021 Firestopping JG 9/10/2021 Insulation GR 1/28/2022 Above Ceiling Plumbing JG 9/28/2021 See Notes Firestopping JG 9/29/2021 Drywall JG 10/5/2021 Drywall (rc channel)JG 11/1/2021 See Notes Drywall JG 11/10/2021 Page 2 of 2 Fire Approval:Date:Engineering Approval:Date: PW Approval:Date:Other ( ):Date: To request an inspection: