Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PLANS Urgent Care 420 Steamer Dr 101 2019-12-04
BAS1S.com G0 Sheet No: 303.848.3740 Sheet Title: Date: Architecture, P.C. Issue: © BASIS COVER SHEET T e n a n t I m p r o v e m e n t f o r : Es t e s P a r k H e a l t h 42 0 S t e a m e r D r i v e , S u i t e 1 0 1 Es t e s P a r k , C O - 11/20/2019 ADDENDUM 02 A R C H I T E C T U R E P. C. Es t e s P a r k , C o l o r a d o 8 0 5 1 7 16 9 2 B i g T h o m p s o n A v e n u e , S u i t e 1 0 0 ISSUE HISTORY Issued Date Issue ID Issue Name 01 Architectural 22 Plumbing 23 Mechanical 26 Electrical G0 G1 A1 A1.1 A1.2 A1.3 A2 A3 A4 A5 A6 P0.1 P0.2 P0.3 P0.4 P0.5 P1.0 P1.1 P2.1 M0.1 M0.2 M0.3 M0.4 M1.1 M1.2 M2.1 E0.1 E0.2 E0.3 E0.4 E0.5 E1.1 E1.2 E2.1 E2.2 E3.1 Issue COVER SHEET ARCHITECTURAL INFORMATION FLOOR PLAN DIMENSION PLAN FIXTURE & EQUIPMENT PLAN FINISH PLAN ENLARGED PLANS / DETAILS INTERIOR ELEVATIONS / CASEWORK INTERIOR ELEVATIONS / CASEWORK DOOR SCHEDULE REFLECTED CEILING PLAN PLUMBING LEGEND & NOTES PLUMBING CONTROLS & NOTES PLUMBING SCHEDULES PLUMBING DETAILS PLUMBING DWV ISOMETRIC PLUMBING UNDERGROUND PLAN PLUMBING DWV FIRST FLOOR PLAN PLUMBING SUPPLY FIRST FLOOR PLAN MECHANICAL LEGEND & NOTES MECHANICAL NOTES & DETAILS MECHANICAL SCHEDULES MECHANICAL CONTROLS MECHANICAL FIRST FLOOR EAST PLAN MECHANICAL FIRST FLOOR WEST PLAN MECHANICAL SECOND FLOOR PARTIAL PLAN & VENT… ELECTRICAL LEGEND & NOTES ELECTRICAL GENERAL NOTES ELECTRICAL ONE LINE DIAGRAM ELECTRICAL PANEL SCHEDULES LUMINAIRE SCHEDULE & COMCHECK POWER FIRST FLOOR EAST PLAN POWER FIRST FLOOR WEST PLAN LIGHTING FIRST FLOOR EAST PLAN LIGHTING FIRST FLOOR WEST PLAN POWER SECOND PARTIAL FLOOR PLAN 01 02 03 04 05 Building Code Information - 2015 IBC Description of Work: -In general the Project consists of Tenant Improvements for Estes Park Health at 420 Steamer Drive (Alarado Business Park). Departments include Urgent Care, Physical Therapy and a Speciality Clinic. All clinic services are outpatient based. The Project is protected throughout by a NFPA 13 sprinkler system. Chapter 2 - Definitions -CLINIC, OUTPATIENT. Buildings or portions thereof used to provide medical care on less than a 24-hour basis to persons who are not rendered incapable of self-preservation by the services provided. Outpatient clinics generally consist of doctors’ offices where various medical services can be provided. Code Commentary These clinics typically function during normal business hours (i.e., less than 24 hours) and, unlike ambulatory care facilities, the patients are generally ambulatory and capable of self-preservation. This definition clarifies the difference between ambulatory surgery centers (ambulatory care facilities) and the typical doctor’s office. In many cities, outpatient clinics are open at all hours to be available to people who work a variety of shifts. The term “urgent care” is often used to describe such facilities. An outpatient facility that is open 24/7 may still be classified as a Group B occupancy, provided all patients are outpatients and individual patients are not treated for periods in excess of 24 hours. The latter would describe a Group I-2 hospital. Chapter 3 - Use and Occupancy Classification Occupancy: -Business B per Sec. 304.1 and Definitions above Sec. 303.1.2 - Small assembly spaces The following rooms and spaces shall not be classified as Assembly occupancies: 1. A room or space used for assembly purposes with an occupant load of less than 50 persons and accessory to another occupancy shall be classified as a Group B occupancy or as part of that occupancy. -Exercise 175 occupant load less than 50 therefore considered Group B Chapter 5 - General Building Heights and Areas Sec. 503 - General Building Height and Area Limitations -RE Sec. 504, 506 Sec. 506 - Building Area -RE Building Shell drawings for allowable area calculations below. Sec. 508 - Mixed Use and Occupancy -Group B occupancy separated from Group R-2 above Table 508.4 Occupancies Req'd Separation Provided B 1-HR** 1-HR **required separation provided in Building Shell per Sec. 508.3.3 Exception 2; RE Sec 420 Chapter 6 - Types of Construction -Fire-Resistance Rating Requirements for Building Elements are as follows per Table 601: Construction Type: V-B, complete sprinkler system throughout per Sec 903.3.1.1 Table 601 - Fire Resistance Ratings Element Rating Primary Structural frame 0-HR Bearing Walls Ext.0-HR Bearing Walls Int.0-HR Nonbearing Walls Ext.0-HR (FSD>30ft) Nonbearing Walls Int.0-HR Floor construction 0-HR; 1-HR between 1st & 2nd Roof construction 0-HR -Fire-Resistance rating requirements for exterior walls based on fire separation distance are as follows per Table 602: Table 602 - Fire Separation Distance Wall Location Fire Separation Distance Rating North X > 30 0-HR East X > 30 0-HR South X > 30 0-HR West X > 30 0-HR * Type V-B Chapter 7 - Fire and Smoke Protection Features Sec. 705 - Exterior Walls -RE Building Shell drawings; in general storefront and concrete Sec. 706 - Fire Walls -none Sec. 707 - Fire Barriers -none Sec. 707 - Shaft Enclosures -none Sec. 708 - Fire Partitions -none Sec. 709 - Smoke Barriers -none Sec. 710 - Smoke Partitions -none Sec. 711 - Floor and Roof Assemblies -711.2.4.1 Separating mixed occupancies; RE Sec. 508.4, 1-HR provided between B and R above (2nd/3rd Floors) Sec. 712 - Vertical Openings -RE Sec 717.6.3.2 for duct protection option @ RTUs on roof of First Floor (non-rated roof/ceiling assembly), all non-combustable construction adjacent. Plumbing Fixture Requirements 139 TOTAL OCCUPANT LOAD ‘B’ Occupancy Water Closets Urinals Lavatories Bathtubs/ Showers Drinking Fountains Other M W F M W F TOTAL REQUIRED 2 2 0 0 2 2 0 0 2 1 SERV SINK TOTAL PROVIDED 2 2 2*0 2 2 2*1 SHW 2 3 SERV SINKS M = MEN W = WOMEN F = *FAMILY (RE: 2902.1.2) Sec. 716 - Opening Protectives -no opening protectives required as there are no rated partitions Chapter 9 - Fire Protection Systems Sprinkler System: -B Occupancy NFPA 13 system throughout per Sec. 903.3.1.1 Fire Alarm System: -Fire Alarm submittal deferred Chapter 10 - Means of Egress Sec. 1004 - Occupant Load -Business 106 -Exercise 175 33 Total Occupant Load 139 Sec. 1005 - Means of Egress Sizing -RE Orientation/Code Plans for egress capacities; not less than 0.2inches per occupant Sec. 1006 - Number of Exits and Exit Access Doorways -RE Orientation/Code Plans for Exit locations; two Exits provided from Exercise 175 and the Business occupancies Sec. 1007 - Accessible Means of Egress -Accessible route from accessible parking provided to all suites and units Sec. 1016 - Exit Access -Two exits are required at the First Floor per Table 1015.1 -The distance between required exits shall be not less than one-third of the length of the maximum diagonal dimension of the area served per Sec. 1015.2.1, Exception 2. RE Code Plan Sec. 1017 - Exit Access Travel Distance -Travel distance to be maximum as follows per Table 1017.2: Occupancy with sprinkler system (903.3.1.1) B 300 feet: maximum of 198 feet proposed RE Orientation/Code Plans Sec. 1020 - Corridors -Table 1020.1; B with sprinkler system - 0-HR rated required. Chapter 11 - Accessibility -accessibility and accessible features required throughout Project. 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 R 04'8' 16' IC E R R R R FEC STAFF LOUNGE 144 O2 STG 107 M 121 MEDS 123 CIRC 124 VESTIBULE 106 VESTIBULE 100 W 104 M 105LOBBY 101 RECEPTION 102 CIRC 103 EVS FLR EQ 108 CIRC 109 EVS EQP 110 DIRTY 111 OFFICE 112 RADIOLOGY 113 ORTHO/EXAM 114 EXAM 115 STAFF 116 EXAM 117 EXAM 118 EXAM 119 EXAM 120 NURSE'S STATION 122 CLINICAL EQUIP 125 EXAM 126 CIRC 140 LOCKERS 145F 146 CIRC 147 MECH 150 CLEAN LINEN 149 DIRTY LINEN 148 MAIN SUPPLY 151 RED BAG 153 FACILITIES 152 CIRC 154 CIRC 155 OFFICE 156 EXERCISE 175 OPEN OFFICE 160 RECEPTION 157 CIRC 163 THERAPY 164 THERAPY 165 THERAPY 166 THERAPY 167 THERAPY 169 THERAPY 170 STG 171 CIRC 168 THERAPY 172 THERAPY 173 F 174 CIRC 127 W 128 EXAM 129 EXAM 130 EXAM 131 EXAM 132 CIRC 133 NURSE'S STATION 134 CHART 135 CHART 136 CHART 137 EXAM 138 EXAM 139 EVS EQP 141 EVS STOR 142 IT 143 OFFICE 159 CIRC 158 CIRC 161 STORAGE 162 321 4 5 6 7 8 9 10 A B C D.4 E D A.5 FEC FE C FE C 1 1 1 2 Tenant Improvement for: VICINITY MAP 10/09/2019 01 PERMIT & CONSTRUCTION PROJECT TEAM Owner: Estes Park Health Owner's Rep: RLH engineering, inc. 601 Gyrfalcon Court, Unit A Windsor, CO 80550 Chuck Jordan cjordan@rlhengineering.com (970) 686-5695 Civil: N/A - no exterior changes/modifications Architect: BAS1S Architecture, PC 1692 Big Thompson Avenue, Suite 100 Estes Park, CO 80517 Steve Lane, AIA steve@bas1s.com (303) 848-3740 Structural: N/A - no structural changes/modifications Mechanical: PCD Engineering 323 3rd Avenue, Suite 100 Longmont, CO 80501 Peter D'Antonio, PE peter@pcdenineering.com (303) 678-1108 Plumbing: PCD Engineering Electrical: PCD Engineering GC/CM: Saunders Heath 1212 Riverside Ave Suite 130 Fort Collins, CO 80615 David Stolte, Project Manager d.stolte@saundersheath.com (970) 490-8044 DEFERRED SUBMITTALS 07 80 00 FIRESTOPPING -GC TO RETAIN FIRESTOP SYSTEMS CONTRACTOR TO PROVIDE ALL PROPOSED THROUGH-PENETRATION FIRE STOP SYSTEMS AND DETAILS AS MAY BE REQUIRED 21 03 00 FIRE SUPPRESSION 23 09 00 FIRE ALARM NOTE: DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE ARCHITECT OF RECORD FOR REVIEW . ONCE REVIEWED, CONTRACTOR SHALL FORWARD TO THE BUILDING DEPARTMENT FOR APPROVAL. FABRICATION AND/OR INSTALLATION OF DEFERRED SUBMITTAL ITEMS SHALL NOT OCCUR UNTIL APPROVAL OF THE BUILDING DEPARTMENT IS RECEIVED. CODE SUMMARY APPLICABLE CODES: 2015 INTERNATIONAL BUILDING CODE 2015 INTERNATIONAL ENERGY CONSERVATION CODE 2015 INTERNATIONAL MECH ANICAL CODE 2015 INTERNATIONAL PLUMBING CODE 2015 NATIONAL ELECTRICAL CODE 2015 INTERNATIONAL FIRE CODE 2015 INTERNATIONAL FUEL GAS CODE 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN 2009 ANSI ICC A117.1 GOVERNING AUTHORITY: TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO PROJECT DESCRIPTION: In general the Project consists of Tenant Improvements for Estes Park Health at 420 Steamer Drive (Alarado Business Park). Departments include Urgent Care, Physical Therapy and a Speciality Clinic. All clinic services are outpatient based. The Project is protected throughout by a NFPA 13 sprinkler system. CONSTRUCTION TYPE: V-B OCC CLASSIFICATION(S): B | BUSINESS AUTOMATIC SPRINKLER SYSTEM: per Sec 903.3.1.1 NFPA 13 sprinkler systems. OCC LOAD EA USE: RE Code Plan FIRE ALARM & DETECTION: DEFERRED SUBMITTAL * SHEET INDEX FEC FEC FEC FEC LOBBY/ RECEPTION URGENT CARE CLINIC PHYSICAL THERAPY BACK OF HOUSE EXIT ACCESS DOORWAY 11/11/2019 02 ADDENDUM NO. 01 73' CPoET 31' CPoET 11/20/2019 03 ADDENDUM NO. 02; CODE REPLIES 8' 7' 7' 20 ' 31' 10 ' 7' 8' 4' 11' 16 ' MOST REMOTE POINT -BEGIN COMMON PATH OF EGRESS TRAVEL (CPoET) 73' to END of CPoET. -TOTAL MAX TRAVEL DISTANCE 173'; 300' MAX ALLOWABLE PER NFPA 99 Volumes Less than 300 cu ft. • Cylinders containing this volume are not required to be stored in an enclosure. • Precautions for handling the cylinders must still be observed. O2 STORAGE CAPACITY: MAXIMUM OF 12 FULL 'E' STYLE CYLINDERS ALLOWED 23 cu ft x 12 = 276 cu ft < 300 cu ft END COMMON PATH OF EGRESS TRAVEL; SEPARATE AND DISTINCT ACCESS TO (2) EXITS OR EXIT ACCESS DOORWAYS BEGINS COMMON PATH OF EGRESS TRAVEL EXERCISE = 75' MAX BUSINESS = 100' MAX (TABLE 1006.2.1) PATH OF EGRESS RE SEC 303.1.2; Exercise 175 occupant load less than 50 therefore considered Group B EGRESS CAPACITY 40"/0.2"=200 EGRESS CAPACITY 68"/0.2"=340 EGRESS CAPACITY 34"/0.2"=170 TOTAL OCCUPANT LOAD = 139 occupants EXERCISE 1,608.29 sf / 50 gross = 33 occupants 1 7 2 ' D I A GON A L (3 0 0 ' M A X TR AV E L D IS T A NC E ) 25'6'75'23'49' 63 ' 25 ' 8' 158' BUSINESS EXIT SEP A R ATION 21 ' D E A D - E N D 50 ' A L L O W . 12 ' 15' 4' 29'18' 7' MOST REMOTE POINT -BEGIN COMMON PATH OF EGRESS TRAVEL. 31' to END of CPoET. -TOTAL MAX TRAVEL DISTANCE 174'; 300' MAX ALLOWABLE BUSINESS 10,519.28 sf / 100 gross = 106 occupants 2 EXITS REQUIRED 1 1/16" = 1'-0" Orientation/Code Plan 11/20/2019 Reviewed by SAFEbuilt 12/04/2019 APPROVED by SAFEbuilt; 2015 International Codes Subject to inspection and compliance to all Relevant, adopted Building & Municipal Codes 12/04/2019 BAS1S.com G1 Sheet No: 303.848.3740 Sheet Title: Date: Architecture, P.C. Issue: © BASIS ARCHITECTURAL INFORMATION T e n a n t I m p r o v e m e n t f o r : Es t e s P a r k H e a l t h 42 0 S t e a m e r D r i v e , S u i t e 1 0 1 Es t e s P a r k , C O - 11/11/2019 ADDENDUM 01 A R C H I T E C T U R E P. C. Es t e s P a r k , C o l o r a d o 8 0 5 1 7 16 9 2 B i g T h o m p s o n A v e n u e , S u i t e 1 0 0 T.O. FINISH FLOOR 3' - 2 " M A X 8" 4' - 7 " 2" M I N HEIGHT OF DECK WHEN CHANGING STATION IS OPEN GRAB BARS SHALL BE INSTALLED W/ T.O. GRIPPING SURFACE 33" MIN AND 36" MAX AFF G B 3 G B 2 G B 1 CONTROLS ON WIDE SIDE OF TOILET AREA LAVATORY DF OR EWC URINAL ADAKNEE SPACE REQ. @ LAV, DF AND EWC TYP. CLEARANCE @ LAV, DF, EWC, AND URINALS CL OF FIXTURE UN O ELECTRICAL RECEPTACLE ELECTRICAL SWITCH FIRE HORN STROBE DEVICE FIRE EXTINGUISHER THERMOSTAT MIRROR UNIT WATER CLOSET ADA FIRE ALARM PULL A. LEGEND INDICATES RECOMMENDED MOUNTING HEIGHTS. CONTRACTOR SHALL COORDINATE SPECIFIC MOUNTING HEIGHTS WITH MANUFACTURERS' REQUIREMENTS FOR HANDICAPPED ACCESSIBILITY. B. ACCESSORIES SHALL NOT PROJECT MORE THAN 4" FROM THE WALL IF THEIR LEADING EDGE IS BETWEEN 27" AND 80" ABOVE THE FINISH FLOOR. C. OPERABLE PARTS (CONTROLS) SHALL BE LOCATED A MINIMUM OF 15", AND A MAXIMUM OF 48", ABOVE THE FINISH FLOOR. D. PROVIDE SOLID BLOCKING BEHIND ALL WALL HUNG FIXTURES E. INCLUDE ONE COAT HOOK @ ADA MOUNTING HEIGHT EVERYWHERE COAT HOOKS ARE PROVIDED. COAT HOOK COAT HOOK ADA TPD B. O . RE F L E C T I V E SU R F A C E SOAP / SANITIZER DISPENSER PAPER TOWEL DISPENSER TPD CHANGING STATION 4' - 0 " @ KI T C H E N MA X 1' - 4 " M I N CL 2' - 3 " 2' - 5 " M I N . 9" 6" 8" 1' - 5 " M A X 3'-6" 4'-6" 17 " - 1 9 " 12" MAX 3' 2' - 9 " A D A 2' - 1 0 " 1'-3" 5' M A X 8' - 0 " 1' - 6 " 3' - 4 " 48 " M A X 1'-6" 6" 3'-4" 3' - 4 " 1 ' - 6 " 6' - 3 " 4' 1' - 1 0 " 3' - 8 " 2' - 6 " 2' - 1 0 " 3' - 3 " CL ABBREVIATIONS NOTE: ABBREVIATIONS ARE BASED ON THE CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM "TERMS AND ABBREVIATIONS" MODULE. CLARIFY ANY ABBREVIATIONS NOT LISTED WITH ARCHITECT. GENERAL NOTES M 1/4" = 1'-0" MOUNTING HEIGHTS ACT ACOUSTICAL CEILING TILE AD ADDENDA ADA AMERICANS WITH DISABILITIES ACT ACOUSTICAL CEILING TILE ACMV ADHERED CONC MASONRY VENEER ADAPT ADAPTABLE ADJ ADJ USTABLE; ADJACENT AFF ABOVE FINISH FLOOR AFG ABOVE FINISH GRADE AL ALUMINUM ALT ALTERNATE APPROX APPROXIMATE ARCH ARCHITECTURAL A/V AUDIO / VIDEO BD BOARD BLDG BUILDING BLK BLOCK BLKG BLOCKING BM BEAM BO BY OWNER BTWN BETWEEN CCBR CLOSED CELL BACKER ROD CJ CONTROL JOINT CLG CEILING CLKG CAULKING CLL CONTRACT LIMIT LINE CLO CLOSET CLR CLEAR CMU CONCRETE MASONRY UNIT COL COLUMN CONC CONCRETE COND CONDITION CONN CONNECTION CONST CONSTRUCTION CONT CONTINUOUS CRCQ COLD ROLLED COMMERCIAL QUALITY CVG CLEAR VERTICAL GRAIN D DEEP DEG DEGREE DEMO DEMOLITION; DEMOLISH DET DETAIL DETER DETERMINE DF DRINKING FOUNTAIN DIA DIAMETER DIAG DIAGONAL DIM DIMENSION DN DOWN DS DOWN SPOUT DW DISHWASHER DWG DRAWING DWR DRAWER E EAST (E) EXISTING EA EACH EIFS EXTERIOR INSULATING FINISH SYSTEM EJ EXPANSION JOINT EL ELEVATION ELEC ELECTRICAL EMER EMERGENCY ENCL ENCLOSURE EQ EQUAL EQUIP EQUIPMENT EWC ELECTRIC WATER COOLER EXP EXPOSED; EXPANSION EXT EXTERIOR F FEMALE FA FIRE ALARM FC FIRE CODE GYPSUM PANEL FD FLOOR DRAIN FDTN FOUNDATION FE FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FFE FURNITURE, FIXTURES AND EQUIPMENT FFF FROM FINISH FACE FFLR FINISH FLOOR FHC FIRE HOSE CABINET FIN FINISH FLD FIELD FLR FLOOR FLUOR FLUORESCENT FO FINISHED OPENING FOS FACE OF STUD FPR FIRE PROTECTION RATING FRP FIBERGLASS REINFORCED POLYESTER FRT FIRE RETARDANT TREATED FS FLOOR SINK FT FOOT; FEET FTG FOOTING GA GYPSUM ASSOCIATION GALV GALVANIZED GC GENERAL CONTRACTOR GLAZ GLAZING GSM GALVANIZED SHEET METAL GYP GYPSUM H HIGH HB HOSE BIB HC HOLLOW CORE H/C HANDICAP HDW HARDWARE HDWD HARDWOOD HFR HOUR FIRE RESISTANCE HM HOLLOW METAL HR HOUR HT HEIGHT HVAC HEATING, VENTILATING AND AIR CONDITIONING IBC INTERNATIONAL BUILDING CODE ID INSIDE DIAMETER; IDENTIFIER ILO IN LIEU OF IN INCH INCL INCLUDE(D) INFO INFORMATION INSUL INSULATION INT INTERIOR IT INFORMATION TECHNOLOGY JAN JANITOR JST JOIST JT JOINT KIT KITCHEN KO KNOCKOUT LAB LABORATORY LAV LAVATORY LB POUND LF LINEAR FEET LT LIGHT LVL LEVEL M MALE MATL MATERIAL MAX MAXIMUM MECH MECHANICAL MED MEDIUM MEP MECHANICAL ELECTRICAL PLUMBING MEZZ MEZZANINE MFC MINERAL FIBER CEMENT MFD MANUF ACTURED MFR MANUFACTURER MH MANHOLE MIN MINIMUM; MINUTE MIRR MIRROR MISC MISCELLANEOUS MO MASONRY OPENING MTD MOUNTED MTG MOUNTING MTL METAL N NORTH (N) NEW N/A NOT APPLICABLE NIC NOT IN CONTRACT NFPA NATIONAL FIRE PROTECTION ASSOCIATION NO NUMBER NOM NOMINAL NTS NOT TO SCALE OC ON CENTER OCC OCCUPANT OD OUTSIDE DIAMETER / DIMENSION OH OVERHEAD; OVERHAND OP H OPPOSITE HAND OPNG OPENING OPP OPPOSITE PBD PARTICLE BOARD PC PRECAST PL PROPERTY LINE; PLATE PLAM PLASTIC LAMINATE PLAS PLASTIC; PLASTER PLYWD PLYWOOD PNT(D) PAINT(ED) PR PAIR PREP PREPAR PRTL PARTIAL PT POINT; PRESSURE TREATED PVC POLYVINYL CHLORIDE QTY QUANTITY QT QUARRY TILE R RADIUS RCP REFLECTED CEILING PLAN RD ROOF DRAIN RE: REFER TO REFR REFRIGERATOR REINF REINFORCING (ED) REQ REQUIREMENTS; REQUIRED REV REVISION RI RISER(S) RM ROOM RO ROUGH OPENING S SOUTH SAF SELF-ADHERED FLASHING SC SOLID CORE SCHED SCHEDULE SECT SECTION SF SQUARE FEET SHT SHEET SIM SIMILAR SL SLOPE SPEC SPECIFICATION SQ SQUARE SSTL STAINLESS STEEL ST STAIN; STREET STC SOUND TRANSMISSION CLASS STD STANDARD STL STEEL STRUCT STRUCTURAL SUSP SUSPENDED T TEMPERED T&B TOP AND BOTTOM T&G TONGUE AND GROOVE THK THICK(NESS) TO TOP OF TPD TOILET PAPER DISPENSER TR TREAD(S) TS TUBE STEEL TYP TYPICAL UL UNDERWRITERS LABORATORY UNFIN UNFINISHED UNO UNLESS NOTED OTHERWISE UTIL UTILITIES V VINYL VCT VINYL COMPOSITION TILE VERT VERTICAL VIF VERIFY IN FIELD VOC VOLATILE ORGANIC COMPOUND VTR VENT-THRU ROOF W WEST; WIDE WC WATER CLOSET WDW WINDOW WH WATER HEATER WIR WALK-IN-REFRIGERATOR WIF WALK-IN-FREEZER W/ WITH W/I WITHIN W/O WITHOUT WRB WATER RESISTIVE BARRIER WD WOOD WT WEIGHT YD YARD YR YEAR & AND ∠ ANGLE @ AT x BY, MULTIPLY CENTERLINE º DEGREE Ø DIAMETER / DIVIDE, PER ' FEET > GREATER THAN ≥ GREATER THAN OR EQUAL TO " INCHES < LESS THAN ≤ LESS THAN OR EQUAL TO # NUMBER, POUND % PERCENT ┴ PERPENDICULAR ± APPROXIMATELY (PLUS OR MINUS) 1. ALL WORK SHALL BE EXECUTED IN ACCORDANCE w/ THE 2015 IBC AND ALL FEDERAL, STATE, AND LOCAL CODES AND AGENCIES HAVING JURISDICTION. IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND RESPECTIVE SUB-CONTRACTORS TO BUILD TO SATISFY THESE CODES AND CALL FOR ALL NECE SSARY INSPECTIONS. 2. DO NOT SCALE DRAWINGS. ALL NOTES AND NOTED DIMENSIONS TAKE PRECEDENCE OVER VISUAL REPRESENTATIONS OF ASSUMED INFORMATION SHOWN. ALL MANUFACTURERS' OR FABRICATORS' PRINTED WARNINGS, SPECIFICATIONS AND INSTALLATION INSTRUCTIONS TAKE PRECEDENCE OVER CONSTRUCTION DRAWINGS UNLESS AN EXCEPTION IS NOTED. MANUFACTURERS' OPERATING RECOMMENDATIONS SHALL BE STRICTLY OBSERVED. 3. NOT USED 4. DIMENSIONS SHOWN ON FLOOR PLANS, SECTIONS, ELEVATIONS, AND DETAILS ARE TO GRID LINES, FINISH FACE OF EXISTING WALLS, AND TO THE FACE OF STUDS, MASONRY, AND CONCRETE OF NEW WALLS UNLESS OTHERWISE NOTED. 5. VERIFY ALL EXISTING STRUCTURAL AND LOAD-BEARING CONDITIONS PRIOR TO ANY DEMOLITION WORK OR ANY NEW CONSTRUCTION. CONTACT ARCHITECT IMMEDIATELY IF ANY DISCREPANCIES EXIST. 6. IF THE CONTRACTOR ASCERTAINS AT ANY TIME THAT REQUIREMENTS OF THIS CONTRACT CONFLICT WITH, OR ARE IN VIOLATION OF APPLICABLE LAWS, CODES, REGULATIONS AND ORDINANCES, HE/SHE SHALL NOT PROCEED WITH WORK IN QUESTION, EXCEPT AT HIS/HER OWN RISK, UNTIL THE ARCHITECT HAS BEEN NOTIFIED IN WRITING AND WRITTEN DETERMINATION IS MADE BY THE ARCHITECT. WHERE COMPLETED OR PARTIALLY COMPLETED WORK IS DISCOVERED TO BE IN VIOLATION WITH APPLICABLE LAWS, CODES , REGULATIONS AND ORDINANCES, CONTRACTOR SHALL BE REQUIRED TO REMOVE THAT WORK FROM THE PROJECT AND REPLACE SUCH WORK WITH ALL NEW COMPLYING WORK AT NO ADDITIONAL COST TO THE OWNER OR ARCHITECT. 7. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS/HER EXPENSE AND AT NO ADDITIONAL EXPENSE TO THE OWNER, ARCHITECT, OR CONSULTANTS. 8. ANY FIRE EXTINGUISHERS MOVED DURING CONSTRUCTION ARE TO BE RELOCATED IN ACCORDANCE WITH FIRE MARSHALL'S DIRECTION. 9. ONCE FIRE ALARM SYSTEM IS INSTALLED, FIRE ALARM SYSTEM SHALL REMAIN IN SERVICE AT ALL TIMES DURING CONSTRUCTION. WRITTEN AUTHORIZATION FROM LOCAL FIRE DISTRICT WILL BE REQUIRED IF EITHER SYSTEM IS TO BE SHUT DOWN. 10. CONTRACTOR SHALL PROVIDE AND INSTALL ALL STIFFENERS, BRACINGS, BACK-UP PLATES AND SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL CASEWORK, TOILET ACCESSORIES AND OF ALL FLOOR-MOUNTED OR SUSPENDED EQUIPMENT. 11. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES BELOW GRADE AND RELATED SERVICES CONNECTIONS WITH THE RESPECTIVE UTILITY COMPANIES. 12. INSTALLATION OF ALL SELECTED MATERIALS SHALL BE COMPLETE IN ALL RESPECTS PRIOR TO FINAL ACCEPTANCE. ANY MISCELLANEOUS ITEMS OR MATERIALS NOT SPECIFICALLY NOTED BUT REQUIRED FOR PROPER INSTALLATION SHALL BE FURNISHED BY THE CONTRACTOR. 13. ALL ITEMS TO BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS AT MINIMUM. NOTIFY ARCHITECT OF ANY DISCREPANCIES BETWEEN THE DRAWINGS AND MANUFACTURERS' RECOMMENDATIONS PRIOR TO INSTALLATION. 14. NO ITEMS SHALL BE SUSPENDED FROM/ATTACHED TO THE ROOF DECK INCLUDING LIGHT FIXTURES, MECHANICAL EQUIPMENT, FIRE SPRINKLERS, AND SUSPENDED CEILINGS UNLESS SPECIFICALLY NOTED ON DRAWINGS. 15. CM TO OBTAIN AND RETAIN ALL PRODUCT CERTIFICATION AND IDENTIFICATION INFORMATION FOR THE FOLLOWING: - DOORS - TOILET PARTITIONS - ROOFING 000000_EPMC TI master.pln; G1 ARCHITECTURAL INFORMATION; 100% 11/11/2019 Reviewed by SAFEbuilt 12/04/2019 BAS1S.com A1 Sheet No: 303.848.3740 Sheet Title: Date: Architecture, P.C. Issue: © BASIS FLOOR PLAN T e n a n t I m p r o v e m e n t f o r : Es t e s P a r k H e a l t h 42 0 S t e a m e r D r i v e , S u i t e 1 0 1 Es t e s P a r k , C O - 11/11/2019 ADDENDUM 01 A R C H I T E C T U R E P. C. Es t e s P a r k , C o l o r a d o 8 0 5 1 7 16 9 2 B i g T h o m p s o n A v e n u e , S u i t e 1 0 0 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 10 6 154 146 14 5 10 4 10 5 127 157 16 3 148 149 15 0 15 3 13 3 155 100 2 4 3 0 123 140 131 132 159 15 8 5040 135 136 137 26 4 0 14 3 12 0 R 04'8' 16' IC E R R R R FEC 2 A1 1 A2 2 A2 1 A3 2 A 3 3 A 3 5 A 3 6 A 3 9 A3 8 A3 4 A3 10 A3 11 A 3 12 A3 14 A 3 15 A 3 3 A 4 2 A 4 13 A 3 7 A3 16 A3 1 A 4 4 A 3 4 A 3 4 A 3 4 A 3 4 A 3 4 A 3 4 A 3 4 A 3 4 A3 4 A3 14 A314 A 3 14 A 3 14 A 3 14 A 3 14 A 3 14 A 3 4 A 4 5 A 4 15 A 3 18"D TOP OP H OP H OP H OP H OP H OP H OP H STAFF LOUNGE 144 O2 STG 107 M 121 MEDS 123 CIRC 124 VESTIBULE 106 VESTIBULE 100 W 104 M 105LOBBY 101 RECEPTION 102 CIRC 103 EVS FLR EQ 108 CIRC 109 EVS EQP 110 DIRTY 111 OFFICE 112 RADIOLOGY 113 ORTHO/EXAM 114 EXAM 115 STAFF 116 EXAM 117 EXAM 118 EXAM 119 EXAM 120 NURSE'S STATION 122 CLINICAL EQUIP 125 EXAM 126 CIRC 140 LOCKERS 145F 146 CIRC 147 MECH 150 CLEAN LINEN 149 DIRTY LINEN 148 MAIN SUPPLY 151 RED BAG 153 FACILITIES 152 CIRC 154 CIRC 155 OFFICE 156 EXERCISE 175 OPEN OFFICE 160 RECEPTION 157 CIRC 163 THERAPY 164 THERAPY 165 THERAPY 166 THERAPY 167 THERAPY 169 THERAPY 170 STG 171 CIRC 168 THERAPY 172 THERAPY 173 F 174 CIRC 127 W 128 EXAM 129 EXAM 130 EXAM 131 EXAM 132 CIRC 133 NURSE'S STATION 134 CHART 135 CHART 136 CHART 137 EXAM 138 EXAM 139 EVS EQP 141 EVS STOR 142 IT 143 OFFICE 159 CIRC 158 CIRC 161 STORAGE 162 103 116 115 114 15 1 15 2 172 173 170 169 17 1 15 6 12 5 12 6 12 4 16 0 14 4 12 8 12 9 13 0 14 1 121 11 7 11 9 11 8 107 108 110 174 166 13 9 13 8 162 165 164167 112 113 111 321 4 5 6 7 8 9 10 A B C D.4 E D A.5 FEC FE C FE C 3 A1 4 A1 5 A1 DOORS SCHEDULED IN BUILDING SHELL DRAWINGS 146 14 5 1'-4" WC-1 FD LAV-1 LOCK 145RR 146 CLEAN LINEN 149 1' - 6 5 / 8 " GB3 GB2 GB1 GB4 SWS SHW MIR TPD 10 4 10 5 4' - 7 " 1' - 6 5 / 8 " 1'-6" W 104 M 105 CIRC 103 103 GB2 GB3 GB1 BCS FD WC-1 LAV-1 EWC EWC MIR TPD 1' - 3 3 / 4 " MIR TPD WC-1 LAV-1 FD LAV-1 WC-1 FD MIR GB1 RR 121 EXAM 120 RR 128 12 8 121 1' - 6 5 / 8 " 1' - 6 5 / 8 " 6' - 1 1 / 2 " PTD GB3 PTD GB3 GB2 GB1 TPD GB2 F 174 173 174 1'-6 5/8"4'-6" W C - 1 LAV-1 PTD M IR T P D GB3 GB2 GB1 1 1 1 1 1 1 1 1/8" = 1'-0" FLOOR PLAN 4 1/4" = 1'-0" ENLARGED PLAN 2 1/4" = 1'-0" ENLARGED PLAN3 1/4" = 1'-0" ENLARGED PLAN5 1/4" = 1'-0" ENLARGED PLAN COORDINATE TENANT PROVIDED ITEMS, RE: FIXTURE & EQUIPMENT PLAN TYPICAL ALL RESTROOMS RE: FIXTURE & EQUIPMENT PLAN FOR LEGEND NOTES & DIMENSIONS APPLY TO 104 & 105 000000_EPMC TI master.pln; A1 FLOOR PLAN; 100% 11/11/2019 Reviewed by SAFEbuilt 12/04/2019 BAS1S.com A1.1 Sheet No: 303.848.3740 Sheet Title: Date: Architecture, P.C. Issue: © BASIS DIMENSION PLAN T e n a n t I m p r o v e m e n t f o r : Es t e s P a r k H e a l t h 42 0 S t e a m e r D r i v e , S u i t e 1 0 1 Es t e s P a r k , C O - 11/11/2019 ADDENDUM 01 A R C H I T E C T U R E P. C. Es t e s P a r k , C o l o r a d o 8 0 5 1 7 16 9 2 B i g T h o m p s o n A v e n u e , S u i t e 1 0 0 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 10 6 154 146 14 5 10 4 10 5 127 157 16 3 148 149 15 0 15 3 13 3 155 100 2 4 3 0 123 140 131 132 159 15 8 5040 135 136 137 26 4 0 14 3 12 0 04'8' 16' FEC 2' 5' - 7 1 / 2 " 9'-9"4'-0 3/4" P4 P4 P2 P2 P3 P 3 P2 P4 P4 P2 AL I G N AL I G N AL I G N ALIGN 103 116 115 114 15 1 15 2 172 173 170 169 17 1 15 6 12 5 12 6 12 4 16 0 14 4 12 8 12 9 13 0 14 1 121 11 7 11 9 11 8 107 108 110 174 166 13 9 13 8 162 165 164167 112 113 111 P3 P3 321 4 5 6 7 8 9 10 A B C D.4 E D A.5 FEC FE C FE C 8'-4"8'-3"10'5'-8"5'-5"10'-5"10'-7"12'-4" 5' - 8 1 / 2 " 5' - 5 " 5' - 5 " 5' - 3 " 17 ' - 1 0 " 13 ' - 2 " 9' - 8 " 4' - 8 1 / 4 " 13 ' - 0 3 / 4 " 7'-2"17'-11"10'-4"3'7'-8"8'-11"15'26'14'-9"10'-5"10'-5"10'-5" 8' - 8 " 9' - 3 3 / 4 " 27 ' - 1 0 1 / 4 " 12 ' - 9 " 10 ' - 5 " 7' - 7 " 17 ' - 1 1 3 / 4 " 26 ' - 0 3 / 4 " 6' - 5 " 10 ' - 5 " 10 ' - 5 " 9' - 9 " 6' - 5 " 5' - 1 " 5' - 4 " 3'-10"4'-2"9'-2" 2' - 9 " 10 ' - 3 3 / 4 " 3' - 5 " 11'-2"11'-1"5'-9" 2' - 8 " 4' - 6 1 / 2 " 4' - 6 1 / 2 " 5' - 1 1 " 5' - 5 " 2' - 3 " 15 ' - 5 " 12 ' - 6 " 7' - 7 " 11 ' - 1 1 3 / 4 " 6' - 5 " 12'-3"7'-5"12'12'5'-5"10'-5"12'13'-1 1/2"6'-10 1/2"10'-9"11'-3"26'10'-8"12'-4" 5' - 1 1 / 8 " CL E A R 9'10'-8"24'5'-5"7'-1"10'-11"4'-5"4'-2"8'-11 1/2"6'-10 1/2"8'-4"18'-3"5'-8"3'-6"12'-4"10'-7"12'-4" 4'-7" 14 ' - 5 3 / 4 " 5' - 6 " 8' - 5 " 4' - 3 " 22 ' 7' - 7 " 10 ' - 6 " 7' - 5 3 / 4 " 5'-0 3/8"2'-1" 11 ' 11 ' 8' - 5 " 13 ' - 1 1 / 2 " 13 ' - 1 1 / 2 " 4'-4 7/8" 2'-7" 3 ' 4' - 1 " 4'-4"8' 6'-3"6'-1" 2'-5"7'-4" 4'9'-4"4' 8' - 1 " 2'-2" 2'-2" 2' - 2 3 / 4 " 5' - 1 1 1 / 4 " 8' 8' - 8 " 13 ' - 2 1 / 4 " 13 ' - 1 " 14 ' - 1 0 3 / 4 " 13 ' - 8 1 / 4 " 13 ' - 0 3 / 4 " 5' - 4 " 5' - 6 " 3' - 8 " 3' - 5 3 / 4 " 7' - 3 3 / 8 " 5' - 7 " 6' - 4 3 / 4 " 6' 2'-1" 3' - 5 " 7' 6' - 3 " 4' - 3 3 / 4 " 1'-8"3' - 6 " 6'-9" 1'-6 5/8" 4'-6" 2' - 8 " 2'-6" P3P4 P3 SIM AL I G N ALIGN GENERAL ASSEMBLY NOTES 1. REFER TO CODE AND ARCHITECTURAL PLANS FOR DESIGNATION OF PARTITION TYPES AND RATINGS 2. ALL METAL STUD AND C.M.U. PARTITIONS ARE TO EXTEND TO UNDERSIDE OF STRUCTURE UNLESS NOTED OTHERWISE 3. WHERE TWO DIFFERING PARTITION TYPES ABUT IN A LINE AND ALONG A CONTINUOUS LENGTH OF PARTITIONS, THE CONTINUOUS FINISHED SURFACES OF THESE PARTITIONS SHALL ALIGN UNLESS NOTED OTHERWISE. 4. ALL METAL STUDS TO BE SPACED PER STRUCTURAL REQUIREMENTS. 5. DO NOT PLACE GYPSUM BOARD JOINT AT CORNER OF DOOR FRAME. 6. CEMENT, FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS AT ALL WET LOCATIONS. MAINTAIN FIRE RATING AT ALL PARTITIONS. 7. USE CEMENTITIOUS BACKER UNITS AND SPACE STUDS AT 16" O.C. AT PARTITIONS TO RECEIVE CERAMIC TILE OR STONE. 8. PROVIDE SLIP JOINT CONNECTIONS AT THE TOPS OF ALL PARTITIONS WHICH INTERSECT THE STRUCTURE ABOVE; PROVIDE FIRE-SAFING AT ALL SLIP-JOINT CONNECTIONS IN FIRE-RATED PARTITIONS. IF AMOUNT OF DEFLECTION TO BE ACCOMMODATED IS NOT INDICATED ON STRUCTURAL DRAWINGS, OBTAIN CLARIFICATION FROM THE ARCHITECT PRIOR TO INSTALLATION. 9. ALL FIRE RESISTIVE PARTITIONS SHALL BE CONSTRUCTED IN FULL COMPLIANCE WITH TESTING REQUIREMENTS AND MANUFACTURERS RECOMMENDATIONS FOR CONDITIONS AS REQUIRED. CONSTRUCTION OF ALL SYSTEMS SHALL EQUAL THAT OF THE TESTED ASSEMBLY. CONTRACTOR MAY SUBSTITUTE ANOTHER LISTED ASSEMBLY FOR THAT INDICATED WITH PRIOR APPROVAL OF THE ARCHITECT AND THE BUILDING DEPARTMENT. TESTING FACILITIES ARE ABBREVIATED AS FOLLOWS: UL - UNDERWRITERS LABORATORIES, INC; GA - GYPSUM ASSOCIATION; NER - NATIONAL EVALUATION REPORT; WHI - WARNOCK HERSEY INTERNATIONAL 10. THROUGH PENETRATIONS IN RATED PARTITIONS SHALL BE FIRESTOPPED IN ACCORDANCE WITH IBC 712.3.1 11. MEMBRANE PENETRATIONS IN RATED PARTITIONS SHALL BE IN ACCORDANCE WITH IBC 713.3.2 12. PROVIDE ACOUSTICAL SEALANT AT ALL PENETRATIONS IN ACOUSTICAL PARTITIONS. 13. ACOUSTICAL BATT INSULATION TO TERMINATE AT THE STRUCTURE UNLESS NOTED OTHERWISE. 14. ALL BATT INSULATION IN EXTERIOR WALL ASSEMBLIES TO BE INSTALLED TO GRADE I STANDARDS P4 P3 P2 P1 -5/8" GWB -3 5/8", 24GA MTL STUDS @ 16" OC -SOUND BATT INSULATION -5/8" GWB -5/8" IMPACT RESISTANT GWB -1/4" METAL SECURITY MESH (AMICO SSM .50-13F) -3 5/8", 24GA MTL STUDS @ 16" OC -SOUND BATT INSULATION -5/8" GWB -5/8" GWB -6", 24GA MTL STUDS @ 16" OC -SOUND BATT INSULATION -5/8" GWB -5/8" LEAD-LINED GWB (ROOM SIDE ONLY, RADIOLOGY 113) -3 5/8", 24GA MTL STUDS @ 16" OC -SOUND BATT INSULATION -5/8" GWB PARTITION - P1 0-HR LISTING: NA PARTITION - P2 0-HR LISTING: NA PARTITION - P3 0-HR LISTING: NA PARTITION - P4 0-HR LISTING: NA ALL INTERIOR PARTITIONS TO BE TYPE 'P1' UNLESS INDICATED OTHERWISE EXTEND MTL STUDS TO UNDERSIDE OF METAL DECK ABOVE. EXTEND GYP BD TO WITHIN 2" OF BOTTOM BAR JOISTS AND STEEL. PARTITIONS PERPENDICULAR TO BAR JOISTS AND BEAMS ABOVE TO MAINTAIN A 2" GAP ALL AROUND JOISTS AND BEAMS. PATCH SPRAY-APPLIED FIRE-PROOFING AS REQD. EXTEND TOP OF PARTITION TO UNDERSIDE OF METAL DECK ABOVE. PARTITIONS PERPENDICULAR TO BAR JOISTS AND BEAMS ABOVE TO MAINTAIN A 2" GAP ALL AROUND JOISTS AND BEAMS. PATCH SPRAY-APPLIED FIRE-PROOFING AS REQD. EXTEND TOP OF PARTITION TO UNDERSIDE OF METAL DECK ABOVE. PARTITIONS PERPENDICULAR TO BAR JOISTS AND BEAMS ABOVE TO MAINTAIN A 2" GAP ALL AROUND JOISTS AND BEAMS. PATCH SPRAY-APPLIED FIRE-PROOFING AS REQD. EXTEND MTL STUDS TO UNDERSIDE OF METAL DECK ABOVE. EXTEND GYP BD TO WITHIN 2" OF BOTTOM BAR JOISTS AND STEEL. PARTITIONS PERPENDICULAR TO BAR JOISTS AND BEAMS ABOVE TO MAINTAIN A 2" GAP ALL AROUND JOISTS AND BEAMS. PATCH SPRAY-APPLIED FIRE-PROOFING AS REQD. 1 1 1 1/8" = 1'-0" DIMENSION PLAN CENTER WALL ON MULLION 000000_EPMC TI master.pln; A1.1 DIMENSION PLAN; 100% 11/11/2019 Reviewed by SAFEbuilt 12/04/2019 BAS1S.com A1.2 Sheet No: 303.848.3740 Sheet Title: Date: Architecture, P.C. Issue: © BASIS FIXTURE & EQUIPMENT PLAN T e n a n t I m p r o v e m e n t f o r : Es t e s P a r k H e a l t h 42 0 S t e a m e r D r i v e , S u i t e 1 0 1 Es t e s P a r k , C O - 11/11/2019 ADDENDUM 01 A R C H I T E C T U R E P. C. Es t e s P a r k , C o l o r a d o 8 0 5 1 7 16 9 2 B i g T h o m p s o n A v e n u e , S u i t e 1 0 0 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 R 0 4' 8' 16' IC E R R R R FEC STAFF LOUNGE 144 O2 STG 107 M 121 MEDS 123 CIRC 124 VESTIBULE 106 VESTIBULE 100 W 104 M 105LOBBY 101 RECEPTION 102 CIRC 103 EVS FLR EQ 108 CIRC 109 EVS EQP 110 DIRTY 111 OFFICE 112 RADIOLOGY 113 ORTHO/EXAM 114 EXAM 115 STAFF 116 EXAM 117 EXAM 118 EXAM 119 EXAM 120 NURSE'S STATION 122 CLINICAL EQUIP 125 EXAM 126 CIRC 140 LOCKERS 145F 146 CIRC 147 MECH 150 CLEAN LINEN 149 DIRTY LINEN 148 MAIN SUPPLY 151 RED BAG 153 FACILITIES 152 CIRC 154 CIRC 155 OFFICE 156 EXERCISE 175 OPEN OFFICE 160 RECEPTION 157 CIRC 163 THERAPY 164 THERAPY 165 THERAPY 166 THERAPY 167 THERAPY 169 THERAPY 170 STG 171 CIRC 168 THERAPY 172 THERAPY 173 F 174 CIRC 127 W 128 EXAM 129 EXAM 130 EXAM 131 EXAM 132 CIRC 133 NURSE'S STATION 134 CHART 135 CHART 136 CHART 137 EXAM 138 EXAM 139 EVS EQP 141 EVS STOR 142 IT 143 OFFICE 159 CIRC 158 CIRC 161 STORAGE 162 3 4 5 6 7 8 9 10 A B C D.4 E D A.5 FEC FE C FE C FIXTURE AND EQUIPMENT SCHEDULE ID BCS BFL BKR BKU CPK CPY EEW EWC FD FEC FSK GB1 GB2 GB3 GB4 HYC ICE LAV-1 LKR MIR MO-13 MOP MTT NUS PTD PWT PYX REF1 REF2 REF3 REFp SCA SHW RM# 104 105 175 175 175 175 102 134 157 131 103 104 105 107 108 110 111 121 123 128 141 146 150 174 101 106 140 163 123 104 105 121 128 146 174 104 105 121 128 146 174 104 105 121 128 146 174 146 175 123 104 105 121 128 146 174 145 104 105 121 128 146 174 108 110 141 169 175 175 121 128 174 175 123 123 116 144 123 175 146 ROOM RR RR EXERCISE EXERCISE EXERCISE EXERCISE RECEPTION NURSE'S RECEPTION EXAM CIRC RR RR O2 STG EVS FLR EQ EVS EQP DIRTY RR MEDS RR EVS EQP RR MECH RR LOBBY VESTIBULE CIRC CIRC MEDS RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR EXERCISE MEDS RR RR RR RR RR RR LOCKERS RR RR RR RR RR RR EVS FLR EQ EVS EQP EVS EQP THERAPY EXERCISE EXERCISE RR RR RR EXERCISE MEDS MEDS STAFF STAFF LOUNGE MEDS EXERCISE RR DESCRIPTION BABY CHANGING STATION BOTTLE FILLER BICYCLE, RECUMBENT BICYCLE, UPRIGHT COLPAC UNIT COPY MACHINE EMERGENCY EYE WASH ELECTRIC WATER COOLER FLOOR DRAIN; RE PLUMBING FIRE EXTINGUISHER CABINET FLOOR SINK GRABBAR GRABBAR GRABBAR GRABBAR HYDROCULATOR ICE MACHINE LAVATORY LOCKER MIRROR, 24"Wx36H" MOP BASIN MAT TABLE PYXIS LAB (CIRC 109) REFIGERATOR PYXIS REFRIGERATOR SCALES (2) SHOWER NOTES ADA TRANSFER SHOWER TYPE SSTL FRAME ALL FLOOR MOUNTED; RE: PLUMBING COUNTERTOP 1-PIECE FIBERGLASS; ADA TRANSFER SNK SSK SWS TML TPD TRT TV UBE ULS WC-1 146 114 115 116 117 118 119 120 123 126 129 130 132 138 139 144 175 111 146 175 104 121 128 146 174 166 167 170 175 175 175 104 105 121 128 146 174 RR ORTHO/EXAM EXAM STAFF EXAM EXAM EXAM EXAM MEDS EXAM EXAM EXAM EXAM EXAM EXAM STAFF LOUNGE EXERCISE DIRTY RR EXERCISE RR RR RR RR RR THERAPY THERAPY THERAPY EXERCISE EXERCISE EXERCISE RR RR RR RR RR RR SHOWER SINK SLUICE SINK SHOWER SEAT (ADA) TREADMILL TOILET PAPER DISPENSER TREATMENT TABLE TELEVISION UPPER BODY EXERCISER ULTRA SOUND CART WATER CLOSET 1 PIECE FIBERGLASS; ADA TRANSFER COORD STYLE W/ TENANT; RE: MEP PROVIDE BLOCKING COORD W/ TENANT SUPPLIER (3) UNITS RE: MEP FIXTURE AND EQUIPMENT SCHEDULE ID RM#ROOM DESCRIPTION NOTES VERIFY STYLE W/ TENANT MOUNT TOP @ 3'-0" AFF UNLESS DIRECTED OTHERWISE EPMC - PHYSICAL THERAPY UHS Equip ID Manufacturer Model Equipment Type Serial Number ROOM EQUIPMENT DESCRIPTION CLINICAL MISCELLANEOUS MISCELLANEOUS DEPARTMENT SAFETY TESTING 988331 ARMEDICA AM-300 TABLES, EXAMINATION/TREATMENT 49330 166 Treatment Table 988444 Biodex Medical Systems, Inc.950-130 EXERCISERS 712388 175 Upper body Exerciser 988454 Chattanooga C2 MOIST HEAT THERAPY PACK CONDITIONERS 3545 175 ColPac - stored under open counter space - 24" W x 16"D X34"H 988457 Chattanooga HOT PACK HEATER MOIST HEAT THERAPY PACK CONDITIONERS T8888C 175 Hydrocollator - stored under open counter space - 32"W x 18"D x 34"H 1077958 Chattanooga TRITON T-700 TRACTION UNITS 3805 169 Traction Table 796194 Clinton Industries, Inc.253-47 TABLES, EXAMINATION/TREATMENT, ADJUSTABLE, OCI-6017 169 Mat table - 4' W x 7' L 988452 CoolSystems, Inc.GAME READY WARMING/COOLING UNITS, PATIENT EC12150-B581 175 Game Ready - stored in cabinet 988458 Detecto - A Division of Cardinal Scale Manufacturing Co.UPRIGHT SCALE SCALES, PATIENT n/a 175 Scale 988328 Dynatronics DYNATRON 850 PLUS ULTRASOUND THERAPY SYSTEM 856467 175 Ultrasound unit on cart - stored under open counter space - cart is 17"W"x 28"D"X 38"H 988330 Dynatronics DYNATRON SOLARIS 708 ULTRASOUND THERAPY SYSTEM 781054 175 Ultrasound unit on cart - stored under open counter space - cart is 17"W x 28"D x 38"H 988329 Dynatronics DYNATRON SOLARIS 709 ULTRASOUND THERAPY SYSTEM 797006 175 Ultrasound unit on cart - stored under open counter space - cart is 17"W x 28"D x 38"H 988336 Dynatronics DYNATRON SOLARIS 709 PLUS ULTRASOUND THERAPY SYSTEM ST91902067 175 Mobile free standing ultrasound unit 988337 Dynatronics DYNATRON SOLARIS 709 PLUS ULTRASOUND THERAPY SYSTEM ST91902068 175 Mobile free standing ultrasound unit 988445 efi Sports Medicine TOTAL GYM EXERCISERS TFT70127 175 Power Tower 1044034 HAUSMANN INDUSTRIES, INC.4710 TABLES, EXAMINATION/TREATMENT 2186400022 175 Mat Table - 5' W x 7' L 988500 Huntleigh Healthcare STREAMLINE 225 TABLES, EXAMINATION/TREATMENT IPS-29595 170 Treatment Table 988502 Huntleigh Healthcare STREAMLINE 225 TABLES, EXAMINATION/TREATMENT 215470 167 Treatment Table 988460 NuStep, Inc.T4R EXERCISERS T4r520660 175 Nu Step 988461 NuStep, Inc.TRS 4000 EXERCISERS 444675 175 Nu Step 988453 Schwinn Cycling and Fitness Inc AIRDYNE EXERCISERS 3074G00107 175 Upright Bike 988459 SCIFIT ISO7000R EXERCISERS 572-000397 175 Recumbent Bike 988327 SportsArt Fitness T655M TREADMILLS 0334145 175 Treadmill Exam Room Nurse Station Lab Bench Patient Restrooms Other Equipment Stretcher desks that rise to standing level Table top CBC analyzer room trash can - closed one in ED with pedal crash cart under counter trash can 23 gallon Printer/copier/fax Istat Paper towel holder AED room trash can - closed one in ED with pedal Patient label printer Eye Wash station soap dispenser EKG machine biohazard trash can - small rolling ones in ED Lab label printer Lab Fridge alcohol gel dispenser two Nihon Kohden monitors two patient/visitor chairs 3 office chairs under counter trash can 23 gallon Patient CALL LIGHT Temporal thermometer rolling stool for NP Telephones Glove holder Rectal thermometer Glove holder Nurse Call System (monitor and keyboard?)Paper towel holder Staff Room two "Nurse on Stick" rolling vital signs Paper towel holder soap dispenser Table and Chairs Stryker wheelchairs soap dispenser Med Room alcohol gel dispenser room trash can - closed one in ED with pedal Adult Scale alcohol gel dispenser Pt fridge for food Paper towel holder Baby Scale wall mounted cup dispenser Ice Maker soap dispenser Suture Cart desk for NP computer, printer Pyxis alcohol gel dispenser Ortho Cart? desktop computer with two screens Pyxis fridge Nurse Call System black light printer Cactus waste bin and other pharmaceutical waste bins Microwave Linen hampers for gowns/towels/ paper roll as sheets Computer with two screens Coffee Maker Manual Blood Pressure desktop oto/ophthalmoscopes under counter trash can 23 gallon Lockers sharps container room trash can - closed one in ED with pedal Coat Hooks Overhead exam light Glove holder Mayo Stand Paper towel holder Emesis Bag container soap dispenser BREG DME (crutches, slings etc. ONLY IN ORTHO/E alcohol gel dispenser Patient CALL BELL (wall mounted)sharps container Telephone R IC E R R R R FEC FD MOP MOP SSK FD FD FSK I C E REF1 REF2 REF3 REF3 MOP CPY CPY CPY BFL C P K H Y C U L S U L S U L S S NK MTT U B E N U S N U S P W T B K R B K U TM L S CA S C A MTT TRT TRT TRT REFp SNK FD EEW SNK SNK FD LKR TV TV TV SNK SNK SNK SNK SNK SNK SNK SNK SNK SNK FD FD SNK SNK EEW SNK FEC FEC FEC F D F D FD FD FD EWC EWC SNK FULL EMPTY FEC FE C FE C PYX FEC 1 1 2 3" = 1'-0" WALL RAIL 3 PT EQUIPMENT 4 URGENT CARE EQUIPMENT 1 1/8" = 1'-0" FIXTURE & EQUIPMENT PLAN WALL RAILS INDICATED THUS. RE DETAIL, COORD W/ TENANT WALL RAILS INDICATED THUS. RE DETAIL, COORD W/ TENANT PVC CORNER GUARDS INDICATED THUS. LOCATE @ ALL OUTSIDE CORNERS DASHED ELEMENTS INDICATE TENANT PROVIDED/GC INSTALLED F & E CANISTER RACKS FURNISHED BY TENANT, GC INSTALLED RE ENLARGED PLANS SHEET A1, FOR ALL RESTROOM F & E GC TO COORDINATE ALL EQUIPMENT REQUIREMENTS W/ TENANT'S RADIOLOGY EQUIPMENT SUPPLIER Kelly Hammack | Project Manager, Digital Radiography Systems US+C MEDICAL SVCS PROF SVCS IMP SVCS/SUP Kelly.hammack@carestream.com 109 LAB/CIRC 109 LAB/CIRC 000000_EPMC TI master.pln; A1.2 FIXTURE & EQUIPMENT PLAN; 100% 11/11/2019 Reviewed by SAFEbuilt 12/04/2019 BAS1S.com A1.3 Sheet No: 303.848.3740 Sheet Title: Date: Architecture, P.C. Issue: © BASIS FINISH PLAN T e n a n t I m p r o v e m e n t f o r : Es t e s P a r k H e a l t h 42 0 S t e a m e r D r i v e , S u i t e 1 0 1 Es t e s P a r k , C O - 11/11/2019 ADDENDUM 01 A R C H I T E C T U R E P. C. Es t e s P a r k , C o l o r a d o 8 0 5 1 7 16 9 2 B i g T h o m p s o n A v e n u e , S u i t e 1 0 0 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 R 04'8' 16' IC E R R R R FEC STAFF LOUNGE 144 O2 STG 107 M 121 MEDS 123 CIRC 124 VESTIBULE 106 VESTIBULE 100 W 104 M 105LOBBY 101 RECEPTION 102 CIRC 103 EVS FLR EQ 108 CIRC 109 EVS EQP 110 DIRTY 111 OFFICE 112 RADIOLOGY 113 ORTHO/EXAM 114 EXAM 115 STAFF 116 EXAM 117 EXAM 118 EXAM 119 EXAM 120 NURSE'S STATION 122 CLINICAL EQUIP 125 EXAM 126 CIRC 140 LOCKERS 145F 146 CIRC 147 MECH 150 CLEAN LINEN 149 DIRTY LINEN 148 MAIN SUPPLY 151 RED BAG 153 FACILITIES 152 CIRC 154 CIRC 155 OFFICE 156 EXERCISE 175 OPEN OFFICE 160 RECEPTION 157 CIRC 163 THERAPY 164 THERAPY 165 THERAPY 166 THERAPY 167 THERAPY 169 THERAPY 170 STG 171 CIRC 168 THERAPY 172 THERAPY 173 F 174 CIRC 127 W 128 EXAM 129 EXAM 130 EXAM 131 EXAM 132 CIRC 133 NURSE'S STATION 134 CHART 135 CHART 136 CHART 137 EXAM 138 EXAM 139 EVS EQP 141 EVS STOR 142 IT 143 OFFICE 159 CIRC 158 CIRC 161 STORAGE 162 321 4 5 6 7 8 9 10 A B C D.4 E D A.5 FEC FE C FE C MAIN SUPPLYLL 151 RED BAG 153 FFFAAAFFCILITIES 111522 CCLEAN LINEN 149 DIRTY LINEN 1148 MECH 150 STG 171 CIRC 154 STORAGE 162 O2 STG 107 EVS FLR EQ 108 EVS EQP 110 DIRTY 111 CLINICAL EQUIP 125 IT 143 EVS EQPPP 141 EVS STOR 142 1 1 1 1 1 1 1 1/8" = 1'-0" FINISH PLAN PT - a PT - a PT - a PT - a PT - a PT - a PT - a PT-a PT-a PT-a PT - a PT - a PT - a PT-a PT-a PT-a PT-a PT-a PT-aPT-a PT - a PT - a PT - a PT - a PT - a PT - a PT - a PT - a PT - a PT-a PT - a PT-a FINISH LEGEND CONCRETE, SEALED SEALER : BASF "LIPIDOLITH" CERAMIC TILE: WALL MANUFACTURER: FLORIDA TILE NY2LA STYLE: PORCELAIN COLOR: TBD SIZE: 12" x 24"; INSTALL PATTERN TBD GROUT: TBD LUXURY VINYL TILE MANUFACTURER: SHAW STYLE: REVIVAL 18" x 36"; INSTALL PATTERN TBD COLOR: TBD CARPET CARPET TILE MANUFACTURER: SHAW STYLE: HIPSTER 24" x 24"; INSTALL PATTERN TBD COLOR: TBD PAINT MANUFACTURER: SHERWIN WILLIAMS STYLE: SEMI-GLOSS COLOR: - PRIMER: - PAINT - ACCENT COLOR MANUF ACTURER: SHERWIN WILLIAMS STYLE: - COLOR: - PRIMER: - PAINT MANUFACTURER: SHERWIN WILLIAMS STYLE: FLAT COLOR: CEILING WHITE PRIMER: - FINISH NOTES 1. IT IS THE GC's RESPONSIBILITY TO ENSURE ALL MANUFACTURER'S SPECIFICATION REQUIREMENTS FOR THE INSTALLATION ARE FOLLOWED. 2. ALL WALLS AND PARTITIONS WITHOUT A DESIGNATED FINISH ARE TO BE PAINTED (PT-1) 3. ALL FLOORING TRANSITIONS TO OCCUR UNDER CENTER OF DOORS, UNO. 4. ALL FLOORING MATERIALS TO CONTINUE UNDER CASEWORK TO TOE KICK AND UNDER OPEN COUNTERS TO WALL. 5. APPLY ALL SEALANTS AND NON-SLIP AGENTS AS RECOMMENDED BY MANUFACTURER. 6. PRIME AND PAINT ALL GRILLES, ELECTRICAL PANELS, AND COVER PLATES TO MATCH ADJACENT SURFACES. 7. REFER TO MANUFACTURER'S SPECIFICATIONS FOR DETAILED PRODUCT DESCRIPTIONS. 8. ALLOW 10 DAYS IN SCHEDULE FOR CONCRETE FINISHING. 9. ALL WALLS AND PARTITIONS TO RECEIVE RESILIENT BASE (RB-1) UNO. 10. ALL INTERIOR COLUMNS SHALL BE PAINTED (PT-1) UNO. 11. ALL INTERIOR HOLLOW METAL DOOR FRAMES SHALL BE PAINTED (PT-4) UNO. 12. REFER TO REFLECTED CEILING PLANS FOR ADDITIONAL CEILING FINISHES. 13. REFER TO INTERIOR ELEVATIONS FOR ADDITIONAL WALL FINISHES. 14. ALL OFFICE WALLS SHALL BE PAINTED (PT-1) UNO. PARTITION PREP FOR WALL COVERINGS: LEVEL 5 GYPBD FINISH AND 2 COATS OF PAINT (GLOSS FINISH) PRIOR TO INSTALLATION OF WALL COVERING SHEET VINYL MANUFACTURER: MANNINGTON STYLE: BIOSPEC MD COLOR: TBD https://www.manningtoncommercial.com/products/hard-surface/homogeneous/biospec-md/ CS LVT-1 PT-1 PT-2 PT-a SV-1 CPT-1 CPT-2 PAINT MANUFACTURER: SHERWIN WILLIAMS STYLE: EPOXY COLOR: - PRIMER: - PT-3 RESILENT BASE MANUFACTURER: MANNINGTON STYLE: BIOSPEC MD INTEGRAL 6" TALL COVE BASE COLOR: TBD RB-1 RESILENT BASE MANUFACTURER: JOHNSONITE STYLE: 4" RUBBER WITH TOE COLOR: TBD RB-2 CT-1 CT-2 PAINT MANUFACTURER: SHERWIN WILLIAMS STYLE: EPOXY COLOR: - PRIMER: - PT-4 FRP SHEET MANUFACTURER: MARLITE STYLE: INDURAO FRP W/ COLOR: TBD FRP LVT-1 LVT-1 CPT-2 CARPET WALK OFF MAT MANUFACTURER: SHAW STYLE: SUCCESSION II - 24" x 24"; INSTALL PATTERN TBD COLOR: TBD CPT-3 CARPET CARPET TILE MANUFACTURER: SHAW STYLE: HIPSTER 24" x 24"; INSTALL PATTERN TBD COLOR: TBD CERAMIC TILE: FLOOR MANUFACTURER: FLORIDA TILE SEQUENCE STYLE: PORCELAIN COLOR: TBD SIZE: 12" x 24"; INSTALL PATTERN TBD GROUT: TBD 1210.2.1 Floors and wall bases. Floor ÀQLVKPDWHULDOVVKDOlKDYHDVPRoWKKDUGQRQDEVRUEHQWVXUIDFH7KH intersections of such ÁRoUVZLWKZDOlVVKDOlKDYHDVPRoWKKDUGQRQDEVRUEHQWYHUWLFDO base that extends upward onto the walls not less than 4 inches (102 mm). 6" COVE BASE or CERAMIC TILE SCHEDULED @ RESTROOMS 1210.2.2 Walls and partitions. Walls and partitions within 2 feet (610 mm) of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet (1219 mm) above the ÁRoU FRP TO 4 FEET ABOVE FINISHED FLOOR MIN. 4'-6" PROPOSED INCLUDES 6" COVE BASE @ RESTROOMS EPOXY PAINT PT-3 AT A LL RESTROOM WALLS ABOVE FRP FLOOR: SV-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: SV-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: LVT-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: SV-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: SV-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: SV-1 BASE: RB-1 WALLS: PT-1 CEILING: PT-2 FLOOR: CS BASE: RB-1 WALLS: PT-1 CEILING: PT-2 FLOOR: LVT-1, RECESSED MAT BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: RECESSED MAT BASE: STFT WALLS: STFT CEILING: PT-2 FLOOR: LVT-1, CPT-2 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: SV-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: SV-1 BASE: SV COVE WALLS: FRP/PT-3 CEILING: PT-2 FLOOR: SV-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: CPT-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: SV-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: SV-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: SV-1 BASE: RB-1 WALLS: PT-1 CEILING: PT-2 FLOOR: CPT-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: SV-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: CS BASE: RB-1 WALLS: PT-3 CEILING: PT-2 FLOOR: CS BASE: RB-1 WALLS: PT-1 CEILING: PT-2 FLOOR: CS BASE: RB-1 WALLS: PT-1 CEILING: PT-2 FLOOR: SV-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: SV-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: CS BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: CS BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: CT-2 BASE: CT w/ COVE TRIM WALLS: CT-1 CEILING: PT-2 FLOOR: SV-1 BASE: SV COVE WALLS: FRP/PT-3 CEILING: PT-2 FLOOR: LVT-1 BASE: RB-1 WALLS: PT-1 CEILING: ACT FLOOR: SV-1 BASE: SV COVE WALLS: FRP/PT-3 CEILING: PT-2 000000_EPMC TI master.pln; A1.3 FINISH PLAN; 100% 11/11/2019 Reviewed by SAFEbuilt 12/04/2019 BAS1S.com A2 Sheet No: 303.848.3740 Sheet Title: Date: Architecture, P.C. Issue: © BASIS ENLARGED PLANS / DETAILS T e n a n t I m p r o v e m e n t f o r : Es t e s P a r k H e a l t h 42 0 S t e a m e r D r i v e , S u i t e 1 0 1 Es t e s P a r k , C O - 11/11/2019 ADDENDUM 01 A R C H I T E C T U R E P. C. Es t e s P a r k , C o l o r a d o 8 0 5 1 7 16 9 2 B i g T h o m p s o n A v e n u e , S u i t e 1 0 0 135 1' 2' 7' - 2 1 / 4 " 2' - 7 1 / 4 " 2'-6"1'-0 1/4" 5' - 5 " 3' C L E A R 4' - 6 " 5' 3'-8" 9' - 6 " ( F A C E O F F R A M I N G ) 2'-6" 4'9'-4"4'4 A2 WORK POINT MODESTY PANEL MODESTY PANEL 3/8" PLYWD VENEER W/ HORIZ METAL REVEL SIM TO (E) EPH RECEPTION TOP @ 29" AFF TOP @ 29" AFF LOBBY RECEPTION 102 14 ' 20' 8'-6"4'7'-6" 4'3'-6" 3' 1' - 6 " 5' 1' - 6 " 3' 4 7 / 8 " 13 ' - 2 1 / 4 " 4 7 / 8 " 1' 1' 3'5'-6" 8' - 6 " 2' - 4 1 / 8 " 5' 3' - 6 " 2' - 4 1 / 8 " 13 ' - 2 1 / 4 " ( F A C E O F F R A M I N G ) 3" 3" 3"3" 2'-9" 1' 4'3'-6" 3"3" 8' 1' 19'-2 1/4" (FACE OF FRAMING) R 2'-6" R 2'-10 7/8" 4 A 2 NURSE'S STATION 122 RE E L E V A T I O N S 1" (2) ADJUSTABLE SHELVES LED TAPE LIGHT TYP ALL UPPER CABINETS. RE ELEC 3' - 0 " 1'-0" 2'-3" 2' - 5 " 7" 3/ 4 " 1 " 1" 1' - 6 " 3 / 4 " 2" A&M EXTENDED CONCEALED BRACKETS LOCATE 4" FROM EDGES @ 48" MAX SPACING 3/4" PLYWOOD UNDERLAYMENT TYPICAL COUNTER @: -RECEPTION 102 -NURSE'S STATION 122 -NURSE'S STATION 134 4 7/8" 14.5" (11" MIN)10 " (9 " M I N ) 27 . 5 " (2 7 " M I N ) 1 1 / 2 " 29 " 30" 1 1 1 1 1/4" = 1'-0" RECEPTION 102 2 1/4" = 1'-0" UC NURSE'S STATION 122 3 1" = 1'-0" TYP UPPER CABINET 4 3" = 1'-0" COUNTER SECTION 5 1" = 1'-0" SECTION @ RECPT 1026ICC 306 SOLID SURFACING HIGH PRESSURE PLASTIC LAMINATE TYP @ UPPERS & LOWER CABINETS SOLID SURFACING SOLID SURFACING SOLID SURFACING 3/8" VENEER PLYWOOD W/ REVEALS @ RECEP 102 MODESTY PANEL 000000_EPMC TI master.pln; A2 ENLARGED PLANS / DETAILS; 100% 11/11/2019 Reviewed by SAFEbuilt 12/04/2019 BAS1S.com A3 Sheet No: 303.848.3740 Sheet Title: Date: Architecture, P.C. Issue: © BASIS INTERIOR ELEVATIONS / CASEWORK T e n a n t I m p r o v e m e n t f o r : Es t e s P a r k H e a l t h 42 0 S t e a m e r D r i v e , S u i t e 1 0 1 Es t e s P a r k , C O - 11/11/2019 ADDENDUM 01 A R C H I T E C T U R E P. C. Es t e s P a r k , C o l o r a d o 8 0 5 1 7 16 9 2 B i g T h o m p s o n A v e n u e , S u i t e 1 0 0 9' 3' 1' - 6 " 4' - 6 " FILLER, VIF 3'-9"4'4'FILLER, VIF FILLER, VIF 3'-9"1'-9"1'-9"3'1'-6"FILLER, VIF 3' FILLER, VIF 4'3'-9"4' 9' 6' 3' 3' 1' - 6 " 3' FILLER, VIF 2'-3"1'-3"2' FILLER, VIF 3'-6" 2' - 5 " 6" DIA OPENING, BULLNOSE EDGE SOLID SURFACING 3' 5'1' 3' 1' - 6 " 3' - 6 " FILLER, VIF 2'-9"2'-2"1'-6" FILLER, VIFFILLER, VIF 2'-6"2'-9"FILLER, VIF FILLER, VIF 2'-6"2'-9"FILLER, VIFFILLER, VIF 2'-9"3'-6" FILLER, VIF REF2 EEW 1'-9"8"2'-3"2'-8" 1'-9"8"2'-3" 3' 1' - 6 " 3' - 6 " 2'-6" 4" REFp REF-1 COUNTER CONTINUES BEHIND COL BLANK FILLER BEHIND COL 3' 4" 3' 1' - 6 " 3' - 6 " 3'3'3'2'-6" 2'1'-6"1'-6"1'-6"3'2'-5"FILLER, VIF 2'-6" ICE PYX 3' - 0 " 1' - 6 " 3' - 6 " 1'-0" 2'-0"2'-0" PYX REFp 2' - 5 " 3' 2' - 5 " 2' - 1 " 3' - 6 " 2'2'-6"2'-6"FILLER, VIF 2'-6" 1'-11"2'-6"2'-6" FILLER, VIF 2' - 5 " 2' - 1 " 3' - 6 " 3' 2'-6" FILLER, VIF 2'-6"2' FILLER, VIF 2'-6"2'-6" FILLER, VIF 4'5'-9" OPEN BELOW 4'5'-9" OPEN BELOW 4'FILLER, VIF 3'-3"3'3'3'3'-3" 9' 6' 3' 3' 1' - 6 " 4' - 6 " HYC CPK ULS ULS ULS 2' - 5 " 2 ' - 1 " 3 ' - 6 " 4' FILLER, VIF 2' FILLER, VIF 1'-6"2'-9"1'-6"FILLER, VIF FILLER, VIF 1'-6"2'-9"1'-6"FILLER, VIF 3' 1' - 6 " 3' - 6 " 1'-3"3'FILLER, VIF 2' - 1 0 " 1' - 8 " 3' - 6 " 1'-6"2'-9"FILLER, VIF 2' REF3 3' 1 ' - 6 " 3 ' - 6 " 4'-6"FILLER, VIF 2' 2'-6"FILLER, VIF 3' 1' - 6 " 3' - 6 " 3'-6"FILLER, VIF 1'-9"1'-9"FILLER, VIF 1 8 3/8" = 1'-0" ORTHO NORTH9 3/8" = 1'-0" ORTHO SOUTH 4 3/8" = 1'-0" TYP EXAM 6 3/8" = 1'-0" 113 OBSERVATION 5 3/8" = 1'-0" LAB 3 3/8" = 1'-0" MEDS EAST 2 3/8" = 1'-0" MEDS WEST 1 3/8" = 1'-0" MEDS SOUTH 10 3/8" = 1'-0" PT RECP SOUTH11 3/8" = 1'-0" PT RECP EAST 12 3/8" = 1'-0" EXERCISE NORTH14 3/8" = 1'-0" TYP THERAPY15 3/8" = 1'-0" CIRC 163/16816 3/8" = 1'-0" STAFF 116 13 3/8" = 1'-0" THERAPY 7 3/8" = 1'-0" 113 SOUTH SOLID SURFACING TYP IN MED 123 SOLID SURFACINGSOLID SURFACING SOLID SURFACING SOLID SURFACING SOLID SURFACING SOLID SURF INTEGRAL/INTEGRATED BACKSPLASH, TYP WHERE INDICATED SOLID SURFACING HPL (HIGH PRESSURE LAMINATE)HPLSOLID SURFACING HPL HPL OPEN OPEN NOTE: COORDINATE LOCK & CYLINDER REQUIREMENTS FOR ALL CASEWORK ALL ROOMS W/ TENANT 000000_EPMC TI master.pln; A3 INTERIOR ELEVATIONS / CASEWORK; 100% 11/11/2019 Reviewed by SAFEbuilt 12/04/2019 BAS1S.com A4 Sheet No: 303.848.3740 Sheet Title: Date: Architecture, P.C. Issue: © BASIS INTERIOR ELEVATIONS / CASEWORK T e n a n t I m p r o v e m e n t f o r : Es t e s P a r k H e a l t h 42 0 S t e a m e r D r i v e , S u i t e 1 0 1 Es t e s P a r k , C O - 11/11/2019 ADDENDUM 01 A R C H I T E C T U R E P. C. Es t e s P a r k , C o l o r a d o 8 0 5 1 7 16 9 2 B i g T h o m p s o n A v e n u e , S u i t e 1 0 0 7' 7' 15 " 2'-6" (2' REQD) FILLER, VIF 4'4'FILLER, VIF FILLER, VIF 2'2'2'2'FILLER, VIF 3' 1' - 6 " 4' - 6 " 2' - 1 0 " 1' - 8 " 3' - 6 " 2'2'-9"2'FILLER, VIF 2'2'-9"2'FILLER, VIF REF3 3' 1' - 6 " 3' - 6 " 4'FILLER, VIF 1'-6"2'-6"FILLER, VIF 2' - 5 " 2' - 1 " 3' - 6 " 2'-5"2'-5" 4'-10" 1 1 1 3/8" = 1'-0" LOCKERS 1452 3/8" = 1'-0" FACILITIES3 3/8" = 1'-0" STAFF 1444 3/8" = 1'-0" OFFICE 1595 3/8" = 1'-0" OPEN OFFICE 160 SOLID SURFACING BACKSPLASH HPLHPL HPL ADJUSTABLE SHELF @ ACCESSIBLE LOCKERS (2). 5% BUT NOT LESS THAN 1 REQD: 1 REQD, 2 PROVIDEDTYPICAL OF (8) CONFIRM CABINET LAYOUT W/ TENANT CONFIRM LOCKER STYLE AND QUANTITY W/ TENANT 000000_EPMC TI master.pln; A4 INTERIOR ELEVATIONS / CASEWORK; 100% 11/11/2019 Reviewed by SAFEbuilt 12/04/2019 BAS1S.com A5 Sheet No: 303.848.3740 Sheet Title: Date: Architecture, P.C. Issue: © BASIS DOOR SCHEDULE T e n a n t I m p r o v e m e n t f o r : Es t e s P a r k H e a l t h 42 0 S t e a m e r D r i v e , S u i t e 1 0 1 Es t e s P a r k , C O - 11/11/2019 ADDENDUM 01 A R C H I T E C T U R E P. C. Es t e s P a r k , C o l o r a d o 8 0 5 1 7 16 9 2 B i g T h o m p s o n A v e n u e , S u i t e 1 0 0 DOOR SCHEDULE ID 100 103 104 105 106 107 108 110 111 112 113 114 115 116 117 118 119 120 121 123 124 125 126 127 128 129 130 131 132 133 135 136 137 138 139 140 141 143 144 145 146 148 149 150 151 152 153 154 155 156 157 158 159 160 162 163 164 165 166 167 169 170 171 172 173 174 ROOM NAME VESTIBULE CIRC CIRC CIRC VESTIBULE O2 STG EVS FLR EQ EVS EQP DIRTY OFFICE RADIOLOGY ORTHO/EXAM EXAM STAFF EXAM EXAM EXAM EXAM M MEDS LOBBY CLINICAL EXAM CIRC W EXAM EXAM EXAM EXAM LOBBY CHART CHART CHART EXAM EXAM CIRC EVS EQP EVS STOR STAFF LOUNGE LOCKERS F DIRTY LINEN CLEAN LINEN MECH MAIN SUPPLY FACILITIES RED BAG CIRC LOBBY EXERCISE RECEPTION CIRC OFFICE OPEN OFFICE EXERCISE CIRC THERAPY THERAPY THERAPY THERAPY THERAPY THERAPY STG THERAPY THERAPY EXERCISE WIDTH 3'-6" 3' 3' 3' 6' 3' 3' 3' 3' 3' 4' 4' 4' 3' 4' 4' 4' 4' 3' 3' 3'-6" 3' 4' 6' 3' 3'-6" 3'-6" 4' 4' 3'-6" 3' 3' 3' 3'-6" 3'-6" 6' 3' 3' 3' 3' 3' 3' 3' 3' 3' 3' 3' 4'-6" 3' 3' 3' 3' 3' 3' 3' 3' 4' 4' 4' 4' 4' 4' 3' 4' 4' 3' HEIGHT 6'-9" 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' 7' LEAF THICKNESS 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" MATERIAL ALUM / GLASS SC WOOD SC WOOD SC WOOD SC WOOD HM HM HM HM SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD HM SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD HM HM SC WOOD SC WOOD SC WOOD HM HM HM HM HM HM HM SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD SC WOOD DOOR TYPE --- D A A E A A A A A A A A A A A A A A A D A A E A A A A A D A A A A A E A A A A A A A A A A A --- D A A D A A A D B B B B B B A B B A HARDWARE SET HW-1 HW-2 HW-4 HW-4 HW-7 HW-5 HW-5 HW-5 HW-5 HW-6 HW-3 HW-3 HW-3 HW-3 HW-3 HW-3 HW-3 HW-3 HW-4 HW-5 HW-2 HW-5 HW-3 HW-2 HW-4 HW-3 HW-3 HW-3 HW-3 HW-2 HW-3 HW-3 HW-3 HW-3 HW-3 HW-2 HW-5 HW-5 HW-3 HW-4 HW-4 HW-5 HW-5 HW-5 HW-5 HW-5 HW-5 HW-8 HW-2 HW-6 HW-6 HW-3 HW-6 HW-6 HW-5 HW-6 HW-3 HW-3 HW-3 HW-3 HW-3 HW-3 HW-5 HW-3 HW-3 HW-4 FRAME ALUM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM HM ACCESSORIES CARD READER - - CARD READER CARD READER CARD READER CARD READER CARD READER CARD READER ALT BID CONTIN GEARED HINGE - CARD READER CARD READER CARD READER CARD READER CARD READER CARD READER CARD READER CARD READER CARD READER CARD READER CARD READER CARD READER CARD READER CARD READER CARD READER CARD READER CARD READER ALT BID CARD READER ALT BID CARD READER ALT BID CARD READER ALT BID CARD READER CARD READER CARD READER REMARKS DOOR TYPE F1 COORD LOCKING FUNCTIONS W/ TENANT; TYP COORDINATE W/ TENANT LEAD-LINED; COORD LEAF SIZE W/ EQ RQMTS DOOR TYPE C COORDINATE W/ TENANT COORDINATE W/ TENANT COORDINATE W/ TENANT COORDINATE W/ TENANT TRANSOM; RE: ELEVATIONS TRANSOM; RE: ELEVATIONS TRANSOM; RE: ELEVATIONS TRANSOM; RE: ELEVATIONS TRANSOM; RE: ELEVATIONS TRANSOM; RE: ELEVATIONS TRANSOM; RE: ELEVATIONS TRANSOM; RE: ELEVATIONS 2"RE SCHED 2"2"3'1'-6"2" 7' 2" 7' 2' 2"RE SCHED 2" 7' 2" 2"RE SCHED 2" 8"4" 3' 8" 7' 2" 2"RE SCHED 2" 7' 2" 4"8" 3' 8" 4"8" 3' 8" 9'-9" 10 ' 2" 3' - 1 " 2" 3' - 4 " 2" 7" 2" 2' - 2 " 2" 6 1/2"4'-3"2"4'-3"6 1/2" 5'-7 1/2" 2"4'-11"6 1/2" 2" 3' - 1 " 2" 3' - 4 " 2" 7" 2" 2' - 2 " 2" 10 ' 5'-7 1/2" 6 1/2"3'-8"1'-3"2" 2'-4"2'-6"5' 3' 4' 3' 3' 3' 4' 6' - 9 " 7' - 6 " V E S T I B U L E CE I L I N G H E I G H T SPANDREL GLASS (SG) TEMPERED GLASS LEADED TEMPERED GLASS @ RADIOLOGY. CONFIRM REQMTS W/ CARESTREAM REP ALUM BREAK MTL OVER WD. RE: 3/A5 TYP @ F1, F2, F3 TYPE C TYPE BTYPE E LEAF: SC WOOD FRAME: 5 3/4" HOLLOW METAL HDW: RE SCHED TRIM: NA RATING: NA -INDICATED DOUBLE ACTING DOORS, PROVIDE OPENER & (2) ACTUATORS EA LEAF -SSTL KICKPLATE, EA SIDE EA LEAF LEAF: HOLLOW METAL FRAME: 5 3/4" HOLLOW METAL HDW: RE SCHED TRIM: NA RATING: NA -INCLUDE FLOOR & HEAD FLUSHBOLTS @ SMALL LEAF ONLY LEAF: SC WOOD FRAME: HM HDW: RE SCHED TRIM: NA RATING: NA -SSTL KICKPLATE, EA SIDE HARDWARE GROUPS ID QUANTITY ITEM HW-1 - VESTIBULE DOOR 1 CONTINUOUS GEARED HINGE 1 INTEGRAL CONCEALED OVERHEAD OPENER W/ (2) ACTUATORS; RE ELEC 1 INTEGRAL PANIC DEVICE 1 CYLINDER* 1 WEATHERSTRIP 1 INTEGRAL DOOR SWEEP 1 ALUM SILL (ADA) HW-2 - ACCESS DOORS 1.5 PR BUTT HINGES 1 SURFACE MOUNTED OVERHEAD OPENER W/ (2) ACTUATORS; RE ELEC 2 STAINLESS STEEL KICKPLATES 1 STAINLESS STEEL PUSH PLATE 1 STAINLESS STEEL PULL HW-3 - PASSAGE LOCKSET 1.5 PR BUTT HINGES 1 PASSAGE LOCKSET 1 WALL BUMPER 2 STAINLESS STEEL KICKPLATES HW-4 - PRIVACY LOCKSET 1.5 PR BUTT HINGES 1 PRIVACY LOCKSET* 1 WALL BUMPER 2 STAINLESS STEEL KICKPLATES HW-5 - STORAGE / EQUIPMENT 1.5 PR BUTT HINGES 1 STORAGE LOCKSET* 1 CARD READER 2 STAINLESS STEEL KICKPLATES 1 WALL BUMPER HW-6 - OFFICE 1.5 PR BUTT HINGES 1 OFFICE LOCKSET* 1 CARD READER 1 WALL BUMPER HW-7 - ACCESS DOORS 3 PR BUTT HINGES 2 SURFACE MOUNTED OVERHEAD OPENER W/ (2) ACTUATORS; RE ELEC 2 SURFACE MOUNTED PANIC DEVICE 1 CARD READER 2 CYLINDER* 4 STAINLESS STEEL KICKPLATES 2 STAINLESS STEEL PUSH PLATES 2 STAINLESS STEEL PULLS HW-8 - SERVICE DOORS 3 PR BUTT HINGES 1 CLOSER (@ ACTIVE LARGE LEAF) 1 PASSAGE LOCKSET 1 CARD READER 2 INTEGRAL DOOR SWEEPS 2 WALL BUMPERS 2 FLUSHBOLTS (@ INACTIVE SMALL LEAF) *COORDINATE KEYING OF ALL LOCKSETS AND CARD READERS W/ TENANT TYPE A LEAF: SC WOOD -OR- HM (RE SCHED) FRAME: 5 3/4" HOLLOW METAL HDW: RE SCHED TRIM: NA RATING: NA -LEAD LINED @ RADIOLOGY 113 -SSTL KICKPLATE, EA SIDE -OPENER & (2) ACTUATORS, RE SCHED T TYPE D LEAF: SC WOOD FRAME: 5 3/4" HOLLOW METAL HDW: RE SCHED TRIM: NA RATING: NA -PROVIDE OPENER & (2) ACTUATORS EA LEAF -SSTL KICKPLATE, EA SIDE TTT T TT TTT TT T T SGSGSGSG TYPE F1 LEAF: ALUM/GLAZING FRAME: ALUM HDW: RE SCHED TRIM: NA RATING: NA -COORDINATE OPENER STYLE W/ DOOR SUPPLIER, PROVIDE (2) ACTUATORS TYPE F2TYPE F3 ALUMINUM STOREFRONTALUMINUM STOREFRONT Door Hardware Function The following list shows different door lockset functions. Manufacturers may use various terminology, but these are standard terms. Refer to specific manufacture data prior to specifying types. Locksets that require a key to retract the latch or deadbolt on the inside are not to be used for egress use. Locksets Without a Deadbolt CL Classroom Lockset - The latchbolt is retracted by the grip on either side unless the outside grip is locked by the outside key. CS Classroom Security Lockset - The latchbolt is retracted by the grip on either side unless the outside grip is locked by either the inside key or the outside key. Operating the inside grip always retracts the latchbolt. IL Institutional (Psyciatric) Lockset - The latchbolt is retracted by a key on either side. The grips on both sides are rigid. OL Office Lockset - The latchbolt is retracted by the grip on either side unless the outside grip is locked by the toggle or outside key. Operating the inside grip does not unlock the outside grip. PH Panic Hardware - The emergency release is always available for exiting. PL Passage Lockset - The latchbolt is always retracted by the grip on either side. Both grips are always free. PV Privacy Lockset - The latchbolt is retracted by the grip on either side unless the outside grip is locked by the inside thumb-turn, button, or key. Operating the inside grip unlocks the outside grip. An emergency release tool unlocks the outside grip. Some manufacturers offer models that also unlock the outside grip when the door is closed (i.e. the door can only be locked from the inside if the door is fully closed - locking an open door then closing the door unlocks the outside grip). PR Public Restroom Lockset - The latchbolt is retracted by the inside grip or an outside key. The latchbolt is retracted by the outside grip unless the grip is locked by a key from the inside. The latchbolt / outside grip cannot be locked by a key from the outside. SL Storeroom Lockset - The latchbolt is retracted by the inside grip or outside key. The outside grip is optional, but when provided it is always rigid. DA Door Actuator - ADA and accessibility compliant push pad, coordinate w/ electrical PP Push Plate / Pull - No latch DOOR NOTES ALL STOREFRONT GLASS TO BE 1" INSULATED. TINTED TO MATCH BUILDING SHELL. RADIOLOGY 113 TYPE: FIXED FRAME: HM W/ LEAD LINING HDW: RE SCHED TRIM: NA RATING: NA -COORDINATE GLASS AND FRAME REQUIREMENTS W/ RADIOLOGY EQUIPMENT SUPPLIER (CARESTREAM) RECEPTION 157 (EAST) TYPE: FIXED ALUM FRAME: 4 1/2" ALUM HDW: NA TRIM: NA RATING: NA RECEPTION 157 (SOUTH) TYPE: SLIDER/FIXED ALUM FRAME: 4 1/2" ALUM HDW: SLIDES, LOCKSET TRIM: NA RATING: NA -COORDINATE LOCKING FUNCTION W/ TENANT TTTT 4 1/2" 5 3/4" UNO 2" PARTITION AS SCHEDULED HOLLOW METAL FRAME 14GA, TYP HEAD JAMB UNO 2" 7 " 2 " 4 1/2" FLAT BLACK ALUM BREAK METAL TO MATCH STOREFRONT. PROVIDE 2x WD BLOCKING SUSPENDED CEILING SYSTEM PER RCP HEAD @ STOREFRONT 1 1 1 1/4" = 1'-0" DOORS, WINDOWS & FRAMES 2 3" = 1'-0" DOOR DETAILS 3 3" = 1'-0" SECTION @ STOREFRONT OFFICE STORAGE CIRC CHART CHART CHART VESTIBULE VESTIBULELOBBY 000000_EPMC TI master.pln; A5 DOOR SCHEDULE; 100% 11/11/2019 Reviewed by SAFEbuilt 12/04/2019 BAS1S.com A6 Sheet No: 303.848.3740 Sheet Title: Date: Architecture, P.C. Issue: © BASIS REFLECTED CEILING PLAN T e n a n t I m p r o v e m e n t f o r : Es t e s P a r k H e a l t h 42 0 S t e a m e r D r i v e , S u i t e 1 0 1 Es t e s P a r k , C O - 11/11/2019 ADDENDUM 01 A R C H I T E C T U R E P. C. Es t e s P a r k , C o l o r a d o 8 0 5 1 7 16 9 2 B i g T h o m p s o n A v e n u e , S u i t e 1 0 0 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 R 04'8' 16' IC E R R R R FEC STAFF LOUNGE 144 O2 STG 107 M 121 MEDS 123 CIRC 124 VESTIBULE 106 VESTIBULE 100 W 104 M 105LOBBY 101 RECEPTION 102 CIRC 103 EVS FLR EQ 108 CIRC 109 EVS EQP 110 DIRTY 111 OFFICE 112 RADIOLOGY 113 ORTHO/EXAM 114 EXAM 115 STAFF 116 EXAM 117 EXAM 118 EXAM 119 EXAM 120 NURSE'S STATION 122 CLINICAL EQUIP 125 EXAM 126 CIRC 140 LOCKERS 145F 146 CIRC 147 MECH 150 CLEAN LINEN 149 DIRTY LINEN 148 MAIN SUPPLY 151 RED BAG 153 FACILITIES 152 CIRC 154 CIRC 155 OFFICE 156 EXERCISE 175 OPEN OFFICE 160 RECEPTION 157 CIRC 163 THERAPY 164 THERAPY 165 THERAPY 166 THERAPY 167 THERAPY 169 THERAPY 170 STG 171 CIRC 168 THERAPY 172 THERAPY 173 F 174 CIRC 127 W 128 EXAM 129 EXAM 130 EXAM 131 EXAM 132 CIRC 133 NURSE'S STATION 134 CHART 135 CHART 136 CHART 137 EXAM 138 EXAM 139 EVS EQP 141 EVS STOR 142 IT 143 OFFICE 159 CIRC 158 CIRC 161 STORAGE 162 321 4 5 6 7 8 9 10 A B C D.4 E D A.5 FEC FE C FE C F F F 8'-0" 8'-0" 8'-0"8'-0" 8'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 8'-0"8'-0" 8'-0" 8'-0" 8'-0" 9'-0" TYP UNO 7'-6" OS OS OS OS OS OS OS OS OS OS OS OS OS OS OS OS OS PE PE 8" 2' - 6 " 1' - 1 1 3 / 4 " 10' CH 10' CH10' CH 10' CH RTU OPENING 10' CH FC SOFFIT 10' CH 3 3 2 2 1 1 4 4 5 5 6 6 7 7 8 8 9 9 10 10 AA A.6 BB CC D.4D.4 EE DD A.5A.5 2 1/16" = 1'-0" SHELL RCP 1" RE : RC P SUSPENDED CEILING SYSTEM PER RCP CONT GYPBD 8" ABOVE CEILING HANG BULKHEAD FROM DECK ABOVE AND BRACEPARTITION AS SCHEDULED 1 1 1 1 1 1/8" = 1'-0" REFLECTED CEILING PLAN 3 1" = 1'-0" TYP SOFFIT MEDICAL ILLUMINATION; CEILING MOUNTED EXAM LIGHT, RE: ELEC GYP BD TO UNDERSIDE OF DECK ABOVE @ PARTITIONS INDICTED THUS REFLECTED CEILING NOTES 1. REFER TO FLOOR PLANS FOR ROOM NAMES AND NUMBERS. 2. ALL REFLECTED CEILING PLAN DIMENSIONS ARE FROM FINISHED FACE TO FINISHED FACE. 3. ALL CEILING GRIDS ARE CENTERED ON ROOM OR CORRIDOR, UNO. 4. ALL FIXTURES SHOWN AT CEILING GRID TO BE CENTERED IN BOTH DIRECTIONS WITHIN THE TILE. CENTER ALL CEILING MOUNTED ITEMS WITHIN CEILING ELEMENTS, IN GYPSUM BOARD SOFFITS, AND BETWEEN OTHER CEILING MOUNTED FIXTURES. 5. COORDINATE ACCESS PANEL LOCATIONS WITH LOCATIONS OF OTHER CEILING MOUNTED ITEMS. 6. REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FOR FIXTURE TYPES. 7. EMERGENCY LIGHTING SHALL REMAIN FUNCTIONAL DURING AND AFTER CONSTRUCTION. 8. REFER TO DETAIL FOR TYPICAL GYP.BD. CONTROL JOINT LAYOUT 9. PARTITIONS WITHOUT ADJACENT CEILINGS SHALL EXTEND TO STRUCTURE UNO. 12. EXIT SIGNAGE MUST BE TACTILE PER IBC 1011.3.SPRAY-APPLIED FIRE-PROOFING SPRAY-APPLIED FIRE-PROOFING 000000_EPMC TI master.pln; A6 REFLECTED CEILING PLAN; 100% 11/11/2019 Reviewed by SAFEbuilt 12/04/2019 P FS W H S S DRAWING TITLE MECHANICAL LEGEND & NOTES KEY: FULL SHEET ISSUE. PARTIAL SHEET ISSUE (SKETCH). M0.1 DRAWING NUMBER 8. 1 5 . 2 0 1 9 - 5 0 % C D THE DRAWINGS AND SPECIFICATIONS FOR THIS PROJECT ARE COPYRIGHT 2019, PCD ENGINEERING SERVICES, INC., WHICH SHALL RETAIN ALL RIGHTS OF OWNERSHIP AND COPYRIGHT FOR THE INFORMATION AND DATA DESCRIBED HEREIN, WHETHER IN HARDCOPY OR ELECTRONIC FORMAT. THESE DOCUMENTS MAY NOT BE BID, REPRODUCED, OR COPIED FOR USE ON ANY OTHER PROJECT WITHOUT WRITTEN PERMISSION FROM PCD ENGINEERING SERVICES INC. MECHANICAL SCHEDULESM0.3 MECHANICAL FIRST FLOOR EAST PLANM1.1 ISSUE DATE - DESCRIPTION MECHANICAL NOTES & DETAILSM0.2 MECHANICAL DRAWING INDEXSPECIFICATION GENERAL NOTES M U.C. SIZE CO T XXX CO2 H XXX A # X # CFM (QUANTITY) } 20/16 DIFFUSER NECK SIZE THROW BLOCKINGFLEX RIGID DUCT DIFFUSER I.D. SOD RDL ORDL GW IW RS RL PC LPS MPS MPC LPC HPS HPC FOV FOR FOS DIDIC F CWR CWS CS CHS A SYMBOL ABBREVIATION DESCRIPTION DUAL TEMPERATURE RETURNCHR DUAL TEMPERATURE SUPPLYCHS CHILLED WATER RETURNCR CHILLED WATER SUPPLYCS CONDENSER WATER RETURNCWR CONDENSER WATER SUPPLYCWS HEATING WATER RETURNHWR HEATING WATER SUPPLYHWS HIGH PRESSURE CONDENSATEHPC HIGH PRESSURE STEAMHPS LOW PRESSURE CONDENSATELPC LOW PRESSURE STEAMLPS MEDIUM PRESSURE CONDENSATEMPC MEDIUM PRESSURE STEAMMPS PUMPED CONDENSATEPC REFRIGERANT LIQUIDRL REFRIGERANT SUCTIONRS DOMESTIC COLD WATERCW DOMESTIC HOT WATERHW DOMESTIC HOT WATER CIRCULATIONHWC AIR PIPING (COMPRESSED)A DRAIND DE-IONIZED WATERDIDE-IONIZED WATER CIRCULATIONDIC FUEL OIL RETURNFOR FUEL OIL SUPPLYFOS FUEL OIL VENTFOV GASG REFRIGERANT DISCHARGERD FIREF GREASE WASTEGW MEDICAL AIRMA NITROGENN OVERFLOW ROOF DRAIN LEADERORDL OXYGENOXY ROOF DRAIN LEADERRDL SANITARY WASTESAN SAND AND OIL DRAINSOD STORMST VACUUMVAC VENTV WASTEW TO BE DEMOLISHED(D) DEMO EXISTING (LIGHT LINE)(E) NEW (HEAVY LINE)(N) SYMBOL DESCRIPTION PIPE UP AND DOWN ELBOW PIPE DOWN TEE PIPE UNION AND CAP PIPE CONTINUATION BALL VALVE, GATE VALVE MOTORIZED VALVE - 2-WAY MOTORIZED VALVE - 3-WAY PRESSURE REDUCING VALVE PIPE REDUCER CHECK VALVE BUTTERFLY VALVE, GLOBE VALVE BALANCE VALVE STRAINER HOSE-END DRAIN VALVE STRAINER WITH BLOW-OFF VENTURI GAS COCK PUMP DUAL CHECK BACKFLOW PREVENTOR REDUCED PRESSURE BACKFLOW PREVENTOR PRESSURE-TEMPERATURE TAP PRESSURE-TEMPERATURE RELIEF VALVE AIR VENT PIPE GUIDE OR SLEEVE PIPE EXPANSION JOINT PIPE ANCHOR VACUUM RELIEF VALVE THERMOMETER PRESSURE GAUGE FLOW SENSOR SYMBOL FLOOR DRAIN FLOOR SINK-FULL-3/4-HALF GRATE DRAIN ABOVE ROOF DRAIN ROOF DRAIN - OVERFLOW DOWNSPOUT NOZZLE CLEANOUT - VERTICAL CLEANOUT - HORIZONTAL WALL HYDRANT, HOSE BIBB SMOKE DETECTOR DUCT ELBOW WITH TURNING VANE DUCT TEE WITH TURNING VANES DUCT SIZE INDICATING SHEET METAL DIMENSIONS. FIRST NUMBER WIDTH AND SECOND IS DEPTH (INCHES). MANUAL DAMPER WITH LOCKING QUADRANT. MOTORIZED DAMPER FLEXIBLE DUCT CONNECTOR SPIN-IN FITTING WITH DAMPER 45° DUCT TAKE-OFF DOOR UNDERCUT FIRE DAMPER FIRE AND SMOKE DAMPER SMOKE DAMPER EXISTING FIRE DAMPER SUPPLY DIFFUSER NOTE: NOT ALL SYMBOLS ON THIS LEGEND ARE NECESSARILY USED ON THIS PROJECT. RETURN OR TRANSFER GRILLE CONNECTION NEW TO EXISTING CARBON MONOXIDE SENSOR THERMOSTAT OR TEMPERATURE SENSOR FOR DEVICE "XXX" DESCRIPTION ABOVE FINISHED FLOORAFF RECTANGULAR RETURN AIR DUCT UP RECTANGULAR SUPPLY AIR DUCT UP ROUND DUCT UP INDIRECT WASTEIW EXHAUST GRILLE RECTANGULAR EXHAUST AIR DUCT UP CARBON DIOXIDE SENSOR ABOVE FINISHED GRADEAFG PIPE FLOW DIRECTION (SHOWN TO RIGHT) ELECTRICAL CONTRACTOREC GENERAL CONTRACTORGC MECHANICAL CONTRACTORMC PLUMBING CONTRACTORPC SNOW MELT SUPPLYSMS SNOW MELT RETURNSMR ENGINEER OF RECORDEOR HUMIDISTAT OR HUMIDITY SENSOR FOR DEVICE "XXX" EXISTING RETURN AIR DEVICEER EXISTING SUPPLY AIR DEVICEES RR RS RT EXISTING TRANSFER AIR DEVICEET RELOCATED RETURN AIR DEVICE RELOCATED SUPPLY AIR DEVICE RELOCATED TRANSFER AIR DEVICE MECHANICAL LEGEND W V VAC ST SAN SMS SMR O N D MA G RD HWS HWR CR CHR GENERAL NOTES: A. REVIEW THE CONTRACT CONDITIONS AND GENERAL REQUIREMENTS FOR INFORMATION THAT APPLIES. B. THE WORD "PROVIDE" IS USED TO MEAN "FURNISH AND INSTALL." C. PROVIDE ALL ITEMS FOR A COMPLETE AND SUCCESSFUL OPERATION OF ALL SYSTEMS SHOWN ON THESE DRAWINGS. D. THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF THE WORK. LOCATIONS ARE APPROXIMATE UNLESS DIMENSIONED. MINOR MODIFICATIONS IN LOCATION TO MEET SITE REQUIREMENTS ARE ACCEPTABLE. REFER TO LATEST ARCHITECTURAL DRAWINGS FOR EXACT WALL LOCATIONS AND DIMENSIONS. E. THE ARCHITECTURAL AND ENGINEERING DRAWINGS ARE COMPLEMENTARY. GENERAL CONTRACTORS, SUBCONTRACTORS, AND VENDORS SHALL ACKNOWLEDGE ALL THE ARCHITECTURAL AS WELL AS ALL THE ENGINEERING DRAWINGS AND INCLUDE ALL WORK NECESSARY TO ACHIEVE A COMPLETE WORKING INSTALLATION FOR ALL DEVICES OR EQUIPMENT WHICH MAY BE SHOWN ON ONE DRAWING BUT NOT SHOWN ON ANOTHER. WHERE ELEMENTS ARE INDICATED OR DESCRIBED IN ANY DRAWING, IT IS THE INTENT THAT ALL RELATED CONSTRUCTION ASSOCIATED WITH SUCH ELEMENTS IS TO BE INCLUDED IN ORDER TO OBTAIN A COMPLETE INSTALLATION. FOR INSTANCE, IF A PIECE OF EQUIPMENT IS IDENTIFIED IN THE ARCHITECTURAL AND/OR MECHANICAL DRAWINGS, BUT THE ELECTRICAL CIRCUIT FOR SUCH EQUIPMENT IS NOT IDENTIFIED IN THE ELECTRICAL DRAWINGS, THE CONTRACTOR IS TO PROVIDE SUCH CIRCUIT IN ORDER TO HAVE FULLY OPERATIONAL EQUIPMENT. FOR ANOTHER EXAMPLE, IF A SINK IS INDICATED, IT IS THE INTENT THAT RELATED PLUMBING WORK INCLUDING DRAINS, VENT, PIPING, VALVES, ETC. ARE TO BE INCLUDED IN ORDER TO RESULT IN A FULLY OPERATIONAL SYSTEM. NO SUBCONTRACTOR SHALL BE ALLOWED TO EXCLUDE PORTIONS OF THE COMPLIMENTARY DRAWING SET. F. LAY OUT ALL WORK IN ADVANCE. DO NOT DEFACE THE WORK OF OTHER TRADES OR THE EXISTING BUILDING. G. LOCATION OF PIPES, DUCTS, SWITCHES, PANELS, EQUIPMENT, AND FIXTURES SHALL BE ADJUSTED TO ACCOMMODATE THE WORK OR INTERFERENCES ANTICIPATED AND ENCOUNTERED. DETERMINE THE EXACT ROUTE AND LOCATION OF EACH PIPE AND DUCT PRIOR TO FABRICATION. G.A. RIGHT-OF-WAY: LINES WHICH PITCH SHALL HAVE THE RIGHT-OF-WAY OVER THOSE WHICH DO NOT PITCH. LINES WHOSE ELEVATIONS CANNOT BE CHANGED SHALL HAVE THE RIGHT-OF-WAY OVER LINES WHOSE ELEVATIONS CAN BE CHANGED. G.B. OFFSETS, TRANSITIONS, AND CHANGES IN DIRECTION: OFFSETS, TRANSITIONS, AND CHANGES IN DIRECTION OF PIPES AND DUCTS SHALL BE MADE AS REQUIRED TO MAINTAIN PROPER HEADROOM AND PITCH OF SLOPING LINES WHETHER OR NOT INDICATED ON THE DRAWINGS. G.C. FURNISH AND INSTALL ALL TRAPS, AIR VENTS, SANITARY VENTS, AND DEVICES AS REQUIRED TO EFFECT THESE OFFSETS, TRANSITIONS, AND CHANGES IN DIRECTION. H. ALL PENETRATIONS OF FIRE RATED WALLS, FLOORS, AND CEILINGS SHALL HAVE THE SPACE AROUND PENETRATIONS SEALED WITH A FIRE BARRIER SEALANT MEETING THE REQUIREMENTS OF U.L. STANDARD 1479 AND ASTM-E 814. INSTALL SEALANT IN FULL COMPLIANCE WITH MANUFACTURER'S STANDARD INSTALLATION INSTRUCTIONS. I. ALL MATERIALS LOCATED ABOVE CEILING SHALL BE SUITABLE FOR USE WITHIN A RETURN AIR PLENUM AS REQUIRED BY THE ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL CODE. J. WHEN USING A TORCH OR OTHER FLAME-PRODUCING DEVICE ON THIS PROJECT, CONTRACTOR SHALL PROVIDE ONE APPROVED FIRE EXTINGUISHER OR WATER HOSE EQUIPPED WITH A SUITABLE NOZZLE, SUFFICIENT IN LENGTH TO REACH ALL PORTIONS OF THE BUILDING AND CONNECTED TO A WATER SUPPLY ON THE PREMISES WHERE SAID BURNING OPERATION IS PERFORMED. COMBUSTIBLE MATERIAL IN THE CLOSE PROXIMITY OF OPEN FLAME SHALL BE PROTECTED AGAINST IGNITION BY SHIELDING, WETTING, OR OTHER MEANS. IN ALL CASED, A FIRE WATCH SHALL BE MAINTAINED IN THE VICINITY OF THE OPERATION BY THE CONTRACTOR FOR ONE-HALF HOUR AFTER THE TORCH OR FLAME-PRODUCING DEVICE HAS BEEN USED. K. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING THE PROJECT AND TAKE INTO CONSIDERATION CONDITIONS THAT MAY AFFECT THE WORK. NO ADDITIONAL COMPENSATION WILL BE APPROVED FOR FAILURE TO VISIT THE SITE PRIOR TO PRICING THE WORK. L. MAINTAIN A CONTRACT SET OF THESE DRAWINGS AT THE SITE, WITH ALL CHANGES OR DEVIATIONS FROM THE ORIGINAL DRAWINGS NEATLY MARKED ON THEM IN RED COLOR. THIS SHALL BE A SEPARATE SET OF DRAWINGS NOT USED FOR CONSTRUCTION PURPOSES, WHICH SHALL BE KEPT UP TO DATE AS THE JOB PROGRESSES AND SHALL BE MADE AVAILABLE FOR INSPECTION BY THE ENGINEER AT ALL TIMES. UPON COMPLETION OF THE CONTRACT, THIS SET OF "AS-BUILTS" SHALL BE DELIVERED TO THE ENGINEER WITHIN 15 DAYS OF COMPLETION OF THE PROJECT. M. MATERIAL SHALL BE AS SPECIFIED. SUBSTITUTIONS WILL BE CONSIDERED IF SUBMITTED FOR PRIOR APPROVAL AT LEAST ONE (1) WEEK PRIOR TO THE CONTRACT BID DATE. SUBSTITUTIONS SHOULD BE SUBMITTED SEPARATELY FOR EACH PRODUCT WITH SUPPORTING DATA, DRAWINGS AND SAMPLES AS APPROPRIATE, INCLUDING: 1.) COMPARISON OF THE QUALITIES OF THE PROPOSED SUBSTITUTION WITH THAT SPECIFIED. 2.) CHANGES REQUIRED IN OTHER ELEMENTS OF THE WORK BECAUSE OF THE SUBSTITUTION. 3.) COST DATA COMPARING THE PROPOSED SUBSTITUTION WITH THE PRODUCT SPECIFIED. THE ENGINEER WILL DETERMINE THE ACCEPTABILITY OF THE PROPOSED SUBSTITUTION. N. SUBMIT ELECTRONIC PDF OF MANUFACTURER'S SHOP DRAW INGS FOR EQUIPMENT AND DEVICES. PRIOR TO SUBMITTING THE SHOP DRAWINGS FOR REVIEW, THE CONTRACTOR SHALL REVIEW AND CERTIFY SAME AS TO COMPLIANCE WITH THE PLANS AND SPECIFICATIONS AND FOR DIMENSIONAL SUITABILITY FOR THE APPLICATIONS. O. WHEN ALTERNATE OR SUBSTITUTED EQUIPMENT IS USED, CONTRACTOR IS RESPONSIBLE FOR COORDINATING S PACE REQUIREMENTS, CONFIGURATIONS, CHANGES IN SUPPORTS OR STRUCTURAL MEMBERS, ELECTRICAL REQUIREMENTS, AND COORDINATION OF OTHER TRADES THAT MAY BE AFFECTED BY THEIR USE. CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE SAME WHEN USING LISTED APPROVED MANUFACTURERS OTHER THAN THE BASIS OF DESIGN. P. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND PERSONNEL REQUIRED FOR TESTING OF INSTALLED EQUIPMENT. Q. THE CONTRACTOR SHALL DEMONSTRATE THE PROPER OPERATION AND CALIBRATION OF ALL SYSTEMS TO THE OWNER, AT A TIME AS AGREED TO BY THE OWNER AND DIRECTED BY THE OWNER. R. THE CONTRACTOR SHALL PROVIDE THE OWNER WITH OPERATION AND MAINTENANCE MANUALS FOR ALL SYSTEMS WITHIN 15 DAYS OF THE COMPLETION OF THE PROJECT. S. THE CONTRACTOR SHALL INCLUDE THE COST FOR COMMISSIONING TO VERIFY THE PERFORMANCE OF THE SYSTEM CONTROLS SHOWN ON THIS DRAWING. THIS INCLUDES PREPARING A COMMISSIONING PLAN, VERIFYING THE OPERATION OF ALL SYSTEMS PER CODE REQUIREMENTS, AND PROVIDING A FINAL COMMISSIONING REPORT. SUBMIT TO ENGINEER FOR REVIEW. FINAL COMMISSIONING REPORT IS DUE WITHIN 90 DAYS OF COMPLETION OF THE PROJECT. CODES, REGULATIONS, AND STANDARDS: 1. ALL WORK SHALL BE IN STRICT ACCORD WITH LOCAL GOVERNING LAWS, ORDINANCES, AND REGULATIONS; ALL WORK MUST BE IN FULL ACCORDANCE WITH ALL CODES, ORDINANCES, AND CODE RULINGS. CONTRACTOR SHALL PROVIDE, WITHOUT EXTRA CHARGE, THE LABOR AND MATERIALS REQUIRED FOR FULL CODE COMPLIANCE. 2. ALL MATERIALS SHALL BE NEW AND SHALL COMPLY WITH THE SPECIFICATIONS ON DRAWINGS. 3. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LOCAL FEES, PERMITS, AND SERVICES OF INSPECTION AUTHORITIES REQUIRED BY THE WORK OF THE PROJECT. THE CONTRACTOR SHALL ARRANGE FOR ALL INSPECTIONS WHEN THEY BECOME DUE AND SHALL NOT COVER NEW WORK UNTIL APPROVED BY THE INSPECTION AUTHORITY. GUARANTEE: A. THE CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP, MATERIALS, AND EQUIPMENT PROVIDED FOR THE PROJECT AGAINST DEFECTS AND/OR FAULTY WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER. B. THE CONTRACTOR SHALL REPAIR AND/OR REPLACE DEFECTIVE OR FAULTY WORKMANSHIP, MATERIALS, OR EQUIPMENT, AND SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF OTHER PROPERTY OR WORK DAMAGED AS A RESULT, WITHOUT CHARGE TO THE OWNER AND AS QUICKLY AS POSSIBLE, DURING THE GUARANTEE PERIOD. DISCIPLINE EDITION INTERNATIONAL BUILDING CODEGENERAL 2015 CODE INTERNATIONAL MECHANICAL CODEHVAC / MECHANICAL 2015 INTERNATIONAL PLUMBING CODEPLUMBING 2015 NATIONAL ELECTRIC CODEELECTRICAL 2017 INTERNATIONAL FIRE CODE 2015 NFPA STANDARDS FIRE PROTECTION CURRENT INTERNATIONAL FUEL GAS CODEFUEL 2015 INTERNATIONAL ENERGY CONSERVATION CODEENERGY 2015 ICC/ANSI A117.1ACCESSIBILITY 2009 NOTES: A.ALL WORK PERFORMED SHALL COMPLY WITH THE REQUIREMENTS OF THE LISTED CODES, LOCAL CODE AMENDMENTS, AND REFERENCED STANDARDS AS ENFORCED BY THE AUTHORITY HAVING JURISDICTION (AHJ). B.ALL WORK SUBJECT TO INSPECTION BY THE AHJ AT THE PROJECT SITE FOR COMPLIANCE. TOWN OF ESTES PARKLOCAL AMMENDMENTS 2015 BUILDING CODE DATA MECHANICAL CONTROLSM0.4 10 . 9 . 2 0 1 9 - P E R M I T MECHANICAL FIRST FLOOR WEST PLANM1.2 MECHANICAL SECOND FLOOR PARTIAL PLAN & VENT CALCSM2.1 11 . 1 1 . 2 0 1 9 - A D D E N D U M 1 ( D E L T A 1 ) COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 M0.1 ME C H A N I C A L L E G E N D & N O T E S EJ DO 19022 11/11/2019 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 SCALE: SCALE: SCALE: SCALE: SCALE:SCALE: SCALE: SCALE: RS RL REFRIGERANT PIPE SUPPORT AT WALL DUCT TAKE-OFF DETAIL - ROUND VARIABLE AIR VOLUME BOX DETAIL RETURN GRILLE SOUND BOOT DETAIL CEILING EXHAUST FAN DETAIL FAN COIL UNIT DETAIL-WALL MOUNTED FAN POWERED BOX DETAIL CONDENSING UNIT ROOF PLATFORM DETAIL NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE NO SCALE SLEEVE. 16 GAUGE GALVANIZED BUILDING COLOR TO MATCH SILICONE SEALANT. OPENINGS WITH SEAL AROUND ALL (TYPICAL) 4" X 4" X 1/4" ANGLE EXPANSION BOLTS. ANCHORED TO STRUCTURE WITH 3/8"X3" CLAMP ASSEMBLY SUCTION LINE THRU RUN INSULATION OF CLAMP OR EQUAL WELD BOTH SIDES OR EQUAL "UNISTRUT" P-3300 1-5/8" WITH "UNISTRUT" PIPE PIPING TO SUPPORTS SECURE REFRIGERANT LIQUID LINE SIMILAR NOTE: INSULATION FACE BRICK SUCTION LINE RECTANGULAR DUCT SEAL DUCT WITH GASKET AND/OR DUCT SEALING MASTIC, TYPICAL RE T U R N A I R F L O W D I R E C T I O N SU P P L Y A I R F L O W D I R E C T I O N MANUAL BALANCING DAMPER WITH LOCKING QUADRANT HANDLE, TYPICAL CONICAL SPIN-IN FITTING 45-DEGREE TAKE-OFF FITTING SHEET METAL DUCT, TYPICAL DUCT WRAP CONTINUOUS TO MAIN WHERE REQUIRED FLEXIBLE DUCT, 5-FEET MAXIMUM LENGTH, TYPICAL STAINLESS STEEL WORM DRIVE CLAMP, TYPICAL OR 5 FEET OF LINED RECTANGULAR SUPPLY AIR DUCT, MINIMUM SUPPORT BOX FROM STRUCTURE, TYPICAL CONTROL BOX ON AN ACCESSIBLE SIDE 3X DUCT DIAMETER OF STRAIGHT SUPPLY AIR DUCT INTO BOX, MINIMUM D (MINIMUM)D (NECK SIZE) 2/3 (D) 6" MIN. HARD CEILING LAY-IN CEILINGRETURN GRILLE OPEN END 1" FIBERGLASS DUCTBOARD OR SHEET METAL WITH 1/2" DUCT LINER SHEET METAL SUPPORT STRAP SUPPORT FROM STRUCTURE, TYPICAL SUPPORT FROM CONSTRUCTION BACKDRAFT DAMPER FLEXIBLE CONNECTIONEXHAUST FAN ADJUSTABLE FLANGE GRILLECEILING RUBBER GROMMET EXHAUST DUCT CONDENSATE DRAIN, PROVIDE WITH OPTIONAL CONDENSATE PUMP, SEE PLUMBING PLANS FOR ROUTING WALL DOOR TRIM REFRIGERANT LINESETS SIZED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS, SEE MECHANICAL PLANS FOR ROUTING CEILING MIN. 3-1/2" MIN. 1-1/4" 5 FEET OF LINED RECTANGULAR SUPPLY AIR DUCT, MINIMUM SUPPORT BOX FROM STRUCTURE, TYPICAL CONTROL BOX ON AN ACCESSIBLE SIDE, MINIMUM 36" CLEARANCE 1" PLEATED FILTER IN RACK WITH CLEARANCE FOR CHANGING IT FLEXIBLE DUCT CONNECTION, TYPICAL SECONDARY AIR - DUCT IF INDICATED ON PLANS PRIMARY AIR - 3X DUCT DIAMETER OF STRAIGHT SUPPLY AIR DUCT INTO BOX, MINIMUM LINED RETURN AIR BOOT R RHEOSTAT ON SIDE OF FAN FOR BALANCING COUNTER-FLASHING ROOF INSULATION ROOF STRUCTURE MINIMUM ROOF CURB HEIGHT 24" (3) LAYERS OF 5/8" TYPE X DRYWALL & 1" THICK DUCT BOARD FOR SOUND ATTENUATION 3/4" CDX PLYWOOD 16 GAUGE GALVANIZED SHEET METAL COVER WITH BEVELED EDGERUBBER WASHER BOLT CU TO CURB DECK LAG BOLT DECK TO CURB AT CORNERS AND 18" O.C. MAX. CONDENSING UNIT (CU) ELECTRICAL THRU SIDE OF CURB AND DOWN THRU ROOF UNDER CURB SEAL WATERTIGHT REFRIGERANT PIPING TO COOLING COIL CONTINUOUS NEOPRENE PAD 2x6 BRACING AT 24" O.C. 2" X 1/8" STEEL ANGLE AT EACH CORNER, BOLTED TO 2X12'S ROOF SURFACE (2) 2X12 TREATED DIMENSIONAL LUMBER FLASHING 1. THE NEW MECHANICAL SYSTEMS SHALL BE BY THE MECHANICAL CONTRACTOR. THIS INCLUDES, BUT IS NOT LIMITED TO: 1.1. THE AIR DISTRIBUTION SYSTEMS WITH: AIR HANDLING EQUIPMENT, DUCTWORK, FLEXIBLE DUCT, DIFFUSERS, GRILLES, DAMPERS, CONTROL SYSTEMS, ETC. 2. CONTRACTOR SHALL SECURE THE SERVICES OF AN INDEPENDENT TEST, ADJUST, AND BALANCE CONTRACTOR WHO IS A MEMBER OF THE NEBB OR EQUIVALENT. FOLLOWING ALL TAB WORK, SUBMIT TEST RESULTS IN A BOUND MANUAL, STAMPED AND SIGNED BY A CERTIFIED BALANCING SUPERVISOR OR REGISTERED PE ON STAFF WITH TAB CONTRACTOR. REQUIRED FINAL AIR AND HYDRONIC BALANCE TOLERANCE SHALL BE +10% TO -5% OF QUANTITIES SHOWN ON THESE PLANS. 3. PROJECT DESIGN CONDITIONS ARE: 3.1. LOCATION: ESTES PARK, COLORADO, LARIMER COUNTY. 3.2. SITE ELEVATION: 7,525 FEET. 3.3. HVAC DESIGN CONDITIONS PER PER CHVAC LOAD PROGRAM WHICH MEETS OR EXCEEDS ASHRAE 99% HEATING, 1% COOLING ARE: 3.3.1. LOCATION USED FOR CONDITIONS: ESTES PARK, CO. 3.3.2. HEATING OUTDOOR DB: -7 DEGREES FAHRENHEIT. 3.3.3. COOLING OUTDOOR DB/MCWB: 85/58.1 DEGREES FAHRENHEIT. 3.3.4. INDOOR DESIGN TEMPERATURES AS STATED IN THE TEMPERATURE CONTROLS INFORMATION. 4. IDENTIFY ALL HVAC AND REFRIGERATION EQUIPMENT AS TO THE AREA SERVED BY THE EQUIPMENT. IDENTIFICATION SHALL BE ENGRAVED PLASTIC TAGS PERMANENTLY AFFIXED TO EACH PIECE OF EQUIPMENT. 5. PROVIDE UL RATED FIRE OR FIRE/SMOKE DAMPERS WHERE INDICATED ON PLANS OR SCHEDULES. INSTALL PER BUILDING DEPARTMENT, UL, AND SMACNA REQUIREMENTS. INCLUDE LABELED ACCESS FOR DUCT AND CEILING/WALL STRUCTURES. ACCESS DOORS TO BE UL RATED IN ALL FIRE RATED ARCHITECTURAL ASSEMBLIES. 7. PROVIDE ALL CURBS, SUPPORTS, AND ANCHORS FOR MECHANICAL WORK. NO CHAIN, TAPE OR WIRE MAY BE USED FOR HANGING OR SUPPORTING. 8. RECEIVE, UNCRATE, ASSEMBLE, AND INSTALL ALL EQUIPMENT FURNISHED BY THIS CONTRACT AND FURNISHED BY THE OWNER IN CONFORMANCE TO MANUFACTURER'S RECOMMENDATIONS. 9. DUCT DIMENSIONS ARE CLEAR INSIDE DIMENSIONS. OVERALL OUTSIDE DUCT DIMENSIONS SHALL BE ADJUSTED TO ALLOW FOR LINER THICKNESS. 10. ALL SHEET METAL TO BE MADE AND INSTALLED TO SMACNA STANDARDS (AND IN ACCORDANCE WITH THE INTERNATIONAL MECHANICAL CODE) WITH 45 DEGREE MAXIMUM REDUCING, 30 DEGREE MAXIMUM EXPANDING TRANSITIONS. ALL EXPOSED RECTANGULAR TO BE PAINT LOCK GALVANIZED. SINGLE BLADE TURNING VANES AND 1.5 CENTERLINE RADIUS FOR ALL ELBOWS AND TEES. HVAC SUPPLY AND RETURN RECTANGULAR DUCTS TO HAVE 1" THICK 2 LB/CF DENSITY ACOUSTIC DUCT LINER MINIMUM R-5 CLASS I, UL-181. 11. OUTSIDE AIR DUCTS TO HAVE R-8 1-1/2" THICK AND 1-1/2 LB/CF DENSITY UL 181 CLASS ONE FIBERGLASS DUCT WRAP. 12. DUCT LINER SHALL BE ATTACHED WITH STIC-CLIPS 15"OC EACH WAY AND 100% COVERAGE OF FLAME PROOF ADHESIVE. INCREASE DUCT TO ALLOW FOR LINER. SEAL ALL DUCT AIRTIGHT WITH TWO COATS OF DUCT SEALANT. DUCT SEALANT TO BE CLEAR PAINTABLE SILICON CAULK ON ALL EXPOSED DUCTWORK. 13. CAULK ALL DUCT JOINTS AND SEAMS AIR AND WATER TIGHT WITH PERMANENT COMMERCIAL CAULK PER MANUFACTURER'S RECOMMENDATIONS. 14. CONCEALED ROUND SUPPLY DUCTS SHALL BE LOW-PRESSURE CONSTRUCTION, SEALED AIRTIGHT AND EXTERNALLY INSULATED WITH 1-1/2", 3/4 LB/CF DENSITY BLANKET INSULATION WITH FOIL SCRIM KRAFT FACING. FOIL TAPE ALL JOINTS, MINIMUM R5 FIBERGLASS. 15. EXPOSED ROUND DUCTS SHALL BE PAINT LOCK SPIRAL ONE GAGE HEAVIER THAN SMACNA STANDARD. HARD PIPE TO DIFFUSERS (NO FLEX) AND SEAL WITH CLEAR, PAINTABLE, SILICONE CAULK. 16. ALL FLEXIBLE DUCTWORK SHOWN SHALL BE INSULATED, CLASS I, UL 181, SEMI-RIGID FLEXIBLE DUCT. R4.2 FLEXMASTER 5M OR THERMOPILEX XMK, AND SHALL CONFORM TO LOCAL CODES. NO FLEX DUCT IN EXPOSED AREAS. 17. ALL FLEXIBLE DUCT TAKEOFFS SHALL BE CONICAL BELL MOUTH SPIN-IN FITTINGS WITH MANUAL VOLUME DAMPER WHERE POSSIBLE. MAKE CONNECTION WITH DRAW BANDS AT EACH END OF FLEX. 18. ALL FLEXIBLE DUCT TO BE SAME SIZE AS DIFFUSER CONNECTION. 19. LIMIT FLEXIBLE DUCTWORK TO 5-FT MAXIMUM LENGTH. 20. THIS CONTRACTOR SHALL COORDINATE ALL DUCTWORK PRIOR TO INSTALLATION. 21. WEATHERPROOF ALL MECHANICAL ROOF PENETRATIONS PER CODES AND ALL ROOFING MANUFACTURER RECOMMENDATIONS. 22. PROVIDE SMOKE DETECTORS IN RETURN DUCT FOR MECHANICAL SYSTEMS OVER 2000 CFM (INDIVIDUALLY OR COLLECTIVELY IN A SHARED RETURN AIR PLENUM) AS REQUIRED BY SECTION 606 OF THE INTERNATIONAL MECHANICAL CODE. 23. PROVIDE SLEEVES AND COLLARS FOR ALL DUCTWORK AND PIPES THROUGH WALL, FLOORS, AND CEILINGS. SEAL ALL EXTERNAL PENETRATIONS OF FIRE RATED WALL, FLOORS, AND CEILINGS WITH APPROVED FIRE STOP MATERIAL IN COMPLIANCE WITH ASTM E 814 AND UL 1479. 24. CONFIRM VOLTAGE, PHASE, AND AMPACITY WITH ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIPMENT. ALL CONTROL AND INTERLOCK WIRING FOR MECHANICAL EQUIPMENT BY MECHANICAL CONTRACTOR. THREE-PHASE MOTORS TO HAVE MAGNETIC STARTERS WITH PROTECTION ON ALL THREE LEADS. CONTROL AND HEATING/COOLING EQUIPMENT TO AUTOMATICALLY RESTART AFTER POWER FAILURE. ALL WITH IN CONDUIT AS REQUIRED BY CODE. 25. A MINIMUM CLEARANCE OF 30 INCHES SHALL BE PROVIDED AROUND ALL EQUIPMENT (I.E., FANS, PUMPS, BOILERS, AIR CONDITIONERS, ETC.) FOR SERVICE AND MAINTENANCE AND AS REQUIRED BY MANUFACTURER'S INSTALLATION INSTRUCTIONS. 26. ROOF MOUNTED EQUIPMENT LOCATED WITHIN 10 FEET OF THE EDGE OF THE ROOF SHALL BE PROVIDED WITH SAFETY RAILINGS AS REQUIRED PER CODES OR AS DETAILED ON THE DRAWINGS. 28. REFRIGERANT PIPING SHALL BE TYPE "ARC" SOFT OR HARD DRAWN COPPER WITH WROUGHT COPPER BRAZED FITTINGS. 28.1. INSULATE ALL EXPOSED NEW PIPING, VALVES AND FITTINGS FOR REFRIGERANT SUCTION LINE SERVICE: 28.1.1. 1/2" THICK ELASTOMERIC PIPE INSULATION INSTALLED IN COMPLIANCE WITH MANUFACTURERS STANDARD INSTALLATION INSTRUCTIONS. 29. ALL PIPE INSULATION MATERIALS SHALL CONFORM TO ASTM 84, NFPA 50A AND 255 AND UL 723 NOT TO EXCEED RATING OF 25 FLAME SPREAD AND 50 SMOKE DEVELOPED. ALL INSTALLED INSULATION SHALL MEET OR EXCEED ASHRAE STANDARD 90.1. 30. ALL DUCT AND PIPE INSULATION EXPOSED OUTSIDE SHALL BE WEATHER PROTECTED AND UV RESISTANT WITH ALUMINUM JACKET. 31. SEE TEMPERATURE CONTROLS SHEET M0.5 FOR TEMPERATURE CONTROLS REQUIREMENTS. 32. CEILING CAVITY IS A RETURN AIR PLENUM IN PART OF THE SPACE. 33. VARIABLE AIR VOLUME TERMINAL UNITS - HEAVY GAGE STEEL HOUSING, MECHANICALLY SEALED AND GASKETED, LEAK- RESISTANT, DUAL DENSITY INTERNAL INSULATION. SHALL MEET REQUIREMENTS OF NFPA 90A AND UL 181. COMPLETE WITH SLIP AND DRIVE CLEAT DISCHARGE DUCT CONNECTION AND GAUGE TEES FOR CFM MEASUREMENT. 34. ALL RECIRCULATED AIR SHALL PASS THROUGH STANDARD 2" THICK PLEATED MERV 8 THROW AWAY FILTERS. PROVIDE ONE ADDITIONAL SET FOR OWNER AT PROJECT COMPLETION. 35. INSTALL ALL NEW MECHANICAL EQUIPMENT IN COMPLETE COMPLIANCE WITH MANUFACTURER'S STANDARD INSTALLATION INSTRUCTIONS. ARRANGE ALL EQUIPMENT TO PERMIT EASY REMOVAL OF COILS, MOTORS, FILTERS, AND ALL OTHER PARTS WHICH MIGHT REQUIRE PERIODIC REPLACEMENT OR MAINTENANCE. HVAC GENERAL NOTES COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 M0.2 ME C H A N I C A L N O T E S & D E T A I L S EJ DO 19022 11/11/2019 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 A-JEAST ZONETRANE 7,525 1,6707.5(E)RTU-1 TAG MANUFACTURER SUPPLY FAN DATA OPER. ELEV. (FEET)E.S.P. (IN. W.C.) MIN. HORSE POWER NOTES 2,400 MIN. AIR FLOW (CFM) 8,000 MAX. AIR FLOW (CFM) SERVICE 208/3 103 125 UNIT ELECTRICAL DATA VOLTAGE/ PHASES MIN. CIRCUIT AMPS MAX. OCP N. GAS 400 80 HEATING FUEL OR FLUID INPUT (MBH) % EFF. R410A 20 COOLING REF.NOMINAL TONS EER 2,860 UNIT WEIGHT (LBS.) MIN. OUTSIDE AIR FLOW (CFM) WEST ZONETRANE 7,525(E)RTU-2 A-J 1.75 11.0 1,935 208/3 R410AN. GAS NOTES: A. VARIABLE FREQUENCY DRIVE FOR VAV SYSTEM. B. DRY BULB CONTROLLED LOW-LEAK ECONOMIZER WITH FAULT DETECTION & DIAGNOSTICS. C. POWER EXHAUST FAN. D. 14" HIGH ROOF CURB. E. 1" MASON INDUSTRIES WAFFLE NEOPRENE PAD BETWEEN CURB AND UNIT. F. HAIL GUARDS. G. SMOKE DETECTOR IN RETURN INLET, FACTORY MOUNTED, WIRED BY E.C. H. STAINLESS STEEL HEAT EXCHANGER AND BURNER. I. HIGH WATER CONTROL AND KILL SWITCH. J. 2" MERV 13 FILTER. MODEL YHD-240 IEER 14.0 163.2 OUPUT (MBH) 224 OUTPUT (MBH) TAG MANUFACTURER MODEL MOUNT FV-05-11VK1PANASONIC CEILING NOTES: A. INTERLOCK WITH LIGHT ON/OFF SWITCH IN ROOM. EQUALS BY: BROAN, COOK, GREENHECK, PENN-BARRY. EF-1 SERVICE EXHAUST AIR FLOW (CFM) 70 E.S.P. (IN. W.C.) 0.25 OPER. ELEV. (FEET) 7,525 CABINET MAX. RPM 1131 MAX. SONES 0.4 TYPE DRIVE DIRECT H.P. OR WATTS 10.2 W AMPS/VOLTS/PH. 0.1A/120V/1PH OP. WT. (LBS) 15 NOTES A-C MOTOR DATAFAN DATA B. SEE PLANS FOR QUANTITIES. EXAM 138,139, MEDS 123 VAV-1-2 VAV-1-3 VAV-1-4 VCEF06 6 185/460VAV-1-1 95.0 2.5TRANE VCEF04 4 100/220TRANE TRANE TRANE VAV-2-1 TRANE NURSES STATION 134, CIRC 133,127 VAV-2-2 TRANE EXAM 126, OFFICE 112 VAV-2-3 TRANE VAV-2-4 TRANE NURSES STATION 122, CIRC EAST ZONE THERAPY 169,170,172,173 THERAPY 164-167 VPEF06 6 120/395 VPEF08 8 235/780 VCEF08 8 VPEF08 8 250/800 VCEF08 8 250/800 225/725 VCEF08 8 220/725 FV-1115VK2PANASONIC CEILINGEF-2 EXHAUST 120 0.25 7,525 CABINET 1086 0.4 DIRECT 20.5 W 0.1A/120V/1PH 15 A-C TAG MANUFACTURER MODEL PKA-A12H17MITSUBISHIFCU-1 SERVICE IT 143 ELECTRICAL DATAOPERATING CONDITIONS COOLING SEER 20.8 12.0 MCA 1 CAPACITY (MBH) 10.2 EERVOLTS/PH. 208-230/1PH MOP 15 COIL EAT (DEG. F.) 80.0 NOM. CAP. SENS. (MBH) 12.0 NOTES A-C OP. WT. (LBS) 30 TAG MANUFACTURER MODEL PUY-A12NKA7MITSUBISHICU-1 SERVICE FCU-1 OAT DB (DEG. F.) 85 NOTES A-F ELECTRICAL DATAOPERATING CONDITIONS COOLING SEER 20.8 12.0 OP. WT. (LBS) 95 MCA 11 CAPACITY (MBH) 10.2 EERVOLTS/PH. 208-230/1PH MOP 28 OAT WB (DEG. F.) 58 COIL MIN. CAP. SENS. (MBH) 12.0 OUTPUT (MBH) 10.2 NOTES: A. -40° F LOW AMBIENT WIND BAFFLE KIT. B. REFRIGERANT LINE SET, SIZED BY MANUFACTURER. C. COMPRESSOR HARD START KIT. D. CRANKCASE HEATER. E. HAIL GUARD. F. 24" HIGH ROOF PLATFORM. EQUALS BY: CARRIER, DAIKIN, LG, SAMSUNG. EQUALS BY: CARRIER, DAIKIN, LG, SAMSUNG. NOTES: A. REFRIGERANT LINE SET, SIZED BY MANUFACTURER. B. CONTROLLED BY WALL MOUNTED THERMOSTAT, SEE PLANS. EXAM 131,132, OFFICE 159, RECEPTION 157 CIRC WEST ZONE 1.5 2.0 3.5 3.0 3.0 3.0 4.0 NOTES: EQUALS BY: TITUS, PRICE, METALAIRE, ANEMOSTAT, KRUEGER, J&J, TUTTLE & BAILEY. TAG AREA SERVEDMODEL INLET DIAMETER (INCHES) CFM MIN./MAX.LAT (°F) HEATING COIL DATA KW MANUF. MCAMOP 15 VOLTS/PH 208/3 208/3 208/3 208/3 208/3 208/3 208/3 208/3 8.7 TAG MANUFACTURER MODEL CP758FQMARK A. WITH RECESS MOUNTING FRAME. B. UNIT DISCONNECT SWITCH. C. CONTROL TRANSFORMER. D. LINE VOLTAGE THERMOSTAT. EQUALS BY: MARKEL, BERKO, TPI, INDEECO. CP-1 SERVICE SOUTH PERIMETER 3.6 VOLTS/PH. 208V/1PH OP. WT. (LBS) 30 NOTES A-F ELECTRICAL DATA HEAT FUEL ELEC INPUT (WATTS) 750 AMPS EFFICIENCY (%) 100 E. U.L. LISTED. F. SEE PLANS FOR QUANTITIES. NOTES: DIMENSIONS (IN) 24X48 A. MULTI POINT INLET PRESSURE SENSOR. B. DISCHARGE AIR TEMPERATURE SENSOR. C. UNIT-MOUNTED CONTROL POWER TRANSFORMER, DISCONNECT, AND POWER FUSE. D. MAXIMUM 30 NOISE CRITERIA. E SCR CONTROLLED HEATING COIL. F. MINIMUM OUTSIDE AIR TO BE DELIVERED AT ALL TIMES DURING OCCUPIED HOURS. 95.0 95.0 95.0 95.0 95.0 95.0 95.0 NOTES A-F CFM 250 125 170 350 250 250 250 400 ELECTRICAL DATA DCV MIN. CFM - - - - - - - - 7.52,4008,000 103 125 400 80 201.75 11.0YHD-240 14.0 163.2224 C. CONDENSATE PUMP. NOTES: EQUALS BY: TITUS, PRICE, METALAIRE, ANEMOSTAT, KRUEGER, J&J, TUTTLE & BAILEY. TAG AREA SERVEDMODEL INLET DIAMETER (INCHES) CFM MIN./MAX.LAT (°F) HEATING COIL DATA KW FPB-1-2 FPB-1-3 EXAM 129, 130FPB-1-4 VPEF14 14 620/2060FPB-1-1 95.0 8.0 MANUF. TRANE VPEF10 10 400/1335TRANE TRANE TRANE EXAM 117-120FPB-1-5 TRANE FPB-1-6 TRANE FPB-1-7 TRANE EXERCISE 175FPB-2-1 TRANE EXERCISE 175FPB-2-2 TRANE EXERCISE 175FPB-2-3 TRANE FPB-2-4 OFFICE 156 LOBBY 101, RECEP 102 LOBBY 101, RECEP 102 TRANE VPEF08 8 200/665 VPEF06 6 130/360 VPEF08 8 VPEF08 8 260/720 VPEF06 6 150/455 165/550 VPEF14 14 615/2045 VPEF10 10 310/1025 VPEF10 10 VPEF08 8 260/855 5.0 4.5 3.0 6.5 4.0 5.0 8.0 4.0 8.0 HPSIZE 04SQ 02SQ 03SQ 02SQ 03SQ 02SQ 03SQ 04SQ 02SQ 02SQ 03SQ VOLTS/PH 115/1208/3 208/3 208/3 208/3 208/3 208/3 208/3 208/3 208/3 208/3 208/3 115/1 115/1 115/1 115/1 115/1 115/1 115/1 115/1 115/1 115/1 1/3 1/8 1/3 1/8 1/8 1/3 1/8 1/3 1/3 1/8 1/3 A. MULTI POINT INLET PRESSURE SENSOR. B. DISCHARGE AIR TEMPERATURE SENSOR. C. UNIT-MOUNTED CONTROL POWER TRANSFORMER, DISCONNECT, AND POWER FUSE. D. MAXIMUM 30 NOISE CRITERIA. E. WITH MERV 8 FILTER ON RETURN AIR CONNECTION. F. FULL SIZED LINED SHEET METAL RETURN AIR BOOT BY M.C. (NOT SHOWN ON PLANS). H. MINIMUM OUTSIDE AIR REQUIRED TO BE DETERMINED BY CO2 SENSOR. I. MINIMUM OUTSIDE AIR TO BE DELIVERED AT ALL TIMES DURING OCCUPIED HOURS. 95.0 95.0 95.0 95.0 95.0 95.0 95.0 95.0 95.0 95.0 NOTES A-H A-H A-H CFM 950 525 550 360 720 455 550 925 450 855 FAN DATA ELECTRICAL (VOLTS/PH) DCV MIN. CFM 50 30 - - - - - 10 5 5 - STAFF 116, EXAM 115, ORTHO/EXAM 114 RADIOLOGY 113, DIRTY, EVS EQUIP, EVS, STG 107 BACK OF HOUSE A-H A-H A-G, I G. SCR CONTROLLED HEATING COIL. A-G, I A-G, I A-G, I A-G, I A-G, I A-F A-F A-F A-F A-F A-F A-F HEATING 15 5.2 15 6.9 15 12.1 15 10.4 15 10.4 15 10.4 15 13.9 2,860 TAG MANUFACTURER MODEL 25126NWBERKO NOTES: A. RECESSED WALL UNIT. B. UNIT DISCONNECT SWITCH. C. CONTROL TRANSFORMER. D. CONTROLLED BY WALL MOUNTED THERMOSTAT, SEE PLANS. EQUALS BY: MARKEL, QMARK, FPI, INDEECO. UH-1 SERVICE RR 146, LOCKERS 145 500 W VOLTS/PH. 120V/1PH NOTES B-F ELECTRICAL DATA HEAT FUEL ELEC INPUT (WATTS) 500 WATTS OR AMPS EFFICIENCY (%) 100 E. U.L. LISTED. F. SEE PLANS FOR QUANTITIES. TAG MANUFACTURER MODEL MATERIAL FACE SIZE SERVICE(INCHES) NECK SIZE (INCHES) OPPOSED BLADE DAMPER SUPPLYONMITITUSSTEEL 24x24 SEE PLAN SEE PLANSS1 SUPPLYONMITITUSSTEEL 24x24 SEE PLAN SEE PLANSS2 COLOR WHITE WHITE RETURNPARTITUSSTEEL 24X24 22X22 NOWHITER1 NOTES A-C, E A-D A-C, E, F SUPPLY SUPPLY RETURN MAX. NOISE CRITERIA (NC) SUPPLYONMITITUSSTEEL 12x12 SEE PLAN SEE PLANSS3WHITE A-DSUPPLY 310/1025 4.0450 RETURNPARTITUSSTEEL 12X12 10X10 NOWHITER4 A-D, FRETURN NOTES: A. MAXIMUM STATIC PRESSURE DROP ALLOWED: 0.15" W.C. UNLESS OTHERWISE NOTED. B. MAXIMUM N.C. LEVEL EQUALS 25. C. SEE PLANS FOR SIZES AND QUANTITIES. D. SURFACE MOUNTING BORDER. E. LAY-IN TYPE BORDER. FRA1512FBERKOUH-2 IT 143 12.5 A 120V/1PH A-FELEC 1500 100 RETURNPARTITUSSTEEL 24X12 22X10 NOWHITER3 A-C, E, FRETURN RETURNPARTITUSSTEEL 24X24 22X22 NOWHITER2 A-D, FRETURN F. RETURN GRILLE SOUND BOOT (NOT SHOWN ON PLANS). EQUALS BY: ANEOMOSTAT, J & J, KRUEGER, METAL-AIRE, PRICE, TITUS, TUTTLE & BAILEY C. PROVIDE AND INSTALL ACCESSIBLE RHEOSTAT ON SIDE OF FAN FOR BALANCING. SUPPLYONMITITUSSTEEL 24x24 SEE PLAN SEE PLANSS4WHITE A-D, GSUPPLY RETURNPARTITUSSTEEL 24X24 22X22 NOWHITER5 A-D, F, GRETURN G. FIRE-RATED CAULKING AROUND AIR DEVICE CEILING PENETRATION. SUPPLY300FLTITUSSTEEL SEE PLAN SEE PLAN SEE PLANSS5WHITE A-DSUPPLY ROOF-TOP UNIT SCHEDULE (CORE & SHELL - SHOWN FOR REFERENCE ONLY) FAN SCHEDULE SINGLE DUCT VAV BOX SCHEDULE FAN COIL UNIT SCHEDULE CONDENSING UNIT SCHEDULE RADIANT CEILING PANEL SCHEDULE FAN POWERED (PARALLEL) BOX SCHEDULE UNIT HEATER SCHEDULE AIR DEVICE SCHEDULE 1 COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 M0.3 ME C H A N I C A L S C H E D U L E S EJ DO 19022 11/11/2019 1 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 H L OPEN DX C SPD SKT - 1 H L MOD S/S STG 1 STG 2 L H OPEN SCALE: 1 SUPPLY AIR AIR FLOW SCALE: SCALE: PLENUM AIR SUPPLY AIR AIR FLOW CMD SPD CO2 T T Locate ¾ distance down longest duct H L H L EA OA SA RA VAV RTU POINTS DIAGRAM (CORE & SHELL) VAV BOX POINTS DIAGRAM FPB BOX (PARALLEL) POINTS DIAGRAM NO SCALE NO SCALE NO SCALE VAV RTU POINTS BREAKDOWN (CORE & SHELL) VAV BOX POINTS BREAKDOWN FAN-POWERED BOX POINTS BREAKDOWN Point Name Harware Points Software Points AI AO BI BO AV BV Trend Alarm Airflow X X Discharge Air Temp X X Zone Setpoint Adjust X Zone Temp X X Reheating Coil X X Zone Damper X X Zone Override X X Airflow Setpoint X X Cooling Setpoint X X Heating Setpoint X X Heating Mode X X High Discharge Air Temp X High Zone Temp X Low Discharge Air Temp X Low Zone Temp X Point Name Harware Points Software Points AI AO BI BO AV BV Trend Alarm Airflow X X Discharge Air Temp X X Zone CO2 PPM (FPB-1-1,2 and 2-1,2,3 only)X X Zone Setpoint Adjust X Zone Temp X X Reheating Coil X X Zone Damper X X Fan Status X X Zone Override X X Fan Start/Stop X X Airflow Setpoint X X Cooling Setpoint X X Heating Setpoint X X Zone CO2 PPM Setpoint (FPB-1-1,2 and 2-1,2,3 only)X X Heating Mode X X Fan Failure X High Discharge Air Temp X High Zone CO2 Concentration (FPB-1-1,2 and 2-1,2,3 only)X High Zone Temp X Low Discharge Air Temp X Low Zone Temp X Point Name Harware Points Software Points AI AO BI BO AV BV Trend Alarm Mixed Air Temp X X Return Air CO2 PPM X X Return Air Temp X X Supply Air Static Pressure X X X Supply Air Temp X X Mixed Air Dampers X X Supply Fan VFD Speed X X Freezestat X X X High Static Shutdown X X X Return Air Smoke Detector X X X Supply Fan Status X X Supply Fan VFD Fault X X X Cooling Stage 1 X X Cooling Stage 2 X X Heating Modulating X X Supply Fan Start/Stop X X Economizer Mixed Air Temp Setpoint X X Return Air CO2 PPM Setpoint X X Supply Air Static Pressure Setpoint X X Supply Air Temp Setpoint X X Emergency Shutdown X X High Mixed Air Temp X High Return CO2 Concentration X High Return Air Temp X High Supply Air Static Pressure X High Supply Air Temp X Low Mixed Air Temp X Low Return Air Temp X Low Supply Air Static Pressure X Low Supply Air Temp X Low Supply Air Temp X Supply Fan Failure X 1. THE HVAC SYSTEM CONTROLS ARE TO BE FULLY AUTOMATIC UNLESS OTHERWISE LISTED BELOW. 1.1. CONTROLS SHALL HAVE INTEGRAL FAULT DETECTION AND DIAGNOSTIC CAPABILITIES. 2. APPROVED CONTROLS MANUFACTURERS: 2.1. ROCKY MOUNTAIN TRANE. 2.2. ENGINEERED APPROVED EQUALS: 2.2.1. JCI. 2.2.2. SIEMENS. 2.3. ALL CONTROL SYSTEMS SHALL BE DESIGNED AND PROVIDED BY A CONTROL MANUFACTURER WHO HAS BEEN IN THE BUSINESS OF MANUFACTURING, DESIGNING, AND INSTALLING CONTROL COMPONENTS FOR A MINIMUM OF TEN (10) YEARS. 3. COORDINATE WITH ELECTRICAL CONTRACTOR FOR INTERFACE WITH LINE VOLTAGE WIRING, CONNECTIONS, RELAYS, ETC. 4. SETPOINTS: 4.1. OCCUPIED: 4.1.1.1. HEATING: 68 DEGREES FAHRENHEIT (ADJUSTABLE). 4.1.1.2. COOLING: 75 DEGREES FAHRENHEIT (ADJUSTABLE). 4.2. UNOCCUPIED: 4.2.1. HEATING: 55 DEGREES FAHRENHEIT (ADJUSTABLE). 4.2.2. COOLING: 85 DEGREES FAHRENHEIT (ADJUSTABLE). 4.3. MECHANICAL ROOMS: 4.3.1. HEATING: 55 DEGREES FAHRENHEIT (ADJUSTABLE). 4.4. ELECTRICAL, ELEVATOR MACHINE, AND DATA ROOMS: 4.4.1. HEATING: 55 DEGREES FAHRENHEIT (ADJUSTABLE). 4.2.2. COOLING: 85 DEGREES FAHRENHEIT (ADJUSTABLE). 5. THERMOSTATS OR TEMPERATURE SENSORS: 5.1. ALL SETPOINTS ARE TO BE ADJUSTABLE. 5.2. TEMPERATURE CONTROL SETUP AND SETBACK SHALL BE ACCOMPLISHED BY MEANS OF A DEDICATED PROGRAMMABLE THERMOSTAT WITH ADJUSTABLE HEATING AND COOLING SETPOINTS. 5.3. CONTRACTOR SHALL PROGRAM THERMOSTATS FOR OCCUPIED/UNOCCUPIED PERIODS BASED ON A SCHEDULE PROVIDED BY OWNER. 5.4. CONTROLS SHALL HAVE A 5 DEGREE F. DEAD-BAND FOR AUTO-CHANGEOVER SYSTEMS, WITH OVERLAP RESTRICTIONS. 5.5. SYSTEM SHALL HAVE A MINIMUM OF A 7-DAY PROGRAM. 5.6. PROVIDE A 2-HOUR MINIMUM OCCUPIED OVERRIDE. 5.7. PROVIDE MINIMUM A 10-HOUR BATTERY BACKUP. 6. VAV SYSTEM: 6.1. CONTROLS FOR THE VAV SYSTEM ARE TO BE ELECTRIC/ ELECTRONIC. 6.2. ROOFTOP UNITS: 6.2.1. OCCUPIED MODE: DURING OCCUPIED PERIODS, THE SUPPLY FAN SHALL RUN CONTINUOUSLY AND THE OUTSIDE AIR DAMPER SHALL OPEN TO MAINTAIN MINIMUM VENTILATION REQUIREMENTS. THE UNIT CONTROLLER SHALL CONTROL THE SUPPLY FAN SPEED TO MAINTAIN THE CURRENT DUCT STATIC PRESSURE SETPOINT (ADJ.). THE DX COOLING SHALL STAGE AND GAS HEAT SHALL MODULATE TO MAINTAIN THE CURRENT DISCHARGE AIR TEMPERATURE SETPOINT. IF ECONOMIZING IS ENABLED THE OUTSIDE AIR DAMPER SHALL MODULATE TO MAINTAIN THE CURRENT DISCHARGE AIR TEMPERATURE SETPOINT. 6.2.2. UNOCCUPIED MODE: WHEN THE SPACE TEMPERATURE FALLS BELOW THE UNOCCUPIED HEATING SETPOINT IN ONE OR MORE ZONES, THE SUPPLY FAN SHALL START, THE OUTSIDE AIR DAMPER SHALL REMAIN CLOSED, AND THE GAS HEAT SHALL BE ENABLED. ALL VAV AND FPB'S SHALL BE FULLY OPENED. W HEN THE SPACE TEMPERATURE RISES ABOVE THE SETPOINT PLUS THE UNOCCUPIED DIFFERENTIAL OF 4.0 DEG F (ADJ.) THE SUPPLY FAN SHALL STOP AND THE GAS HEAT SHALL BE DISABLED. WHEN THE SPACE TEMPERATURE IS ABOVE THE UNOCCUPIED COOLING SETPOINT, THE SUPPLY FAN SHALL START, THE OUTSIDE AIR DAMPER SHALL OPEN IF ECONOMIZING IS ENABLED AND REMAIN CLOSED IF ECONOMIZING IS DISABLED, AND THE DX COOLING SHALL BE ENABLED. WHEN THE SPACE TEMPERATURE FALLS BELOW THE UNOCCUPIED DIFFERENTIAL OF 4.0 DEG F (ADJ.) THE SUPPLY FAN SHALL STOP, THE DX COOLING SHALL BE DISABLED, AND THE OUTSIDE AIR DAMPER SHALL CLOSE. 6.2.3. MORNING WARM-UP MODE: THE BAS SHALL MONITOR THE SCHEDULED OCCUPIED TIME, OCCUPIED SPACE SETPOINTS, AND SPACE TEMPERATURE TO CALCULATE WHEN THE OPTIMAL START OCCURS. DURING OPTIMAL START, IF THE AVERAGE SPACE TEMPERATURE IS BELOW THE OCCUPIED HEATING SETPOINT, A MORNING WARM-UP MODE SHALL BE ACTIVATED. THE OUTSIDE AIR DAMPER SHALL REMAIN CLOSED DURING WARM-UP. WHEN THE AVERAGE SAPCE TEMPERATURE REACHES THE OCCUPIED HEATING SETPOINT (ADJ.), THE UNIT SHALL TRANSITION TO OCCUPIED MODE. 6.2.4. ECONOMIZER: THE SUPPLY AIR SENSOR SHALL MEASURE THE DRY BULB TEMPERATURE OF THE AIR LEAVING THE EVAPORATOR COIL WHILE ECONOMIZING. WHEN ECONOMIZING IS ENABLED AND THE UNIT IS OPERATING IN COOLNG MODE, THE ECONOMIZER DAMPER SHALL BE MODULATED BETWEEN ITS MINIMUM POSITION AND 100% TO MAINTAIN THE DISCHARGE AIR TEMPERATURE SETPOINT. THE ECONOMIZER DAMPER SHALL MODULATE TOWARD MINIMUM POSITION IN THE EVENT THE DISCHARGE AIR TEMPERATURE FALLS BELOW THE DISCHARNGE LOWER LIMIT TEMPERATURE SETPOINT. COMPRESSORS SHALL BE DELAYED FROM OPERATING UNITL THE ECONOMIZER HAS OPENED TO 100%. 6.2.4.1. REFERENCE DRY BULB: OUTSIDE AIR TEMPERATURES SHALL BE COMPARED WITH A REFERENCE DRY BULB SETPOINT. THE ECONOMIZER SHALL ENABLE WHEN THE OUTSIDE AIR TEMPERATURE IS LESS THAN OR EQUAL TO REFERENCE DRY BULB SETPOINT. THE ECONOMIZER SHALL BE DISABLED WHEN OUTDOOR AIR TEMPERATURE IS GREATER THAN REFERENCE DRY BULT SETPOINT + 5.0 DEG F. 6.2.5. SUPPLY DUCT STATIC PRESSURE CONTROL: THE UNIT CONTROLLER SHALL MODULATE THE SUPPLY FAN OUTPUT AS REQUIRED TO MAINTAIN THE DUCT STATIC PRESSURE SETPOINT. IF THE DUCT STATIC PRESSURE FALLS BELOW THE SUPPLY AIR STATIC SETPOINT + DEADBAND, THE UNIT CONTROLLER SHALL INCREASE THE OUTPUT TO THE SUPPLY FAN TO MAINTAIN SETPOINT. IF THE DUCT STATIC PRESSURE RISES ABOVE THE SUPPLY AIR STATIC SETPOINT + DEADBAND, THE UNIT CONTROLLER SHALL DECREASE THE OUTPUT TO THE SUPPLY FAN TO MAINTAIN SETPOINT. IF FOR ANY REASON THE SUPPLY AIR PRESSURE EXCEEDS THE FIXED SUPPLY AIR PRESSURE LIMIT OF 3.5 INCHES OF W.C. THE SUPPLY FAN SHALL SHUT DOW N. THE UNIT SHALL BE ALLOWED TO RESTART THREE TIMES. IF THE OVERPRESSURIZATION CONDITION OCCURS ON THE FOURTH RESTART, THE UNIT SHALL SHUT DOWN AND A MANUAL RESET DIAGNOSTIC IS DISPLAYED AT THE REMOTE PANEL AND THE BAS SYSTEM. 6.2.6. BUILDING PRESSURE CONTROL: THE POWER EXHAUST SHALL BE ENABLED WHEN THE ECONOMIZER DAMPER POSITION IS EQUAL TO OR GREATER THAN THE EXHAUST FAN SETPOINT. 6.2.7. DEMAND CONTROL VENTILATION: THE OUTDOOR AIR DAMPER POSITION SHALL BE MODULATED BETWEEN THE DCV MINIMUM OUTDOOR AIR DAMPER SETPOINT AND THE DESIGN MINIMUM OUTDOOR AIR DAMPER SETPOINT IN ORDER TO MAINTAIN SPACE C02 LEVELS. IF THERE IS A CALL FOR ECONOMIZER COOLING, THE DAMPER MAY BE OPENED FURTHER TO SATISFY THE COOLING REQUEST. 6.3. VAV BOXES: 6.3.1. COOLING MODE: WHEN THE UNIT IS IN COOLING MODE, THE VAV CONTROLLER SHALL MAINTAIN THE SPACE TEMPERATURE AT THE ACTIVE COOLING SETPOINT BY MODULATING THE AIRFLOW BETWEEN THE ACTIVE COOLING MINIMUM AIRFLOW SETPOINT TO THE MAXIMUM COOLING AIRFLOW SETPOINT. AS THE ZONE TEMPERATURE FALLS TOWARD SETPOINT, THE DAMPER IS MODULATED CLOSED TOWARD ITS MINIMUM POSITION. 6.3.2. HEATING MODE: WHEN THE UNIT IS IN HEATING MODE, THE VAV CONTROLLER SHALL MAINTAIN THE SPACE TEMPERATURE AT THE ACTIVE HEATING SETPOINT BY MODULATING THE AIRFLOW BETWEEN THE ACTIVE HEATING MINIMUM AIRFLOW SETPOINT TO THE MAXIMUM HEATING AIRFLOW SETPOINT. 6.3.2.1. REHEAT CONTROL: THE REHEAT WILL ONLY BE ALLOWED WHEN PRIMARY AIR TEMPERATURE IS 5.0 DEG F BELOW THE CONFIGURED REHEAT ENABLED SETPOINT OF 70.0 DEG F (ADJ.). THE REHEAT SHALL BE ENABLED WHEN THE SPACE TEMPERATURE DROPS BELOW THE ACTIVE HEATING SETPOINT AND THE MINIMUM AIRFLOW REQUIREMENTS ARE MET. A SILICON CONTROLLED RECTIFIER WILL BE UTILITIZED FOR REHEAT CONTROL TO MODULATE ELECTRIC REHEAT COILS IN ORDER TO MAINTAIN THE HEATING SETPOINT. 6.4. FAN-POWERED BOXES: 6.3.1. COOLING MODE: REFER TO VAV BOX COOLING MODE ABOVE. 6.3.2. HEATING MODE: REFER TO VAV BOX HEATING MODE ABOVE. 6.3.3. INTERMITTENT FAN CONTROL: DURING ALL OCCUPIED MODES, AS THE SPACE TEMPERATURE FALLS BELOW THE ACTIVE COOLING SETPOINT, THE FPB SHALL MODULATE TO ITS MINIMUM COOLING AIRFLOW SETPOINT. UPON A CONTINUED DROP IN TEMPERATURE AND UNIT AIRFLOW, THE PARALLEL FAN SHALL BE ENERGIZED. DURING UNOCCUPIED MODE, THE PRIMARY AIR VALVE SHALL MODULATE FULLY CLOSED. THE TERMINAL FAN AND HEAT SHALL CYCLE AS NEEDED TO MAINTAIN THE UNOCCUPIED HEATING SETPOINT. 6.3.4. DEMAND CONTROL VENTILATION (FPB-1-1,2, 2-1,2,3): WHEN THE UNIT IS IN OCCUPIED MODE, THE VENTILATION AIRFLOW SETPOINT WILL BE CONTINUOUSLY CALCULATED USING THE MEASURED CO2 CONCENTRATION IN THE SPACE. THE CURRENT VENTILATION AIRFLOW SETPOINT SHALL BE COMMUNICATED TO THE BAS FOR CONTROL OF THE SYSTEM OUTSIDE AIR INTAKE. 7. MINI-SPLIT SYSTEM: 7.1. FAN COIL UNIT OPERATION TO BE TIED TO WALL-MOUNTED THERMOSTAT. 8. RADIANT CEILING PANELS: 8.1. WALL-MOUNTED LINE VOLTAGE THERMOSTATS SHALL CYCLE THE PANELS. 9. ELECTRIC UNIT HEATERS: 9.1. INTEGRAL THERMOSTAT SHALL CYCLE THE UNIT TO MAINTAIN SPACE TEMPERATURE. 10. EXHAUST FANS: 10.1.TOILET ROOM AND JANITORIAL CLOSET FAN OPERATIONS TO BE INTERLOCKED WITH THE ROOM LIGHT OPERATION. TEMPERATURE CONTROLS BI FILT STS D SF VFD AO AI OA TEMP AI SA PRESS D D AO RA/OA ACT AO BO BO BO AI SA TEMPBI SF STS RA TEMP AI MIXED AIR TEMP AI FREEZE STAT BI SA STATIC PRESSURE AI HIGH STATIC SHUTDOWN BI AI RA CO2 D FLTG AIR VAL ACT AI DA TEMP DH AO SCR HEAT VCM AI CFM D FLTG AIR VAL ACT AI DA TEMP DH BO D AO SCR HEAT AO VCM AI CFM ZONE CO2 PPMAI ZONE OVERRIDEBI (FPB-2-1,2,3,5,6 ONLY) ZONE TEMPAI ZONE SETPOINT ADJUSTAI ZONE OVERRIDEBI ZONE TEMPAI ZONE SETPOINT ADJUSTAI SMOKE DETECTOR BI COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 M0.4 ME C H A N I C A L C O N T R O L S EJ DO 19022 11/11/2019 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 GENERAL NOTES: 1. REFER TO CORE AND SHELL PLANS FOR EXISTING SYSTEM DETAILS. COORDINATE ALL NEW WORK WITH EXISTING CORE AND SHELL DESIGN. 2. FIRST FLOOR SPACE ABOVE CEILING TO BE USED AS RETURN AIR PLENUM. ALL SYSTEMS INSTALLED IN THIS SPACE TO BE PLENUM-RATED AND SHALL COMPLY WITH ALL REQUIREMENTS LISTED IN 2015 IMC 602.2.1. 3. MAINTAIN CLEARANCES AROUND ALL EQUIPMENT PER MANUFACTUER'S RECOMMENDATIONS. 4. PROVIDE LINED RETURN AIR SOUND BOOT AT ALL FAN POWERED BOXES (NOT SHOWN). MC SHALL FIELD COORDINATE WITH OBSTRUCTIONS (SEE DETAIL ON M0.2). 5. PROVIDE LINED RETURN AIR SOUND BOOT AT ALL RETURN GRILLES (NOT SHOWN). MC SHALL FIELD COORDINATE WITH OBSTRUCTIONS AND ORIENT FOR MAXIMUM SOUND ATTENUATION FROM ADJACENT SPACES (SEE DETAIL ON M0.2). 6. INSTALL ALL DUCTWORK TIGHT TO STRUCTURE AS HIGH AS POSSIBLE. 1 1 WORK NOTES: 1. TRANSITION DUCT UP TO RTU-1 INLET/OUTLET. REFER TO CORE & SHELL PLANS FOR ROOTOP UNIT DETAILS. 2. RETURN DUCT OPEN ON TOP PROVIDING (2) ELBOWS FOR SOUND MITIGATION. 3. CEILING UNIT HEATER. REFER TO CORE & SHELL PLANS FOR DETAILS. 4. INSTALL FIRE-RATED CAULKING AROUND CEILING DIFFUSER/GRILLE PENETRATION TO MAINTAIN THE INTEGRITY OF THE RADIATION BARRIER OF THE ROOM. 5. 10"Ø EA ROUTED TO SIDEWALL VENT WITH BACKDRAFT DAMPER. MAINTAIN MINIMUM 3 FEET CLEARANCE FROM OPERABLE OPENINGS INTO BUILDING AND 10 FEET CLEARANCE FROM MECHANICAL AIR INTAKES. COORDINATE EXACT SIDEWALL VENT INSTALLATION HEIGHT WITH ARCHITECT. 6. ROUTE RETURN DUCT THROUGH FULL-HEIGHT WALL TO RETURN AIR PLENUM. REFER TO ARCHITECTURAL PLANS FOR DETAILS. 7. 1/2" DOOR UNDERCUT. 8. NOT USED. # 1 1 NURSE'S 122 VESTIBULE 100 CHART 136 RR 104 RECEPTION 102 CIRC 127 MEDS 123 ORTHO/EXAM 114 RADIOLOGY 113 O2 STG 107 RR 128 RR 121 STAFF 116 EXAM 115 CLINICAL 125 CIRC 133 NURSE'S 134 EXAM 138 CIRC 124 CHART 137 EVS FLR EQ 108 CIRC 103 EXAM 119 EVS EQP 110 EXAM 118 EXAM 117 VESTIBULE 106 RR 105 EXAM 130 OFFICE 112 DIRTY 111 EXAM 126 EXAM 139 CHART 135 EXAM 120 7 A 8 9 10 A.5 B C D D.4 E EF-1 CP-1RCP-1M CP-1N CP-1O CP-1Q CP-1S CP-1T CP-1P T CP-1M-P T CP-1Q-T T FPB-1-2 T FPB-1-1 T FPB-1-4 T VAV-1-1 T FPB-1-5 T FPB-1-6 T FPB-1-7 T VAV-1-2 T VAV-1-3 T VAV-1-4 EXAM 129 CIRC 109 SH E E T M 1 . 1 SH E E T M 1 . 2 FPB-1-3 FPB-1-4 FPB-1-5 FPB-1-6 FPB-1-7 VAV-1-1 VAV-1-2 VAV-1-3 VAV-1-4 10"ø 330 CFM S1 10"ø 355 CFMS1 10"ø 355 CFMS1 10"ø 335 CFM S1 10"ø 355 CFMS1 10"ø 335 CFMS1 10"ø 335 CFM S1 8"ø 250 CFMS3 10"ø 390 CFMS1 8"ø 180 CFMS1 8"ø 180 CFMS1 8"ø 180 CFMS1 8"ø 180 CFM S1 8"ø 180 CFMS1 8"ø 180 CFMS1 6"ø 95 CFMS3 8"ø 180 CFMS1 8"ø 180 CFMS1 8"ø 200 CFMS4 8"ø 200 CFM S4 6"ø 35 CFMS3 6"ø 35 CFMS3 6"ø 50 CFMS3 8"ø 130 CFMS1 8"ø 200 CFMS2 8"ø 120 CFMS1 6"ø 100 CFMS1 8"ø 200 CFM S1 8"ø 195 CFMS1 10"ø 260 CFM S1 10"ø 260 CFMS1 10"ø 260 CFM S1 3 3 22"x14"12"x12" 18"x12" 10"ø 10"ø 10"ø 10"ø 10"ø 10 " ø 13 " x 5 " 12"ø 10"x10" 8" ø 8" ø 14"x10" 8"ø 8"ø 8" ø 8" ø 10"x10" 12"ø 12 " x 1 0 " 8"ø 8"ø 6"ø 6"ø 6"ø 6"ø 10"x10" 8"ø 8" ø 8"x10" 8" ø 6"ø 4 4 FPB-1-1 FPB-1-2 10"x10" 8" ø 8"ø 6"ø 8" ø 12"x12" 40"x22" 1 32 " x 2 0 " 28 " x 2 0 " 2 4 R3 R3 R1 R3 R3 R3 R3 R4 R3 R3 R5 R4 R4 R4 R4R3 R1 R3 R3 R4 R1 R4 R1 R3 6"ø 8"ø 10"ø 5 6"ø 30 CFM S3 6"ø 6"ø EF-1 EF-1 EF-1 EF-1 EF-1 6"ø 6"ø 7 7 12 " x 1 2 " 10 " ø 10 " ø 7 7 14"ø 10"ø 8"ø 8"ø 6"ø 4"ø 8"ø 6"ø 8"ø 6"ø 6"ø R3 R3 8"ø 200 CFMS2 10 " ø 10"ø 10"ø 8"ø 1 6 6 1 12"x10" 355 CFM S5 1 COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 M1.1 ME C H A N I C A L F I R S T F L O O R E A S T P L A N Author Checker 19022 11/11/2019 NORTH 1/4" = 1'-0"1 MECHANICAL FIRST FLOOR EAST PLAN REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 THERAPY 172 CLEAN LINEN 149 OPEN OFFICE 160 RECEPTION 157 THERAPY 165 EVS EQP 141 RED BAG 153 STG 171 CIRC 161 CIRC 163 STAFF LOUNGE 144 STORAGE 162 EXAM 132 FACILITIES 152 RR 174 THERAPY 173 EXAM 131 THERAPY 169 CIRC 158 THERAPY 167 THERAPY 170 THERAPY 166 EVS STOR 142 OFFICE 159 THERAPY 164 DIRTY LINEN 148 CIRC 147 IT 143 MECH 150 OFFICE 156 CIRC 155 CIRC 140 LOCKERS 145 CIRC 154 RR 146 4 5 6 A A.5 B C D D.4 E CP-1A CP-1B CP-1C CP-1D CP-1E CP-1F CP-1G CP-1H CP-1I CP-1J CP-1K CP-1L T T CP-1A-D CP-1I-L T FPB-2-2 T FPB-2-3 T FPB-2-1 T FPB-1-3 T VAV-2-1 T VAV-2-2 T VAV-2-3 TFPB-2-4 TVAV-2-4 EXERCISE 175 MAIN SUPPLY 151 SH E E T M 1 . 1 SH E E T M 1 . 2 FCU-1 UH-2T 3 FPB-2-2 FPB-2-3 FPB-2-4 VAV-2-1 VAV-2-2 VAV-2-3 VAV-2-4 10"ø 330 CFMS1 10"ø 335 CFMS1 10"ø 340 CFMS110"ø 345 CFM S1 10"ø 340 CFMS1 10"ø 340 CFMS1 10"ø 340 CFMS1 10"ø 340 CFMS1 10"ø 340 CFM S1 10"ø 340 CFM S1 10"ø 345 CFMS1 10"ø 345 CFM S1 10"ø 340 CFM S1 10"ø 340 CFMS1 8"ø 55 CFM S3 8"ø 50 CFM S3 10"ø 240 CFM S2 6"ø 60 CFMS3 10"ø 320 CFMS1 10"ø 60 CFM S1 6"ø 70 CFMS3 8"ø 200 CFMS1 8"ø 200 CFM S1 8"ø 200 CFM S1 8"ø 200 CFM S1 8"ø 200 CFMS1 8"ø 200 CFMS1 8"ø 200 CFMS1 8"ø 200 CFMS1 10"ø 240 CFM S1 8"ø 130 CFMS1 8"ø 130 CFMS1 6"ø 100 CFMS1 8"ø 125 CFM S1 8"ø 125 CFMS1 10"ø 300 CFM S1 10"ø 300 CFM S1 12"x12" 10 " ø 10 " ø 16"x12" 10"ø 10 " ø 10 " ø 16"x12" 10"ø 14"x12" 8"ø 8"ø 10"ø 6"ø 6"ø 10"ø 10"ø 1 1 2 32 " x 2 0 " 12"x12" 12"x12" 10"ø8"ø 10"ø 12"x12" 8" ø 8" ø 8" ø 8" ø 8"ø 8"ø 12"ø 12 " x 1 2 " 8"ø 8"ø 8"ø 10"ø UH-1 UH-1 T T 26"x34" 26 " x 1 6 " R3 R1 R4 R4 R4 R4 R4 R1 R3 R3 R3 R3 R3 R3 R3 R1R1R1 R3 R1 R3 R3 R3 R3 EF-2 EF-16"ø 5 7 10"ø 10"ø FPB-2-1 26"x12"16"x12" R3 6 6 6 EF-1 4 7 EF-1 10"ø 10"ø 14"ø 8"ø T CP-1E-H R3 8" ø 1 8"ø 4 1 6"ø 1 GENERAL NOTES: 1. REFER TO CORE AND SHELL PLANS FOR EXISTING SYSTEM DETAILS. COORDINATE ALL NEW WORK WITH EXISTING CORE AND SHELL DESIGN. 2. FIRST FLOOR SPACE ABOVE CEILING TO BE USED AS RETURN AIR PLENUM. ALL SYSTEMS INSTALLED IN THIS SPACE TO BE PLENUM-RATED AND SHALL COMPLY WITH ALL REQUIREMENTS LISTED IN 2015 IMC 602.2.1. 3. MAINTAIN CLEARANCES AROUND ALL EQUIPMENT PER MANUFACTUER'S RECOMMENDATIONS. 4. PROVIDE LINED RETURN AIR SOUND BOOT AT ALL FAN POWERED BOXES (NOT SHOWN). MC SHALL FIELD COORDINATE WITH OBSTRUCTIONS (SEE DETAIL ON M0.2). 5. PROVIDE LINED RETURN AIR SOUND BOOT AT ALL RETURN GRILLES (NOT SHOWN). MC SHALL FIELD COORDINATE WITH OBSTRUCTIONS AND ORIENT FOR MAXIMUM SOUND ATTENUATION FROM ADJACENT SPACES (SEE DETAIL ON M0.2). 6. COORDINATE DIFFUSER INSTALLATION WITH CEILING FANS IN EXERCISE 175 . VERIFY FINAL INSTALL LOCATIONS WITH ARCHITECT. 7. INSTALL ALL DUCTWORK TIGHT TO STRUCTURE AS HIGH AS POSSIBLE. 1 1 WORK NOTES: 1. TRANSITION DUCT UP TO RTU-2 INLET/OUTLET. REFER TO CORE & SHELL PLANS FOR ROOTOP UNIT DETAILS. 2. RETURN DUCT OPEN ON TOP PROVIDING (2) ELBOWS FOR SOUND MITIGATION. 3. SINGLE THERMOSTAT TO CONTROL FAN COIL UNIT AND WALL HEATER SERVING IT ROOM WITH 5 DEGREE F DEAD-BAND. 4. 8"Ø EA UP. REFER TO M2.1 FOR CONTINUATION. 5. 10"Ø EA UP. REFER TO M2.1 FOR CONTINUATION. 6. BIG ASS FAN i6 CEILING FAN, 72" DIAMETER, 120V/1PH/.62A. MOUNT BLADES AT 9'-3" AFF. REFER TO ELECTRICAL PLANS FOR CONTROLS. 7. 3/4" DOOR UNDERCUT. # COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 M1.2 ME C H A N I C A L F I R S T F L O O R W E S T P L A N EJ DO 19022 11/11/2019 1/4" = 1'-0"1 MECHANICAL FIRST FLOOR WEST PLAN NORTH REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 Ventilation Calculations Ventilation Calculations Comply with: 2016 ASHRAE 62.1 6.2.5 for multi-zone systems Room Name Room Area Room Type Number of People CFM/Person CFM/sqft Total Required OA CFM Total Provided OA CFM Zone Primary Airflow, Vpz (Max CFM) Primary Outdoor Air Fraction, Zpz RTU-1 - East Zone FPB 1-1,2 Lobby 101/Recep 102 1092 Reception areas 33 5 0.06 289 2,655 Vestibule 100 72 Main entry lobbies 1 5 0.06 12 350 Vestibule 106 111 Main entry lobbies 2 5 0.06 21 390 Total 322 390 3,395 0.09 FPB 1-3 Office 156 168 Office spaces 1 5 0.06 19 665 Total 19 40 665 0.03 FPB 1-4 Exam 130 125 Patient rooms 2 25 0 63 180 Exam 129 124 Patient rooms 2 25 0 63 180 Total 126 130 360 0.35 FPB 1-5 Exam 120 139 Patient rooms 2 25 0 63 180 Exam 119,118,117 381 Patient rooms 6 25 0 188 540 Total 251 260 720 0.35 FPB 1-6 Staff 116 89 Breakroom 1 5 0.12 20 95 Exam 115 110 Patient rooms 2 25 0 63 180 Ortho/Exam 114 155 Patient rooms 2 25 0 63 180 Total 146 150 455 0.32 FPB 1-7 Radiology 113 197 Patient rooms 2 25 0 63 400 Dirty, EVS Equip, EVS 183 Storage rooms 0 0 0.12 28 100 Stg 107 57 Storage rooms 0 0 0.12 9 50 Total 100 140 550 0.18 VAV 1-1 Exam 138,139 158 Patient rooms 4 25 0 125 260 Meds 123 140 Office spaces 1 5 0.06 17 200 Total 142 185 460 0.31 VAV 1-2 Exam 126 111 Patient rooms 2 25 0 63 120 Office 112 109 Office spaces 1 5 0.06 15 100 Total 78 100 220 0.35 VAV 1-3 Nurses Station 134 138 Office spaces 1 5 0.06 17 95 Circ 133,127 414 Corridors 0 0 0.06 32 300 Total 49 95 395 0.12 VAV 1-4 Nurses Station 122 351 Office spaces 2 5 0.06 39 330 Circulation East Zone 1000 Corridors 0 0 0.06 75 450 Total 114 180 780 0.15 Total 1,670 8,000 Max Zpz 0.35 System Vent Efficiency, Ev 0.8 Uncorrected Outdoor Air intake, Vou 1328 Outdoor Air Intake, Vot 1660 RTU % OA 20.9% Ventilation Calculations Ventilation Calculations Comply with: 2016 ASHRAE 62.1 6.2.5 for multi-zone systems Room Name Room Area Room Type Number of People CFM/Person CFM/sqft Total Required OA CFM Total Provided OA CFM Zone Primary Airflow, Vpz (Max CFM) Primary Outdoor Air Fraction, Zpz RTU-2 - West Zone FPB 2-1,2,3 Excercise 175 1736 Physical therapy 35 15 0 657 4,050 Circ 155 52 Corridors 0 0 0.06 4 45 Total 661 865 4,095 0.16 FPB 2-4 Red Bag 153 58 Storage rooms 0 0 0.12 9 55 Facilities 152 54 Storage rooms 0 0 0.12 9 50 Main Supply 151 310 Storage rooms 0 0 0.12 47 240 Mech 150 76 Storage rooms 0 0 0.12 12 60 Staff Lounge/Lockers/RR 287 Breakroom 2 5 0.12 56 380 EVS Stor/EVS Equip 146 Storage rooms 0 0 0.12 22 70 Total 155 225 855 0.18 VAV 2-1 Therapy 172 119 Physical therapy 3 15 0 57 200 Therapy 173 119 Physical therapy 3 15 0 57 200 Therapy 170 118 Physical therapy 3 15 0 57 200 Therapy 169 145 Physical therapy 3 15 0 57 200 Total 228 250 800 0.29 VAV 2-2 Therapy 166 117 Physical therapy 3 15 0 57 200 Therapy 167 130 Physical therapy 3 15 0 57 200 Therapy 165 105 Physical therapy 3 15 0 57 200 Therapy 164 107 Physical therapy 3 15 0 57 200 Total 228 250 800 0.29 VAV 2-3 Open Office 160 254 Office spaces 2 5 0.06 32 240 Exam 131 161 Patient rooms 2 25 0 63 130 Exam 132 162 Patient rooms 2 25 0 63 130 Office 159 84 Office spaces 1 5 0.06 13 100 Reception 157 103 Reception areas 4 5 0.06 33 125 Total 204 225 725 0.28 VAV 2-4 Circulation West Zone 977 Corridors 0 0 0.06 74 725 Total 74 120 725 0.10 Total 1,935 8,000 Max Zpz 0.29 System Vent Efficiency, Ev 0.8 Uncorrected Outdoor Air intake, Vou 1569 Outdoor Air Intake, Vot 1961 RTU % OA 24.2% (E)RTU-2 (E)RTU-1 CU-1 1 1 2 3 OA INTAKE OA INTAKE 1 10"Ø EA DN 8"Ø EA DN 1 1 8"Ø EA DN GENERAL NOTES: 1. REFER TO CORE AND SHELL PLANS FOR EXISTING SYSTEM DETAILS. COORDINATE ALL NEW WORK WITH EXISTING CORE AND SHELL DESIGN. 2. MAINTAIN CLEARANCES AROUND ALL EQUIPMENT PER MANUFACTUER'S RECOMMENDATIONS. WORK NOTES: 1. EXHAUST AIR DUCT ROUTED UP TO ROOF CAP WITH BACKDRAFT DAMPER. MAINTAIN MINIMUM 3 FEET CLEARANCE FROM OPERABLE OPENINGS INTO BUILDING AND 10 FEET CLEARANCE FROM MECHANICAL AIR INTAKES. 2. 3" COMBUSTION AIR AND FLUE FROM WATER HEATER BELOW ROUTED TO SIDEWALL. REFER TO SHEET P1.1 FOR CONTINUATION. MAINTAIN MINIMUM 12" CLEARANCE FROM OPERABLE OPENINGS INTO BUILDING. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 3. MOUNTING PLATFORM BY GC, SEE DETAIL ON M0.2. # 1 1 1 COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 M2.1 ME C H A N I C A L S E C O N D F L O O R P A R T I A L P L A N & VE N T I L A T I O N C A L C U L A T I O N S EJ DO 19022 11/11/2019 1/8" = 1'-0"1 MECHANICAL SECOND FLOOR PARTIAL PLAN NORTH REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 P FS W H S S DRAWING TITLE PLUMBING LEGEND & NOTES KEY: FULL SHEET ISSUE. PARTIAL SHEET ISSUE (SKETCH). P0.1 DRAWING NUMBER 8. 1 5 . 2 0 1 9 - 5 0 % C D THE DRAWINGS AND SPECIFICATIONS FOR THIS PROJECT ARE COPYRIGHT 2019, PCD ENGINEERING SERVICES, INC., WHICH SHALL RETAIN ALL RIGHTS OF OWNERSHIP AND COPYRIGHT FOR THE INFORMATION AND DATA DESCRIBED HEREIN, WHETHER IN HARDCOPY OR ELECTRONIC FORMAT. THESE DOCUMENTS MAY NOT BE BID, REPRODUCED, OR COPIED FOR USE ON ANY OTHER PROJECT WITHOUT WRITTEN PERMISSION FROM PCD ENGINEERING SERVICES INC. PLUMBING SCHEDULESP0.3 PLUMBING DETAILSP0.4 PLUMBING UNDERGROUND PLANP1.0 PLUMBING DWV FIRST FLOOR PLANP1.1 PLUMBING SUPPLY FIRST FLOOR PLANP2.1 ISSUE DATE - DESCRIPTION PLUMBING CONTROLS & NOTESP0.2 PLUMBING DRAWING INDEXSPECIFICATION GENERAL NOTES M U.C. SIZE CO T XXX CO2 H XXX A # X # CFM (QUANTITY) } 20/16 DIFFUSER NECK SIZE THROW BLOCKINGFLEX RIGID DUCT DIFFUSER I.D. SOD RDL ORDL GW IW RS RL PC LPS MPS MPC LPC HPS HPC FOV FOR FOS DIDIC F CWR CWS CS CHS A SYMBOL ABBREVIATION DESCRIPTION DUAL TEMPERATURE RETURNCHR DUAL TEMPERATURE SUPPLYCHS CHILLED WATER RETURNCR CHILLED WATER SUPPLYCS CONDENSER WATER RETURNCWR CONDENSER WATER SUPPLYCWS HEATING WATER RETURNHWR HEATING WATER SUPPLYHWS HIGH PRESSURE CONDENSATEHPC HIGH PRESSURE STEAMHPS LOW PRESSURE CONDENSATELPC LOW PRESSURE STEAMLPS MEDIUM PRESSURE CONDENSATEMPC MEDIUM PRESSURE STEAMMPS PUMPED CONDENSATEPC REFRIGERANT LIQUIDRL REFRIGERANT SUCTIONRS DOMESTIC COLD WATERCW DOMESTIC HOT WATERHW DOMESTIC HOT WATER CIRCULATIONHWR AIR PIPING (COMPRESSED)A DRAIND DE-IONIZED WATERDIDE-IONIZED WATER CIRCULATIONDIC FUEL OIL RETURNFOR FUEL OIL SUPPLYFOS FUEL OIL VENTFOV GASG REFRIGERANT DISCHARGERD FIREF GREASE WASTEGW MEDICAL AIRMA NITROGENN OVERFLOW ROOF DRAIN LEADERORDL OXYGENOXY ROOF DRAIN LEADERRDL SANITARY WASTESAN SAND AND OIL DRAINSOD STORMST VACUUMVAC VENTV WASTEW TO BE DEMOLISHED(D) DEMO EXISTING (LIGHT LINE)(E) NEW (HEAVY LINE)(N) SYMBOL DESCRIPTION PIPE UP AND DOWN ELBOW PIPE DOWN TEE PIPE UNION AND CAP PIPE CONTINUATION BALL VALVE, GATE VALVE MOTORIZED VALVE - 2-WAY MOTORIZED VALVE - 3-WAY PRESSURE REDUCING VALVE PIPE REDUCER CHECK VALVE BUTTERFLY VALVE, GLOBE VALVE BALANCE VALVE STRAINER HOSE-END DRAIN VALVE STRAINER WITH BLOW-OFF VENTURI GAS COCK PUMP DUAL CHECK BACKFLOW PREVENTOR REDUCED PRESSURE BACKFLOW PREVENTOR PRESSURE-TEMPERATURE TAP PRESSURE-TEMPERATURE RELIEF VALVE AIR VENT PIPE GUIDE OR SLEEVE PIPE EXPANSION JOINT PIPE ANCHOR VACUUM RELIEF VALVE THERMOMETER PRESSURE GAUGE FLOW SENSOR SYMBOL FLOOR DRAIN FLOOR SINK-FULL-3/4-HALF GRATE DRAIN ABOVE ROOF DRAIN ROOF DRAIN - OVERFLOW DOWNSPOUT NOZZLE CLEANOUT - VERTICAL CLEANOUT - HORIZONTAL WALL HYDRANT, HOSE BIBB SMOKE DETECTOR DUCT ELBOW WITH TURNING VANE DUCT TEE WITH TURNING VANES DUCT SIZE INDICATING SHEET METAL DIMENSIONS. FIRST NUMBER WIDTH AND SECOND IS DEPTH (INCHES). MANUAL DAMPER WITH LOCKING QUADRANT. MOTORIZED DAMPER FLEXIBLE DUCT CONNECTOR SPIN-IN FITTING WITH DAMPER 45° DUCT TAKE-OFF DOOR UNDERCUT FIRE DAMPER FIRE AND SMOKE DAMPER SMOKE DAMPER EXISTING FIRE DAMPER SUPPLY DIFFUSER NOTE: NOT ALL SYMBOLS ON THIS LEGEND ARE NECESSARILY USED ON THIS PROJECT. RETURN OR TRANSFER GRILLE CONNECTION NEW TO EXISTING CARBON MONOXIDE SENSOR THERMOSTAT OR TEMPERATURE SENSOR FOR DEVICE "XXX" DESCRIPTION ABOVE FINISHED FLOORAFF RECTANGULAR RETURN AIR DUCT UP RECTANGULAR SUPPLY AIR DUCT UP ROUND DUCT UP INDIRECT WASTEIW EXHAUST GRILLE RECTANGULAR EXHAUST AIR DUCT UP CARBON DIOXIDE SENSOR ABOVE FINISHED GRADEAFG PIPE FLOW DIRECTION (SHOWN TO RIGHT) ELECTRICAL CONTRACTOREC GENERAL CONTRACTORGC MECHANICAL CONTRACTORMC PLUMBING CONTRACTORPC SNOW MELT SUPPLYSMS SNOW MELT RETURNSMR ENGINEER OF RECORDEOR HUMIDISTAT OR HUMIDITY SENSOR FOR DEVICE "XXX" EXISTING RETURN AIR DEVICEER EXISTING SUPPLY AIR DEVICEES RR RS RT EXISTING TRANSFER AIR DEVICEET RELOCATED RETURN AIR DEVICE RELOCATED SUPPLY AIR DEVICE RELOCATED TRANSFER AIR DEVICE MECHANICAL LEGEND W V VAC ST SAN SMS SMR O N D MA G RD HWS HWR CR CHR DISCIPLINE EDITION INTERNATIONAL BUILDING CODEGENERAL 2015 CODE INTERNATIONAL MECHANICAL CODEHVAC / MECHANICAL 2015 INTERNATIONAL PLUMBING CODEPLUMBING 2015 NATIONAL ELECTRIC CODEELECTRICAL 2017 INTERNATIONAL FIRE CODE 2015 NFPA STANDARDS FIRE PROTECTION CURRENT INTERNATIONAL FUEL GAS CODEFUEL 2015 INTERNATIONAL ENERGY CONSERVATION CODEENERGY 2015 ICC/ANSI A117.1ACCESSIBILITY 2009 NOTES: A.ALL WORK PERFORMED SHALL COMPLY WITH THE REQUIREMENTS OF THE LISTED CODES, LOCAL CODE AMENDMENTS, AND REFERENCED STANDARDS AS ENFORCED BY THE AUTHORITY HAVING JURISDICTION (AHJ). B.ALL WORK SUBJECT TO INSPECTION BY THE AHJ AT THE PROJECT SITE FOR COMPLIANCE. TOWN OF ESTES PARKLOCAL AMMENDMENTS 2015 BUILDING CODE DATA GENERAL NOTES: A. REVIEW THE CONTRACT CONDITIONS AND GENERAL REQUIREMENTS FOR INFORMATION THAT APPLIES. B. THE WORD "PROVIDE" IS USED TO MEAN "FURNISH AND INSTALL." C. PROVIDE ALL ITEMS FOR A COMPLETE AND SUCCESSFUL OPERATION OF ALL SYSTEMS SHOWN ON THESE DRAWINGS. D. THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF THE WORK. LOCATIONS ARE APPROXIMATE UNLESS DIMENSIONED. MINOR MODIFICATIONS IN LOCATION TO MEET SITE REQUIREMENTS ARE ACCEPTABLE. REFER TO LATEST ARCHITECTURAL DRAWINGS FOR EXACT WALL LOCATIONS AND DIMENSIONS. E. THE ARCHITECTURAL AND ENGINEERING DRAWINGS ARE COMPLEMENTARY. GENERAL CONTRACTORS, SUBCONTRACTORS, AND VENDORS SHALL ACKNOWLEDGE ALL THE ARCHITECTURAL AS WELL AS ALL THE ENGINEERING DRAWINGS AND INCLUDE ALL WORK NECESSARY TO ACHIEVE A COMPLETE WORKING INSTALLATION FOR ALL DEVICES OR EQUIPMENT WHICH MAY BE SHOWN ON ONE DRAWING BUT NOT SHOWN ON ANOTHER. WHERE ELEMENTS ARE INDICATED OR DESCRIBED IN ANY DRAWING, IT IS THE INTENT THAT ALL RELATED CONSTRUCTION ASSOCIATED WITH SUCH ELEMENTS IS TO BE INCLUDED IN ORDER TO OBTAIN A COMPLETE INSTALLATION. FOR INSTANCE, IF A PIECE OF EQUIPMENT IS IDENTIFIED IN THE ARCHITECTURAL AND/OR MECHANICAL DRAWINGS, BUT THE ELECTRICAL CIRCUIT FOR SUCH EQUIPMENT IS NOT IDENTIFIED IN THE ELECTRICAL DRAWINGS, THE CONTRACTOR IS TO PROVIDE SUCH CIRCUIT IN ORDER TO HAVE FULLY OPERATIONAL EQUIPMENT. FOR ANOTHER EXAMPLE, IF A SINK IS INDICATED, IT IS THE INTENT THAT RELATED PLUMBING WORK INCLUDING DRAINS, VENT, PIPING, VALVES, ETC. ARE TO BE INCLUDED IN ORDER TO RESULT IN A FULLY OPERATIONAL SYSTEM. NO SUBCONTRACTOR SHALL BE ALLOW ED TO EXCLUDE PORTIONS OF THE COMPLIMENTARY DRAWING SET. F. LAY OUT ALL WORK IN ADVANCE. DO NOT DEFACE THE W ORK OF OTHER TRADES OR THE EXISTING BUILDING. G. LOCATION OF PIPES, DUCTS, SWITCHES, PANELS, EQUIPMENT, AND FIXTURES SHALL BE ADJUSTED TO ACCOMMODATE THE WORK OR INTERFERENCES ANTICIPATED AND ENCOUNTERED. DETERMINE THE EXACT ROUTE AND LOCATION OF EACH PIPE AND DUCT PRIOR TO FABRICATION. G.A. RIGHT-OF-WAY: LINES WHICH PITCH SHALL HAVE THE RIGHT-OF-WAY OVER THOSE WHICH DO NOT PITCH. LINES WHOSE ELEVATIONS CANNOT BE CHANGED SHALL HAVE THE RIGHT-OF-WAY OVER LINES WHOSE ELEVATIONS CAN BE CHANGED. G.B. OFFSETS, TRANSITIONS, AND CHANGES IN DIRECTION: OFFSETS, TRANSITIONS, AND CHANGES IN DIRECTION OF PIPES AND DUCTS SHALL BE MADE AS REQUIRED TO MAINTAIN PROPER HEADROOM AND PITCH OF SLOPING LINES WHETHER OR NOT INDICATED ON THE DRAWINGS. G.C. FURNISH AND INSTALL ALL TRAPS, AIR VENTS, SANITARY VENTS, AND DEVICES AS REQUIRED TO EFFECT THESE OFFSETS, TRANSITIONS, AND CHANGES IN DIRECTION. H. ALL PENETRATIONS OF FIRE RATED WALLS, FLOORS, AND CEILINGS SHALL HAVE THE SPACE AROUND PENETRATIONS SEALED WITH A FIRE BARRIER SEALANT MEETING THE REQUIREMENTS OF U.L. STANDARD 1479 AND ASTM-E 814. INSTALL SEALANT IN FULL COMPLIANCE WITH MANUFACTURER'S STANDARD INSTALLATION INSTRUCTIONS. I. ALL MATERIALS LOCATED ABOVE CEILING SHALL BE SUITABLE FOR USE WITHIN A RETURN AIR PLENUM AS REQUIRED BY THE ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL CODE. J. WHEN USING A TORCH OR OTHER FLAME-PRODUCING DEVICE ON THIS PROJECT, CONTRACTOR SHALL PROVIDE ONE APPROVED FIRE EXTINGUISHER OR WATER HOSE EQUIPPED WITH A SUITABLE NOZZLE, SUFFICIENT IN LENGTH TO REACH ALL PORTIONS OF THE BUILDING AND CONNECTED TO A WATER SUPPLY ON THE PREMISES WHERE SAID BURNING OPERATION IS PERFORMED. COMBUSTIBLE MATERIAL IN THE CLOSE PROXIMITY OF OPEN FLAME SHALL BE PROTECTED AGAINST IGNITION BY SHIELDING, WETTING, OR OTHER MEANS. IN ALL CASED, A FIRE WATCH SHALL BE MAINTAINED IN THE VICINITY OF THE OPERATION BY THE CONTRACTOR FOR ONE-HALF HOUR AFTER THE TORCH OR FLAME-PRODUCING DEVICE HAS BEEN USED. K. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING THE PROJECT AND TAKE INTO CONSIDERATION CONDITIONS THAT MAY AFFECT THE WORK. NO ADDITIONAL COMPENSATION WILL BE APPROVED FOR FAILURE TO VISIT THE SITE PRIOR TO PRICING THE WORK. L. MAINTAIN A CONTRACT SET OF THESE DRAWINGS AT THE SITE, WITH ALL CHANGES OR DEVIATIONS FROM THE ORIGINAL DRAWINGS NEATLY MARKED ON THEM IN RED COLOR. THIS SHALL BE A SEPARATE SET OF DRAWINGS NOT USED FOR CONSTRUCTION PURPOSES, WHICH SHALL BE KEPT UP TO DATE AS THE JOB PROGRESSES AND SHALL BE MADE AVAILABLE FOR INSPECTION BY THE ENGINEER AT ALL TIMES. UPON COMPLETION OF THE CONTRACT, THIS SET OF "AS-BUILTS" SHALL BE DELIVERED TO THE ENGINEER WITHIN 15 DAYS OF COMPLETION OF THE PROJECT. M. MATERIAL SHALL BE AS SPECIFIED. SUBSTITUTIONS WILL BE CONSIDERED IF SUBMITTED FOR PRIOR APPROVAL AT LEAST ONE (1) WEEK PRIOR TO THE CONTRACT BID DATE. SUBSTITUTIONS SHOULD BE SUBMITTED SEPARATELY FOR EACH PRODUCT WITH SUPPORTING DATA, DRAWINGS AND SAMPLES AS APPROPRIATE, INCLUDING: 1.) COMPARISON OF THE QUALITIES OF THE PROPOSED SUBSTITUTION WITH THAT SPECIFIED. 2.) CHANGES REQUIRED IN OTHER ELEMENTS OF THE WORK BECAUSE OF THE SUBSTITUTION. 3.) COST DATA COMPARING THE PROPOSED SUBSTITUTION WITH THE PRODUCT SPECIFIED. THE ENGINEER WILL DETERMINE THE ACCEPTABILITY OF THE PROPOSED SUBSTITUTION. N. SUBMIT ELECTRONIC PDF OF MANUFACTURER'S SHOP DRAW INGS FOR EQUIPMENT AND DEVICES. PRIOR TO SUBMITTING THE SHOP DRAWINGS FOR REVIEW, THE CONTRACTOR SHALL REVIEW AND CERTIFY SAME AS TO COMPLIANCE WITH THE PLANS AND SPECIFICATIONS AND FOR DIMENSIONAL SUITABILITY FOR THE APPLICATIONS. O. WHEN ALTERNATE OR SUBSTITUTED EQUIPMENT IS USED, CONTRACTOR IS RESPONSIBLE FOR COORDINATING SPACE REQUIREMENTS, CONFIGURATIONS, CHANGES IN SUPPORTS OR STRUCTURAL MEMBERS, ELECTRICAL REQUIREMENTS, AND COORDINATION OF OTHER TRADES THAT MAY BE AFFECTED BY THEIR USE. CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE SAME WHEN USING LISTED APPROVED MANUFACTURERS OTHER THAN THE BASIS OF DESIGN. P. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND PERSONNEL REQUIRED FOR TESTING OF INSTALLED EQUIPMENT. Q. THE CONTRACTOR SHALL DEMONSTRATE THE PROPER OPERATION AND CALIBRATION OF ALL SYSTEMS TO THE OWNER, AT A TIME AS AGREED TO BY THE OWNER AND DIRECTED BY THE OWNER. R. THE CONTRACTOR SHALL PROVIDE THE OWNER WITH OPERATION AND MAINTENANCE MANUALS FOR ALL SYSTEMS WITHIN 15 DAYS OF THE COMPLETION OF THE PROJECT. S. THE CONTRACTOR SHALL INCLUDE THE COST FOR COMMISSIONING TO VERIFY THE PERFORMANCE OF THE SYSTEM CONTROLS SHOWN ON THIS DRAWING. THIS INCLUDES PREPARING A COMMISSIONING PLAN, VERIFYING THE OPERATION OF ALL SYSTEMS PER CODE REQUIREMENTS, AND PROVIDING A FINAL COMMISSIONING REPORT. SUBMIT TO ENGINEER FOR REVIEW. FINAL COMMISSIONING REPORT IS DUE WITHIN 90 DAYS OF COMPLETION OF THE PROJECT. CODES, REGULATIONS, AND STANDARDS: 1. ALL WORK SHALL BE IN STRICT ACCORD WITH LOCAL GOVERNING LAWS, ORDINANCES, AND REGULATIONS; ALL WORK MUST BE IN FULL ACCORDANCE WITH ALL CODES, ORDINANCES, AND CODE RULINGS. CONTRACTOR SHALL PROVIDE, WITHOUT EXTRA CHARGE, THE LABOR AND MATERIALS REQUIRED FOR FULL CODE COMPLIANCE. 2. ALL MATERIALS SHALL BE NEW AND SHALL COMPLY WITH THE SPECIFICATIONS ON DRAWINGS. 3. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LOCAL FEES, PERMITS, AND SERVICES OF INSPECTION AUTHORITIES REQUIRED BY THE WORK OF THE PROJECT. THE CONTRACTOR SHALL ARRANGE FOR ALL INSPECTIONS WHEN THEY BECOME DUE AND SHALL NOT COVER NEW WORK UNTIL APPROVED BY THE INSPECTION AUTHORITY. GUARANTEE: A. THE CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP, MATERIALS, AND EQUIPMENT PROVIDED FOR THE PROJECT AGAINST DEFECTS AND/OR FAULTY WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER. B. THE CONTRACTOR SHALL REPAIR AND/OR REPLACE DEFECTIVE OR FAULTY WORKMANSHIP, MATERIALS, OR EQUIPMENT, AND SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF OTHER PROPERTY OR WORK DAMAGED AS A RESULT, WITHOUT CHARGE TO THE OWNER AND AS QUICKLY AS POSSIBLE, DURING THE GUARANTEE PERIOD. 10 . 9 . 2 0 1 9 - P E R M I T PLUMBING DWV ISOMETRICP0.5 11 . 1 1 . 2 0 1 9 - A D D E N D U M 1 ( D E L T A 1 ) COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 P0.1 PL U M B I N G L E G E N D & N O T E S EJ DO 19022 11/11/2019 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 1. THE NEW PLUMBING SYSTEMS SHALL BE BY THE PLUMBING CONTRACTOR. THIS INCLUDES, BUT IS NOT LIMITED TO: 1.1. THE PLUMBING FIXTURES AND EQUIPMENT AS SCHEDULED OR LISTED. 1.2. THE WATER DISTRIBUTION SYSTEMS WITH: WATER SERVICE ENTRANCE, BACKFLOW PREVENTION, PRESSURE REGULATION, PIPING, VALVES, INSULATION, WATER HEATING EQUIPMENT, PUMPS, CONTROL SYSTEMS, ETC. 1.3. THE WASTE AND VENT SYSTEMS WITH: PIPING, TRAPS, INTERCEPTORS, CLEANOUTS, VALVES, INSULATION, ETC. 1.4. THE GAS DISTRIBUTION SYSTEMS WITH: GAS METER SERVICE ENTRANCE, PRESSURE REGULATION, PIPING, VALVES, EQUIPMENT CONNECTIONS, CONTROL SYSTEMS, ETC. 2. ALL PLUMBING SHALL BE IN ACCORDANCE WITH THE LOCAL PLUMBING CODES AND/OR ORDINANCES, INCLUDING, BUT NOT LIMITED TO PIPE SIZE. 3. CONTRACTOR SHALL MAINTAIN FULL RESPONSIBILITY FOR ALL DAMAGE CAUSED BY LEAKS IN PIPING SYSTEMS WHICH HE HAS BUILT OR MODIFIED IN ANY WAY. ALL DAMAGE SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE OWNER. 4. PROJECT DESIGN CONDITIONS ARE: 4.1. LOCATION: ESTES PARK, COLORADO, LARIMER COUNTY. 4.2. SITE ELEVATION: 7,525 FEET. 4.3. DOMESTIC WATER PROVIDED BY: TOWN OF ESTES PARK WATER DEPARTMENT. 4.3.1. DESIGN CONDITIONS PER CITY WATER DEPARTMENT ARE: 4.3.1.1. MINIMUM DESIGN WATER PRESSURE: 75 PSI. 4.3.1.2. MAXIMUM DESIGN WATER PRESSURE: 75 PSI. 5. INSTALL ALL PIPING TRUE AND PLUMB, PARALLEL OR PERPENDICULAR TO BUILDING CONSTRUCTION. USE ONLY NEW MATERIALS, CLEAN AND FREE OF RUST. 6. PROVIDE DIELECTRIC UNIONS AT ALL PIPING CONNECTIONS OF DISSIMILAR METALS. 7. DOMESTIC WATER PIPING ABOVE GRADE; 7.1. TYPE "L" HARD DRAWN COPPER WITH WROUGHT COPPER SWEAT FITTINGS. USE ONLY CANFIELD 100% WATERSAFE SOLDER (95% TIN, 4% COPPER, 1% SILVER) OR APPROVED EQUAL. DO NOT USE LEAD OR ANTIMONY SOLDERS. 8. DOMESTIC WATER PIPING BELOW GRADE - TYPE "K" SOFT DRAWN COPPER WITH WROUGHT COPPER BRAZED FITTINGS. USE ONLY CANFIELD BRAZESAFE 56 BRAZING ALLOY OR APPROVED EQUAL. DO NOT USE LEAD OR ANTIMONY BRAZING ALLOYS. INSTALL WITHOUT JOINTS WHERE POSSIBLE. IF JOINTS ARE REQUIRED, LOCATE THEM ON THE RECORD DRAWINGS WITH DIMENSIONS TO WALLS OR OTHER REFERENCE POINTS. 9. INSULATE DOMESTIC HOT WATER PIPING AND HOT WATER RECIRCULATION PIPING ABOVE GRADE WITH 1" THICK SNAP-ON TYPE FIBERGLASS PIPE INSULATION WITH SELF SEALING ALL-SERVICE JACKET, FLAME RETARDANT. INSULATE DOMESTIC COLD WATER PIPING ABOVE GRADE WITH 1/2" THICK SNAP-ON TYPE FIBERGLASS PIPE INSULATION WITH SELF SEALING ALL-SERVICE JACKET, FLAME RETARDANT. ALL WATER VALVES AND FITTINGS SHALL BE INSULATED WITH MOLDED OR MITERED FIBERGLASS (SAME THICKNESS AS ASSOCIATED PIPING), FINISHED WITH A BRUSH COAT OF B.F. 30-35, 6 OZ. CANVAS AND A SECOND COAT OF SEALANT. NO STAPLES SHALL BE USED ON WATER PIPE INSULATION. 10. INTERIOR SOIL, WASTE, AND VENT PIPING ABOVE GRADE - SERVICE WEIGHT IRON SOIL PIPE AND NO-HUB FITTINGS, (PVC SCHEDULE-40 SOLID CORE PLASTIC PIPE AND FITTINGS MAY BE USED WHERE ALLOWED BY THE BUILDING DEPARTMENT AND NOT LOCATED IN NEW OR EXISTING RETURN AIR PLENUM.) 11. INTERIOR SOIL, WASTE, AND VENT PIPING BELOW GRADE - SERVICE WEIGHT CAST IRON HUB AND SPIGOT SOIL PIPE AND FITTINGS WITH NEOPRENE GASKETS. (PVC SCHEDULE-40 SOLID CORE PLASTIC PIPE AND FITTINGS MAY BE USED WHERE ALLOWED BY THE BUILDING DEPARTMENT.) 12. SLOPE ALL SANITARY WASTE LINES DOWN TOWARDS DRAIN. MINIMUM SLOPE EQUALS 1/4" PER LINEAR FOOT FOR PIPING 2-1/2" DIAMETER AND SMALLER; 1/8" PER LINEAR FOOT FOR ALL PIPING 3" DIAMETER AND LARGER. SLOPE ALL SANITARY VENT LINES TOWARD TRAP SERVED AT MINIMUM 1/10" PER LINEAR FOOT. 13. ALL REQUIRED SAWCUTTING, EXCAVATING, AND BACKFILLING SHALL BE PERFORMED BY PLUMBING CONTRACTOR FOR INSTALLATION OF NEW PLUMBING PIPING. CONCRETE FLOOR PATCHING SHALL BE PERFORMED BY G.C. 14. ALL CORE DRILLING THROUGH CONCRETE FLOORS, WALLS, OR ROOF SHALL BE PROCEED BY X-RAYING. THIS WORK IS THE RESPONSIBILITY OF THE CONTRACTOR. 15. GAS PIPING 2" AND SMALLER SHALL BE THREADED SCHEDULE 40 STEEL PIPE WITH MALLEABLE IRON FITTINGS. ALL GAS PIPE OVER 2" IN SIZE SHALL BE WELDED. 16. CONTRACTOR SHALL VERIFY GAS PRESSURE DELIVERED BY METER AT EXITING BUILDING (IF APPLICABLE). PROVIDE GAS PRESSURE REGULATOR AT GAS PIPING SUPPLY TO EACH PIECE OF CONNECTED EQUIPMENT IF GAS PRESSURE AT METER OUTLET EXCEEDS 7" W.C. 17. TEST THREADED NATURAL GAS PIPING AT 20 PSIG FOR A TEST PERIOD OF 2 HOURS. TEST PRESSURE SHALL NOT FALL OVER 5% DURING TEST PERIOD TO PASS. IF PIPING FAILS TEST, INVESTIGATE AND REPAIR THE SOURCE OF LEAKAGE AND REPEAT TEST. 18. ALL NEW EXTERIOR GAS PIPING SHALL BE PAINTED WITH AN ENAMEL CORROSION-RESISTANT PAINT BY THE M.C. FOLLOWING PRESSURE TESTING OF GAS PIPING. COLOR TO MATCH BUILDING EXTERIOR. 19. ALL NATURAL GAS PIPING SHALL BE BUILT AND SUPPORTED IN COMPLIANCE WITH THE LATEST EDITION OF NFPA PAMPHLET 54. 20. INTERIOR ROOF DRAINAGE PIPING ABOVE GRADE - SERVICE WEIGHT IRON SOIL PIPE AND NO-HUB FITTINGS, (PVC SCHEDULE-40 SOLID CORE PLASTIC PIPE AND FITTINGS MAY BE USED WHERE ALLOWED BY THE BUILDING DEPARTMENT) AND NOT LOCATED IN AN AIR PLENUM. 21. INSULATE ALL NEW PIPING, DRAINS AND FITTINGS FOR ROOF DRAINAGE, INCLUDING OVERFLOW PIPING SYSTEMS, WITH 1/2". 75 DEGREE MEAN TEMPERATURE FOR ALL HORIZONTAL PIPING AND VERTICAL PIPING WITHIN 24 INCHES VERTICALLY OF THE ROOF DRAIN, OR AS OTHERWISE INDICATED. 22. ALL PIPE INSULATION MATERIALS SHALL CONFORM TO ASTM 84, NFPA 50A AND 255 AND UL 723 NOT TO EXCEED RATING OF 25 FLAME SPREAD AND 50 SMOKE DEVELOPED. ALL INSTALLED INSULATION SHALL MEET OR EXCEED ASHRAE STANDARD 90.1 AND IECC. 23. INSULATION EXPOSED OUTSIDE SHALL BE COVERED WITH AN ALUMINUM JACKET OR OTHER ENGINEER APPROVED COVER. 24. MOUNT LAVATORY AT REQUIRED ELEVATION FOR HANDICAP USAGE WHERE REQUIRED. INSULATE ALL EXPOSED PIPING PER ANSI/ICC A117.1. 25. WEATHERPROOF ALL PLUMBING ROOF PENETRATIONS PER CODES AND ROOFING MANUFACTURER RECOMMENDATIONS. PLUMBING VENT PENETRATIONS SHALL BE CAST IRON AND ONE SIZE LARGER THAN REQUIRED VENT SIZE. 26. PROVIDE LINE SIZE SHUT-OFF VALVE, MALLEABLE UNION, AND 6" DIRT LEG ON ALL GAS EQUIPMENT. 27. ACCESSIBLE WATER HAMMER ARRESTERS SHALL BE PROVIDED AND INSTALLED ON WATER PIPING WITH QUICK CLOSING VALVES TO PREVENT PIPING SHOCK OR HAMMER. 28. ALL MATERIAL AND EQUIPMENT PROVIDED AND INSTALLED UNDER THIS SECTION SHALL BE NEW AND IN CLEAN AND BRIGHT CONDITION. THE CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO ENSURE AND MAINTAIN THE QUALITY OF THE INSTALLATION. ALL PIPING SHALL BE FLUSHED WITH CLEAN WATER PRIOR TO BEING PLACED INTO SERVICE TO ENSURE THAT ALL RESIDUAL CUTTING OIL, SLAG, THREAD TAPE, FLUX OR DIRT HAS BEEN PURGED. IN ADDITION TO FLUSHING, THE DOMESTIC WATER PIPING SHALL BE STERILIZED TO ELIMINATE ALL CONTAMINATION IN ACCORDANCE WITH IPC RECOMMENDATIONS. 29. PROVIDE FREEZE PROTECTION FOR PIPING WITHIN UNHEATED SPACES. 30. ALL PIPING, EQUIPMENT, ETC. SHALL BE IDENTIFIED. 31. ALL SAFETY RELIEF VALVES SHALL BE VENTED TO ATMOSPHERE OR PIPED TO FLOOR, NEAREST FLOOR SINK, OR OTHER APPROVED RECEPTOR. REDUCED PRESSURE BACKFLOW PREVENTORS SHALL BE PROVIDED WITH ATTACHED FUNNEL PIPED TO THE NEAREST FLOOR SINK, RECEPTOR, OR OUTSIDE. 32. PRESSURE REDUCING VALVES SHALL BE INSTALLED ON ALL WATER SERVICES WHERE THE WATER PRESSURE EXCEEDS 80 PSI. 33. BACKFLOW PREVENTORS SHALL BE INSTALLED AND CERTIFIED BY PLUMBING CONTRACTOR PER THE LOCAL WATER UTILITY COMPANY REQUIREMENTS. 34. ALL PIPING TO BE HUNG ON ADJUSTABLE SPLIT RING HANGERS OF SIMILAR MATERIAL AS THE PIPE UNLESS OTHERWISE NOTED. PIPING RACKED ON WALLS SHALL BE RACKED ON UNI-STRUT TYPE SUPPORTS. PIPE HANGER SPACING PER THE PLUMBING CODE REQUIREMENTS. 35. PROVIDE ALL CURBS, SUPPORTS, AND ANCHORS FOR MECHANICAL WORK. NO CHAIN, TAPE OR WIRE MAY BE USED FOR HANGING OR SUPPORTING. 36. RECEIVE, UNCRATE, ASSEMBLE, ENSURE, AND INSTALL ALL EQUIPMENT FURNISHED BY THIS CONTRACT (AND FURNISHED BY THE OWNER) IN CONFORMANCE TO MANUFACTURER'S STANDARD INSTALLATION INSTRUCTIONS. 37. THIS CONTRACTOR SHALL COORDINATE ALL PIPING PRIOR TO INSTALLATION. 38. PROVIDE SLEEVES AND COLLARS FOR ALL PIPES THROUGH WALL, FLOORS, AND CEILINGS. SEAL ALL EXTERNAL PENETRATIONS OF FIRE RATED WALL, FLOORS, AND CEILINGS WITH APPROVED FIRE STOP MATERIAL IN COMPLIANCE WITH ASTM E814 AND UL 1479.. 39. A MINIMUM CLEARANCE OF 30 INCHES SHALL BE PROVIDED AROUND ALL EQUIPMENT (I.E., WATER HEATERS, PUMPS, BOILERS, ETC.) FOR SERVICE AND MAINTENANCE. 40. ROOF MOUNTED EQUIPMENT LOCATED WITHIN 10 FEET OF THE EDGE OF THE ROOF SHALL BE PROVIDED WITH SAFETY RAILINGS AS REQUIRED PER CODES OR AS DETAILED ON THE ARCHITECTURAL DRAWINGS. 41. TEST ALL PIPING SYSTEMS IN WHICH ANY ALTERATIONS HAVE BEEN MADE FOR COMPLIANCE WITH THE LATEST EDITION OF THE INTERNATIONAL PLUMBING AND FUEL/GAS CODE. DOMESTIC HOT AND COLD WATER PIPING SHALL BE SUBJECT TO 100 PSIG FOR A MINIMUM OF 24 HOURS, DOMESTIC WASTE AND VENT PIPING SHALL BE TESTED AT 10' STATIC HEAD FOR A PERIOD GREATER THAN 15 MINUTES. IF THE REQUIRED PRESSURE DROPS BY MORE THAN 5% DURING ITS TEST DURATION, INVESTIGATE THE SOURCE OF THE LEAK, REPAIR THE LEAK, AND RETEST THE SYSTEM FOR THE REQUIRED TEST PERIOD. INSPECT ALL W & V JOINTS WHILE UNDER PRESSURE AND REPAIR ALL LEAKS. 42. SEE PLUMBING CONTROLS THIS SHEET FOR TEMPERATURE CONTROLS REQUIREMENTS. 1. THE PLUMBING SYSTEM CONTROLS ARE TO BE FULLY AUTOMATIC UNLESS OTHERWISE LISTED BELOW. 2. ALL CONTROL SYSTEMS SHALL BE DESIGNED AND PROVIDED BY A CONTROL MANUFACTURER WHO HAS BEEN IN THE BUSINESS OF MANUFACTURING, DESIGNING, AND INSTALLING CONTROL COMPONENTS FOR A MINIMUM OF TEN (10) YEARS. 3. COORDINATE WITH ELECTRICAL CONTRACTOR FOR INTERFACE WITH LINE VOLTAGE WIRING, CONNECTIONS, RELAYS, ETC. 4. SETPOINTS: 4.1. WATER TEMPERATURE AT WATER HEATER DISCHARGE: 4.1.1. 140 DEGREES FAHRENHEIT (ADJUSTABLE). 4.2. WATER TEMPERATURE AT MASTER THERMOSTATIC MIXING VALVE DISCHARGE: 4.2.1. 120 DEGREES FAHRENHEIT (ADJUSTABLE). 4.3. MAXIMUM WATER TEMPERATURE AT LAVATORY OR HAND SINK FAUCET: 4.3.1. 105 DEGREES FAHRENHEIT (ADJUSTABLE). 4.4. WATER TEMPERATURE AT EMERGENCY EQUIPMENT DISCHARGE: 4.4.1. 80 DEGREES FAHRENHEIT (ADJUSTABLE). 5. WATER HEATER: 5.1. WATER HEATER SHALL HAVE INTEGRAL CONTROLS TO MAINTAIN TEMPERATURE SETPOINT. 5.2. CONTROLS SHALL HAVE INTEGRAL FAULT DETECTION AND DIAGNOSTIC CAPABILITIES. 5. WATER HEATER CIRCULATION PUMP: 5.1. PUMP SHALL BE CONTROLLED BY A TIMER TO RUN DURING BUILDING OCCUPIED PERIODS. 5.2. AQUASTAT ON RETURN PIPE SHALL CYCLE PUMP TO MAINTAIN 135 DEGREES FAHRENHEIT (ADJUSTABLE). PLUMBING GENERAL NOTESPLUMBING CONTROLS COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 P0.2 PL U M B I N G C O N T R O L S & N O T E S EJ DO 19022 11/11/2019 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 PUMP SCHEDULE MIN PRESSURE (PSI) MAX MIN TEMP. (°F) MAX NOTES: A. PROVIDE PUMP WITH PROGRAMMABLE TIMER. B. PROVIDE PUMP WITH CHECK VALVE. TAG MANUFACTURER MODEL SERVICE LOCATION HEAD (FEET) HORSE POWER OR WATTS VOLTS/ PHASETYPE FLOW (GPM) EQUALS BY: BELL & GOSSETT, GRUNDFOS, WILO. 120/ 1∅007TACO HW RECIRC. WH CLOSET 5' 1/25 HPCP-1 CIRCULATOR 2 Pipe sizing guide for Copper Type L, 8 fpm maximum velocity (inside): Pipe size (inch)Max GPM Max WSFU - FV Max WSFU- Non FV 1/2 3.5 0 1 3/4 6.5 0 3 1 13 0 8 1-1/4 28 11 45 1-1/2 40 27 87 2 80 158 275 TAG MANUFACTURER MODEL BTH-150(A)AO SMITH 178 NOTES: A. POWER DIRECT VENT. B. ASME T&P RELIEF VALVE. EQUALS BY: BRADFORD WHITE, RHEEM, STATE. GWH-1 CAPACITY (GALLONS) 100 RECOVERY 100°F RISE (GPH) FUEL N. GAS GAS INPUT (MBH) 150 NOTES A-C120/1 5 ELECTRICAL REQUIREMENTS VOLTAGE/ PHASES AMPS EFFICIENCY FACTOR 98 EF C. SHEET METAL DRAIN PAN. GAS OUTPUT (MBH) 103 TAG MANUFACTURER MODEL MOUNTING TANK VOLUME (GAL)NOTES A-CST-20V-CAMTROL STAND 8.0 .4 NOTES: A. CHARGE TO MINIMUM SYSTEM PRESSURE LISTED HERE PRIOR TO INSTALLATION. B. ASME SERIES. ET-1 ACCEPT. FACTOR 20 80 50 160 SERVICE GWH-1 EQUALS BY: PROFLO, TACO. TAG DESCRIPTION MSB-1 MOP SERVICE BASIN SH-1 SHOWER EWC-1 ELECTRIC WATER COOLER S-5 SINK, WALL-HUNG WASTE DISPOSAL TAG FIXTURE TYPE WASTE (INCHES) COLD WATER (INCHES) NOTESVENT (INCHES) HOT WATER (INCHES) AELEC. WATER COOLER 1-1/2 1-1/4 1/2EWC-1 - NONE-SHOWER 2 1-1/4 1/2SH-1 1/2 -SINK 2 1-1/4 1/2S-1 1/2 -MOP SERVICE BASIN 3 1-1/2 3/4MSB-1 3/4 NONE NONE A-LAVATORY 1-1/2 1-1/4 1/2L-1 1/2 TANKWATER CLOSET 3 2 1/2WC-1 - NONE -SINK 2 1-1/4 1/2S-2 1/2 NONE -SINK 2 1-1/4 1/2S-3 1/2 NONE FS-1 FLOOR SINK NONE - FLOOR SINK 3 2 - FS-1 - NOTES: 1. PROVIDE SUITABLE REINFORCEMENTS FOR WALL HANGERS & SUPPORTS. 2. APPROVED EQUALS: 2.1. DRAINS: JOSAM, SMITH, SUN, WADE, ZURN. 2.2. CHINA: AMERICAN STANDARD, KOHLER, TOTO. 2.3. STAINLESS SINKS: BK RESOURCES, DAYTON, ELKAY, JUST. 2.4. FAUCETS: CHICAGO, DELTA, MOEN, PIONEER, SYMMONS. 2.5. SEATS: BEMIS, CHURCH, OLSONITE. 2.6. HYDRANTS: CHICAGO, WOODFORD. 2.7. BRASS: BRASSCRAFT, CS&B, DEARBORN. 3. ALL LAVATORIES MUST HAVE ASSE 1070 TEMPERING VALVES AND ADA BRAND = FIAT MODEL MSB2424 SPECIFICATIONS = 24"x24"x10", MOLDED STONE. FAUCET = FIAT MODEL 830AA SERVICE SINK FAUCET, 8" CENTERS, CROSS HANDLES, THREADED SPOUT WITH INTEGRAL VACUUM BREAKER, POLISHED CHROME, WITH WALL BRACE. WASTE = 3" OUTLET WITH DOME DRAIN STRAINER. OTHER = WITH STAINLESS STEEL BUMPERGUARDS ON OPEN SIDES. GRAB BARS BY ARCHITECT. PREFAB SHOWER STALL = DREAMLINE DL-6194C-01, 36"Wx36"Dx76-3/4"H. VALVE AND TRIM = DELTA T14259-LHD, CHROME FINISH. SHOWERHEAD = HIGH SIERRA SHOWERHEADS HDFCS-100-CH, CHROME FINISH, 1.5 GPM. WASTE = KOHLER K-9132 SHOWER DRAIN, DRAIN LOCATION PER PLANS. BRAND = ELKAY LMABFTL8WSSK. SPECIFICATIONS = ADA, BARRIER FREE, STAINLESS STEEL, DOUBLE BI-LEVEL STATIONS WITH BOTTLE FILLER, 8GPH, FILTERED, 115 V, 6.0 A. BRAND = ZURN MODEL Z1901. SPECIFICATIONS = 12"x12" A.P.C. FLOOR SINK 6" SUMP DEPTH. OTHER = DOME STRAINER, SEEPAGE FLANGE & 3/4 TOP GRATE. WASTE = DEEP SEAL P-TRAP WITH PROSET SYSTEMS TRAP-GUARD MODEL TG33ZURN. NOTES: 1. PIPE SIZES SHOWN ARE MINIMUM SIZE TO A SINGLE FIXTURE. 2. ALL FIXTURES LISTED ARE NOT NECESSARILY USED ON THIS PROJECT. A. WASTE PIPING BELOW GRADE SHALL BE A MINIMUM OF 2". B. PROVIDE PRV SET AT 20 PSI AND PDI SIZE "A" WATER HAMMER ARRESTOR. IMB-1 ICE MAKER BOX BRAND = OATEY MODEL 12K. SPECIFICATIONS = INTEGRAL 1/4 TURN SHUT-OFFS AND WATER HAMMER ARRESTOR. NONEICE MAKER BOX - 1/2IMB-1 -- EYE WASH, FAUCET MOUNTEW-1 -- BRAND = BRADLEY MODEL S19-200B. SPECIFICATIONS = CHROME-PLATED BRASS SPRAYHEAD WITH TWIN SOFT=FLOW EYEWASH HEADS.. TEMPERING VALVE = BRADLEY MODEL S19-2000. OTHER = PROVIDE ADAPTOR TO FIT FAUCET. WASTE = WITH CHROME PLATED FINISH P-TRAP. -SINK 2 1-1/4 1/2S-4 1/2 NONE -SINK 3 2 1S-5 1/2 NONE BRAND = ZURN Z5410. SPECIFICATIONS = WALL HUNG BLOWOUT SERVICE SINK, 21.5"X19", VITREOUS CHINA, ANTIMICROBIAL CERAMIC GLAZE, FAUCET = ZURN Z5410.010.01.49.50.51, POLISHED CHROME-PLATED CAST BRASS 8" CLINICAL SERVICE SINK FAUCET, 3" LONG SWIVEL INLETS WITH INTEGRAL STOPS, INTEGRAL 3 4" HOSE THREADED OUTLET, PAIL HOOK, FORKED BOTTOM FRAME, 6" VANDAL-RESISTANT WRIST BLADE HANDLES. FLUSH VALVE = ZURN Z6000AV-BWN1, 1.28 GPF, WITH BEDPAN WASHER. SUPPLIES = LOOSE KEY 1/4-TURN ANGLE STOP VALVE WITH CHROME PLATED BRASS OR BRAIDED STAINLESS STEEL SUPPLIES. WASTE = 4" 17 GA. C.P. P-TRAP WITH CLEAN OUT. TAG MANUFACTURER MODEL SERVICE TM-1520B-LF-DTLEONARD URGENT CARETMV-1 125 120 NOTES A,B TAG DESCRIPTION WC-1 BRAND = KOHLER MODEL K-3949 (-RA) HIGHLINE. SPECIFICATIONS = 1.28 GPF FLUSH TANK, WHITE VITREOUS CHINA, ELONGATED BOWL. SEAT = BEMIS MODEL 1655SSCT, OPEN FRONT, LESS COVER, WHITE SOLID PLASTIC, STAINLESS STEEL POSTS AND PINTLES. SUPPLY = LOOSE KEY 1/4-TURN ANGLE STOP VALVE WITH CHROME PLATED BRASS OR BRAIDED STAINLESS STEEL SUPPLY. OTHER = MINIMUM OF 1,000 MaP TEST PERFORMANCE. FLUSH HANDLE ON OPEN SIDE OF STALL OR ROOM. COMPLY WITH ANSI A117.1 REQUIREMENTS. WATER CLOSET, FLOOR MOUNT, TANK TYPE, ACCESSIBLE L-1 BRAND = KOHLER MODEL K-2032 GREENWICH. SPECIFICATIONS = WHITE VITREOUS CHINA, SELF RIMMING, THREE HOLE, WITH OVERFLOW. FAUCET = DELTA MODEL 21C-4-5-3, TWO HANDLE, 4" CENTERS, CHROME FINISH, 0.5 GPM AERATOR OUTLET. SUPPLIES = LOOSE KEY 1/4-TURN ANGLE STOP VALVES WITH CHROME PLATED BRASS OR BRAIDED STAINLESS STEEL SUPPLIES. TEMPERING VALVE = WATTS MODEL USG-B, ASSE 1070. SET AT 105 DEGREES F. (ADJUSTABLE) OUTLET TEMPERATURE. WASTE = 1-1/2" 17 GA. CHROME PLATED FINISH P-TRAP WITH CLEAN OUT AND OFFSET GRID STRAINER. OTHER = WITH CONCEALED ARM WALL SUPPORT. ANSI A117.1 APPROVED WITH "TRUEBRO LAV GUARD" INSULATION KIT. LAVATORY, WALL HUNG, ACCESSIBLE S-2 BRAND = ELKAY MODEL LRAD221965PD. SPECIFICATIONS = SINGLE BOWL, STAINLESS STEEL, 22"x19.5"x6.5", 3-HOLE PUNCH, DROP-IN. FAUCET = DELTA MODEL 27C4944, SINGLE HANDLE, 8" CENTERS, CHROME FINISH, 10" GOOSENECK SPOUT, 1.5 GPM. SUPPLIES = LOOSE KEY 1/4-TURN ANGLE STOP VALVES WITH CHROME PLATED BRASS OR BRAIDED STAINLESS STEEL SUPPLIES. WASTE = 2" 17 GA. C.P. P-TRAP WITH CLEAN OUT. OTHER = ANSI A117.1 APPROVED WITH "TRUEBRO LAV GUARD" INSULATION KIT ON EXPOSED PIPING. SINK, COUNTERTOP, ACCESSIBLE S-4 BRAND = ELKAY MODEL LRAD332265. SPECIFICATIONS = DOUBLE BOWL, STAINLESS STEEL, 33"x22"x6.5", 4-HOLE PUNCH, DROP-IN. FAUCET = DELTA MODEL 400LF-HDF, SINGLE HANDLE, 8" CENTERS, CHROME FINISH, 8" LONG SWING SPOUT, WITH SPRAY HOSE, 1.5 GPM AERATOR. DISPOSER = INSINKERATOR MODEL EVOLUTION ESSENTIAL, 3/4 HP, 120 VOLT, WITH STAINLESS STEEL GRID CHAMBER AND COMPONENTS. SUPPLIES = LOOSE KEY 1/4-TURN ANGLE STOP VALVES WITH CHROME PLATED BRASS OR BRAIDED STAINLESS STEEL SUPPLIES. WASTE = 2" 17 GA. C.P. P-TRAP WITH CLEAN OUT. OTHER = ANSI A117.1 APPROVED WITH "TRUEBRO LAV GUARD" INSULATION KIT ON EXPOSED PIPING. SINK, COUNTERTOP, ACCESSIBLE S-3 BRAND = ELKAY MODEL LRAD332265. SPECIFICATIONS = DOUBLE BOWL, STAINLESS STEEL, 33"x22"x6.5", 3-HOLE PUNCH, DROP-IN. FAUCET = DELTA MODEL 27C4944, SINGLE HANDLE, 8" CENTERS, CHROME FINISH, 10" GOOSENECK SPOUT, 1.5 GPM. SUPPLIES = LOOSE KEY 1/4-TURN ANGLE STOP VALVES WITH CHROME PLATED BRASS OR BRAIDED STAINLESS STEEL SUPPLIES. WASTE = 2" 17 GA. C.P. P-TRAP WITH CLEAN OUT. OTHER = ANSI A117.1 APPROVED WITH "TRUEBRO LAV GUARD" INSULATION KIT ON EXPOSED PIPING. SINK, COUNTERTOP, ACCESSIBLE S-1 BRAND = ELKAY MODEL RLRL12. SPECIFICATIONS = SINGLE BOWL, STAINLESS STEEL, 14-3/8"x14-3/8"x6", ROUND, DROP-IN. FAUCET = DELTA MODEL 27C4944, SINGLE HANDLE, 8" CENTERS, CHROME FINISH, 10" GOOSENECK SPOUT, 1.5 GPM. SUPPLIES = LOOSE KEY 1/4-TURN ANGLE STOP VALVES WITH CHROME PLATED BRASS OR BRAIDED STAINLESS STEEL SUPPLIES. WASTE = 2" 17 GA. C.P. P-TRAP WITH CLEAN OUT. OTHER = ANSI A117.1 APPROVED WITH "TRUEBRO LAV GUARD" INSULATION KIT ON EXPOSED PIPING. SINK, COUNTERTOP, ACCESSIBLE TEMPERING VALVE = WATTS MODEL USG-B, ASSE 1070. SET AT 105 DEGREES F. (ADJUSTABLE) OUTLET TEMPERATURE. NOTES: A. ASSE 1017 CERTIFIED. B. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. EQUALS BY: POWERS, WATTS. MAX. PRESSURE (PSI) TEMPERATURE (°F) C. SECURE TANK TO MOUNTING STAND. NOTES A, B NONEFLOOR DRAIN 3 2FD-1 --- FD-1 FLOOR DRAIN, IN SLAB BRAND = ZURN MODEL Z415B. SPECIFICATIONS = COATED CAST IRON BODY, ADJUSTABLE POLISHED NICKEL BRONZE TOP. WASTE = DEEP SEAL P-TRAP WITH PROSET SYSTEMS TRAP-GUARD MODEL TG33ZURN. BF-1 BRAND = ELKAY LZWSMDK. SPECIFICATIONS = ADA, STAINLESS STEEL, SENSOR ACTIVATED, 1.5 GPM, FILTERED, 115 V, 1.0 A. BOTTLE FILLER ABOTTLE FILLER 1-1/2 1-1/4 1/2BF-1 -- GAS WATER HEATER SCHEDULE EXPANSION TANK SCHEDULE PLUMBING FIXTURE CONNECTION SCHEDULE MASTER THERMOSTATIC MIXING VALVE SCHEDULE PLUMBING FIXTURE SCHEDULE 1 1 COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 P0.3 PL U M B I N G S C H E D U L E S EJ DO 19022 11/11/2019 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 SCALE: SCALE: SCALE: SCALE: SCALE: SCALE: SCALE: SCALE: . . . . .. .. . . . . . . . . . . . . . . . .. .. . . . . . . . .. . . . . . . . . . . . .. . .. .. . . . . . . . . . . 2 PSIG GAS GAS COCK 7" W.C. GAS TO APPLIANCE CONNECTION GAS REGUALTOR, 2 PSIG INLET, 7" W.C. OUTLET CAPPED TEE FITTING UNION 6" SEDIMENT TRAP. CAPPED TEE FITTING. FULL SIZE RELIEF VENT TO BUILDING EXTERIOR IF LOCATED INSIDE NON TRAFFIC GRATE TRAFFIC GRATE FLASHING CLAMP FLOOR LINE CAST IRON PIPE DRAIN BODY 2'-0" x 2'-0" BLOCKOUT OR SPECIFIED FLOOR SINK OUTLET DOME STRAINER (2" MINIMUM) 1/2" RAISED FLANGE OTHERWISE SCHEDULED FULL GRATE UNLESS COLD WATER CONNECTION WATER HAMMER ARRESTOR BALL VALVE MOUNT ICE MAKER BOX AT 48" AFF 120°F HW TO FIXTURES THERMOMETER (TYP.) AIR RELEASE VALVE (TYP.) TMV-1 11/2" WALL HUNG LAVATORY - SEE ARCHITECTURAL DETAILS BOTTOM OF CABINET OR FLOOR COUNTERTOP NOTE: PIPES SHOWN FOR SIZE AND ROUTING, NOT LOCATION - FIELD VERIFY EXACT PIPE LOCATIONS. PIPE INSULATION NOT SHOWN FOR CLARITY. COMPRESSION FITTING, TYP. WATTS LFUSG TEMPERING VAVLE 2" WALL CLEANOUT (WITH COVER) 1-1/4" VENT UP IN WALL DROP-IN STYLE LAVATORY IN CABINET - SEE ARCHITECTURAL DETAILS SINK STOP VALVES2" W IN WALL PT RELIEF - ROUTE TO FLOOR DRAIN OR MOP BASIN GAS SERVICE UNION OR FLANGE, TYP. P/T TAP, TYP. 1-1/2" CW IN HOSE END DRAIN VALVE EXPANSION TANK, ET-1 BALL VALVE, TYP. 3/4" HWC IN CHECK VALVE, TYP. CIRCULATION PUMP, CP-1 COMBUSTION AIR DUCT FLUE VENT WATER HEATER CONDENSATE DRAIN WITH ACID NUETRALIZER - ROUTE TO FLOOR DRAIN OR MOP BASIN FLOOR 6" DIRT LEG GAS VALVE G WATER PIPING HANGERS/SUPPORTS DETAIL LAVATORY WITH TEMPERING VALVE DETAIL GAS REGULATOR DETAIL WALL CLEANOUT DETAIL FLOOR SINK DETAIL ICE MAKER BOX DETAIL GAS WITH CIRCULATION WATER HEATER DETAIL -FLOOR CLEANOUT DETAIL NO SCALE NO SCALE NO SCALE NO SCALE CLEANOUT TEE CLEANOUT PIPE ACCESS COVER FINISHED WALL 18 GAUGE ROUND GALVANIZED STEEL NO SCALE NO SCALE NO SCALE NO SCALE FITTING TYPE AS REQUIRED TO SUIT FLANGED WITH FLASHING COLLAR AS REQUIRED CENTER SECURING SCREW THREADED PLUG BRONZE SCORATED TOP FLOOR LINE UNISTRUT CHANNELSHIELD FOR PIPE 3" AND LARGER PROVIDE A SECTION OF HIGH INSULATION AT EACH HANGER POINT. INSULATION MAY BE HALF ROUND OR FULL ROUND PIPE (TYP.) INSULATION (TYP.) GALVANIZED IRON SHEET SHIELD H.W. PIPE 3" AND PIPE ROLLER FOR FOR ALL SUPPORTS) LOCK NUTS(TYP. FLAT WASHERS DOUBLE NUTS OR LARGER HANGER ROD AND SMALLER FOR PIPE 2 1/2"INSULATION PIPE 2-1/2" & PIPE CLAMP FOR SMALLER PIPE SINGLE PIPE RUNS CLEVIS HANGER FOR COMPRESSION STRENGTH AND INSULATION SHALL EXTEND 2" BEYOND GALV. SHIELD EACH WAY. COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 P0.4 PL U M B I N G D E T A I L S EJ DO 19022 11/11/2019 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 SCALE: WCO 83 DFU 181 DFU 397 DFU 74 DFU 74 DFU 74 DFU 90 DFU 93 DFU 167 DFU 6 DFU 14 DFU 183.5 DFU 4 DFU 18 DFU 6 DFU 24 DFU 26 DFU 4 DFU 14 DFU 18 DFU 92 DFU 2.5 DFU 14.5 DFU 17.5 DFU 109.5 DFU 113.5 DFU 139.5 DFU 323 DFU 8 DFU 12 DFU 20 DFU 31.5 DFU 10 DFU 10 DFU GENERAL NOTES: WORK NOTES: 1 1 1 1 1 1 1 1 X 1. REFER TO CORE AND SHELL PLANS FOR CONTINUATION. 1. PIPES SHOWN IN LIGHT GREY COLOR ARE PART OF CORE AND SHELL DESIGN. REFER TO CORE AND SHELL PLANS FOR DETAILS. (E)6"SAN (E)4"SAN (E)6"SAN 3"V UP TO UNIT 203 3"V UP TO UNIT 208 3"V UP TO UNIT 206 3"V UP TO UNIT 204 (E)4"SAN (E)6"SAN 4"SAN 4"SAN (E)6"SAN 2"SAN 4"SAN 3"SAN 4"SAN 4"SAN 2"SAN 4"SAN 4"SAN (E)4"SAN 2"SAN 4"SAN 4"SAN (E)4"SAN (E)4"SAN(E)4"SAN (E)6"SAN 2"V 2"V 1-1/2"V 2"V 2"V 2"V 2"V 2"V 2"V 2"V 1-1/2"V 2"V 2"V 2"V 2"V 2"V 2"V 1-1/2"V 4"SAN 2"V 4"SAN (E)4"SAN UP TO UNITS 203-204 (E)4"SAN UP TO UNITS 200-202 (E)4"SAN UP TO UNITS 205-206 (E)4"SAN UP TO UNITS 207-208 (E)2-WAY GCO (E)6"SAN POINT OF CONNECTION WCO WC-1 L-1 S-2 S-2 S-2 S-1 S-1 3"FS-1 SH-1 WCO WC-1 WC-1 L-1 S-4 MSB-1 S-1 S-1 WCO WC-1 L-1 L-1 S-1 S-1 S-1 S-1 WCO S-1 S-1 S-2 S-2 S-2 S-1 WC-1 WC-1 L-1 L-1 EWC-1 WCO FCO S-1 S-1 S-3 S-5 MSB-1 MSB-1 2"FD-1 2"FD-1 BF-1 3"FD-1 3"FS-1 3"FD-1 3"FD-1 WCO 3"FD-1 3"FD-1 3"FD-1 3"FD-1 3"FD-1 3"FD-1 3"FD-1 1 P0.5 DWV ISOMETRIC NO SCALE 1 COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 P0.5 PL U M B I N G D W V I S O M E T R I C EJ DO 19022 11/11/2019 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 GENERAL NOTES: 1. REFER TO CORE AND SHELL PLANS FOR EXISTING SYSTEM DETAILS. COORDINATE ALL NEW WORK WITH EXISTING CORE AND SHELL DESIGN. 2. PIPES SHOWN IN LIGHT GREY COLOR, INCLUDING SANITARY MAINS, ARE PART OF CORE AND SHELL DESIGN. REFER TO CORE AND SHELL PLANS FOR DETAILS. 3. SLOPE ALL HORIZONTAL SANITARY PIPING 3" AND GREATER AND ALL CONDENSATE PIPING AT 1/8" PER 1'-0" (1%). SLOPE ALL HORIZONTAL SANITARY PIPING 2-1/2" AND LESS AT 1/4" PER 1'-0" (2%). SLOPE ALL SANITARY VENT PIPING AT MINIMUM 1/16" PER 1'-0" TOWARDS TRAP(S) SERVED. WORK NOTES: 1. 4" SAN UP TO UNITS ABOVE. REFER TO CORE AND SHELL PLANS FOR CONTINUATION. 2. SANITARY LINE UP TO CLEANOUT. # 2 3 4 5 6 7 A 8 9 10 A.5 B C D D.4 E NURSE'S 122 VESTIBULE 100 THERAPY 172 CHART 136 CLEAN LINEN 149 OPEN OFFICE 160 RECEPTION 157 THERAPY 165 RR 104 EVS EQP 141 RECEPTION 102 RED BAG 153 CIRC 127 MEDS 123 ORTHO/EXAM 114 RADIOLOGY 113 STG 171 CIRC 161 CIRC 163 O2 STG 107 RR 128 RR 121 STAFF 116 EXAM 115 STAFF LOUNGE 144 CLINICAL 125 CIRC 133 STORAGE 162 EXAM 132 NURSE'S 134 FACILITIES 152 EXAM 138 CIRC 124 RR 174 CHART 137 THERAPY 173 EXAM 131 THERAPY 169 CIRC 158 THERAPY 167 THERAPY 170 EVS FLR EQ 108 THERAPY 166 CIRC 103 EXAM 119EVS STOR 142 OFFICE 159 EVS EQP 110 THERAPY 164 EXAM 118 EXAM 117 VESTIBULE 106 DIRTY LINEN 148 CIRC 147 IT 143 RR 105 EXAM 130 MECH 150 OFFICE 112 OFFICE 156 CIRC 155 DIRTY 111 CIRC 140 LOCKERS 145 EXAM 126 EXAM 139 CIRC 154 CHART 135 RR 146 EXAM 120 1 EXERCISE 175 MAIN SUPPLY 151 EXAM 129 CIRC 109 WC-1 SH-1 L-1 MSB-1 WC-1 L-1 WC-1 L-1 WC-1 L-1 MSB-1 S-5 EWC-1 WC-1 L-1 L-1 WC-1 S-4 S-2 S-2 S-1 S-1 S-1 S-1S-1S-1 S-1 S-1 S-2 S-1S-1 S-1 S-3 S-2 S-2 3" 3" S-1 S-1 S-2 FS-1 2 4" SAN 6" SAN 6" S A N 1 1 1 1 MSB-1 2 4" SAN 4" SAN FD-13"FD-13" (E)2-WAY GCO I.E. = 5'-9" BFF BF-1 1 FS-1 1 FD-13" FD-13" FD-13" 1 FD-13" FD-13" FD-13"1 FD-13" FD-13" FD-13" 1 1 FD-13" 1 1 1 COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 P1.0 PL U M B I N G U N D E R G R O U N D P L A N EJ DO 19022 11/11/2019 1/8" = 1'-0"1 PLUMBING UNDERGROUND PLAN NORTH REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 GENERAL NOTES: 1. REFER TO CORE AND SHELL PLANS FOR EXISTING SYSTEM DETAILS. COORDINATE ALL NEW WORK WITH EXISTING CORE AND SHELL DESIGN. 2. FIRST FLOOR SPACE ABOVE CEILING TO BE USED AS RETURN AIR PLENUM. ALL SYSTEMS INSTALLED IN THIS SPACE TO BE PLENUM-RATED AND SHALL COMPLY WITH ALL REQUIREMENTS LISTED IN 2015 IMC 602.2.1. 3. MAINTAIN CLEARANCES AROUND ALL EQUIPMENT PER MANUFACTUER'S RECOMMENDATIONS. 1 WORK NOTES: 1. 4" SAN UP/DN FOR UNITS ABOVE. REFER TO CORE AND SHELL PLANS FOR CONTINUATION. 2. 3" V UP. ROUTE UP THROUGH SECOND FLOOR AND CONNECT TO VENT PIPING IN UNIT ABOVE. REFER TO CORE AND SHELL PLANS FOR CONNECTION POINT. PIPES THROUGH RATED ASSEMBLY SHALL COMPLY WITH 2015 IBC 714. 3. ROUTE 3/4" CONDENSATE LINE FROM WALL-HUNG FAN COIL UNIT TO MOP SINK BASIN. 4. 3" COMBUSTION AIR AND FLUE UP. REFER TO SHEET M2.1 FOR CONTINUATION. # 1 2 3 4 5 6 7 A 8 9 10 A.5 B C D D.4 E NURSE'S 122 VESTIBULE 100 THERAPY 172 CHART 136 CLEAN LINEN 149 OPEN OFFICE 160 RECEPTION 157 THERAPY 165 RR 104 EVS EQP 141 RECEPTION 102 RED BAG 153 CIRC 127 MEDS 123 ORTHO/EXAM 114 RADIOLOGY 113 STG 171 CIRC 161 CIRC 163 O2 STG 107 RR 128 RR 121 STAFF 116 EXAM 115 STAFF LOUNGE 144 CLINICAL 125 CIRC 133 STORAGE 162 EXAM 132 NURSE'S 134 FACILITIES 152 EXAM 138 CIRC 124 CHART 137 THERAPY 173 EXAM 131 THERAPY 169 CIRC 158 THERAPY 167 THERAPY 170 EVS FLR EQ 108 THERAPY 166 CIRC 103 EXAM 119EVS STOR 142 OFFICE 159 EVS EQP 110 THERAPY 164 EXAM 118 EXAM 117 VESTIBULE 106 DIRTY LINEN 148 CIRC 147 IT 143 RR 105 EXAM 130 MECH 150 OFFICE 112 OFFICE 156 CIRC 155 DIRTY 111 CIRC 140 LOCKERS 145 EXAM 126 EXAM 139 CIRC 154 CHART 135 RR 146 EXAM 120 1 GWH-1 WC-1SH-1 L-1 MSB-1 RR 174 WC-1 L-1 WC-1 L-1 WC-1 L-1 MSB-1 MSB-1 S-5 EWC-1 WC-1 L-1 L-1 WC-1 S-4 S-2 S-2 S-1 S-1 S-1S-1S-1S-1 S-1 S-1 S-2 S-1S-1 S-1 S-3 S-2 S-2 FS-13" 3" S-1 S-1 S-2 EXERCISE 175 MAIN SUPPLY 151 EXAM 129 CIRC 109 WCO WCO 1 1 1 1 WCO WCO WCO WCO WCO 2 2 2 2 V V V V V V V V V V V V FCU-1 3 4 FCO FD-13" FD-13" BF-1 1 FS-1 1 FD-13" FD-13" FD-13" 1 FD-13" FD-13" FD-13"1 FD-13" FD-13" FD-13"1 1 FD-13" 1 1 COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 P1.1 PL U M B I N G D W V F I R S T F L O O R P L A N EJ DO 19022 11/11/2019 1/8" = 1'-0"1 PLUMBING DWV FIRST FLOOR PLAN NORTH REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 GENERAL NOTES: 1. REFER TO CORE AND SHELL PLANS FOR EXISTING SYSTEM DETAILS. COORDINATE ALL NEW WORK WITH EXISTING CORE AND SHELL DESIGN. 2. FIRST FLOOR SPACE ABOVE CEILING TO BE USED AS RETURN AIR PLENUM. ALL SYSTEMS INSTALLED IN THIS SPACE TO BE PLENUM-RATED AND SHALL COMPLY WITH ALL REQUIREMENTS LISTED IN 2015 IMC 602.2.1. 3. MAINTAIN CLEARANCES AROUND ALL EQUIPMENT PER MANUFACTUER'S RECOMMENDATIONS. 1 WORK NOTES: 1. ROUTE 2"CW BACK TO WATER ENTRY ROOM AND CONNECT TO URGENT CARE STUB-OUT DOWNSTREAM OF SHUTOFF VALVE. REFER TO CORE AND SHELL PLANS FOR DETAILS. 2. CONNECT 1/2"G TO URGENT CARE GAS STUB-OUT AT LOCATION SHOWN ON PLANS. ROUTE TO WATER HEATER AND PROVIDE SHUT-OFF VALVE AND GAS REGULATOR PER DETAIL ON P0.4. INSTALL VENT LIMITING DEVICE AT GAS REGULATOR. REFER TO CORE AND SHELL PLANS FOR GAS PIPING CONTINUATION. 3. ROUTE FIXTURE PIPING ON INSIDE OF INSULATION JUST INSIDE DRYWALL FOR FREEZE PROTECTION. 4. PROVIDE AND INSTALL WATER HAMMER ARRESTOR FOR FLUSH VALVE. # 2 3 4 5 6 7 A 8 9 10 A.5 B C D D.4 E NURSE'S 122 VESTIBULE 100 THERAPY 172 CHART 136 CLEAN LINEN 149 OPEN OFFICE 160 RECEPTION 157 THERAPY 165 EVS EQP 141 RECEPTION 102 RED BAG 153 CIRC 127 MEDS 123 ORTHO/EXAM 114 RADIOLOGY 113 STG 171 CIRC 161 CIRC 163 O2 STG 107 STAFF 116 EXAM 115 STAFF LOUNGE 144 CLINICAL 125 CIRC 133 STORAGE 162 EXAM 132 NURSE'S 134 FACILITIES 152 EXAM 138 CIRC 124RR 174 CHART 137 THERAPY 173 EXAM 131 THERAPY 169 CIRC 158 THERAPY 167 THERAPY 170 EVS FLR EQ 108 THERAPY 166 CIRC 103 EXAM 119 EVS STOR 142 OFFICE 159 EVS EQP 110 THERAPY 164 EXAM 118 EXAM 117 VESTIBULE 106 DIRTY LINEN 148 IT 143 EXAM 130 OFFICE 112 OFFICE 156 CIRC 155 DIRTY 111 CIRC 140 LOCKERS 145 EXAM 126 EXAM 139 CIRC 154 CHART 135 EXAM 120 1 GWH-1 MECH 150 CP-1 RR 146 WC-1 SH-1 L-1 MSB-1 WC-1 L-1 RR 104 RR 105 WC-1 L-1 WC-1 L-1 MSB-1 S-5 EWC-1 S-4 RR 128 RR 121 WC-1 L-1 L-1 WC-1 S-2 S-2 S-1 S-1 S-1 S-1S-1S-1 S-2 S-1S-1 S-1 S-3 S-2 S-2 IMB-1 EW-1 EW-1 S-1 S-1 S-2 EXERCISE 175 MAIN SUPPLY 151 EXAM 129 CIRC 109 ET-1 1 MSB-1 S-1 S-1 2" CW 2" CW 1 1/2" CW 1 1/2" CW 1 1/4" CW 1 1/4" CW 1" CW 1 1 / 2 " C W 1 1/2" CW 3/4" CW 1 1 / 4 " C W 1 1/4" CW 1 1 / 4 " C W 1" C W 1 1 / 4 " C W 1 1 / 4 " C W 1" CW 1 1/2" HW 1 1/2" HW 1 1/4" HW 1 1 / 4 " H W 1 1 / 4 " H W 1 1 / 4 " H W 1 1/4" HW1 1/4" HW1" HW1" HW3/4" HW 3/4" HWR 2 3 TMV-1 4 BF-1 1 1 1 COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 P2.1 PL U M B I N G S U P P L Y F I R S T F L O O R P L A N EJ DO 19022 11/11/2019 1/8" = 1'-0"1 PLUMBING SUPPLY FIRST FLOOR PLAN REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Reviewed by SAFEbuilt 12/04/2019 P DRAWING TITLE ELECTRICAL LEGEND AND NOTES KEY: FULL SHEET ISSUE. PARTIAL SHEET ISSUE (SKETCH). E0.1 DRAWING NUMBER THE DRAWINGS AND SPECIFICATIONS FOR THIS PROJECT ARE COPYRIGHT 2019, PCD ENGINEERING SERVICES, INC., WHICH SHALL RETAIN ALL RIGHTS OF OWNERSHIP AND COPYRIGHT FOR THE INFORMATION AND DATA DESCRIBED HEREIN, WHETHER IN HARDCOPY OR ELECTRONIC FORMAT. THESE DOCUMENTS MAY NOT BE BID, REPRODUCED, OR COPIED FOR USE ON ANY OTHER PROJECT WITHOUT WRITTEN PERMISSION FROM PCD ENGINEERING SERVICES INC. ELECTRICAL PANEL SCHEDULESE0.4 LUMINAIRE SCHEDULE AND COMCHECKSE0.5 POWER FIRST FLOOR EAST PLANE1.1 POWER FIRST FLOOR WEST PLANE1.2 ISSUE DATE - DESCRIPTION ELECTRICAL ONE LINE DIAGRAME0.3 ELECTRICAL DRAWING INDEX DISCIPLINE EDITION INTERNATIONAL BUILDING CODEGENERAL 2015 CODE INTERNATIONAL MECHANICAL CODEHVAC / MECHANICAL 2015 INTERNATIONAL PLUMBING CODEPLUMBING 2015 NATIONAL ELECTRIC CODEELECTRICAL 2017 INTERNATIONAL FIRE CODE 2015 NFPA STANDARDS FIRE PROTECTION CURRENT INTERNATIONAL FUEL GAS CODEFUEL 2015 INTERNATIONAL ENERGY CONSERVATION CODEENERGY 2015 ICC/ANSI A117.1ACCESSIBILITY 2009 NOTES: A.ALL WORK PERFORMED SHALL COMPLY WITH THE REQUIREMENTS OF THE LISTED CODES, LOCAL CODE AMENDMENTS, AND REFERENCED STANDARDS AS ENFORCED BY THE AUTHORITY HAVING JURISDICTION (AHJ). B.ALL WORK SUBJECT TO INSPECTION BY THE AHJ AT THE PROJECT SITE FOR COMPLIANCE. TOWN OF ESTES PARKLOCAL AMENDMENTS 2015 BUILDING CODE DATA LIGHTING FIRST FLOOR EAST PLANE2.1 LIGHTING FIRST FLOOR WEST PLANE2.2 POWER SECOND PARTIAL FLOOR PLANE3.1 OS VS DS OS S S S WM PM FIXTURE TYPE (SEE SCHEDULE) SWITCH LETTER / MULTI-GANG NUMERAL CIRCUIT NUMBER FIXTURE TYPE SYMBOL SYMBOL DESCRIPTION CURRENT TRANSFORMER CONCEALED CIRCUIT UNDERGROUND/FLOOR CIRCUIT EXPOSED CIRCUIT WIREMOLD (SURFACE RACEWAY) CONDUIT TURNS UP CONDUIT TURNS DOWN JUNCTION BOX PANELBOARD MAIN DISTRIBUTION BOARD ELECTRIC SERVICE METER PLUGMOLD (SURFACE RACEWAY) SYMBOL DESCRIPTION RECESSED 2x2 LUMINAIRE SURFACE MOUNT 2x4 LUMINAIRE RECESSED 2x4 LUMINAIRE SURFACE MOUNT 1x4 LUMINAIRE SURFACE MOUNT ROUND LUMINAIRE RECESSED ROUND LUMINAIRE PENDANT LUMINAIRE SURFACE MOUNT STRIP LUMINAIRE WALL MOUNTED LUMINAIRE POLE MOUNTED LUMINAIRE MOTOR (REFER TO MOTOR SCHEDULE) SYMBOL DESCRIPTION WALL MOUNT STRIP LUMINAIRE NEW WORK UNDER THIS CONTRACT WORK DEMOLISHED UNDER THIS CONTRACT NOTE: NOT ALL SYMBOLS OR ABBREVIATIONS ON THIS LEGEND ARE NECESSARILY USED ON THIS PROJECT. HOMERUN TO PANELBOARD (ONE ARROW / CIRCUIT, PANEL AND CIRCUIT #'S SHOWN) RECESSED ROUND LUMINAIRE WITH EMERGENCY BATTERY BACK-UP RECESSED 2x4 LUMINAIRE WITH EMERGENCY BATTERY BACK-UP RECESSED 2x2 LUMINAIRE WITH EMERGENCY BATTERY BACK-UP SURFACE MOUNT 2x4 LUMINAIRE - UN-SWITCHED (NIGHT-LIGHT) RECESSED 2x4 LUMINAIRE - UN-SWITCHED (NIGHT-LIGHT) WALL MOUNTED EMERGENCY BATTERY BACK-UP EXIT SIGN WITH DIRECTIONAL ARROWS HATCH INDICATES ILLUMINATED FACES, ARROWS INDICATE DIRECTIONS RECEPTACLE - DUPLEX RECEPTACLE - DUPLEX WITH ISOLATED GROUND RECEPTACLE - DUPLEX WITH GFCI PROTECTION RECEPTACLE - DUPLEX SPLIT WIRE RECEPTACLE - QUADRAPLEX (DOUBLE DUPLEX) RECEPTACLE - SPECIAL PURPOSE - SINGLE PHASE RECEPTACLE - SPECIAL PURPOSE - THREE PHASE RECEPTACLE - SINGLE OUTLET - RECEPTACLE - RANGE RECEPTACLE - DUPLEX - FLOOR MOUNTED RECEPTACLE - QUADRAPLEX - FLOOR MOUNTED COMBINATION SWITCH/RECEPTACLE SWITCH (TOGGLE UNLESS NOTED): x - SWITCH GROUP "x" to - THERMAL OVERLOAD 2 - 2 POLE p - PILOT LIGHT 3 - 3-WAY k - KEYED 4 - 4-WAY t - TIMER D - DIMMER F - FUSTAT OS - OCCUPANCY SENSOR VS - VACANCY SENSOR FC - CEILING FAN CONTROL V - VARIABLE SPEED ROMAN NUMERAL (I,II,III, etc) INDICATES QUANTITY OF GANGED DEVICES UNDER COMMON FACEPLATE DATA OUTLET COMBINATION DATA / TELEPHONE OUTLET TELEPHONE OUTLET TELEVISION OUTLET AC - ABOVE COUNTER AFF - ABOVE FINISHED FLOOR AFG - ABOVE FINISHED GRADE BFC - BELOW FINISHED CEILING BAS - BUILDING AUTOMATION SYSTEM BLDG - BUILDING BMS - BUILDING MANAGEMENT SYSTEM BOF - BOTTOM OF FIXTURE COF - COFFEE MAKER CKT - CIRCUIT CLG - CEILING CO - CONDUIT ONLY CWA - COORDINATE WITH ARCHITECT CWM - COORDINATE WITH EQ SUPPLIER DW - DISHWASHER EF - EXHAUST FAN EHD - ELECTRIC HAND DRYER EM - EMERGENCY EMS - ENERGY MANAGEMENT SYSTEM EP - EXPLOSION PROOF EWC - ELECTRIC WATER COOLER EX - EXISTING FRZ - FREEZER FA - FIRE ALARM FCP - FIRE ALARM CONTROL PANEL GD - GARBAGE DISPOSAL GND - GROUND GFI - GROUND FAULT CIRCUIT GFCI - GROUND FAULT CIRCUIT HZL - HAZARDOUS LOCATION IHW - INSTANT HOT WATER DISPENSER JB - JUNCTION BOX LGT(S) - LIGHT(S) LV - LOW VOLTAGE MAX - MAXIMUM MGMT - MANAGEMENT MIN - MINIMUM MOP - MOTOR OPERATED PARITITION MW - MICROWAVE NC - NORMALLY CLOSED NL - NIGHT LIGHT NO - NORMALLY OPEN. OVN - OVEN PRJ - CEILING MOUNTED PROJECTOR PS - ELECTRIC PROJECTOR SCREEN PB - PULLBOX RCPT(S) - RECEPTACLE(S) RNG - RANGE ST - SHUNT TRIP SPD - SURGE PROTECTIVE DEVICE REF - REFRIGERATOR TV - TELEVISION UNO - UNLESS NOTED OTHERWISE UVR - UNDER-VOLTAGE RELEASE UH - UNIT HEATER VFD - VARIABLE FREQUENCY DRIVE XFMR - TRANSFORMER WP - WEATHERPROOF SAFETY DISCONNECT SWITCH (REFER TO MOTOR SCHEDULE) OCCUPANCY SENSOR - CEILING CEILING MOUNTED EMERGENCY BATTERY BACK-UP VACANCY SENSOR - CEILING DAYLIGHT SENSOR - CEILING RECEPTACLE - SINGLE - CEILING MOUNTED RECEPTACLE - DUPLEX - CEILING MOUNTED RECEPTACLE - QUADRAPLEX - CEILING MOUNTED MISCELLANEOUS FIRE ALARM DEVICE F- MANUAL PULL STATION FJ - FIREFIGHTER PHONE JACK H - HEAT DETECTOR S - SMOKE DETECTOR D - DUCT SMOKE DETECTOR DT - SMOKE DETECTOR TEST STATION SH - SMOKE VENTING HATCH RELEASE DH - DOOR HOLD OPEN RELEASE FR - FAN SHUT DOWN RELAY PS - PRESSURE SWITCH FS - FLOW SWITCH TS - TAMPER SWITCH RR - CONTROL / MONITORING RELAY DASHED OUTLINE - CEILING MOUNTED DEVICE WALL MOUNTED FIRE ALARM HORN WALL MOUNTED FIRE ALARM SPEAKER WALL MOUNTED FIRE ALARM SPEAKER STROBE WALL MOUNTED FIRE ALARM STROBE GENERAL ELECTRICAL ABBREVIATIONSMISCELLANEOUS SYSTEMS DEVICE DB - DOORBELL CH - CHIME CK - CARD READER / KEYPAD CR - CARD READER DA - DURESS ALARM DC - DOOR CONTACT DE - DELAYED EGRESS EL - ELECTRIC LOCK ES - ELECTRIC STRIKE IC - INTERCOM CALL STATION KP - KEYPAD MD - MOTION DETECTOR ML - MAGNETIC LOCK RX - REQUEST TO EXIT MISCELLANEOUS ELECTRICAL DEVICE DM - MOTORIZED DAMPER HH - HANDHOLE MH - MANHOLE PP - PUSHPLATE RC - RELAY CABINET TC - TIME CLOCK MISCELLANEOUS ELECTRICAL DEVICE EPO - EMERGENCY POWER OFF POD - POWER OPERATED DOOR VFD - VARIABLE FREQUENCY DRIVE MISCELLANEOUS FIRE ALARM DEVICE ARA - AREA OF RESCUE ASSISTANCE NAC - NOTIFICATION EXTENDER PANEL FAP - REMOTE ANNUNCIATOR PANEL FCB - FIRE PHONE CABINET FCP - FIRE ALARM CONTROL PANEL FAC - TERMINAL CABINET MULTI-SERVICE BOXES AND RACEWAYS CHARACTERS DESCRIBE MOUNTING LOCATION, ACCESS, SERVICE DEVICE/COVER FITTING AS INDICATED BELOW. REFER TO MULTI-SERVICE BOX SCHEDULE FOR SPECIFIC REQUIREMENTS, CONDUIT, AND DEVICE CONFIGURATIONS. X--- LOCATION -X--ACCESS F-FLOORBOX C-CONCEALED P-POKE-THRU E-EXPOSED R-RAISED FLOOR S-STAGE T-TABLE U-UNDERFLOOR DUCT W-WALL --X- SERVICE COVER / DEVICE FITTING B-BLANK F-FLUSH R-REGRESSED S-SEMI FLUSH T-TOMBSTONE W-WHIP ---X SEQUENTIAL NUMBER 1,2,3,ETC - REFER TO MULTI-SERVICE BOX SCHEDULE OCCUPANCY SENSOR - WALL MOUNTED WORK EXISTING TO REMAIN UNDER THIS CONTRACT ELECTRICAL LEGEND GENERAL NOTES: A. REVIEW THE CONTRACT CONDITIONS AND GENERAL REQUIREMENTS FOR INFORMATION THAT APPLIES. B. THE WORD "PROVIDE" IS USED TO MEAN "FURNISH AND INSTALL." C. PROVIDE ALL ITEMS FOR A COMPLETE AND SUCCESSFUL OPERATION OF ALL SYSTEMS SHOWN ON THESE DRAWINGS. D. THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF THE WORK. LOCATIONS ARE APPROXIMATE UNLESS DIMENSIONED. MINOR MODIFICATIONS IN LOCATION TO MEET SITE REQUIREMENTS ARE ACCEPTABLE. REFER TO LATEST ARCHITECTURAL DRAWINGS FOR EXACT WALL LOCATIONS AND DIMENSIONS. E. THE ARCHITECTURAL AND ENGINEERING DRAWINGS ARE COMPLEMENTARY. GENERAL CONTRACTORS, SUBCONTRACTORS, AND VENDORS SHALL ACKNOWLEDGE ALL THE ARCHITECTURAL AS WELL AS ALL THE ENGINEERING DRAWINGS AND INCLUDE ALL WORK NECESSARY TO ACHIEVE A COMPLETE WORKING INSTALLATION FOR ALL DEVICES OR EQUIPMENT WHICH MAY BE SHOWN ON ONE DRAWING BUT NOT SHOWN ON ANOTHER. WHERE ELEMENTS ARE INDICATED OR DESCRIBED IN ANY DRAWING, IT IS THE INTENT THAT ALL RELATED CONSTRUCTION ASSOCIATED WITH SUCH ELEMENTS IS TO BE INCLUDED IN ORDER TO OBTAIN A COMPLETE INSTALLATION. FOR INSTANCE, IF A PIECE OF EQUIPMENT IS IDENTIFIED IN THE ARCHITECTURAL AND/OR MECHANICAL DRAWINGS, BUT THE ELECTRICAL CIRCUIT FOR SUCH EQUIPMENT IS NOT IDENTIFIED IN THE ELECTRICAL DRAWINGS, THE CONTRACTOR IS TO PROVIDE SUCH CIRCUIT IN ORDER TO HAVE FULLY OPERATIONAL EQUIPMENT. FOR ANOTHER EXAMPLE, IF A SINK IS INDICATED, IT IS THE INTENT THAT RELATED PLUMBING WORK INCLUDING DRAINS, VENT, PIPING, VALVES, ETC. ARE TO BE INCLUDED IN ORDER TO RESULT IN A FULLY OPERATIONAL SYSTEM. NO SUBCONTRACTOR SHALL BE ALLOWED TO EXCLUDE PORTIONS OF THE COMPLIMENTARY DRAWING SET. F. LAY OUT ALL WORK IN ADVANCE. DO NOT DEFACE THE WORK OF OTHER TRADES OR THE EXISTING BUILDING. G. LOCATION OF PIPES, DUCTS, SWITCHES, PANELS, EQUIPMENT, AND FIXTURES SHALL BE ADJUSTED TO ACCOMMODATE THE WORK OR INTERFERENCES ANTICIPATED AND ENCOUNTERED. DETERMINE THE EXACT ROUTE AND LOCATION OF EACH PIPE AND DUCT PRIOR TO FABRICATION. G.A. RIGHT-OF-WAY: LINES WHICH PITCH SHALL HAVE THE RIGHT-OF-WAY OVER THOSE WHICH DO NOT PITCH. LINES WHOSE ELEVATIONS CANNOT BE CHANGED SHALL HAVE THE RIGHT-OF-WAY OVER LINES WHOSE ELEVATIONS CAN BE CHANGED. G.B. OFFSETS, TRANSITIONS, AND CHANGES IN DIRECTION: OFFSETS, TRANSITIONS, AND CHANGES IN DIRECTION OF PIPES AND DUCTS SHALL BE MADE AS REQUIRED TO MAINTAIN PROPER HEADROOM AND PITCH OF SLOPING LINES WHETHER OR NOT INDICATED ON THE DRAWINGS. G.C. FURNISH AND INSTALL ALL TRAPS, AIR VENTS, SANITARY VENTS, AND DEVICES AS REQUIRED TO EFFECT THESE OFFSETS, TRANSITIONS, AND CHANGES IN DIRECTION. H. ALL PENETRATIONS OF FIRE RATED WALLS, FLOORS, AND CEILINGS SHALL HAVE THE SPACE AROUND PENETRATIONS SEALED WITH A FIRE BARRIER SEALANT MEETING THE REQUIREMENTS OF U.L. STANDARD 1479 AND ASTM-E 814. INSTALL SEALANT IN FULL COMPLIANCE WITH MANUFACTURER'S STANDARD INSTALLATION INSTRUCTIONS. I. ALL MATERIALS LOCATED ABOVE CEILING SHALL BE SUITABLE FOR USE WITHIN A RETURN AIR PLENUM AS REQUIRED BY THE LATEST EDITION OF THE INTERNATIONAL MECHANICAL CODE. J. WHEN USING A TORCH OR OTHER FLAME-PRODUCING DEVICE ON THIS PROJECT, CONTRACTOR SHALL PROVIDE ONE APPROVED FIRE EXTINGUISHER OR WATER HOSE EQUIPPED WITH A SUITABLE NOZZLE, SUFFICIENT IN LENGTH TO REACH ALL PORTIONS OF THE BUILDING AND CONNECTED TO A WATER SUPPLY ON THE PREMISES WHERE SAID BURNING OPERATION IS PERFORMED. COMBUSTIBLE MATERIAL IN THE CLOSE PROXIMITY OF OPEN FLAME SHALL BE PROTECTED AGAINST IGNITION BY SHIELDING, WETTING, OR OTHER MEANS. IN ALL CASED, A FIRE WATCH SHALL BE MAINTAINED IN THE VICINITY OF THE OPERATION BY THE CONTRACTOR FOR ONE-HALF HOUR AFTER THE TORCH OR FLAME-PRODUCING DEVICE HAS BEEN USED. K. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING THE PROJECT AND TAKE INTO CONSIDERATION CONDITIONS THAT MAY AFFECT THE WORK. NO ADDITIONAL COMPENSATION WILL BE APPROVED FOR FAILURE TO VISIT THE SITE PRIOR TO PRICING THE WORK. L. MAINTAIN A CONTRACT SET OF THESE DRAWINGS AT THE SITE, WITH ALL CHANGES OR DEVIATIONS FROM THE ORIGINAL DRAWINGS NEATLY MARKED ON THEM IN RED COLOR. THIS SHALL BE A SEPARATE SET OF DRAWINGS NOT USED FOR CONSTRUCTION PURPOSES, WHICH SHALL BE KEPT UP TO DATE AS THE JOB PROGRESSES AND SHALL BE MADE AVAILABLE FOR INSPECTION BY THE ENGINEER AT ALL TIMES. UPON COMPLETION OF THE CONTRACT, THIS SET OF "AS-BUILTS" SHALL BE DELIVERED TO THE ENGINEER WITHIN 15 DAYS OF COMPLETION OF THE PROJECT. M. MATERIAL SHALL BE AS SPECIFIED. SUBSTITUTIONS WILL BE CONSIDERED IF SUBMITTED FOR PRIOR APPROVAL AT LEAST ONE (1) WEEK PRIOR TO THE CONTRACT BID DATE. SUBSTITUTIONS SHOULD BE SUBMITTED SEPARATELY FOR EACH PRODUCT WITH SUPPORTING DATA, DRAWINGS AND SAMPLES AS APPROPRIATE, INCLUDING: 1.) COMPARISON OF THE QUALITIES OF THE PROPOSED SUBSTITUTION WITH THAT SPECIFIED. 2.) CHANGES REQUIRED IN OTHER ELEMENTS OF THE WORK BECAUSE OF THE SUBSTITUTION. 3.) COST DATA COMPARING THE PROPOSED SUBSTITUTION WITH THE PRODUCT SPECIFIED. THE ENGINEER WILL DETERMINE THE ACCEPTABILITY OF THE PROPOSED SUBSTITUTION. N. SUBMIT ELECTRONIC PDF OF MANUFACTURER'S SHOP DRAWINGS FOR EQUIPMENT AND DEVICES. PRIOR TO SUBMITTING THE SHOP DRAWINGS FOR REVIEW, THE CONTRACTOR SHALL REVIEW AND CERTIFY SAME AS TO COMPLIANCE WITH THE PLANS AND SPECIFICATIONS AND FOR DIMENSIONAL SUITABILITY FOR THE APPLICATIONS. O. WHEN ALTERNATE OR SUBSTITUTED EQUIPMENT IS USED, CONTRACTOR IS RESPONSIBLE FOR COORDINATING SPACE REQUIREMENTS, CONFIGURATIONS, CHANGES IN SUPPORTS OR STRUCTURAL MEMBERS, ELECTRICAL REQUIREMENTS, AND COORDINATION OF OTHER TRADES THAT MAY BE AFFECTED BY THEIR USE. CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE SAME WHEN USING LISTED APPROVED MANUFACTURERS OTHER THAN THE BASIS OF DESIGN. P. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND PERSONNEL REQUIRED FOR TESTING OF INSTALLED EQUIPMENT. Q. THE CONTRACTOR SHALL DEMONSTRATE THE PROPER OPERATION AND CALIBRATION OF ALL SYSTEMS TO THE OWNER, AT A TIME AS AGREED TO BY THE OWNER AND DIRECTED BY THE OWNER. R. THE CONTRACTOR SHALL PROVIDE THE OWNER WITH OPERATION AND MAINTENANCE MANUALS FOR ALL SYSTEMS WITHIN 15 DAYS OF THE COMPLETION OF THE PROJECT. S. THE CONTRACTOR SHALL INCLUDE THE COST FOR COMMISSIONING TO VERIFY THE PERFORMANCE OF THE SYSTEM CONTROLS SHOWN ON THIS DRAWING. THIS INCLUDES PREPARING A COMMISSIONING PLAN, VERIFYING THE OPERATION OF ALL SYSTEMS PER CODE REQUIREMENTS, AND PROVIDING A FINAL COMMISSIONING REPORT. SUBMIT TO ENGINEER FOR REVIEW. FINAL COMMISSIONING REPORT IS DUE WITHIN 90 DAYS OF COMPLETION OF THE PROJECT. CODES, REGULATIONS, AND STANDARDS: 1. ALL WORK SHALL BE IN STRICT ACCORD WITH LOCAL GOVERNING LAWS, ORDINANCES, AND REGULATIONS; ALL WORK MUST BE IN FULL ACCORDANCE WITH ALL CODES, ORDINANCES, AND CODE RULINGS. CONTRACTOR SHALL PROVIDE, WITHOUT EXTRA CHARGE, THE LABOR AND MATERIALS REQUIRED FOR FULL CODE COMPLIANCE. 2. ALL MATERIALS SHALL BE NEW AND SHALL COMPLY WITH THE SPECIFICATIONS ON DRAWINGS. 3. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LOCAL FEES, PERMITS, AND SERVICES OF INSPECTION AUTHORITIES REQUIRED BY THE WORK OF THE PROJECT. THE CONTRACTOR SHALL ARRANGE FOR ALL INSPECTIONS WHEN THEY BECOME DUE AND SHALL NOT COVER ANY WORK UNTIL APPROVED BY THE INSPECTION AUTHORITY. GUARANTEE: A. THE CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP, MATERIALS, AND EQUIPMENT PROVIDED FOR THE PROJECT AGAINST DEFECTS AND/OR FAULTY WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER. B. THE CONTRACTOR SHALL REPAIR AND/OR REPLACE DEFECTIVE OR FAULTY WORKMANSHIP, MATERIALS, OR EQUIPMENT, AND SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF OTHER PROPERTY OR WORK DAMAGED AS A RESULT, WITHOUT CHARGE TO THE OWNER AND AS QUICKLY AS POSSIBLE, DURING THE GUARANTEE PERIOD. SPECIFICATION GENERAL NOTES ELECTRICAL GENERAL NOTESE0.2 WALL MOUNTED FIRE ALARM HORN STROBE 1 S SMOKE ALARM - CEILING 1 8. 1 5 . 2 0 1 9 - 5 0 % C D 10 . 9 . 2 0 1 9 - P E R M I T 11 . 1 1 . 2 0 1 9 - A D D E N D U M 1 ( D E L T A 1 ) COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 E0.1 EL E C T R I C A L L E G E N D & N O T E S WN PD 19022 11/11/2019 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 Note: Electrical drawings not reviewed for code compliance. All electrical subject to State inspections and approvals. J F S SS 1.THE ELECTRICAL CONTRACTOR SHALL VERIFY THAT ALL ELECTRICAL ITEMS TO REMAIN OR BE RELOCATED AND REUSED ARE IN WORKING ORDER PRIOR TO ANY DEMOLITION WORK. IF THE EXISTING MATERIAL IS FOUND TO BE INOPERABLE, CONTRACTOR SHALL INFORM THE OWNER. ONCE ANY DEMOLITION WORK HAS BEGUN, ANY INOPERABLE OR DAMAGED MATERIAL SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE. 2.VERIFICATION OF EXISTING CONDITIONS. "INASMUCH AS THE REMODELING AND/OR REHABILITATION OF THE EXISTING BUILDING REQUIRES THAT CERTAIN ASSUMPTIONS BE MADE REGARDING EXISTING CONDITIONS, AND BECAUSE SOME OF THESE ASSUMPTIONS MAY NOT BE VERIFIABLE WITHOUT DESTROYING OTHERWISE ADEQUATE OR SERVICEABLE PORTIONS OF THE BUILDING, THE GENERAL CONTRACTOR AGREES THAT, EXCEPT FOR NEGLIGENCE ON THAT PART OF THE DESIGN PROFESSIONAL THE CONTRACTOR WILL HOLD HARMLESS, INDEMNIFY AND DEFEND THE DESIGN PROFESSIONAL FROM AND AGAINST ANY AND ALL CLAIMS ARISING OUT OF THE PROFESSIONAL SERVICES PROVIDED." 3. ANY ELECTRICAL ITEMS SHOWN OR NOT SHOWN ON THE PLANS, OR WHERE CIRCUITS IN EXISTING WALLS ARE REMOVED BY DEMOLITION, SHALL UPON COMPLETION OF REMODEL WORK BE LEFT IN WORKING CONDITION. 4. ALL PHASES OF THE ELECTRICAL WORK SHALL BE COORDINATED WITH THE ARCHITECT. WORK SHALL BE DONE IN A FASHION TO CAUSE AS LITTLE INCONVENIENCE AS POSSIBLE TO THE OWNER. 5. ELECTRICAL DEVICES NOTED TO BE REMOVED SHALL BE REMOVED BACK TO A POINT WHERE EXISTING CONDUIT CAN BE ABANDONED IN CONCEALED SPACES. REMOVE ALL WIRING FROM ABANDONED CONDUIT. ALL BOXES TO BE REMOVED SHALL BE TAKEN OUT OF WALLS AND HAVE HOLES REFINISHED TO MATCH WALL FINISH. 6. ELECTRICAL CONTRACTOR SHALL NOT DEFACE ANY AREAS OF THE BUILDING WHERE REMODELING IS NOT BEING DONE. 7. RACEWAYS: ALL CONDUIT SHALL BE CONCEALED WHEREVER POSSIBLE. CONDUIT SHALL NOT BE EXPOSED IN FINISHED AREAS (EXCLUDES MECHANICAL ROOMS, STORAGE CLOSETS, AND SIMILAR AREAS). EXPOSED RACEWAYS SHALL BE SURFACE RACEWAYS PER SPECIFICATIONS. 8. ROUTING OF EXISTING CONCEALED CONDUIT NOT KNOWN. LOCATION DETERMINED BY ELECTRICAL CONTRACTOR. ELECTRICAL CONTRACTOR SHALL RECIRCUIT AS NOTED UTILIZING ANY EXISTING CONDUIT. HE SHALL REMOVE EXISTING WIRE AND REPULL NEW. ALL NEW CONDUIT ADDED SHALL BE CONCEALED WHEREVER POSSIBLE. 9. SURFACE RACEWAY: WHEREVER CONCEALED CONDUIT IN FINISHED AREAS IS NOT POSSIBLE, ELECTRICAL CONTRACTOR SHALL INSTALL SURFACE MOUNTED RACEWAYS EQUAL TO WIREMOLD. RUN SURFACE RACEWAYS IN CORNER OF WALL AND CEILING. ALL RACEWAYS THAT ARE EXPOSED SHALL BE APPROVED BY ARCHITECT PRIOR TO ROUGH-IN. 10. TERMINATING AND SPLICING: MAKE ALL JOINTS AND SPLICES IN BRANCH CIRCUIT WIRING WITH APPROVED SOLDERLESS TOOL APPLIED OR TWIST-ON CONNECTORS, IN THE VARIOUS BOXES, GUTTERS, AND SIMILAR LOCATIONS, BUT NOT IN RACEWAYS. LEAVE SUFFICIENT SLACK TO PERMIT TWO (2) OR MORE SPLICES OR JOINTS TO BE REMADE IN CASE OF FAULT. 11. NM (ROMEX CABLE) WILL NOT BE ALLOWED ON THIS PROJECT. 12. ELECTRICAL CONTRACTOR SHALL RECEIVE, FROM SYSTEM SUPPLIERS, ALL WIRING DIAGRAMS FOR ALL EQUIPMENT, PRIOR TO ANY ROUGH-IN, TO ASSURE PROPER ELECTRICAL CHARACTERISTICS ARE PROVIDED. ELECTRICAL CONTRACTOR SHALL PROVIDE ARCHITECT WRITTEN NOTIFICATION PRIOR TO ROUGH-IN, THAT ALL WIRING DIAGRAMS HAVE BEEN RECEIVED AND REVIEWED FOR CORRECTNESS. ANY INCORRECT WIRING OR DEVICES INSTALLED BY ELECTRICAL CONTRACTOR WITHOUT WIRING DIAGRAMS SHALL BE CORRECTED AT ELECTRICAL CONTRACTOR'S EXPENSE. 13. ELECTRICAL CONTRACTOR SHALL RECEIVE, FROM MECHANICAL CONTRACTOR, ALL WIRING DIAGRAMS AND SHOP DRAWINGS FOR ALL MECHANICAL EQUIPMENT, PRIOR TO ANY ROUGH-IN, TO ASSURE PROPER ELECTRICAL CHARACTERISTICS, VOLTAGE, PHASE, HORSEPOWER, AMPERE, KILOWATTS AND ETC. ARE PROVIDED. ELECTRICAL CONTRACTOR SHALL PROVIDE ARCHITECT WRITTEN NOTIFICATION PRIOR TO ANY ROUGH-IN, THAT ALL WIRING DIAGRAMS AND SHOP DRAWINGS HAVE BEEN RECEIVED AND REVIEWED FOR CORRECTNESS. ANY INCORRECT WIRING OR DEVICES INSTALLED BY ELECTRICAL CONTRACTOR WITHOUT WIRING DIAGRAMS SHALL BE CORRECTED AT ELECTRICAL CONTRACTOR'S EXPENSE. 14. ALL EXISTING AND NEW SMOKE DETECTORS IN OR NEAR AREAS BEING REMODELED SHALL BE BAGGED OR REMOVED. IF REMOVED, STORE IN A SEALED BAG UNTIL ALL REMODELING WORK IS COMPLETE. IF SMOKE DETECTORS ARE NOT BAGGED OR REMOVED THEY SHALL BE REPLACED WITH NEW DETECTORS AT CONTRACTOR'S EXPENSE WHEN THE PROJECT IS COMPLETED. 15. EXACT ELECTRICAL DEMOLITION REQUIREMENTS NOT SHOWN ON THE DRAWINGS. 16. ELECTRICAL CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING TO DETERMINE EXACT DEMOLITION WORK TO BE DONE AND SHALL INCLUDE ALL DEMOLITION COSTS IN THEIR BID. 17. ELECTRICAL CONTRACTOR SHALL VERIFY ELECTRICAL DEVICE LOCATIONS IN ALL CASE WORK WITH ARCHITECTURAL CASE WORK DETAILS PRIOR TO ANY ROUGH-IN. 18. ELECTRICAL CONTRACTOR SHALL VERIFY FINAL LOCATIONS OF ALL SINKS WITH PLUMBING CONTRACTOR PRIOR TO ROUGH-IN. ANY ELECTRICAL DEVICES LOCATED ABOVE COUNTER AND BEHIND FINAL SINK LOCATIONS SHALL BE SHIFTED A MINIMUM OF 6" TO EITHER SIDE OF SINK. ANY ELECTRICAL DEVICES LEFT BEHIND SINK AT TIME OF FINAL ELECTRICAL OBSERVATION SHALL BE RELOCATED AT ELECTRICAL CONTRACTOR'S EXPENSE. 19. ALL NEW ELECTRICAL ITEMS SHOWN ON EXISTING WALLS AND CEILINGS SHALL BE FLUSH MOUNTED UNLESS NOTED OTHERWISE. CUT AND PATCH EXISTING WALLS AND CEILINGS TO CONCEAL ALL MOUNTING BOXES AND CONDUITS. 20. FIRE ALARM SHALL BE APPROVED BY LOCAL AUTHORITY HAVING JURISDICTION PRIOR TO ROUGH-IN. ANY MODIFICATIONS OR ADDITIONS REQUIRED BY THE LOCAL AUTHORITY HAVING JURISDICTION SHALL BE INCLUDED IN ELECTRICAL CONTRACTOR'S BASE CONSTRUCTION COST. 21. RELOCATIONS: OWNER RESERVES THE RIGHT TO RELOCATE ANY ELECTRICAL DEVICE, UP TO A DISTANCE OF 12'-0", BEFORE INSTALLATION WITHOUT EXTRA CHARGE FROM ELECTRICAL CONTRACTOR. 22. ELECTRICAL DRAWINGS ARE DIAGRAMMATIC ONLY. EXACT LOCATION OF ALL SYSTEMS AND EQUIPMENT SHALL BE FIELD VERIFIED AND COORDINATED WITH OTHER TRADES PRIOR TO ANY INSTALLATION. WHERE EXACT LOCATIONS ARE NECESSARY, THEY ARE DIMENSIONED ON THESE DRAWINGS. WHERE THERE IS A QUESTION OF ADEQUATE CLEARANCE OR COORDINATION BETWEEN TRADES, THIS CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ENGINEER'S REVIEW. ON ALL SPECIAL SYSTEMS REQUIRING DRAWINGS BY LICENSED INSTALLATION CONTRACTORS, SUCH AS FIRE PROTECTION, SUCH DRAWINGS SHALL BE SUBMITTED WITHIN 30 DAYS AFTER AWARD OF CONTRACT. 23. CALL UTILITY COMPANIES (POWER, GAS, WATER, SEWER, TELEPHONE, CABLE TV, ETC.) IN ADVANCE BEFORE TRENCHING FOR THE MARKING OF THEIR UNDERGROUND UTILITIES. ALSO CONTRACTOR SHALL LOCATE ALL ON-SITE UTILITIES SUCH AS SECONDARY SERVICE FEEDERS, UNDERGROUND ELECTRICAL BRANCH CIRCUITS, SPRINKLER LINES, ETC. PRIOR TO TRENCHING. ANY CUT OR DAMAGED UNDERGROUND UTILITIES SHALL BE REPAIRED OR REPLACED AT CONTRACTOR'S EXPENSE. 24. EMT CONDUIT FITTINGS: DRY LOCATIONS ALL EMT COUPLERS AND CONNECTORS SHALL BE STEEL SET SCREW TYPE. DIE CAST FITTINGS SHALL NOT BE USED ON THIS PROJECT. DAMP/WET LOCATIONS, USE STEEL COMPRESSION GLAND TYPE COUPLER AND CONNECTORS. 25. ACCESS PANELS REQUIRED BY THE ELECTRICAL CONTRACTOR SHALL BE PROVIDED BY THE ELECTRICAL BID CONTRACTOR, THEN TURNED OVER TO THE APPROPRIATE TRADE FOR INSTALLATION. SEE ARCHITECTURAL SPECIFICATION SECTION DIVISION 8. 26. ELECTRICAL CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH THE GENERAL CONTRACTOR TO OBTAIN ACTUAL ROOM NAMES AND NUMBERS, DESIGNATED BY THE OWNER/ARCHITECT AT THE COMPLETION OF THE PROJECT. ACTUAL ROOM NAMES AND NUMBERS SHALL BE USED ON ALL PANEL SCHEDULES, COMPUTER PROGRAMMING, GRAPHIC PLAQUES, SOUND SYSTEMS, TELEPHONE SYSTEM, INTERCOMS, FIRE ALARMS, SECURITY SYSTEMS, CATV SYSTEMS AND SIMILAR. 27. CONTRACTOR SHALL NOT FASTEN, ATTACH OR HANG ANY MATERIAL FROM THE ROOF DECK. ALL CONDUITS, JUNCTION BOXES, FIXTURES, DEVICES AND EQUIPMENT SHALL BE HUNG FROM THE STRUCTURAL STEEL FRAME AND SHALL BE PLACED WITH A MINIMUM OF 1" CLEARANCE BELOW THE ROOF DECK. WIRING AND CONDUITS SHALL NOT BE PLACED WITHIN THE RIBS OF THE ROOF DECK. CONTRACTOR SHALL NOT LOOSEN, REMOVE OR CUT ANY ROOFING SYSTEM FASTENERS PROTRUDING THROUGH THE ROOF DECK. 1. PROVIDE ALL EQUIPMENT AND SERVICES NECESSARY FOR COMPLETE SYSTEM. 2. EQUIPMENT AND MATERIALS SHALL BE UL-LISTED FOR THE USE INTENDED. 3. SUPPORT CONDUIT AND EQUIPMENT FROM THE STRUCTURE TO PREVENT SAGGING, POCKETING, AND VIBRATION. 4. FIRE-CAULK ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES. 5. PROVIDE COMPLETE SYSTEMS OF CONDUCTORS AND RACEWAYS USING CONDUIT AND/OR CABLE ASSEMBLIES APPROPRIATE TO THE FUNCTION AND LOCATION AND APPROVED PER NEC REQUIREMENTS. CONDUCTORS MUST BE DERATED PER CODE. 6. PROVIDE A COMPLETE GROUNDING SYSTEM PER NEC, SECTION 250. 7. RACEWAYS MAY BE THE FOLLOWING (SUBJECT TO NEC REQUIREMENTS): ELECTRICAL METALLIC TUBING, GALVANIZED. POLYVINYL CHLORIDE CONDUIT, SCHEDULE 40. 8. CABLE ASSEMBLIES MAY BETHE FOLLOWING (SUBJECT TO NEC REQUIREMENTS): METALCLAD CABLE. 9. PROVIDE GALVANIZED STEEL JUNCTION AND OUTLET BOXES, EXCEPT AS INDICATED OTHERWISE. PROVIDE WEATHER-PROOF TYPE CAST BOXES WITH GASKET AND CAST COVERPLATE FOR WET LOCATIONS. THROUGH THE WALL BOXES ARE NOT PERMITTED. 10. POWER CONDUCTORS SHALL BE COPPER, (STRANDED FOR NO. 8 AWG AND LARGER), WITH THE FOLLOWING INSULATION STANDARDS: THHN, THWN, XHHW (90C). THE CONDUCTORS SHALL BE APPLIED USING THE 75C RATING. ALUMINUM CONDUCTORS MAY BE SUBSTITUTED USING THE THE SAME CAPACITY OF THE COPPER CONDUCTORS SPECIFIED. 11. PROVIDE SPECIFICATION GRADE, IVORY COLORED DEVICES THROUGHOUT, UNLESS NOTED OTHERWISE ON THE PLANS. DEVICES SHALL BE HUBBELL. PLATES SHALL BE IVORY PLASTIC, WITH MATCHING SCREWS, UNLESS NOTED OTHERWISE. PROVIDE BLANK COVERPLATES FOR UNUSED OUTLETS. COVERPLATES FOR MULTI-GANG BOXES SHALL BE SIZED FOR THE BOX T COVERS. 12. BRANCH CIRCUITS SHALL USE MINIMUM NO. 12 AWG WIRING. CONTROL WIRING MINIMUM NO. 14 AWG. FOR DISTANCES EXCEEDING 75' FROM THE PANEL, PROVIDE MIN. 10 AWG. 13. DO NOT INSTALL EXPOSED CONDUIT UNLESS APPROVED BY THE ARCHITECT. 14. RUN ALL CONDUIT PARALLEL AND PERPENDICULAR TO BUILDING LINES. 15. USE FLEXIBLE METALLIC CONDUIT FOR CONNECTIONS TO MOTORS, FIXTURES, OR OTHER EQUIPMENT WHERE VIBRATION IS PRESENT. PROVIDE SEALTITE FMC IN WET AREAS. 16. PROVIDE GROUND WIRE IN NON-METALLIC CONDUIT AND FLEXIBLE CONDUIT. GROUND WIRES SHALL BE INCREASED IN SIZE WHERE CIRCUIT WIRING IS INCREASED FOR VOLTAGE DROP. 17. PROVIDE A TYPED PANEL SCHEDULE FOR EACH PANEL, INSERTED IN A PLASTIC SLEEVE. ELECTRICAL GENERAL NOTESELECTRICAL SPECIFICATION NOTES 1 E0.2 TYPICAL DEVICE MOUNTING HEIGHTS NONE 2 E0.2 LV WIRING (DATA/TV) DETAIL NONE T FINISHED FLOOR TV 3 18" 44"54"64" 78"80"DATA OUTLET INTERNET SWITCHES AND CATV LOCATED IN I.T. ROOM CABLE TV OUTLET DATA CABLE CABLE TV CABLE ETHERNET SWITCH & SERVER RACKS CATV VIDEO SPLITTER 2" CONDUCT FROM I.T. ROOM TO DEMARC LOCATION. SCALE:SCALE: COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 E0.2 EL E C T R I C A L G E N E R A L N O T E S WN PD 19022 11/11/2019 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 ELECTRICAL ONE-LINE DIAGRAM1 E0.3 NONE BUILDING FEED BY UTILITY 500KVA 208V 3∅4W 1 GROUNDS SPARE SPARE PANEL 'S2' 600A 3∅ 120/208V 2 3 4 5 6 (E)PANEL 'HP' 100A 3∅ 120/208V M 400AS 400AF 600AS 600AF 200AS 200AF 200AS 200AF 600AS 500AF 1600/4 600/4 100/4 G #3/0 CU GROUND WATER PIPE #3/0 CU BUILDING STEEL #6 CU GROUNDING ROD #8 CU GROUND UFER 100AS 100AF TO SUITE #1 TO METERSTACK 200 200 PANEL 'S2W' 200A 3∅ 120/208V 1 2 (E)1600A 'MDP', 208V, 3∅, 4W, 65KAIC, NEMA 3R 3 4 5 200/4 200/4 PANEL 'S2E' 200A 3∅ 120/208V 400 PANEL 'M' 400A 3∅ 120/208V 6 400/4 SCALE: MM COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 E0.3 EL E C T R I C A L O N E L I N E D I A G R A M WN PD 19022 11/11/2019 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 1 1 1 1 COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 E0.4 EL E C T R I C A L P A N E L S C H E D U L E S WN PD 19022 11/11/2019 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 WAI NG - PCD ENGINEERING 10/09/19 COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 E0.5 LU M I N A I R E S C H E D U L E & C O M C H E C K WN PD 19022 11/11/2019 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 GF C I GF C I GF C I GFCI GF C I GF C I GF C I GF C I GFCI GFCIGFCI GF C I GF C I GFCI GFCI GFCI GFCI GFCI GFCI GFCI GF C I GF C I GF C I GF C I G F C I G F C I GF C I GF C I GF C I GF C I GF C I GF C I GF C I GFCI GF C I S S S S S S S S S S F F F F F F F F F F F F F 7 A 8 9 10 A.5 B C D D.4 E NURSE'S 122 VESTIBULE 100 CHART 136 RR 104 RECEPTION 102 CIRC 127 MEDS 123 ORTHO/EXAM 114 RADIOLOGY 113 O2 STG 107 RR 128 RR 121 STAFF 116 EXAM 115 CLINICAL 125 CIRC 133 NURSE'S 134 EXAM 138 CIRC 124 CHART 137 EVS FLR EQ 108 CIRC 103 EXAM 119 EVS EQP 110 EXAM 118 EXAM 117 VESTIBULE 106 RR 105 EXAM 130 OFFICE 112 DIRTY 111 EXAM 126 EXAM 139 CHART 135 Space 215 EXAM 120 EXAM 129 CIRC 109 +40"1 AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC +40" AC AC AC AC +40" AC AC AC AC AC FACP S2E-83 AC AC AC AC ACACACAC S2E-1 S2E-3 S2E-5 S2E-7 S2E-9 S2E-11 S2E-13 S2E-15 S2E-45 S2E-47 S2E-41 S2E-43 S2E-1 S2E-39 S2E-37 S2E-1 S2E-31 S2E-35 S2E-69 S2E-65 S2E-59S2E-61 S2E-67 S2E-17 S2E-19 S2E-21 PANEL 'S2E' TC-2; S2E-84 S2E-23 S2E-33 S2E-57 S2E-49 S2E-51 S2E-53 S2E-53 S2E-63 S2E-71 AC FPB-1-4 M-35,37,39 FPB-1-5 M-41,43,45 FPB-1-6 M-47,49,51 FPB-1-7 M-53,55,57 FPB-1-2 M-23,25,27 FPB-1-1 M-17,19,21 FPB-1-3 M-29,31,33 VAV-1-1 M-2,4,6 VAV-1-2 M-8,10,12 VAV-1-4 M-20,22,24 VAV-1-3 M-14,16,18 5 S2E-81 (PART) 5 S2E-81 (PART) 5 S2E-81 (PART) 5 S2E-81 (PART) 5 S2E-81 (PART) 5 S2E-81 (PART) 5 S2E-81 (PART) J J J M-62,64 J J J J M-66,68 J ACEPO 2 J 3 J 4 J 6 XRAY S2-19,21,23 S2E-27 S2E-73 (E)UNIT HEATER M-74,76 (E)UNIT HEATER M-78,80 7 7 PLUG MOLD S2E-75 +48" 8 PLUG MOLD S2E-77 +48" 8 J J S2E-20 S2E-22 S2E-24 S2E-26 S2E-28 S2E-30 S2E-32 S2E-34 1 J 9 9 J9 J 9 S2E-74 S2E-76 USBUSB USB USB USBUSB USB USB USB USB USB 1 1 1 1 1 1 1 1 1 1 1 1 1 J J 9 9 S2E-72 J9 S2E-70 J 9 1 1 J J J J 9 J 10 J S2E-68 S2E-66 S2E-64 9 9 9 9 9 1 GENERAL NOTES: 1. E.C. TO PROVIDE EMERGENCY PULL STRING STATIONS FOR ALL ROOMS. 2. LOW VOLTAGE DEVICES SUCH AS FIRE ALARM, SECURITY, HANDICAPPED ACCESS, PHONE SYSTEMS, AND CCTVS SHALL BE COORDINATE WITH VENDORS. 3. E.C. TO REFER TO X-RAY VENDOR SHOP DRAWINGS AND COORDINATE TO CONFIRM FINAL POWER REQUIREMENTS AND LOCATIONS PRIOR TO ANY WORK. 4. E.C. TO PROVIDE J-BOXES NEXT TO ALL DOORS THAT REQUIRES FOB ACCESS. 5. FIRST FLOOR SPACE ABOVE CEILING TO BE USED AS RETURN AIR PLENUM. ALL SYSTEMS INSTALLED IN THIS SPACE TO BE PLENUM-RATED AND SHALL COMPLY WITH ALL REQUIREMENTS LISTED IN 2015 IMC 602.2.1. 6. CARD READERS AND EMERGENCY PULL LIGHTS TO BE COORDINATED WITH TENANT IMPROVEMENT LOW VOLTAGE SECURITY CONTRACTOR. WORK NOTES: 1. E.C. TO PROVIDE A SWITCH ABOVE CABINETS TO CONTROL THE ON/OFF OF THE GARBAGE DISPOSAL. 2. E.C. TO CONFIRM WITH OWNER IF EPO IS NEEDED, THIS EQUIPMENT IS OPTIONAL. 3. E.C. TO PROVIDE 1/2" CONDUIT WITH PULLSTRINGS TO GENERATOR FOR WARNING LIGHT. 4. E.C. TO PROVIDE 2-1/2" CONDUIT FROM GENERATOR. STUB BELOW FINISHED CEILING. REFER TO XRAY SHOP DRAWINGS FOR MORE DETAILS. 5. E.C. TO PROVIDE A SERVICE RECEPTACLE AT THE SAME LEVEL AS FPB AND VAV (MECHANICAL EQUIPMENTS). EQUIPMENTS ARE APPROXIMATELY 9' TO 10' AFF. IF DISTANCE OF MECH. EQUIPMENT AND SERVICE RECEPTACLE EXCEEDS 25', PROVIDE ADDITIONAL SERVICE RECEPTACLES AS NECESSARY TO COMPLY PER NEC 210.63. 6. E.C. TO PROVIDE 3" CONDUIT FROM GENERATOR. STUB BELOW FINISHED CEILING. REFER TO XRAY SHOP DRAWINGS FOR MORE DETAILS. 7. E.C. TO RE-WIRE EXISTING UNIT HEATERS TO PANEL 'M' IF CONNECTED TO EXISTING HOUSE PANEL OF THIS BUILDING. 8. E.C. TO CONFIRM EXACT LOCATION AND RECEPTACLE SPACING REQUIREMENTS FOR PLUG MOLD PRIOR TO FURNISHING. 9. E.C. TO PROVIDE JUNCTION BOX FOR POWER OPERATED DOOR ACTUATOR. COORDINATE WITH DOOR ACTUATOR VENDOR TO PROVIDE ADDITIONAL J- BOXES AS NEEDED FOR DOOR SWITCHES. 10. BALLARD-MOUNTED ACTUATOR. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION. # COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 E1.1 PO W E R F I R S T F L O O R E A S T P L A N WN PD 19022 11/11/2019 NORTH 1/4" = 1'-0"1 POWER FIRST FLOOR EAST PLAN 1 1 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 GFCI GFCI GF C I GF C I GF C I G F C I GF C I GFCI GF C I GF C I GF C I GF C I GF C I GFCI GFCI GFCI GFCI GFCI GFCI S S S S F F F F F F F F F F 4 5 6 A A.5 B C D D.4 E THERAPY 172 CLEAN LINEN 149 OPEN OFFICE 160 RECEPTION 157 THERAPY 165 EVS EQP 141 RED BAG 153 STG 171 CIRC 161 CIRC 163 STAFF LOUNGE 144 STORAGE 162 EXAM 132 FACILITIES 152 RR 174 THERAPY 173 EXAM 131 THERAPY 169 CIRC 158 THERAPY 167 THERAPY 170 THERAPY 166 EVS STOR 142 OFFICE 159 THERAPY 164 DIRTY LINEN 148 CIRC 147 IT 143 MECH 150 OFFICE 156 CIRC 155 CIRC 140 LOCKERS 145 CIRC 154 RR 146 EXERCISE 175 MAIN SUPPLY 151 1 AC AC AC +40" AC AC AC AC AC AC AC AC AC AC 2 2 AC AC 2 AC 2 ACACACAC 3 3 3 4 AC AC +40" CP-1 2 S2W-1 S2W-11 S2W-7 S2W-5 S2W-9 M-83 PANEL 'S2' PANEL 'M' S2W-3 S2W-11 S2W-13 S2W-15 S2W-19 S2W-41 S2W-37 S2W-33 S2W-39 S2W-29 S2W-27 S2W-51 S2W-53 S2W-57 S2W-65 S2W-69 S2W-47 S2W-49 S2W-43 S2W-45 S2W-3 S2W-21 S2W-25 S2W-23 S2W-31 S2W-35 AC AC AC S2W-5 5 S2W-59 (PART) S2W-57 PANEL 'S2W' TC-1; S2W-84 S2W-71 FPB-2-1 M-59,61,63 FPB-2-2 M-65,67,69 FPB-2-3 M-71,73,75 FPB-2-4 M-77,79,81 VAV-2-3 M-38,40,42 VAV-2-4 M-44,46,48 VAV-2-2 M-32,34,36 VAV-2-1 M-26,28,30 5 S2W-81 (PART) 5 S2W-81 (PART) 5 S2W-81 (PART) 5 S2W-81 (PART) 5 S2W-81 (PART)5 S2W-81 (PART) 5 S2W-81 (PART) J J M-70 J J J S2W-59 (PART) S2W-59 (PART) J M-50,52 J J J J M-54,56 J J J J M-58,60 UH-1 UH-1 UH-2 M-72 S2W-75 S2W-77 S2W-16 S2W-18 USB USBUSB USB USB USBUSB USB USB 1 1 1 1 11 1 1 1 J J9 9 S2W-52 1 +48" +48"+48" +48" +48" +48" +48" +48" 1 1 1 1 1 1 1 4 S2W-654S2W-61 4 S2W-63 4 S2W-61 7 7 7 7 7 7 7 7 4 S2W-61 4 S2W-65 1 WORK NOTES: 1. E.C. TO PROVIDE A SWITCH ABOVE CABINETS TO CONTROL THE ON/OFF OF THE GARBAGE DISPOSAL. 2. E.C. TO CONFIRM EXACT LOCATION OF RECEPTACLE PRIOR TO ANY WORK. 3. E.C. TO PROVIDE RECEPTACLE ABOVE CEILING FOR CEILING TV MOUNT. 4. E.C. TO PROVIDE POWERED WIREWAY BY CONNECTRAC #K-2.7-IN-048-144D. CONFIRM WITH ARCHITECT IF RECEPTACLES AND DATA EXACT LOCATIONS AND NUMBER OF HUBS NEEDED. 5. E.C. TO PROVIDE A SERVICE RECEPTACLE AT THE SAME LEVEL AS FPB AND VAV (MECHANICAL EQUIPMENTS). EQUIPMENTS ARE APPROXIMATELY 9' TO 10' AFF. IF DISTANCE OF MECH. EQUIPMENT AND SERVICE RECEPTACLE EXCEEDS 25', PROVIDE ADDITIONAL SERVICE RECEPTACLES AS NECESSARY TO COMPLY PER NEC 210.63. 6. E.C. TO PROVIDE JUNCTION BOX FOR POWER OPERATED DOOR ACTUATOR. COORDINATE WITH DOOR ACTUATOR VENDOR TO PROVIDE ADDITIONAL J- BOXES AS NEEDED FOR DOOR SWITCHES. 7. PROVIDE RECEPTACLES STACKED DIRECTLY ON TOP OF EACH OTHER. SHOWN OFFSET FOR CLARITY PURPOSES. # GENERAL NOTES: 1. LOW VOLTAGE DEVICES SUCH AS FIRE ALARM, SECURITY, HANDICAPPED ACCESS, PHONE SYSTEMS, AND CCTVS SHALL BE COORDINATE WITH VENDORS. 2. E.C. TO PROVIDE J-BOXES NEXT TO ALL DOORS THAT REQUIRES FOB ACCESS. 3. FIRST FLOOR SPACE ABOVE CEILING TO BE USED AS RETURN AIR PLENUM. ALL SYSTEMS INSTALLED IN THIS SPACE TO BE PLENUM-RATED AND SHALL COMPLY WITH ALL REQUIREMENTS LISTED IN 2015 IMC 602.2.1. 4. CARD READERS AND EMERGENCY PULL LIGHTS TO BE COORDINATED WITH TENANT IMPROVEMENT LOW VOLTAGE SECURITY CONTRACTOR. COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 E1.2 PO W E R F I R S T F L O O R W E S T P L A N WN PD 19022 11/11/2019 1/4" = 1'-0"1 POWER FIRST FLOOR WEST PLAN NORTH 1 1 1 REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 OS OS OS OS OS OS OS OS PE S S S S S S S S S S F F F F F F F F F F F F F 7 A 8 9 10 A.5 B C D D.4 E NURSE'S 122 VESTIBULE 100 CHART 136 RR 104 RECEPTION 102 CIRC 127 MEDS 123 ORTHO/EXAM 114 RADIOLOGY 113 O2 STG 107 RR 128 RR 121 STAFF 116 EXAM 115 CLINICAL 125 CIRC 133 NURSE'S 134 EXAM 138 CIRC 124 CHART 137 EVS FLR EQ 108CIRC 103 EXAM 119 EVS EQP 110 EXAM 118 EXAM 117 VESTIBULE 106 RR 105 EXAM 130 OFFICE 112 DIRTY 111 EXAM 126 EXAM 139 CHART 135 Space 215 EXAM 120 (E) (E) EXAM 129 CIRC 109 A2 A2 A2 A2 A2 A2 A2 A2-EM A2-EM A4-EM A4-EM A4 A2-EM A2 A2-EM A2 A4 A4 A2 A2-EM A4-EM A4-EM A2 A2 A2 A2 A2 A2 A2-EM A2 A2-EM A2 A2-EM A4-EM A4 A2 A2-EM A4 A4-EM A4 A4 A4 A2 A2-EM A2 A2-EM A2 A2-EM A2 A2 A2A2 A2 A2 A2-EM A4-EM A4 A4 B B B B B B-EM B2-EM B2 EX EX EX EX EX EX EX EM C C C C A4-EM A4 A4 A2A2 B2 B B B B A2 A2 A2 A2 A2 A2-EM A2 A2 A2 A2 A2 A2 A2A4 A4 A4 B2 B2 B2B2 B2 B2 A2 A2 A2A2 A2 A2 A2 A2-EM A2A2 A2 A2 A2-EM A2 A2 A2-EM A2 A2 A2 A2 A2 EX (E) VSVS VSVS OS OS VS VS VS VS VS VS VS VS VS VS VS VS VS VS VS VS VS VS OSOS VS VSVSVSVSVS VS VS VSVSVSVS VS VS VS VS PANEL 'S2E' S2W-6 S2W-6 S2W-6 S2W-6 TC-2 J SIGN S2E-78 2 J SIGN S2E-802 J SIGN S2E-82 2 S2E-2 S2E-2 S2E-2 S2E-2 S2E-14 S2E-14 S2E-14 S2E-14 S2E-14 S2E-14 S2E-16 S2E-16 S2E-16 S2E-16S2E-16 S2E-2 S2E-2 S2E-2 S2E-2 S2E-2 S2E-2 S2E-2 S2E-2 S2E-2 S2E-2 S2E-2 S2E-2 S2E-2 S2E-2 S2E-2 S2E-2 S2E-2S2E-2 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 S2E-4 EX S2E-6S2E-6 S2E-6 S2E-6 S2E-6S2E-6 S2E-6 S2E-6 S2E-6 S2E-6 S2E-6 S2E-6 S2E-6 S2E-6 S2E-6 S2E-6 S2E-6 S2E-6 S2E-6 S2E-6 S2E-6 S2E-6 S2E-6S2E-6 S2E-6 S2E-6 S2E-6S2E-6 S2E-6 S2E-8 S2E-8 S2E-8 S2E-8 S2E-8S2E-8 S2E-8 S2E-8 S2E-8 S2E-8 S2E-8 S2E-8 S2E-8S2E-8 S2E-10 S2E-10 S2E-10 S2E-10 S2E-10 S2E-10 S2E-10 S2E-10 S2E-10 S2E-10 S2E-10 S2E-10 S2E-10 S2E-10 S2E-10 S2E-10 S2E-10S2E-10 S2E-10 S2E-10 S2E-10 EX S2E-10 S2E-10 S2E-10 S2E-10S2E-10 S2E-10 S2E-10 3 3 3 3 3 3 3 3 3 3 33 1 S2E-2 EF-1 S2E-2 EF-1 S2E-6 EF-1 S2E-6 EF-1 S2E-6EF-1 S2E-6 EF-1 D S2E-8 D S2E-8 D S2E-8 D S2E-8 D S2E-8 F F F F F F F F F FF D S2E-2 J J J J J J J J J JJ D S2E-2 D S2E-2 D S2E-2 D S2E-2 D S2E-2 D S2E-6 D S2E-6 G G G G /1 E2.2 /1 E2.2 4 4 4 4 4 4 4 4 4 4 S2E-4 B 4 1 GENERAL NOTES: 1. ALL LIGHT SWITCHES SHALL BE DIMMABLE AND COMPATIBLE WITH THE LIGHT FIXTURES AS SPECIFIED IN LUMINAIRE SCHEDULE ON SHEET E0.4. 2. ALL LIGHT FIXTURES IN CORRIDORS AND RECEPTION AREA (WITHOUT SWITCH LEGS ATTACHED) SHALL BE CONTROLLED VIA TIME CLOCK TO AUTOMATICALLY SHUT OFF DURING NON-BUSINESS HOURS. OCCUPANCY SENSORS SHALL DIM LIGHTS TO 50% POWER DURING BUSINESS HOURS WHEN UN-OCCUPIED. 3. E.C. TO PROVIDE UNDERCOUNTER LED STRIPS (12V STARSTRAND LED TAPE LIGHTING BY MAXIM LIGHTING) UNDER FRONT LIPS OF ALL UPPER CABINETS FACING WALL. TIE SWITCH LEG AND CIRCUIT WITHIN THE ROOM RESPECTIVELY. 4. FIRST FLOOR SPACE ABOVE CEILING TO BE USED AS RETURN AIR PLENUM. ALL SYSTEMS INSTALLED IN THIS SPACE TO BE PLENUM-RATED AND SHALL COMPLY WITH ALL REQUIREMENTS LISTED IN 2015 IMC 602.2.1. 1 WORK NOTES: 1. E.C. TO COORDINATE WITH ARCHITECT FOR FINAL LOCATION OF DIMMER SWITCHES FOR NURSE STATION AREA. E.C. TO COORDINATE ANY LIGHT ZONES FROM ARCHITECT/OWNER. 2. E.C. TO COORDINATE WITH ARCHITECT FOR FINAL LOCATION OF SIGN CIRCUITS AND POWER REQUIREMENTS PRIOR TO ANY WORK. 3. LIGHT FIXTURE IS WITHIN SIDELIGHT DAYLIGHT ZONE. LIGHT FIXTURE SHALL BE CONTROLLED VIA PHOTOVOLTAIC SENSOR NEARBY. LIGHT SHALL ALSO BE AUTOMATICALLY SHUT OFF VIA TIME CLOCK DURING NON-BUSINESS HOURS. 4. E.C. TO PROVIDE CORRECT TRIM KIT FOR LIGHT FIXTURE ON HARD-LID CEILINGS. # COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 E2.1 LI G H T I N G F I R S T F L O O R E A S T P L A N WN PD 19022 11/11/2019 NORTH 1/4" = 1'-0"1 LIGHTING FIRST FLOOR EAST PLAN REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 OS OS OS OS OS OS OS OS OS PE S S S S S F F F F F F F F F F F 4 5 6 A A.5 B C D D.4 E THERAPY 172 CLEAN LINEN 149 OPEN OFFICE 160 RECEPTION 157 THERAPY 165 EVS EQP 141 RED BAG 153 STG 171 CIRC 161 CIRC 163 STAFF LOUNGE 144 STORAGE 162 EXAM 132 FACILITIES 152 RR 174 THERAPY 173 EXAM 131 THERAPY 169 CIRC 158 THERAPY 167 THERAPY 170 THERAPY 166 EVS STOR 142 OFFICE 159 THERAPY 164 DIRTY LINEN 148 CIRC 147 IT 143 EXAM 130 MECH 150 OFFICE 156 CIRC 155 CIRC 140 LOCKERS 145 CIRC 154 RR 146 VS VS VS (E) EXERCISE 175 MAIN SUPPLY 151 J J J A4-EM A4 A4 A4 A4 A4 A4 A4 A4 A2 A2 A2 A2 A2 A2 A2 A2 A2 A2-EM A2 A2 A4 A4-EM A4 A4-EM A4 A4-EM A4 A4 A4 A4 A4 A4 A4 A4 A2-EM A2 A2 A4 A4 A4 A4 A2 A2 A2 A2 A2 A2 A2 A2 A2 A4A4A4 A2 A2-EM A2 A2-EM A4-EM A4 A4 A4 A4 A4 A4-EM A4-EM A4 A4 A4A4 A4-EM A4-EM A4 A4 A4 A4 A4 A2-EM A2 A2-EMA2 A2A2 A2 A2A2 A2A2 A2A2 A2-EMA2 A2A2 A2-EM A2 A2 A2 A2 A2 A2 A2 A2 A2-EM B B B B B B B B EX EX C C EX A2 A2-EM A4 B B A2 A2 A2 A2 A2 A2-EM A2 A2 A2A2 A2A2 B B EX EX EX VS VS VS VS OS VS VS VS VS VS VS VS VSVS VS VS VS VS VSVS VS VS OS OS 1 VS PANEL 'M'PANEL 'S2' PANEL 'S2W' S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-2 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-4 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 VS S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 VS S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6S2W-6 S2W-6 S2W-6 S2W-6 S2W-6S2W-6 S2W-6 S2W-6S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-6 S2W-4 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8S2W-8 FAN S2W-8 FAN S2W-8 FAN S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 S2W-8 TC-1 J MONUMENT SIGN S2W-80 2 3 3 3 3 3 3 3 S2E-10 S2E-2 S2E-2 S2W-14 S2W-14 S2E-14 S2E-4 EX S2E-10 S2E-10 3 3 3 3 S2W-2 EF-2 S2W-2 EF-1 S2W-6 EF-1 D S2W-6 D S2W-6 J J F F F /1 E2.1 /1 E2.1 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 EF-1 1 GENERAL NOTES: 1. ALL LIGHT SWITCHES SHALL BE DIMMABLE AND COMPATIBLE WITH THE LIGHT FIXTURES AS SPECIFIED IN LUMINAIRE SCHEDULE ON SHEET E0.4. 2. ALL LIGHT FIXTURES IN CORRIDORS AND EXERCISE ROOM (WITHOUT SWITCH LEGS ATTACHED) SHALL BE CONTROLLED VIA TIME CLOCK TO AUTOMATICALLY SHUT OFF DURING NON-BUSINESS HOURS. OCCUPANCY SENSORS SHALL DIM LIGHTS TO 50% POWER DURING BUSINESS HOURS WHEN UN-OCCUPIED. 3. E.C. TO PROVIDE UNDERCOUNTER LED STRIPS (12V STARSTRAND LED TAPE LIGHTING BY MAXIM LIGHTING) UNDER FRONT LIPS OF ALL UPPER CABINETS FACING WALL. TIE SWITCH LEG AND CIRCUIT WITHIN THE ROOM RESPECTIVELY. 4. FIRST FLOOR SPACE ABOVE CEILING TO BE USED AS RETURN AIR PLENUM. ALL SYSTEMS INSTALLED IN THIS SPACE TO BE PLENUM-RATED AND SHALL COMPLY WITH ALL REQUIREMENTS LISTED IN 2015 IMC 602.2.1. 1 WORK NOTES: 1. E.C. TO COORDINATE WITH ARCHITECT FOR FINAL LOCATION OF DIMMER AND FAN CONTROL SWITCHES FOR EXERCISE ROOM. 2. E.C. TO COORDINATE WITH VENDOR ON FINAL POWER REQUIREMENTS AND LOCATION OF MONUMENT SIGN. REFER TO VENDOR SHOP DRAWINGS FOR MORE DETAILS. 3. LIGHT FIXTURE IS WITHIN SIDELIGHT DAYLIGHT ZONE. LIGHT FIXTURE SHALL BE CONTROLLED VIA PHOTOVOLTAIC SENSOR NEARBY. LIGHT SHALL ALSO BE AUTOMATICALLY SHUT OFF VIA TIME CLOCK DURING NON-BUSINESS HOURS. 4. E.C. TO PROVIDE CORRECT TRIM KIT FOR LIGHT FIXTURE ON HARD-LID CEILINGS. # COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 E2.2 LI G H T I N G F I R S T F L O O R W E S T P L A N WN PD 19022 11/11/2019 NORTH 1/4" = 1'-0"1 LIGHTING FIRST FLOOR WEST PLAN REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1 (E)RTU-2 M-7,9,11 1 (E)RTU-1 M-1,3,5 1CU-1 M-13,15 2 WORK NOTES: 1. E.C. TO VERIFY IF EXISTING ROOF TOP UNIT (RTU) DISCONNECT AND SERVICE RECEPTACLE ARE PRESENT. RE-RUN CONDUCTORS TO PANEL 'M' IF NECESSARY. PROVIDE SERVICE RECEPTACLE IF THERE IS NONE WITHIN 25' OF RTU. 2. E.C. TO PROVIDE A DISCONNECT FOR NEW CONDENSING UNIT. E.C. TO ROUTE MANUFACTURER'S RECOMMENDED CONDUCTORS TO THE INDOOR UNIT LOCATED ON 1ST FLOOR ROOM 143 (I.T. ROOM). PROVIDE SERVICE RECEPTACLE IF THERE IS NONE WITHIN 25' OF CU-1. # COPYRIGHT RESERVED SEAL: CHECKED BY: DRAWN BY: PROJECT NO: SH E E T T I T L E : PR O J E C T T I T L E : 32 3 T H I R D A V E , # 1 0 0 , L O N G M O N T , C O 8 0 5 0 1 PC D E N G I N E E R I N G . C O M FA X : ( 3 0 3 ) 6 7 8 . 1 1 4 2 TE L : ( 3 0 3 ) 6 7 8 . 1 1 0 8 NOTICE: DUTY OF COOPERATION Release of these plans contemplates further coordination among the owner, his contractor(s), the architect and engineers. Design and construction are complex. Although the architect and his consultants have performed their services with due care and diligence, they cannot guarantee perfection. Communication is imperfect, and every contingency cannot be anticipated. Any ambiguity or discrepancy discovered by the use of these plans shall be reported immediately to the architect. Failure to notify the architect compounds misunderstanding and increases construction costs. A failure to cooperate by a notice to the architect shall relieve the architect/engineer from responsibility for all consequences. Changes made from the plans without consent of the architect are unauthorized, and shall relieve the architect/engineer of responsibility for all consequences caused by such changes. OW N E R : PR O J E C T N A M E : AD D R E S S : ES T E S P A R K M E D I C A L C E N T E R 42 0 S T E A M E R D R I V E U N I T 1 0 1 , E S T E S P A R K C O 8 0 5 1 7 E3.1 PO W E R S E C O N D F L O O R P A R T I A L P L A N WN PD 19022 11/11/2019 1/8" = 1'-0"1 POWER SECOND FLOOR PARTIAL PLAN REVISIONS 10.9.2019 PERMIT 0 11.11.2019 ADDENDUM 1 1