Loading...
HomeMy WebLinkAboutDOCUMENT 660 Community Dr Construction Observation & Testing 2017-04-08 April 28, 2017 RLH Engineering, Inc. 541 East Garden Drive, Unit S Windsor, Colorado 80550 Attn: Mr. Chuck Jordan (cjordan@rlhengineering.com) Owner’s Representative for EVRPD Re: Construction Observation and Testing Services – Submittal No. 8 Proposed Estes Valley Community Center – North of Existing Aquatics Center 660 Community Drive - Southeast Corner of Manford Drive and Community Drive Estes Park, Colorado EEC Project No. 1164046 Mr. Jordan: As requested, during the period March 13 through April 8, 2017, Earth Engineering Consultants, LLC (EEC) personnel provided construction observation and testing services for the proposed Estes Valley Community Center expansion project currently under construction at 660 Community Drive in Estes Park, Colorado. The services provided during the referenced period were on a part-time/on-call as-needed basis and included observation and field density testing of prepared foundation bearing strata material, foundation and retaining wall backfill, and water line and various utility line backfill material as described herein, observations of foundation reinforcing steel for various structural related elements, periodic site observations during the concrete masonry unit (CMU) wall construction for the elevator shaft, observations of drilled and epoxy set all-threaded anchor bolts at locations as described herein, observations of non- destructive testing (NDT) services, along with testing of masonry grout and cast-in-place concrete for the referenced project. The results of the site observations and testing services completed by EEC personnel during the referenced period are included with this report. Field Density Testing and Observation Services During the referenced period, EEC personnel performed field density tests on prepared foundation bearing strata material, foundation and retaining wall backfill and of water line and various utility line backfill material as described herein, which were prepared/placed and compacted prior to and/or during our various site visits. The field density tests were completed 4396 G REENFIELD D RIVE W INDSOR, C OLORADO80550 (970) 545-3908 FAX (970) 663-0282 www.earth-engineering.com Earth Engineering Consultants, LLC EEC Project No. 1164046 Estes Valley Community Center – Estes Park, Colorado April 28, 2017 Page 2 at random locations and elevations within the areas tested and were performed in general accordance with ASTM Specification D6938. The field density test results and approximate location of each test completed during the referenced period are shown on the attached summary sheet and the associated site diagrams. The final field density test results, after several areas were reworked and tested as indicated herein by Retest of Consecutive Test No.’s (xx), conformed to the project specific compaction requirement of at least 95% or 98% of standard Proctor maximum dry density (ASTM D698), as required. Foundation Reinforcement Observations During the referenced period, EEC personnel conducted site visits on March 13, 14, 16, 17, 20 through 23, and 24, 2017, and April 5 and 6, 2017, to perform visual observations of the reinforcing steel placed within portions of the building’s foundation alignments, at the gridlines identified on the enclosed “color-coded/highlighted” site diagrams, prior to placement of concrete. The reinforcement for the footings/footing pads was placed in general accordance with the “Footing Schedule” as presented on page S300 and details as presented on pages S300 and S301 of the structural drawings. The reinforcement for the various pilasters was placed in general accordance with details on sheets S300 and S301 of the structural drawings. The reinforcement for the stem wall and foundation wall alignments was placed in general accordance with the details as presented on pages S301 and S305 of the structural drawings. The reinforcement for the swimming pool sump pit was placed in general accordance with details as presented on 10/S300 and 4/S390. The vertical dowels continuing into the CMU walls above, where appropriate, were installed to match the CMU reinforcement as per the plans and specifications. Any discrepancies of reinforcement during the various daily site visits were brought to the attention of the project’s construction management consultant, and the reinforcement subcontractor, during the initial site visit and corrections/modifications were addressed accordingly prior to placement of concrete. Clearances and lap lengths, where applicable, were checked and appeared to meet the minimum requirements. The horizontal and vertical reinforcement for the portion of the foundation system as noted herein and observed by EEC personnel on the dates indicated, appeared to be in general Earth Engineering Consultants, LLC EEC Project No. 1164046 Estes Valley Community Center – Estes Park, Colorado April 28, 2017 Page 3 accordance with details presented on the structural drawings prepared by Martin and Martin Consulting Engineers, dated January 12, 2017, and/or the shop drawings prepared by Barton Supply, dated December 22 and 28, 2016. The shop drawings were used as a reference to provide clarity when specific details were not presented on the structural drawings. In addition, on April 7, 2017, EEC personnel provided observations of grout placement under column base plates at approximate Gridlines H by 7, J by 4, 4.7, 5.8 and 6.5, K by 4.7, 5.8 and 6.5, and K.2 by 7. Based on these observations, the material appeared to be placed in general accordance with project and manufacturer specifications. Concrete Masonry Unit (CMU) Wall Construction Observations During the referenced period, EEC personnel observed portions of the reinforcing steel and other structural related elements during the 8-inch by 16-inch standard block CMU wall construction for the elevator core at approximate gridlines A6 between AH and AH.3. Layout of the CMU wall alignments were provided by others. During each daily site visit, (March 13 and 15, 2017,), EEC personnel observed CMU wall construction at the elevator core wall alignments and recorded approximate gridline locations, elevations/courses for each day, along with the observed horizontal and vertical reinforcement requirements and grout placement as needed. The vertical reinforcement for the elevator core, in general, consisted of one (1) #5 rebar spaced 48-inches on-center, along with an additional #5 rebar positioned at each end of walls, at each corner, and along each side of openings, control joints and/or expansion joints. The horizontal reinforcement consisted of 9-gauge “ladder-type” reinforcement spaced every 16-inches on- center full-height of each CMU wall. At the various bond beam locations, below and above windows, beam pockets, and at openings, where noted on the structural drawings, EEC personnel noted the reinforcement consisted of two (2) or one (1) continuous #5 within the fully-grouted cell alignments. The horizontal and vertical reinforcement for the portions of the CMU walls and observed by EEC personnel during the referenced timeframe on a periodic basis as noted herein appeared to be in general accordance with details presented on the structural drawings. During the grouting Earth Engineering Consultants, LLC EEC Project No. 1164046 Estes Valley Community Center – Estes Park, Colorado April 28, 2017 Page 4 operations, EEC personnel observed grout placement within the low lifts. Lap lengths, where applicable, were checked and appeared to meet the minimum required lengths. During the CMU construction phase for the project, EEC personnel tested/evaluated the grout material used within portions of the wall alignments, as identified herein, (please refer to EEC’s Grout Set No. 2). Grout compressive strength cylinders, (approximately 4-inch diameter by 7- 5/8 inches in length), were molded on-site in general accordance with ASTM specifications. The grout cylinders were molded on-site within CMU blocks used to construct the CMU walls, and were extracted/cored using a 4-inch inside diameter diamond bit core barrel upon retrieval and delivery to our Windsor laboratory 2 days following the initial preparation of the specimens. Results of the field, 7-day, 14-day and 28-day laboratory tests performed during the referenced period are provided herein. Drilled and Epoxied Anchor Bolt Observations For the drilled and epoxy set column anchors for misplaced or damaged anchor bolts previously set at approximate Gridlines J by 5.8, J by 6.5, C by 7, and F by 7, we observed 16-inch in length, ¾-inch diameter all-thread anchor bolts set in drilled and brush cleaned holes approximately 9 inches in depth and set/secured in place with Hilti HIT-HY 200R epoxy injected into the hole. Non-Destructive Testing (NDT) Services During the referenced period EEC’s in-house certified bolt and weld inspector conducted preliminary observations on April 3 and 6, 2017 and final observations on April 7, 0217 of the upper level north structural framing located in the approximate area of Gridlines 3 through 8 from J through L and A5 through A6 from AH through L. A summary report describing our observations is attached with this report and were provided verbally to the contractor immediately following our site observations. The work in the area of the referenced lines observed by EEC during the referenced period appeared to be in general accordance with the project plans and details dated January 12, 2017. Earth Engineering Consultants, LLC EEC Project No. 1164046 Estes Valley Community Center – Estes Park, Colorado April 28, 2017 Page 6 cc: RLH Engineering, Inc. - Mr. Travis Guerette (tguerette@rlhengineering.com) Adolfson & Peterson Construction Mr. Tom Purcell (tpurcell@a-p.com) Adolfson & Peterson Construction Mr. Quintin Quimby (qquimby@a-p.com) Adolfson & Peterson Construction Mr. Jason Heustis (jheustis@a-p.com) Adolfson & Peterson Construction Mr. Les Fernando (lfernando@a-p.com) Adolfson & Peterson Construction Mr. Josh Cohen (jcohen@a-p.com) Martin & Martin Ed Sabia (esabia@martinmartin.com) Ohlson Lavoie Collaborative Laine McLaughlin (lmclaughlin@olcdesigns.com) Ohlson Lavoie Collaborative Robert McDonald (rmcdonald@olcdesigns.com) Van Horn Engineering and Surveying, Inc. – Mr. David Bangs davidvhe@airbits.com EARTH ENGINEERING CONSULTANTS, LLC SUMMARY OF FIELD DENSITY TESTS Project Name:New Community CenterProject No: 1164046 Location: Estes Park, ColoradoDate: April 2017 Proctor DesignationABA1B1 Maximum Dry Density (pcf)126.5123.7126.5123.7 Optimum Moisture Content (%)10.0%10.0%10.0%10.0% Required Moisture VarianceN/AN/AN/AN/A Required Percent Compaction95%95%98%98% Laboratory MethodASTM D-698ASTM D-698ASTM D-698ASTM D-698 Compliance with Field Test Results Project Specs Approximate Test Location / Notes Moisture %Comp. Elev. / Lift Material Percent Dry (Pass / (Pass / No.(Proctor)MoistureDensity Fail)Fail) 1083/141Building Backfill - See Diagram-8.0A8.1%129.0-1.9%102%N/APass 1093/142Building Backfill - See Diagram-6.0A7.9%130.1-2.1%103%N/APass 1103/171Footing Subgrade - See DiagramFSGB16.1%125.3-3.9%101%N/APass 1113/172Footing Subgrade - See DiagramFSGB16.7%126.5-3.3%102%N/APass 1123/173Footing Subgrade - See DiagramFSGB16.9%124.1-3.1%100%N/APass 1133/174Footing Subgrade - See DiagramFSGB19.1%124.3-0.9%100%N/APass 1143/175Footing Subgrade - See DiagramFSGB14.0%122.4-6.0%99%N/APass 1153/176Footing Subgrade - See DiagramFSGB16.4%122.7-3.6%99%N/APass 1163/177Footing Subgrade - See DiagramFSGB16.5%121.9-3.5%99%N/APass 1173/178Footing Subgrade - See DiagramFSGB15.0%121.5-5.0%98%N/APass 1183/179Footing Subgrade - See DiagramFSGB16.4%122.5-3.6%99%N/APass 1193/1710Footing Subgrade - See DiagramFSGB18.4%121.9-1.6%99%N/APass *FAIL* 1203/1711Footing Subgrade - See DiagramFSGB16.5%115.8-3.5%94%N/A 1213/1712Retest Conecutive Test #120FSGB16.9%122.9-3.1%99%N/APass 1223/1713Building Backfill - See Diagram-6.0B6.4%124.2-3.6%100%N/APass 1233/1714Building Backfill - See Diagram-4.0B7.9%122.8-2.1%99%N/APass 1243/1715Building Backfill - See Diagram-2.0B7.7%121.1-2.3%98%N/APass 1253/1716Utility Backfill - See Diagram-2.0B4.9%114.2-5.1%92%N/A*FAIL* *FAIL* 1263/1717Utility Backfill - See Diagram-2.0B5.5%114.4-4.5%92%N/A 1273/1718Utility Backfill - See Diagram-2.0B7.9%124.1-2.1%100%N/APass 1283/1719Utility Backfill - See Diagram-2.0B6.9%124.4-3.1%101%N/APass 1293/201Building Backfill - See Diagram-4.0A7.9%125.6-2.1%99%N/APass 1303/202Building Backfill - See Diagram-3.0A8.4%125.8-1.6%99%N/APass 1313/203Building Backfill - See Diagram-2.0A6.1%126.3-3.9%100%N/APass 1323/204Building Backfill - See Diagram-1.0A6.5%124.3-3.5%98%N/APass 1333/205Utility Backfill - See Diagram-2.0B6.9%119.6-3.1%97%N/APass 1343/206Utility Backfill - See Diagram-2.0A5.5%120.5-4.5%95%N/APass 1353/207Utility Backfill - See Diagram-2.0A6.1%120.9-3.9%96%N/APass 1363/208Utility Backfill - See Diagram-2.0A7.1%122.6-2.9%97%N/APass 1373/209Retest Consecutive Test #125-2.0B10.1%124.50.1%101%N/APass 1383/2010Retest Consecutive Test #126-2.0B9.5%125.1-0.5%101%N/APass 1393/221Building Backfill - See Diagram-5.0B7.1%122.6-2.9%99%N/APass 1403/222Building Backfill - See Diagram-5.0B8.0%124.1-2.0%100%N/APass 1413/223Building Backfill - See Diagram-5.0B5.4%119.7-4.6%97%N/APass 1423/224Building Backfill - See Diagram-4.0A6.8%124.7-3.2%99%N/APass 1433/225Building Backfill - See Diagram-4.0B7.0%119.9-3.0%97%N/APass 1443/226Building Backfill - See Diagram-4.0B8.1%124.1-1.9%100%N/APass 1453/227Building Backfill - See Diagram-3.0A6.5%122.8-3.5%97%N/APass 1463/228Building Backfill - See Diagram-2.0B7.9%120.2-2.1%97%N/APass 1473/229Building Backfill - See Diagram-2.0B7.0%120.8-3.0%98%N/APass 1483/2210Building Backfill - See Diagram-1.0B5.9%119.7-4.1%97%N/APass 1493/231Building Backfill - See Diagram-0.5B7.6%119.1-2.4%96%N/APass 1503/232Building Backfill - See Diagram-0.5B8.1%124.1-1.9%100%N/APass 1513/233Building Backfill - See Diagram-0.5B8.4%122.8-1.6%99%N/APass 1523/234Building Backfill - See Diagram-0.5B8.5%123.5-1.5%100%N/APass 1533/235Building Backfill - See Diagram-1.0B7.1%121.6-2.9%98%N/APass EARTH ENGINEERING CONSULTANTS, LLC SUMMARY OF FIELD DENSITY TESTS Project Name:New Community CenterProject No: 1164046 Location: Estes Park, ColoradoDate: April 2017 Proctor DesignationABA1B1 Maximum Dry Density (pcf)126.5123.7126.5123.7 Optimum Moisture Content (%)10.0%10.0%10.0%10.0% Required Moisture VarianceN/AN/AN/AN/A Required Percent Compaction95%95%98%98% Laboratory MethodASTM D-698ASTM D-698ASTM D-698ASTM D-698 Compliance with Field Test Results Project Specs Approximate Test Location / Notes Moisture %Comp. Elev. / Lift Material Percent Dry (Pass / (Pass / No.(Proctor)MoistureDensity Fail)Fail) 1543/236Building Backfill - See Diagram-1.0B6.8%122.8-3.2%99%N/APass 1553/237Utility Backfill - See Diagram-1.0A6.1%122.1-3.9%97%N/APass 1563/238Utility Backfill - See Diagram-1.0A5.9%123.4-4.1%98%N/APass 1573/241Building Backfill - See Diagram-0.5B5.8%121.9-4.2%99%N/APass 1583/242Building Backfill - See Diagram-0.5B5.5%125.1-4.5%101%N/APass 1593/243Building Backfill - See Diagram-0.5B7.3%121.7-2.7%98%N/APass 1603/244Building Backfill - See Diagram-0.5B8.8%125.8-1.2%102%N/APass 1613/245Building Backfill - See Diagram-0.5B6.1%126.0-3.9%102%N/APass 1623/246Building Backfill - See Diagram-0.5B6.8%126.7-3.2%102%N/APass 1633/247Building Backfill - See Diagram-0.5B6.0%127.1-4.0%103%N/APass 1643/248Building Backfill - See Diagram-0.5B6.6%125.6-3.4%102%N/APass 1653/249Building Backfill - See Diagram-0.5B6.6%126.1-3.4%102%N/APass 1663/2410Building Backfill - See Diagram-0.5B7.1%124.8-2.9%101%N/APass 1673/2411Building Backfill - See Diagram-2.0A6.5%122.7-3.5%97%N/APass 1683/2412Building Backfill - See Diagram-2.0A7.1%124.0-2.9%98%N/APass 1693/2413Building Backfill - See Diagram-1.0A6.1%122.9-3.9%97%N/APass 1703/2414Building Backfill - See Diagram-1.0A5.5%124.0-4.5%98%N/APass 1713/2415Building Backfill - See Diagram0.0A7.7%120.7-2.3%95%N/APass 1723/271Utility Backfill - See Diagram0.0A8.0%123.1-2.0%97%N/APass 1733/272Utility Backfill - See Diagram0.0A6.5%125.9-3.5%100%N/APass 1743/273Utility Backfill - See Diagram0.0A4.0%127.3-6.0%101%N/APass 1753/274Utility Backfill - See Diagram0.0A9.3%125.4-0.7%99%N/APass 1763/275Utility Backfill - See Diagram-2.0B10.3%124.10.3%100%N/APass 1773/281Building Backfill - See Diagram-1.0B7.8%126.1-2.2%102%N/APass 1783/282Building Backfill - See Diagram-1.0B8.1%119.7-1.9%97%N/APass 1793/283Building Backfill - See Diagram0.0B8.3%121.4-1.7%98%N/APass 1803/291Building Backfill - See Diagram0.0B7.8%121.7-2.2%98%N/APass 1813/292Building Backfill - See Diagram0.0B8.1%120.8-1.9%98%N/APass 1823/293Building Backfill - See Diagram0.0B8.4%121.6-1.6%98%N/APass 1833/301Footing Subgrade - See DiagramFSGA17.1%126.0-2.9%100%N/APass 1843/302Footing Subgrade - See DiagramFSGA16.5%124.5-3.5%98%N/APass 1853/303Footing Subgrade - See DiagramFSGA18.0%124.8-2.0%99%N/APass 1863/304Footing Subgrade - See DiagramFSGB18.1%121.5-1.9%98%N/APass 1873/305Footing Subgrade - See DiagramFSGB17.3%121.4-2.7%98%N/APass 1883/306Footing Subgrade - See DiagramFSGB17.1%122.7-2.9%99%N/APass 1893/307Footing Subgrade - See DiagramFSGB14.9%122.5-5.1%99%N/APass 1903/308Footing Subgrade - See DiagramFSGB110.5%121.30.5%98%N/APass 1913/309Footing Subgrade - See DiagramFSGB17.8%123.8-2.2%100%N/APass 1923/3010Building Backfill - See Diagram-4.0B4.5%119.7-5.5%97%N/APass 1934/51Utility Backfill - See Diagram0.0A9.8%122.5-0.2%97%N/APass 1944/52Utility Backfill - See Diagram-1.0A11.0%120.31.0%95%N/APass 1954/53Water Line - See Diagram-4.0B7.9%124.8-2.1%101%N/APass 1964/54Water Line - See Diagram-4.0B10.0%121.80.0%98%N/APass 1974/61Utility Backfill - See Diagram0.0A7.1%123.5-2.9%98%N/APass 1984/62Utility Backfill - See Diagram0.0A7.4%122.7-2.6%97%N/APass 1994/63Water Line - See Diagram-3.0B7.7%122.5-2.3%99%N/APass EARTH ENGINEERING CONSULTANTS, LLC SUMMARY OF FIELD DENSITY TESTS Project Name:New Community CenterProject No: 1164046 Location: Estes Park, ColoradoDate: April 2017 Proctor DesignationABA1B1 Maximum Dry Density (pcf)126.5123.7126.5123.7 Optimum Moisture Content (%)10.0%10.0%10.0%10.0% Required Moisture VarianceN/AN/AN/AN/A Required Percent Compaction95%95%98%98% Laboratory MethodASTM D-698ASTM D-698ASTM D-698ASTM D-698 Compliance with Field Test Results Project Specs Approximate Test Location / Notes Moisture %Comp. Elev. / Lift Material Percent Dry (Pass / (Pass / No.(Proctor)MoistureDensity Fail)Fail) 2004/64Water Line - See Diagram-3.0B8.1%123.6-1.9%100%N/APass 2014/65Water Line - See Diagram-4.0B8.2%121.9-1.8%99%N/APass 2024/66Water Line - See Diagram-4.0B7.4%123.1-2.6%100%N/APass 2034/71Water Line - See Diagram-3.0B7.8%124.1-2.2%100%N/APass 2044/72Water Line - See Diagram-3.0B8.1%122.9-1.9%99%N/APass 2054/73Water Line - See Diagram-3.0B6.9%125.1-3.1%101%N/APass 2064/74Water Line - See Diagram-2.0B8.8%123.6-1.2%100%N/APass 2074/75Water Line - See Diagram-2.0B7.6%122.9-2.4%99%N/APass 2084/76Water Line - See Diagram-2.0B7.4%123.8-2.6%100%N/APass 2094/77Water Line - See Diagram-1.0B8.5%124.7-1.5%101%N/APass 2104/78Water Line - See Diagram-1.0B7.9%124.6-2.1%101%N/APass 2114/79Water Line - See Diagram-1.0B7.9%123.7-2.1%100%N/APass 2124/710Water Line - See Diagram-2.0B9.1%122.1-0.9%99%N/APass 2134/711Water Line - See Diagram-1.0B8.1%123.9-1.9%100%N/APass EARTH ENGINEERING CONSULTANTS, LLC EEC Project #: 1164046 Fill, Subgrade, & Aggregate Base Field Density Test Location Diagram New Community Center - Estes Park, Colorado EARTH ENGINEERING CONSULTANTS, LLC EEC Project #: 1164046 Fill, Subgrade, & Aggregate Base Field Density Test Location Diagram New Community Center - Estes Park, Colorado EARTH ENGINEERING CONSULTANTS, LLC Utilities EEC Project #: 1164046 Field Density Test Location Diagram New Community Center - Estes Park, Colorado EARTH ENGINEERING CONSULTANTS, LLC Utilities EEC Project #: 1164046 Field Density Test Location Diagram New Community Center - Estes Park, Colorado 10 7 7 11 8 HC8 HC 10 44 7 12 15 7 4 HC4 HC 9 9 4 HC 4 4 HC Field Density Test Location Diagram New Community Center - Estes Park, Colorado EEC Project #: 1164046 Water Line EARTH ENGINEERING CONSULTANTS, LLC Observation 3/13/17Observation 3/13/17Observation 3/14/17 LegendFooting ReinforcementPilaster ReinforcementRetaining Wall ReinforcementEpoxy Anchor BoltReinforcement Observation3/29 & 3/31/17 EARTH ENGINEERING CONSULTANTS, LLC April 2017 EEC Project #: 1164046 Reinforcing Steel Observation Diagram New Community Center - Estes Park, Colorado Sump Pit ReinforcementObservation 3/16/17Wall ReinforcementObservation 3/17/17Observation 3/20, 21, 22,Wall ReinforcementObservation 3/23 & 3/24/17Observation 4/5 & 4/6/17 LegendFooting Reinforcement& 3/23/17Footing Reinforcement EARTH ENGINEERING CONSULTANTS, LLC April 2017 EEC Project #: 1164046 Reinforcing Steel Observation Diagram New Community Center - Estes Park, Colorado Earth Engineering Consultants, LLC Report of Masonry Grout Tests GENERAL INFORMATION Batch Date:3/15/2017Batch Time:12:00 PMTest Set No:2 Placement Location:Elevator Shaft - 118' Grout Supplier:On-SiteTruck No:N/A Water Added on Site:N/ATime of Sample:12:00 PM Comments: FIELD TEST RESULTS TESTRESULTS Slump (Inches)8.25 o Grout Temperature (F)52 o Air Temperature at Placement (F)54 o Maximum/ Minimum Temperature (F)HighLow 48 Hour Cure Temperature Design 28 Day Compressive Strength (psi)2000 Comments: LABORATORY CYLINDER TEST RESULTS Compressive Maximum Area Sample Date Age Type of Strength Average 2 Applied Load No.Tested(days)Failure (in) (psi) (pounds) 3/22/2017 b723290Split2110 2 11.04 2110 3/22/2017 b.17Split0 2 11.04 3/29/2017 2 c1420740Split1880 11.04 1880 3/29/2017 c.114------ 2-- 4/12/2017 2 d2830750Split2790 11.04 4/12/2017 d.12824570Split2230 2 11.04 2520 2 d.22827950Split2530 4/12/2017 11.04 ---- 2 h.1Hold------ Project:New Community Center - Estes Park Recreation and Park District EEC Project #:1164046 Reports to: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:3/13/2017Test No.:23 Placement Location:Column Pads - Grid Lines C7 & D7 Concrete Supplier:Martin MariettaType of Placement:Tailgate Ticket Number:39008192Truck Number:1711 Mix Code:CD4405 Water Added on Site:None Batch Time:1:55 PMSample Time:2:35 PMYards:6of12 Required 28 Day Compressive Strength (psi):4500EEC Technician:GG Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1434.5" Air Content (%)ASTM C2316.8% Unit Weight (pcf)ASTM C138---- Concrete Temperature (deg F)ASTM C106490° Max Air Temperature at Placement (deg F)51---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 23B03/20/177560008412.57Shear44604460 23D04/10/1728703308412.57Shear5600 5540 23D104/10/1728697208412.57Shear5550 23D204/10/1728687608412.57Shear5470 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Robert McDonald rmcdonald@olcdesigns.com OLC - Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:3/14/2017Test No.:24 Placement Location:Retaining Wall - Grid Lines L, 3 Concrete Supplier:Martin MariettaType of Placement:Tailgate Ticket Number:39008208Truck Number:1711 Mix Code:CD4405 Water Added on Site:None Batch Time:1:59 PMSample Time:2:40 PMYards:6of12 Required 28 Day Compressive Strength (psi):4500EEC Technician:GG Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1433" Air Content (%)ASTM C2318%5.6% Unit Weight (pcf)ASTM C138143.8---- Concrete Temperature (deg F)ASTM C106490° Max Air Temperature at Placement (deg F)5656---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 24B03/21/177563808412.57Shear44904490 24D04/11/1728670008412.57Shear5330 5270 24D104/11/1728656408412.57Shear5220 24D204/11/1728662008412.57Shear5270 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Robert McDonald rmcdonald@olcdesigns.com OLC - Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:3/16/2017Test No.:25 Placement Location:Swimming Pool - Pump Pit Slab Concrete Supplier:Martin MariettaType of Placement:Pump Ticket Number:39008231Truck Number:212 Mix Code:CD4405 Water Added on Site:None Batch Time:12:34 PMSample Time:1:15 PMYards:9of9 Required 28 Day Compressive Strength (psi):4500EEC Technician:GG Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1433" Air Content (%)ASTM C2314.8% Unit Weight (pcf)ASTM C138146.2---- Concrete Temperature (deg F)ASTM C10647790° Max Air Temperature at Placement (deg F)59---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 25B03/23/177590708412.57Shear47004700 25D04/13/1728721908412.57Shear5740 5650 25D104/13/1728684408412.57Shear5450 25D204/13/1728723808412.57Shear5760 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Robert McDonald rmcdonald@olcdesigns.com OLC - Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:3/17/2017Test No.:26 Placement Location:Swimming Pool - Pump Pit Slab Concrete Supplier:Martin MariettaType of Placement:Pump Ticket Number:39008243Truck Number:233 Mix Code:CD4405 Water Added on Site:None Batch Time:11:01 AMSample Time:11:35 AMYards:10of10 Required 28 Day Compressive Strength (psi):4500EEC Technician:GG Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1434" Air Content (%)ASTM C2316.5% Unit Weight (pcf)ASTM C138143.0---- Concrete Temperature (deg F)ASTM C10647190° Max Air Temperature at Placement (deg F)57---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 26B03/24/177530908412.57Shear42204220 26D04/14/1728710408412.57Shear5650 5600 26D104/14/1728707008412.57Shear5630 26D204/14/1728694008412.57Shear5520 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Robert McDonald rmcdonald@olcdesigns.com OLC - Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:3/22/2017Test No.:27 Placement Location:Footings - Grid Lines Q, 7.9 Concrete Supplier:Martin MariettaType of Placement:Pump Ticket Number:39008266Truck Number:1764 Mix Code:CD4405 Water Added on Site:None Batch Time:9:01 AMSample Time:10:45 AMYards:10of20 Required 28 Day Compressive Strength (psi):4500EEC Technician:GG Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1434.25" Air Content (%)ASTM C2316.8% Unit Weight (pcf)ASTM C138140.2---- Concrete Temperature (deg F)ASTM C10647390° Max Air Temperature at Placement (deg F)55---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 27B03/29/177607908412.57Shear48404840 27D04/19/1728676908412.57Shear5390 5300 27D104/19/1728641808412.57Shear5110 27D204/19/1728680008412.57Shear5410 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Robert McDonald rmcdonald@olcdesigns.com OLC - Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:3/24/2017Test No.:28 Placement Location:Upper Level Walls - Grid Lines Q, 7.9 Concrete Supplier:Martin MariettaType of Placement:Pump Ticket Number:39008282Truck Number:1763 Mix Code:CD4405 Water Added on Site:None Batch Time:9:26 AMSample Time:10:06 AMYards:10of20 Required 28 Day Compressive Strength (psi):4500EEC Technician:GG Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1433.5" Air Content (%)ASTM C2316.5% Unit Weight (pcf)ASTM C138141.0---- Concrete Temperature (deg F)ASTM C10647390° Max Air Temperature at Placement (deg F)35---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 28B03/31/177548508412.57Shear43604360 28D04/21/1728713208412.57Shear5680 5640 28D104/21/1728682708412.57Shear5430 28D204/21/1728729808412.57Shear5810 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Robert McDonald rmcdonald@olcdesigns.com OLC - Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:4/6/2017Test No.:29 Placement Location:Footings - Grid Lines E3, NJ Concrete Supplier:Martin MariettaType of Placement:Pump Ticket Number:39008337Truck Number:1763 Mix Code:CD4405 Water Added on Site:None Batch Time:8:33 AMSample Time:9:05 AMYards:10of20 Required 28 Day Compressive Strength (psi):4500EEC Technician:GG Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1433.75" Air Content (%)ASTM C2319.9%5.9% Unit Weight (pcf)ASTM C138---- Concrete Temperature (deg F)ASTM C1064717190° Max Air Temperature at Placement (deg F)4545---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 29B04/13/177675608412.57Shear53805380 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Robert McDonald rmcdonald@olcdesigns.com OLC - Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta