May 24, 2017
RLH Engineering, Inc.
541 East Garden Drive, Unit S
Windsor, Colorado 80550
Attn: Mr. Chuck Jordan (cjordan@rlhengineering.com)
Owner’s Representative for EVRPD
Re: Construction Observation and Testing Services – Submittal No. 10
Proposed Estes Valley Community Center – North of Existing Aquatics Center
660 Community Drive - Southeast Corner of Manford Drive and Community Drive
Estes Park, Colorado
EEC Project No. 1164046
Mr. Jordan:
As requested, during the period April 24 through May 6, 2017, Earth Engineering Consultants,
LLC (EEC) personnel provided construction observation and testing services for the proposed
Estes Valley Community Center expansion project currently under construction at 660
Community Drive in Estes Park, Colorado. The services provided during the referenced period
were on a part-time/on-call as-needed basis and included observation and field density testing of
water line and storm sewer backfill material as described herein, periodic site observations
during the various stages of concrete masonry unit (CMU) wall construction for various wall
alignments as presented herein, observations of non-destructive testing (NDT) services, along
with testing of masonry grout for the referenced project. The results of the site observations and
testing services completed by EEC personnel during the referenced period are included with this
report.
Field Density Testing and Observation Services
During the referenced period, EEC personnel performed field density tests on water line and
storm sewer alignment backfill material as described herein, which were placed and compacted
prior to and/or during our site visits. The field density tests were completed at random locations
and elevations within the areas tested and were performed in general accordance with ASTM
Specification D6938. The field density test results and approximate location of each test
completed during the referenced period are shown on the attached summary sheet and the
4396 G REENFIELD D RIVE
W INDSOR, C OLORADO80550
(970) 545-3908 FAX (970) 663-0282
www.earth-engineering.com
Earth Engineering Consultants, LLC
EEC Project No. 1164046
Estes Valley Community Center – Estes Park, Colorado
May 24, 2017
Page 2
associated site diagrams. The field density test results conformed to the project specific
compaction requirement of at least 95% or 98% of standard Proctor maximum dry density
(ASTM D698), as required.
Concrete Masonry Unit (CMU) Wall Construction Observations
During the referenced period, EEC personnel, on a periodic basis, observed portions of the
reinforcing steel and other structural related elements during the 8 to 12-inch by 16-inch standard
block CMU wall construction at the gridlines identified on the enclosed “color-
coded/highlighted” site diagram. Layout of the CMU wall alignments were provided by others.
During each daily site visit, (April 24 through 28, 2017, and May 1 through May 5, 2017), EEC
personnel observed CMU wall construction along the various wall alignments and recorded
approximate gridline locations, elevations/courses for each day, along with the observed
horizontal and vertical reinforcement requirements, as well as grout placement as needed.
The vertical reinforcement for the various walls, in general, consisted of one (1) #5 rebar spaced
32 to 48 inches on-center, along with an additional #5 rebar positioned at each end of walls, at
each corner, and along each side of openings, control joints and/or expansion joints. The
horizontal reinforcement consisted of 9-gauge “ladder-type” reinforcement spaced every 16-
inches on-center full-height of each CMU wall. At the various bond beam locations, below and
above windows, beam pockets, and at openings, where noted on the structural drawings, EEC
personnel noted the reinforcement consisted of two (2) or one (1) continuous #5 within the fully-
grouted cell alignments.
The horizontal and vertical reinforcement for the portions of the CMU walls and observed by
EEC personnel during the referenced timeframe on a periodic basis as noted herein appeared to
be in general accordance with details presented on the structural drawings and/or as referenced
the approved shop drawings. During the grouting operations, EEC personnel observed grout
placement within the low lifts. Lap lengths, where applicable, were checked and appeared to
meet the minimum required lengths.
Earth Engineering Consultants, LLC
EEC Project No. 1164046
Estes Valley Community Center – Estes Park, Colorado
May 24, 2017
Page 3
During the referenced period, it was
brought to our attention that the two (2)
#4 “hooked” 2-feet in length rebar as
illustrated on the detail inserted to the
left were omitted. The rebar was in-
place; however the “hooked” portion
were not installed at a few locations.
We understand a structural modification
has been provided and supplemental site
observations will be performed during
the repair / modification install phase.
During the CMU construction phase for
the project, EEC personnel
tested/evaluated the grout material used within portions of the wall alignments, as identified
herein, (please refer to EEC’s Grout Set No. 4). Grout compressive strength cylinders,
(approximately 4-inch diameter by 7-5/8 inches in length), were molded on-site in general
accordance with ASTM specifications. The grout cylinders were molded on-site within CMU
blocks used to construct the CMU walls, and were extracted/cored using a 4-inch inside diameter
diamond bit core barrel upon retrieval and delivery to our Windsor laboratory 2 days following
the initial preparation of the specimens. Results of the field, 3-day and 7-day laboratory tests
performed during the referenced period are provided herein; while the 28-day results will be
provided in a separate cover when the results become available.
During the referenced period the project’s masonry subcontractor prepared another set of
concrete masonry unit (CMU) prisms (EEC Set No. 3) which consisted of three (3) 12-inch
singled-celled fully grouted CMU block prisms, for compressive strength testing evaluation.
Results of the 7-day laboratory compressive tests performed during the referenced period for the
prisms are included herein, while the 28-day CMU prism test results will be provided as the
results become available.
Non-Destructive Testing (NDT) Services
During the referenced period EEC’s in-house certified bolt and weld inspector conducted
observations on May 4, and 5, 2017 to perform load testing of 2 post installed epoxied anchor
Earth Engineering Consultants, LLC
EEC Project No. 1164046
Estes Valley Community Center – Estes Park, Colorado
May 24, 2017
Page 4
rods located at the elevator core at Gridlines AG.8 and A6. The post installed anchors were
pulled to 1000 pounds of tension and held for 30 seconds. The tested post installed anchor rods
held the required load without failing. Also load tested was 1 post installed anchor rod located at
the column base plate at Gridlines L/7. Based on the tensioning performed, the post installed
anchor rods were in general accordance with the requirements of the electronic transmission (e-
mail) from the project’s structural engineering consultant, Martin & Martin dated April 3, 2017.
In addition, observations of the Low Roof bar joist in the approximate area of Gridlines A2
through A6 from AD through AE were performed. Included were the welded bar joist top chord
to beam connections and the welded bar joist bridging connections. Based on visual
observations, the work completed in the area of the referenced gridline appeared to be in general
accordance with the project plans and details dated January 12, 2017.
On May 4, 2017, a preliminary site visit along with a final visit on May 10, 2017 were conducted
and included visual observations of the structural framing located in the approximate area of
Gridlines 3 through 8 from A through J, and A2.5 through A6 from AE through AH. Included
were the bolted column to beam connections, the bolted beam to beam connections, the Bolted
X-bracing connections, the welded beam clip to concrete wall embed connections, the welded
perimeter angle to beam top flange connections, the anchor bolt to column base plate
connections, the column base plate grouting, the decking puddle welds, the Headed Anchor
Studs (HAS) count and weld quality, and the deck lap screws. Based on visual observations, the
work completed in the area of the referenced gridlines appeared to be in general accordance with
the project plans and details dated January 12, 2017. A summary report describing our
observations is attached with this report and was provided verbally to the contractor immediately
following our site observations.
During the referenced period on May 1, 2017, a site visit was conducted by an independently
hired 3rd party consultant, Intermountain Testing Company, as requested by Adolfson &
Peterson Construction, to provide ultrasonic examination of all visually acceptable complete
joint penetration (CJP) welded moment connections as well as field welded structural steel
components as described herein. Their report is included herein for reference.
EARTH ENGINEERING CONSULTANTS, LLC
SUMMARY OF FIELD DENSITY TESTS
Project Name:New Community CenterProject No: 1164046
Location: Estes Park, ColoradoDate: May 2017
Proctor DesignationB
Maximum Dry Density (pcf)123.7
Optimum Moisture Content (%)10.0%
Required Moisture VarianceN/A
Required Percent Compaction95%
Laboratory MethodASTM D-698
Compliance with
Field Test Results
Project Specs
Approximate Test Location / Notes
Moisture %Comp.
Elev. / Lift Material Percent Dry
(Pass / (Pass /
No.(Proctor)MoistureDensity
Fail)Fail)
2454/261Water Line - See Diagram-3.0B6.3%120.7-3.7%98%N/APass
2504/262Water Line - See Diagram-3.0B7.4%123.1-2.6%100%N/APass
2514/263Water Line - See Diagram-3.0B7.2%122.9-2.8%99%N/APass
2524/264Water Line - See Diagram-3.0B7.1%121.8-2.9%98%N/APass
2534/265Water Line - See Diagram-3.0B7.8%124.1-2.2%100%N/APass
2544/266Water Line - See Diagram-3.0B7.8%123.5-2.2%100%N/APass
2554/267Water Line - See Diagram-1.5B6.6%122.0-3.4%99%N/APass
2564/268Water Line - See Diagram-1.5B6.4%120.9-3.6%98%N/APass
2574/269Water Line - See Diagram-1.5B5.5%121.8-4.5%98%N/APass
2584/2610Water Line - See Diagram-1.5B7.0%122.5-3.0%99%N/APass
2594/2611Water Line - See Diagram-1.5B6.9%123.7-3.1%100%N/APass
2604/2612Water Line - See Diagram-1.5B6.1%120.6-3.9%97%N/APass
2615/11Storm Sewer - See Diagram-4.0B6.9%121.5-3.1%98%N/APass
2625/12Storm Sewer - See Diagram-4.0B7.4%122.3-2.6%99%N/APass
2635/13Storm Sewer - See Diagram-2.0B7.1%119.9-2.9%97%N/APass
2645/14Storm Sewer - See Diagram-2.0B7.5%121.8-2.5%98%N/APass
2655/21Storm Sewer - See Diagram-4.0B7.8%122.1-2.2%99%N/APass
2665/22Storm Sewer - See Diagram-2.0B8.4%123.0-1.6%99%N/APass
2675/23Storm Sewer - See Diagram-2.0B8.2%121.7-1.8%98%N/APass
2685/31Storm Sewer - See Diagram-4.0B7.4%121.4-2.6%98%N/APass
2695/32Storm Sewer - See Diagram-4.0B8.1%119.8-1.9%97%N/APass
2705/33Storm Sewer - See Diagram-2.0B7.2%122.7-2.8%99%N/APass
2715/34Storm Sewer - See Diagram-2.0B6.9%123.1-3.1%100%N/APass
2725/35Storm Sewer - See Diagram-4.0B7.1%120.9-2.9%98%N/APass
2735/36Storm Sewer - See Diagram-4.0B7.6%123.4-2.4%100%N/APass
2745/37Storm Sewer - See Diagram-2.0B7.4%120.1-2.6%97%N/APass
2755/38Storm Sewer - See Diagram-2.0B7.3%119.7-2.7%97%N/APass
2765/39Storm Sewer - See Diagram-3.0B7.6%120.7-2.4%98%N/APass
2775/41Water Line - See Diagram-3.0B7.8%123.4-2.2%100%N/APass
2785/42Water Line - See Diagram-3.0B7.1%122.9-2.9%99%N/APass
2795/43Water Line - See Diagram-3.0B7.6%123.1-2.4%100%N/APass
2805/44Water Line - See Diagram-3.0B8.1%124.8-1.9%101%N/APass
2815/45Water Line - See Diagram-3.0B7.4%123.3-2.6%100%N/APass
2825/46Water Line - See Diagram-3.0B8.3%122.7-1.7%99%N/APass
2835/51Water Line - See Diagram-2.0B6.1%122.6-3.9%99%N/APass
2845/52Water Line - See Diagram-2.0B5.7%121.7-4.3%98%N/APass
2855/53Water Line - See Diagram-2.0B5.8%123.4-4.2%100%N/APass
2865/54Water Line - See Diagram-2.0B6.4%124.1-3.6%100%N/APass
2875/55Water Line - See Diagram0.0B6.9%123.8-3.1%100%N/APass
Sheet 2Sheet 3
Sheet 4Sheet 5
Field Density Test Location Diagram
New Community Center - Estes Park, Colorado
EEC Project #: 1164046
Storm Sewer
Sheet 1 of 5
EARTH ENGINEERING CONSULTANTS, LLC
Field Density Test Location Diagram
New Community Center - Estes Park, Colorado
EEC Project #: 1164046
Storm Sewer
Sheet 2 of 5
EARTH ENGINEERING CONSULTANTS, LLC
Sheet 2Sheet 3
Sheet 4Sheet 5
Field Density Test Location Diagram
New Community Center - Estes Park, Colorado
EEC Project #: 1164046
Water Line
Sheet 1 of 5
EARTH ENGINEERING CONSULTANTS, LLC
Field Density Test Location Diagram
New Community Center - Estes Park, Colorado
EEC Project #: 1164046
Water Line
Sheet 2 of 5
EARTH ENGINEERING CONSULTANTS, LLC
Field Density Test Location Diagram
New Community Center - Estes Park, Colorado
EEC Project #: 1164046
Water Line
Sheet 3 of 5
EARTH ENGINEERING CONSULTANTS, LLC
Field Density Test Location Diagram
New Community Center - Estes Park, Colorado
EEC Project #: 1164046
Water Line
Sheet 4 of 5
EARTH ENGINEERING CONSULTANTS, LLC
Field Density Test Location Diagram
New Community Center - Estes Park, Colorado
EEC Project #: 1164046
Water Line
Sheet 5 of 5
EARTH ENGINEERING CONSULTANTS, LLC
CMU ReinforcementObservation 4/24 thru
Legend4/28/17, & 5/1 thru 5/5/17
EARTH ENGINEERING CONSULTANTS, LLC
May 2017
EEC Project #: 1164046
Reinforcing Steel Observation Diagram
New Community Center - Estes Park, Colorado
Earth Engineering Consultants, LLC
Report of Masonry Grout Tests
GENERAL INFORMATION
Batch Date:5/5/2017Batch Time:Test Set No:4
Placement Location:Bond Beam along Gridline L between 3 and 6 @ 21 Feet elevation
Grout Supplier:On-SiteTruck No:N/A
Water Added on Site:N/ATime of Sample:10:00 AM
Comments:
FIELD TEST RESULTS
TESTRESULTS
Slump (Inches)8.5
o
Grout Temperature (F)70
o
Air Temperature at Placement (F)53
o
Maximum/ Minimum Temperature (F)HighLow
48 Hour Cure Temperature
Design 28 Day Compressive Strength (psi)2000
Comments:
LABORATORY CYLINDER TEST RESULTS
Compressive
Maximum
Area
Sample Date Age Type of
Strength Average
2
Applied Load
No.Tested(days)Failure
(in)
(psi)
(pounds)
5/8/2017
a324460Split2260
4
10.81
2260
b.17Split#VALUE!
4
5/12/2017
4 b.1727850Split2580
10.81
2580
5/12/2017
c.114--
4
6/2/2017
4 d28
6/2/2017
d.128
4
#DIV/0!
4 d.228
6/2/2017
----
4 h.1Hold------
Project:New Community Center - Estes Park Recreation and Park District
EEC Project #:1164046
Reports to:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Earth Engineering Consultants, LLC
Compressive Strength Report of FULLY GROUTED 12-Inch CMU Prisms
GENERAL INFORMATION
Date Constructed:5/5/2017Test Set Number:3
Date Grouted:5/8/2017
Required 28 Day Compressive
2000
Strength (psi)
Date Retrieved From Site:5/10/2017
PRISM DETAILS
No. of Mortar Bed Joints:1Prism Constructed By:On-Site Masons
No. of Masonry Units:2Max/Min Temperature (deg F):--
Prism Height (h) - Inches = t least actual lateral dimension of prism, inches =h/t =
15.58.7501.77
pp-pp
MORTAR INFORMATION
Mortar Supplier/Preparer:Masonry Sub. - Batched on-siteMortar Type/Description:Type S1800 psi
GROUT INFORMATION
Grout Supplier/Preparer:Masonry Sub. - Batched on-siteGrout Type/Description:3000PSI
COMPRESSIVE STRENGTH OF FIELD CAST PRISM TEST SPECIMENS (ASTM C1314)
Net Corrected Net Average
Avg. Avg.
Net Area Compressive Compressive Corrected Net
Specimen Date Age
h/h
Width Length Load (lbs)CF
pt
2
Strength Strength Compressive
NumberTested(Days)
(in)
(in)(in)
222
(lbs/in)(lbs/in)Strength (lbs/in)
#DIV/0!
B05/22/17148.75011.25098.4419354019701.770.9361840
3
1840
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - tpurcell@a-p.com
Adolfson & Peterson Construction - qquimby@a-p.com
Adolfson & Peterson Construction - jheustis@a-p.com
Adolfson & Peterson Construction - lfernando@a-p.com
Adolfson & Peterson Construction - jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com