HomeMy WebLinkAboutDOCUMENT 660 Community Dr Construction Observation & Testing 2017-03-22
March 22, 2017
RLH Engineering, Inc.
541 East Garden Drive, Unit S
Windsor, Colorado 80550
Attn: Mr. Chuck Jordan (cjordan@rlhengineering.com)
Owner’s Representative for EVRPD
Re: Construction Observation and Testing Services – Submittal No. 7
Proposed Estes Valley Community Center – North of Existing Aquatics Center
660 Community Drive - Southeast Corner of Manford Drive and Community Drive
Estes Park, Colorado
EEC Project No. 1164046
Mr. Jordan:
As requested, during the period February 13 through March 11, 2017, Earth Engineering
Consultants, LLC (EEC) personnel provided construction observation and testing services for the
proposed Estes Valley Community Center expansion project planned for construction at 660
Community Drive in Estes Park, Colorado. The services provided during the referenced period
were on a part-time/on-call as-needed basis and included observation and field density testing of
prepared foundation bearing strata material, foundation wall backfill and of retaining wall
backfill material as described herein, observations of foundation bearing strata for acceptance to
place/form the cast-in-place concrete foundation system at locations presented herein,
observations of foundation reinforcing steel, for various structural related elements, periodic site
observations during the concrete masonry unit (CMU) wall construction for the elevator shaft,
along with testing of masonry grout and cast-in-place concrete for the referenced project. The
results of the site observations and testing services completed by EEC personnel during the
referenced period are included with this report.
Field Density Testing and Observation Services
During the referenced period, EEC personnel performed field density tests on prepared
foundation bearing strata material, foundation wall backfill and of retaining wall backfill
material as described herein, which was prepared/placed and compacted prior to and/or during
our various site visits. The field density tests were completed at random locations and elevations
4396 G REENFIELD D RIVE
W INDSOR, C OLORADO80550
(970) 545-3908 FAX (970) 663-0282
www.earth-engineering.com
Earth Engineering Consultants, LLC
EEC Project No. 1164046
Estes Valley Community Center – Estes Park, Colorado
March 22, 2017
Page 2
within the areas tested and were performed in general accordance with ASTM Specification
D6938. The field density test results and approximate location of each test completed during the
referenced period are shown on the attached summary sheet and the associated site diagrams.
The field density test results, in general, conformed to the project specific compaction
requirement of at least 95% of standard Proctor maximum dry density (ASTM D698).
As requested by the general contractor, EEC personnel conducted visits on February 14 and 21,
2017, and March 3 and 6, 2017, to perform a visual observation of the foundation strata
materials’ in-situ conditions prior to placement of formwork and reinforcement of the foundation
alignments along approximate gridlines A1-7.5, A2-AB, A5-AC, A6-AE.5, F-8, E-8, D-8, B-8,
AB from A.3 to A.5, and of footing pads at B-6, and B-7. The prepared foundation bearing
strata as observed on the dates indicated herein appeared suitable for support of the foundation
designed using a maximum net allowable bearing pressure of 5,000 psf as per the site-specific
geotechnical engineering report. The areas were approved for continuation of the planned
foundation construction.
Foundation Reinforcement Observations
During the referenced period, EEC personnel conducted site visits on February 17, 21, and 23,
2017, and March 1, 2, 6. 7, 8, 9, and 10, 2017, to perform visual observations of the reinforcing
steel placed within portions of the building’s foundation alignments, at the gridlines identified on
the enclosed “color-coded/highlighted” site diagram, prior to placement of concrete. The
reinforcement for the footings/footing pads was placed in general accordance with the “Footing
Schedule” as presented on page S300 of the structural drawings. The reinforcement for the
various pilasters were placed in general accordance with the “Pilaster Schedule” as presented on
page S305 of the structural drawings. The reinforcement for the stem wall and foundation wall
alignments were placed in general accordance with the details as presented on pages S301 and
S305 “Footing Schedule” as presented on pages S300 of the structural drawings. The vertical
dowels continuing into the CMU walls above, where appropriate, were installed to match the
CMU reinforcement as per the plans and specifications. The brace frame footing/interior grade
beams reinforcement was in general accordance with the details as presented on pages S550 and
S551 of the structural drawings.
Earth Engineering Consultants, LLC
EEC Project No. 1164046
Estes Valley Community Center – Estes Park, Colorado
March 22, 2017
Page 3
Any discrepancies of reinforcement during the various daily site visits were brought to the
attention of the project’s construction management consultant, and the reinforcement
subcontractor, during the initial site visit and corrections/modifications were addressed
accordingly prior to placement of concrete.
Clearances and lap lengths, where applicable, were checked and appeared to meet the minimum
requirements. The horizontal and vertical reinforcement for the portion of the foundation system
as noted herein and observed by EEC personnel on the dates indicated, appeared to be in general
accordance with details presented on the structural drawings prepared by Martin and Martin
Consulting Engineers, dated January 12, 2017, and/or the shop drawings prepared by Barton
Supply, dated December 22 and 28, 2016. The shop drawings were used as a reference to
provide clarity when specific details were not presented on the structural drawings. The hand
written field copies of each daily observation were also provided to the on-site project
superintendent for the general contractor.
Concrete Masonry Unit (CMU) Wall Construction Observations
During the referenced period, EEC personnel observed portions of the reinforcing steel and other
structural related elements during the 8-inch by 16-inch standard block CMU wall construction
for the elevator core at approximate gridlines A6 between AH and AH.3. Layout of the CMU
wall alignments were provided by others. During each daily site visit, (February 23, 24, 27, and
28, 2017, and March 3, and 10, 2017), EEC personnel observed CMU wall construction at the
elevator core wall alignments and recorded approximate gridline locations, elevations/courses for
each day, along with the observed horizontal and vertical reinforcement requirements and grout
placement as needed.
The vertical reinforcement for the elevator core, in general, consisted of one (1) #5 rebar spaced
48-inches on-center, along with an additional #5 rebar positioned at each end of walls, at each
corner, and along each side of openings, control joints and/or expansion joints. The horizontal
reinforcement consisted of 9-gauge “ladder-type” reinforcement spaced every 16-inches on-
center full-height of each CMU wall. At the various bond beam locations, below and above
windows, beam pockets, and at openings, where noted on the structural drawings, EEC personnel
Earth Engineering Consultants, LLC
EEC Project No. 1164046
Estes Valley Community Center – Estes Park, Colorado
March 22, 2017
Page 4
noted the reinforcement consisted of two (2) continuous #5 within the fully-grouted cell
alignments.
The horizontal and vertical reinforcement for the portions of the CMU walls and observed by
EEC personnel during the referenced timeframe on a periodic basis as noted herein appeared to
be in general accordance with details presented on the structural drawings. During the grouting
operations, EEC personnel observed grout placement within the low lifts. Lap lengths, where
applicable, were checked and appeared to meet the minimum required lengths.
During the CMU construction phase for the project, EEC personnel tested/evaluated the grout
material used within portions of the wall alignments, as identified herein, (please refer to EEC’s
Grout Set No. 1). Grout compressive strength cylinders, (approximately 4-inch diameter by 7-
5/8-inches in length), were molded on-site in general accordance with ASTM specifications.
The grout cylinders were molded on-site within CMU blocks used to construct the CMU walls,
and were extracted/cored using a 4-inch inside diameter diamond bit core barrel upon retrieval
and delivery to our Windsor laboratory 2 days following the initial preparation of the specimens.
Results of the field and 7-day laboratory tests performed during the referenced period are
provided herein, while the 28-day test results will be provided as the results become available.
During the referenced period the project’s masonry subcontractor prepared two (2) sets of
concrete masonry unit (CMU) prisms, one of which consisted of three (3) 8-inch singled-celled
“hollow” prism and the second of which consisted of three (3) 8-inch singled-celled fully grouted
CMU block prisms, for compressive strength testing evaluation. Results of the 7-day laboratory
compressive tests performed during the referenced period for the prisms are included herein,
while the 28-day fully grouted CMU prism test results will be provided as the results become
available.
Testing of Cast-in-Place Concrete
During the referenced period, EEC personnel observed and tested Portland cement concrete
delivered to the site for placement as indicated on the enclosed daily reports for the referenced
project, (please refer to Set Nos. 12 through 22). Field testing performed on the plastic concrete
included slump, air content, unit weight, and concrete temperature. The ambient air temperature
EARTH ENGINEERING CONSULTANTS, LLC
SUMMARY OF FIELD DENSITY TESTS
Project Name:New Community CenterProject No: 1164046
Location: Estes Park, ColoradoDate: March 2017
Proctor DesignationAB
Maximum Dry Density (pcf)126.5123.7
Optimum Moisture Content (%)10.0%10.0%
Required Moisture VarianceN/AN/A
Required Percent Compaction95%95%
Laboratory MethodASTM D-698ASTM D-698
Compliance with
Field Test Results
Project Specs
Approximate Test Location / Notes
Moisture %Comp.
Elev. / Lift Material Percent Dry
(Pass / (Pass /
No.(Proctor)MoistureDensity
Fail)Fail)
732/171Footing Subgrade - See Diagram0.0A7.5%121.6-2.5%96%N/APass
742/172Footing Subgrade - See Diagram0.0A5.8%125.2-4.2%99%N/APass
752/231Retaining Wall Backfill - See Diagram3.0B9.4%119.6-0.6%97%N/APass
762/232Retaining Wall Backfill - See Diagram3.0B10.5%124.50.5%101%N/APass
772/233Retaining Wall Backfill - See Diagram3.0B9.6%118.5-0.4%96%N/APass
782/234Retaining Wall Backfill - See Diagram3.0B8.8%120.6-1.2%97%N/APass
792/281Building Backfill - See Diagram-13.0A9.0%125.8-1.0%99%N/APass
802/282Building Backfill - See Diagram-13.0A8.8%126.8-1.2%100%N/APass
812/283Building Backfill - See Diagram-13.0B8.2%120.8-1.8%98%N/APass
822/284Building Backfill - See Diagram-13.0B8.7%121.2-1.3%98%N/APass
832/285Building Backfill - See Diagram-2.0B8.4%123.2-1.6%100%N/APass
842/286Building Backfill - See Diagram-2.0B9.3%121.7-0.7%98%N/APass
852/287Building Backfill - See Diagram-12.0B8.9%123.5-1.1%100%N/APass
862/288Building Backfill - See Diagram-12.0B8.8%123.6-1.2%100%N/APass
873/11Wing Wall Backfill - See Diagram-12.0B8.9%120.9-1.1%98%N/APass
883/12Wing Wall Backfill - See Diagram-12.0B8.7%118.9-1.3%96%N/APass
893/13Footing Subgrade - See DiagramFSGB8.6%123.4-1.4%100%N/APass
903/14Footing Subgrade - See DiagramFSGB10.9%123.80.9%100%N/APass
913/15Footing Subgrade - See DiagramFSGA9.7%126.4-0.3%100%N/APass
923/21Footing Subgrade - See DiagramFSGB9.3%121.9-0.7%99%N/APass
933/22Footing Subgrade - See DiagramFSGB8.8%121.7-1.2%98%N/APass
943/23Footing Subgrade - See DiagramFSGB10.1%122.60.1%99%N/APass
953/24Footing Subgrade - See DiagramFSGA8.4%126.2-1.6%100%N/APass
963/31Building Backfill - See Diagram-8.0A6.4%122.3-3.6%97%N/APass
973/32Building Backfill - See Diagram-8.0A7.3%120.9-2.7%96%N/APass
983/33Building Backfill - See Diagram-8.0A8.8%125.5-1.2%99%N/APass
993/81Building Backfill - See Diagram-6.0A10.3%125.60.3%99%N/APass
1003/82Building Backfill - See Diagram-6.0A9.0%127.5-1.0%101%N/APass
1013/83Building Backfill - See Diagram-6.0A9.3%126.4-0.7%100%N/APass
1023/84Building Backfill - See Diagram-11.0A10.6%128.10.6%101%N/APass
1033/91Building Backfill - See Diagram-4.0A6.5%122.4-3.5%97%N/APass
1043/92Building Backfill - See Diagram-4.0A6.4%123.2-3.6%97%N/APass
1053/93Building Backfill - See Diagram-4.0A8.4%124.6-1.6%98%N/APass
1063/101Building Backfill - See Diagram-1.0A9.9%124.1-0.1%98%N/APass
1073/102Building Backfill - See Diagram-1.0A7.3%122.1-2.7%97%N/APass
EARTH ENGINEERING CONSULTANTS, LLC
EEC Project #: 1164046
Fill, Subgrade, & Aggregate Base
Field Density Test Location Diagram
New Community Center - Estes Park, Colorado
EARTH ENGINEERING CONSULTANTS, LLC
EEC Project #: 1164046
Fill, Subgrade, & Aggregate Base
Field Density Test Location Diagram
New Community Center - Estes Park, Colorado
Wall & PilasterStem Wall ReinforcementStem Wall ReinforcementStem Wall Reinforcement
Observation 2/17/17Observation 2/17/17Observation 2/21/17Observation 2/23/17Observation 3/1/17Observation 3/2/17Observation 3/6/17Observation 3/6/17Observation 3/7/17Observation 3/8/17Grade
BeamObservation 3/9/17Observation 3/10/17
LegendFooting ReinforcementReinforcementFooting ReinforcementFooting ReinforcementFooting ReinforcementFooting ReinforcementFooting ReinforcementReinforcementFooting Reinforcement
EARTH ENGINEERING CONSULTANTS, LLC
March 2017
EEC Project #: 1164046
Reinforcing Steel Observation Diagram
New Community Center - Estes Park, Colorado
Earth Engineering Consultants, LLC
Report of Masonry Grout Tests
GENERAL INFORMATION
Batch Date:2/23/2017Batch Time:11:45 AMTest Set No:1
Placement Location:Elevator Shaft - Lifts 1 & 2
Grout Supplier:On-SiteTruck No:N/A
Water Added on Site:N/ATime of Sample:12:00 PM
Comments:
FIELD TEST RESULTS
TESTRESULTS
Slump (Inches)9
o
Grout Temperature (F)46
o
Air Temperature at Placement (F)
o
Maximum/ Minimum Temperature (F)HighLow
48 Hour Cure Temperature
Design 28 Day Compressive Strength (psi)2000
Comments:
LABORATORY CYLINDER TEST RESULTS
Compressive
Maximum
Area
Sample Date Age Type of
Strength Average
2
Applied Load
No.Tested(days)Failure
(in)
(psi)
(pounds)
3/2/2017
b710240Split930
1
11.04
930
3/2/2017
b.17Split0
1 11.04
3/9/2017
1 c14------
--
--
3/9/2017
c.114------
1--
3/23/2017
1 d280
11.04
0
3/23/2017
d.1280
1 11.04
1 hHold------
----
--
----
1 h.1Hold------
Notify Contractor of Low 7 Day Breaks
Project:New Community Center - Estes Park Recreation and Park District
EEC Project #:1164046
Reports to:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Earth Engineering Consultants, LLC
Report of Masonry Mortar Tests
GENERAL INFORMATION
Batch Date:2/24/2017Batch Time:9:45 AMTest Set No:1
Placement Location:Elevator Shaft - 15th Course
Masonry Contractor:
Type of Mortar:Batched on-site Type S
Comments:
FIELD TEST RESULTS
TESTRESULTS
o
Air Temperature at Placement (F)54
o
Mortar Temperature (F)42
Type of Mold UsedMasonry
o
Maximum/ Minimum Temperature (F)HighLow
oo
48 Hour Cure Temperature72 F (Lab)72 F (Lab)
28 Day Compressive Strength (psi)1800
Comments:
LABORATORY CYLINDER TEST RESULTS
Compressive
Maximum
Area
Sample Date Age Type of
Strength Average
2
Applied Load
No.Tested(days)Failure
(in)
(psi)
(pounds)
2/28/2017
1 a4Shear0
3.14
0
2/28/2017
1 a.14Shear0
3.14
3/3/2017
b76630Shear1660
1 4
1660
3/3/2017
1 b.17--Shear--
3.14
3/24/2017
d28--0
1 4.00
0
3/24/2017
1 d.128--0
4.00
hHold------
1
----
--
----
h.1Hold------
1
Project:New Community Center - Estes Park Recreation and Park District
EEC Project #:1164046
Reports to:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Earth Engineering Consultants, LLC
Compressive Strength Report of SINGLE HOLLOW CELLED 8-Inch CMU Prisms
GENERAL INFORMATION
Date Constructed:3/2/2017Test Set Number:1
Elevator Wall
Date Grouted:N/A
Required 28 Day Compressive
Construction Phase
1500
Strength (psi)
Date Retrieved From Site:3/13/2017
PRISM DETAILS
No. of Mortar Bed Joints:1Prism Constructed By:On-Site Masons
No. of Masonry Units:2Max/Min Temperature (deg F):--
Prism Height (h) - Inches = t least actual lateral dimension of prism, inches =h/t =
15.57.7502.00
pp-pp
MORTAR INFORMATION
Mortar Supplier/Preparer:Masonry Sub. - Batched on-siteMortar Type/Description:Type S1800 psi
GROUT INFORMATION
Grout Supplier/Preparer:Masonry Sub. - Batched on-siteGrout Type/Description:3000PSI
COMPRESSIVE STRENGTH OF FIELD CAST PRISM TEST SPECIMENS (ASTM C1314)
Net Corrected Net Average
Avg. Avg.
Net Area Compressive Compressive Corrected Net
Specimen Date Age
h/h
Width Length Load (lbs)CF
pt
2
Strength Strength Compressive
NumberTested(Days)
(in)
(in)(in)
222
(lbs/in)(lbs/in)Strength (lbs/in)
#DIV/0!
B03/16/17187.7508.75042.666827016002.001.0001600
1
B103/16/17147.7508.75042.666995016402.001.00016401580
1
B103/16/17147.7508.75042.666442015102.001.0001510
1
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - tpurcell@a-p.com
Adolfson & Peterson Construction - qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-
Adolfson & Peterson Construction - jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Earth Engineering Consultants, LLC
Compressive Strength Report of FULLY GROUTED 8-Inch CMU Prisms
GENERAL INFORMATION
Date Constructed:3/2/2017Test Set Number:2
Elevator CMU wall
Date Grouted:3/10/2017
Required 28 Day Compressive
Construction
1500
Strength (psi)
Date Retrieved From Site:3/13/2017
PRISM DETAILS
No. of Mortar Bed Joints:1Prism Constructed By:On-Site Masons
No. of Masonry Units:2Max/Min Temperature (deg F):--
Prism Height (h) - Inches = t least actual lateral dimension of prism, inches =h/t =
15.57.7502.00
pp-pp
MORTAR INFORMATION
Mortar Supplier/Preparer:Masonry Sub. - Batched on-siteMortar Type/Description:Type S1800 psi
GROUT INFORMATION
Grout Supplier/Preparer:Masonry Sub. - Batched on-siteGrout Type/Description:3000PSI
COMPRESSIVE STRENGTH OF FIELD CAST PRISM TEST SPECIMENS (ASTM C1314)
Net Corrected Net Average
Avg. Avg.
Net Area Compressive Compressive Corrected Net
Specimen Date Age
h/h
Width Length Load (lbs)CF
pt
2
Strength Strength Compressive
NumberTested(Days)
(in)
(in)(in)
222
(lbs/in)(lbs/in)Strength (lbs/in)
#DIV/0!
B03/17/1778.7507.75067.818215012102.001.0001210
2
1210
D204/07/17281#VALUE!2.001.000#VALUE!#VALUE!
2
D204/07/17281#VALUE!2.001.000#VALUE!
2
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - tpurcell@a-p.com
Adolfson & Peterson Construction - qquimby@a-p.com
Adolfson & Peterson Construction - jheustis@a-p.com
Adolfson & Peterson Construction - lfernando@a-p.com
Adolfson & Peterson Construction - jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:2/14/2017Test No.:12
Placement Location:Wall - Gridline L - 6
Concrete Supplier:Martin MariettaType of Placement:Pump
Ticket Number:39008019Truck Number:233
Mix Code:CD4405 Water Added on Site:None
Batch Time:9:28 AMSample Time:10:15 AMYards:10of90
Required 28 Day Compressive Strength (psi):4500EEC Technician:KW
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1433.5"
Air Content (%)ASTM C2315.4%
Unit Weight (pcf)ASTM C138145.7----
Concrete Temperature (deg F)ASTM C10646090° Max
Air Temperature at Placement (deg F)40----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
12B02/21/177740508412.57Shear58905890
12D03/14/1728808508412.57Shear6430
6450
12D103/14/1728829708412.57Shear6600
12D203/14/1728795508412.57Shear6330
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:2/14/2017Test No.:13
Placement Location:Wall - Gridline L - 8
Concrete Supplier:Martin MariettaType of Placement:Pump
Ticket Number:39008024Truck Number:1734
Mix Code:cd4405 Water Added on Site:None
Batch Time:11:00 AMSample Time:11:45 AMYards:50of90
Required 28 Day Compressive Strength (psi):4500EEC Technician:KW
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1435"
Air Content (%)ASTM C2316%
Unit Weight (pcf)ASTM C138144.5----
Concrete Temperature (deg F)ASTM C10646490° Max
Air Temperature at Placement (deg F)45----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
13B02/21/177623508412.57Shear49604960
13D03/14/1728759008412.57Shear6040
5990
13D103/14/1728703808412.57Shear5600
13D203/14/1728794608412.57Shear6320
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:2/17/2017Test No.:14
Placement Location:Footing Pad - Grid Lines J, 4
Concrete Supplier:Martin MariettaType of Placement:Chute
Ticket Number:39008039Truck Number:233
Mix Code:CD4405 Water Added on Site:None
Batch Time:10:30 AMSample Time:11:05 AMYards:10of10
Required 28 Day Compressive Strength (psi):4500EEC Technician:KW
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1434.5"
Air Content (%)ASTM C2316.5%
Unit Weight (pcf)ASTM C138142.6----
Concrete Temperature (deg F)ASTM C10646590° Max
Air Temperature at Placement (deg F)55----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
14B02/24/177605908412.57Shear48204820
14D03/17/1728730308412.57Shear5810
5950
14D103/17/1728755208412.57Shear6010
14D203/17/1728758008412.57Shear6030
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:2/21/2017Test No.:15
Placement Location:Wall - Grid Lines H,3
Concrete Supplier:Martin MariettaType of Placement:Pump
Ticket Number:39008055Truck Number:212
Mix Code:CD4405 Water Added on Site:None
Batch Time:9:54 AMSample Time:10:35 AMYards:10of40
Required 28 Day Compressive Strength (psi):4500EEC Technician:KW
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1435"
Air Content (%)ASTM C2317.5%
Unit Weight (pcf)ASTM C138140.0----
Concrete Temperature (deg F)ASTM C10646690° Max
Air Temperature at Placement (deg F)55----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
15B02/28/177512508412.57Shear40804080
15D03/21/1728693208412.57Shear5520
5260
15D103/21/1728624608412.57Shear4970
15D203/21/1728664008412.57Shear5280
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:2/27/2017Test No.:16
Placement Location:Foundation Walls - Lines E-B & Along A & B, 3-5.8 & Footings E7, F7, H7, K7, K6.5, K5.8, K4.7
Concrete Supplier:Martin MariettaType of Placement:Pump
Ticket Number:39008079Truck Number:212
Mix Code:CF4405 Water Added on Site:None
Batch Time:12:01 PMSample Time:12:40 PMYards:10of40.1
Required 28 Day Compressive Strength (psi):4500EEC Technician:TB
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1435"
Air Content (%)ASTM C2316.8%
Unit Weight (pcf)ASTM C138140.4----
Concrete Temperature (deg F)ASTM C10646990° Max
Air Temperature at Placement (deg F)39----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
16B03/06/177642708412.57Shear51105110
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:3/1/2017Test No.:17
Placement Location:Foundation Walls - Lines 8, E-F & A1 & AB.5-5.5 to A2.5
Concrete Supplier:Martin MariettaType of Placement:Pump
Ticket Number:39008099Truck Number:1601
Mix Code:CD4405 Water Added on Site:6 gals
Batch Time:1:43 PMSample Time:2:25 PMYards:10of20.1
Required 28 Day Compressive Strength (psi):4500EEC Technician:TB
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1435"
Air Content (%)ASTM C2316.6%
Unit Weight (pcf)ASTM C138140.0----
Concrete Temperature (deg F)ASTM C10646790° Max
Air Temperature at Placement (deg F)34----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
17B03/08/177660508412.57Shear52605260
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:3/2/2017Test No.:18
Placement Location:Footings - Lines A6 & A5 from Af.5 to AB & AD from A3.6 to A5
Concrete Supplier:Martin MariettaType of Placement:Pump
Ticket Number:39008109Truck Number:233
Mix Code:CD4405 Water Added on Site:None
Batch Time:12:32 PMSample Time:1:15 PMYards:8.5of17
Required 28 Day Compressive Strength (psi):4500EEC Technician:TB
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1433.5"
Air Content (%)ASTM C2315.5%
Unit Weight (pcf)ASTM C138143.8----
Concrete Temperature (deg F)ASTM C10646790° Max
Air Temperature at Placement (deg F)35----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
18B03/09/177534608412.57Shear42504250
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:3/6/2017Test No.:19
Placement Location:Footings - Grid Lines AB-A4.5
Concrete Supplier:Martin MariettaType of Placement:Pump
Ticket Number:39008131Truck Number:212
Mix Code:CD4405 Water Added on Site:None
Batch Time:12:32 PMSample Time:1:05 PMYards:6of6
Required 28 Day Compressive Strength (psi):4500EEC Technician:KW
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1435"
Air Content (%)ASTM C2316.1%
Unit Weight (pcf)ASTM C138142.2----
Concrete Temperature (deg F)ASTM C10645790° Max
Air Temperature at Placement (deg F)28----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
19B03/13/177664808412.57Shear52905290
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:3/7/2017Test No.:20
Placement Location:Footings - Grid Lines B, 6
Concrete Supplier:Martin MariettaType of Placement:Pump
Ticket Number:39008140Truck Number:212
Mix Code:CD4405 Water Added on Site:20 gals
Batch Time:12:35 PMSample Time:1:10 PMYards:10of20
Required 28 Day Compressive Strength (psi):4500EEC Technician:KW
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1433.75"
Air Content (%)ASTM C2316.8%
Unit Weight (pcf)ASTM C138141.8----
Concrete Temperature (deg F)ASTM C10646090° Max
Air Temperature at Placement (deg F)35----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
20B03/14/177701408412.57Shear55805580
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:3/9/2017Test No.:21
Placement Location:Stem Wall - Grid Lines AE-A6
Concrete Supplier:Martin MariettaType of Placement:Pump
Ticket Number:39008166Truck Number:233
Mix Code:CD4405 Water Added on Site:10 gals
Batch Time:12:30 PMSample Time:1:10 PMYards:10of20
Required 28 Day Compressive Strength (psi):4500EEC Technician:KW
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1434.5"
Air Content (%)ASTM C2316%
Unit Weight (pcf)ASTM C138144.6----
Concrete Temperature (deg F)ASTM C10646890° Max
Air Temperature at Placement (deg F)60----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
21B03/16/177632708412.57Shear50305030
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:3/10/2017Test No.:22
Placement Location:Footing - Grid Lines AD, A3
Concrete Supplier:Martin MariettaType of Placement:Chute
Ticket Number:39008172Truck Number:1729
Mix Code:CD4405 Water Added on Site:None
Batch Time:9:10 AMSample Time:9:45 AMYards:6of6
Required 28 Day Compressive Strength (psi):4500EEC Technician:KW
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1433.5"
Air Content (%)ASTM C2316%
Unit Weight (pcf)ASTM C138143.8----
Concrete Temperature (deg F)ASTM C10646590° Max
Air Temperature at Placement (deg F)55----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
22B03/17/177588708412.57Shear46804680
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com
OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta