HomeMy WebLinkAboutDOCUMENT 660 Community Dr Construction Observation & Testing 2017-03-22 March 22, 2017 RLH Engineering, Inc. 541 East Garden Drive, Unit S Windsor, Colorado 80550 Attn: Mr. Chuck Jordan (cjordan@rlhengineering.com) Owner’s Representative for EVRPD Re: Construction Observation and Testing Services – Submittal No. 7 Proposed Estes Valley Community Center – North of Existing Aquatics Center 660 Community Drive - Southeast Corner of Manford Drive and Community Drive Estes Park, Colorado EEC Project No. 1164046 Mr. Jordan: As requested, during the period February 13 through March 11, 2017, Earth Engineering Consultants, LLC (EEC) personnel provided construction observation and testing services for the proposed Estes Valley Community Center expansion project planned for construction at 660 Community Drive in Estes Park, Colorado. The services provided during the referenced period were on a part-time/on-call as-needed basis and included observation and field density testing of prepared foundation bearing strata material, foundation wall backfill and of retaining wall backfill material as described herein, observations of foundation bearing strata for acceptance to place/form the cast-in-place concrete foundation system at locations presented herein, observations of foundation reinforcing steel, for various structural related elements, periodic site observations during the concrete masonry unit (CMU) wall construction for the elevator shaft, along with testing of masonry grout and cast-in-place concrete for the referenced project. The results of the site observations and testing services completed by EEC personnel during the referenced period are included with this report. Field Density Testing and Observation Services During the referenced period, EEC personnel performed field density tests on prepared foundation bearing strata material, foundation wall backfill and of retaining wall backfill material as described herein, which was prepared/placed and compacted prior to and/or during our various site visits. The field density tests were completed at random locations and elevations 4396 G REENFIELD D RIVE W INDSOR, C OLORADO80550 (970) 545-3908 FAX (970) 663-0282 www.earth-engineering.com Earth Engineering Consultants, LLC EEC Project No. 1164046 Estes Valley Community Center – Estes Park, Colorado March 22, 2017 Page 2 within the areas tested and were performed in general accordance with ASTM Specification D6938. The field density test results and approximate location of each test completed during the referenced period are shown on the attached summary sheet and the associated site diagrams. The field density test results, in general, conformed to the project specific compaction requirement of at least 95% of standard Proctor maximum dry density (ASTM D698). As requested by the general contractor, EEC personnel conducted visits on February 14 and 21, 2017, and March 3 and 6, 2017, to perform a visual observation of the foundation strata materials’ in-situ conditions prior to placement of formwork and reinforcement of the foundation alignments along approximate gridlines A1-7.5, A2-AB, A5-AC, A6-AE.5, F-8, E-8, D-8, B-8, AB from A.3 to A.5, and of footing pads at B-6, and B-7. The prepared foundation bearing strata as observed on the dates indicated herein appeared suitable for support of the foundation designed using a maximum net allowable bearing pressure of 5,000 psf as per the site-specific geotechnical engineering report. The areas were approved for continuation of the planned foundation construction. Foundation Reinforcement Observations During the referenced period, EEC personnel conducted site visits on February 17, 21, and 23, 2017, and March 1, 2, 6. 7, 8, 9, and 10, 2017, to perform visual observations of the reinforcing steel placed within portions of the building’s foundation alignments, at the gridlines identified on the enclosed “color-coded/highlighted” site diagram, prior to placement of concrete. The reinforcement for the footings/footing pads was placed in general accordance with the “Footing Schedule” as presented on page S300 of the structural drawings. The reinforcement for the various pilasters were placed in general accordance with the “Pilaster Schedule” as presented on page S305 of the structural drawings. The reinforcement for the stem wall and foundation wall alignments were placed in general accordance with the details as presented on pages S301 and S305 “Footing Schedule” as presented on pages S300 of the structural drawings. The vertical dowels continuing into the CMU walls above, where appropriate, were installed to match the CMU reinforcement as per the plans and specifications. The brace frame footing/interior grade beams reinforcement was in general accordance with the details as presented on pages S550 and S551 of the structural drawings. Earth Engineering Consultants, LLC EEC Project No. 1164046 Estes Valley Community Center – Estes Park, Colorado March 22, 2017 Page 3 Any discrepancies of reinforcement during the various daily site visits were brought to the attention of the project’s construction management consultant, and the reinforcement subcontractor, during the initial site visit and corrections/modifications were addressed accordingly prior to placement of concrete. Clearances and lap lengths, where applicable, were checked and appeared to meet the minimum requirements. The horizontal and vertical reinforcement for the portion of the foundation system as noted herein and observed by EEC personnel on the dates indicated, appeared to be in general accordance with details presented on the structural drawings prepared by Martin and Martin Consulting Engineers, dated January 12, 2017, and/or the shop drawings prepared by Barton Supply, dated December 22 and 28, 2016. The shop drawings were used as a reference to provide clarity when specific details were not presented on the structural drawings. The hand written field copies of each daily observation were also provided to the on-site project superintendent for the general contractor. Concrete Masonry Unit (CMU) Wall Construction Observations During the referenced period, EEC personnel observed portions of the reinforcing steel and other structural related elements during the 8-inch by 16-inch standard block CMU wall construction for the elevator core at approximate gridlines A6 between AH and AH.3. Layout of the CMU wall alignments were provided by others. During each daily site visit, (February 23, 24, 27, and 28, 2017, and March 3, and 10, 2017), EEC personnel observed CMU wall construction at the elevator core wall alignments and recorded approximate gridline locations, elevations/courses for each day, along with the observed horizontal and vertical reinforcement requirements and grout placement as needed. The vertical reinforcement for the elevator core, in general, consisted of one (1) #5 rebar spaced 48-inches on-center, along with an additional #5 rebar positioned at each end of walls, at each corner, and along each side of openings, control joints and/or expansion joints. The horizontal reinforcement consisted of 9-gauge “ladder-type” reinforcement spaced every 16-inches on- center full-height of each CMU wall. At the various bond beam locations, below and above windows, beam pockets, and at openings, where noted on the structural drawings, EEC personnel Earth Engineering Consultants, LLC EEC Project No. 1164046 Estes Valley Community Center – Estes Park, Colorado March 22, 2017 Page 4 noted the reinforcement consisted of two (2) continuous #5 within the fully-grouted cell alignments. The horizontal and vertical reinforcement for the portions of the CMU walls and observed by EEC personnel during the referenced timeframe on a periodic basis as noted herein appeared to be in general accordance with details presented on the structural drawings. During the grouting operations, EEC personnel observed grout placement within the low lifts. Lap lengths, where applicable, were checked and appeared to meet the minimum required lengths. During the CMU construction phase for the project, EEC personnel tested/evaluated the grout material used within portions of the wall alignments, as identified herein, (please refer to EEC’s Grout Set No. 1). Grout compressive strength cylinders, (approximately 4-inch diameter by 7- 5/8-inches in length), were molded on-site in general accordance with ASTM specifications. The grout cylinders were molded on-site within CMU blocks used to construct the CMU walls, and were extracted/cored using a 4-inch inside diameter diamond bit core barrel upon retrieval and delivery to our Windsor laboratory 2 days following the initial preparation of the specimens. Results of the field and 7-day laboratory tests performed during the referenced period are provided herein, while the 28-day test results will be provided as the results become available. During the referenced period the project’s masonry subcontractor prepared two (2) sets of concrete masonry unit (CMU) prisms, one of which consisted of three (3) 8-inch singled-celled “hollow” prism and the second of which consisted of three (3) 8-inch singled-celled fully grouted CMU block prisms, for compressive strength testing evaluation. Results of the 7-day laboratory compressive tests performed during the referenced period for the prisms are included herein, while the 28-day fully grouted CMU prism test results will be provided as the results become available. Testing of Cast-in-Place Concrete During the referenced period, EEC personnel observed and tested Portland cement concrete delivered to the site for placement as indicated on the enclosed daily reports for the referenced project, (please refer to Set Nos. 12 through 22). Field testing performed on the plastic concrete included slump, air content, unit weight, and concrete temperature. The ambient air temperature EARTH ENGINEERING CONSULTANTS, LLC SUMMARY OF FIELD DENSITY TESTS Project Name:New Community CenterProject No: 1164046 Location: Estes Park, ColoradoDate: March 2017 Proctor DesignationAB Maximum Dry Density (pcf)126.5123.7 Optimum Moisture Content (%)10.0%10.0% Required Moisture VarianceN/AN/A Required Percent Compaction95%95% Laboratory MethodASTM D-698ASTM D-698 Compliance with Field Test Results Project Specs Approximate Test Location / Notes Moisture %Comp. Elev. / Lift Material Percent Dry (Pass / (Pass / No.(Proctor)MoistureDensity Fail)Fail) 732/171Footing Subgrade - See Diagram0.0A7.5%121.6-2.5%96%N/APass 742/172Footing Subgrade - See Diagram0.0A5.8%125.2-4.2%99%N/APass 752/231Retaining Wall Backfill - See Diagram3.0B9.4%119.6-0.6%97%N/APass 762/232Retaining Wall Backfill - See Diagram3.0B10.5%124.50.5%101%N/APass 772/233Retaining Wall Backfill - See Diagram3.0B9.6%118.5-0.4%96%N/APass 782/234Retaining Wall Backfill - See Diagram3.0B8.8%120.6-1.2%97%N/APass 792/281Building Backfill - See Diagram-13.0A9.0%125.8-1.0%99%N/APass 802/282Building Backfill - See Diagram-13.0A8.8%126.8-1.2%100%N/APass 812/283Building Backfill - See Diagram-13.0B8.2%120.8-1.8%98%N/APass 822/284Building Backfill - See Diagram-13.0B8.7%121.2-1.3%98%N/APass 832/285Building Backfill - See Diagram-2.0B8.4%123.2-1.6%100%N/APass 842/286Building Backfill - See Diagram-2.0B9.3%121.7-0.7%98%N/APass 852/287Building Backfill - See Diagram-12.0B8.9%123.5-1.1%100%N/APass 862/288Building Backfill - See Diagram-12.0B8.8%123.6-1.2%100%N/APass 873/11Wing Wall Backfill - See Diagram-12.0B8.9%120.9-1.1%98%N/APass 883/12Wing Wall Backfill - See Diagram-12.0B8.7%118.9-1.3%96%N/APass 893/13Footing Subgrade - See DiagramFSGB8.6%123.4-1.4%100%N/APass 903/14Footing Subgrade - See DiagramFSGB10.9%123.80.9%100%N/APass 913/15Footing Subgrade - See DiagramFSGA9.7%126.4-0.3%100%N/APass 923/21Footing Subgrade - See DiagramFSGB9.3%121.9-0.7%99%N/APass 933/22Footing Subgrade - See DiagramFSGB8.8%121.7-1.2%98%N/APass 943/23Footing Subgrade - See DiagramFSGB10.1%122.60.1%99%N/APass 953/24Footing Subgrade - See DiagramFSGA8.4%126.2-1.6%100%N/APass 963/31Building Backfill - See Diagram-8.0A6.4%122.3-3.6%97%N/APass 973/32Building Backfill - See Diagram-8.0A7.3%120.9-2.7%96%N/APass 983/33Building Backfill - See Diagram-8.0A8.8%125.5-1.2%99%N/APass 993/81Building Backfill - See Diagram-6.0A10.3%125.60.3%99%N/APass 1003/82Building Backfill - See Diagram-6.0A9.0%127.5-1.0%101%N/APass 1013/83Building Backfill - See Diagram-6.0A9.3%126.4-0.7%100%N/APass 1023/84Building Backfill - See Diagram-11.0A10.6%128.10.6%101%N/APass 1033/91Building Backfill - See Diagram-4.0A6.5%122.4-3.5%97%N/APass 1043/92Building Backfill - See Diagram-4.0A6.4%123.2-3.6%97%N/APass 1053/93Building Backfill - See Diagram-4.0A8.4%124.6-1.6%98%N/APass 1063/101Building Backfill - See Diagram-1.0A9.9%124.1-0.1%98%N/APass 1073/102Building Backfill - See Diagram-1.0A7.3%122.1-2.7%97%N/APass EARTH ENGINEERING CONSULTANTS, LLC EEC Project #: 1164046 Fill, Subgrade, & Aggregate Base Field Density Test Location Diagram New Community Center - Estes Park, Colorado EARTH ENGINEERING CONSULTANTS, LLC EEC Project #: 1164046 Fill, Subgrade, & Aggregate Base Field Density Test Location Diagram New Community Center - Estes Park, Colorado Wall & PilasterStem Wall ReinforcementStem Wall ReinforcementStem Wall Reinforcement Observation 2/17/17Observation 2/17/17Observation 2/21/17Observation 2/23/17Observation 3/1/17Observation 3/2/17Observation 3/6/17Observation 3/6/17Observation 3/7/17Observation 3/8/17Grade BeamObservation 3/9/17Observation 3/10/17 LegendFooting ReinforcementReinforcementFooting ReinforcementFooting ReinforcementFooting ReinforcementFooting ReinforcementFooting ReinforcementReinforcementFooting Reinforcement EARTH ENGINEERING CONSULTANTS, LLC March 2017 EEC Project #: 1164046 Reinforcing Steel Observation Diagram New Community Center - Estes Park, Colorado Earth Engineering Consultants, LLC Report of Masonry Grout Tests GENERAL INFORMATION Batch Date:2/23/2017Batch Time:11:45 AMTest Set No:1 Placement Location:Elevator Shaft - Lifts 1 & 2 Grout Supplier:On-SiteTruck No:N/A Water Added on Site:N/ATime of Sample:12:00 PM Comments: FIELD TEST RESULTS TESTRESULTS Slump (Inches)9 o Grout Temperature (F)46 o Air Temperature at Placement (F) o Maximum/ Minimum Temperature (F)HighLow 48 Hour Cure Temperature Design 28 Day Compressive Strength (psi)2000 Comments: LABORATORY CYLINDER TEST RESULTS Compressive Maximum Area Sample Date Age Type of Strength Average 2 Applied Load No.Tested(days)Failure (in) (psi) (pounds) 3/2/2017 b710240Split930 1 11.04 930 3/2/2017 b.17Split0 1 11.04 3/9/2017 1 c14------ -- -- 3/9/2017 c.114------ 1-- 3/23/2017 1 d280 11.04 0 3/23/2017 d.1280 1 11.04 1 hHold------ ---- -- ---- 1 h.1Hold------ Notify Contractor of Low 7 Day Breaks Project:New Community Center - Estes Park Recreation and Park District EEC Project #:1164046 Reports to: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Earth Engineering Consultants, LLC Report of Masonry Mortar Tests GENERAL INFORMATION Batch Date:2/24/2017Batch Time:9:45 AMTest Set No:1 Placement Location:Elevator Shaft - 15th Course Masonry Contractor: Type of Mortar:Batched on-site Type S Comments: FIELD TEST RESULTS TESTRESULTS o Air Temperature at Placement (F)54 o Mortar Temperature (F)42 Type of Mold UsedMasonry o Maximum/ Minimum Temperature (F)HighLow oo 48 Hour Cure Temperature72 F (Lab)72 F (Lab) 28 Day Compressive Strength (psi)1800 Comments: LABORATORY CYLINDER TEST RESULTS Compressive Maximum Area Sample Date Age Type of Strength Average 2 Applied Load No.Tested(days)Failure (in) (psi) (pounds) 2/28/2017 1 a4Shear0 3.14 0 2/28/2017 1 a.14Shear0 3.14 3/3/2017 b76630Shear1660 1 4 1660 3/3/2017 1 b.17--Shear-- 3.14 3/24/2017 d28--0 1 4.00 0 3/24/2017 1 d.128--0 4.00 hHold------ 1 ---- -- ---- h.1Hold------ 1 Project:New Community Center - Estes Park Recreation and Park District EEC Project #:1164046 Reports to: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Earth Engineering Consultants, LLC Compressive Strength Report of SINGLE HOLLOW CELLED 8-Inch CMU Prisms GENERAL INFORMATION Date Constructed:3/2/2017Test Set Number:1 Elevator Wall Date Grouted:N/A Required 28 Day Compressive Construction Phase 1500 Strength (psi) Date Retrieved From Site:3/13/2017 PRISM DETAILS No. of Mortar Bed Joints:1Prism Constructed By:On-Site Masons No. of Masonry Units:2Max/Min Temperature (deg F):-- Prism Height (h) - Inches = t least actual lateral dimension of prism, inches =h/t = 15.57.7502.00 pp-pp MORTAR INFORMATION Mortar Supplier/Preparer:Masonry Sub. - Batched on-siteMortar Type/Description:Type S1800 psi GROUT INFORMATION Grout Supplier/Preparer:Masonry Sub. - Batched on-siteGrout Type/Description:3000PSI COMPRESSIVE STRENGTH OF FIELD CAST PRISM TEST SPECIMENS (ASTM C1314) Net Corrected Net Average Avg. Avg. Net Area Compressive Compressive Corrected Net Specimen Date Age h/h Width Length Load (lbs)CF pt 2 Strength Strength Compressive NumberTested(Days) (in) (in)(in) 222 (lbs/in)(lbs/in)Strength (lbs/in) #DIV/0! B03/16/17187.7508.75042.666827016002.001.0001600 1 B103/16/17147.7508.75042.666995016402.001.00016401580 1 B103/16/17147.7508.75042.666442015102.001.0001510 1 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - tpurcell@a-p.com Adolfson & Peterson Construction - qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a- Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a- Adolfson & Peterson Construction - jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Earth Engineering Consultants, LLC Compressive Strength Report of FULLY GROUTED 8-Inch CMU Prisms GENERAL INFORMATION Date Constructed:3/2/2017Test Set Number:2 Elevator CMU wall Date Grouted:3/10/2017 Required 28 Day Compressive Construction 1500 Strength (psi) Date Retrieved From Site:3/13/2017 PRISM DETAILS No. of Mortar Bed Joints:1Prism Constructed By:On-Site Masons No. of Masonry Units:2Max/Min Temperature (deg F):-- Prism Height (h) - Inches = t least actual lateral dimension of prism, inches =h/t = 15.57.7502.00 pp-pp MORTAR INFORMATION Mortar Supplier/Preparer:Masonry Sub. - Batched on-siteMortar Type/Description:Type S1800 psi GROUT INFORMATION Grout Supplier/Preparer:Masonry Sub. - Batched on-siteGrout Type/Description:3000PSI COMPRESSIVE STRENGTH OF FIELD CAST PRISM TEST SPECIMENS (ASTM C1314) Net Corrected Net Average Avg. Avg. Net Area Compressive Compressive Corrected Net Specimen Date Age h/h Width Length Load (lbs)CF pt 2 Strength Strength Compressive NumberTested(Days) (in) (in)(in) 222 (lbs/in)(lbs/in)Strength (lbs/in) #DIV/0! B03/17/1778.7507.75067.818215012102.001.0001210 2 1210 D204/07/17281#VALUE!2.001.000#VALUE!#VALUE! 2 D204/07/17281#VALUE!2.001.000#VALUE! 2 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - tpurcell@a-p.com Adolfson & Peterson Construction - qquimby@a-p.com Adolfson & Peterson Construction - jheustis@a-p.com Adolfson & Peterson Construction - lfernando@a-p.com Adolfson & Peterson Construction - jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:2/14/2017Test No.:12 Placement Location:Wall - Gridline L - 6 Concrete Supplier:Martin MariettaType of Placement:Pump Ticket Number:39008019Truck Number:233 Mix Code:CD4405 Water Added on Site:None Batch Time:9:28 AMSample Time:10:15 AMYards:10of90 Required 28 Day Compressive Strength (psi):4500EEC Technician:KW Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1433.5" Air Content (%)ASTM C2315.4% Unit Weight (pcf)ASTM C138145.7---- Concrete Temperature (deg F)ASTM C10646090° Max Air Temperature at Placement (deg F)40---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 12B02/21/177740508412.57Shear58905890 12D03/14/1728808508412.57Shear6430 6450 12D103/14/1728829708412.57Shear6600 12D203/14/1728795508412.57Shear6330 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:2/14/2017Test No.:13 Placement Location:Wall - Gridline L - 8 Concrete Supplier:Martin MariettaType of Placement:Pump Ticket Number:39008024Truck Number:1734 Mix Code:cd4405 Water Added on Site:None Batch Time:11:00 AMSample Time:11:45 AMYards:50of90 Required 28 Day Compressive Strength (psi):4500EEC Technician:KW Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1435" Air Content (%)ASTM C2316% Unit Weight (pcf)ASTM C138144.5---- Concrete Temperature (deg F)ASTM C10646490° Max Air Temperature at Placement (deg F)45---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 13B02/21/177623508412.57Shear49604960 13D03/14/1728759008412.57Shear6040 5990 13D103/14/1728703808412.57Shear5600 13D203/14/1728794608412.57Shear6320 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:2/17/2017Test No.:14 Placement Location:Footing Pad - Grid Lines J, 4 Concrete Supplier:Martin MariettaType of Placement:Chute Ticket Number:39008039Truck Number:233 Mix Code:CD4405 Water Added on Site:None Batch Time:10:30 AMSample Time:11:05 AMYards:10of10 Required 28 Day Compressive Strength (psi):4500EEC Technician:KW Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1434.5" Air Content (%)ASTM C2316.5% Unit Weight (pcf)ASTM C138142.6---- Concrete Temperature (deg F)ASTM C10646590° Max Air Temperature at Placement (deg F)55---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 14B02/24/177605908412.57Shear48204820 14D03/17/1728730308412.57Shear5810 5950 14D103/17/1728755208412.57Shear6010 14D203/17/1728758008412.57Shear6030 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:2/21/2017Test No.:15 Placement Location:Wall - Grid Lines H,3 Concrete Supplier:Martin MariettaType of Placement:Pump Ticket Number:39008055Truck Number:212 Mix Code:CD4405 Water Added on Site:None Batch Time:9:54 AMSample Time:10:35 AMYards:10of40 Required 28 Day Compressive Strength (psi):4500EEC Technician:KW Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1435" Air Content (%)ASTM C2317.5% Unit Weight (pcf)ASTM C138140.0---- Concrete Temperature (deg F)ASTM C10646690° Max Air Temperature at Placement (deg F)55---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 15B02/28/177512508412.57Shear40804080 15D03/21/1728693208412.57Shear5520 5260 15D103/21/1728624608412.57Shear4970 15D203/21/1728664008412.57Shear5280 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:2/27/2017Test No.:16 Placement Location:Foundation Walls - Lines E-B & Along A & B, 3-5.8 & Footings E7, F7, H7, K7, K6.5, K5.8, K4.7 Concrete Supplier:Martin MariettaType of Placement:Pump Ticket Number:39008079Truck Number:212 Mix Code:CF4405 Water Added on Site:None Batch Time:12:01 PMSample Time:12:40 PMYards:10of40.1 Required 28 Day Compressive Strength (psi):4500EEC Technician:TB Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1435" Air Content (%)ASTM C2316.8% Unit Weight (pcf)ASTM C138140.4---- Concrete Temperature (deg F)ASTM C10646990° Max Air Temperature at Placement (deg F)39---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 16B03/06/177642708412.57Shear51105110 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:3/1/2017Test No.:17 Placement Location:Foundation Walls - Lines 8, E-F & A1 & AB.5-5.5 to A2.5 Concrete Supplier:Martin MariettaType of Placement:Pump Ticket Number:39008099Truck Number:1601 Mix Code:CD4405 Water Added on Site:6 gals Batch Time:1:43 PMSample Time:2:25 PMYards:10of20.1 Required 28 Day Compressive Strength (psi):4500EEC Technician:TB Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1435" Air Content (%)ASTM C2316.6% Unit Weight (pcf)ASTM C138140.0---- Concrete Temperature (deg F)ASTM C10646790° Max Air Temperature at Placement (deg F)34---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 17B03/08/177660508412.57Shear52605260 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:3/2/2017Test No.:18 Placement Location:Footings - Lines A6 & A5 from Af.5 to AB & AD from A3.6 to A5 Concrete Supplier:Martin MariettaType of Placement:Pump Ticket Number:39008109Truck Number:233 Mix Code:CD4405 Water Added on Site:None Batch Time:12:32 PMSample Time:1:15 PMYards:8.5of17 Required 28 Day Compressive Strength (psi):4500EEC Technician:TB Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1433.5" Air Content (%)ASTM C2315.5% Unit Weight (pcf)ASTM C138143.8---- Concrete Temperature (deg F)ASTM C10646790° Max Air Temperature at Placement (deg F)35---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 18B03/09/177534608412.57Shear42504250 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:3/6/2017Test No.:19 Placement Location:Footings - Grid Lines AB-A4.5 Concrete Supplier:Martin MariettaType of Placement:Pump Ticket Number:39008131Truck Number:212 Mix Code:CD4405 Water Added on Site:None Batch Time:12:32 PMSample Time:1:05 PMYards:6of6 Required 28 Day Compressive Strength (psi):4500EEC Technician:KW Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1435" Air Content (%)ASTM C2316.1% Unit Weight (pcf)ASTM C138142.2---- Concrete Temperature (deg F)ASTM C10645790° Max Air Temperature at Placement (deg F)28---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 19B03/13/177664808412.57Shear52905290 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:3/7/2017Test No.:20 Placement Location:Footings - Grid Lines B, 6 Concrete Supplier:Martin MariettaType of Placement:Pump Ticket Number:39008140Truck Number:212 Mix Code:CD4405 Water Added on Site:20 gals Batch Time:12:35 PMSample Time:1:10 PMYards:10of20 Required 28 Day Compressive Strength (psi):4500EEC Technician:KW Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1433.75" Air Content (%)ASTM C2316.8% Unit Weight (pcf)ASTM C138141.8---- Concrete Temperature (deg F)ASTM C10646090° Max Air Temperature at Placement (deg F)35---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 20B03/14/177701408412.57Shear55805580 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:3/9/2017Test No.:21 Placement Location:Stem Wall - Grid Lines AE-A6 Concrete Supplier:Martin MariettaType of Placement:Pump Ticket Number:39008166Truck Number:233 Mix Code:CD4405 Water Added on Site:10 gals Batch Time:12:30 PMSample Time:1:10 PMYards:10of20 Required 28 Day Compressive Strength (psi):4500EEC Technician:KW Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1434.5" Air Content (%)ASTM C2316% Unit Weight (pcf)ASTM C138144.6---- Concrete Temperature (deg F)ASTM C10646890° Max Air Temperature at Placement (deg F)60---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 21B03/16/177632708412.57Shear50305030 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION Placement Date:3/10/2017Test No.:22 Placement Location:Footing - Grid Lines AD, A3 Concrete Supplier:Martin MariettaType of Placement:Chute Ticket Number:39008172Truck Number:1729 Mix Code:CD4405 Water Added on Site:None Batch Time:9:10 AMSample Time:9:45 AMYards:6of6 Required 28 Day Compressive Strength (psi):4500EEC Technician:KW Comments: FIELD TEST DATA TESTRESULTSSPECIFICATIONS Slump (in)ASTM C1433.5" Air Content (%)ASTM C2316% Unit Weight (pcf)ASTM C138143.8---- Concrete Temperature (deg F)ASTM C10646590° Max Air Temperature at Placement (deg F)55---- Comments: COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Average MaximumCylinderCylinderCompressiveCompressive SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength 2 NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi) 22B03/17/177588708412.57Shear46804680 Project:New Community Center - Estes Park Recreation and Park District Project Number:1164046Report Distribution: RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com OLC - Mr. Robert McDonald rmcdonald@olcdesigns.com OLC - Mr. Laine McLaughlin lmclaughlin@olcdesigns.com Martin & Martin - Ed Sabia esabia@martinmartin.com Martin Marietta