June 5, 2017
RLH Engineering, Inc.
541 East Garden Drive, Unit S
Windsor, Colorado 80550
Attn: Mr. Chuck Jordan (cjordan@rlhengineering.com)
Owner’s Representative for EVRPD
Re: Construction Observation and Testing Services – Submittal No. 11
Proposed Estes Valley Community Center – North of Existing Aquatics Center
660 Community Drive - Southeast Corner of Manford Drive and Community Drive
Estes Park, Colorado
EEC Project No. 1164046
Mr. Jordan:
As requested, during the period May 8 through May 20, 2017, Earth Engineering Consultants,
LLC (EEC) personnel provided construction observation and testing services for the proposed
Estes Valley Community Center expansion project currently under construction at 660
Community Drive in Estes Park, Colorado. The services provided during the referenced period
were on a part-time/on-call as-needed basis and included observation and field density testing of
storm sewer backfill as described herein, observations of slab-on-deck (SOD) reinforcing steel,
periodic site observations during the various stages of concrete masonry unit (CMU) wall
construction for various wall alignments as presented herein, observations of non-destructive
testing (NDT) services, along with testing of cast-in-place concrete for the referenced project.
The results of the site observations and testing services completed by EEC personnel during the
referenced period are included with this report.
Field Density Testing and Observation Services
During the referenced period, EEC personnel performed field density tests on water line and
storm sewer alignment backfill material as described herein, which were placed and compacted
prior to and/or during our site visits. The field density tests were completed at random locations
and elevations within the areas tested and were performed in general accordance with ASTM
Specification D6938. The field density test results and approximate location of each test
completed during the referenced period are shown on the attached summary sheet and the
4396 G REENFIELD D RIVE
W INDSOR, C OLORADO80550
(970) 545-3908 FAX (970) 663-0282
www.earth-engineering.com
Earth Engineering Consultants, LLC
EEC Project No. 1164046
Estes Valley Community Center – Estes Park, Colorado
June 5, 2017
Page 2
associated site diagrams. The field density test results conformed to the project specific
compaction requirement of at least 95% or 98% of standard Proctor maximum dry density
(ASTM D698), as required.
Reinforcement Observations
During the referenced period, EEC personnel conducted site visits on May 11 and 12, 2017, to
perform visual observations of the reinforcing steel placed within portions of the building’s
SOD, at the gridlines identified on the enclosed “color-coded/highlighted” site diagram, prior to
placement of concrete.
The reinforcement for the portion of the SOD as indicated herein was placed in general
accordance with the Metal Deck Slab Schedule detail 10/S530 along with details and notes
presented on pages S103, S390, S500, S530, and S531 of the structural drawings.
Any discrepancies of reinforcement during the various daily site visits were brought to the
attention of the project’s construction management consultant, and the reinforcement
subcontractor, during the initial site visit and corrections/modifications were addressed
accordingly prior to placement of concrete.
Clearances and lap lengths, where applicable, were checked and appeared to meet the minimum
requirements. The horizontal and vertical reinforcement for the portion of the SOD as noted
herein and observed by EEC personnel on the dates indicated, appeared to be in general
accordance with details presented on the structural drawings prepared by Martin and Martin
Consulting Engineers, dated January 12, 2017, and the shop drawings prepared by Barton
Supply, dated February 23, 2017.
Concrete Masonry Unit (CMU) Wall Construction Observations
During the referenced period, EEC personnel, on a periodic basis, observed portions of the
reinforcing steel and other structural related elements during the 8 to 12-inch by 16-inch standard
block CMU wall construction at the gridlines identified on the enclosed “color-
coded/highlighted” site diagram. Layout of the CMU wall alignments were provided by others.
During each daily site visit, (May 8, 9, 11, 12, and 15 through 17, 2017), EEC personnel
observed CMU wall construction along the various wall alignments and recorded approximate
Earth Engineering Consultants, LLC
EEC Project No. 1164046
Estes Valley Community Center – Estes Park, Colorado
June 5, 2017
Page 3
gridline locations, elevations/courses for each day, along with the observed horizontal and
vertical reinforcement requirements, as well as grout placement as needed.
The vertical reinforcement for the various walls, in general, consisted of one (1) #5 rebar spaced
32 to 48 inches on-center, along with additional #5 rebar positioned at each end of walls, at each
corner, and along each side of openings, control joints and/or expansion joints. The horizontal
reinforcement consisted of 9-gauge “ladder-type” reinforcement spaced every 16-inches on-
center full-height of each CMU wall. At the various bond beam locations, below and above
windows, beam pockets, and at openings, where noted on the structural drawings, EEC personnel
noted the reinforcement consisted of two (2) or one (1) continuous #5 within the fully-grouted
cell alignments.
The horizontal and vertical reinforcement for the portions of the CMU walls and observed by
EEC personnel during the referenced timeframe on a periodic basis as noted herein appeared to
be in general accordance with details presented on the structural drawings and/or as referenced
on the approved shop drawings. During the grouting operations, EEC personnel observed grout
placement within the low lifts. Lap lengths, where applicable, were checked and appeared to
meet the minimum required lengths.
Non-Destructive Testing (NDT) Services
During the referenced period EEC’s in-house certified bolt and weld inspector conducted
observations on May 17, 2017 to perform load testing of 3 (three) post installed epoxied anchor
rods, one (1) at each location, located at the Upper Level South at approximate Gridlines NJ by
E13.4, E10.3, and E8. The post installed anchors were pulled to 5000 pounds of tension and held
for 30 seconds. The tested post installed anchor rods held the required load without failing.
Based on the tensioning performed, the post installed anchor rods were in general accordance
with the requirements of the electronic transmission (e-mail) from the project’s structural
engineering consultant, Martin & Martin dated April 3, 2017.
Testing of Cast-in-Place Concrete
During the referenced period, EEC personnel observed and tested Portland cement concrete
delivered to the site for placement as indicated on the enclosed daily reports for the referenced
project, (please refer to Set Nos. 34 through 37). Field testing performed on the plastic concrete
EARTH ENGINEERING CONSULTANTS, LLC
SUMMARY OF FIELD DENSITY TESTS
Project Name:New Community CenterProject No: 1164046
Location: Estes Park, ColoradoDate: May 2017
Proctor DesignationA
Maximum Dry Density (pcf)126.5
Optimum Moisture Content (%)10.0%
Required Moisture VarianceN/A
Required Percent Compaction95%
Laboratory MethodASTM D-698
Compliance with
Field Test Results
Project Specs
Approximate Test Location / Notes
Moisture %Comp.
Elev. / Lift Material Percent Dry
(Pass / (Pass /
No.(Proctor)MoistureDensity
Fail)Fail)
2885/81Storm Sewer - See Diagram-2.0A8.2%125.0-1.8%99%N/APass
2895/82Storm Sewer - See Diagram-1.0A8.8%123.8-1.2%98%N/APass
2905/83Storm Sewer - See Diagram-2.0A7.9%123.6-2.1%98%N/APass
2915/84Storm Sewer - See Diagram-1.0A8.7%124.2-1.3%98%N/APass
2925/91Storm Sewer - See Diagram-2.0A9.9%122.1-0.1%97%N/APass
2935/92Storm Sewer - See Diagram-1.0A10.5%120.20.5%95%N/APass
2945/93Storm Sewer - See Diagram0.0A11.8%122.71.8%97%N/APass
Sheet 2Sheet 3
Sheet 4Sheet 5
Field Density Test Location Diagram
New Community Center - Estes Park, Colorado
EEC Project #: 1164046
Storm Sewer
Sheet 1 of 5
EARTH ENGINEERING CONSULTANTS, LLC
Field Density Test Location Diagram
New Community Center - Estes Park, Colorado
EEC Project #: 1164046
Storm Sewer
Sheet 2 of 5
EARTH ENGINEERING CONSULTANTS, LLC
Slab-on-Deck ReinforcementObservation 5-11 & 5-12-17
Legend
EARTH ENGINEERING CONSULTANTS, LLC
May 2017
EEC Project #: 1164046
Reinforcing Steel Observation Diagram
New Community Center - Estes Park, Colorado
CMU ReinforcementObservation 5/8, 5/9, 5/11,
Legend
5/12, & 5/15 thru 5/17/17
EARTH ENGINEERING CONSULTANTS, LLC
May 2017
EEC Project #: 1164046
Reinforcing Steel Observation Diagram
New Community Center - Estes Park, Colorado
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:5/12/2017Test No.:34
Placement Location:Slab-on-Metal Deck - Grid Lines B, 6.5
Concrete Supplier:Martin MariettaType of Placement:Pump
Ticket Number:39008602Truck Number:1764
Mix Code:N4200 Water Added on Site:None
Batch Time:7:22 AMSample Time:8:20 AMYards:10of180
Required 28 Day Compressive Strength (psi):4000EEC Technician:JB
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1431.5"
Air Content (%)ASTM C2312.5%
Unit Weight (pcf)ASTM C138144.0----
Concrete Temperature (deg F)ASTM C10646890° Max
Air Temperature at Placement (deg F)40----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
34B05/19/177482208412.57Shear38403840
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Robert McDonald rmcdonald@olcdesigns.com
OLC - Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:5/12/2017Test No.:35
Placement Location:Slab-on-Metal Deck - Grid Lines D.5, 7.5
Concrete Supplier:Martin MariettaType of Placement:Pump
Ticket Number:39008606Truck Number:1763
Mix Code:N4200 Water Added on Site:None
Batch Time:8:29 AMSample Time:9:10 AMYards:50of180
Required 28 Day Compressive Strength (psi):4000EEC Technician:JB
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1435.5"
Air Content (%)ASTM C2312.3%
Unit Weight (pcf)ASTM C138145.2----
Concrete Temperature (deg F)ASTM C10646490° Max
Air Temperature at Placement (deg F)53----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
35B05/19/177546908412.57Shear43504350
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Robert McDonald rmcdonald@olcdesigns.com
OLC - Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:5/12/2017Test No.:36
Placement Location:Slab-on-Metal Deck - Grid Lines AG, A4
Concrete Supplier:Martin MariettaType of Placement:Pump
Ticket Number:39008612Truck Number:1764
Mix Code:N4200 Water Added on Site:None
Batch Time:9:58 AMSample Time:10:40 AMYards:110of180
Required 28 Day Compressive Strength (psi):4000EEC Technician:JB
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1432.5"
Air Content (%)ASTM C2312.4%
Unit Weight (pcf)ASTM C138145.6----
Concrete Temperature (deg F)ASTM C10646590° Max
Air Temperature at Placement (deg F)61----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
36B05/19/177541608412.57Shear43104310
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Robert McDonald rmcdonald@olcdesigns.com
OLC - Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta
EARTH ENGINEERING CONSULTANTS, LLC
REPORT OF CAST-IN-PLACE CONCRETE TESTS
GENERAL INFORMATION
Placement Date:5/12/2017Test No.:37
Placement Location:Slab-on-Metal Deck - Grid Lines B, 5
Concrete Supplier:Martin MariettaType of Placement:Pump
Ticket Number:39008614Truck Number:1737
Mix Code:N4200 Water Added on Site:None
Batch Time:10:35 AMSample Time:11:45 AMYards:130of180
Required 28 Day Compressive Strength (psi):4000EEC Technician:JB
Comments:
FIELD TEST DATA
TESTRESULTSSPECIFICATIONS
Slump (in)ASTM C1436"
Air Content (%)ASTM C2312%
Unit Weight (pcf)ASTM C138145.2----
Concrete Temperature (deg F)ASTM C10647090° Max
Air Temperature at Placement (deg F)65----
Comments:
COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31)
Average
MaximumCylinderCylinderCompressiveCompressive
SpecimenDateAgeApplied LoadHeightDiameterAreaFailureStrengthStrength
2
NumberTested(days)(lbs)(in)(in)(in)Type(psi)(psi)
37B05/19/177436408412.57Shear34703470
Project:New Community Center - Estes Park Recreation and Park District
Project Number:1164046Report Distribution:
RLH Engineering - Chuck Jordan: cjordan@rlhengineering.com
Adolfson & Peterson Construction - Mr. Tom Purcell tpurcell@a-p.com
Adolfson & Peterson Construction - Mr. Quintin Quimby qquimby@a-p.com
Adolfson & Peterson Construction - Mr. Jason Heustis jheustis@a-p.com
Adolfson & Peterson Construction - Mr. Les Fernando lfernando@a-p.com
Adolfson & Peterson Construction - Mr. Josh Cohen jcohen@a-p.com
OLC - Robert McDonald rmcdonald@olcdesigns.com
OLC - Laine McLaughlin lmclaughlin@olcdesigns.com
Martin & Martin - Ed Sabia esabia@martinmartin.com
Martin Marietta