HomeMy WebLinkAboutPERMIT 452 Columbine Ave Solar Panels 2019-06-24Received Date
____________
Permit Number 1’1 5
ReceiiedBy________IRC Application /Building Permit
\pivisicnot.puLaing safety 170 MacGregor Avenue P.O.Box 1200 Estes Park,CO 80517 Application Expires ,t—2.—i
General Information (970)517-3726 •FAX (970)586-0249’www.estes.org
SEE REVERSE SIDE BEFORE PROCEEDING Permit Expires
Job Address:452 Columbine Ave Vacation Home?2 No C Yes #Bedrooms
Lot:Biock:Subdivision:
_____________________________________________
Parcei #:_____________________________
Owner Name:Lucian Oprea Phone:970-222-4751
Address:452 Columbine Ave Estes Park Co 80517
(Street)(City)(State)(Zip Code)
Contractor:ARE Soiar Town License It:
_____________Phone:
970-471-0584
Email Address (REQUIRED):casey@aresoiar.com
The Following Applies to New Work Only —Complete all that apply:D New Building OAlteration C Addition Master Planfl
Building Use(s):E Owner /Residence C B &B C Short-term Rental —Less than 30 days.
Existing use:Proposed use:;4*of New Dwellings:;It of New Kitchens:
______
Sewer:C Estes Park Sanitation C Upper Thompson Sanitation C Private Septic —Requires Applicant to first go to the Health Department.
Plumbing Involved:C No U Yes —State and Town Licenses Required
Fixtures:C Add C Relocate C Replace C Demolish Water Service:C Existing C New -It of Meters:
________
.Meter Size:
______
inches
Electric Involved C No I(es —State &Town License Required.State Permit and Inspection Required.Phase Single Volts 240
Service:Existing C New:Overhead C Underground:4*of Meters:1
;Meter Size:200 amps;Temp Meter:E No C Yes
Type of Heat:C Gas C Furnace Fuel Gas Involved:W No C Yes —Qualifications and System Sizing Required.
C Electric C Boiler Type:C Natural Gas C LPG Uof Gas Appliances!Outlets:________
Building Height:U Floors Basement (sf)1St Floor (sf)2,d Floor (sf)Garage /Carport (sQ Porch w/Roof Deck w/o Roof
Existing6rade Fin
__________
Fin
___________
Fin
___________
Attached
________
(sf)(sQ
Ft.UBdrm Unfin Unfin Unfin Detached
Job Description;11.16 KW PV Solar Installation Total valuations (Labor &Materials)
I $
I certify this application is true and correct and agree to perform the work described according to plans/specifications submitted,reviewed and approved,and comply with
local ordinances,state and federal laws as well as building codes.I certify that I have the property owner’s authority and permission to apply for this permit.Additionally,I
UNDERSTAND THAT I AM RESPONSIBLE FOR ANY FEES OR EXPENSES INCURRED FOR PLAN REVIEW,PERMITS,INSPECTIONS AND OTHER FEES ASSOCIATED WITH THIS
APPLICATION.
Contractor C Owner C Owner’s Agent C Tenant
Signature Date 6/24/19 Print Name Casey Cole
______________-
Office Use Oniy
Applicable Code(s):Registered VH Registered LVH?Public Works)o5 zBC ——Water
UBedrooms/Occ.Load Floor Load:Elevation ft/Roof Load/Pg Light &Power4opsf—
Planning
variances:Building ‘iS I
.£S
NIAC PhnReview
Front Side Rear River CountylaxSetbacksg—’‘I ,t a
1 D [.)(J Certofoccupanoy.
Zoning Lot Size .
.‘O I..)Hazards:Qeo Wildfire FIooq
-I —Totai
BuiIdin Official A i ‘fr ceo Date’-,IjAfl.*.LLL-Y ‘i/7,9 I.JN ,‘-:--\
Town of Estes Park Off
coP9
Address:2183 S.Downing St.Denver
(Street)(City)
CO
(State)
80303
(Zip Code)
Job Description:es Sol,qy tnetS Dept.Approved Disapproved Fees
S..I
u:u(fllng Divisioe\Fonns-Logs\IRC Applicalion Pg l.doc Revised 8/7/2018.KT LJ’r 13