Loading...
HomeMy WebLinkAboutPLAN Revised Crawl Space 1720 Avalon Dr 2022-05-24Crawlspace Ledger Detail1Not to Scale north Crawlspace Post2Not to Scale Double 1¾"x9½" LVL beam - Install tight and level against bottom of floor joists using jacks as needed to fully contact all joists Sister beams together with (4) 10d nails at 24"oc alternating sides of beam Nail both sides of splices from splice side - space slices min 4'-0" apart and min 18" from bearing posts (2) Simpson LVE4 Post-to-Beam connections at opposite corners as shown 4x4 treated wood posts (2) Simpson RPBZ Post Bases at opposite corners as shown Excavate approximately 3"± on average into sloping existing grade to set bottom of concrete pad footings - Re: Plan (Sheet A2) for size & reinforcing New double LVL beams re: Detail 2/A3 2x6 framed wall with treated base plate and double top plate - install triple and quadruple stud packs below beams as illustrated Install additional 12" blocking below existing mid-line beam Excavate down to existing perimeter footing (4) Hilti KB-TZ2 (or sim) ½"ϕ concrete expansion anchors with nominal 3" embedment 5/16/22 Sheet Number A3 Joseph E Calvin Date Sheet Title Details March 3, 2022 of 3 PA T K A S I S K A C R A W L S P A C E RE P A I R S 17 2 0 A v a l o n D r Es t e s P a r k , C O Pr o j e c t : 2 1 2 4 – P A T K A S I S K A C R A W L S P A C E R E P A I R S F i l e : " 2 1 2 4 C D s " M o d i fi e d : M o n , M a y 1 6 , 2 2 P r i n t : M o n , M a y 1 6 , 2 2 D r a w n b y : J E C C h e c k e d b y : R M C April 29, 20221 May 16, 20222 2 APP R O V E D R E V I S I O N S b y SAFE B u i l t ; 2015 I n t e r n a t i o n a l C o d e s Subj e c t t o i n s p e c t i o n a n d c o m p l i a n c e t o a l l Rele v a n t , a d o p t e d B u i l d i n g & M u n i c i p a l C o d e s 5/24 / 2 0 2 2 REVISIONS TO PERMIT #22-EP-00205 Field Copy Print out legibly & in color and have on site for inspector REVIEWED BY SAFEBUILT