Loading...
HomeMy WebLinkAboutINSPECTIONS Remodel 130 Stanley Ave 2023-11-27INSPECTION CARD Estes Park 170 MacGregor Ave Suite 230, Estes Park, CO 80517 POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE. APPLICATION NO.:22-EP-00135 TYPE: Commercial Remodel ISSUED DATE:04/24/2023 EXPIRATION DATE:05/25/2024 PROJECT ADDRESS:130 Stanley Avenue (LF), Estes Park, CO 80517 PARCEL NO.:2530233001 OWNER:Castle Peak Holdings CONTRACTOR:Humphrey Rich Construction Group CONTRACTOR PHONE:(301) 330-1650 DESCRIPTION OF WORK: Renovation of hotel main lobby "Building B". Basement to be office, storage, equipment and food service storage. Main level to be guest registration, lounge, bar, restaurant and kitchen. 2nd level to be predominantly eliminated for higher ceilings with small area dedicated to employee housing. Main floor expands into back patio for additional restaurant seating and lounge area. This permit application includes site work to address Building B parking and access, as well as additional site landscaping and low voltage lighting. It also includes utility service upgrades to domestic water, sanitary (for grease interceptor), storm water from back lot, and electrical service and transformer. INSPECTION INSP DATE PASSED COMMENTS Rough Plumbing GR 6/27/2023 See Notes Rough Frame GR 6/26/2023 See Notes Fire Resistive Wall Assembly JG 7/24/2023 Above Ceiling Mechanical JG 11/8/2023 Drywall JG 11/8/2023 Final Plumbing JG 11/8/2023 Final Building JG 11/16/2023 Final Public Works/CO JW 11/17/2023 See Notes Final Fire/CO JJ 11/5/2023 Rough Gas GR 5/5/2023 Insulation JG 8/14/2023 See Notes Rough Frame JG 7/24/2023 See Notes Rough Mechanical (Walk in cooler/freezer pressure test insp.) JG 8/14/2023 Final Building JG 11/27/2023 See Notes INSPECTION INSP DATE PASSED COMMENTS Rough Mechanical GR 5/5/2023 Gas Test JG 7/14/2023 See Notes Firestopping JG 7/10/2023 See Notes Gas Pressure Test JG 11/8/2023 Insulation GR 5/5/2023 Final Mechanical JG 11/8/2023 Final Fire GR 11/27/2023 See Notes Final Planning/CO JG 11/27/2023 See Notes Final Building/CO JG 11/16/2023 Rough Mechanical GR 6/26/2023 See Notes Rough Plumbing JG 7/10/2023 Gas Pressure Test JG 11/8/2023 Final Sanitation/CO JD 10/16/2023 CONSTRUCTION TYPE:OCCUPANT LOAD: Page 1 of 1 Fire Approval:Date:Engineering Approval:Date: PW Approval:Date:Other ( ):Date: To request an inspection: