HomeMy WebLinkAboutINSPECTIONS Remodel 130 Stanley Ave 2023-11-27INSPECTION CARD
Estes Park
170 MacGregor Ave Suite 230, Estes Park, CO 80517
POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE
AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE.
APPLICATION NO.:22-EP-00135 TYPE:
Commercial
Remodel ISSUED DATE:04/24/2023 EXPIRATION DATE:05/25/2024
PROJECT ADDRESS:130 Stanley Avenue (LF), Estes Park, CO 80517 PARCEL NO.:2530233001
OWNER:Castle Peak Holdings CONTRACTOR:Humphrey Rich Construction Group CONTRACTOR PHONE:(301) 330-1650
DESCRIPTION OF WORK:
Renovation of hotel main lobby "Building B". Basement to be office, storage, equipment and food service storage. Main level to
be guest registration,
lounge, bar, restaurant and kitchen. 2nd level to be predominantly eliminated for higher ceilings with small area dedicated to
employee housing.
Main floor expands into back patio for additional restaurant seating and lounge area. This permit application includes site work to
address Building B parking
and access, as well as additional site landscaping and low voltage lighting. It also includes utility service upgrades to domestic
water, sanitary (for grease
interceptor), storm water from back lot, and electrical service and transformer.
INSPECTION INSP
DATE
PASSED COMMENTS
Rough Plumbing GR 6/27/2023 See Notes
Rough Frame GR 6/26/2023 See Notes
Fire Resistive Wall
Assembly
JG 7/24/2023
Above Ceiling
Mechanical
JG 11/8/2023
Drywall JG 11/8/2023
Final Plumbing JG 11/8/2023
Final Building JG 11/16/2023
Final Public Works/CO JW 11/17/2023 See Notes
Final Fire/CO JJ 11/5/2023
Rough Gas GR 5/5/2023
Insulation JG 8/14/2023 See Notes
Rough Frame JG 7/24/2023 See Notes
Rough Mechanical
(Walk in cooler/freezer
pressure test insp.)
JG 8/14/2023
Final Building JG 11/27/2023 See Notes
INSPECTION INSP
DATE
PASSED COMMENTS
Rough Mechanical GR 5/5/2023
Gas Test JG 7/14/2023 See Notes
Firestopping JG 7/10/2023 See Notes
Gas Pressure Test JG 11/8/2023
Insulation GR 5/5/2023
Final Mechanical JG 11/8/2023
Final Fire GR 11/27/2023 See Notes
Final Planning/CO JG 11/27/2023 See Notes
Final Building/CO JG 11/16/2023
Rough Mechanical GR 6/26/2023 See Notes
Rough Plumbing JG 7/10/2023
Gas Pressure Test JG 11/8/2023
Final Sanitation/CO JD 10/16/2023
CONSTRUCTION TYPE:OCCUPANT LOAD:
Page 1 of 1
Fire Approval:Date:Engineering
Approval:Date:
PW Approval:Date:Other ( ):Date:
To request an inspection: