HomeMy WebLinkAboutAFFIDAVIT Beam Attachment Remodel 359 Big Boulder Dr 2022-09-16LAND SURVEYS
SUBDIVISIONS
DEVELOPMENT PLANNING
IMPROVEMENT PLATS
STRUCTURAL ENGINEERING
SANITARY ENGINEERING
MUNICIPAL ENGINEERING
VAN HORN ENGINEERING AND SURVEYING
DATE: September 16, 2022.
TO: Building Department.
'FROM: .Frank E. Roberts, P,E,
RE: Beam End Attachment
359 Big Boulder Drive
Estes Park, CO 80517
This memo is written to approve an alternate 'bearn end attachment
for the new beam which replaced the. wall between the kitchen/dining and
living room. The south end support condition is adequate with 3-2)(4:lack
studs and a king stud on each side of the beam, No straps are required as
the beam supports ceiling load only without uplift. The north end support
condition is adequate with 3-2x.4 jack studs and the addition of (6)
Simpson A23 angles attaching ceiling joists to the top of .the beam (2 at.
each rafter for the first 3 rafters at the end of the beam): The Simpson
A23 angles replace the need :for king studs, no straps are required at this
'location since the beam supports ceiling load only without uplift.
Sincerely,
titn /-35,-.e512L4-&-t-
Frank Roberts, RF_
1043 Fish Creek. Road • Estes Park„ Colorado 80517 • 970-586-9318 • ink4varihornengineirringicom