Loading...
HomeMy WebLinkAboutAFFIDAVIT Beam Attachment Remodel 359 Big Boulder Dr 2022-09-16LAND SURVEYS SUBDIVISIONS DEVELOPMENT PLANNING IMPROVEMENT PLATS STRUCTURAL ENGINEERING SANITARY ENGINEERING MUNICIPAL ENGINEERING VAN HORN ENGINEERING AND SURVEYING DATE: September 16, 2022. TO: Building Department. 'FROM: .Frank E. Roberts, P,E, RE: Beam End Attachment 359 Big Boulder Drive Estes Park, CO 80517 This memo is written to approve an alternate 'bearn end attachment for the new beam which replaced the. wall between the kitchen/dining and living room. The south end support condition is adequate with 3-2)(4:lack studs and a king stud on each side of the beam, No straps are required as the beam supports ceiling load only without uplift. The north end support condition is adequate with 3-2x.4 jack studs and the addition of (6) Simpson A23 angles attaching ceiling joists to the top of .the beam (2 at. each rafter for the first 3 rafters at the end of the beam): The Simpson A23 angles replace the need :for king studs, no straps are required at this 'location since the beam supports ceiling load only without uplift. Sincerely, titn /-35,-.e512L4-&-t- Frank Roberts, RF_ 1043 Fish Creek. Road • Estes Park„ Colorado 80517 • 970-586-9318 • ink4varihornengineirringicom