Loading...
HomeMy WebLinkAboutPLAN Pavillion 510 Moraine Ave 2023-04SHEET TITLE: 1 CLIENT: SHEET PROJECT TITLE: 11001-001 JOB NO.SHEET DATE: SCALE: APRIL 2023 AS SHOWN APPROVED BY:MST REVISION:BY: CHECKED BY: DRAWN BY: DESIGNED BY: DATE: MST JLR --- COFFEE ON THE ROCKS SITEPLAN PAVILION COFFEE ON THE ROCKS 2023 CORNERSTONE ENGINEERING & SURVEYING, INC. COPYRIGHT - ALL RIGHTS RESERVED 1692 BIG THOMPSON AVE. SUITE 200 ESTES PARK, CO 80517 PH: (970) 586-2458 FAX: (970) 586-2459 SITE STATISTICS: Utilities: Water Town of Estes Park Electric Town of Estes Park Sewer Upper Thompson Sanitation District Gas Excel Telephone Century Link AVERAGE SLOPE = ~4.0% ALLOWABLE MAXIMUM NET LOT COVERAGE (80%): GROSS/NET LAND AREA -73,616± SF 1.69± ACRES SITE LAND AREA COVERAGE STATISTICS COVERAGE % LOT (GROSS LAND AREA - 73,616± SF) EXISTING LOT COVERAGE Buildings 1273 sf 1.74% Parking/Drives 10651 sf 14.47% Walkways/ Patio 1250 sf 1.70% PROPOSED LOT COVERAGE Pavilion 900 sf 1.22% TOTAL IMPERVIOUS COVERAGE 25,500 sf 19.12% TOTAL OPEN SPACE 11,350 sf 80.88% SITE STATISTICS: THAT PORTION OF THE SOUTHWEST 1/4 OF SECTION 25, TOWNSHIP 5 NORTH, RANGE 73 WEST OF THE 6TH P.M., DESCRIBED AS FOLLOWS: BEGINNING AT A POINT FROM WHENCE THE SOUTHWEST CORNER OF THE NORTHEAST 1/4 OF THE SOUTHWEST 1/4 OF SAID SECTION 25 BEARS SOUTH 61°00' WEST 1007.8 FEET; THENCE NORTH 40°30' EAST 195.1 FEET; THENCE SOUTH 49°30' EAST 140 FEET, MORE OR LESS TO THE CENTER OF THE BIG THOMPSON RIVER; THENCE SOUTHWESTERLY ALONG CENTER OF SAID RIVER TO A POINT FROM WHICH THE POINT OF BEGINNING BEARS NORTH 29°47' WEST 380 FEET, MORE OR LESS TO THE POINT OF BEGINNING, COUNTY OF LARIMER, STATE OF COLORADO. LEGAL DESCRIPTION: CS & NC, LLC 510 MORAINE AVENUE ESTES PARK, CO 80517 PROPERTY OWNER: PROPERTY SIZE = 1.69 ACRES ZONING - COMMERCIAL OUTLYING (CO) HIGHWAY SETBACK = 25 FEET SIDE SETBACK (EAST) = 15 FEET SIDE SETBACK (WEST) = 25 FEET RIVER SETBACK = 30 FEET TABLE 4-5 [6] STATES; "SETBACK SHALL BE INCREASED TO 25 FEET IF THE LOT LINE ABUTS A RESIDENTIAL ZONING DISTRICT BOUNDARY" OWNER PROPOSES AN 8-FOOT SETBACK TO THE PROPERTY LINE. 40 SCALE 1" = 40' 0 40 80 120 LEGEND: SCALE 1" = 1000' VICINITY MAP MAP TAKEN FROM ESTES PARK DIGITAL MAPPING SITEPLAN COFFEE ON THE ROCKS PAVILION 510 MORAINE AVE. ESTES PARK, CO 80517 VARIANCE REQUEST: APPROVED 04/04/2023 4" CONCRETE SLAB 2 ' 2' 9'-4" 9'-4"9'-4" 9'-4" 17 ' - 4 " 9'-8" 9'-8"9'-73 4 " 9'-8 1 4" 1 8 ' 1 7 ' - 4 " 18 ' 2' 4' 47'-1" 8'-11 4" 167° 167° 154° 4" ( T Y P . ) 4" (TYP.) 1' TYPICAL PIER SEE DETAIL D-D' TYPICAL PIER SEE DETAIL D-D' D D' 18' 9' 10'-03 4" 11'-103 4" 12'-111 2" 2'X2' 1'-2" 2'X2' 1'-2" 4" CONCRETE SLAB 8X8 TIMBER COLUMNS 1-3/4" LVL. @ SUPPORT COLUMNS 19 32" OSB NAILED W/ 8d NAILS @ 4" O.C. EDGES AND 6" O.C. FIELD. 8X8 TIMBER COLUMNS STANDING SEAM METAL ROOFING W/ UNDERLAYMENT PER IRC SECTION 1507.4 3-1/8" X 13-1/2" GLULAM 2 12(2) 3 4" THRU BOLTS (2) 3 4" THRU BOLTS 3-1/8" X 13-1/2" GL. SIMPSON CB88 POST BASE 6' 8X8 TIMBER KNEE BRACE 8'-6" 3 4" THRU BOLTS W/ (2) 8" TIMBERLOK 18' 9' 10'-03 4" 11'-111 2" 12'-111 2" 2'X2' 1'-2" 2'X2' 1'-2" 4" CONCRETE SLAB 8X8 TIMBER COLUMNS 11-7/8" RFPI 40 @ 16" O.C. 19 32" OSB NAILED W/ 8d NAILS @ 4" O.C. EDGES AND 6" O.C. FIELD. 8X8 TIMBER COLUMNS STANDING SEAM METAL ROOFING W/ UNDERLAYMENT PER IRC SECTION 1507.4 3-1/8" X 13-1/2" GLULAM 2 12 SIMPSON ISU2.37/11.88 HANGER 3-1/8" X 13-1/2" GL. SIMPSON CB88 POST BASE D D' SIMPSON ISU2.37/11.88 HANGER -FOOTINGS- DESIGN OF FOOTINGS IS BASED ON A MAXIMUM ALLOWABLE BEARING PRESSURE OF 2,500 PSF ON THE EXISTING SUBGRADE, BELOW FROST DEPTH BASED ON DEAD LOAD PLUS LIVE LOAD. ALL FOOTINGS TO BE SET ON EXISTING SUBGRADE. REINFORCED CONCRETE: DESIGN IS BASED ON "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE"(ACI 318-14). CONCRETE WORK SHALL CONFORM TO "STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE" (ACI 301). STRUCTURAL CONCRETE SHALL HAVE THE FOLLOWING PROPERTIES: DETAILING, FABRICATIONS, AND PLACEMENT OF REINFORCING STEEL SHALL BE IN ACCORDANCE WITH THE MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES (ACI 315-80). WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185. REINFORCING BARS SHALL CONFORM TO ASTM A615, AND SHALL BE GRADE 60, EXCEPT TIES OR BARS SHOWN TO BE FIELD-BENT, WHICH SHALL BE GRADE 40. AT SPLICES, LAP BARS 50 DIAMETERS UNLESS NOTED OTHERWISE. AT CORNERS AND INTERSECTIONS, MAKE HORIZONTAL BARS CONTINUOUS OR PROVIDE MATCHING CORNER BARS. AROUND OPENINGS IN WALLS AND SLABS, PROVIDE 2-#5, EXTENDING 2'-0" BEYOND EDGE OF OPENING. IN CONTINUOUS MEMBERS, SPLICE TOP BARS AT MID-SPAN AND SPLICE BOTTOM BARS OVER SUPPORTS. PROVIDE INTERMITTENT SHEAR KEYS AT ALL CONSTRUCTION JOINTS AND ELSEWHERE AS SHOWN ON THE DRAWINGS. EXCEPT AS NOTED ON THE DRAWINGS, CONCRETE PROTECTION FOR REINFORCEMENT IN CAST-IN-PLACE CONCRETE SHALL BE AS FOLLOWS: A. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH B. EXPOSED TO EARTH OR WEATHER: #5 BAR, W31 OR D31 WIRE, AND SMALLER C. NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND: SLABS, WALLS, JOISTS:#11 BAR AND SMALLER BEAMS, COLUMNS: PRIMARY REINFORCEMENT STIRRUPS, TIES, SPIRALS ALL REINFORCING STEEL IS TO BE TIED IN PLACE PRIOR TO PLACING CONCRETE. NO WET SET OF REINFORCING STEEL WILL BE PERMITTED. ANCHOR BOLTS AND RODS FOR BEAM AND COLUMN-BEARING PLATES SHALL BE PLACED WITH SETTING TEMPLATES. A REPRESENTATIVE OF THE GEOTECHNICAL ENGINEER SHOULD OBSERVE THE FOUNDATION EXCAVATION PRIOR TO FOUNDATION CONSTRUCTION. CONTROL JOINTS ARE RECOMMENDED @ 10" O.C. IN EACH DIRECTION AND HAVE A MINIMUM DEPTH OF 1". AREAS BELOW SLABS SHALL BE SCARIFIED, MOISTENED AND RECOMPACTED TO 95% STANDARD PROCTOR. Intended Use f'c, psi 28day Ratio W/C Aggregate Maximum inches Slump Percent Entrained Air Type Cement Comments Admixtures, I/II2-4%63/4" Stone3,000Footings .5 3/4" StoneWalls4,500 .45 6%4 I/II 3/4" StoneExt slab on grade 4,500 .45 6%4 I/II 3/4" StoneInt slab on grade 3,500 .5 2-4%4 I/II Fibermesh 3" 1-1/2" 3/4" 1-1/2" 1-1/2" FOUNDATION DESIGN 1.CONSTRUCTION TO COMPLY WITH 2015 IBC (TYP) 2.ALL FRAMING LUMBER TO BE #2 HEM FIR OR BETTER 3.ALL STRUCTURAL SHEATHING SHALL CONFORM TO U.S. PRODUCT STANDARDS, AND SHALL BE IDENTIFIED WITH AN APA GRADE MARK 4.ALL BOLT HOLES TO BE 1/32" LARGER THAN THE BOLT DIAMETER 5.NO CHECKS OR SPLITS ALLOWED AT AREAS TO BE BOLTED 6.THE FRAMING HARDWARE SHOWN ARE BY "SIMPSON-STRONG TIE COMPANY", ANY SUBSTITUTIONS TO BE APPROVED BY THE ENGINEER AND BE I.C.B.O APPROVED 7.ALL SIMPSON HARDWARE (OR APPROVED SUBSTITUTION) TO BE INSTALLED PER MANUFACTURES RECOMMENDATION. 8.ALL ENGINEERED LUMBER TO BE INSTALLED PER MANUFACTURES RECOMMENDATION. 9.SHEATHING TO BE 19 23 OSB NAILED W/ 8d NAILS @ 4" O.C. EDGE AND 6" O.C. FIELD FRAMING NOTES: INTERNATIONAL BUILDING CODE: IBC 2015 EDITION ROOFS GROUND SNOW, Pg (INTERPOLATED)67 psf ELEVATION (7600) FLAT ROOF SNOW, Pf 56 psf SNOW EXPOSURE FACTOR, Ce 1.0 SNOW IMPORTANCE FACTOR, Ci 1.0 SNOW THERMAL FACTOR, Ct 1.2 LATERAL WIND 3-SECOND GUST VELOCITY 175 MPH IMPORTANCE FACTOR 1.0 SEISMIC SOILS SITE CLASS B MAPPED SPECTRAL RESPONSE ACCELERATIONS Ss 22.5 S1 7.0 DESIGN LOADS: 20'19'-101 4" 18' 10' 47'-2" 18' 154° 4'-13 4"4'-11 2" 11-7/8" RFPI JOIST @ 16" OC. 11-7/8" RFPI JOIST @ 16" OC. 11-7/8" RFPI JOIST @ 16" OC. 11-7/8" RFPI JOIST @ 16" OC. A A' A A' A A' B B' B B' B B' B B' 1 1 - 7 / 8 " X 1 - 3 / 4 " L V L 1 1 - 7 / 8 " X 1 - 3 / 4 " L V L 1 1 - 7 / 8 " X 1 - 3 / 4 " L V L 11 - 7 / 8 " X 1 - 3 / 4 " L V L 11 - 7 / 8 " X 1 - 3 / 4 " L V L 11 - 7 / 8 " X 1 - 3 / 4 " L V L SIMPSON ISU2.37/11.88 HANGER EACH END SIMPSON ISU2.37/11.88 HANGER EACH END LSSR2.37Z HANGER C C' C C' 1'-2" (2) 3 4" THRU BOLTS (2) 3 4" THRU BOLTS 8"X8" TIMBER COLUMN 8"X8" KNEE BRACE 3-1/8" X 13-1/2" GLULAM (2) THRU BOLTS W/ (2) 8" TIMBERLOK EACH SIDE 14" Ø CAISSION 2" 3" (2) #4 HOOPS LOCATED IN TOP 5" (TYP) SIMPSON CB88 POST BASE 8X8 TIMBER COLUMN 2'-6" 10" 2'X2' (4) #4 VERT. W/ 6" FOOT (3) #4 HORZ. EACH WAY DATE SCALE APPROVED BY AS SHOWN DRAWN BY CHECKED BY DESIGNED BY PROJECT TITLE: 2023 CORNERSTONE ENGINEERING & SURVEYING, INC. COPYRIGHT - ALL RIGHTS RESERVED 1692 BIG THOMPSON AVE. SUITE 200 ESTES PARK, CO 80517 PH: (970) 586-2458 R Know what's below. Call before you dig. CALL 3-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. SHEET TITLE: BY:REVISION:DATE: CLIENT: SHEET 2 SHEET 11001.001 JOB NO. DATE SCALE APPROVED BY AS SHOWN APRIL 2023 MST DRAWN BY CHECKED BY DESIGNED BY PROJECT TITLE: COFFEE ON THE ROCKS 510 MORAINE AVE. ESTES PARK, COLORADO PAVILION FRAMING AND FOUNDATION COFFEE ON THE ROCKS FOUNDATION PLAN SCALE 1/4"=1' MST JLR MST ROOF PLAN SCALE 1/4"=1' OCCUPANCY GROUP: A-2 ASSEMBLY TYPE V-B BUILDING               0HR ROOF               >10' DISTANCE TO PROPERTY, NO RATINGS REQUIRED SIZE: 790 SF OCCUPANT LOAD: 53 (@ 15SF /PERSON TABLES + CHAIRS, TYPICAL)                             2 EXITS REQUIRED (MIN 82' APART - ½ DIAGONAL) RESTROOM FACILITIES: GUEST + PUBLIC (INCL ACCESSIBLE) RESTROOMS PROVIDED WITHIN EXISTING STRUCTURE ON-SITE 18"X6' ROCK GABIAN BASKET, FREE STANDING 12'-111 2" 2 12 18"X6' ROCK GABIAN BASKET, FREE STANDING 6' 12'-111 2" 2 12 18"X6' ROCK GABIAN BASKET, FREE STANDING 6' DATE SCALE APPROVED BY AS SHOWNMST DRAWN BY CHECKED BY DESIGNED BY PROJECT TITLE: 2023 CORNERSTONE ENGINEERING & SURVEYING, INC. COPYRIGHT - ALL RIGHTS RESERVED 1692 BIG THOMPSON AVE. SUITE 200 ESTES PARK, CO 80517 PH: (970) 586-2458 R Know what's below. Call before you dig. CALL 3-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. SHEET TITLE: BY:REVISION:DATE: CLIENT: SHEET 2 SHEET 21001.001 JOB NO.MST DATE SCALE APPROVED BY AS SHOWN APRIL 2023 MST MSTDRAWN BY CHECKED BY DESIGNED BY PROJECT TITLE: COFFEE ON THE ROCKS 2015 IBC CODE STUDY COFFEE ON THE ROCKS 510 MORAINE AVE. ESTES PARK, COLORADO PAVILION ELEVATIONS COFFEE ON THE ROCKS