HomeMy WebLinkAboutPLANS 23-363 1020 Pine Ln, remodel 2023-07-17A-1
REVISION TABLE
NUMBER
DATE
REVISED BY
DESCRIPTION
SHEET:
SCALE:
DATE:
7/14/2023
Sorenson Residence
1020 Pine Ln
Estes Park, CO 80517
COLLEEN LOGAN
DRAWINGS PROVIDED BY:
WESTOVER CONSTRUCTION
1789 WILDFIRE RD.
ESTES PARK, CO 80517
Area Calculations:
-Main Level Remodel: 395 sqft
-Basement Level Remodel: 87 sqft
Total Remodel sqft: 482 sqft
-This home has had asbestos testing and mitigation in remodel areas
-This home requires no structural changes
General Project Scope: Home remodel
-Main Level: Removing existing bedroom & 3/4 bath to make master bedroom
and main level bathroom bigger. Laundry will be relocated from lower level to
main level in new master bedroom closet
-Lower level: Adding new 3/4 bathroom
Utilities:
-City water
-City Sewer
General Construction Notes
Siding Specifications:
-Siding to match existing in window patch areas
Exhaust Specifications:
-All bathrooms and water closets to have exhaust fans terminating to the exterior
-Dryer ducts to comply with M1502
-Ducts terminate at least 3' of openings
Insulation Specifications:
-Insulation to be provided around all bathrooms and bedrooms
Smoke Alarm and Co Specifications:
-Smoke alarms are required in all bedrooms and immediately outside of each bedroom,
they are to be hardwired this holds true throughout the structure
-CO detectors are required outside of every bedroom
Home of April & Russ Sorenson
Home Remodel
1020 Pine Lane
Estes Park, CO. 80517
General Contractor
Westover Construction
1789 Wildfire Rd.
Estes Park, CO 80517
970 586 9342
Designers:
Detailing + Construction Document
Assembly:
Colleen Logan
colleen@westoverconstruction.com
COVER PAGE &
GENERAL PROJECT
INFORMATION
Varies
Sheet Index:
A1 -COVER PAGE & GENERAL PROJECT
INFORMATION
A2 -MAIN LEVEL EXISTING, DEMOLITION PLAN &
PROPOSED
FLOOR PLAN
A3 -LOWER LEVEL EXISTING & PROPOSED PLAN
A4-RENDERINGS
APPROVED by SAFEbuilt;
2015 International Codes
Subject to inspection and compliance to all
Relevant, adopted Building & Municipal
Codes
07/27/2023
This structure must comply
with the requirements of the
2020 National Electrical Code
Issuance of a permit or approval of these construction
documents shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions
of the adopted codes or of other ordinances of this jurisdiction.
A permit presuming to give authority to violate or cancel the
provisions of these codes shall be invalid. R105.4
Approved
by
SAFEbuilt
07/27/2023
2:00:03 PM
SB27
SB3221
SB27
SB3221
31026DC
31026DC
3426DC31026DC
31026DC 2826DC
2068
2368
2568
26682668
4768 2668 2068
4168
4068
31026DC
31026DC
3426DC31026DC
31026DC 2826DC
2068
2368
2568
2668
4168
4068
2068
2668
4768 2668
5'-4 3/4"
31026DC
C02C02
C01C01
C01C01
C02C02
C01C01
C01C01 C04C04
C03C03
W01W01
W01W01
D01D01
D02D02
2668
D03D03
5110WN
RR
R R
R
R
10'-5"
5'-2"
15'-4 1/2"
5'
5'-1 7/8"11'-4"
12'-11 1/2"
8'-10"CL
5'-7 1/2"
3'-9"
4'-1 1/2"
3'
CL
2'-2"
CL
5'-7 1/2"
CL
8'-6 1/2"
CL
CL
9'-2 1/2"
CL
3'-1"
CL5'-2 1/2"
2'-9"
Double hung shelf and rod
Double hung shelf and rod
Double hung shelf and rod
Double hung shelf and rod
Double hung shelf and rod
Double hung shelf and rod
Single hung shelf and rod
CL
3'-1"
5110WN
R
3'-9"
CL
2'-2"
5'-7 1/2"
2'-9"
42"Washer Dryer
C02C02 C01C01C01C01
C04C04C03C03
C02C02 C01C01C01C01
C04C04C03C03
18"
12"52"
12"
A-2
REVISION TABLE
NUMBER
DATE
REVISED BY
DESCRIPTION
SHEET:
SCALE:
DATE:
7/14/2023
Sorenson Residence
1020 Pine Ln
Estes Park, CO 80517
COLLEEN LOGAN
DRAWINGS PROVIDED BY:
WESTOVER CONSTRUCTION
1789 WILDFIRE RD.
ESTES PARK, CO 80517
MAIN LEVEL EXISTING,
DEMOLITION PLAN &
PROPOSED
FLOOR PLAN
Designer Notes:
*All new drywall in locations it was
removed.
*all new paint TBD in redesigned areas
*All new trim and base to be matched to
the existing home
Proposed Master Bedroom:
-Two new windows to be framed in & installed
in non load bearing wall
-Patch in wood floor where needed
-New baseboard heating TBD in field
-New light fixtures and layout TBD
Proposed Bathroom
-New tile flooring
-New electric heat mat below tile flooring
-New poured shower pan with tile floor and
walls
-New bath vanity
-Existing baseboard heating assessed and
resigned if needed
-New plumbing fixtures: toilet, sink & shower
faucet
-New light fixtures and layout TBD
-New wall hardware
Proposed Laundry closet
-Patch in wood floor where needed
-New door to closet
-Move Washer and Dryer up from basement to
this new location
-new quartz shelf over washer and dryer for
folding clothing
-New baseboard heat under window
-New closet shelving and rods
Proposed closet
-Patch in wood floor where needed
-New door to closet
-New baseboard heat under window
-New closet shelving and rods
Varies
Existing Master Bedroom
Existing 3/4
Bathroom
Existing Kitchen
Location
Existing Chase
Existing Full Bathroom
Existing Bedroom 2Existing Bedroom 1
Existing hot water
baseboard heating
Existing hot water
baseboard heating
= wall to be removed
= hatch cloud indicates removal of door or window
-All existing wood floors to be protected and saved
*all sink and shower faucets, light fixtures and wall hardware to be saved
and reused for new bathroom in basement
Exiting Master Bedroom Demo:
-All baseboard heating to be capped off and removed (to be relocated)
-Remove windows and doors indicated
-Remove all lighting (to be replaced)
Exiting 3/4 Bathroom:
-All baseboard heating to be capped off and removed (to be relocated)
-All plumbing fixtures and cabinets to be removed and disposed
-All mirrors, hardware etc. removed and Saved for basement bath
-Existing shower to be discontinued
-Remove windows and doors indicated
Exiting Full Bathroom:
-All baseboard heating to be capped off
-Cabinets to be removed and disposed of.
-All lighting, hardware mirrors to be removed and SAVED for basement
bath
Exiting Bedroom
-All baseboard heating to be capped off and removed (to be relocated)
-Remove windows and doors indicated
-Remove all lighting (to be replaced)
MAIN LEVEL DEMOLITION PLAN
Scale: 1/4" = 1'
2
A2
2
A2
MAIN LEVEL EXISTING FLOOR PLAN
Scale: 1/4" = 1'
1
A2
1
A2
Master Bedroom
-Patch in wood floor as
needed
-Wall texture to match
existing
Closet/Laundry
Room
-Patch in wood
floor as needed
-Wall texture to
match existing
Existing Bedroom 2
SAVE DOORS
remove and put in safe place
Saved doors
to be installed
here
New doorway framed
New 3/4 master
bathroom
-Tile floor with
electric heat mat
-Wall texture to
match existing
New elongated
comfort height toilet
& vent fan with light
Framed bench with
quartz on the top and
(waterfall) quartz front
New 2x4 wall framed in
front of existing exterior
wall to house new wall to
wall niche with recessed
LED strip light. See 3.2-A2
See 3.1-A2 for
more detail
Poured shower
pan w/ quartz
capped curb
Framless shower glass
over 42" tall pony wall
with a quartz wall cap
New vanity to be
provided by artisan
W
D
Clothes folding quartz
shelf
height TBD based off of
washer and dryer heights
3.4
A2
3.4
A2
New hot water
baseboard heater
location
New hot water
baseboard heater
location
MAIN LEVEL PROPOSED FLOOR PLAN
Scale: 1/4" = 1'
3
A2
3
A2
NEW SHOWER PLAN
Scale: 1/2" = 1'
3.1
A2
3.1
A2
LAUNDRY ROOM ELEVATION
Scale: 1/2" = 1'
3.4
A4
3.4
A4
New 2x6 framed walls for washer/
dryer plumbing and vents & shower
plumbing
Bench
Niche
Waterproofed recessed
LED strip light at the top
of niche
SHOWER ELEVATION W/ NICHE
Scale: 1/2" = 1'
3.2
A2
3.2
A2
BATHROOM VANITY
Scale: 1/2" = 1'
3.3
A2
3.3
A2
Quartz
countertop & 4"
B.S.
Sconce lights
hang off
cabinet
Closet
-Patch in wood
floor as needed
-Wall texture to
match existing
3.2
A2
3.2
A2
3.3
A2
3.3
A2
General Notes:
-Min (1) emergency escape and rescue opening req’d per
bedroom
-Glazing to be tempered per R308
-Min (1) programmable thermostat req’d
-Smoke alarm req’d in each sleeping room
-Smoke/CO alarm req’d w/in 15’ vicinity of bedroom exterior.
-Fireblock/Draftstop all chases and penetrations
FAN
Toilets & Lavatories shall be provided with a
min. of 21 inches in front each fixture
- each side of Toilets shall have 15 inches from
the center line of the toilet and any sidewall or
other obstructions.
2015 IECC
-75% OF LAMPS SHALL BE HIGH EFFICIENCY
-ALL DUCT WORK LOCATED OUTSIDE THE THERMAL
ENVELOPE SHALL BE TESTED FOR LEAKAGE
Approved
by
SAFEbuilt
07/27/2023
2:00:03 PM
BCB74
BCB127
BCB74
BCB127
WH
2718LS
2668
2668
2636RS
4968
2668
C03C03C01C01
BCB74
BCB127
C02C02C03C03C01C01
BCB74
BCB127
C02C02
WH
3068
D05D05 D04D04
D06D06
R
R
10'-3"
3'-10"10'-6"
3'-1"
2'-1"
14'-11"
5'
CL
4'-7"
WH
2718LS
2718LS 2718LS
2668
2668
2718RS
2718RS
4968
2668
31026DC
C01C01 C03C03 C02C02C01C01C03C03C02C02
DOOR SCHEDULE
NUMBER LABEL ROOM NAME QTY SIZE DESCRIPTION FIRE
D01 3068 MASTER BEDROOM/MASTER CLOSET & LAUNDRY ROOM 1 3068 L/R IN DOUBLE HINGED-DOOR P04
D02 3068 MASTER BEDROOM/MASTER CLOSET 1 3068 L/R IN DOUBLE HINGED-DOOR P04
D03 2468 MAIN FLOOR BATHROOM /MASTER BEDROOM 1 2468 L POCKET-DOOR P04
D04 2468 LOWER LEVEL 3/4 BATHROOM/HALLWAY 1 2468 R IN HINGED-DOOR P04
D05 2068 LINEN CLOSET /HALLWAY 1 2068 L IN HINGED-DOOR P04
D06 3068 MECHNICAL ROOM/HALLWAY 1 3068 L IN HINGED-DOOR P04 YES
WINDOW SCHEDULE
NUMBER LABEL ROOM NAME QTY SIZE TOP DESCRIPTION EGRESS
W01 2640DC MASTER BEDROOM 2 2640DC 80"DOUBLE CASEMENT-LHL/RHR YES
A-3
REVISION TABLE
NUMBER
DATE
REVISED BY
DESCRIPTION
SHEET:
SCALE:
DATE:
7/14/2023
Sorenson Residence
1020 Pine Ln
Estes Park, CO 80517
COLLEEN LOGAN
DRAWINGS PROVIDED BY:
WESTOVER CONSTRUCTION
1789 WILDFIRE RD.
ESTES PARK, CO 80517
Varies
LOWER LEVEL EXISTING
& PROPOSED PLAN
= hatch cloud indicates removal of door or window
-All existing flooring to be protected during construction
Mechanical Room & future 3/4 bathroom
-Remove door and door jamb
Area where existing
plumbing from above runs
below floor joists
Existing sewer pit location
Existing boiler and hot water heater locations (these
remain as is)
Existing utility sink (remain as is)
Washer and
dryer locations
Existing Drain that leads to daylight
Washer
dryer to be
removed and
relocated up
to main level
in proposed
closet
Remove door and jam, see proposed plan for sizing
Existing Mechanical Room & Laundry Room
Existing Lower
Room Existing Lower
Media Room
Utility Sink
remains as is
This existing basin will become the
new sewer injection basin. It will
be determined in field if the size
will accommodate the new 3/4
bath sewer. The existing basin may
need to become larger and deeper
TBD.
This existing slab will need to be
jack hammered up to reach the
side of the sewer injection basin.
Jack hammering locations TBD in
field
Discontinue existing pipe in floor that drains to daylight
Prefabricated shower pan,
surround and glass
New Vanity w/ qaurtz top
LOWER LEVEL DEMOLITION PLAN
Scale: 1/4" = 1'
2
A3
2
A3
LOWER LEVEL EXISTING FLOOR PLAN
Scale: 1/4" = 1'
1
A3
1
A3
LOWER LEVEL PROPOSED FLOOR PLAN
Scale: 1/4" = 1'
3
A3
3
A3
Plumbing chase, drywall wrapped
New hot water baseboard
heater or electric baseboard
heater, TBD in field
New linen closet
with paint grade
shelving TBD
Existing Lower
Room
Mechanical Room &
Storage
New Basement
bathroom
-Match existing LVT
flooring
-Wall texture to
match existing
New Basement
hallway
-Match existing LVT
flooring
-Wall texture to
match existing
Designer Notes:
*All new drywall in locations needed
*all new paint TBD in redesigned areas
*All new trim and base to be matched to
the existing home
Proposed Basement Bathroom:
-Jackhammer up slab to install a new sewer
injection basin
-New LVT flooring
-New baseboard heating TBD in field
-Shower faucet, light sconce, mirror, sink
faucet & wall hardware to be reused in this
bathroom from the previous upper bathroom
-New toilet
-New prefab shower unit & prefab glass
-New vanity
Proposed Hallway and Linen Closet
-New LVT flooring
-New doors as indicated
-New shelving in linen closet
-New lighting, TBD in field
Soffit for plumbing
Existing 4 light
sconce to go here
Existing mirror from
upper bathroom to
be installed here
Facet from upper
bath to be
installed here
New toilet
Existing shower
faucet from upper
bathrooms to be
installed here
New prefab shower unit
NEW SHOWER PLAN
Scale: 1/2" = 1'
3.1
A3
3.1
A3
3.1
A2
3.1
A2
New 3' wide
opening
New 20 min fire
rated door
General Notes:
-All rooms to be AFCI except bath, utility and unfinished rooms
-Bath, utility and unfinished rooms to be GFCI
-Backwater valves to remain accessible
-Back flow protect all below grade fixtures
-1/2” dry wall req’d for enclosed usable space under stairs
-Smoke alarms req’d in each sleeping room
-Smoke/CO alarms req’d w/in 15’vicinity of bedroom exteriors
-Min 1 emergency escape and rescue opening req’d per bedroom
Toilets & Lavatories shall be
provided with a min. of 21
inches in front each fixture
- each side of Toilets shall
have 15 inches from the
center line of the toilet and
any sidewall or other
obstructions.
FAN
2015 IECC
-75% OF LAMPS SHALL BE HIGH EFFICIENCY
-ALL DUCT WORK LOCATED OUTSIDE THE THERMAL
ENVELOPE SHALL BE TESTED FOR LEAKAGE
Approved
by
SAFEbuilt
07/27/2023
1:59:58 PM
A-4
REVISION TABLE
NUMBER
DATE
REVISED BY
DESCRIPTION
SHEET:
SCALE:
DATE:
7/14/2023
Sorenson Residence
1020 Pine Ln
Estes Park, CO 80517
COLLEEN LOGAN
DRAWINGS PROVIDED BY:
WESTOVER CONSTRUCTION
1789 WILDFIRE RD.
ESTES PARK, CO 80517
Varies
MASTER BATH
MASTER BEDROOM
MASTER BEDROOM
BASEMENT BATHROOM
RENDERINGS
Approved
by
SAFEbuilt
07/27/2023
2:00:03 PM