Memo
To: Floodplain Development Permit No. FP-002-22
From: Jennifer Waters, EIT, CFM
Floodplain Administrator
Cc: Matthew Khachaturian, P.E.
Sky Pond Engineering
Re: 300 E. Elkhorn Ave
Date: 3/18/2022
This memo shall serve as a supplement for the Floodplain Development Permit (FDP) to be issued in
accordance with the requirements in Estes Park Municipal Code Chapter 18.04 – Floodplain Regulations.
The proposed FDP application (stamped 3/12/22) was prepared by the applicant, Matthew Khachaturian,
P.E. The decorative structural steel work on the site in the floodway has been approved under building permit
22-EP-00075.
Floodplain Analysis
1) All of the applicant’s proposed site improvements occur within the Big Thompson River Special Flood
Hazard Area (SFHA) established using 2D hydraulic modeling. The CHAMP boundary, more restrictive than
the effective 2006 FEMA boundary, triggers the Town’s floodplain permit requirement.
2) The proposed exterior improvements meet the definition of “development” in Section 18.04.020 of the
floodplain regulations.
3) The proposed work does not meet the definition of “substantial improvement.” Therefore, the applicant is
not required to elevate or floodproof the building. If substantial improvements are proposed in the future,
floodproofing or elevation may be required.
4) The proposed work consists of a new decorative structural steel arcade along the front entrance to the
building. Calculations provided by the applicant indicate that steel material added to the floodway up to a
depth of 2’ is approximately 3640 cubic inches (approximately 2.12 CF). This volume is the equivalent of a
sphere with a diameter of about 1.6 feet.
5) The proposed site work in the SFHA is comparable to landscape improvements which do not trigger
further regulatory compliance other than approval of a Floodplain Development Permit.