HomeMy WebLinkAboutINSPECTION New Mulit-Family Building 1041 S Saint Vrain D 2024-08-12INSPECTION CARD
Estes Park
170 MacGregor Ave Suite 230, Estes Park, CO 80517
POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE
AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE.
APPLICATION NO.:22-EP-00432 TYPE:
New Multi-Family
Building ISSUED DATE:02/16/2023 EXPIRATION DATE:02/08/2025
PROJECT ADDRESS:1041 S St. Vrain Ave. (Building D), Estes Park, CO 80517 PARCEL NO.:
OWNER:Rural Coz Estes Park St Vrain LLC CONTRACTOR:Dohn Construction Inc CONTRACTOR PHONE:(970) 490-1855
DESCRIPTION OF WORK:
New construction of 23,660 SF, 23 unit wood framed apartment building. This building includes amenity space on the first floor.
This is for Building D.
INSPECTION INSP
DATE
PASSED COMMENTS
Setbacks JG 7/25/2024
Foundation GR 6/27/2023 See Notes
Rough Plumbing JG 10/20/2023
Rough Frame GR 10/9/2023
Fire Resistive Wall
Assembly
JG 4/3/2024
Above Ceiling
Mechanical
JG 12/15/2023 See Notes
Insulation JG 10/31/2023 See Notes
Final Mechanical JG 7/1/2024
Final Building JG 8/12/2024
Final Public Works/CO JW 7/10/2024
Final Water/CO JL 7/22/2024
Final Sanitation/CO TD 8/6/2024
Final Building/CO JG 8/12/2024
Stucco/Stone Lathing JG 10/20/2023
Rough Frame (2ND
FLOOR FRAMING
INSPECTION)
JG 4/3/2024
Firestopping JG 10/27/2023 See Notes
Draftstop Inspection JG 4/25/2024
Foundation (Car port)GR 6/6/2024
INSPECTION INSP
DATE
PASSED COMMENTS
Footings JG 5/22/2023 See Notes
Underground Plumbing JG 6/20/2023 See Notes
Rough Mechanical JG 4/3/2024
Wall Sheathing JG 8/30/2023 See Notes
Firestopping JG 4/3/2024
Drywall JG 11/29/2023
Final Plumbing JG 7/1/2024
Energy Code
Compliance
JG 7/25/2024
Final Fire SS 8/9/2024
Final Planning/CO LB 7/23/2024 See Notes
Final P&C/CO JL 7/23/2024
Final Fire/CO SS 8/9/2024
Final/CO JG 8/12/2024
Window/Door Flashing JG 10/2/2023 See Notes
Rough Frame (WALL
FRAMING AND
TRUSSES AT
BUILDING D)
JG 4/3/2024
Wall Sheathing JG 10/31/2023
Rebar (Monument
Sign)
GR 6/6/2024
CONSTRUCTION TYPE:VA OCCUPANT LOAD:
Page 1 of 1
Fire Approval:Date:Engineering
Approval:Date:
PW Approval:Date:Other ( ):Date:
To request an inspection: