Loading...
HomeMy WebLinkAboutINSPECTION New Mulit-Family Building 1041 S Saint Vrain D 2024-08-12INSPECTION CARD Estes Park 170 MacGregor Ave Suite 230, Estes Park, CO 80517 POST THIS CARD IN A SAFE CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE. APPLICATION NO.:22-EP-00432 TYPE: New Multi-Family Building ISSUED DATE:02/16/2023 EXPIRATION DATE:02/08/2025 PROJECT ADDRESS:1041 S St. Vrain Ave. (Building D), Estes Park, CO 80517 PARCEL NO.: OWNER:Rural Coz Estes Park St Vrain LLC CONTRACTOR:Dohn Construction Inc CONTRACTOR PHONE:(970) 490-1855 DESCRIPTION OF WORK: New construction of 23,660 SF, 23 unit wood framed apartment building. This building includes amenity space on the first floor. This is for Building D. INSPECTION INSP DATE PASSED COMMENTS Setbacks JG 7/25/2024 Foundation GR 6/27/2023 See Notes Rough Plumbing JG 10/20/2023 Rough Frame GR 10/9/2023 Fire Resistive Wall Assembly JG 4/3/2024 Above Ceiling Mechanical JG 12/15/2023 See Notes Insulation JG 10/31/2023 See Notes Final Mechanical JG 7/1/2024 Final Building JG 8/12/2024 Final Public Works/CO JW 7/10/2024 Final Water/CO JL 7/22/2024 Final Sanitation/CO TD 8/6/2024 Final Building/CO JG 8/12/2024 Stucco/Stone Lathing JG 10/20/2023 Rough Frame (2ND FLOOR FRAMING INSPECTION) JG 4/3/2024 Firestopping JG 10/27/2023 See Notes Draftstop Inspection JG 4/25/2024 Foundation (Car port)GR 6/6/2024 INSPECTION INSP DATE PASSED COMMENTS Footings JG 5/22/2023 See Notes Underground Plumbing JG 6/20/2023 See Notes Rough Mechanical JG 4/3/2024 Wall Sheathing JG 8/30/2023 See Notes Firestopping JG 4/3/2024 Drywall JG 11/29/2023 Final Plumbing JG 7/1/2024 Energy Code Compliance JG 7/25/2024 Final Fire SS 8/9/2024 Final Planning/CO LB 7/23/2024 See Notes Final P&C/CO JL 7/23/2024 Final Fire/CO SS 8/9/2024 Final/CO JG 8/12/2024 Window/Door Flashing JG 10/2/2023 See Notes Rough Frame (WALL FRAMING AND TRUSSES AT BUILDING D) JG 4/3/2024 Wall Sheathing JG 10/31/2023 Rebar (Monument Sign) GR 6/6/2024 CONSTRUCTION TYPE:VA OCCUPANT LOAD: Page 1 of 1 Fire Approval:Date:Engineering Approval:Date: PW Approval:Date:Other ( ):Date: To request an inspection: