Loading...
HomeMy WebLinkAboutPLANS Remodel 880 Heinz Parkway 2023-02-012023-Jan-30 08:51:53 Rig ht-Su ite® U niv er sal 20 22 22 .0.01 RSU1 5461 Page 1 ...Bell Residence Addition - Estes - Manual JS.rup Calc = MJ8 Front Door faces: E 800 Heinz ParkwayJob:Manual S Compliance Report January 30, 2023Date:Entire House VORtech Services, LLCBy: 12.07.2022Plan:Metal Mechanics Inc. 165 S. Madison Ave., Loveland, CO 80537 Phone: 970.203.9954 Project Information Bell ResidenceFor: 800 Heinz Parkway, Estes Park, CO 80517 Cooling Equipment Design Conditions °F75.0Entering coil DB:Btuh9072Sensible gain:°F84.0Outdoor design DB: °F54.5Entering coil WB:Btuh492Latent gain:°F62.0Outdoor design WB: Btuh9564Total gain:°F75.0Indoor design DB: cfm600Estimated airflow:%30Indoor RH: Manufacturer's Performance Data at Actual Design Conditions Split ASHPEquipment type: 2MXL18QMVJUModel:DaikinManufacturer: cfm600Actual airflow: % of load125Btuh11340Sensible capacity: % of load988Btuh4860Latent capacity: %70SHR:% of load169Btuh16200Total capacity: Heating Equipment Design Conditions °F71.6Entering coil DB:Btuh20692Heat loss:°F-10Outdoor design DB: °F72.0Indoor design DB: Manufacturer's Performance Data at Actual Design Conditions Split ASHPEquipment type: 2MXL18QMVJUModel:DaikinManufacturer: cfm600Actual airflow: °F14Capacity balance:% of load57Btuh11700Output capacity: °F-99Economic balance:Btuh8992Supplemental heat required: Elec baseboardBackup equipment type: Model:Manufacturer: cfm600Actual airflow: °F0Temp. rise:% of load100Btuh20692Output capacity: Meets all requirements of ACCA Manual S. Approved by SAFEbuilt 02/13/2023 3:37:26 PM Rig ht-Su ite® U niv er sal 20 22 22 .0.01 RSU1 5461 Form RPER 1 15 Mar 09 Residential Plans Examiner Review Form for HVAC System Design (Loads, Equipment, Ducts) Estes Park Header Information Contractor:ATTACHEDREQUIRED ATTACHMENTSMetal Mechanics Inc. NoYesManual J1 Form (and supporting worksheets): Mechanical license:NoYesor MJ1AE Form* (and supporting worksheets): NoYesOEM performance data (heating, cooling, blower): Building plan #:12.07.2022 NoYesManual D Friction Rate Worksheet: NoYesDuct distribution sketch: Home address (Street or Lot#, Block, Subdivision):800 Heinz Parkway, Entire House HVAC LOAD CALCULATION (IRC M1401.3) Design Conditions Building Construction Information Front Door faces EastBuildingWinter Design Conditions North, East, West, South, Northeast, Northwest, Southeast, SouthwestOrientation:°F-10Outdoor temperature: °F72Indoor temperature: 0Number of bedrooms:Btuh20692Total heat loss: f t²794Conditioned floor area: 0Number of occupants:Summer Design Conditions °F84Outdoor temperature: Windows°F75Indoor temperature: ft0Eave overhang depth:% RH30gr/lb @24Grains difference: Blinds, drapes, etc. noneInternal shade:Btuh10194Sensible heat gain: Btuh553Latent heat gain: 0Number of skylights:Btuh10746Total heat gain: HVAC EQUIPMENT SELECTION (IRC M1401.3) Heating Equipment Data Blower DataCooling Equipment Data 600Heating cfm:Air Conditioner, Heat pump, etc.Split ASHPEquipment type:Furnace, Heat pump, Boiler, etc.Split ASHPEquipment type: 600Cooling cfm: Fan's rated external static pressure for design airflow in H2O0.80Static pressure:DaikinModel:DaikinModel: 2MXL18QMVJU 2MXL18QMVJU+ Btuh16200Total cooling capacity:Heat pumps - capacity at winter design outdoor conditionsBtuh11700Heating output capacity: Btuh11340Sensible cooling capacity: Btuh4860Latent cooling capacity:Btuh20692Aux. heating output capacity: HVAC DUCT DISTRIBUTION SYSTEM DESIGN (IRC M1601.1) Duct Materials Usedft0Longest supply duct:cfm600Design airflow: Trunk duct:ft0Longest return duct:in H2O0.80Equipment design ESP: ft0Total effective length (TEL):in H2O-0.3Total device pressure losses: Sheet metalBranch duct:Friction R ate = ASP ÷ (T EL x 100)in/100ft0Friction rate:in H2O0.49Available static pressure (ASP): I declare the load calculation, equipment, equipment selection and duct design were rigorously performed based on the building plan listed above. I understand the claims made on these forms will be subject to review and verification. Contractor's printed name: Contractor's signature:Date: Reserved for County, Town Municipality or Authority having jurisdiction use. *Home qualifies for MJ1AE Form based on Abridged Edition Checklist Approved by SAFEbuilt 02/13/2023 3:37:30 PM Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jan-30 08:51:53 Rig ht-Su ite® U niv er sal 20 22 22 .0.01 RSU1 5461 Page 1 ...Bell Residence Addition - Estes - Manual JS.rup Calc = MJ8 Front Door faces: E 800 Heinz ParkwayJob:Load Short Form January 30, 2023Date:Entire House VORtech Services, LLCBy: 12.07.2022Plan:Metal Mechanics Inc. 165 S. Madison Ave., Loveland, CO 80537 Phone: 970.203.9954 Project Information Bell ResidenceFor: 800 Heinz Parkway, Estes Park, CO 80517 Design Information InfiltrationClgHtg SimplifiedMethod84-10Outside db (°F) Semi-tightConstruction quality7572Inside db (°F) 1 (Average)Fireplaces982Design TD (°F) H-Daily range 3050Inside humidity (%) 2474Moisture difference (gr/lb) HEATING EQUIPMENT COOLING EQUIPMENT Make Daikin Make Daikin Trade DAIKIN Trade DAIKIN Model 2MXL18QMVJU Cond 2MXL18QMVJU AHRI ref 205663365 Coil AHRI ref 205663365 Efficiency 9.25 HSPF Efficiency 11.4 EER, 15.5 SEER Heating input Sensible cooling Btuh12600 Heating output Btu h @ 47°F18900 Latent cooling Btuh5400 Temperature rise °F38 Total cooling Btuh18000 Actual air flow cfm600 Actual air flow cfm600 Air flow factor cfm/Btuh0.029 Air flow factor cfm/Btuh0.066 Static pressure in H2O0.80 Static pressure in H2O0.80 Space thermostat Load sensible heat ratio 0.95 Ca pacity ba lance po int = 14 °F Backup: Elec baseboard Input = 20692 Btuh, Output = 20692 Btuh, 100 EFF ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft²)(Btuh)(Btuh)(cfm)(cfm) Family Room 232 5451 3825 160 254 Bar 248 4049 543 118 36 Bath 66 1643 0 48 0 Loft 248 4136 977 121 65 Open to Below 0 5225 3707 153 246 Entire House p 794 20506 9052 600 600 Other equip loads 186 20 Equip. @ 0.89 RSM 8074 Latent cooling 492 TOTALS 794 20692 8566 600 600 Approved by SAFEbuilt 02/13/2023 3:37:30 PM Bold/italic values have been manually overridden 2023-Jan-30 08:51:53 Rig ht-Su ite® U niv er sal 20 22 22 .0.01 RSU1 5461 Page 1 ...Bell Residence Addition - Estes - Manual JS.rup Calc = MJ8 Front Door faces: E 800 Heinz ParkwayJob:Building Analysis January 30, 2023Date:Entire House VORtech Services, LLCBy: 12.07.2022Plan:Metal Mechanics Inc. 165 S. Madison Ave., Loveland, CO 80537 Phone: 970.203.9954 Project Information Bell ResidenceFor: 800 Heinz Parkway, Estes Park, CO 80517 Design Conditions Location:CoolingHeatingIndoor: 7572Indoor temp era ture (°F)Craig, Creig-Moffit Field, CO, US 982Design TD (°F)ft7522Elevation: 3050Relative humidity (%)°N41Latitude: Outdoor:24.174.3Moisture difference (gr/lb)CoolingHeating Infiltration:84-10Dry bul b (°F) SimplifiedMethod)H(30-Da ily ra nge (°F) Semi-tightConstruction quality62-We t bu lb (°F) 1 (Average)Fireplaces7.515.0Wind speed (mph) Heating Walls Glazing Doors Ceilings Floors Infiltration Other % of loadBtuhBtuh/ft²Component 25.853484.0Walls 24.1497824.6Glazing 6.9142137.5Doors 3.57231.3Ceilings 7.715842.92.9Floors 31.264524.3Infiltration 00Ducts 00Piping 00Humidification 0.9186Ventilation0Adjustments 100.020692Total Cooling Walls Glazing Doors CeilingsInfiltration Internal GainsOther% of loadBtuhBtuh/ft²Component 2.82530.2Walls 77.7705134.8Glazing 3.02697.1Doors 3.33020.6Ceilings 000Floors 3.02770.2Infiltration 00Ducts 0.220Ventilation 9.9900Internal gains 00Blower 0Adjustments 100.09072Total Latent Cooling Load = 492 Btuh Overall U-va lue = 0.0 65 Btuh/ft²-°F WARNING: window to floor area ratio = 25.5% - more than 25%. Approved by SAFEbuilt 02/13/2023 3:37:30 PM Bold/italic values have been manually overridden 2023-Jan-30 08:51:53 Right-Suite® Universal 2022 22.0.01 RSU15461 Page 1 ...Bell Residence Addition - Estes - Manual JS.rup Calc = MJ8 Front Door faces: E 800 Heinz ParkwayJob:Component Constructions January 30, 2023Date:Entire House VORtech Services, LLCBy: 12.07.2022Plan:Metal Mechanics Inc. 165 S. Madison Ave., Loveland, CO 80537 Phone: 970.203.9954 Project Information Bell ResidenceFor: 800 Heinz Parkway, Estes Park, CO 80517 Design Conditions Location:CoolingHeatingIndoor: 7572Indoor temperature (°F)Craig, Creig-Moffit Field, CO, US 982Design TD (°F)ft7522Elevation: 3050Relative humidity (%)°N41Latitude: Outdoor:24.174.3Moisture difference (gr/lb)CoolingHeating Infiltration:84-10Dry bulb (°F) SimplifiedMethod)H(30-Daily range (°F) Semi-tightConstruction quality62-Wet bulb (°F) 1 (Average)Fireplaces7.515.0Wind speed (mph) GainLossClg HTMHtg HTMInsul RU-valueAreaOr BtuhBtuh/ft²BtuhBtuh/ft²ft²-°F/BtuhBtuh/ft²-°Fft² 360.178644.1330.00.050209ne 760.2214554.1330.00.050352se 340.226514.1330.00.050158sw 1060.1823784.1330.00.050576nw 2520.1953484.1330.00.0501294all 10.040020.00.06231 67921.278724.600.30032ne 19112.736924.600.30015ne 63726.559024.600.30024se 26526.524624.600.30010se 303526.5281424.600.300114sw 14821.217224.600.3007nw 495524.5497824.600.300202all 1909.30100549.26.30.60020se 794.4941623.810.50.29018n 3020.557231.3260.10.016546 Construction descriptions Walls Exterior Wall - R30 2022A: Frm wall, wd ext, 3/8" wood shth, r-30 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions Partition Wall - R20 2020 USE: Frm wall, 5/8" wood shth, r-20 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Windows Window - Fixed - 3030: 2 glazing, clr low-e outr, air gas, insulated vinyl frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht Doors 11J0: Door, mtl fbrgl type 11P0: Door, mtl pur core type Ceilings Roof-R-60AAA: Attic ceiling, asphalt shingles roof mat, r-60 ceil ins, 5/8" gypsum board int fnsh Floors 22B-10tpl: Bg floor, light dry soil, 4' depth, r-10 edge ins 158417.210.00.21092 00 Approved by SAFEbuilt 02/13/2023 3:37:30 PM Bold/italic values have been manually overridden Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jan-30 08:51:53 Right-Suite® Universal 2022 22.0.01 RSU15461 Page 1 ...Bell Residence Addition - Estes - Manual JS.rup Calc = MJ8 Front Door faces: E 800 Heinz ParkwayJob:Project Summary January 30, 2023Date:Entire House VORtech Services, LLCBy: 12.07.2022Plan:Metal Mechanics Inc. 165 S. Madison Ave., Loveland, CO 80537 Phone: 970.203.9954 Project Information Bell ResidenceFor:800 Heinz Parkway, Estes Park, CO 80517 Notes: Design Information Craig, Creig-Moffit Field, CO, USWeather: Winter Design Conditions Summer Design Conditions Outside db °F-10 Outside db °F84Inside db °F72 Inside db °F75 Design TD °F82 Design TD °F9Daily range H Relative humidity %30Moisture difference gr/lb24 Heating Summary Sensible Cooling Equipment Load Sizing Structure Btuh20506 Structure Btuh9052 Ducts Btuh0 Ducts Btuh0Central vent (3 cfm)Btuh186 Central vent (3 cfm)Btuh20 Outside air Outside airHumidificationBtuh0Blower Btuh0 Piping Btuh0Equipment load Btuh20692 Use manufacturer's data n Rate/swing multiplier 0.89InfiltrationEquipment sensible load Btuh8074 Method Latent Cooling Equipment Load SizingSimplified Construction quality Semi-tight1 (Average)Fireplaces Structure Btuh458 Ducts Btuh0Central vent (3 cfm)Btuh34 CoolingHeating Outside air728794Area (ft²)Equipment latent load Btuh492 79128440Volume (ft³)Air changes/hour 0.280.67 Equipment Total Load (Sen+Lat)Btuh8566 Equiv. AVF (cfm)3795 Req. total capacity at 0.70 SHR ton1.0 Heating Equipment Summary Cooling Equipment Summary Make Daikin Make DaikinTradeDAIKINTradeDAIKIN Model 2MXL18QMVJU Cond 2MXL18QMVJUAHRI ref 205663365 Coil AHRI ref 205663365Efficiency9.25 HSPF Efficiency 11.4 EER, 15.5 SEER Heating input Sensible cooling Btuh12600Heating output Btuh @ 47°F18900 Latent cooling Btuh5400 Temperature rise °F38 Total cooling Btuh18000Actual air flow cfm600 Actual air flow cfm600 Air flow factor cfm/Btuh0.029 Air flow factor cfm/Btuh0.066Static pressure in H2O0.80 Static pressure in H2O0.80 Space thermostat Load sensible heat ratio 0.95Capacity balance point = 14 °F Backup: Elec baseboardInput = 20692 Btuh, Output = 20692 Btuh, 100 EFF Approved by SAFEbuilt 02/13/2023 3:37:30 PM Bold/italic values have been manually overridden 2023-Jan-30 08:51:54 Rig ht-Su ite® U niv er sal 20 22 22 .0.01 RSU1 5461 Page 1 ...Bell Residence Addition - Estes - Manual JS.rup Calc = MJ8 Front Door faces: E 800 Heinz ParkwayJob:AED Assessment January 30, 2023Date:Entire House VORtech Services, LLCBy: 12.07.2022Plan:Metal Mechanics Inc. 165 S. Madison Ave., Loveland, CO 80537 Phone: 970.203.9954 Project Information Bell ResidenceFor: 800 Heinz Parkway, Estes Park, CO 80517 Design Conditions Location:CoolingHeatingIndoor: 7572Indoor temp era ture (°F)Craig, Creig-Moffit Field, CO, US 982Design TD (°F)ft7522Elevation: 3050Relative humidity (%)°N41Latitude: Outdoor:24.174.3Moisture difference (gr/lb)CoolingHeating Infiltration:84-10Dry bul b (°F) )H(30-Da ily ra nge (°F) 62-We t bu lb (°F) 7.515.0Wind speed (mph) Test for Adequate Exposure Diversity Hourly Glazing Load Hourly Average AED limit Gl a z i n g l o a d ( B t u h ) Hour of Day 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 8 9 10 11 12 13 14 15 16 17 18 19 20 Maximum hourly glazing load exceeds average by 46.2%. House does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 2096 Btuh (PFG - ALP) Approved by SAFEbuilt 02/13/2023 3:37:30 PM Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jan-30 08:51:54Right-Su ite® U niv er sal 20 22 22 .0.01 RSU1 5461 Page 1...Bell Residence Addition - Estes - Manual JS.rup Calc = MJ8 Front Door faces: E 800 Heinz ParkwayJob:Right-J® W or ksheet January 30, 2023Date:Entire House VORtech Services, LLCBy:12.07.2022Plan:Metal Mechanics Inc. 165 S. Madison Ave., Loveland, CO 80537 Phone: 970.203.9954 1 Room name Entire House Family Room 2 Exposed wall 184.0 ft 45.0 ft 3 Room height 10.6 pft 8.0 heat/coolft 4 Room dimensions ft16.0x14.5 5 Room area 794.0 f t²232.0 f t² Ty Construction U-value Or HTM Area (f t²)Load Area (f t²)Load number (Bt uh/f t²-°F)(Bt uh/f t²-°F)(Bt uh/f t²)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW Exterior Wall - R30 0.050Exterior Wall - R30 0.050 nene 4.134.13 0.170.17 256 209 864 36 0 0 0 0 .GG Window - Fixed - 303 0.300Window - Fixed - 303 0.300 nene 24.6024.60 21.2121.21 32 0 787 679 0 0 0 0 .GG Window - Operable -0.300Window - Operable -0.300 nene 24.6024.60 12.7212.72 15 0 369 191 0 0 0 0 .WW Exterior Wall - R30 0.050Exterior Wall - R30 0.050 sese 4.134.13 0.220.22 407 352 1455 76 116 82 339 18 1 1 GG Window - Fixed - 303 0.300Window - Fixed - 303 0.300 sese 24.6024.60 26.5426.54 24 0 590 637 24 0 590 637 GG Window - Operable -0.300Window - Operable -0.300 sese 24.6024.60 26.5426.54 10 0 246 265 10 0 246 265 DD 11J011J0 0.6000.600 sese 49.2049.20 9.309.30 20 20 1005 190 0 0 0 0 WW Exterior Wall - R30 0.050Exterior Wall - R30 0.050 swsw 4.134.13 0.220.22 272 158 651 34 128 88 364 19 GG Window - Fixed - 303 0.300Window - Fixed - 303 0.300 swsw 24.6024.60 26.5426.54 114 0 2814 3035 40 0 984 1061 WW Exterior Wall - R30 0.050Exterior Wall - R30 0.050 nwnw 4.134.13 0.180.18 583 576 2378 106 116 109 450 24 GG Window - Operable -0.300Window - Operable -0.300 nwnw 24.6024.60 21.2121.21 7 0 172 148 7 0 172 148 PP Partition Wall - R20 0.062Partition Wall - R20 0.062 --0.000.00 0.040.04 48 31 0 1 0 0 0 0 DD 11P011P0 0.2900.290 nn 23.7823.78 4.494.49 18 18 416 79 0 0 0 0 CC Roof-R-60AAARoof-R-60AAA 0.0160.016 --1.321.32 0.550.55 546 546 723 302 0 0 0 0 FF 22B-10tpl22B-10tpl 0.2100.210 --17.2217.22 0.000.00 546 92 1584 0 232 45 775 0 6 c) AED excursion 2096 680 Envelope loss/gain 14054 7875 3920 2853 12 a)Infiltration 6452 277 1531 72 b)Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 900 900 Subtotal (lines 6 to 13)20506 9052 5451 3825 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 0 0 14 Subtotal 20506 9052 5451 3825 15 Duct loads 0%0%0 0 -0%0%0 0 Total room load 20506 9052 5451 3825 Air required (cfm)Air required (cfm)600 600 160 254 Approved by SAFEbuilt 02/13/2023 3:37:30 PM Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jan-30 08:51:54Right-Su ite® U niv er sal 20 22 22 .0.01 RSU1 5461 Page 2...Bell Residence Addition - Estes - Manual JS.rup Calc = MJ8 Front Door faces: E 800 Heinz ParkwayJob:Right-J® W or ksheet January 30, 2023Date:Entire House VORtech Services, LLCBy:12.07.2022Plan:Metal Mechanics Inc. 165 S. Madison Ave., Loveland, CO 80537 Phone: 970.203.9954 1 Room name Bar Bath 2 Exposed wall 30.0 ft 17.0 ft 3 Room height 8.0 heat/coolft 8.0 heat onlyft 4 Room dimensions ft16.0x15.5 ft6.0x11.0 5 Room area 248.0 f t²66.0 f t² Ty Construction U-value Or HTM Area (f t²)Load Area (f t²)Load number (Bt uh/f t²-°F)(Bt uh/f t²-°F)(Bt uh/f t²)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW Exterior Wall - R30 0.050Exterior Wall - R30 0.050 nene 4.134.13 0.170.17 80 71 293 15 48 42 174 0 .GG Window - Fixed - 303 0.300Window - Fixed - 303 0.300 nene 24.6024.60 21.2121.21 0 0 0 0 0 0 0 0 .GG Window - Operable -0.300Window - Operable -0.300 nene 24.6024.60 12.7212.72 9 0 221 191 6 0 148 0 .WW Exterior Wall - R30 0.050Exterior Wall - R30 0.050 sese 4.134.13 0.220.22 36 16 64 3 0 0 0 0 1 1 GG Window - Fixed - 303 0.300Window - Fixed - 303 0.300 sese 24.6024.60 26.5426.54 0 0 0 0 0 0 0 0 GG Window - Operable -0.300Window - Operable -0.300 sese 24.6024.60 26.5426.54 0 0 0 0 0 0 0 0 DD 11J011J0 0.6000.600 sese 49.2049.20 9.309.30 20 20 1005 190 0 0 0 0 WW Exterior Wall - R30 0.050Exterior Wall - R30 0.050 swsw 4.134.13 0.220.22 0 0 0 0 0 0 0 0 GG Window - Fixed - 303 0.300Window - Fixed - 303 0.300 swsw 24.6024.60 26.5426.54 0 0 0 0 0 0 0 0 WW Exterior Wall - R30 0.050Exterior Wall - R30 0.050 nwnw 4.134.13 0.180.18 124 124 512 27 88 88 364 0 GG Window - Operable -0.300Window - Operable -0.300 nwnw 24.6024.60 21.2121.21 0 0 0 0 0 0 0 0 PP Partition Wall - R20 0.062Partition Wall - R20 0.062 --0.000.00 0.040.04 48 31 0 1 0 0 0 0 DD 11P011P0 0.2900.290 nn 23.7823.78 4.494.49 18 18 416 79 0 0 0 0 CC Roof-R-60AAARoof-R-60AAA 0.0160.016 --1.321.32 0.550.55 0 0 0 0 66 66 87 0 FF 22B-10tpl22B-10tpl 0.2100.210 --17.2217.22 0.000.00 248 30 517 0 66 17 293 0 6 c) AED excursion -11 0 Envelope loss/gain 3029 495 1065 0 12 a)Infiltration 1021 48 578 0 b)Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13)4049 543 1643 0 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 0 0 14 Subtotal 4049 543 1643 0 15 Duct loads -0%0%0 0 -0%0%0 0 Total room load 4049 543 1643 0 Air required (cfm)Air required (cfm)118 36 48 0 Approved by SAFEbuilt 02/13/2023 3:37:31 PM Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jan-30 08:51:54Right-Su ite® U niv er sal 20 22 22 .0.01 RSU1 5461 Page 3...Bell Residence Addition - Estes - Manual JS.rup Calc = MJ8 Front Door faces: E 800 Heinz ParkwayJob:Right-J® W or ksheet January 30, 2023Date:Entire House VORtech Services, LLCBy:12.07.2022Plan:Metal Mechanics Inc. 165 S. Madison Ave., Loveland, CO 80537 Phone: 970.203.9954 1 Room name Loft Open to Below 2 Exposed wall 47.0 ft 45.0 ft 3 Room height 8.0 heat/coolft 9.0 heat/coolft 4 Room dimensions ft16.0x15.5 ft16.0x14.5 5 Room area 248.0 f t²0 f t² Ty Construction U-value Or HTM Area (f t²)Load Area (f t²)Load number (Bt uh/f t²-°F)(Bt uh/f t²-°F)(Bt uh/f t²)(Bt uh/f t²)or perimeter (ft)(Btuh)or perimeter (ft)(Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 WW Exterior Wall - R30 0.050Exterior Wall - R30 0.050 nene 4.134.13 0.170.17 128 96 397 21 0 0 0 0 .GG Window - Fixed - 303 0.300Window - Fixed - 303 0.300 nene 24.6024.60 21.2121.21 32 0 787 679 0 0 0 0 .GG Window - Operable -0.300Window - Operable -0.300 nene 24.6024.60 12.7212.72 0 0 0 0 0 0 0 0 .WW Exterior Wall - R30 0.050Exterior Wall - R30 0.050 sese 4.134.13 0.220.22 124 124 512 27 131 131 539 28 1 1 GG Window - Fixed - 303 0.300Window - Fixed - 303 0.300 sese 24.6024.60 26.5426.54 0 0 0 0 0 0 0 0 GG Window - Operable -0.300Window - Operable -0.300 sese 24.6024.60 26.5426.54 0 0 0 0 0 0 0 0 DD 11J011J0 0.6000.600 sese 49.2049.20 9.309.30 0 0 0 0 0 0 0 0 WW Exterior Wall - R30 0.050Exterior Wall - R30 0.050 swsw 4.134.13 0.220.22 0 0 0 0 144 70 288 15 GG Window - Fixed - 303 0.300Window - Fixed - 303 0.300 swsw 24.6024.60 26.5426.54 0 0 0 0 74 0 1830 1974 WW Exterior Wall - R30 0.050Exterior Wall - R30 0.050 nwnw 4.134.13 0.180.18 124 124 512 27 131 131 539 28 GG Window - Operable -0.300Window - Operable -0.300 nwnw 24.6024.60 21.2121.21 0 0 0 0 0 0 0 0 PP Partition Wall - R20 0.062Partition Wall - R20 0.062 --0.000.00 0.040.04 0 0 0 0 0 0 0 0 DD 11P011P0 0.2900.290 nn 23.7823.78 4.494.49 0 0 0 0 0 0 0 0 CC Roof-R-60AAARoof-R-60AAA 0.0160.016 --1.321.32 0.550.55 248 248 328 156 232 232 307 146 FF 22B-10tpl22B-10tpl 0.2100.210 --17.2217.22 0.000.00 0 0 0 0 0 0 0 0 6 c) AED excursion -8 1435 Envelope loss/gain 2537 902 3503 3626 12 a)Infiltration 1599 75 1722 81 b)Room ventilation 0 0 0 0 13 Internal gains:Occupants @ 230230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13)4136 977 5225 3707 Less external loadLess external load 0 0 0 0 Less transferLess transfer 0 0 0 0 RedistributionRedistribution 0 0 0 0 14 Subtotal 4136 977 5225 3707 15 Duct loads -0%0%0 0 -0%0%0 0 Total room load 4136 977 5225 3707 Air required (cfm)Air required (cfm)121 65 153 246 Approved by SAFEbuilt 02/13/2023 3:37:31 PM Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2023-Jan-30 08:51:54 Rig ht-Su ite® U niv er sal 20 22 22 .0.01 RSU1 5461 Page 1 ...Bell Residence Addition - Estes - Manual JS.rup Calc = MJ8 Front Door faces: E 800 Heinz ParkwayJob:Loads for Multiple Orientations January 30, 2023Date:Entire House VORtech Services, LLCBy: 12.07.2022Plan:Metal Mechanics Inc. 165 S. Madison Ave., Loveland, CO 80537 Phone: 970.203.9954 Project Information Bell ResidenceFor: 800 Heinz Parkway, Estes Park, CO 80517 Design Conditions Location:CoolingHeatingIndoor: 7572Indoor temp era ture (°F)Craig, Creig-Moffit Field, CO, US 982Design TD (°F)ft7522Elevation: 3050Relative humidity (%)°N41Latitude: Outdoor:24.174.3Moisture difference (gr/lb)CoolingHeating Infiltration:84-10Dry bul b (°F) )H(30-Da ily ra nge (°F) 62-We t bu lb (°F) 7.515.0Wind speed (mph) Front Door North Northeast East Southeast South Southwest West Northwest Sensible Load (Btuh)7129 6962 8074 8346 7067 5570 5907 6639 Latent Load (Btuh)492 492 492 492 492 492 492 492 Total Load (Btuh)7621 7454 8566 8838 7559 6062 6399 7131 Heating AVF (cfm)600 600 600 600 600 600 600 600 Cooling AVF (cfm)600 600 600 600 600 600 600 600 Building Orientation Cooling Load To t a l C o o l i n g L o a d ( B t u h ) Direction Front Door faces 0 2000 4000 6000 8000 10000 N NE E SE S SW W NW Front Door faces EastCurrent Orientation: Front Door faces SoutheastHighest Cooling Load: Approved by SAFEbuilt 02/13/2023 3:37:31 PM Job #: 800 Heinz Parkway Performed by VORtech Services, LLC for: Bell Residence 800 Heinz Parkway Estes Park, CO 80517 Metal Mechanics Inc. 165 S. Madison Ave. Loveland, CO 80537 Phone: 970.203.9954 Scale: 1 : 68 Page 1 Right-Suite® Universal 2022 22.0.01 RSU15461 2023-Jan-30 08:52:14 ...Addition - Estes - Manual JS.rup N Loft LoftOpen to Below 0.5T indoor unit Approved by SAFEbuilt 02/13/2023 3:37:31 PM Job #: 800 Heinz Parkway Performed by VORtech Services, LLC for: Bell Residence 800 Heinz Parkway Estes Park, CO 80517 Metal Mechanics Inc. 165 S. Madison Ave. Loveland, CO 80537 Phone: 970.203.9954 Scale: 1 : 68 Page 2 Right-Suite® Universal 2022 22.0.01 RSU15461 2023-Jan-30 08:52:14 ...Addition - Estes - Manual JS.rup N Main Existing Garage BarFamily Room Bath 1.0T indoor unit 1.5T heat-pump @grade See 24"x36" design drawing attached, for electric baseboard heaters. Approved by SAFEbuilt 02/13/2023 3:37:31 PM M-1.0 Approved by SAFEbuilt 02/13/2023 3:37:18 PM